Loading...
HomeMy WebLinkAbout20053505.tiff RESOLUTION RE: GRANT CHANGE OF ZONE, MZ#1081, FROM A(AGRICULTURAL)ZONE DISTRICT TO E (ESTATE) ZONE DISTRICT FOR NINE (9) LOT MINOR SUBDIVISION WITH SINGLE FAMILY RESIDENTIAL LOTS - GOLD STONE CENTER, LLC WHEREAS,the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS,a public hearing was held on the 21st day of December,2005,at 10:00 a.m.for the purpose of hearing the application of Gold Stone Center, LLC, 1714 Topaz Drive, Suite 240, Loveland, Colorado 80537, requesting Change of Zone,MZ#1081,from the A(Agricultural)Zone District to the E (Estate) Zone District for a nine (9) lot Minor Subdivision with single family residential lots, for a parcel of land located on the following described real estate, to-wit: N1/2 NW 1/4/4 of Section 16,Township 8 North, Range 66 West of the 6th P.M., Weld County, Colorado WHEREAS, the applicant was represented by Thomas Honn, THinc., 1601 Quail Hollow Drive, Fort Collins, Colorado 80525, and WHEREAS,Section 23-2-40 of the Weld County Code provides standards for review of such a Change of Zone, and WHEREAS,the Board of County Commissioners heard all the testimony and statements of those present,studied the request of the applicant and the recommendation of the Weld County Planning Commission and,having been fully informed,finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 23-2-50 of the Weld County Code. 2. The request is in conformance with Section 23-2-40.B of the Weld County Code as follows: a. Section 23-2-40.B.1 -- The proposal is consistent with Chapter 22 of the Weld County Code. 1) Section 22-2-60.G.1.(A.Pol icy 7.1)states,"Weld County recognizes the Right to Farm". In order to validate this recognition, Weld County's Right to Farm statement shall appear on all recorded plats. 2) Section 22-2-60.C (A.Goal 3) discourages urban-scale residential development which is not located adjacent to existing incorporated municipalities. The proposed Minor Subdivision does not propose an urban scale development,as defined by the Weld County Code,and it is not located adjacent to existing incorporated municipalities, subdivisions, or unincorporated town sites. 2005-3505 PL1810 (le 1, PL, Plti1 /�2.,Cer) AWL, /ffric) ea o,.2 U& CHANGE OF ZONE (MZ#1081) - GOLD STONE CENTER, LLC PAGE 2 b. Section 23-2-40.6.2--The uses which will be allowed on the subject property will be compatible with the surrounding land uses. The proposed site does not lie within the Urban Growth Boundary or Intergovernmental Agreement area for any municipality. The subject property lies within the three-mile referral area of the Towns of Nunn and Pierce. The Town of Pierce, in its referral dated July 26, 2005, indicated concerns with access to Lots 5 and 6 crossing and damming Spring Creek, which runs through the Town of Pierce. No referral response has been received from the Town of Nunn. c. Section 23-2-40.B.3 -- Adequate water and sewer service can be made available to the site to serve the uses permitted within the proposed Zone District. The applicant has a Water Service Agreement with the North Weld County Water District for the nine(9)lots,which has been approved by the Weld County Attorney's Office. 1) The Weld County Department of Public Health and Environment has reviewed the proposal and has indicated the applicant has satisfied Chapter 24 of the Weld County Code in regard to water and sewer service. Sewer will be provided by Individual Sewage Disposal Systems, and the overall density meets the current policy with one septic system per 3.9 acres. Portions of Lots 4, 5, 6, and 7 are located within the boundaryof the one hundred(100)yearfloodplain, and the Department of Public Health and Environment is recommending the applicant place primary and secondary septic envelopes outside of said boundary. Language for the preservation and/or protection of the second absorption field envelope shall be placed in the development Covenants. The Covenants should state that activities,such as landscaping(i.e. planting of trees and shrubs) and construction(i.e.auxiliary structures,dirt mounds,etcetera),are expressively prohibited in the designated absorption field envelopes. d. Section 23-2-40.6.4-- Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed Zone District. Weld County Road 29 is classified as a local gravel road and requires a minimum 60-foot right-of-way. The right-of-way shall be verified and shown on the final plat. If the right-of-way cannot be documented,it shall be dedicated on the final plat. The Department of Public Works indicated, in its referral dated July29,2005,that dust mitigation and off-site improvements to Weld County Road 29 will not be required. e. Section 23-2-40.6.5—In those instances where the following characteristics are applicable to the rezoning request, the applicant has demonstrated compliance with the applicable standards: 1) Section 23-2-40.6.5.a -- The proposed Change of Zone does lie within the one hundred(100)yearfloodplain(Spring Creek). Building 2005-3505 PL1810 CHANGE OF ZONE (MZ #1081) - GOLD STONE CENTER, LLC PAGE 3 permits issued on the lots will be required to adhere to the fee structure of the County-Wide Road Impact Program and the Capital Expansion Fee Program. NOW,THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado,that the application of Gold Stone Center, LLC,for Change of Zone, MZ#1081, from the A (Agricultural) Zone District to the E (Estate) Zone District for a nine (9) lot Minor Subdivision with single family residential lots,on the above referenced parcel of land be,and hereby is, granted subject to the following conditions: 1. Prior to recording the Change of Zone Plat: A. The Change of Zone plat shall be amended to delineate the following: 1) All sheets of the plat shall be labeled MZ-1081. 