HomeMy WebLinkAbout20053240.tiff WELD COUNTY ROAD ACCESS INFORMATION SHEET
Weld County Department of Public Works
111 H Street, P.O. Box 758, Greeley, Colorado 80632
Phone: (970 )356-4000, Ext. 3750 Fax: (970) 304-6497
Road File #: Date:
RE# : Other Case #:
1. Applicant Name_ IY14t l�ld L OtirSfIOV) QfLt,YGJl hone 3°3 )1( ;jai
Address 10 LLF KIRA City t C "t State (,6 Zip `r )D°4'
2, Address or Location of Access
Section Township Range Subdivisbn Block Lot
Weld County Road #: Side of Road Distance from nearest intersection
3. Is there an existing access(es)to the property? Yes X No # of Accesses
4. Proposed Use:
❑ Permanent ❑ Residential/Agricultural Cl Industrial• ���
❑ Temporary A Subdivision ❑ Commercial ❑ Other
•
5. Site Sketch
Ip
Legend for Access Description:
AG = Agricultural LUC/1Z,7--(O
RES = Residential
O&G = Oil&Gas
D.R. = Ditch Road
O = House
O = Shed
A = Proposed Access ,J
• = Existing Access
Ni
.91
a 4;aCked kv\co_.
OFFICE USE ONLY:
Road ADT Date Accidents Date
Road ADT Date Accidents Date
Drainage Requirement Culvert Size Length
Special Conditions
•
❑ Installation Authorized ❑ Information Insufficient
Reviewed By: Title:
-17-
2OO5-324O
R69W R6BW
���
�,.� n Counly Rd 29
1/?, 17TH AVE E
33 T3N
��A�JJ ' I 1 UNID �?
OJECT
RESERV )IR
� i,, �, °'�� FEBRIDGE
D
i t , I V im_ 1/ counbv RE 29
1 9 . AVE.
�7. C —=(J 6 _ I 'rj'c _ 25-1%2
V 14 4D
m ;� aa. m,.wm
Lr. ��` I �/ TEN
AVM� . R), ;
n
Slate'
�` \\ ICJ~ 1
a
N-I'Er �/I
•
f• 11
c
Z.
Cy
LL-
LT 3
VICINITY MAP
w m,
N
North
E!T
ThI U
1 Y w , PROJECT LIFEBREDOE PUD
U
U. o
I,
T
i
�� Q E a
x
U
H
ROCKY MOUNTAIN CONSULTANTS INC.
s eas oEAW AVE,surrE soo,LotraMorrr,co eosin
a (30S)7723282 METRJ:(9ai)BB6- 83 FAX:�5)9e6-%69
N
IrT, 80-4270.001.00
1 OF 1
s
\
C
� I �
// mil' _
J
---
,----
_______./C-- VJC . 412 1 j ��1 z
WCRZfi -- I \ —"i ? to
"y 9 /
1 n m
1 ` �I 1 ee Access C Q
,AccessI \
(I' l
1 r, Access 0
-...., - Denotes Lane
ii L, TS
\ -. 1 ii Carlsbad
L. /c or
01
Access A a
F
K
\ C `
sH„s ' 'i i t I - If f I
a
2
a
re LONG RANGE (2025) GEOMETRY
26
THE LIFEBRIDGE PROJECT PUD
TRAFFIC IMPACT STUDY
WELD COUNTY, COLORADO
JANUARY 2005
Prepared for:
LifeBridge Christian Church
10345 Ute Highway
Longmont, CO 80504
Prepared by:
PPpO RE94sn
MATTHEW J. DELICH, P.E. OQ��� do(<c
2272 Glen Haven Drive a` , `,
Loveland, CO 80538 ,3
Phone: 970-669-2061 = n "
FAX: 970-669-5034 .
TABLE OF CONTENTS
Page
I. Introduction 1
II. Existing Conditions 3
A. Existing Road Network 3
B. Existing Traffic Conditions 3
C. Surrounding Land Uses 6
III. Future Traffic Projections 7
A. Development Assumptions 7
B. Site Trip Generation 7
C. Trip Distribution 7
D. Traffic Assignments and Volumes 12
Site Generated Traffic Volumes 12
Background Traffic Volumes 12
Total Traffic 12
IV. Traffic Impacts 19
Short Range Background Traffic 19
Short Range Total Traffic 19
Long Range Background Traffic 22
Long Range Total Traffic 22
V. Conclusions 31
LIST OF TABLES
Table Page
1. Current Peak Hour Operation 6
2. Phase 1 Trip Generation 9
3. Full Development Trip Generation 9
4. Short Range (2010) Background Peak Hour Operation 20
5. Short Range (2010) Total Peak Hour Operation 23
6. Long Range (2025) Background Peak Hour Operation . . . . 25
7. Long Range (2025) Total Peak Hour Operation 28
LIST OF FIGURES
Figure Page
1. Site Location 2
2. Recent Peak Hour Traffic 4
3. Balanced Recent Peak Hour Traffic 5
4. Site Plan 8
5. Short Range (2010) Trip Distribution 10
6. Long Range (2025) Trip Distribution 11
7 . Phase 1 (2010) Site Generated Peak Hour Traffic 13
8 . Full Development (2025) Site Generated
Peak Hour Traffic 14
9. Short Range (2010) Background Peak Hour Traffic 15
10 . Long Range (2025) Background Peak Hour Traffic 16
11 . Short Range (2010) Total Peak Hour Traffic 17
12 . Long Range (2025) Total Peak Hour Traffic 18
13. Short Range (2010) Geometry 21
14 . Long Range (2025) Geometry 26
r-.
APPENDIX
A Recent Peak Hour Traffic Data
B Existing Traffic Analyses/Level of Service Description
C Signal Warrants
D Short Range Background Traffic Analyses
E Short Range Total Traffic Analyses
F Long Range Background Traffic Analyses
G Long Range Total Traffic Analyses
I. INTRODUCTION
The LifeBridge Project PUD, a mixed-use development, is proposed
in the northeast quadrant of the SHll9/WCR3',p intersection in Weld
County. Hereinafter, it will be referred to as the LifeBridge PUD. The
site location is shown on Figure 1. The purpose of this study is to
address the traffic impacts of the proposed development. The focus of
this review is the street/road network, which will serve the proposed
development. This study and recommended improvements to the street/road
network serve as a benchmark for the level of development considered
herein. Specific improvements will be related to the actual development
proposed.
Significant development is expected to occur in this area of Weld
County. The LifeBridge PUD is in an area known as the "I-25 Mixed Use
Development Area" (MUD area) as defined by Weld County. Data regarding
short range and long range future development was obtained from Weld
County traffic projections, other traffic studies in the area of the
site, and CDOT traffic forecasts. The scope of the traffic impact study
was discussed with the owner/developer (LifeBridge Christian Church) ,
the project planner (DTJ) , the project engineer (Tetra Tech/RMC) , Weld
County Public Works Department, and the Weld County transportation
consultant (FHU) .
1
) )
Cn i_____.] L_____ I Ipljr,01
r
O l
O \ lij
> County line Road :NCR 1 BOULDER COUNTY
O WELD COUNTY
Z 73
N
ccb Lill ell
Kb Yom? s?co �Y-bo WCR 3 1/2 a
RA
RI a `k 4 j?kv% di o
M1 i cwt d
N L�Qj 1a� ��t*YJs� �4jk5� d
O
� '�� �t'1 WCR5
v
CD
�EA7WFgrERNR4LRpq�
��_ O W \ WCR 5 1/2
� C Cfl =Q �\
J
CD
`V
D
Q a
I— ���
J Interstate 25
7°re 0 I '
- Z 0
EXISTING CONDITIONS
A. Existing Road Network
The major existing streets in the vicinity of The LifeBridge PUD
site are SH119, WCR3'-2, Fairview Street (WCR3) , WCR26, and County Line
Road (WCR1) . SH119 is a regional four-lane divided highway under CDOT
control with a posted speed limit of 65 mph in the area of The
LifeBridge PUD site. It extends from Interstate 25 to the west, past
the site, to the City of Longmont and beyond. According to CDOT, it is
an classified expressway highway in the vicinity of the site.
Weld County Road extends from SH119 north to WCR26. It is
paved along the Long View residential area (0.5 miles) and is gravel for
the remaining 0.5 miles to WCR26.
Fairview Street is 0.5 miles west of WCR3'-.. It is paved, serving
a business park which is occupied by Concepts Direct. Fairview Street
does not currently connect to WCR26 across the Great Western Railroad
tracks.
Weld County Road 26 is an east/west gravel road that borders the
subject property on the north. It intersects with County Line Road at
an intersection with stop sign control on WCR26.
County Line Road is a north/south paved road. It is continuous to
the north and south of this study area. It currently has a two-lane
cross section. It is classified as an arterial street on the Longmont
Comprehensive Plan.
Access to the site will be via WCR3 and WCR26 for both Phase 1
and full development of the LifeBridge PUD.
B. Existing Traffic Conditions
Recent morning and afternoon peak hour traffic volumes at the key
intersections are shown in Figure 2. Raw traffic counts are provided in
Appendix A. The count data at the key intersections was obtained in
September 2004. Since the counts were performed on different days, the
traffic volumes between the SH119/Fairview and SH119/WCR3 intersections
were averaged and balanced, and are shown in Figure 3. Table 1 shows
the current peak hour operation at the key intersections. Calculation
forms are provided in Appendix B. As can be seen, the key intersections
operate acceptably with current controls and geometry, except for the
northbound and southbound minor street legs at the SH119/Fairview
intersection during both the morning and afternoon peak hours.
Typically, minor street left-turn movements operate at level of service
E or F during the peak hours at stop sign controlled intersections along
arterial streets. The minor street legs operate acceptably at level of
service C. A description of level of service for signalized and
unsignalized intersections is also provided in Appendix B.
3
AS
N
I
m g
3/9
f 12/9
1/3 —1
12/9 --...-
WCR26
iaJa
CD CO
0
U m o a 14/7 m _ co ``—12/36
N 0 N 1783/1357 0 NN N f 1779/1124
"J ram J.
1 L.
r 16/3
SH119 `l
24/15 1 t 1 19/96 }
993/1675 —► C o , 891/1595 --ow- N
9/4 m o 0 46/26 m
c
O I
m
a
c
(0
U)
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 2
4
N
Im g�ft) � 3/9
-------X
1/3 -II12/9 --
WCR26
O4
m CC
CI
L U
L
LL. to
N `—14/7 m 12/36
N C N -.I--1823/1293 m N N 1741/1182
/J I j N 4/3 ApeI 1 L 16/3
SH119N.,24/15 —, t r. 19/96 —, ) } r
973/1688 -0.- C o - 909/1582 --0.- , N Lo
9/4 `° o c 47/26 m
I o I
in
C
C
CO
CO
AM/PM
BALANCED RECENT PEAK HOUR TRAFFIC Figure 3
5
C. Surrounding Land Uses
There is currently an existing residential development (Long View)
on the west side of WCR3 . A commercial development (Vista Business
Park) exists along WCR3'1 to the south of SH119. A commercial
development (Concepts Direct) exists on the west side of Fairview
Street. To the east of the LifeBridge PUD site are two residential
developments, Meadow Vale Farms and The Elms.
TABLE 1
Current Peak Hour Operation
f tI olE Sera
NB LT E F
NB T/RT A C
NB APPROACH E F
SH119/Fairview SB LT/T F F
(stop sign) SB RT C C
SB APPROACH F D
EB LT C B
WBLT B C
EB LT A A
EBT A A
EB RT A A
EB APPROACH A A
WB LT A A
WBT A A
WB RT A A
SH1191WCR3Y2 WB APPROACH A A
(signal) NB LT D D
NBT A D
NB RT D D
NB APPROACH D D
_ SB LT/T D D
SB RT D D
SB APPROACH D D
OVERALL A A
WCR26/WCR5 SB LT/RT A A
(stop sign) EB LT A A
6
III. FUTURE TRAFFIC PROJECTIONS
A. Development Assumptions
The overall site plan of the LifeBridge PUD is shown on Figure 4 .
The LifeBridge PUD is expected to be built in two phases. Phase 1 is
expected to be built by/before the short range future year 2010. Phase
1 will consist of the portion of the site that is shaded in Figure 4.
B. Site Trip Generation
To estimate the traffic generated by the proposed development,
standard trip generation factors compiled by the Institute of
Transportation Engineers in their report entitled Trip Generation, 7th
Edition were utilized. These factors were applied to the appropriate
land use to determine daily, and morning and afternoon peak hour traffic
volumes expected to be generated at the site. In discussions with the
owner/developer, the development on the church property would be more
than the church facility itself and the administrative offices of the
church. There would be activity that would be reasonably constant over
the course of an average weekday. The trip activity would be similar to
that of a junior or community college. While this would not be the
specific use, for trip generation purposes this land use was used. An
estimate was made of the number of students, so that this variable could
be used to generate the daily and peak hour trip ends. Table 2
summarizes the results of this analysis for Phase 1 of the LifeBridge
PUD development. A multi-use factor of 0.8 was applied to all land uses
except for the single family residential portion of the site. Phase 1
of the LifeBridge PUD would generate approximately 8602 trips per day
with 564 and 724 trips occurring during the morning and afternoon peak
hour periods, respectively.
Table 3 shows the trip generation for full development of the
LifeBridge PUD. Of significance, is the church campus variable used
for trip generation will have a three times increase. There will also
be a significant increase in the retail, office, and recreation
aspects of the site.
C. Trip Distribution
Trip distribution assumptions were derived utilizing the
relationship of the site land uses to trip productions and attractions
in/near Longmont. The existing and future street system also play a
role in determining the trip distribution. Figure 5 shows the trip
distribution for the short range (2010) future. Figure 6 shows the trip
distribution for the long range (2025) future.
7
} ) ) AL
4,.„. ` COUNTY ROAD 26 N
.. - --•. s �pq = —r _ ..�.: r 9CJ1LE 1'.4101Y
., ...... „... ...,,,. ten r di ,-,,, ..-- F. .---4, I /
•
•
Yi
� J ,•
HMV' Imo; •I - ' ly �L l -, I I
t .-+ i mom. / `�_ ! .._...,
-- - •.__-.-_ -1 - -.__ ' BMRMI',�. i /nom I 4��7i11 � ,? _... .. .._ ...
/111?
1'7:
•
C ,il' a
z i r,..,„....„
jHici
Ci 11! •
,..„.„.. , i . .. ,, ...
I i.„., : 1-1 I, 1) L..... ..: ii8 I I t••'.. '
i 'y ✓n 1J ;
L__ __ I S eiRcti5' •I� I• II f ?. •/��
-� — f \
•
II
- . i i11 _ -
i ; ,
P
:.. _ HWY-119_
•
• Eli Phase 1
• I SITE PLAN Figure 4
R
TABLE 2
Phase 1 Trip Generation
Coda- 1194 ' ,
AWOTE_ iMit.Sats Hour PM Peak'Hour
.>*4-1 er ?b!M a ? o°'' .tom � p : t�
210 Single Fanily 100 D.U. 9.57 957 0.75 75 19 56 1.01 101 64 37
2500 1.20 3000 0.12 300 249 51 0.12 300 201 99
540 Church Campus students
814 Specialty Retail 50.0 KSF 44.32 2216 0.68 34 19 15 2.71 136 58 78
710 General Office 30.0 KSF 11.01 330 1.55 47 42 5 1.49 48 8 40
495 Recreation Center 100.0 KSF 22.88 2288 1.62 162 98 64 t64 164 48 116
251 Senior Housing Detached 192 D.U. 3.71 712 0.20 38 15 23 0.26 50 31 19
253 Congregate Care Facility 500 D.U. 2.02 1010 0.06 30 20 10 0.17 85 45 40
Subtotal 10,513 686 462 224 884 455 429
Less Multi-Use Factor 1911 121 89 33 160 79 81
Total 8602 564 373 191 1724 376 348
TABLE 3
Full Development Trip Generation
yid 2! 4 rrf.r �- }{ Hour.b
fig V �P!... `�>.f'.0 7.1: .4 t 'Ac
210 Single Fanily 160 D.U. 957 1531 0.75 120 30 90 1.01 162 102 60
7500
540 Church Campus students
1.20 9000 0.12 900 748 152 0.12 900 603 297
s
814 Specialty Retail 260.0 KSF 44.32 11,523 0.68 177 99 78 2.71 705 304 401
710 General Office 110.0 KSF 11.01 1211 1.55 171 151 20 1.49 164 28 136
495 Recreation Center 200.0 KSF 22.88 4576 1.62 324 198 126 1.64 328 95 233
251 Senior Housing Detached 192 D.U. 371 712 0.20 38 15 23 0.26 50 31 19
253 Congregate Care Facility 500 D.U. 2.02 1010 0.06 30 20 10 0.17 85 45 40
Subtotal 29,563 1760 1261 499 2394 1208 1186
Less Multi-Use Factor 5605 328 248 80 447 In 225
Total I 23,958 I 11432 1 1013 1 419 1947 1 986 1 961 1
9
AS
N
in
O
U
e e
0 0
5%
5%
pri
i - , _ ---- - , , -
WCR26r L..................................................v
e
m
c
�
C
7
O •U
Z U
ri
LL
20%
55%
30%
55% ,a...s• C S
SH119
Z
I
Residential
Church Camp us/Commercial
SHORT RANGE (2010) TRIP DISTRIBUTION Figure 5
10
a
N
In
X
U
0 0
0 r
5%
5%
.R
Z0%
15
WCR26
C
m
c
J
T
C m
J
U
1i
30%
35%
40% 30%
SH119 I
I I
Residential
Church Campus/Commercial
LONG RANGE (2025) TRIP DISTRIBUTION Figure 6
11
D. Traffic Assignments and Volumes
Site Generated Traffic Volumes
Utilizing the trip generation estimates and the distribution
assumptions identified previously, projected vehicle trips were assigned
to the existing and planned street system. The resulting Phase 1 (2010)
site generated traffic at the key intersections for the morning and
afternoon peak hours was determined and is shown in Figure 7. The long
range (2025) site generated traffic volumes at the key intersections are
shown in Figure 8.
Background Traffic Volumes
Figure 9 shows the short range (2010) background peak hour traffic
volumes (traffic on the roadways not attributed to the proposed project)
at the key intersections. These were determined based upon existing
traffic volumes, which were increased to account for adjacent/nearby
development activity and a general increase in traffic passing through
the study area. Data was obtained from the Concepts Direct, Vista
Business Park, Richardson PUD, and Adler Estates traffic studies.
Traffic generated from these developments was used to reflect an
appropriate amount of development for the background traffic. Figure 10
shows the long range (2025) background peak hour traffic volumes at the
key intersections.
Total Traffic
The traffic volumes generated by the proposed LifeBridge PUD
development were added to the background traffic to produce total
traffic volume projections. The short range (2010) total peak hour
traffic at the key intersections is shown in Figure 11. The long range
(2025) total _peak hour traffic at the key intersections is shown in
Figure 12.
12
k illik
o
to
N
93
v -o-0/5
1 tic 15/1100 A
°
WCR26 515 15
f I
5/0 -0.-
LO N 0
y �G�3 No- spq o
•
n
�
o i.0
o o
T
La'
`R
� 5/0
Ir Access I
t2 A
re 23
-am— AM/PM
Rounded to Nearest
s CI i \ 5/15 5 Vehicles
� 20/100
1 t ( Carlsbad
I p-
o
N T ..
