HomeMy WebLinkAbout20042863.tiff CHANGE ORDER NO. 3 Weld County Bridge 27/58A Over Sheep Draw Date: Project: Weld County Bridge WEL027.0-058.0A over Sheep Draw. The project is located on Two Rivers Parkway or 83rd Ave.just south of West 10th St., Greeley, CO and is funded with a Federal Bridge Replacement Grant. Sear-Brown was selected as the consultant for the project to provide engineering design and construction management services. Owner: Weld County,Colorado Consultant: Stantec Inc.,(Sear-Brown)209 S.Meldrum,CO 80521 The following change is hereby made to the Contract Documents: o The Consultant's company name "Sear-Brown" shall be changed to "Stantec Inc.". The company Sear- Brown was purchased by Stantec Inc. during the course of the contract. (See attached Exhibit A) o Additional services to the original Scope of Work were required. Additional services included: (See attached Exhibit B) • Resetting section corner in State Hwy 34 • Supplementary surveying for landowner's utilities and driveway • Design landowner's leach field impacted by the project • Design landowner's private waterline impacted by the project • Change hourly rate of pay for Stantec's construction staff CHANGE TO CONTRACT PRICE: Original Contract Price: $ 169,718.00 Current Contract Price adjusted by previous Change Order: $ 177,174.67 The Contract Price due to this Change Order will be increased by: $ 9,032.00 The new Contract Price,including this Change Order,will be$ 186,206.67 CHANGE TO CONTRACT TIME: The Contract time will be increased by 0 calendar days. RECOMMENDED: \�� S Owner Representative: - Date: EP 2 7 2004 Ro ert D.Masden,Chair p Engineer: /4 Date: 9/ac/�7 APPROVALS Consultant: Sttaanntec Inc. By: ' % " --Z(//_)�y/2 Date: (f 5- /o 91 Title: ---R,_„ .-,,, .- /L'�n r c.csLe c .4C50('/CIA-C_ 2004-2863 � ec : ✓U%. ?CC_,,f.:Ty4.,1f-, c. StaMec Consulting Inc. NA. xA I S 1 1 209 South Meldrum Street Fort Collins CO 80521-2603 Tel:(970)482-5922 Fax:(970)482-6368 stantec.com . NMILOAr4 .,g \s > Stantec �\ Wayne Howard June 25, 2004 Attention: Accounts Payable 1111 H. Street, PO Box 758 Greeley, CO 80632-0758 To Whom It May Concern: Your Reference: Weld County Sheep Draw & WCR27 Bridge Please be informed that on April 2, 2004, Stantec Technology International Inc. acquired The Sear-Brown Group, Inc. ("Sear-Brown"), with the result that Sear-Brown is a wholly owned subsidiary of Stantec Technology International Inc. Stantec Technology International Inc. reassigned Sear-Brown's Colorado',, operations to Stantec Consulting, Inc., also a wholly owned subsidiary of Stantec Technology International, Inc. Stantec Consulting Inc. is the western states operating entity for the Stantec group of companies. !, Stantec will maintain Sear-Brown's present geographic locations with no interruption in operations or client services, and all future projects and operations will be under the Stantec name. Stantec and its affiliates offer '. knowledge-based solutions for infrastructure and facilities projects through professional services in management, planning, design, and implementation, provided by more than 4,000 employees in over 52 locations, principally in North America. Above all else, Stantec's primary focus is client satisfaction. Accordingly, please be assured that the continuity of your current project will be unaffected by this new arrangement. The personnel currently working on your project will not change, and except for the assignment requested herein, no other aspect will be affected. In this regard, we request your approval to assign the above-noted contract in the name of Sear-Brown Group, Inc to Stantec Consulting Inc. Kindly indicate your consent to the request for assignment by returning a duplicate copy of this letter, executed on behalf of Wayne Howard. Sincerely, Stantec Consulting, Inc. Bret