2) All proposed lot lines and lots shall be removed from the plat. 3) The internal road shall be removed from the plat. 4) All non-recorded easements shall be removed from the plat. 5) The Weld County's Right to Farm statement,Appendix 22-E of the Weld County Code, shall be placed on the plat. 6) General Note#5 on the Change of Zone plat must be reworded to exclude any inferred or implied language that septic systems can be installed in Flood Zone A at any time. B. The applicant shall attempt to address the requirements and concerns of the Town of Pierce, as stated in the referral response dated July 26, 2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. C. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within thirty (30) days of approval by the Board of County Commissioners. With the Change of Zone plat map, the applicant shall submita digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is.e00. The preferred format for Images is .tif(Group 4) ... (Group 6 is not acceptable). 2. The Change of Zone is conditional upon the following,and each shall be placed on the Change of Zone plat as notes: 2005-3505 PL1810 CHANGE OF ZONE (MZ#1081)- GOLD STONE CENTER, LLC PAGE 4 A. The Change of Zone shall comply with the E (Estate) Zone District requirements as set forth in Chapter 23 of the Weld County Code. The Minor Subdivision shall consist of nine (9) residential lots and one (1) 0.9 acre outlot to be used for a lift station for the North Weld County Water District. The outlot shall be non-buildable for residential purposes. B. Water service shall be obtained from the North Weld County Water District. C. This subdivision is in rural Weld County and is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment,Water Quality Control Division,and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. D. Activities such as landscaping (i.e. planting of trees and shrubs) and construction (i.e. auxiliary structures, dirt mounds, etcetera)are expressly prohibited in the designated absorption field site. E. A Stormwater Discharge Permit shall be required for a development/ redevelopment/construction site where a contiguous or non-contiguous land disturbance is greater than or equal to one (1) acre in area. Contact the Colorado Department of Public Health and Environment, Water Quality Control Division, at www.cdphe.state.co.us/wq/PermitsUnit for more information. F. During development of the site,all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Department of Public Health and Environment, a Fugitive Dust Control Plan must be submitted. G. In accordance with the Regulations of the Colorado Air Quality Control Commission any development that disturbs more than 5 acres of land must incorporate all available and practical methods which are technologically feasible and economically reasonable in order to minimize dust emissions. H. If land development creates more than a 25-acre contiguous disturbance,or exceeds 6 months in duration,the responsible party shall prepare a Fugitive Dust Control Plan,submit an Air Pollution Notice,and apply fora permit from the Colorado Department of Public Health and Environment. "Weld County's Right to Farm,"as provided on this plat,shall be recognized at all times. J. The site shall maintain compliance at all times with the requirements of Weld County Government. 2005-3505 PL1810 CHANGE OF ZONE (MZ#1081) - GOLD STONE CENTER, LLC PAGE 5 • K. Personnel from the Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County Regulations. L. Building permits shall be obtained prior to the construction of any building. Building permits are required for the principle dwelling and for buildings accessory to the principle dwelling. M. A plan review is required for each building. Two complete sets of plans are required when applying for each permit. Each building may be required to be designed by a Colorado registered engineer. N. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. Current adopted codes include: the 2003 International Building Code,2003 International Mechanical Code,2003 International Plumbing Code, 2003 International Fuel Gas Code, 2002 National Electrical Code, and Chapter 29 of the Weld County Code. O. Each building will require an engineered foundation based on a site-specific Geotechnical Report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. P. Fire resistance of walls and openings,construction requiremerits,maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by the Weld County Code. Q. Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. R. Installation of utilities shall comply with Section 24-9-10 of the Weld County Code. S. A Homeowners'Association shall be established prior to the sale of any lot. Membership in the Association is mandatory for each parcel owner. The Association is responsible for liability insurance,taxes and maintenance of open space, streets, private utilities and other facilities along with the enforcement of Covenants. 