1 `A x20/35
a) I7essA
a)
SLLnNh A�1 o 5/15 A ra m 55/35diri L50/40
1 C f60/135 .-30/80 i f 55/40
10/35 + 180/140 -' + SH119
180/130 — - tol 101-5 —....
o tO
PHASE 1 (2010) SITE GENERATED Figure 7
PEAK HOUR TRAFFIC
13
) U
N
♦561135 furs
j-0/15
r°,3s
e e
/ a ulJlmy 10110-� 1
\ ,5/p—' S5_� `I
'r! f re
a 13 a125 n n
J/--
3e), is ti 707—� 1 41--ss3oe ^'� PSSh, Q '1 317 641'4°`\ S�
2514 s° I m ( "fd
/ WCR3112 / 12°s0 ;s 3 v
p5 , \ g
WCR26 1532110—-- �yw^v o g n m
5
2 a 1 C. rzaIoo g
n'a \--ono m
` r afro } r Access C 0
1 / Access 2 ��g
321 •a v
o { /-1515°
Ir Access B
s —0—AM/PM
'. Rounded to Nearest
S \_150 5 Vehicles
I I \ r-4alm
1 r Carlsbad
m
Ss 0
225
135 1-4015
m } r Access A
Z m
02
m H
eta ` :ag 2 se
se
J 1 Lvm A ) 1 �17a155 1 -ace°
f 105/145 V 1 ` f 401 A, -a 170/155
5H 119 iaao� $ 320/205_/ I
315/250 v 15513
a
m
0
a
10 LONG RANGE (2025) SITE Figure 8
GENERATED PEAK HOUR TRAFFIC
19
N
I
t
42 5110
,ILab �—15/10
5/5
°M.MillitialealX
15/10 y
WCR26
N
N 2
Z U
.� U-
LL `
°' 70/30 0 o `15/40
N ° do 2I /-r x2025/1495 m Z r x2015/1320
fI I 30/30 iI L1/4
110/80
IN
SH119115/45 -, } r 20/95 -1 "41 }
1190/1730 —► o 2 c 1080/1720 y o g o
80/60 m .2 O o 110/80 N O N
u, z Or N Z
N
C
C
U)
CO
AM/PM
Rounded to Nearest
5 Vehicles
SHORT RANGE (2010) BACKGROUND Figure 9
PEAK HOUR TRAFFIC
15
N
in
I
o
CD LO
0 'n
CD
/90
f i 17
f 175/15/1 05
35/110
gmallitalaYs
65/180 --a....WCR26
N
N co
CC
? 0
Ts
LL
N 1k CO 330/95 c CD v 40/90
c k-, ro �--2855/2470 �`+ o —3000/2210
dei L1/4 it—85/85 I L1/4, c-190/190
SH119190/60 -1 f 1 60/220 --" ‘41.1f re
21802900 --m- o 0 19752995 y o 0 0
170/120 � g-ti O m 220/200 m v m
0 Z 0 0 0
O
Co
C
co
Co
f AM/PM
Rounded to Nearest
5 Vehicles
LONG RANGE (2025) BACKGROUND Figure 10
PEAK HOUR TRAFFIC
16
kn
" N
. N n 5/10
:-:—.5 O
\ 15/15
/ I
35/40
4?
/ 4 WCR26 ,0/,0 -1 (�
'� 1p�S 515 co m
P 7S--70
d' ,o�g5
��2pj15 ssy
f.p,5 too
'toe"� ta,o IBC 7
,o
20y5�-\ o NN
o T
e. R N o \
5/0
30/20
f Access
Snin
H CO
O O
f— AM/PM
Rounded to Nearest
\ 5/15 5 Vehicles
20/1000
NOM 1015 r CaI rlsbad
40/20
n co in �
0/ R 2e8
N `L5/N
i L. x20/35
CD f r Access A N
a I m
22 a)
R
L
o 75145 0/ o S Nk
70/75 2
Fri 2085/1630 ' in in 2045/1380 N
r 30/30 ) � r 110/80 ) t 50/40
y f 2200/1480
N
125/80 --filNik4 I 200/235 I T I SH119
1 9
1370/1860 —a o w o 1090/1715 � o ml, o
80/80 w o 110!80 h R
LI in
T. CM CO
SHORT RANGE (2010) TOTAL Figure 11
PEAK HOUR TRAFFIC
17
3 N
2
_-tom
NOESO
/cm' ) ` ,- 125185
e ua
/% eo 1r Off ` }
430 N 15/0.5 y
e� t3,lss
i� �1 � A R m
�So m i"'
'9E u ',mss i
10011¢0 �� SSSh, al
a �.,T„Y" .p MO VC;
WCR3 �1� „6:50—_,1/4—
w^� ;�3 � o
WCR26 lssoo---1-
t( x0ysw E x 1 'G
wr+0� g55 LO, to '^
) L _:._masxou a m
_, A/,O
I OI10 r
L �z5110 vs , } Access C N
Nom p
orbs ?,a
f r Access]
_a 8
g� 5g Ln
n /_,5,50
1 / Access B
I f AM/PM
a Rounded to Nearest
L5,,,o 5 Vehicles
J I LT.w,�x°"1
NOM p-' , t r Carlsbad
o� Sa
8 a a�,w
I I —<w�
,
1 (€ Access A
98 m
8 Sa a
8 EC
C 43 e `--.115/125nl2s n `2101245 $ C2
'^.+1:2 f3960/21ts 1 �rEO
J 1 2\ —MIS'
� J 1 L. 9� ) -m-2400128 45
EmlimmEmmEm
SH119 200,100 1 r\ \1, 31301500 „ re
24050100_� > 1740121011— 1
1701120—\ l`3 m Y20100 m u/
m
O
,n LONG RANGE (2025) TOTAL Figure 12
PEAK HOUR TRAFFIC
HI
IV. TRAFFIC IMPACTS
In order to determine the impacts of future traffic volumes, the
key intersections were evaluated for the short range (2010) and long
range (2025) futures using capacity analysis procedures from the 20O0
Highway Capacity Manual. Acceptable operation is defined as level of
service "C" overall at signalized and unsignalized intersections. It is
expected that individual movements, particularly minor street left-turns
at stop sign controlled intersections, will operate at level of service
D or E in the peak hours. This is considered to be normal. It is also
expected that the operation at the intersections along SH119 may be at
level of service D, overall, in the long range (2025) future. In
addition, the potential need for signals was also evaluated using the
short range and long range traffic forecasts. While peak hour signal
warrants are not applicable at the intersections in the vicinity of the
LifeBridge PUD, they do provide an indication of whether signals will be
warranted in the future. This analysis/evaluation is conducted, since
the peak hour traffic forecasts are a product of a TIS. It is
acknowledged that a comprehensive signal warrant study would be
conducted using actual volumes at the subject intersections. Findings
are as stated below.
Short Range Background Traffic
Traffic volumes presented on Figure 9 were used to evaluate the
short range (2010) background future traffic operation at the key
intersections. Peak hour signal warrants are expected to be met in the
short range future at the SH119/Fairview intersection during the
afternoon peak hour. Peak hour signal warrant analyses are provided in
Appendix C.
Table 4 presents the calculated levels of service at the key
intersections in the short range (2010) future. As shown on Table 5,
acceptable operation can be expected for the short range (2010) future
at the key intersections. Calculation forms are provided in Appendix D.
Short Range Total Traffic
Traffic volumes presented on Figure 11 were used to evaluate the
short range (2010) total future traffic operations at the key
intersections. Figure 13 shows the short range (2010) approach
geometry at the key intersections. Dimensions of the key auxiliary
lanes that are associated with the LifeBridge PUD traffic are also
shown. At the analyzed level of traffic, center left-turn lanes will
not be required on WCR26. Based upon the short range traffic
forecasts, WCR3'I should provide for one travel lane in each direction
and bike lanes. A center painted median lane would provide for
northbound and southbound left turns at all existing accesses to Long
19
TABLE 4
Short Range (2010) Background Peak Hour Operation
EB LT D B
EBT A
EB RT A A
EB APPROACH A C
WB LT A B
WBT B B
WB RT A A
SH119/Fairview WB APPROACH B B
(signal) NB LT D D
NB T/RT D C
NB APPROACH D D
SB LT D C
SB T/RT D C
SB APPROACH D C
OVERALL B B
EB LT B A
EBT A B
EB RT A A
EB APPROACH A B
WB LT A B
WBT B B
WB RT A A
SH119/WCR3% WB APPROACH A B
(signal) NB LT D D
NB LT A A
NB RT D C
NB APPROACH D D
SB LT/1-
SB RT A A
SB APPROACH B A
OVERALL A B
WCR26/VVCR5 SB LT/RT A A
(stop sign) EB LT A A
20
S
O
A
WCR26 395' It; Cs:
n
m
M
�e5
s
ti
d r
cp
Access I
f— - Denotes Lane
Lane Length Includes
Taper and Storage
di 220'
. a
Rc___
t iy, Carlsbad I I.?,
170'
2 1 Access A co
TI d
m co
LL
�j \ 800' lj 800
1 EXISTS Aj 1 EXISTS ...3/4 0
N
92 :__, ! }� 1035 l/ ) t �/ SH119
II Ill
EXISTS EXISTS I
SHORT RANGE (2010) GEOMETRY Figure 13
21
View and accesses to the LifeBridge PUD. The center left-turn lane
would not be required at the WCR3'4/Access F intersection, but it may be
prudent to have it as part of the interim cross section of WCR3'-,. All
intersections along WCR3'- should allow full movements with stop sign
control on the minor (east/west) streets. It is the desire of Weld
County that WCR3'2 will have a four-lane cross section, plus auxiliary
lanes where appropriate. However, this road can be built in phases as
the LifeBridge PUD develops. The functional distance (available for
storage and deceleration) between SH119 and the access to Long View is
340 feet. It is recommended that this area be widened and striped to
have side-by-side left-turn lanes at the initial level of development of
the LifeBridge PUD. Design details should be addressed later in the
development review process.
Table 5 shows the peak hour operation at the key intersections
using the short range (2010) total peak hour traffic (Figure 11) . Based
upon the short range traffic volumes, it is expected that all of the key
intersections will operate acceptably. Calculation forms are provided
in Appendix E. At these levels of development and background traffic,
no signals will be warranted along WCR3 .
Long Range Background Traffic
Traffic volumes presented on Figure 10 were used to evaluate the
long range (2025) background future traffic operation at the key
intersections.
Table 6 presents the calculated levels of service at the key
intersections in the long range (2025) future. As shown on Table 7,
acceptable operation can be expected for the long range (2025) future at
the key intersections. Calculation forms are provided in Appendix F.
Long Range Total Traffic
Traffic volumes presented on Figure 12 were used to evaluate the
long range (2025) total future traffic operations at the key
intersections. With the growing urbanization in the long range future
and posted speeds of 40 mph or less on WCR3 and WCR26, signals will
not be warranted at any of the key intersection along these roads. If
circumstances with regard to through traffic change and/or the
proposed LifeBridge PUD changes, then need for traffic signals should
be reevaluated.
Figure 14 shows the long range (2025) approach geometry at the key
intersections. Dimensions of the auxiliary lanes at the key
intersections are not shown in this graphic. It is more appropriate to
deal with design conditions later in the development review process.
Clearly, adequate auxiliary lanes can be built given the distances
between intersections. In meetings, Weld County indicated that WCR3'ri
would likely have a four-lane (plus auxiliary lanes) cross section. The
22
TABLE 5
Short Range(2010)Total Peak Hour Operation
man Molten*
EB LT D B
EBT A
EB RT A A
EB APPROACH A C
WB LT A B
WBT B B
WB RT A A
SH119/Fairview WB APPROACH B B
(signal)
NB LT
NB T/RT D D
NB APPROACH D D
SB LT D C
SB T/RT D D
SB APPROACH D D
OVERALL B C
EB LT E C
EBT A B
EB RT A A
EB APPROACH B B
WB LT A B
WBT B B
WB RT A A
SH119/WCR3'/z WB APPROACH
i�cr.��n NB LT D D
,JIy•IQI/
NB LT D D
NB RT A A
NB APPROACH C C
SB LT D D
SB T D D
SB RT A A
SB APPROACH B B
OVERALL B B
SH 119/RT Access SB RT D C
(RT-in/RT-out)
Continued on next page
23
Continued from previous page
TABLE 5
Short Range (2010) Total Peak Hour Operation
1:-.0,1410�1'1t'
r
WB LT B B
WCR3//Access A WB RT A A
(stop sign) WB APPROACH B B
SB LT A A
EB LT/T/RT A A
WB LT B B
WCR3'/2/Carlsbad WB T/RT A A
(stop sign) WB APPROACH B B _
NB LT A A
SB LT A A
WCR3'/z/Access F NB LT/RT A A
(stop sign) WB LT A A
NB LT A A
NB T/RT A A
NB APPROACH A A
WCR26/WCR5 SB LT A _ B
(stop sign) SB T/RT A A
SB APPROACH A A
EB LT A A
WB LT A A
WCR26/Access H WB LT/RT A A
(stop sign) SB LT A A
WCR26/Fairview NB LT/RT A A
(stop sign) WB LT A A
Fairview/Access I WB LT/RT A A
(stop sign) SB LT A A
..--
24
TABLE 6
Long Range(2025) Background Peak Hour Operation
l�rv�t of� -
inberseotiort_ _ .
EB LT E B
EBT A B
EB RT A A
EB APPROACH A B
WB LT A C
WBT A A
WB RT A A
WB APPROACH A A
SH119/Fairview NB LT D D
(signal) NB T A A
NB RT A A
NB APPROACH D C
SB LT D E
SBT A A
_
SB RT A A
SB APPROACH C C
OVERALL A B
EB LT B E
EBT B D
EB RT A A
EB APPROACH B D
WB LT D E
WBT B B
WBRT A A
WB APPROACH B C
SH119/WCR3Y2 NB LT D E
(signs₹) NB LT D D
NBRT A A
NB APPROACH C D
SB LT D D
SBT D D
SB RT A A
SB APPROACH B B
OVERALL B C
WCR26NVCR5 SB LT/RT B B
(stop sign) EB LT A A
25
> ) a ) a
Jl� c
��� Y 1fr
r .NGR3,I2 i\ \`
WCR _s- 1./ 1 \� 1 ?
-1--
!--
31'D
rp
It
il
Access —r 1 t r Access CO fr i Access B
I7 --•— -Denotes Lane
L. l
S
...it r Carlsbad
3 ! \ \C
o ti m
Z Access A
m Q
LL r
re
JILL _
SH119 �1+ r _�1 I. N�t1
Iv
En
LONG RANGE (2025) GEOMETRY Figure 14
26
traffic forecasts in this traffic impact study indicate that a two-lane
(plus auxiliary lanes) cross section will be adequate. If future
volumes indicate the need for or Weld County desires to maintain the
ability to have a four-lane cross section, the right-of-way can be
dedicated with this development. WCR26 should have left-turn lanes at
all street/street intersections. Right-turn lanes will be necessary at
the WCR26/Fairview and WCR26/WCR3 intersections. In addition, WCR3
1,1
and Fairview should provide for one travel lane in each direction and
bike lanes. A center painted median lane or raised median area with
left-turn lanes would provide for storage of northbound and southbound
left turns at all accesses along these streets. All intersections along
WCR3 and Fairview should allow full movements with stop sign control on
the minor (east/west) streets. As stated earlier, the functional
distance (available for storage and deceleration) between SH119 and the
south access to Long View is 340 feet. It is recommended that this area
be widened and striped to have side-by-side left-turn lanes if the south
most access to Long View is to be maintained as a full-movement
intersection. The forecasted southbound left-turn volume exceeds 300
vehicles in the afternoon peak hour. If this geometry cannot be
accomplished, then this access should be changed to right-in/right-out.
Table 7 shows the peak hour operation at the key intersections
using the long range (2025) total peak hour traffic (Figure 12) . It is
expected that the key intersections will operate acceptably with the
geometry shown in Figure 14 with one exception. That exception is,
during the afternoon peak hour, the SH119/WCR3 intersection will
operate at level of service D overall. This exceeds the Weld County
operational criteria in the MUD area. However, this intersection is on
the CDOT road system. Generally, acceptable operation on the CDOT
system is level of service D during the peak hours. Calculation forms
are provided in Appendix G. The forecasted volumes on SH119 indicate
that three through lanes should be considered by the year 2025. These
lanes are needed to accommodate the through traffic volumes in the peak
hours.
27
TABLE 7
Long Range(2025)Total Peak Hour Operation
Iniersecbon - Morreme st
EB LT D C
EBT A
EB RT A A
EB APPROACH B C
WB LT B E
WBT B B
WB RT A A
WB APPROACH B B
SH119/Fairview NB LT D D
(signal)
NBT D D
NB RT A A
NB APPROACH D C
SB LT D E
SBT D D
SB RT A A
SB APPROACH
OVERALL B C
EB LT E E
EBT B D
EB RT A A
EB APPROACH C D
WB LT D E
WBT D C
WB RT A B
WB APPROACH D C
SH119/WCR;3% NB LT D E
(signal) NB LT D D
NB RT A A
_ NB APPROACH C C
SB LT E E
SBT
SB RT A A
SB APPROACH C C
OVERALL C D
SH119/RT Access SB RT D C
(RT-in/RT-out)
Continued on next page
28
Continued from previous page
TABLE 7
Long Range (2025)Total Peak Hour Operation
< tenet+D woe _
► ,- _
WB LT C C
WCR3%z/Access A WB RT B B
(stop sign) WB APPROACH B C
SB LT A A
EB LT/T/RT B B
WB LT C E
WCR3'/2/Carlsbad WB T/RT B B
(stop sign) WB APPROACH C E
NB LT A A
SB LT A A
WB LT B C
WCR31/2/Access B WB RT B _ B
(stop sign) WB APPROACH B C
SB LT A A
EB LT C C
EB T/RT B B
WB APPROACH _ B B
WCR3'/2/Access C WB LT C D
(stop sign) WB T/RT A B
WB APPROACH C D
NB LT A A
SB LT A A
NB LT B B
WCR31/2/Access D NB RT A B
(stop sign) NB APPROACH B B
WB LT A A
NB LT B B
WCR3'//Access E NB RT _ A B
(stop sign) NB APPROACH B B
WB LT A A
NB LT B B
WCR3'h/Access F NB RT A B
(stop sign) NB APPROACH B B
i I WB LT A I A
Continued on next page
29
Continued from previous page
TABLE 7
Long Range(2025) Total Peak Hour Operation
�--
NBLT C D
NB T B C
NB RT A A
NB APPROACH B C
WCR26/WCR5 SB LT C D
(stop sign) SB T C C
SB T A A
SB APPROACH C C
EB LT A A
WB LT A A
WCR26/Access G NB LT/RT B B
(stop sign) WB LT A A
WCR26/Access H NB LT/RT A B
(stop sign) WB LT A A
NB LT B B
WCR26/Fairview NB RT A A
(stop sign) NB APPROACH B B
WB LT A A
Fairview/Access I WB LT/RT A A
(stop sign) SB LT A A
----
30
V. CONCLUSIONS
The following summarizes the significant findings as a result of
this study:
- Phase 1 of the proposed LifeBridge PUD mixed-use development will
generate 8602 trips per day with 564 and 724 trips occurring
during the morning and afternoon peak hour periods, respectively.
At an long range (2025) level of development, the proposed
LifeBridge PUD will generate 23, 958 trip ends per day, 1432
morning peak hour trip ends, and 1947 afternoon peak hour trip
ends.
- Using the short range (2010) background peak hour traffic, peak
hour signal warrants are likely to be met at the SH119/Fairview
intersection.
- In the short range future with the background peak hour traffic
forecasts, the key intersections will operate acceptably.
- In the short range (2010) future with the total peak hour traffic
forecasts, the key intersections will operate acceptably. The
short range geometry is shown in Figure 13.
- In the long range future (2025) with development of the LifeBridge
PUD, the key intersections will operate acceptably. It is not
likely that traffic signals will be warranted at intersections
along WCR3;1 or WCR26 related to the LifeBridge Project PUD_ The
long range (2025) geometry is shown in Figure 14 .