A. Cummock, P.E. Senior Associate 1 The undersigned hereby consents to the assignment of the Contract noted above to Stantec Consulting, Inc. effective April 2, 2004. City 60.44 L1 N TA) ibli B Stantec Inc. 10160-112 Street Edmonton AB T5K 2L6 Tel:(780)917-7000 Fax:(780)917-7330 D E c js I n vq stantec.com l�J IS s. . AUG 2 7 • WELD COUNTY PUBLIC WORKS DEPT Stantec August 23, 2004 File: 114005, Contract Wayne Howard Weld County Public Works Department 1111 H Street Greeley, CO 80632-0758 3 Reference: RE: Bridge Project WEL027.0-058.0A, Change Order #x Request Dear Mr. Howard: Thank you for allowing us to submit the following fee as additional services the Sheep Draw Bridge Project (Bridge 27/58A). The fees below cover additional services rendered during original design, and increases related to an updated Specific Rate of Pay table to be utilized for final design and construction administration. Additional Services during original Desikn • Addition survey that was needed at the Morgan's property to perform a design of his septic tank and a driveway entering the rear of his house $1,598 • Design adjustments to the Morgan leach field were required in order to remove a leach line that was within the proposed right-of-way and replace a leach line outside of the proposed right-of-way. Charge includes work performed by Stantec, Terracon and John Brunner & Company. $3,545 • Additional design effort was required to assemble a set of plans for the construction of a waterline service to the Morgan property. This was needed in order to allow Mr. Morgan to install a new waterline prior to the start of the bridge project. $980 fr t„b 1- B Stantec August 23,2004 Page 2 of 2 Reference: Budget Update for Bridge Project WEL027.0-058.0A • Weld County requested that Stantec set a survey corner within the intersection of US-34 and WCR 27. $1,525 Additional Fee for Final Design and Construction Administration • Weld County has agreed to compensate Stantec for final design and construction administration based on an updated rate of pay. This is due to normal salary increases since the signing of the original contract in August 2001 $903 • Additional mileage will be required in order to allow Stantec to visit the construction site during construction. This is due to the fact that Bridge 27/58A and 13/27A were not constructed simutaniously $481 3 Total requested for Change Order # $9,032 Contract Summary: Original Budget $169,718 Additional Services outside of the scope Change Order#1 (Preble's Mouse Investigation) 7,457 Change Order#2 (Cknnjc sVafF e4' 9032,O C�ryrsc OrcLcr 43 '1,0 .2 Total Budget $ 186,207 Sincerely, STANTEC INC. l�ff mple le Tel: 970-482-5922 Fax: 970 482 6368 Attachments: SRP, SRP Comparison, &Additional Cost spreadsheets i„ ; B ADDITIONAL COSTS 23-Aug-04 Sheep Draw Additional Services Labor Category Pro)Mgr Pr0j Eng, SR Des,Eng, Survey Crew CADD:I Clencal:Expenses TASK TOTAL. Lahti Sur Rate/hour $90 $55 $70 $75 $50 $40 SURVEY 1.Morgan Property 1 12 3 8.5 $ 1,598 2.Set Corner in US-34 2 4.5 8 $ 430 $ 1,525 DESIGN 4.Leach Field Design 16 7 $ 1,825 5.Leach Field Expenses Terracon($550+$670+$200) $ 1,420 $ 1,420 Brunner $ 300 $ 300 6.Waterline Design 4 4 8 $ 980 Final Design Construction 7.Increase in specific rate of pay $ 903 $ 903 8.Additional Milage $ 481 $ 481 Total Additional Design $ 9,032 Item#1 through#6 were approved through a Weld County letter dated October 15,2003 Item#7 is addition cost based on Stantec's updated Rate of Pay Item#8 are additional direct miles required for one weekly visit for a duration of 6 months 1 Add Ser SD-8-23-04 xIs 1, i,,s + 6 STANTEC'S SPECIFIC RATE OF PAY TABLE-COMPARISON PROJECT NUMBER: Bridge 27/58A LOCATION: Sheep Draw FIRM NAME: Stantec NAME OF PREPARER: Jeff Temple PHONE No: (970)482-5922 PREPARATION DATE: 23-Aug-04 1.SPECIFIC LABOR RATES SHADED CELLS