2005-3505 PL1810 CHANGE OF ZONE (MZ#1081) - GOLD STONE CENTER, LLC PAGE 6 T. Appropriate building permits shall be obtained prior to any construction, grading or excavation. U. No development activity shall commence on the property, nor shall any building permits be issued on the property until the final plan has been approved and recorded. V. Effective January 1, 2003, building permits issued on the proposed lots will be required to adhere to the fee structure of the County-Wide Road Impact Program and the Capital Expansion Fee Program. 3. At the time of Final Plan: A. The Department of Public Works, in a referral dated July 29, 2005, has numerous requirements regarding the internal road and drainage. The applicant shall address these concerns/requirements prior to recording the final plat. Any questions pertaining to roadway improvements or drainage shall be addressed to Peter Schei, Civil Engineer, for the Weld County Department of Public Works. B. The applicant shall submit an ImprovementAgreement Regarding Collateral for Improvements to the Minor Subdivision,for acceptance by the Board of County Commissioners, prior to recording the final plat. C. The applicant shall submit Covenants for The Gold Stone Creek Minor Subdivision. The Covenants shall be approved by the Weld County Attorney's Office and County staff prior to recording the final plat. D. The right-of-way for the internal roadway shall be dedicated to the County. E. Primary and secondary septic envelopes shall be placed on each lot. All septic system envelopes must meet all setbacks, including the 100-foot setback to any well. F. Language for the preservation and/or protection of the absorption field envelopes shall be placed in the development Covenants. The Covenants shall state that activities such as permanent landscaping, structures, dirt mounds,or other items,are expressly prohibited in the absorption field site. G. All landscaping within the site distance triangles must be less than 3.5 feet in height at maturity,and noted on the Landscape Plan. The bus stop bench and mailboxes must be outside the sight distance triangles. H. Roadway and grading plans, along with details, must be approved prior to recording the final plat. Stop signs and street names shall be indicated on the final roadway plans. 2005-3505 PL1810 CHANGE OF ZONE (MZ#1081) - GOLD STONE CENTER, LLC PAGE 7 A Final Drainage Report and construction plans,conforming to the Drainage Report, shall be approved prior to recording the final plat. J. Easements shall be shown in accordance with County standards and/or Utilities Coordinating Advisory Committee recommendations on the final plat. K. The following note shall be placed on the final plat: "Outlot A is to be dedicated to the North Weld County Water District as a parcel for a public utilityfacility(water pumping facilities). Outlot A shall be non-buildable for all other purposes." L. The applicant shall submit Certificates from the Secretary of State showing the Homeowners'Association has been formed and registered with the State prior to recording the final plat. M. The applicant shall submit copies of finalized water agreements with the North Weld County Water District prior to recording the final plat. N. Prior to recording the final plat,the applicant shall provide written evidence from School District RE-9,which indicates that all District requirements have been met. O. The applicant shall submit the name of the street(other than Weld County Road 92.75) within the proposed development, along with the street addresses, for review, to the Weld County Sheriffs Office, Department of Planning Services, Postal Service, and emergency responders. Evidence of their approval shall be submitted to the Department of Planning Services. P. The applicant has indicated the location of the subdivision identification sign on the final plat. The subdivision identification sign shall adhere to the size requirements for quasi-public signs (32 square feet), as stated in Section 23-2-80.A.3 of the Weld County Code, on property owned and maintained by the Homeowners' Association. Q. The applicant shall provide a deed, ready for recording, that transfers ownership of all subsurface mineral interests to the Homeowners' Association. R. Prior to recording the final plat, the applicant shall submit a digital file of all drawings associated with the Final Plan application. Acceptable CAD formats are.dwg, .dxf,and .dgn(Microstation);acceptable GIS formats are .shp(Shape Files),Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4) ... (Group 6 is not acceptable). 2005-3505 PL1810 CHANGE OF ZONE (MZ#1081) - GOLD STONE CENTER, LLC PAGE 8 The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 21st day of December, A.D., 2005. � BOARD OF COUNTY COMMISSIONERS °� WELD COUNTY, COLORADO ATTEST: '�r ° i�� ' f �?' William H. ke, Chair Weld County Clerk to th BY:� 4 l l { r /1 6-(71 ile, ro- em D4,uty CI to the Boa a David E. Long AP OV AS TO F EXCUSED ( Robert O. Masd n untyAttorney U� Glenn Vaad Date of signature: 113i 3 i 1D(0 2005-3505 PL1810 Hello