- The actual development may be more or less than that shown in this
report in any given phase or subphase. The level of improvements.
to the street/road network should be tied to that specific level
of development. These will be determined in subsequent traffic
impact study addenda that are specific to an actual development
proposal.
31
APPENDIX A
) ) )
MATTHEW J.DELICH, P.E.
2272 GLEN HAVEN DRIVE
LOVELAND,CO 80538
Phone: (970)669.2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 9.21.04 Observer: Joe
Day: Tuesday Jurisdiction: Longmont
R= ghttum Intersection: SH119ICR3112
S=straight
L=left turn
Time Northbound: CR3 112 Southbound: CR3 112 Total Eastbound: SH119 Westbound: SH119 Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 5 0 1 6 5 2 23 30 36 5 200 10 215 3 403 3 409 624 660
7:45 5 0 0 5 4 0 26 30 35 0 232 12 244 2 482 2 486 730 765
N
8:00 0 0 0 0 5 0 12 17 17 5 236 10 251 4 466 2 472 723 740
8:15 8 0 0 8 7 0 23 30 38 9 223 14 246 7 428 5 440 686 724
7:30.8:30 18 0 1 19 21 2 84 107 126 19 891 46 956 16 1779 12 1807 2763 2889
PHF 0.59 0.89 0.95 0.93
4:30 19 0 2 21 2 0 9 11 : 32 23 331 10 364 1 265 12 278 642 674
4:45 37 1 7 45 2 0 9 11 56 25 445 5 475 1 290 9 300 775 831
5:00 13 1 3 17 2 1 9 12 29 20 423 6 449 1 266 8 275 724 753
5:15 12 0 3 15 3 0 7 10 25 28 396 5 429 0 303 7 310 739 764
4:30.5:30 81 2 15 98 9 1 34 44 142 96 1595 26 1717 3 1124 36 1163 2880 3022
PHF 0.54 0.92 0.9 0.94
) ) )
MATTHEW J. DELICH, P.E.
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970)669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 9.23.04 Observer: Harry
Day: Thursday Jurisdiction: Longmont
R=right tum Intersection: CR5/CR26
S =straight
L =left turn
Time Northbound: Southbound: CR5 Total Eastbound: CR26 Westbound: CR26 Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total eastlwest All
7:30 0 1 0 1 1 0 3 3 7 0 7 10 11
7:45 0 0 3 3 3 0 2 2 1 2 3 5 8
8:00 0 3 0 3 3 0 3 3 4 1 5 8 11
8:15 i 0 1 1 2 2 1 4 5 0 0 0 5 7
7:30-8:30 0 0 0 0 5 0 4 9 9 1 12 0 13 0 12 3 15 28 37
PHF n/a 0.75 0.65 0.54
4:30 0 0 0 0 0 0 2 2 0 0 0 2 2
4:45 0 1 0 1 1 1 2 3 2 3 5 8 9
5:00 0 1 1 2 2 1 4 5 3 2 5 10 12
5:15 0 2 2 4 4 1 1 2 4 4 8 10 14
4:30.5:30 0 0 0 0 4 0 3 7 7 3 9 0 12 0 9 9 18 30 37
PHF n/a 0.44 0.6 0.56
) )
MATTHEW J. DELICH, P.E.
2272 GLEN HAVEN DRIVE
LOVELAND,CO 80538
Phone: (970)669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 9.22.04 Observer: Joe
Day: Wednesday Jurisdiction: Longmont
R=right turnIntersection: County Line Road/CR26
S=straight
L=left tum
Time Northbound: CLR Southbound: CLR Total Eastbound: CR26 Westbound: CR26 Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 13 95 1 109 3 189 0 192 301 3 0 11 14 1 0 1 2 16 317
7:45 7 65 0 72 0 192 5 197 269 1 0 16 17 0 0 0 0 17 286
8:00 10 91 0 101 0 167 4 171 272 1 0 21 22 0 0 1 1 23 295
8:15 7 82 0 89 3 215 6 224 313 0 0 15 15 0 0 2 2 17 330
7:30.8:30 37 333 1 371 6 763. 15 784 1155 5 0 63 68 1 0 4 5 73 1228
PHF 0.85 0.88 0.77 0.63
4:30 12 153 0 165 5 96 0 101 266 1 1 5 7 0 0 12 12 19 285
4:45 6 155 0 161 9 121 1 131 292 0 1 14 15 0 0 4 4 19 311
5:00 5 178 1 184 6 133 0 139 323 3 0 11 14 0 0 5 5 19 342
5:15 4 182 4 190 11 117 0 128 318 1 0 15 16 0 0 3 3 19 337
4:30.5:30 27 668 5 700 31 467 1 499 1199 5 2 45 52 0 0 24 24 76 1275
PHF 0.92 0.9 0.81 0.5
) ) )
MATTHEW J. DELICH, P.E.
2272 GLEN HAVEN DRIVE
LOVELAND,CO 80538
Phone: (970)669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 9.22.04 Observer: Harry
Day: Wednesday Jurisdiction: Longmont
R=right turn Intersection: SH1191Fairview-Sand Stone
S=straight
L=left tum
Time Northbound: Sand Stone Southbound: Fairview Total Eastbound: SH119 Westbound: SH119 Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 0 0 0 0 0 0 0 0 0 4 267 2 273 2 454 2 458 731 731
7:45 2 0 0 2 2 0 1 3 5 6 292 2 300 1 570 7 578 878 883
l) 8:00 1 0 0 1 0 0 1 1 2 8 223 3 234 0 432 2 434 668 670
8:15 3 0 0 3 0 0 0 0 3 6 211 2 219 1 327 3 331 550 553
7:30.8:30 6 0 0 6 2 0 2 4 10 24 993 9 1026 4 1783 14 1801 2827 2837
PHF 0.5 0.33 0.86 0.78
4:30 3 0 0 3 3 0 7 10 13 3 391 2 396 2 1348 2 352 748 761
4:45 3 0 0 3 2 0 8 10 13 5 344 0 349 0 312 5 317 666 679
5:00 0 0 0 0 4 0 9 13 13 5 497 0 502 0 413 0 413 915 928
5:15 1 0 1 2 5 0 8 13 15 2 443 2 447 1 284 0 285 732 747
4:30-5:30 7 0 ' 1 8 14 0 32 46 54 15 1675 4 1694 3 1357 7 1367 3061 3115
PHF 0.67 0.88 0.84 0.83
�- APPENDIX B
2: SH 119 & Fairview St.
recent AM 12/22/2004
l I 4- 1 t P L 4 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 14 r ff r 11 T. 4 r
Sign Control Free Free Stop Stop
Grade 0% 0% 0% 0%
Volume (veh/h) 24 993 9 4 1783 14 6 0 0 2 0 2
Peak Hour Factor 0.86 0.86 0.86 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Hourly flow rate (vph) 28 1155 10 5 2098 16 7 0 0 2 0 2
Pedestrians
Lane Width (ft)
Walking Speed (fUs)
Percent Blockage
Right turn flare (veh)
Median type Raised Raised
Median storage veh) 1 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 2114 1165 2269 3334 577 2740 3328 1049
vC1, stage 1 conf vol 1210 1210 2107 2107
vC2, stage 2 conf vol 1058 2124 633 1221
vCu, unblocked vol 2114 1165 2269 3334 577 2740 3328 1049
tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9
tC, 2 stage (s) 6.5 5.5 6.5 5.5
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 89 99 93 100 100 95 100 99
cM capacity (veh/h) 255 595 95 46 460 43 61 224
Direction, Lane* EB 1 EB 2 EB 3 ES 4 WB 1 WB 2' WB 3 ?W8 4' NB 1 NB 2" SB 1 SB 2
Volume Total 28 577 577 10 5 1049 1049 16 7 0 2 2
Volume Left 28 0 0 0 5 0 0 0 7 0 2 0
Volume Right 0 0 0 10 0 0 0 16 0 0 0 2
cSH 255 1700 1700 1700 595 1700 1700 1700 95 1700 43 224
Volume to Capacity 0.11 0.34 0.34 0.01 0.01 0.62 0.62 0.01 0.07 0.00 0.05 0.01
Queue Length 95th (ft) 9 0 0 0 1 0 0 0 6 0 4 1
Control Delay(s) 20.8 0.0 0.0 0.0 11.1 0.0 0.0 0.0 45.9 0.0 92.6 21.2
Lane LOS C B E A F C
Approach Delay (s) 0.5 0.0 45.9 56.9
Approach LOS E F
Intersection Summary
Average Delay 0.4
Intersection Capacity Utilization 66.0% ICU Level of Service C
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
1
2: SH 119 & Fairview St.
recent PM 12/22/2004
J -+ -r k 4\ t r ` 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 11 tt r ►) TT r 11 1. 4 r
Sign Control Free Free Stop Stop
Grade 0% 0% 0% 0%
Volume (veh/h) 15 1688 4 3 1293 7 7 0 1 14 0 32
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.88 0.88 0.88
Hourly flow rate (vph) 18 1986 5 4 1521 8 8 0 1 16 0 36
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised Raised
Median storage veh) 1 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 1529 1991 2789 3558 993 2558 3554 761
vC1, stage 1 conf vol 2021 2021 1528 1528
vC2, stage 2 conf vol 768 1536 1029 2026
vCu, unblocked vol 1529 1991 2789 3558 993 2558 3554 761
tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9
tC, 2 stage (s) 6.5 5.5 6.5 5.5
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 96 99 82 100 100 80 100 90
cM capacity (veh/h) 431 285 46 57 244 78 57 348
Direction,Lane# EB 1 !EB2 EB 3 "EB4 ,WB 1 WB-2 WB 3 WB4 NB;1 NB 2 SB 1 862
Volume Total 18 993 993 5 4 761 761 8 8 1 16 36
Volume Left 18 0 0 0 4 0 0 0 8 0 16 0
Volume Right 0 0 0 5 0 0 0 8 0 1 0 36
cSH 431 1700 1700 1700 285 1700 1700 1700 46 244 78 348
Volume to Capacity 0.04 0.58 0.58 0.00 0.01 0.45 0.45 0.00 0.18 0.00 0.20 0.10
Queue Length 95th (ft) 3 0 0 0 1 0 0 0 15 0 18 9
Control Delay(s) 13.7 0.0 0.0 0.0 17.8 0.0 0.0 0.0 100.5 19.8 62.5 16.5
Lane LOS B C F C F C
Approach Delay (s) 0.1 0.0 90.4 30.5
Approach LOS F D
Intersection Summary '
Average Delay 0.8
Intersection Capacity Utilization 60.8% ICU Level of Service B
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
3
3: SH 119 & CR 3.5
recent AM 12/15/2004
f —D• --st cam- t4\ t r \W ! I
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations vi tt rt 1 tt p 'I t r 4 r
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.85 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.96 1.00
Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1583 1781 1583
Flt Permitted 0.09 1.00 1.00 0.29 1.00 1.00 0.74 1.00 0.76 1.00
Satd. Flow (perm) 171 3539 1583 537 3539 1583 1379 1583 1408 1583
Volume (vph) 19 909 47 16 1741 12 18 0 1 21 2 82
Peak-hour factor, PHF 0.95 0.95 0.95 0.93 0.93 0.93 0.85 0.85 0.85 0.89 0.89 0.89
Adj. Flow (vph) 20 957 49 17 1872 13 21 0 1 24 2 92
RTOR Reduction (vph) 0 0 9 0 0 2 0 0 1 0 0 24
Lane Group Flow(vph) 20 957 40 17 1872 11 21 0 0 0 26 68
Turn Type Perm Penn Penn Penn Penn Penn Penn Penn
Protected Phases 2 6 8 4
Permitted Phases 2 2 6 6 8 8 4 4
Actuated Green, G (s) 76.2 76.2 76.2 76.2 76.2 76.2 8.6 8.6 8.6 8.6
Effective Green, g (s) 77.2 77.2 77.2 77.2 77.2 77.2 9.6 9.6 9.6 9.6
Actuated g/C Ratio 0.81 0.81 0.81 0.81 0.81 0.81 0.10 0.10 0.10 0.10
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
'^ Lane Grp Cap (vph) 139 2882 1289 437 2882 1289 140 160 143 160
v/s Ratio Prot 0.27 c0.53
v/s Ratio Penn 0.12 0.03 0.03 0.01 0.02 0.00 0.02 c0.04
v/c Ratio 0.14 0.33 0.03 0.04 0.65 0.01 0.15 0.00 0.18 0.42
Uniform Delay, dl 1.9 2.2 1.7 1.7 3.5 1.6 38.9 38.3 39.0 40.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 2.2 0.3 0.0 0.2 1.1 0.0 0.5 0.0 0.6 1.8
Delay (s) 4.0 2.5 1.7 1.9 4.6` 1.7 39.4 38.3 39.6 41.8
Level of Service A A A A A AD D D D
Approach Delay(s) 2.5 4.6 39.3 41.3
Approach LOS A A n n
Intersection Summary
HCM Average Control Delay 5.6 HCM Level of Service A
HCM Volume to Capacity ratio 0.62
Actuated Cycle Length (s) 94.8 Sum of lost time (s) 8.0
Intersection Capacity Utilization 66.5% ICU Level of Service C
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
Cl
3: SH 119 & CR 3.5
recent PM 12/15/2004
"' f —. 1 I k- 4\ t r ' l
Movement EBL ' EBT EBR ; WBL WBT WBR NBL NBT NBR SBL SBT,' SBR
Lane Configurations "j if 1' '1 tt 1' 'f t r 4 P
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.85
Ftt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.96 1.00
Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1863 1583 1782 1583
Fit Permitted 0.20 1.00 1.00 0.10 1.00 1.00 0/5 1.00 1.00 0.82 1.00
Satd. Flow(perm) 371 3539 1583 192 3539 1583 1398 1863 1583 1527 1583
Volume (vph) 95 1582 26 3 1182 36 85 2 15 9 1 36
Peak-hour factor, PHF 0.90 0.90 0.90 0.94 0.94 0.94 0.85 0.85 0.85 0.92 0.92 0.92
Adj. Flow(vph) 108 1758 29 3 1257 38 100 2 18 10 1 39
RTOR Reduction (vph) 0 0 6 0 0 8 0 0 16 0 0 34
Lane Group Flow(vph) 106 1758 23 3 1257 30 100 2 2 0 11 5
Turn Type Penn Penn Perm Penn Penn Penn Penn Penn
Protected Phases 2 6 8 4
Permitted Phases 2 2 6 6 8 8 4 4
Actuated Green, G (s) 74.2 74.2 74.2 74.2 74.2 74.2 10.9 10.9 10.9 10.9 10.9
Effective Green, g (s) 75.2 75.2 75.2 75.2 75.2 75.2 11.9 11.9 11.9 11.9 11.9
Actuated g/C Ratio 0.79 0.79 0.79 0.79 0.79 0.79 0.13 0.13 0.13 0.13 0.13
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 293 2798 1252 152 2798 1252 175 233 198 191 198
v/s Ratio Prot c0.50 0.36 0.00
v/s Ratio Penn 0.29 0.01 0.02 0.02 c0.07 0.00 0.01 0.00
v/c Ratio 0.36 O.63 0.02 0.02 0.45 0.02 0.57 0.01 0.01 0.06 0.02
Uniform Delay, dl 2.9 4.1 2.1 2.1 3.2 2.1 39.2 36.4 36.4 36.7 36.5
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 3.4 1.1 0.0 0.2 0.5 0.0 4.5 0.0 0.0 0.1 0.1
Delay (s) 6.4 5.2 2.1 2.4 3.8 2.2 43.6 36.4 36.5 36.8 36.6
Level of Service A A A A A A DDD D D
Approach Delay(s) 5.2 3.7 42.5 36.6
Approach LOS A A n n
Intersection Summary -
HCM Average Control Delay 6.4 HCM Level of Service A
HCM Volume to Capacity ratio 0.62
Actuated Cycle Length (s) 95.1 Sum of lost time (s) 8.0
Intersection Capacity Utilization 68.4% ICU Level of Service C
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 light Report
Matthew J. Delich , P. E. Page 1
/D
22: CR26 & CR5
recent AM 12/15/2004
Movement EBL' "EBT WBT WBR ': SBL SBR
Lane Configurations 4 14 ►1+
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 1 12 12 3 5 4
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85
Hourly flow rate (vph) 1 14 14 4 6 5
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 18 32 16
vC1, stage 1 coal vol
vC2, stage 2 cord vol
vCu, unblocked vol 18 32 16
tC, single (s) 4.1 6.4 6.2
tC. 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 99 100
cM capacity (veh/h) 1599 981 1063
Direction, Lane* BB 1 _+NB I SB 1 = -
Volume Total 15 18 11
Volume Left 1 0 6
Volume Right 0 4 5
cSH 1599 1700 1016
Volume to Capacity 0.00 0.01 0.01
Queue Length 95th (ft) 0 0 1
Control Delay (s) 0.6 0.0 8.6
Lane LOS A A
Approach Delay(s) 0.6 0.0 8.6
Approach LOS A
Intersection Summary
Average Delay 2.3
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
II
22: CR 26 & CR 5
recent PM 12/15/2004
•— ` J
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations 4 1 "t'
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume(veh/h) 3 9 9 9 4 3
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85
Hourly flow rate (vph) 4 11 11 11 5 4
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 21 34 16
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 21 34 16
tC,single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 100 100
cM capacity (veh/h) 1595 978 1063
Direction, Lane# EB / WB'1 SB 1 !'
Volume Total 14 21 8
Volume Left 4 0 5
Volume Right 0 11 4
cSH 1595 1700 1013
Volume to Capacity 0.00 0.01 0.01
Queue Length 95th (ft) 0 0 1
Control Delay(s) 1.8 0.0 8.6
Lane LOS A A
Approach Delay (s) 1.8 0.0 8.6
Approach LOS A
Intersection Summary
Average Delay 2.2
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
12-
APPENDIX C
Figure 4C-4. Warrant 3, Peak Hour (70% Factor)
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 70 km/h (40 mph) ON MAJOR STREET)
I
a.
400 ` = 2 OR MORE LANES & 2 OR MORE LANES
v
2 OR MORE LANES & 1 LANE
cc CC 300 _
r j Q 1 LANE & 1 LANE
2 2 200
Pat
100 , *100
`75
4 : 35✓' = _____ __... .._ _____--- _ __._ ____._...__.. _ dCD-
i y
300 400 500 600 700 800 900 1000 1100 1200 1300
A �
MAJOR STREET-TOTAL OF BOTH APPROACHES- `a
VEHICLES PER HOUR (VPH)
*Note: 100 vph applies as the lower threshold volume for a minor-street x x
approach with two or more lanes and 75 vph applies as the lower
threshold volume for a minor-street approach with one lane.
June 2001 Sect. 4C.05
ininert— PAnl/ F RA/ W/,&nus. IiA to IA/FP--A'Ur i4i' S,hil tclic. i PviEs�/ — V)S-7--azkiC
Figure 4C-4. Warrant 1, Peak Hour (70% Factor)
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 70 km/h (40 mph) ON MAJOR STREET)
I
' 400 2 OR MORE LANES & 2 OR MORE LANES
tig:34S/Py -
2 OR MORE LANES & 1 LANE
al O
[C 300
'M:z6S✓PH a
_ �k t7
cc
O 200
O 100 - I .100
_ *75
J\ C7
I
300 400 500 600 700 800 900 1000 1100 120O 1300
MAJOR STREET-TOTAL OF BOTH APPROACHES INj
-
VEHICLES PER HOUR (VPH) U (*)
*Note: 100 vph applies as the lower threshold volume for a minor-street
approach with two or more lanes and 75 vph applies as the lower
threshold volume for a minor-street approach with one lane.
