Loading...
HomeMy WebLinkAbout20053176.tiff RESOLUTION RE: GRANT CHANGE OF ZONE, PZ#1074, FROM A(AGRICULTURAL) ZONE DISTRICT TO PUD (PLANNED UNIT DEVELOPMENT) ZONE DISTRICT FOR NINE (9) RESIDENTIAL LOTS WITH E (ESTATE) ZONE USES - FRANK AND LORETTA WRIGHT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS,a public hearing was held on the 23rd day of November,2005,at 10:00 a.m.for the purpose of hearing the application of Frank and Loretta Wright, 22 Seven Hills Drive, Boulder, Colorado 80302, requesting a Change of Zone from the A(Agricultural)Zone District to the PUD (Planned Unit Development)Zone District for nine(9)residential lots with E(Estate)Zone uses,for a parcel of land located on the following described real estate, to-wit: Lot B of Amended Recorded Exemption#3381;being part of the S1/2NW1/4 of Section 5, Township 1 North, Range 68 West of the 6th P.M.,Weld County, Colorado WHEREAS, the applicant was present at said hearing, and WHEREAS, Section 27-6-120 of the Weld County Code provides standards for review of said Change of Zone, and WHEREAS,the Board of County Commissioners heard all the testimony and statements of those present,studied the request of the applicant and the recommendations of the Weld County Planning Commission,and,having been fully informed,finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 27-5-30 of the Weld County Code. 2. The request is in conformance with Section 27-6-120.D as follows: a. Section 27-6-120.D.5.a - The proposal is consistent with any Intergovernmental Agreement in effect influencing the PUD and Chapter 19 (Coordinated Planning Agreements), Chapter 22 (Comprehensive Plan), Chapter 23(Zoning),Chapter 24(Subdivision),and Chapter 26(Mixed Use Development)of the Weld County Code. The proposed site is not influenced by an Intergovernmental Agreement. The proposal is consistent with the aforementioned documents as follows: 1) Section 22-3-50.B.1 (P.Goal 2)states, "Require adequate facilities and services to assure the health,safety,and general welfare of the present and future residents of the County." The proposed PUD will 2005-3176 00; PL, (1 , /}t_Ce2P) i4PPL PL1798 CHANGE OF ZONE #1074 FROM A (AGRICULTURAL) TO PUD - FRANK AND LORETTA WRIGHT PAGE 2 be serviced by the Left Hand Water District for potable water and Individual Sewage Disposal Systems will handle the effluent flow. b. Section 27-6-120.D.5.b - The uses which will be allowed in the proposed PUD will conform with the Performance Standards of the PUD Zone District contained in Chapter 27, Article II, of the Weld County Code. 1) Section 27-2-40, Bulk requirements -The applicant has chosen to adhere to the bulk requirements of the E(Estate)Zone District for the nine (9) residential lots. 2) Section 27-6-90,Signage-Section 27-2-90.C states,"Signage within a PUD shall adhere to all requirements in Chapters 23,26,and 27 of the Weld County Code, if applicable." The Department of Planning Services has consistently required that subdivision signs adhere to the size standards of signs for public and quasi-public uses, which is 32-square feet, per Section 23-4-80 of the Weld County Code. The applicant is proposing a sign that is larger than 32 square feet. The Department of Planning Services recommends that the size of the PUD entrance sign not exceed 32 square feet. 3) Section 27-2-190, Urban Scale Development, states, "Urban scale developments are developments exceeding nine (9) lots and/or located in close proximity to existing PUDs,subdivisions, municipal boundaries or urban growth corridors and boundaries." The subject property borders the Carmacar Estates, Peaks at Mountain View, and Summit at Mountain View Subdivisions to the west and, therefore, is considered an urban scale development. c. Section 27-6-120.D.5.c-The uses which will be permitted will be compatible with the existing or future development of the surrounding area as permitted by the existing zoning, and with the future development as projected by Chapter 22 of the Weld County Code or master plans of affected municipalities. The Towns of Frederick and Erie,and the City of Dacono, in their referrals dated June 10, 2005, May 25, 2005, and June 15, 2005, respectively, indicated no conflicts with their interests. d. Section 27-6-120.D.5.d - The PUD Zone District shall be serviced by an adequate water supply and sewage disposal system in compliance with the Performance Standards in Chapter 27,Article II,of the Weld County Code. The applicant has a signed Subdivision/Multiple Tap Purchase Agreement with the Left Hand Water District. The Office of the State Engineer,Division of Water Resources, in its referral dated June 9, 2005, indicated the proposed water supply would not cause material injury to existing water rights, and the water supply is expected to be adequate. However, the Division of Water Resources indicated the requirement, as stated in the 2005-3176 PL1798 CHANGE OF ZONE #1074 FROM A (AGRICULTURAL) TO PUD - FRANK AND LORETTA WRIGHT PAGE 3 Water Supply Information Summary, (.085 acre feet per lot) is low. The Division of Water Resources is requesting the applicant confirm or correct this estimate and submit a copy of the water tap agreement to the Division. The Department of Public Health and Environment indicated, in its referral dated June 15,2005,that the proposed PUD has satisfied Chapter 27 of the Weld County Code in regard to water and sewer