Loading...
HomeMy WebLinkAbout20051214.tiff RESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURES OF WELD COUNTY ROAD 15 BETWEEN WELD COUNTY ROADS 84 AND 86,AND BETWEEN STATE HIGHWAY 14 AND WCR 84 FOR INSTALLATION OF A NEW WATER LINE WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-410(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance,temporarily close to through traffic or to all vehiculartraffic any highway or portion thereof fora period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS,the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate,warn and guide vehicular traffic on said County roads by posting signs thereon. NOW,THEREFORE,BE IT RESOLVED that the Board of County Commissioners of Weld County,Colorado,deems it necessary to regulate,warn and guide vehicular traffic on County roads and any intersections thereof,and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado,does declare and establish that Weld County Road 15 between Weld County Roads 84 and 86 be temporarily closed, with said closure being effective April 20, 2005, for approximately sixteen working days for installation of a new water line, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that Weld County Road 15 between State Highway 14 and Weld County Road 84 be temporarily closed,with said closure being effective April 28, 2005,for approximately one week for installation of a new water line,and further,that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. 2005-1214 EG0024 ; tiv C/27,54 ROAD CLOSURE - WCR 15 PAGE 2 The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 18th day of April, A.D., 2005. II IE ls��` BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ?êS.'\, 861 / /M �J 1 William H. J <e, Chair Clerk to the Board BY: M. J. ile, - em . Deputy Clerk to the Board C D id E. Lon APP D AS TO M: _ Robera Masden ounty Atto ney law,/ Glenn Vaad `� Date of signature: _0 1- 2005-1214 EG0024 Kit-t ,t;" MEMORANDUM WIIDc. TO: Keith Meyer U,` DATE: 4/11/05 FROM: Ted Eyl COLORADO SUBJECT: Road Closure for WCR 15 from Shl 14 to WCR 86 This is a road closure to be submitted to the BOCC for the 4/13/05 agenda. North Weld County Water District (NWCWD) is requesting the closure of WCR 15 from SH 14 to WCR 86 for the installation of a new 16"water line. This project will be done in two phases. The first phase will be the closure of WCR 15 from WCR 84 to WCR 86. This requested closure will take place starting on April 20, 2005 and go until April 28, 2005. The second phase would be the closure of WCR 15 from SH 14 to WCR 84 and will take place from April 28, 2005 to May 6, 2005 The detour route for the first phase of this project will be WCR 84 (paved) to WCR 13 (stabilized) to WCR 86 (gravel). There are four houses from WCR 13 to WCR 15 on WCR 86 and NWCWD has agreed to apply dust suppressant in front of these homes. The detour route for the second phase will use SH 14 (paved) to WCR 13 (stabilized) to WCR 84 (paved). 2005-1214 MAR.15.2005 11:?BAN UNITED RE=NTALS N0.442 P.2 14) - ,/, bilii, p1 J ,_- °LI 1r y 8 t d0M !IllASli +I0' 3T i z i F i 11 , s 1 t 1 .44 14 t � � xaIre E = a HIR,L, ,, ;4') I ¢p N .J• NNN CV • P1 C. III 101 7 L�'. •�.aW.a•.w:�Isa. •1'N•w:a•N.' `. .i��'.�Ai14•1:M•/C��:a•�r.a•N'a.l .__ ' 1 ; 1 ' a Zile.2 f ! •81 S . rr oIm _.__ _-_____.. ,,., c.nn-itnn iii aun imiunc•nr !J•bT C/1 CT/C!1 7C(1'OM �1T4 FILE No.052 03/15 '05 1427 ID:SCHMIDT EARTH BUILDERS FAX:9709629081 PAGE 3 3 i -4c - In ba .2 i3. 2 b _ t) LI: 44 ;11 j L fril m- gi Et wa(Q 1a _ 3 — 73- �1 ei xi . 41> r 1. :111 8' 119 . - • WCR 15 . , .4. ,d i„ 41).d W N N N N N N M 99 '# I I , I I 1 1 ,ill 1 " . R� IN y 1 iiilatillo 4 te cn er W154 IV3 1 ? e II irs ? 1 1 WCR15' v, _TO citit Hello