June 2001 Sect 4C.05
LLN)(1 RArJ((t: S4(-et-Qniit l it ?Al/+kP.Aer �7' 111(e Z6/..oun/ l L//1/ 'CO .
APPENDIX D
t ,
2: SH 119 & Fairview St.
short bkgrd AM 12/21/2004
J — j- +- t441 t r 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 'S TT P. "1 ft r 'f I. 1 A
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4M 4.0 4A 4.0
Lane Util. Factor 1.00 0.95 1M0 1.00 0.95 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.85 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00
Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1583 1770 1583
Flt Permitted 0.05 1.00 1.00 0.19 1.00 1.00 0.82 1.00 0.98 1.00
Satd. Flow(perm) 93 3539 1583 345 3539 1583 1521 1583 1817 1583
Volume (vph) 115 1190 80 30 2025 70 15 0 10 10 0 25
Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 125 1293 87 33 2201 76 16 0 11 11 0 27
RTOR Reduction (vph) 0 0 22 0 0 20 0 10 0 0 26 0
Lane Group Flow(vph) 125 1293 65 33 2201 56 16 1 0 11 1 0
Turn Type Pm+pt Perm pm+pt Perm pm+pt pm+pt
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 8 4
Actuated Green, G (s) 83.0 78.9 78.9 80.0 77.4 77.4 5.5 3.9 3.9 3.1
Effective Green, g (s) 85.0 79.9 79.9 82.0 78.4 78.4 7.5 4.9 5.9 4.1
Actuated g/C Ratio 0.80 0.75 0.75 0.77 0.74 0.74 0.07 0.05 0.06 0.04
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.D 3.0 3.0
^ Lane Grp Cap (vph) 155 2663 1191 315 2613 1169 114 73 100 61
v/s Ratio Prot c0.04 0.37 0.00 c0.62 c0.00 0.00 0.00 0.00
v/s Ratio Perm 0.61 0M4 0.08 0.04 c0.01 0.00
v/c Ratio 0.81 0.49 0.05 0.10 0.84 0.05 0.14 0.01 0.11 0.02
Uniform Delay, dl 27.8 5.1 3.4 3.4 9.6 3.8 46.3 48.3 47.7 49.1
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 25.5 0.6 0.1 0.1 3.5 0.1 0.6 0.0 0.5 0.1
Delay (s) 53.3 5.8 3.5 3.5 13.1 3.8 46.9 48.4 48.1 49.2
Level of Service D A A A B A D D D D
Approach Delay (s) 9.6 12.7 47.5 48.9
Approach LOS A B 0 D
Intersection Summary -
HCM Average Control Delay 12.1 HCM Level of Service B
HCM Volume to Capacity ratio 0.76
Actuated Cycle Length (s) 106.2 Sum of lost time (s) 12.0
Intersection Capacity Utilization 79.8% ICU Level of Service D
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
CI
2: SH 119 & Fairview St.
short bkqrd PM 12/21/2004
i —i 1< '— k- t t ' 1 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations ' if r ►j tt r 11 T. 11 I.
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.85 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00
Satd. Flow(prot) 1770 3539 1583 1770 3539 1583 1770 1583 1770 1583
Fit Permitted 0.08 1.00 1.00 0.08 1.00 1.00 0.47 1.00 0.69 1.00
Satd. Flow(perm) 152 3539 1583 152 3539 1583 876 1583 1279 1583
Volume (vph) 45 1730 60 30 1495 30 130 0 100 65 0 130
Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow(vph) 49 1880 65 33 1625 33 141 0 109 71 0 141
RTOR Reduction (vph) 0 0 27 0 0 13 0 95 0 0 109 0
Lane Group Flow(vph) 49 1880 38 33 1625 20 141 14 0 71 32 0
Turn Type pm+pt Perm pm+pt Perm pm+pt pm+pt
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 8 4
Actuated Green, G (s) 50.4 48.1 48.1 50.4 48.1 48.1 13.3 9.3 11.7 8.5
Effective Green, g (s) 52.4 49.1 49.1 52.4 49.1 49.1 15.3 10.3 13.7 9.5
Actuated g/C Ratio 0.63 0.59 0.59 0.63 0.59 0.59 0.18 0.12 0.17 0.11
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 160 2096 938 160 2096 938 216 197 236 181
v/s Ratio Prot c0.01 c0.53 0.01 0.46 c0.04 0.01 0.02 0.02
v/s Ratio Perm 0.18 0M2 0.12 0.01 c0.08 0.03
v/c Ratio 0.31 0.90 0.04 0.21 0.78 0.02 0.65 0.07 0.30 0.18
Uniform Delay, dl 10.8 14.7 7.1 14.6 12.7 7.0 30.4 32.1 30.1 33.2
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 1.1 6.5 0.1 0.6 2.9 0.0 6.9 0.1 0.7 0.5
Delay(s) 11.9 21.2 7.1 15.2 15.6 7.0 37.3 322 30.8 33.6
Level of Service BC ABB A DC C C
Approach Delay(s) 20.6 15.4 35.1 32.7
Approach LOS C B D a
Intersection Summary
HCM Average Control Delay 20.0 HCM Level of Service B
HCM Volume to Capacity ratio 0.78
Actuated Cycle Length (s) 82.9 Sum of lost time (s) 12.0
Intersection Capacity Utilization 73.1% ICU Level of Service ID
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
LS
3: SH 119 & CR 3.5
short bkgrd AM 12/21/2004
J _ j 4— k I\ t t L i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations li T? r 11 tt r '1 t r 4 r
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane UM. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.85 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00
Said. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1583 1770 1583
Fit Permitted 0.05 1.00 1.00 0.21 1.00 1.00 0.48 1.00 0.91 1.00
Said. Flow (perm) 95 3539 1583 386 3539 1583 887 1583 1693 1583
Volume (vph) 20 1080 110 110 2015 15 25 0 25 20 0 85
Peak-hour factor, PHF 0.95 0.95 0.95 0.93 0.93 0.93 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow(vph) 21 1137 116 118 2167 16 27 0 27 22 0 92
RTOR Reduction (vph) 0 0 31 0 0 4 0 0 24 0 0 0
Lane Group Flow(vph) 21 1137 85 118 2167 12 27 0 3 0 22 92
Turn Type pm+pt Perm pm+pt Penn pm+pt Perm pm+pt Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 8 8 4 Free
Actuated Green, G (s) 79.2 77.7 77.7 86.4 81.3 81.3 9.9 9.9 3.4 107.7
Effective Green, g (s) 81.2 78.7 78.7 88.4 82.3 82.3 10.9 10.9 4.4 107.7
Actuated g1C Ratio 0.75 0.73 0.73 0.82 0.76 0.76 0.10 0.10 0.04 1.00
Clearance Time (s) 5.0 5.0 5M 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 111 2586 1157 395 2704 1210 110 160 69 1583
v/s Ratio Prot 0.00 0.32 c0.02 c0.61 c0.01
v/s Ratio Perm 0.14 0.05 0.23 0.01 c0.02 0.00 0.01 0.06
v/c Ratio 0.19 0.44 0.07 0.30 0.80 0.01 0.25 0.02 0.32 0.06
Uniform Delay, dl 10.3 5.8 4.1 3.1 7.7 3.0 44.3 43.6 50.2 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 0.8 0.5 0.1 0.4 2.6 0.0 1.2 0.0 2.7 0.1
Delay(s) 11.1 6.3 4.2 3.5 103 3.0 45.4 43.6 52.9 0.1
Level of Service B A A A B AD D D A
Approach Delay (s) 6.2 9.9 44.5 10.3
Approach LOS A A D B
Intersection Summary
HCM Average Control Delay 9.2 HCM Level of Service A
HCM Volume to Capacity ratio 0.73
Actuated Cycle Length (s) 107.7 Sum of lost time (s) 12.0
Intersection Capacity Utilization 77.1% ICU Level of Service D
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
lq
3: SH 119 & CR 3.5
short bkqrd PM 12/21/2004
C 4. 4\ t t 1 -'
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations ' if r iri tt r ) f r 4 r
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.85 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00
Said. Flow(prof) 1770 3539 1583 1770 3539 1583 1770 1583 1770 1583
Flt Permitted 0.12 1.00 1.00 0.08 1.00 1.00 0.62 1.00 1.00 1.00
Satd. Flow(perm) 229 3539 1583 156 3539 1583 1164 1583 1863 1583
Volume (vph) 95 172O 80 80 1320 40 200 0 200 10 0 40
Peak-hour factor, PHF 0.92 0.92 0.92 0.94 0.94 0.94 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 103 1870 87 85 1404 43 217 0 217 11 0 43
RTOR Reduction (vph) 0 0 34 0 0 17 0 0 134 0 0 0
Lane Group Flow(vph) 103 1870 53 85 1404 26 217 0 83 0 11 43
Turn Type pm+pt Penn pm+pt Penn pm+pt Penn pm+pt Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 8 8 4 Free
Actuated Green, G (s) 50.0 46.9 46.9 50.0 46.9 46.9 13.2 13.2 1.4 78.2
Effective Green, g (s) 52.0 47.9 47.9 52.0 47.9 47.9 14.2 14.2 2.4 78.2
Actuated g/C Ratio 0.66 0.61 0.61 0.66 0.61 0.61 0.18 0.18 0.03 1.00
Clearance Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 233 2168 970 188 2168 970 272 287 57 1583
v/s Ratio Prot 0.02 c0.53 c0.02 0.40 c0.08
v/s Ratio Penn 0.27 0.03 0.28 0.02 c0.07 0.05 0.01 0.03
v/c Ratio 0.44 0.86 0.05 0.45 0.65 0.03 0.80 0.29 0.19 0.03
Uniform Delay, dl 7.3 12.4 6.1 12.8 9.7 6.0 30.4 27.6 37.0 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 1.3 4.8 0.1 1.7 1.5 0.1 14.9 0.6 1.7 0.0
Delay(s) 8.6 17.3 6.2 14.6 11.2 6.0 45.3 28.2 38.6 0.0
Level of Service A B A B B A D C D A
Approach Delay (s) 16.4 11.3 36.8 7.9
Approach LOS B B D A
Intersection Summary
HCM Average Control Delay 16.5 HCM Level of Service B
HCM Volume to Capacity ratio 0.82
Actuated Cycle Length (s) 78.2 Sum of lost time (s) 12.0
Intersection Capacity Utilization 79.7% ICU Level of Service D
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
ZD
22: CR26 & CR5
short bkgrd AM 12/15/2004
-D. 4- 4,-
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations 1 V
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 5 15 15 5 10 5
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 5 16 16 5 11 5
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft)
pX. platoon unblocked
vC, conflicting volume 22 46 19
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 22 46 19
tC, single (s) 4A 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 99 99
cM capacity (veh/h) 1594 961 1059
Direction, Lane# EBT WB 1 SB 1
Volume Total 22 22 16
Volume Left 5 0 11
Volume Right 0 5 5
cSH 1594 1700 991
Volume to Capacity 0.00 0.01 0.02
Queue Length 95th (ft) 0 0 1
Control Delay (s) 1.8 0.0 8.7
Lalle LOS A A
Approach Delay (s) 1.8 0.0 8.7
Approach LOS A
Intersection Summary
Average Delay 3.0
Intersection Capacity Utilization 15.2% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
2-I
22: CR 26 & CR 5
short bkgrd PM 12/15/2004
Movement EBL EBT WBT "WBR SBL SBR
Lane Configurations 4 1. M
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 5 10 10 10 5 5
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 5 11 11 11 5 5
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 22 38 16
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 22 38 16
tC, single (s) 4.1 8-4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 99 99
cM capacity (veh/h) 1594 971 1063
Direction. Lane`# EB i -WB d 561
Volume Total - 16 22 11
Volume Left 5 0 5
Volume Right 0 11 5
cSH 1594 1700 1015
Volume to Capacity 0.00 0.01 0.01
Queue Length 95th (ft) 0 0 1
Control Delay (s) 2.4 0.0 8.6
Lane LOS A A
Approach Delay (s) 2.4 0.0 8.6
Approach LOS A
Intersection Summary
Average Delay 2.7
Intersection Capacity Utilization 15.0% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
22-
APPENDIX E
z3
6: SH 119 & Fairview
short total AM 12/21/2004
t —P• I ~ 4.- 41 t r " 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations ' $4 r ''S $4 r ' T1 ) A
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4:0 .,-
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.90 1.00 0.86
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00
Said. Flow(prot) 1770 3539 1583 1770 3539 1583 1770 1671 1770 1605
Flt Permitted 0.05 1,00 1.00 0.15 1.00 1.00 0.71 1.00 0.75 1.00
Satd. Flow(perm) 87 3539 1583 272 3539 1583 1319 1671 1392 1605
Volume (vph) 125 1370 80 30 2085 75 15 5 10 20 5 55
Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow(vph) 136 1489 87 33 2266 82 16 5 11 22 5 60
RTOR Reduction (vph) 0 0 22 0 0 17 0 10 0 0 56 0
Lane Group Flow(vph) 136 1489 65 33 2266 65 16 6 0 22 9 0
Turn Type Prn+pt Penn pm+pt Penn pm+pt pm+pt
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 8 4
Actuated Green, G (s) 92.4 85.4 85.4 83.2 80.8 80.8 7.4 5.8 7.4 5.8
Effective Green, g (s) 93.8 86.4 86.4 85.2 81.8 81.8 9.4 6.8 9.4 6.8
Actuated g/C Ratio 021 0.75 0.75 0.74 0.71 0.71 0.08 0.06 0.08 0.06
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 188 2654 1187 245 2513 1124 118 99 122 95
v/s Ratio Prot c0.05 0.42 0.00 c0.64 0.00 0.00 c0.00 0.01
v/s Ratio Perm 0.54 0.04 0.10 0.04 0.01 c0.01
v/c Ratio 0.72 0.56 0.05 0.13 0.90 0.06 0.14 0.06 0.18 0.09
Uniform Delay, dl 35.9 6.2 3.8 4.9 13.5 5.0 49.0 51.2 49.2 51.3
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 12.9 0.3 0.0 0.3 5.0 0.0 0.5 0.2 0.7 0.4
Delay(s) 48.8 6.5 3.8 5.1 18.4 5.1 49.6 51.4 49.9 ' 51.7
Level of Service D A A A B A D D D D
Approach Delay(s) 9.7 17.8 50.5 51.2
Approach LOS A B D D
Intersection Summary
HCM Average Control Delay 15.4 HCM Level of Service B
HCM Volume to Capacity ratio 0.82
Actuated Cycle Length (s) 115.2 Sum of lost time (s) 16.0
Intersection Capacity Utilization 82.3% ICU Level of Service E
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
Z4
6: SH 119 & Fairview
short total PM 12/21/2004
J 7 I t 1 t r ` I J
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations i tt r ) tt r ' vl A 11 I.