service. e. Section 27-6-120.D.5.e-Street or highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the uses of the proposed PUD Zone District. The proposed PUD will be accessing off of Weld County Road 3. The Department of Public Works, in its referral dated June 10, 2005, indicated Weld County Road 3 is classified as a minor arterial road which requires 110-feet of right-of-way. The Department of Public Works is requiring that this right-of-way(55-feet from the centerline of Weld County Road 3) be dedicated on the final plat. f. Section 27-6-120.D.5.f-An Off-Site Road Improvements Agreement and an On-Site Improvements Agreement are in compliance with Chapter24 of the Weld County Code,and a Road Improvements Agreement is complete and has been submitted,if applicable. The applicant is required to enter into an Improvements Agreement and post adequate collateral for on-site improvements and enter into an Off-Site Improvements Agreement to proportionately share the cost of improvements to Weld County Road 3. g. Section 27-6-120.D.5.g - There has been compliance with the applicable requirements contained in Chapter 23 of the Weld County Code regarding overlay districts, commercial mineral deposits, and soil conditions on the subject site. Effective January 1, 2003, building permits issued on the proposed lots will be required to adhere to the fee structure of the County-Wide Road Impact Program. h. Section 27-6-120.D.5.h - Consistency exists between the proposed zone district(s)uses, and Specific Development Guide. The submitted Specific Development Guide accurately reflects the Performance Standards and allowed uses described in the proposed zone district, as described previously. The applicant is requesting that the Final Plan be administratively reviewed,and the Department of Planning Services and Weld County Board of Commissioners support this request. NOW,THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado,that the application of Frank and Loretta Wright for a Change of Zone from the A(Agricultural)Zone District to the PUD (Planned Unit Development)Zone District on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: 1. Prior to recording the Change of Zone plat: 2005-3176 PL1798 CHANGE OF ZONE #1074 FROM A (AGRICULTURAL) TO PUD - FRANK AND LORETTA WRIGHT PAGE 4 A. The plat shall be amended as follows: 1) All pages of the plat shall be labeled PZ-1074. 2) Weld County Road 3 requires 55 feet of right-of-way west of the centerline. The existing right-of-way,and the documents creating the right-of-way for Weld County Road 3, shall be indicated on the plat. 3) "Weld County's Right to Farm",as provided in Appendix 22-E of the Weld County Code, shall be placed on any recorded plat. 4) Front,side,and rear utility easements are not required to be indicated on the Change of Zone plat and shall be removed. 5) The existing 30-foot access easement for emergency/oil and gas access along the south property line, and the proposed 30-foot oil and gas access easement along the eastern end of the subdivision, shall be designated on the Change of Zone plat separately from Tract C. 6) The PUD entrance sign shall be indicated as no larger than 32-square feet. B. The applicant shall attempt to address the requirements of the Boulder Valley Soil Conservation District, as stated in its referral received June 16, 2005. Written evidence of such shall be provided to the Department of Planning Services. C. The applicant shall address the requirements of the Weld County Sheriffs Office, as stated in its referral received May 23, 2005. Written evidence of such shall be provided to the Department of Planning Services. D. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. 2. The Change of Zone is conditional upon the following,and that each shall be placed on the Change of Zone plat as notes prior to recording: A. The Change of Zone, PZ#1074, is from the A(Agricultural)Zone District to the PUD(Planned Unit Development)Zone District for nine(9)residential lots with E(Estate)Zone uses, as indicated in the application materials on file. The PUD will be subject to,and governed by,the Conditions of Approval stated hereon and all applicable Weld County regulations. B. A Homeowners'Association shall be established prior to the sale of any lot. Membership in the Association is mandatory for each parcel owner. The 2005-3176 PL1798 CHANGE OF ZONE #1074 FROM A (AGRICULTURAL) TO PUD - FRANK AND LORETTA WRIGHT PAGE 5 Association is responsible for liability insurance,taxes and maintenance of open space, streets, private utilities, and other facilities. Open space restrictions are permanent. C. Weld County's Right to Farm,as delineated on this plat,shall be recognized at all times. D. Signs shall adhere to Section 23-4-80 of the Weld County Code. These requirements shall apply to all temporary and permanent signs. E. Water service shall be obtained from the Left Hand Water District. F. This subdivision is in rural Weld County and is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment,Water Quality Control Division,and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. G. A Stormwater Discharge Permit may be required for a development/ redevelopment/construction site where a contiguous or non-contiguous land disturbance is greater than or equal to one(1)acre in area. The applicant shall contact the Water Control Division of the Colorado Department