REPRESENT UPDATED;INFORMATIOM -I1 ORIGINAL NEW. ORIGINAL NEW ORIGINAL NEW EMPLOYEE EMPLOYEE DIRECT SALARY DIRECT SALARY INDIRECT INDIRECT ORIGINAL #dk1�t SPECIFIC RATE SPEEIFIC RATE NAME CLASSIFICATION COST/HOUR ;OST/MQUR COST(141%) COST(1.6034) FEE(12%) HOUR Oti Gary Oberling Engineering Manager $40.70 $42.84 " $57.39 $66.54' $11.77 5 Jeff Temple Senior Engineer I $33.20 $36.08 $46.81 357,73 $9.60 _ 31!3'3 ... , 5109.86 $124:75 (Joe Delich) Engineer $18.20 $29.00 $25.66 ',Moo $5.26 $89.61 405, Cortni Ward II :• ''°. llICi is,r tl $49.13 ;166:96 Keith Smith Construction Administrator $20.10 $22_B2 $28.34 ;•336.51 $5.81 ._l!`,.II3 :+:,.°I;. $54.25 16645 2.OTHER DIRECT COST RATES Vehicle Expense $0.37 per mile 3 ESTIMATED HOURS FOR DESIGN COMPLETION AND CONSTRUCTION ADMINISTRATION ORIGINAL NEW DIFFERENCE ADDITIONAL EMPLOYEE ESTIMATED HOURS SPECIFIC RATE SPECIFIC RATE SPECIFIC RATE COST WITH ' NAME ON 13/26A $/HOUR S/HOUR ti/HOUR UPDATED SPR Gary Oberling 60 $40.70 $42.84 $2.14 $128.40 Jeff Temple 140 $33.20 $36.08 $2.88 $403.20 Cortni Ward(Joe Delich) 40 $18.20 $23.00 $4.80 $192.00 Keith Smith 66 $20.10 $22.82 $2.72 $179.52 Total additional Cost due to updated SRP Table $903.12 3.ADDITIONAL EXPENSES DUE TO SEPARATE CONSTRUCTION PROJECT Mileage Jeff 26trips X 50 Miles/Trip x$0.37= $481.00 Total additional expenses $481.00 APPENDIX"B" STANTEC'S SPECIFIC RATE OF PAY TABLE PROJECT NUMBER: 27/58A(C030-021) LOCATION : Sheep Draw Bridge FIRM NAME: Stantec NAME OF PREPARER: Jeff Temple PHONE No: (970)482-5922 SCOPE OF WORK DATE: 16-Jul-04 1. SPECIFIC LABOR RATES EMPLOYEE EMPLOYEE DIRECT SALARY INDIRECT SPECIFIC RATE NAME CLASSIFICATION COST/HOUR COST(160%) FEE(12%) $/HOUR Dale Stein Senior Engineer I $39.04 $62.46 $12.18 $113.68 Gary Oberling Engineering Manager $42.84 $68.54 $13.37 $124.75 Jeff Temple Senior Engineer I $36.08 $57.73 $11.26 $105.06 Cortni Ward Engineer II $23.00 $36.80 $7.18 $66.98 Keith Smith Construction Administrator $22.82 $36.51 $7.12 $66.45 MEMORANDUM WIWD TO: Clerk to the Board DC. DATE: September 20, 2004 FROM Frank B. Hempen, Jr., P.E. COLORADO Diector of Public Works/County Engineer SUBJECT: Item for Agenda Please submit the following for the Board's next agenda: Change Order No. 3 for Weld County Bridge 27/58A over Sheep Draw. Weld County has contracted with Stantec for design and construction inspection services for the bridge replacement project for the amount of $169,718.00. Change Order No. 1 increased the contract amount by $7,456.67. The change order included additional environmental clearance issues not anticipated in the original scope of work. Change Order No. 2 was approved and allowed Stantec to make changes in staff working on the project. This change order did not change the contract amount. Attached is Change Order No. 3 and support documentation. This change order will officially change the name on the original contract from Sear-Brown to Stantec, Inc. As stated in Exhibit A, Sear-Brown has changed their name to Stantec during the course of this contract. Also, this change order will increase the contract amount by $9,032.00 for additional services that were outside the original scope of work. The additional services include the following: • Resetting section corner in State Hwy 34 • Supplementary surveying for landowner's utilities and driveway • Design landowner's leach field impacted by the project • Design landowner's private waterline impacted by the project • Change hourly rate of pay for Stantec's construction staff The new contract amount will be$186,206.67. The project is funded with a Federal Bridge Replacement Grant and the current project cost and estimates, including this change order, are within the project budget. The project is scheduled to be advertised for construction early October, 2004 with completion in spring of 2005. - Hello