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1,00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.86 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00
Satd. Flow(prot) 1770 3539 1583 1770 3539 1583 1770 1596 1770 1592
Flt Permitted 0.07 1.00 1.00 0.07 1.00 1.00 0.38 1.00 0.64 1.00
Satd. Flow(perm) 128 3539 1583 130 3539 1583 713 1596 1198 1592
Volume (vph) 80 1860 60 30 1630 45 130 5 100 70 5 150
Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow(vph) 87 2022 65 33 1772 49 141 5 109 76 5 163
RTOR Reduction (vph) 0 0 22 0 0 19 0 94 0 0 86 0
Lane Group Flow(vph) 87 2022 43 33 1772 30 141 20 0 76 82 0
Turn Type pm+pt Perm pm+pt Perm pm+pt pm+pt
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 8 4
Actuated Green, G (s) 60.2 57.0 57.0 58.4 56.1 56.1 15.8 11.8 14.2 11.0
Effective Green, g (s) 62.2 58.0 58.0 60.4 57.1 57.1 17.8 12.8 16.2 12.0
Actuated g/C Ratio 0.66 0.62 0.62 0.64 0.61 0.61 0.19 0.14 0.17 0.13
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 158 2177 974 141 2143 959 191 217 231 203
v/s Ratio Prot c0.02 c0.57 0.01 0.50 c0.04 0.01 0.01 0.05
v/s Ratio Perm 0.34 0.03 0.14 0.02 c0.10 0.04
v/c Ratio 0.55 0,93 0.04 0.23 0.83 0.03 0.74 0.09 0.33 0.40
Uniform Delay, dl 15.3 16.3 7.2 18.8 14.7 7.5 35.2 35.7 33.8 37.8
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 4.1 7.6 0.0 0.9 2.8 0.0 13.8 0.2 0.8 1.3
Delay (s) 19.4 23.9 7.2 19.6 17.5 7.5 49.0 35.8 34.6 39.2
Level of Service BC A BB A DD C D
Approach Delay (s) 23.2 17.2 43.1 37.7
Approach LOS C B 0 D
Intersection Summary
HCM Average Control Delay 22.7 HCM Level of Service C
HCM Volume to Capacity ratio 0.80
Actuated Cycle Length (s) 94.3 Sum of lost time (s) 8.0
Intersection Capacity Utilization 84.8% ICU Level of Service E
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
ZS
3: SH 119 & WCR 3.5
short total AM 12/21/2004
—• ( 4— k%, .\ t r '* 1 J
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations ft r 11 tat r 11 t r vi t r
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time(s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1_00 1.00 1.00 1.00
Frl 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1863 1583 1770 1863 1583
Flt Permitted 0.05 1.00 1.00 0.23 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Satd. Flow (perm) 96 3539 1583 421 3539 1583 1863 1863 1583 1863 1863 1583
Volume (vph) 200 1090 110 110 2045 70 25 5 25 55 5 120
Peak-hour factor, PHF 0.95 0.95 0.95 0.93 0.93 0.93 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow(vph) 211 1147 116 118 2199 75 27 5 27 60 5 130
RTOR Reduction (vph) 0 0 31 0 0 23. 0 0 0 0 0 0
Lane Group Flow(vph) 211 1147 85 118 2199 52 27 5 27 60 5 130
Turn Type pm+pt Perm pm+pt Penn pm+pt Free pm+pt Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 8 Free 4 Free
Actuated Green, G (s) 86.0 77.0 77.0 78.0 73.0 73.0 3.6 1.2 106.7 5.8 2.3 106.7
Effective Green, g (s) 88.0 78.0 78.0 80.0 74.0 74.0 5.6 2.2 106.7 7.8 3.3 106.7
Actuated g/C Ratio 0.82 0.73 0.73 0.75 0.69 0.69 0.05 0.02 1.00 0.07 0.03 1.00
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
" Lane Grp Cap (vph) 236 2587 1157 392 2454 1098 95 38 1583 132 58 1583
v/s Ratio Prot co.08 0.32 0.02 0.62 0.01 0.00 c0.02 0.00
v/s Ratio Penn c0.66 0.05 0.21 0.03 0.01 0.02 c0.01 c0.08
v/c Ratio 0.89 0.44 0.07 0.30 0,90 0.05 0.28 0.13 0.02 0.45 0.09 0.08
Uniform Delay, d1 36.9 5.7 4.1 3.8 13.2 5.2 48.6 51.3 0.0 47.4 50.2 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 31.8 0.1 0.0 0.4 4.7 0.0 1.6 1.6 0.0 2.5 0.6 0.1
Delay (s) 68.7 5.8 4.1 4.3 18.0 5.2 50.3 52.9 0.0 49.9 50.9 0.1
Level of Service E A A A B ADD A DD A
Approach Delay(s) 14.7 16.9 27.5 16.7
Approach LOS B B C B
Intersection Summary - -
HCM Average Control Delay 16.3 HCM Level of Service B
HCM Volume to Capacity ratio 0.82
Actuated Cycle Length (s) 106.7 Sum of lost time (s) 8.0
Intersection Capacity Utilization 87.3% ICU Level of Service E
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
2(0
3: SH 119 & WCR 3.5
short total PM 12/21/2004
t l 1 4— 1 t f b 1 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 1 tt r ) tat r vi t r ) t rf
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow (prot) 1770 3539 1583 1770 3539 1583 1770 1863 1583 1770 1863 1583
Flt Permitted 0.09 1.00 1.00 0.10 1.00 1.00 1.00 IMO 1.00 1.00 1.00 1.00
Satd. Flow(perm) 167 3539 1583 183 3539 1583 1863 1863 1583 1863 1863 1583
Volume (vph) 235 1715 80 80 1380 75 200 5 200 105 5 125
Peak-hour factor, PHF 0.92 0.92 0.92 0.94 0.94 0.94 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 255 1864 87 85 1468 80 217 5 217 114 5 136
RTOR Reduction (vph) 0 0 33 0 0 38 0 0 0 0 0 0
Lane Group Flow(vph) 255 1864 54 85 1468 42 217 5 217 114 5 136
Turn Type pm+pt Penn pm+pt Penn pm+pt Free pm+pt Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 8 Free 4 Free
Actuated Green, G (s) 55.7 47.7 47.7 42.7 39.7 39.7 9.1 2.9 78.0 5.5 1.1 78.0
Effective Green, g (s) 56.7 48.7 48.7 44.7 40.7 40.7 11.1 3.9 78.0 7.5 2.1 78.0
Actuated g/C Ratio 0.73 0.62 0.62 0.57 0.52 0.52 0.14 0.05 1.00 0.10 0.03 1.00
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 368 2210 988 186 1847 826 257 93 1583 173 50 1583
v/s Ratio Prot c0.11 c0.53 0.02 0.41 c0.08 0.00 0,05 0.00
v/s Ratio Penn 0.40 0.03 0.24 0.03 c0.04 c0.14 0.02 0.09
v/c Ratio 0.69 0.84 0.05 046 0.79 0.05 0.84 0.05 0.14 0.66 0.10 0.09
Uniform Delay, dl 18.3 11.6 5.7 11.7 15.2 9.2 33.0 35.3 0.0 34.1 37.0 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 5.6 3.1 0.0 1.8 2.4 0.0 21.6 0.2 0.2 8.7 0.9 0.1
Delay (s) 23.8 14.8 5.7 13.5 17.7 9.2 54.6 35.5 0.2 42.8 37.9 0.1
Level of Service C B A B B A D D A D D A
Approach Delay (s) 15.4 17.1 27.5 19.9
Approach LOS B B C B
Intersection Summary
HCM Average Control Delay 17.4 HCM Level of Service B
HCM Volume to Capacity ratio 0.82
Actuated Cycle Length (s) 78.0 Sum of lost time (s) 12.0
Intersection Capacity Utilization 79.6% ICU Level of Service D
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
27
27: SH 119 & R i/o
short total AM 12/16/2004
4— i b
Movement EBL EBT WBT WBR SBL - SBR
Lane Configurations TT 1r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 0 0 2200 50 0 25
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 0 0 2391 54 0 27
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft) 1000
pX, platoon unblocked
vC, conflicting volume 2446 2391 1196
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 2446 2391 1196
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 100 85
cM capacity (veh/h) 189 28 179
Direction, Lane# WB t WB 2' WB 3 -SB 1
Volume Total 1196 1196 54 27
Volume Left 0 0 0 0
Volume Right 0 0 54 27
cSH 1700 1700 1700 179
Volume to Capacity 0.70 0.70 0.03 0.15
Queue Length 95th (ft) 0 0 0 13
Control Delay (s) 0.0 0.0 0.0 28.7
L: I LOS D
Approach Delay (s) 0.0 28.7
Approach LOS D
Intersection Summary
Average Delay 0.3
Intersection Capacity Utilization 70.8% ICU Level of Service C
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
27: SH119 & Ri/o
Short total PM 12/16/2004
Movement EBL EBT WBT% WBR SBL SBR
Lane Configurations t r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 0 0 1480 40 0 55
Peak Hour Factor 0.92 0.92 0.94 0.94 0.92 0.92
Hourly flow rate (vph) 0 0 1574 43 0 60
Pedestrians
Lane Width (ft)
Walking Speed (f/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft) 1000
pX, platoon unblocked
vC, conflicting volume 1617 1574 787
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 1617 1574 787
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 100 82
cM capacity (veh/h) 399 101 334
Direction, Lane# WB 1 WB.2 WB 3 ';SB 1
Volume Total 787 787 43 60
Volume Left 0 0 0 0
Volume Right 0 0 43 60
cSH 1700 1700 1700 334
Volume to Capacity 0.46 0.46 0.03 0.18
Queue Length 95th (ft) 0 0 0 16
Control Delay(s) 0.0 0.0 0.0 18.1
Lane LOS C
Approach Delay (s) 0.0 18.1
Approach LOS C
Intersection Summary
Average Delay 0.6
Intersection Capacity Utilization 51.0% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
1'
5: Access A & WCR 3.5 12/17/2004
short total AM
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations Il r 4 r 'It
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 20 5 145 120 25 100
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 22 5 158 130 27 109
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare(veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft) 885
pX, platoon unblocked
vC, conflicting volume 321 158 288
vCt, stage 1 conf vol 158
vC2, stage 2 conf vol 163
vCu, unblocked vol 321 158 288
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
�—, p0 queue free °/0 97 99 98
cM capacity (veh/h) 692 888 1274
Direction, Lane# WB 1 WB 2 NB 1 -NB 2 SB 1 SB 2
Volume Total 22 5 158 130 27 109
Volume Left 22 0 0 0 27 0
Volume Right 0 5 0 130 0 0
cSH 692 888 1700 1700 1274 1700
Volume to Capacity 0.03 0.01 0.09 0.08 0.02 0.06
Queue Length 95th (ft) 2 0 0 0 2 0
Control Delay (s) 10.4 9.1 0.0 0.0 7S 0.0
Lane LOS
v A A
11
Approach Delay (s) 10.1 0.0 1.6
Approach LOS B
Intersection Summary -
Average Delay 1.1
Intersection Capacity Utilization 24.3% ICU Level of Service A
Analysis Period (min) 15
r
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
30
5: Access A & WCR 3.5
short total PM 12/17/2004
tc t t t `► 1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations vi t T l 'it
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 35 20 155 85 20 180
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 38 22 168 92 22 196
Pedestrians
Lane Width (ft)
Walking Speed (Ws)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft) 885
pX, platoon unblocked
vC, conflicting volume 408 168 261
vC1, stage 1 conf vol 168
vC2, stage 2 conf vol 239
vCu, unblocked vol 408 168 261
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
p0 queue free % 94 98 98
cM capacity (veh/h) 643 876 1304
Direction, Lane# WB 1 WB 2 NB 1 NB 2 SB 1 SB2i" `
Volume Total 38 22 168 92 22 196
Volume Left 38 0 0 0 22 0
Volume Right 0 22 0 92 0 0 cSH 643 876 1700 1700 1304 1700
Volume to Capacity 0.06 0.02 0.10 0.05 0.02 0.12
Queue Length 95th (ft) 5 2 0 0 1 0
Control Delay (s) 11.0 9.2 0.0 0.0 7.8 0.0
Lane LOS B A A
Approach Delay (s) 10.3 0.0 0.8
Approach LOS B
Intersection Summary
Average Delay 1.5
Intersection Capacity Utilization 24.8% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
_2%
11: Carlsbad & WCR 3.5
short total AM 12/16/2004
I "- t 1 t r �► 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR ` SBL SBT SBR
Lane Configurations t r
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume(veh/h) 10 0 40 20 0 5 15 45 90 25 65 5
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 11 0 43 22 0 5 16 49 98 27 71 5
Pedestrians
Lane Width (ft)
Walking Speed (f ls)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 215 307 73 250 212 49 76 147
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 215 307 73 250 212 49 76 147
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4:1
tC. 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free °/0 98 100 96 97 100 99 99 98
cM capacity (veh/h) 721 589 988 657 665 1020 1523 1435
Direction, Lane# FBI WB 3 WB 2 t.NB 1 ' NB 2 N6 3' SS 1 {SB 2.
Volume Total 54 22 5 16 49 98 27 76
Volume Left 11 22 0 16 0 0 27 0
Volume Right 43 0 5 0 0 98 0 5
cSH 920 657 1020 1523 1700 1700 1435 1700
Volume to Capacity 0.06 0.03 0.01 0.01 0.03 0.06 0.02 0.04
Queue Length 95th (ft) 5 3 0 1 0 0 1 0
Control Delay (s) 9.2 10.7 8.5 7.4 0.0 _ 0.0 7.8 - 0.0
Lane LOS A B A A A
Approach Delay (s) 9.2 10.2 0.7 2.0
Approach LOS A B
Intersection Summary
Average Delay 3.2
Intersection Capacity Utilization 24.4% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
32.
11: Carlsbad & WCR 3.5 12/16/2004
short total PM f
— 7 1` +— k 1 1 1 , r
Movement EBL EBT EBR WBL WBT WBR NBL. NBT - NBR SBL 'SBT - SBR
Lane Configurations 4) '9 T. ') T r vi T'
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume(veh/h) 5 0 20 100 0 15 55 75 45 15 80 10
Peak Hour Factor 0.92 0 0.92 0.92109 0 16 60 82 0.92 0_92 0_92 0.92 0 0.92 92 16 87
0.92 0.92 0.92
1 22 Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (fUs)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 342 375 92 342 332 82 98 130
vC1, stage 1 conf vol
vC2, stage 2 conf vol vCu, unblocked vol 342 375 92 342 332 82 98 130
0
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
A^ p0 queue free % 99 100 98 81 100 98 96
99
cM capacity (veh/h) 578 528 965 575 558 ' 978 1495 1455
Direction, Lane* €f3 1 WB' ` WB 2 -NB 1 NB 2 ' NB 3; SS 1, ;SB 2
Volume Total 27 109 16 60 82 49 16 98
Volume Left 5 109 0 60 0 0 16 0
Volume Right 22 0 16 0 0 49 0 11
cSH 851 575 978 1495 1700 1700 1455 1700
Volume to Capacity 0.03 0.19 0.02 0.04 0.05 0.03 0.01 0.06
Queue Length 95th (ft) 2 17 1 3 0 0 1 0
Control Delay (s) 9.4 12.7 8.7 7.5 0.0 0.0 7.5 0.0
Lane LOS A B A A r.
A
Approach Delay (s) 9.4 12.2 2.4 1.1
Approach LOS A B
Intersection Summary
Average Delay 5.1
Intersection Capacity Utilization 28.6% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
33
20: WCR 3.5 & Access F
short total AM 12/16/2004
—. • 4-- 4\ r
Movement EBT EBR" WE L =WBT - -NBL MR
Lane Configurations I. 11 t r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 40 20 5 70 25 5
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 43 22 5 76 27 5
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 8
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 65 141 54
vC1, stage 1 conf vol 54
vC2, stage 2 conf vol 87
vCu, unblocked vol 65 141 54
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 100 97 99
cM capacity (veh/h) 1537 820 1013
Direction, Lane# EB 1 W61 WB 2 '`NB 1
Volume Total 65 5 76 33
Volume Left 0 5 0 27
Volume Right 22 0 0 5
cSH 1700 1537 1700 984
Volume to Capacity 0.04 0.00 0.04 0.03
Queue Length 95th (ft) 0 0 0 3
Control Delay (s) 0.0 7.4 0.0 9.4
Lane LOS A A
Approach Delay(s) 0.0 0.5 9.4
Approach LOS A
Intersection Summary
Average Delay 1.9
Intersection Capacity Utilization 14.2% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
34
20: WCR 3.5 & Access F
short total PM 12/16/2004
1 P
Movement EBT EBR WBL WBT ?NBL NBR
Lane Configurations t r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume(veh/h) 55 40 5 65 40 5
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 60 43 5 71 43 5
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 8
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume ' 103 163 82
vC1, stage 1 conf vol 82
vC2, stage 2 conf vol 82
vCu, unblocked vol 103 163 82
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 100 95 99
cM capacity (veh/h) 1489 805 978
Direction.Lane# EB 1 W61 WB 2 NB 1
Volume Total 103 5 71 49
Volume Left 0 5 0 43
Volume Right 43 0 0 5
cSH 1700 1489 1700 906
Volume to Capacity 0.06 0.00 0.04 0.05
Queue Length 95th (ft) 0 0 0 4
Control Delay (s) 0.0 7.4 0.0 9.6
Lane LOS A M
Approach Delay(s) 0.0 0.5 9.6
Approach LOS A
Intersection Summary
Average Delay 2.2
Intersection Capacity Utilization 15.3% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
3
22: WCR26 & WCR 5
short total AM 12/16/2004
,< t t r `► 1 -'
Movement EBL EBT EBR''WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 1. '1 111 1. "i 1
Sign Control Free Free Stop Stop
Grade 0% 0% 0% 0%
Volume (veh/h) 10 20 5 35 15 5 5 10 30 10 35 10
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 11 22 5 38 16 5 5 11 33 11 38 11
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 22 27 168 144 24 177 144 19
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 22 27 168 144 24 177 144 19
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
IC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 99 98 99 98 97 99 95 99
cM capacity (veh/h) 1594 1587 738 724 1052 735 724 1059
Direction, Lane# EB 1 EB 2 WB 1 'WB 2 NB 1 NB SB 1 =SB 2
Volume Total 11 27 38 22 5 43 11 49
Volume Left 11 0 38 0 5 0 11 0
Volume Right 0 5 0 5 0 33 0 11
cSH 1594 1700 1587 1700 738 945 735 779
Volume to Capacity 0.01 0.02 0.02 0.01 0.01 0.05 0.01 0.06
Queue Length 95th (ft) 1 0 2 0 1 4 1 5
Control Delay (s) 7.3 - 0.0 7.3 0.0 9.9 9.0 10.0 9.9
Lane LOS A A A A A A
Approach Delay (s) 2.1 4.7 9.1 9.9
Approach LOS A A
Intersection Summary'
Average Delay 6.8
Intersection Capacity Utilization 22.5% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
31a
22: WCR26 & WCR 5
short total PM 12/16/2004
"Ne C4— t , t r ki► I J
Movement EBL EBT EBR `: WBL''WBT WBR NBL. NBT NBR SBL SBT SBR
Lane Configurations ' 19 A
Sign Control Free Free Stop Stop
Grade 0% 0% 0% 0%
Volume (veh/h) 10 10 5 40 15 10 5 25 30 5 25 10
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 11 11 5 43 16 11 5 27 33 5 27 11
Pedestrians
Lane Width (ft)
Walking Speed (fUs)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 27 16 163 149 14 188 147 22
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 27 16 163 149 14 188 147 22
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
po queue free % 99 97 99 96 97 99 96 99
cM capacity (veh/h) 1587 1601 751 717 1066 709 719 1055
Direction. Lane# EB i EB;2 W81 WS 2. NB 1 NB 2 ,'SB 1 SB 2
Volume Total 11 16 43 27` 5 60 5 38
Volume Left 11 0 43 0 5 0 5 0
Volume Right 0 5 0 11 0 33 0 11
cSH 1587 1700 1601 1700 751 873 709 791
Volume to Capacity 0.01 0.01 0.03 0.02 0.01 0.07 0.01 0.05
Queue Length 95th (ft) 1 0 2 0 1 6 1 4
Control Delay (s) 7.3 0.0 7.3 0.0 9.8 9.4 10.1 9.8
Lane LOS A A A A B A
Approach Delay (s) 2.9 4.5 9.5 9.8
Approach LOS A A
Intersection Summary -
Average Delay 7.0
Intersection Capacity Utilization 19.7% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew.1. Delich , P. E. Page 1
37
3: Access H & WCR26
short total AM 12/16/2004
t t r ` I
Movement WBL WBR NBT NBR `=SBL SBT
Lane Configurations V to 3 t
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 15 10 25 5 5 25
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 16 11 27 5 5 27
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 68 30 33
vC1, stage 1 conf vol 30
vC2, stage 2 conf vol 38
vCu, unblocked vol 68 30 33
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
p0 queue free % 98 99 100
cM capacity (veh/h) 876 1045 1579
Direction, Lane# . WB 1 _N81.= SBi "SB 2
Volume Total 27 33 5 27
Volume Left 16 0 5 0
Volume Right 11 5 0 0
cSH 937 1700 1579 1700
Volume to Capacity 0.03 0.02 0.00 0.02
Queue Length 95th (ft) 2 0 0 0
Control Delay(s) 9.0 0.0 7.3 0.0
Lane LOS A A
Approach Delay (s) 9.0 0.0 1.2
Approach LOS A
Intersection Summary` - _ - -
Average Delay 3.1
Intersection Capacity Utilization 14.2% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
33
3: Access H & WCR26
short total PM 12/16/2004
t t r 4
Movement WBL WBR NBT NBR -`SBL SBT-
Lane Configurations V 1. '1 T
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 10 5 20 10 10 20
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 11 5 22 11 11 22
Pedestrians
Lane Width (ft)
Walking Speed ((Us)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 71 27 33
vC1, stage 1 conf vol 27
vC2, stage 2 conf vol 43
vCu, unblocked vol 71 27 33
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
p0 queue free % 99 99 99
cM capacity (veh/h) 871 1048 1579
Direction, Lane# WB 1 ' NB 1. SRC, SB 2. '
Volume Total 16 33 11 22
Volume Left 11 0 11 0
Volume Right 5 11 0 0
cSH 923 1700 1579 1700
Volume to Capacity 0.02 0.02 0.01 0.01
Queue Length 95th (ft) 1 0 1 0
Control Delay (s) 9:0 0.0 7.3 0.0
Lane LOS A A
Approach Delay (s) 9.0 0.0 2.4
Approach LOS A
Intersection Summary
Average Delay 2.8
Intersection Capacity Utilization 17.2% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
3`'P
5: WCR26 & Fairview
short total AM 12/16/2004
Movement EBT ERR WBL ",WBT NBL NBR
Lane Configurations to t ►rf
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 20 5 20 20 5 10
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate(vph) 22 5 22 22 5 11
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 27 90 24
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 27 90 24
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 99 99 99
cM capacity (veh/h) 1587 898 1052
Direction, Lane# "EB 1 WB 1 WB 2 :NB 1
Volume Total 27 22 22 _ 16
Volume Left 0 22 0 5
Volume Right 5 0 0 11
cSH 1700 1587 1700 995
Volume to Capacity 0.02 " 0.01 0.01 0.02
Queue Length 95th (ft) 0 1 0 1
Control Delay (s) 0.0 7.3 0.0 8.7
Lane LOS A A
Approach Delay (s) 0.0 3.7 8.7
Approach LOS A
Intersection Summary
Average Delay 3.5
Intersection Capacity Utilization 17.8% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
5: WCR26 & Fairview
short total PM 12/16/2004
Movement EBT ' EBR WBL', WBT . 'NBL NBR
Lane Configurations T 15 t we
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 10 5 15 15 5 20
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 11 5 16 16 5 22
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 16 63 14
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 16 63 14
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 99 99 98
cM capacity (veh/h) 1601 934 1066
Direction, Lane'# EB 1 WB 1 WB 2 :>NB 1
Volume Total 16 16 16 27
Volume Left 0 16 0 5
Volume Right 5 0 0 22
cSH 1700 1601 1700 1037
Volume to Capacity 0.01 0.01 0.01 0.03
Queue Length 95th (ft) 0 1 0 2
Control Delay (s) 0.0 7.3 0.0 8.6
Lane LOS A A
Approach Delay(s) 0.0 3.6 ' 8.6
Approach LOS A
Intersection Summary
Average Delay 4.6
Intersection Capacity Utilization 17.5% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
7: Access I & Fairview
short total AM 12/16/2004
r< t t r ` i
Movement WBL WBR NBT "NBR? SBL SBT`
Lane Configurations Y 1. 4
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 30 5 10 10 0 25
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 33 5 11 11 0 27
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 43 16 22
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 43 16 22
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s)
tF (s) 3.5 3.3 2.2
p0 queue free % 97 99 100
cM capacity (veh/h) 967 1063 1594
Direction. Lane*. WB t Nl31' S$i
Volume Total 38 22 27
Volume Left 33 0 0
Volume Right 5 11 0
cSH 980 1700 1594
Volume to Capacity 0.04 0.01 0.00
Queue Length 95th (ft) 3 0 0
Control Delay (s) 8.8 0.0 0.0
Lai ie L^vS A
Approach Delay (s) 8.8 0.0 0.0
Approach LOS A
Intersection Summary '>•
Average Delay 3.9
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
12
7: Access I & Fairview
short total PM 12/16/2004
4- t l 4
Movement WBL WBR NBT ' NBR SBL "'SBT
Lane Configurations ►fir I. 4
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 20 0 25 35 5 15
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 22 0 27 38 5 16
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 73 46 65
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 73 46 65
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s)
tF (s) 3.5 3.3 2.2
p0 queue free % 98 100 100
cM capacity (veh/h) 927 1023 1537
Direction, Lane# - WB 1-----'14B
Volume Total 22 65 22
Volume Left 22 0 5
Volume Right 0 38 0
cSH 927 1700 1537
Volume to Capacity 0.02 0.04 0.00
Queue Length 95th (ft) 2 0 0
Control Delay(s) 9.0 0.0 7.9
Lane LOS A A
Approach Delay (s) 9.0 0.0 1.9
Approach LOS A
Intersection Summary ' _
Average Delay 2.2
Intersection Capacity Utilization 15.2% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
4;
APPENDIX F
44-
2: SH 119 & Fairview St.
