Loading...
HomeMy WebLinkAbout20051804 tN1 �F DEPARTMENT OF THE ARMY e \F\ CORPS OF ENGINEERS,OMAHA DISTRICT m ';a e E - iv, TRI-LAKES PROJECT OFFICE,9307 S.WADSWORTH BOULEVARD it"' LITTLETON,COLORADO 80128-6901 June 7, 2005 Weld County Board of Commissioners P.O. Box 758 Greeley, Colorado 80632-0758 RE: Emergency Streambank Protection near Windsor, Colorado Gentlemen: An inspection of the Emergency Streambank Protection Project constructed to protect County Road 27 and Bridge 27-62b on the Cache la Poudre River was recently completed. Overall, the project was in fair condition. It was noted that the project is losing riprap at the waters edge, especially at Sta 7+35. At Sta 8+50 the river is eroding the soil along the windrow refusal and the refusal is starting to lose rock. It is recommended that this Riprap and soil be replaced to maintain the integrity of the project. It is also recommended that woody vegetation control be initiated. The US Army Corps of Engineers considers the life span of a section 14 to be 20 years. This section 14 has reached its 20-year mark,for this reason the US Army Corps of Engineers will no longer inspect this project. However we do encourage you to keep the project in good condition. If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at 303-979-4120. Sincerely, I�ACX `VA.I5 r" Fred Rios Project Manager tv/2e -1 e /S — o? ed.. cEm1 /id 2005-1804 F 4 �, 4 t t K •t ;F 3 A i "p r F b t r - Cache La Poudre Prier de P �v r a x 2a" `Yf*F a' '19114w .4 r iF k TS k may..... ' Hello