of Public Health and Environment at www.cdohe.state.co.us/wq/PermitsUnitfor more information. H. During development of the site,all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Department of Public Health and Environment, a Fugitive Dust Control Plan must be submitted. I. In accordance with the Regulations of the Colorado Air Quality Control Commission,any development that disturbs more than five(5)acres of land must incorporate all available and practical methods that are technologically feasible and economically reasonable in order to minimize dust emissions. J. If land development creates more than a 25-acre contiguous disturbance,or exceeds six (6) months in duration, the responsible party shall prepare a Fugitive Dust Control Plan, submit an Air Pollution Emissions Notice, and apply for a permit from the Colorado Department of Public Health and Environment. K. A separate building permit shall be obtained prior to the construction of any building or structure, including entry gates and signs. 2005-3176 PL1798 CHANGE OF ZONE #1074 FROM A (AGRICULTURAL) TO PUD - FRANK AND LORETTA WRIGHT PAGE 6 L. A plan review is required for each building. Plans shall include a floor plan. Residential building plans may be required to bear the wet stamp of a Colorado registered architect or engineer. M. Buildings shall conform to the requirements of the various codes adopted at the time of permit application. Currently,the following have been adopted by Weld County: 2003 International Residential Code, 2003 International Building Code, 2003 International Mechanical Code, 2003 International Plumbing Code,2003 International Fuel Gas Code,2002 National Electrical Code, and Chapter 29 of the Weld County Code. N. Each building will require an engineered foundation based on a site-specific Geotechnical Report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. O. Fire resistance of walls and openings,construction requirements,maximum building height, and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by Chapter 23 of the Weld County Code. P. Effective January 1,2003, building permits issued on the proposed lots will be required to adhere to the fee structure of the County-Wide Road Impact Program. Q. Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction, and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection of the building. R. Installation of utilities shall comply with Section 24-9-10 of the Weld County Code. S. The property owner shall be responsible for complying with the Performance Standards of Chapter 27, Articles II and VIII, of the Weld County Code. T. Weld County Government personnel shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. 2005-3176 PL1798 CHANGE OF ZONE #1074 FROM A (AGRICULTURAL) TO PUD - FRANK AND LORETTA WRIGHT PAGE 7 U. The site shall maintain compliance,at all times,with the requirements of the Weld County Government and the adopted Weld County Code and policies. V. No development activity shall commence on the property, nor shall any building permits be issued, until the Final Plan has been approved and recorded. W. The applicant shall comply with Section 27-8-50 of the Weld County Code, as follows: Failure to submit a Planned Unit Development Final Plan - If a PUD Final Plan application is not submitted within three(3)years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submission of the PUD Final Plan. The Board may extend the date for the submission of the PUD Final Plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board determines that conditions or statements made supporting the original approval of the PUD Zone District have changed, or that the landowner cannot implement the PUD Final Plan,the Board of County Commissioners may, at a public hearing, revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original Zone District. X. The PUD Final Plan shall comply with all regulations and requirements of Chapter 27 of the Weld County Code. 3. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within thirty (30) days of approval by the Board of County Commissioners. With the Change of Zone plat map, the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp(Shape Files),Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4) ... (Group 6 is not acceptable). 4. In accordance with Weld County Code Ordinance 2005-7,approved June 1,2005, should the plat not be recorded within the required sixty(60)days from the date the Board of Commissioners Resolution was signed, a$50.00 recording continuance charge shall added for each additional three (3) month period. 5. At the time of Final Plan submission: A. The applicant shall submit a set of sign standards, as required by Section 27-6-90.E.1 of the Weld County Code, for review and approval. 