long bkgrd AM 12/21/2004
f l 1< 1 t t ' it I
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 11 Tart r ' ttt r 'Pi) t r ti t r
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 0.97 1.00 0.97 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.85 1.00 0.85
Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00
Satd. Flow(prot) 1770 5085 1583 1770 5085 1583 3433 1583 3433 1583
Fit Permitted 0.05 1.00 1.00 0.06 1.00 1.00 0.95 1.00 0.95 1.00
Satd. Flow(perm) 95 5085 1583 105 5085 1583 3433 1583 3433 1583
Volume (vph) 190 2180 170 85 2855 330 60 0 15 60 0 40
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Adj. Flow(vph) 200 2295 179 89 3005 347 63 0 16 63 0 42
RTOR Reduction (vph) 0 0 40 0 0 66 0 0 0 0 0 0
Lane Group Flow(vph) 200 2295 139 89 3005 281 63 0 16 63 0 42
Turn Type pm+pt Perm pm+pt Perm Prot Free Prot Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 Free Free
Actuated Green, G (s) 85.2 77.2 77.2 80.4 74.8 74.8 3.2 101.0 3.2 101.0
Effective Green, g (s) 87.2 78.2 78.2 82.4 75.8 75.8 4.2 101.0 4.2 101.0
Actuated g/C Ratio 0.86 0.77 0.77 0.82 0.75 0.75 0.04 1.00 0.04 1.00
Clearance Time(s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 231 3937 1226 194 3816 1188 143 1583 143 1583
v/s Ratio Prot c0.08 0.45 0.03 0.59 c0.02 0.02
v/s Ratio Perm c0.67 0.09 0.34 0.18 0.01 0.03
v/c Ratio 0.87 0.58 0.11 0,46 0.79 0.24 044 0.01 0.44 0.03
Uniform Delay, dl 31.3 4.7 2.8 4.8 7.7 3.8 47.3 0.0 47.3 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 27.0 0.6 0.2 1.7 1.7 0.5 2.2 0.0 2.2 0.0
Delay(s) 58.3 5.3 3.0 6.5 9.4 4.3 49.4 0.0 49.4 0.0
Level of Service E A A A A A D A D A
Approach Delay(s) 9.1 8.8 39.4 29.7
Approach LOS A A D C
Intersection Summary
HCM Average Control Delay 9.7 HCM Level of Service A
HCM Volume to Capacity ratio 0.87
Actuated Cycle Length (s) 101.0 Sum of lost time (s) 12.0
Intersection Capacity Utilization 84.1% ICU Level of Service E
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
.4
2: SH 119 & Fairview St.
long bkgrd PM 12/21/2004
f 1 I t- 1 t t L 1 1
Movement EBL EBT EBR WBL -WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 'I ttt r "i 'Mt i' )i T t' viva t ip
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 ' 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4A 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 0.97 1.00 0.97 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.85 1_00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00
Satd. Flow(prot) 1770 5085 1583 1770 5085 1583 3433 1583 3433 1583
Flt Permitted 0.06 1.00 1.00 0.06 1.00 1.00 0.95 1.00 0.95 1.00
Satd. Flow (perm) 107 5085 1583 107 5085 1583 3433 1583 3433 1583
Volume (vph) 60 2900 120 85 2470 95 240 0 180 335 0 220
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Adj. Flow(vph) 63 3053 126 89 2600 100 253 0 189 353 0 232
RTOR Reduction (vph) 0 0 25 0 0 24 0 0 0 0 0 0
Lane Group Flow(vph) 63 3053 101 89 2600 76 253 0 189 353 0 232
Turn Type pm+pt Perm pm+pt Perm Prot Free Prot Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 Free Free
Actuated Green, G (s) 71.7 68.6 68.6 71.7 68.6 68.6 11.0 97.7 11.0 97.7
Effective Green,g (s) 73.7 69.6 69.6 73.7 69.6 69.6 12.0 97.7 12.0 97.7
Actuated g/C Ratio 0.75 0.71 0.71 0.75 0.71 0.71 0.12 1.00 0.12 1.00
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 151 3622 1128 151 3622 1128 422 1583 422 1583
v/s Ratio Prot 0.02 c0.60 c0.02 0.51 0.07 c0.10
v/s Ratio Perm 0.30 0.06 0.42 0.05 0.12 0.15
v/c Ratio 0.42 0.84 0.09 0.59 0.72 0.07 0.60 0.12 024 0.15
Uniform Delay, dl 9.1 10.1 4.3 16.6 8.3 4.2 40.6 0.0 41.9 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 1.9 2.6 0.2 5.8 1.3 0.1 2.3 0.2 13.4 0.2
Delay (s) 11.0 12.7 4.5 22.4 9.5 4.4 42.9 0.2 55.3 0.2
Level of Service BB A C A AD A E A
Approach Delay(s) 12.3 9.7 24.6 33.5
Approach LOS B A C C
Intersection Summary
HCM Average Control Delay 13.8 HCM Level of Service B
HCM Volume to Capacity ratio ^ 0.83
Actuated Cycle Length (s) 97.7 Sum of lost time (s) 12.0
Intersection Capacity Utilization 87.0% ICU Level of Service E
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
4
3: SH 119 & CR 3.5
long bkgrd AM 12/21/2004
1 41 t t "
Movement EBL EBT EBR WBL WBT VI/BR NBL NBT NBR SBL SBT SBR
Lane Configurations ttt P 1 ttt p 11 t t 1 try
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 0.97 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow(prot) 1770 5085 1583 1770 5085 1583 3433 1863 1583 1770 1863 1583
Flt Permitted 0.06 1.00 1.00 0.05 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow(perm) 105 5085 1583 100 5085 1583 3433 1863 1583 1770 1863 1583
Volume (vph) 60 1975 220 190 3000 40 60 5 60 65 15 210
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Adj. Flow(vph) 63 2079 232 200 3158 42 63 5 63 68 16 221
RTOR Reduction (vph) 0 0 74 0 0 9 0 0 0 0 0 0
Lane Group Flow(vph) 63 2079 158 200 3158 33 63 5 63 68 16 221
Turn Type pm+pt Perm pm+pt Perm Prot Free Prot Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 Free Free
Actuated Green, G (s) 73.2 70.0 70.0 86.8 78.6 78.6 3.2 1.5 109.9 6.6 4.9 109.9
Effective Green, g (s) 75.2 71.0 71.0 87.8 79.6 79.6 4.2 2.5 109.9 7.6 5.9 109.9
Actuated g/C Ratio 0.68 0.65 0.65 0.80 0.72 0.72 0.04 0.02 1.00 0.07 0.05 1.00
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 135 3285 1023 274 3683 1147 131 42 1583 122 100 1583
v/s Ratio Prot 0.02 0.41 c0.08 c0.62 0.02 0.00 c0.04 0.01
v/s Ratio Penn 0.30 0.10 0.50 0.02 0.04 c0.14
v/c Ratio 0.47 0.63 0.15 0.73 0.86 0.03 0.48 0.12 0.04 0.56 0.16 0.14
Uniform Delay, dl 16.3 11.6 7.6 29.4 11.0 4.3 51.8 52.6 0.0 49.5 49.6 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 2.5 0.9 0.3 9.4 2.8 0.0 2.8 1.3 0.0 5.4 0.8 0.2
Delay (s) 18.8 12.6 8.0 38.8 13.8 4.3 54.5 53.9 0.0 54.9 50.4 0.2
Level of Service BB A D B ADD A DD A
Approach Delay(s) 12.3 15.2 28.3 15.0
Approach LOS B B C g
Intersection Summary
HCM Average Control Delay 14.4 HCM Level of Service B
HCM Volume to Capacity ratio 0.76
Actuated Cycle Length (s) 109.9 Sum of lost time (s) 8.0
Intersection Capacity Utilization 81.6% ICU Level of Service D
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
A7
3: SH 119 & CR 3.5
long bkgrd PM 12/21/2004
f —• 1 te t 1 t r ti I 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 71 TTf P ) ttt P ti t P 'l t P
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 0.97 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow(prot) 1770 5085 1583 1770 5085 1583 3433 1863 1583 1770 1863 1583
Flt Permitted 0.06 1.00 1.00 0.06 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow(perm) 113 5085 1583 117 5085 1583 3433 1863 1583 1770 1863 1583
Volume (vph) 220 2995 200 190 2210 90 350 20 350 40 10 90
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Adj. Flow(vph) 232 3153 211 200 2326 95 368 21 368 42 11 95
RTOR Reduction (vph) 0 0 51 0 0 31 0 0 0 0 0 0
Lane Group Flow(vph) 232 3153 160 200 2326 64 368 21 368 42 11 95
Turn Type pm+pt Penn pm+pt Penn Prot Free Prot Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 Free Free
Actuated Green, G (s) 75.7 64.7 64.7 71.7 62.7 62.7 11.6 8.7 106.7 4.3 1.4 106.7
Effective Green, g (s) 77.7 65.7 65.7 73.7 63.7 63.7 12.6 9.7 106.7 5.3 2.4 106.7
Actuated g/C Ratio 0.73 0.62 0.62 0.69 0.60 0.60 0.12 0.09 1.00 0.05 0.02 1.00
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 269 3131 975 236 3036 945 405 169 1583 88 42 1583
v/s Ratio Prot c0.10 c0.62 0.08 0.46 c0.11 0.01 0.02 0.01
v/s Ratio Perm 0.53 0.10 0.51 0.04 c0.23 0.06
v/c Ratio 0.86 1.01 0.16 0.85 0.77 0.07 0.91 0.12 0.23 0.48 0.26 0.06
Uniform Delay, dl 31.7 20.5 8.8 49.4 16.0 9.0 46.5 44.6 0.0 49.4 51.3 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 23.6 17.8 0.4 23.5 1.9 0.1 23.6 0.3 0.3 4.0 3.3 0.1
Delay(s) 55.3 38.3 9.1 72.9 17.9 9.2 70.1 44.9 0.3 53.4 54.6 0.1
Level of Service ED A E B A ED A D D A
Approach Delay(s) 37.7 21.8 35.5 19.3
Approach LOS D C D R
Intersection Summary
HCM Average Control Delay 31.2 HCM Level of Service C
HCM Volume to Capacity ratio 0.91
Actuated Cycle Length (s) 106.7 Sum of lost time (s) 8.0
Intersection Capacity Utilization 95.0% ICU Level of Service F
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
4
22: CR26 & CR5
long bkgrd AM 12/15/2004
Movement FBL ',EBT WBT WBR SBL SBR
Lane Configurations t + r I r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 35 65 175 35 85 110
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 37 68 184 37 89 116
Pedestrians
Lane Width (ft)
Walking Speed (f/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 221 326 184
vC1, stage 1 conf vol 184
vC2, stage 2 conf vol 142
vCu, unblocked vol 221 326 184
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free% 97 87 87
cM capacity (veh/h) 1348 686 858
Direction, Lane* = :ES 1 .1 r6 Z ifY6 !`"SIUB'2,'"SB 1;:-SS Z
Volume Total 37 68 184 37 89 116
Volume Left 37 0 0 0 89 0
Volume Right 0 0 0 37 0 116
cSH 1348 1700 1700 1700 686 858
Volume to Capacity 0.03 0.04 0.11 0.02 0.13 0.13
Queue Length 95th (ft) 2 0 0 0 11 12
Control Delay(s) 7.7 0.0 0.0 ", 0.0 11.0 9.8
Lane LOS A is A
Approach Delay (s) 2.7 0.0 10.4
Approach LOS B
Intersection Summary -
Average Delay 4.5
Intersection Capacity Utilization 27.3% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. / Page 1
`f
22: CR26 & CR5
long bkgrd PM 12/15/2004
44— t `
Movement ESL EBt 1A/BT `WBR 'SBL SBR `
Lane Configurations t t r vi r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume(veh/h) 110 180 105 90 55 60
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 116 189 111 95 58 63
Pedestrians
Lane Width (ft)
Walking Speed (Ws)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 205 532 111
vC1, stage 1 conf vol 111
vC2, stage 2 conf vol 421
vCu, unblocked vol 205 532 111
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 92 89 93
cM capacity (veh/h) 1366 523 943
Direction, Lane*- ES 1 EE12 .WS 1`'W82- -SB 1 SB 2
Volume Total 116 189 111 95 58 63
Volume Left 116 0 0 0 58 0
Volume Right 0 0 0 95 0 63
cSH 1366 1700 1700 1700 523 943
Volume to Capacity 0.08 0.11 0.07 0.06 0.11 0.07
Queue Length 95th (ft) 7 0 0 0 9 5
Control Delay(s)' 7.9 0.0 0.0 0.0 12/ 9.1
Lane LOS A B A
Approach Delay(s) 3.0 0.0 10.8
Approach LOS B
Intersection Summary
Average Delay 3.5
Intersection Capacity Utilization 22.8% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
r--
APPENDIX G
J f
6: SH 119 & Fairview
long total AM 12/21/2004
--. -" —. I ~ 4\ t r '. 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL 5BT SBR
Lane Configurations If ttt r ll ttt r vi) t r '5"; t fr
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 0.97 1.00 1.00 0.97 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow(prot) 1770 5085 1583 1770 5085 1583 3433 1863 1583 3433 1863 1583
Flt Permitted 0.05 1.00 1.00 0.06 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow(perm) 98 5085 1583 103 5085 1583 3433 1863 1583 3433 1863 1583
Volume (vph) 200 2495 170 85 2960 335 60 1 15 80 5 65
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Adj. Flow(vph) 211 2626 179 89 3116 353 63 1 16 84 5 68
RTOR Reduction (vph) 0 0 43 0 0 79 0 0 0 0 0 0
Lane Group Flow(vph) 211 2626 136 89 3116 274 63 1 16 84 5 68
Turn Type pm+pt Perm pm+pt Perm Prot Free Prot Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 Free Free
Actuated Green, G (s) 87.1 78.9 78.9 74.3 71.1 71.1 4.0 1.2 107.3 4.0 1.2 107.3
Effective Green, g (s) 88.1 79.9 79.9 76.3 72.1 72.1 5.0 2.2 107.3 5.0 2.2 107.3
Actuated g/C Ratio 0.82 0.74 0.74 0.71 0.67 0.67 0.05 0.02 1.00 0.05 0.02 1.00
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
^ Lane Grp Cap (vph) 267 3787 1179 138 3417 1064 160 38 1583 160 38 1583
v/s Ratio Prot c0.09 0,52 0.03 c0.61 0.02 0.00 c0.02 c0,00
v/s Ratio Perm 0.56 0.09 0.43 0.17 0.01 0.04
v/c Ratio 0.79 0.69 0.12 0.64 0.91 0.26 0.39 0.03 0.01 0.52 0.13 0.04
Uniform Delay, dl 35.8 7.2 3.8 9.5 14.9 7.0 49.7 51.5 0.0 50.0 51.6 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 14.6 0.6 0.0 9.9 4.2 0.1 1.6 0.3 0.0 3.1 1.6 0.1
Delay(s) 50.4 7.8 3.9 19.4 19.1 7.1 51.3 51.8 0.0 53.1 53.2 0.1
Level of Service D A A BB A DD A DD A
Approach Delay (s) 10:5 17.9 41.0 30.1
Approach LOS B B D C
Intersection Summary -
HCM Average Control Delay 15.2 HCM Level of Service B
HCM Volume to Capacity ratio 0.86
Actuated Cycle Length (s) 107.3 Sum of lost time (s) 16.0
Intersection Capacity Utilization 87.2% ICU Level of Service E
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
:e2.
6: SH 119 & Fairview
long total PM 12/21/2004
- a t t `► 41
l
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations ttt r ttt r ii) t r t r
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1,00 0.91 1.00 1.00 0.91 1.00 0.97 1.00 1.00 0.97 1.00 100
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow(prot) 1770 5085 1583 1770 5085 1583 3433 1863 1583 3433 1863 1583
Flt Permitted 0.06 1.00 1.00 0.06 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow(perm) 108 5085 1583 109 5085 1583 3433 1863 1583 3433 1863 1583
Volume (vph) 100 3150 120 85 2715 125 240 5 180 355 1 240
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Adj. Flow(vph) 105 3316 126 89 2858 132 253 5 189 374 1 253
RTOR Reduction (vph) 0 0 27 0 0 34 0 0 0 0 0 0
Lane Group Flow(vph) 105 3316 99 89 2858 98 253 5 189 374 1 253
Turn Type pm+pt Penn pm+pt Penn Prot Free Prot Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 2 6 6 Free Free
Actuated Green, G (s) 72.3 68.3 68.3 70.5 67.4 67.4 11.7 1.2 104.7 12.1 1.6 104.7
Effective Green, g (s) 74.3 69.3 69.3 72.5 68.4 68.4 12.7 2.2 104.7 13.1 2.6 104.7
Actuated g/C Ratio 0.71 0.66 0.66 0.69 0.65 0.65 0.12 0.02 1.00 0.13 0.02 1.00
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 156 3366 1048 141 3322 1034 416 39 1583 430 46 1583
v/s Ratio Prot c0.03 c0.65 0.02 0.56 0.07 0.00 c0.11 0.00
v/s Ratio Penn 0.45 0.06 0.41 0.06 0.12 c0.16
v/c Ratio 0.67 0.99 0.09 0.63 0.86 0.09 0.61 0.13 0.12 0.87 0.02 0.16
Uniform Delay, dl 20.2 17.2 6.4 50.9 14.4 6.7 43.6 50.3 0.0 45.0 49.8 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 10.9 12.2 0.0 8.9 2.5 0.0 2.5 1.5 0.2 16.8 0.2 0.2
Delay (s) 31.1 29.4 6.4 59.8 16.9 6.7 46.2 51.8 0.2 61.8 50.0 0.2
Level of Service CC A E B A DD A E D A
Approach Delay (s) 28.6 17.7 26.8 37.0
Approach LOS C B C n
Intersection Summary
HCM Average Control Delay 24.8 HCM Level of Service C
HCM Volume to Capacity ratio 0.87
Actuated Cycle Length (s) 104.7 Sum of lost time (s) 8.0
Intersection Capacity Utilization 92.4% ICU Level of Service F
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
5
3: SH 119 & WCR 3.5
long total AM 12/21/2004
f ,< t t " 4 I
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations ti ttt r v ttt r 'r t r in f r
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4M 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 0.97 0.91 1.00 0.97 0.91 1.00 0.97 1.00 1.00 0.97 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Said. Flow (prot) 3433 5085 1583 3433 5085 1583 3433 1863 1583 3433 1863 1583
Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow(perm) 3433 5085 1583 3433 5085 1583 3433 1863 1583 3433 1863 1583
Volume (vph) 380 1990 220 190 3040 210 60 15 60 155 30 285
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Adj. Flow(vph) 400 2095 232 200 3200 221 63 16 63 163 32 300
RTOR Reduction (vph) 0 0 82 0 0 84 0 0 0 0 0 0
Lane Group Flow(vph) 400 2095 150 200 3200 137 63 16 63 163 32 300
Turn Type Prot Penn Prot Perm Prot Free Prot Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6 Free Free
Actuated Green, G (s) 13.0 70.2 70.2 10.1 67.3 67.3 3.2 14 110.4 6.7 6.9 110.4
Effective Green, g (s) 14.0 71.2 71.2 11.1 68.3 68.3 4.2 4.4 110.4 7.7 7.9 110.4
Actuated g/C Ratio 0.13 0.64 0.64 0.10 0.62 0.62 0.04 0.04 1.00 0.07 0.07 1.00
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3M 3.0 3.0 3.0
Lane Grp Cap (vph) 435 3279 1021 345 3146 979 131 74 1583 239 133 1583
v/s Ratio Prot c0.12 0.41 0.06 c0.63 0.02 0.01 c0.05 c0.02
v/s Ratio Penn 0.09 0.09 0.04 c0.19
v/c Ratio 0.92 0.64 0.15 0.58 1.02 0.14 0.48 0.22 0.04 0.68 0.24 0.19
Uniform Delay, dl 47.6 11.8 7.7 47.4 21.1 8.8 52.0 51.3 0.0 50.2 48.4 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 24.2 0.4 0.1 2.4 20.5 0.1 2.8 1.5 0.0 7.8 0.9 0.3
Delay (s) 71.9 12.3 7.8 49.8 41.5 8.9 54.8 52.8 0.0 57.9 49.4 0.3
Level of Service E B ADD A DD A ED A
Approach Delay(s) 20.6 40.0 30.3 22.4
Approach LOS C D C C
Intersection Summary
HCM Average Control Delay 31.0 HCM Level of Service C
HCM Volume to Capacity ratio 0.89
Actuated Cycle Length (s) 110.4 Sum of lost time (s) 12.0
Intersection Capacity Utilization 90.7% ICU Level of Service E
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
54
3: SH 119 & WCR 3.5
long total PM 12/21/2004
f r 1 t P `► 1 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations )11 ttt r ti ttt r itl t r vi t r
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 0.97 0.91 1.00 0.97 0.91 1.00 0.97 1.00 1.00 0.97 1.00 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow (prot) 3433 5085 1583 3433 5085 1583 3433 1863 1583 3433 1863 1583
Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00
Satd. Flow (perm) 3433 5085 1583 3433 5085 1583 3433 1863 1583 3433 1863 1583
Volume (vph) 505 2980 200 190 2290 245 350 35 350 270 20 300
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Adj. Flow(vph) 532 3137 211 200 2411 258 368 37 368 284 21 316
RTOR Reduction (vph) 0 0 82 0 0 127 0 0 0 0 0 0
Lane Group Flow(vph) 532 3137 129 200 2411 131 368 37 368 284 21 316
Turn Type Prot Pemi Prot Perm Prot Free Prot Free
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6 Free Free
Actuated Green, G (s) 18.1 66.3 66.3 7.0 55.2 55.2 13.5 6.1 110.4 11.0 3.6 110.4
Effective Green, g (s) 19.1 67.3 67.3 8.0 56.2 56.2 14.5 7.1 110.4 12.0 4.6 110.4
Actuated g/C Ratio 0.17 0.61 0.61 0.07 0.51 0.51 0.13 0.06 1.00 0.11 0.04 1.00
Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
.-1 Lane Grp Cap (vph) 594 3100 965 249 2589 806 451 120 1583 373 78 1583
v/s Ratio Prot c0.15 cO.62 0.06 0.47 c0.11 c0.02 0.08 0.01
v/s Ratio Perm 0.08 0.08 cO23 0.20
v/c Ratio 0.90 1.01 0.13 0.80 0.93 0.16 0.82 0.31 0.23 0.76 0.27 0.20
Uniform Delay, dl 44.7 21.6 9.2 50.4 25.3 14.5 46.7 49.3 0.0 47.8 51.3 0.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 16.0 19.2 0.1 16.9 6.8 0.1 10.9 1.5 0.3 8.9 1.9 0.3
Delay (s) 60.7 40.7 9.2 67.3 32.1 14.6 57.5 50.8 0.3 56.7 - 53.1 0.3
Level of Service ED A ECB ED A ED A
Approach Delay (s) 41.7 33.0 30.0 27.9
Approach LOS O C C C
Intersection Summary
HCM Average Control Delay 36.5 HCM Level of Service D
HCM Volume to Capacity ratio 0.92
Actuated Cycle Length (s) 110.4 Sum of lost time (s) 12.0
Intersection Capacity Utilization 89.6% ICU Level of Service E
Analysis Period (min) 15
c Critical Lane Group
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
re-
27: SH119 & Ri/o
long total AM 12/16/2004
—. 4 t b 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations ITT r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 0 0 3400 80 0 40
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 0 0 3579 84 0 42
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft) 1000
pX, platoon unblocked
vC, conflicting volume 3663 3579 1193
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 3663 3579 1193
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 100 77
cM capacity (veh/h) 61 4 179
Direction, Lane* WB 1 WB`2 WB 3 -WB 4" SB 1
Volume Total 1193 1193 1193 84 42
Volume Left 0 0 0 0 0
Volume Right 0 0 0 84 42
cSH 1700 1700 1700 1700 179
Volume to Capacity 0.70 0.70 0.70 0.05 0,23
Queue Length 95th (ft) 0 0 0 0 22
Control Delay (s) 0.0 0.0 0.0 , 0.0 31.1
Lane LOS D
Approach Delay(s) 0.0 31.1
Approach LOS D
Intersection Summary
Average Delay 0.4
Intersection Capacity Utilization 75.7% ICU Level of Service D
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
:it1
27: SH 119 & R i/o
12/16/2004
long total PM
<,. �. J
Movement EBL- EBT WBT WBR SBL SBR
Lane Configurations ttt r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 0 0 2645 80 0 80
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 0 0 2784 84 0 84
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None
Median storage veh)
Upstream signal (ft) 1000
pX, platoon unblocked
vC, conflicting volume 2868 ` 2784 928
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 2868 2784 928
tC, single (s) 4.1 6.8 6.9
tC,2 stage (s) 3.5 3.3
tF (s) 2.2
p0 queue free % 100 100 69
cM capacity (veh/h) 128 15 270
Direction, Lane ft WB 1 WB 2 W03. WS 4 SB 1"
Volume Total 928 928 , 928 84 84
Volume Left 0 0 0 0 0
Volume Right 0 0 0 84 84
cSH 1700 1700 1700 1700 270
Volume to Capacity 0.55 0.55 0.55 0.05 0.31
Queue Length 95th (ft) 0 0 0 0 32
Control Delay(s) 0.0 0.0 OM - 0.0 24.3
Lane LOS C
Approach Delay (s) 0.0 24.3
Approach LOS C
Intersection Summary
Average Delay 0.7
Intersection Capacity Utilization 62.7% ICU Level of Service B
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
5)
5: Access A & WCR 3.5
long total AM 12/21/2004
< < t r "
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations 'girt t r "it
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 40 5 515 75 30 375
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 42 5 542 79 32 395
Pedestrians
Lane Width (ft)
Walking Speed (f/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft) 885
pX, platoon unblocked
vC, conflicting volume 1000 542 621
vC1, stage 1 conf vol 542
vC2, stage 2 conf vol 458
vCu, unblocked vol 1000 542 621
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
p0 queue free % 89 99 97
cM capacity (veh/h) 392 540 960
Direction, Lane* ' WB 1 WB°2 NB 1 NB 2 -SB.1. 'SB'21 -
Volume Total 42 5 542 79 32 395
Volume Left 42 0 0 0 32 0
Volume Right 0 5 0 79 0 0
cSH 392 540 1700 1700 960 1700
Volume to Capacity 0.11 0.01 0.32 0.05 0.03 0.23
Queue Length 95th (ft) 9 1 0 0 3 0
Control Delay (s) 15.3 11/ 0.0 0.0 8.9 0.0
Lana LOS u A
Approach Delay (s) 14.9 0.0 0.7
Approach LOS B
Intersection Summary_
Average Delay 0.9
Intersection Capacity Utilization 37.1% ICU Level of Service A
Analysis Period (min) 15
•
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
62
5: Amass A & WCR 3.5
long total PM 12/21/2004
C t t �►
Movement WBL WBR NBT NBR SBL S8T
Lane Configurations r ? r f
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 50 25 660 50 30 530
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 53 26 695 53 32 558
Pedestrians
Lane Width (ft)
Walking Speed (Ws)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft) 885
pX, platoon unblocked
vC, conflicting volume 1316 695 747
vC1, stage 1 conf vol 695
vC2, stage 2 conf vol 621
vCu, unblocked vol 1316 695 747
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
p0 queue free % 83 94 96
cM capacity (veh/h) 307 442 861
Direction,Lane S WB 1 WB 2 NB 1 NB 2 SB 1 SB 2`
Volume Total 53 26 695 53 32 558
Volume Left 53 0 0 0 32 0
Volume Right 0 26 0 53 0 0
cSH 307 442 1700 1700 861 1700
Volume to Capacity 0.17 0.06 0.41 0.03 0.04 0.33
Queue Length 95th (ft) 15 5 0 0 3 0
Control Delay(s) 19.1 13.7 0.0 0.0 9.3 0.0
Lane LOS C Q A
Approach Delay (s) 17.3 0.0 0.5
Approach LOS C
Intersection Summary '
Average Delay 1.2
Intersection Capacity Utilization 44.7% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
ma=I
11 : Carlsbad & WCR 3.5
long total AM 12/21/2004
is l C 4- t 1 t t " 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations '5 A t r
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume(veh/h) 10 0 40 40 0 15 15 415 95 25 325 5
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 11 0 42 42 0 16 16 437 100 26 342 5
Pedestrians
Lane Width (ft)
Walking Speed (f/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 0 0
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 882 966 345 905 868 437 347 537
vC1, stage 1 conf vol 397 397 468 468
vC2, stage 2 conf vol 484 568 437 400
vCu, unblocked vol 882 966 345 905 868 437 347 537
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s) 6.1 5.5 6.1 5.5
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 96 100 94 84 100 97 99 97
cM capacity (veh/h) 275 260 698 266 286 620 1212 1031
Direction, Lane# EB 1 WB 1 WB'2- `NB 1 14B 2 -NB 3 SB 1 SB 2_
Volume Total 53 42 16 16 437 100 26 347
Volume Left 11 42 0 16 0 0 26 0
Volume Right 42 0 16 0 0 100 0 5
cSH 534 266 620 1212 1700 1700 1031 1700
Volume to Capacity 0.10 0.16 0.03 0.01 0.26 0.06 0.03 0.20
Queue Length 95th (ft) 8 14 2 1 0 0 2 0
Control Delay(s) 12:5 21.0 11.0 8.0 0.0 ` 0.0 8.6 0.0
Larie LOS B C B A A
Approach Delay (s) 12.5 18.3 0.2 0.6
Approach LOS B C
Intersection Summary =
Average Delay 2.0
Intersection Capacity Utilization 38.2% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
11: Carlsbad & WCR 3.5
long total PM 12/21/2004
i 1 c t 4\ t t `- 1 4/
Movement EBL ERT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations «T. 11 T. 1 ? r It i'
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume (veh/h) 5 0 20 100 0 30 55 530 100 25 440 10
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 5 0 21 105 0 32 58 558 105 26 463 11
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 0 0
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 1226 1300 468 1211 1200 558 474 663
vC1, stage 1 conf vol 521 521 674 674
vC2, stage 2 conf vol 705 779 537 526
vCu, unblocked vol 1226 1300 468 1211 1200 558 474 663
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s) 6.1 5.5 6.1 5.5
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 97 100 96 46 100 94 95 97
cM capacity (veh/h) 188 192 595 195 208 529 1088 926
Direction,Lane# EB 1 WB'T WB 2 NB 1 NB 2 NB 3' SS 1 ' _SB 2
Volume Total 26 105 32 58 558 105 26 474
Volume Left 5 105 0 58 0 0 26 0
Volume Right 21 0 32 0 0 105 0 11
cSH 415 195 529 1088 1700 1700 926 1700
Volume to Capacity 0.06 0.54 0.06 0.05 0.33 0.06 0.03 '-0.28
Queue Length 95th (ft) 5 70 5 4 0 0 2 0
Control Delay(s) 14.3 43.3 12.2 8.5 0.0 0.0 •9.0 0.0
Lane LOS
no n C D A
Approach Delay (s) 14.3 36.2 0.7 0.5
Approach LOS B E
Intersection Summary
Average Delay 4.4
Intersection Capacity Utilization 53.4% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
re
14: Access B & WCR a5
long total AM 12/21/2004
t t t
Movement WBL WBR NBT NBR 561 SBT
Lane Configurations ifIritr t
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 15 5 365 75 30 340
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 16 5 384 79 32 358
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 805 384 463
vC1, stage 1 conf vol 384
vC2, stage 2 conf vol 421
vCu, unblocked vol 805 384 463
tC, single (s) 8.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
p0 queue free % 97 99 97
cM capacity (veh/h) 459 663 1098
Direction, Lane# WB 1 W52 NB 1 -'NB 2 SB 1 SB 2
Volume Total 16 5 384 79 32 358
Volume Left 16 0 0 0 32 0
Volume Right 0 5 0 79 0 0
cSH 459 663 1700 1700 1098 1700
Volume to Capacity 0.03 0.01 0.23 0.05 0.03 0.21
Queue Length 95th (ft) 3 1 0 0 2 0
Control Delay(s) 13.1 10.5 0.0 0.0 8.4 0.0
Lane LOS a a A
Approach Delay (s) 12.5 0.0 0.7
Approach LOS B
Intersection Summary
Average Delay 0.6
Intersection Capacity Utilization 34.9% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
r2
14: Access B & WCR 3.5
long total PM 12/21/2004
-- t t r ' 4
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations r t t• T
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 50 25 515 50 50 425
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 53 26 542 53 53 447
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX. platoon unblocked
vC, conflicting volume 1095 542 595
vC1, stage 1 conf vol 542
vC2, stage 2 conf vol 553
vCu, unblocked vol 1095 542 595
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
p0 queue free % 85 95 95
cM capacity (veh/h) 359 540 981
Direction, Lane# WB 1 WB2 NB I -NB 2 "SB 1 SB 2 .
Volume Total 53 26 542 53 53 447
Volume Left 53 0 0 0 53 0
Volume Right 0 26 0 53 0 0
cSH 359 540 1700 1700 981 1700
Volume to Capacity 0.15 0.05 0.32 0.03 0.05 0.26
Queue Length 95th (ft) 13 4 0 0 4 0
Control Delay(s) 16:7 12.0 0.0 0.0 8.9 0.0
Lang LOS
A
Approach Delay (s) 15.2 0.0 0.9
Approach LOS C
Intersection Summary `--Average Delay 1.4
Intersection Capacity Utilization 43.8% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
iv3
17: Access C & WCR 3.5
long total AM 12/21/2004
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 15 T. '4 I ) t r vi 1*
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume (veh/h) 15 0 60 20 0 10 15 255 100 35 290 5
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 16 0 63 21 0 11 16 268 105 37 305 5
Pedestrians
Lane Width (ft)
Walking Speed (Ws)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 0 0
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 692 787 308 742 684 268 311 374
vC1, stage 1 conf vol 382 382 300 300
vC2, stage 2 conf vol 311 405 442 384
vCu, unblocked vol 692 787 308 742 684 268 311 374
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s) 6.1 5.5 6.1 5.5
tF (s) 3.5 4.0 Si 3.5 4.0 3.3 2.2 2.2
p0 queue free % 95 100 91 93 100 99 99 97
cM capacity (veh/h) 331 300 732 296 328 770 1250 1185
Direction,Lane# EB 1 EB 2 WB i WB 2 N8 1 .. NB 2- NB 3 ' SS 1 SB 2
Volume Total 16 63 21 11 16 268 105 37 311
Volume Left 16 0 21 0 16 0 0 37 0
Volume Right 0 63 0 11 0 0 105 0 5
cSH 331 732 296 770 1250 1700 1700 1185 1700
Volume to Capacity 0.05 0.09 0.07 0.01 0.01 0.16 0.06 - 0.03 0.18
Queue Length 95th (ft) 4 7 6 1 1 0 0 2 0
Control Delay (s) 16.4 10.4 18.1 9.7 7.9 0.0 0.0 8.1 0.0
Lane LOS C BC A A A
Approach Delay (s) 11.6 15.3 0.3 0.9
Approach LOS B C
Intersection Summary
Average Delay 2.2
Intersection Capacity Utilization 36.7% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
G,4.