2005-3176 PL1798 CHANGE OF ZONE #1074 FROM A (AGRICULTURAL) TO PUD - FRANK AND LORETTA WRIGHT PAGE 8 B. The applicant shall submit an On-Site(Private) Improvements Agreement that addresses all improvements associated with this development, for review and approval. C. The applicant shall submit an Off-Site(Public)Improvements Agreement that addresses improvements associated with Weld County Road 3. D. The applicant shall submit development Covenants for Highview Ranch PUD. Language for the preservation and/or protection of the absorption field envelopes shall be placed in the development Covenants. The Covenants shall state that activities such as permanent landscaping, structures, dirt mounds,or other items,are expressly prohibited in the absorption field site. The Covenants shall also address signage requirements and refer to the Weld County Code as delineated in the PZ-1074 application materials. E. The applicant shall provide the Department of Public Works with stamped, signed, and dated final plat drawings. F. The applicant shall provide the Department of Public Works with stamped, signed,and dated final plat drawings and roadway/construction and grading plan drawings, for review and approval. Construction details must be included. Stop signs and streetway sign locations must be shown on the final roadway construction plans. G. The applicant shall provide a pavement design prepared by a professional engineer, along with the Final Plan submittal. H. The applicant shall submit a time frame for construction in accordance to Section 27-2-200 of the Weld County Code. Easements shall be delineated on the final plat in accordance with County standards (Section 24-7-60 of the Weld County Code) and the Utilities Coordinating Advisory Committee recommendations. J. Final drainage construction and erosion control plans (conforming to the Drainage Report)stamped, signed, and dated by a professional engineer licensed in the State of Colorado, shall be submitted with the Final Plan application. The Final Drainage Report must include the following: 1) A flood hazard review documenting any FEMA defined floodways. The engineer shall reference the specific map panel number, including date. The development site shall be located on the copy of the FEMA map. 2) The 5-yearstorm and 100-yearstorm drainage studies shall take into consideration off-site flows both entering and leaving the 2005-3176 PL1798 CHANGE OF ZONE #1074 FROM A (AGRICULTURAL) TO PUD - FRANK AND LORETTA WRIGHT PAGE 9 development. Increased runoff due to development will require detention of the 100-year storm developed condition while releasing the 5-year storm existing condition. 3) The applicant shall prepare a construction detail for typical lot grading with respect to drainage for the final application. Front,rear,and side slopes around building envelopes must be addressed. In addition, drainage for rear and side lot line swales shall be considered. Building envelopes must be planned to avoid stormwaterflows,while taking into account adjacent drainage mitigation. K. The applicant shall submit all proposed street names and lot addresses evidence to the Weld County Department of Planning Services for review and approval by the Mountain View Fire Protection District,Sheriffs Office, Weld County Paramedic Service, and the Post Office. L. The applicant shall submit three (3) copies of the Bylaws and Articles of Incorporation for the Homeowners' Association, for review and approval. M. The applicant shall contact the Vegetation Weed Management Specialist with the Weld County Department of Public Works at(970)356-4000,Ext.3770, to develop a Weed Management Plan. The approved plan shall be included in the Final Plan application. N. The applicant shall address the requirements of the Weld County Sheriffs Office, as outlined in the referral dated May 23, 2005. Written evidence of such shall be provided to the Department of Planning Services. 6. Prior to recording the final plat: A. Original copies of the approved Covenants and Bylaws and Articles of Incorporation for the Homeowners'Association,along with the appropriate recording fee(currently$6 for the first page and $5 for subsequent pages), shall be submitted to the Weld County Department of Planning Services. The applicant shall submit Certificates from the Secretary of State showing the Homeowners' Association has been formed and registered with the State. B. The applicant shall enter into an On-Site Improvements Agreement According to Policy Regarding Collateral for Improvements. This agreement shall be approved by the Board of County Commissioners. C. The applicant shall enter into an Off-Site Improvements Agreement According to Policy Regarding Collateral for Improvements. This agreement shall be approved by the Board of County Commissioners. 2005-3176 PL1798 CHANGE OF ZONE #1074 FROM A (AGRICULTURAL) TO PUD - FRANK AND LORETTA WRIGHT PAGE 10 D. The applicant shall address the requirements of the Mountain View Fire Protection District,as outlined in its referral dated May 27,2005, in regards to approval of fire hydrant locations. Written evidence of such shall be provided to the Department of Planning Services. E. The applicant shall provide evidence that the voluntary capital mitigation fee has been paid,along with the fee-in-lieu-of-land dedication,as stated in the agreement with Saint Vrain Valley School District RE-1J. F. The applicant shall submit a digital file of all drawings associated with the Final Plan application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is.e00. The preferred format for Images is .tif(Group 4) ... (Group 6 is not acceptable). The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 23rd day of November, A.D., 2005. BOARD OF COUNTY COMMISSIONERS COUNTY, COLORADO 1� ` IL,�� � �_•"�� ' lli,.1/ F illiam H. J= ke, Chair Weld County Clerk to the / //�.,✓ u 9 ��6l�GC. `( `�j M. . .•eile, Pro-Tem BY: • D uty Clerk to the Boa Da E. Long APP A M: \Vc) Robe D. Masd n unty A orney Glenn Vab Date of signature: I717.-7-/05 2005-3176 PL1798 Hello