17: Access C & WCR 3.5
long total PM 12/21/2004
f — ~ t 1 f r ', 4 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations If T ' 1. '5 T r A
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume (veh/h) 5 0 30 100 0 25 60 405 75 25 345 15
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 5 0 32 105 0 26 63 426 79 26 363 16
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL Raised
Median storage veh) 0 0
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 1003 1055 371 1000 984 426 379 505
vC1, stage 1 conf vol 424 424 553 553
vC2, stage 2 conf vol 579 632 447 432
vCu, unblocked vol 1003 1055 371 1000 984 426 379 505
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage(s) 6.1 5.5 6.1 5.5
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 98 100 95 55 100 96 95 98
cM capacity (veh/h) 234 233 675 234 246 628 1180 1059
Direction, Lane# EB 1 EB2 WB i WB 2 NB 1 NB 2 NB 3 ;=SB 1 SB 2
Volume Total 5 32 105 26 63 426 79 26 379
Volume Left 5 0 105 0 63 0 0 26 0
Volume Right 0 32 0 26 0 0 79 0 16
cSH 234 675 234 628 1180 1700 1700 1059 1700
Volume to Capacity 0.02 0.05 0.45 0.04 0.05 0.25 0.05 0.02 0.22
Queue Length 95th (ft) 2 4 54 3 4 0 0 2 0
Control Delay(s) 20.8 10.6 32.5 11.0 8.2 0:0 0.0 8.5- 0.0
Lane. LOS C La D B A A
Approach Delay (s) 12.0 28.2 0.9 0.6
Approach LOS B D
Intersection Summary
Average Delay 4.3
Intersection Capacity Utilization 46.9% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
7: WCR3.5 & Access D
long total AM 12/21/2004
r< 4- 1 /
Movement EBT EBR WBL WBT NBL `NBR
Lane Configurations T r T 'sr
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 205 75 30 320 10 10
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 216 79 32 337 11 11
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 295 616 216
vC1, stage 1 conf vol 216
vC2, stage 2 conf vol 400
vCu, unblocked vol 295 616 216
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 98 98 99
cM capacity (veh/h) 1267 530 824
Direction, Lane# EB 1 EB 2 WB 1 WB 2 NB 1 N82
Volume Total 216 79 32 337 11 11
Volume Left 0 0 32 0 11 0
Volume Right 0 79 0 0 0 11
cSH 1700 1700 1267 1700 530 824
Volume to Capacity 0.13 005 ' 0:02 0.20 0.02 0.01
Queue Length 95th (ft) 0 0 2 0 2 1
Control Delay (s) 0.0 0.0 7.9 0.0 11.9 9.4
Laic LvS "n o
Approach Delay(s) 0.0 0.7 10.7
Approach LOS B
Intersection Summary
Average Delay 0.7
Intersection Capacity Utilization 27.5% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
Vt,
7: WCR 3.5 & Access D
long total PM 12/21/2004
_, ~ 4\ P
Movement EBT EBR WBL`WBT NBL- NBR
Lane Configurations t r 1 19 r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 385 50 20 345 40 30
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 405 53 21 363 42 32
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 458 811 405
vC1, stage 1 conf vol 405
vC2, stage 2 conf vol 405
vCu, unblocked vol 458 811 405
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 22 3.5 3.3
p0 queue free % 98 91 95
cM capacity (veh/h) 1103 461 646
Direction,Lane# EB 1 EB2 WB 1 WB 2 ,NB 1 ' NB 2
Volume Total 405 53 21 363 42 32
Volume Left 0 0 21 0 42 0
Volume Right 0 53 0 0 0 32
cSH 1700 1700 1103 1700 461 646
Volume to Capacity 0.24 0.03 0.02 0.21 0.09 0.05
Queue Length 95th (ft) 0 0 1 0 8 4
Control Delay (s) 0.0 0.0 8.3 0.0 13.6 10.9
La.^.e LOS A v B
Approach Delay (s) 0.0 0.5 12.4
Approach LOS B
Intersection Summary
Average Delay 1.2
Intersection Capacity Utilization 30.3% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
15: WCR 3.5 & A cess E
long total AM 12/21/2004
r
Movement EBT'` EBR WBU`.tNBT NBL NBR -
Lane Configurations t r in T tilr
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 170 45 30 335 15 10
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 179 47 32 353 16 11
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 226 595 179
vC1, stage 1 conf vol 179
vC2, stage 2 conf vol 416
vCu, unblocked vol 226 595 179
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 98 97 99
cM capacity (veh/h) 1342 535 864
Direction, Lane# EB 1 EB 2 WB 1 WB 2 NB 1 NB 2
Volume Total 179 47 32 353 16 11
Volume Left 0 0 32 0 16 0
Volume Right 0 47 0 0 0 11
cSH 1700 1700 1342 1700 535 864
Volume to Capacity 0.11 0.03 0.02 0.21 0.03 0.01
Queue Length 95th (ft) 0 0 2 0 2 1
Control Delay (s) 0.0 0.0 7.7 0.0 11.9 9.2
L^..2 LOS s-•B A
Approach Delay(s) 0.0 0.6 10.8
Approach LOS B
Intersection Summary
Average Delay 0.8
Intersection Capacity Utilization 27.6% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
(e1.
15: WCR 3.5 & Actress E
long total PM 12/21/2004
~ • •— C
Movement EBT ' EBR WBL WBT :'NBL NBR
Lane Configurations T r I T I r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 365 50 25 315 50 35
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 384 53 26 332 53 37
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 437 768 384
vC1, stage 1 conf vol 384
vC2, stage 2 conf vol 384'
vCu, unblocked vol 437 768 3M
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 98 89 94
cM capacity (veh/h) 1123 475 663
Direction, Lane# EB 1 -EB 2 WB 1 WB 2 NB 1 NB
Volume Total 384 53 26 332 53 37
Volume Left 0 0 26 0 53 0
Volume Right 0 53 0 0 0 37
cSH 1700 1700 1123 1700 475 663
Volume to Capacity 0.23 0.03 0.02 0.20 0.11 0.06
Queue Length 95th (ft) 0 0 2 0 9 4
Control Delay (s) 0.0 0.0 8.3 0.0 13.5 10.7
Lane LOS A B B
Approach Delay (s) 0.0 0.6 - 12.4
Approach LOS B
Intersection Summary
Average Delay 1.5
Intersection Capacity Utilization 30.8% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
(0e)
20: WCR 3.5 & Access F
long total AM 12/21/2004
-. '- 111r
Movement - EBT EBR WBL WBT NBL NBR '
Lane Configurations T r vs t iri r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 150 30 60 335 30 30
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 158 32 63 353 32 32
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 189 637 158
vC1, stage 1 conf vol 158
vC2, stage 2 conf vol 479
vCu, unblocked vol 189 637 158
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 95 94 96
cM capacity (veh/h) 1384 499 887
Direction. Lane* EB 1 EB2 WB 1 :WB 2 ;NB 1 - NB 2
Volume Total 158 32 63 353 32 32
Volume Left 0 0 63 0 32 0
Volume Right 0 32 0 0 0 32
cSH 1700 1700 1384 1700 499 887
Volume to Capacity 0:09 : 0.02 0.05 ' 0.21 0.06` 0.04
Queue Length 95th (ft) 0 0 4 0 5 3
Control Delay (s) 0.0 0.0 7.7 0.0 12.7 9.2
Lane LOS A S A
Approach Delay(s) 0.0 1.2 , 11.0
Approach LOS B
Intersection Summary
Average Delay 1.8
Intersection Capacity Utilization 27.6% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
20: WCR 3.5 & Access F 12/21/2004long total PM
^ —* / 4— 41 r
Movement EBT ` EBR WBL WBT -NBL NBR
Lane Configurations t r S + vl r
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 340 60 40 270 70 40
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 358 63 42 284 74 42
Pedestrians
Lane Width (ft)
Walking Speed (fl/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 421 726 358
vC1, stage 1 conf vol 358
v02, stage 2 conf vol 368
vet], unblocked vol 421 726 358
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
'— p0 queue free % 96 85 94
cM capacity (veh/h) 1138 487 686
Direction, Lane* EB 1 EB 2 WB 1;`WB 2 NB 1 NB;2
Volume Total 358 63 42 284 74 42
Volume Left 0 0 42 0 74 0
Volume Right 0 63 0 0 0 42
cSH 1700 1700 1138 1700 487 686
Volume to Capacity 0.21 0.04 0.04 0.17 0.15 0.06
Queue Length 95th (ft) 0 0 3 0 13 5
Control Delay (s) 0.0 0.0 8.3 0.0 13.7 10.6
Lane LOS A B B
Approach Delay (s) 0.0 1.1 12.6
Approach LOS B
Intersection Summary
Average Delay 2.1
Intersection Capacity Utilization 35.1% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
II
22: WCR26 & WCR 5
long total AM 12/21/2004
�' f "s i O 1 t I" L 1d
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations "i t r li T I ) + (° "I T fr
Sign Control Free Free Stop Stop
Grade 0% 0% 0% 0%
Volume (veh/h) 25 35 130 125 80 35 50 50 80 85 140 55
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 26 37 137 132 84 37 53 53 84 89 147 58
Pedestrians
Lane Width (ft)
Walking Speed (Ws)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, confiding volume 121 174 568 474 37 547 574 84
vC1, stage 1 conf vol
vC2, stage 2 cod vol
vCu, unblocked vol 121 174 568 474 37 547 574 84
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 98 91 80 88 92 74 61 94
cM capacity (veh/h) 1466 1403 263 435 1035 342 382 975
Direction, Lane# EB 1 EB 2: EB 3 °WB 1 WB 2 WB 3 14B1 `NB 2 NB a SB i= SR 2 SB 3
Volume Total 26 37 137 132 84 37 53 53 84 89 147 58
Volume Left 26 0 0 132 0 0 53 0 0 89 0 0
Volume Right 0 0 137 0 0 37 0 0 84 0 0 58
cSH 1466 1700 1700 1403 1700 1700 263 435 1035 342 382 975
Volume to Capacity 0.02 0.02 0.08 0.09 0.05 0.02 0.20 0.12 0.08 0.26 0.39 0.06
Queue Length 95th (ft) 1 0 0 8 0 0 18 10 7 26 44 5
Control Delay (s) 7.5 0.0 0.0 7.8 0.0 0.0 22.1 14.4 8.8 19.2 20.2 8.9
Lame LOS A A C B A C C A
Approach Delay (s) 1.0 4.1 14.0 17.7
Approach LOS B C
Intersection Summary
Average Delay 9.7
Intersection Capacity Utilization 34.3% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
7L
22: WCR26 & WCR 5
long total PM 12/21/2004
f I <- 461 t , ' 4 I
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 1 t r li f r vi f r 'f f r
Sign Control Free Free Stop Stop
Grade 0% 0% 0% 0%
Volume (veh/h) 60 85 125 85 50 90 135 125 120 55 100 35
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 63 89 132 89 53 95 142 132 126 58 105 37
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 147 221 537 542 89 639 579 53
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 147 221 537 542 89 639 579 53
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 96 93 55 67 87 75 72 96
cM capacity (veh/h) 1434 1348 318 399 968 232 380 1015
Direction, Lane# EB 1 `E82 EB 3 WB1: ;WB 2 WB 3- NBT NB 2 NB 3 SB 1 SB 2 (SB 3
Volume Total 63 89 132 89 53 95 142 132 126 58 105 37
Volume Left 63 0 0 89 0 0 142 0 0 58 0 0
Volume Right 0 0 132 0 0 95 0 0 126 0 0 37
cSH 1434 1700 1700 1348 1700 1700 318 399 968 232 380 1015
Volume to Capacity 0.04 0.05 0.08 0.07 0.03 0.06 0.45 0.33 0.13 0.25 0.28 0.04
Queue Length 95th (ft) 3 0 0 5 0 0 55 35 11 24 28 3
Control Delay (s) 7.6 0.0 0.0 7.9 0.0 0.0 25.2 18.4: 9.3 25.6 18.0 8.7
Lane LOS /^1 A V V /' Li 1, J.,
Approach Delay (s) 1.7 3.0 17.9 18.5
Approach LOS C C
Intersection Summary
Average Delay 10.8
Intersection Capacity Utilization 34.1% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
13
35: WCR26 & Access G
long total AM 12/21/2004
7 1_ 1 r
Movement EBT .EBR WBL WBT NBL NOR
Lane Configurations 1 t
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 185 5 0 185 15 5
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 195 5 0 195 16 5
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 200 392 197
vC1, stage 1 conf vol 197
vC2, stage 2 conf vol 195
vCu, unblocked vol 200 392 197
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 100 98 99
cM capacity (veh/h) 1372 661 844
Direction, Lane# EB 1 WB 1 WB 2 NB 1
Volume Total 200 0 195 21
Volume Left 0 0 0 16
Volume Right 5 0 0 5
cSH 1700 1700 1700 699
Volume to Capacity 0:12 0.00 0.11 0.03
Queue Length 95th (ft) 0 0 0 2
Control Delay (s) 0.0 0.0 0.0 10.3
La11G
Approach Delay (s) 0.0 0.0 10.3
Approach LOS B
Intersection Summary
Average Delay 0.5
Intersection Capacity Utilization 20.0% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
24-
35: WCR26 & AccPss G
long total PM 12/21/2004
~ 1 P
Movement EBT EBR WBL WBT .NBL .NBR'
Lane Configurations 1' t V
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 260 20 15 205 5 10
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 274 21 16 216 5 11
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 295 532 284
vC1. stage 1 conf vol 284
vC2, stage 2 coot vol 247
vCu, unblocked vol 295 532 284
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 99 99 99
cM capacity (veh/h) 1267 582 755
Direction, Lane* EB 1 WB 1 WS 2 `NB 1
Volume Total 295 16 216 16
Volume Left 0 16 0 5
Volume Right 21 0 0 11
cSH 1700 1267 1700 687
Volume to Capacity 0.17 0:01 0.13 0.02
Queue Length 95th (ft) 0 1 0 2
Control Delay (s) 0.0 7.9 0.0 10.4
Lane LOS A
Approach Delay (s) 0.0 0.5 10.4
Approach LOS B
Intersection Summary
Average Delay 0.5
Intersection Capacity Utilization 24.9% !CU Level of Service' A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
15
3: Access H & WCR26
long total AM 12/21/2004
t t
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations I t
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 15 20 170 5 5 195
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 16 21 179 5 5 205
Pedestrians
Lane Width (ft)
Walking Speed (f/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 397 182 184
vC1, stage 1 conf vol 182
vC2, stage 2 conf vol 216
vCu, unblocked vol 397 182 184
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
p0 queue free % 98 98 100
cM capacity (veh/h) 656 861 1391
Direction, Lane# WB 1 NB1 SB 1 $6 2
Volume Total 37 184 5 205
Volume Left 16 0 5 0
Volume Right 21 5 0 0
cSH 759 1700 1391 1700
Volume to Capacity 0.05 0.11 0.00 0.12
Queue Length 95th (ft) 4 0 0 0
Control Delay (s) 10.0 0.0 7.6 0.0
Lane LOS rk
A
A
Approach Delay (s) 10.0 0.0 0.2
Approach LOS A
Intersection Summary
Average Delay 0.9
Intersection Capacity Utilization 20.3% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
3: Access H & WCR26 12/21/2004long total PM
I t t r
Movement WBL WBR NBT NBR - SBL SBT
Lane Configurations t
Free
Sign Control Stop Free
Grade
0% 0% 0%
Volume (veh/h) 15 10 270 20 15 195
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 16 11 284 21 16 205
Pedestrians
Lane Width (ft)
Walking Speed (fVs)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 532 295 305
vC1, stage 1 conf vol 295
vC2, stage 2 conf vol 237
vCu, unblocked vol 532 295 305
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF(s) 3.5 3.3 2.2
p0 queue free % 97 99 99
cM capacity (veh/h) 582 745 1256
Direction, Lane4t WB 1, NB'-1 W1 -=38 2
Volume Total 26 305 16 205
Volume Left 16 0 16 0
Volume Right 11 21 0 0
cSH 638 1700 1256 1700
Volume to Capacity 0.04 0.18 0.01 0.12
Queue Length 95th (ft) 3 0 1 0
Control Delay (s) 10.9 0.0 7.9 0.0
B
Lane LOS
Approach Delay(s) 10.9 0.0 0.6
Approach LOS B
Intersection`Summary
Average Delay 0.7
Intersection Capacity Utilization 25.4% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Page 1
Matthew J. Delich , P. E.
71
5: WCR26 & Fairview
long total AM 12/21/2004
—► `i j s— 1 t
Movement EBT , EBR WBL WBT. NBL NBR -
Lane Configurations t r t P
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume (veh/h) 160 50 30 180 20 15
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 168 53 32 189 21 16
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 221 421 168
vC1, stage 1 conf vol 168
vC2, stage 2 conf vol 253
vCu, unblocked vol 221 421 168
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free% 98 97 98
cM capacity(veh/ti) 1348 631 876
Direction, Lane# EB 1 EB 2 WB 1 -WB 2 NB 1 NB 2
Volume Total 168 53 32 189 21 16
Volume Left 0 0 32 0 21 0
Volume Right 0 53 0 0 0 16
cSH 1700 1700 1348 1700 631 876
Volume to Capacity 0.10 0.03 0.02 0.11 0.03 0.02
Queue Length 95th (ft) 0 0 2 0 3 1
Control Delay (s) 0.0 0.0 7.7 0.0 10.9 9.2
ono (IQ A A
Approach Delay(s) 0.0 1.1 102
Approach LOS B
Intersection Summary
Average Delay 1.3
Intersection Capacity Utilization 25.1% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
1c
5: WCR26 & Fairview 12/21/2004
long total PM
--. 1 4 .— 1 r
Movement EBT EBR WBL WEST -NBL NBR
Lane Configurations t r 'S f 'sr
Sign Control Free Free Stop
Grade 0% 0% 0%
Volume(veh/h) 235 20 50 160 60 55
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate(vph) 247 21 53 168 63 58
Pedestrians
Lane Width (ft)
Walking Speed (ff/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 268 521 247
vC1, stage 1 conf vol 247
vC2. stage 2 cunt vol 274
vCu, unblocked vol 268 521 247
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 96 89 93
cM capacity(veh/h) 1295 575 791
Direction. Lane# EB 1 EB`2 WB 1 'WB 2 =NB 1 N6 2
Volume Total 247 21 53 168 63 58
Volume Left 0 0 53 0 63 0
Volume Right 0 21 0 0 0 58
cSH 1700 1700 1295 1700 575 791
Volume to Capacity 0.15 0.01 0.04 0.10 0.11 0.07
Queue Length 95th (ft) 0 0 3 0 9 6
Control Delay (s) 0.0 0.0 7.9 0.0 12.0 9.9
LOS A 0 A
Lane wo
Approach Delay (s) 0.0 1.9 11.0
Approach LOS B
Intersection Summary
Average Delay 2.9
Intersection Capacity Utilization 29.0% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Page 1
Matthew J. Delich , P. E.
.4
7: Access I & Fairview
long total AM 12/16/2004
I f r
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations V 1 t
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 25 10 25 10 5 75
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 26 11 26 11 5 79
Pedestrians
Lane Width (ft)
Walking Speed (f/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 121 32 37
vC1, stage 1 conf vol 32
vC2, stage 2 conf vol 89
vCu, unblocked vol 121 32 37
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
p0 queue free % 97 99 100
cM capacity (veh/h) 832 1042 1574
Direction, Lane# WB 1 NB I SB 1= SB2
Volume Total 37 37 5 79
Volume Left 26 0 5 0
Volume Right 11 11 0 0
cSH 883 1700 1574 1700
Volume to Capacity 0.04 0.02 0.00 0.05
Queue Length 95th (ft) 3 0 0 0
Control Delay(s) 9.3 0.0 7.3 0.0
Lane LOS A A
Approach Delay (s) 9.3 0.0 0.5
Approach LOS A
Intersection Summary Y
Average Delay 2.4
Intersection Capacity Utilization 14.2% ICU Level of Service A
Analysis Period (min) 15
Synchro 6 Light Report
Matthew J. Delich , P. E. Page 1
`SO
7: Access I & Fairview 12/16/2004
long total PM
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations '9 I' vi t
Free
Sign Control Stop Free
Grade 0% 0% 0%
Volume (veh/h) 10 10 105 35 10 60
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 63 0
95
Hourly flow rate (vph) 11 11 111 37 11
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked 147
vC, conflicting volume 213 129
vC1, stage 1 conf vol 129
vC2, stage 2 conf vol 84 7
vCu, unblocked vol 213 129 14 4
tC, single (s) 6.4 6.2 4.1
tC, 2 stage (s) 5.4
tF (s) 3.5 3.3 2.2
p0 queue free %
'' ' 99 99 99
1434
cM capacity (veh/h) 768 921
Direction, Lane# WB 1 NB 1 SB 1 c SB 2
Volume Total 21 147 11 63
Volume Left 11 0 11 0
Volume Right 11 37 0 0
cSH 837 1700 1434 1700
Volume to Capacity 0.03 0.09 0.01 0.04
Queue Length 95th (ft) 2 0 1 0
Control Delay (s) t4 0.0 7.5 0.0
Lane LOS A A
Approach Delay (s) 9.4 0.0 1.1
Approach LOS A
Intersection Summary
Average Delay 1.1 A
Intersection Capacity Utilization 18.3% ICU Level of Service
Analysis Period (min) 15
Synchro 6 Light Report
Page 1
Matthew J. Delich , P. E.
'0I
Hello