Loading...
HomeMy WebLinkAbout20051076 TR I G O N � Your Pipeline To The Future ENGINEERING.PROCNREM E Nt.C ONSTR11CT1 ON Oil&Gas Pipelines Facilities Surveying Permitting Land Services Engineering February 17, 2005 Design Procurement Construction SENT VIA CERTIFIED MAIL-RETURN RECEIPT REQUESTED Inspection Weld County Commissioners 915 Tenth Street P. O. Box 758 Greeley CO 80632 Re: Request for Crossing Requirements Weld County, Colorado To Whom It May Concern: Trigon EPC has recently sent out requests for crossing requirements to various pipeline companies in your county. This request is regarding the construction of the 42" Entrega Gas Pipeline that is to be constructed from Wamsutter, Wyoming to Rockport, Colorado. Construction is anticipated to start as early as 3Q2005. Attached you will find a copy of the letter that was sent out to those companies. Please direct all communication and correspondence to: Terry Brown Right of Way Supervisor Entrega Gas Pipeline/Trigon EPC 816 W. Spruce Rawlins, WY 82301 Phone: 307-324-4322 Ex.14 If you hi questions or concerns please call. Thank you. R,aE':.lazzo :r. poject Manager 6O3 oe•Y.7 m�4 / G 2005-1076 DENVER • D U RANG O 34 Van Gordon Street,Suite 200•Lakewood,Colorado 80228•303/296-9645•Fax 303/296-0117•www.trigon-epc.com TR I G O N M4 t Your Pipeline To The Future ENGINEERINO.PR000REMENT.CON5TRUCTION Oil&Gas Pipelines Facilities Surveying Permitting Land Services Engineering February 11, 2005 Design Procurement Construction SENT VIA CERTIFIED MAIL—RETURN RECEIPT REQUESTED Inspection El Paso Corporation P.O. Box 1087 Colorado Springs, CO 80944 Re: Request for Crossing Requirements Weld County, Colorado To Whom It May Concern: Entrega Gas Pipeline, Inc. is planning the construction of a 42" natural gas pipeline to be constructed from Wamsutter, Wyoming to Rockport, Colorado, with an anticipated construction start as early as 3Q2005. Our linear survey has identified an existing pipeline owned by El Paso Corporation, which we propose to cross. The approximate location of the crossing(s) are located in following location(s) (described in section township range) S6-T11 N-R66W, S6-T11 N-R66W, S6-T11 N-R66W, $6-T11 N-R66W, S6-T11 N-R66W. At your earliest convenience,please provide Entrega with your requirements and or specifications for crossing your pipeline facility. Also, please provide the name and telephone number of a El Paso Corporation representative that you want to be contacted prior to construction. If a response to this letter is not received within 30 days, your crossing specifications will be assumed to the same as the federal or state regulations affecting such crossings and that the only contact you desire is the required Colorado "Dig-Alert"(One Call)notification just prior to construction. Please direct all communication and correspondence to: Terry Brown Right of Way Supervisor Entrega Gas Pipeline/Trigon EPC 816 W. Spruce Rawlins,WY 82301 Phone: 307-324-4322 Ex.14 If you have any questions or concerns please call. Thank you. • Rya zzo Sr. Iect Manager • • DENVER • DURANGO 34 Van Gordon Street,Suite 200•Lakewood.Colorado 80228•303/296-9645•Fax 303/296-0117•www.trigon-epc.com TRIGON G O N'*' Your Pipeline To The Future ENOIN EENi NO.VNOCUNEMENT.CONSTNUCTION Oil&Gas Pipelines Facilities Surveying Permitting Land Services Engineering February 11, 2005 Design Procurement Construction SENT VIA CERTIFIED MAIL-RETURN RECEIPT REQUESTED Inspection Kaneb 7340 West 215`North Suite 200 Wichita,KS 67205 Re: Request for Crossing Requirements Weld County, Colorado To Whom It May Concern: Entrega Gas Pipeline, Inc. is planning the construction of a 42" natural gas pipeline to be constructed from Wamsutter, Wyoming to Rockport, Colorado, with an anticipated construction start as early as 3Q2005. Our linear survey has identified an existing pipeline owned by Kaneb, which we propose to cross. The approximate location of the crossing(s) are located in following location(s)(described in section township range) S20-T12N-R67W. At your earliest convenience, please provide Entrega with your requirements and or specifications for crossing your pipeline facility. Also, please provide the name and telephone number of a Kaneb representative that you want to be contacted prior to construction. If a response to this letter is not received within 30 days, your crossing specifications will be assumed to the same as the federal or state regulations affecting such crossings and that the only contact you desire is the required Colorado"Dig-Alert" (One Call) notification just prior to construction. Please direct all communication and correspondence to: Terry Brown Right of Way Supervisor Entrega Gas Pipeline/Trigon EPC 816 W. Spruce Rawlins, WY 82301 Phone: 307-324-4322 Ex.14 If you have any .i-stions or concerns please call. Thank you. • Ryan Sr. P. .; t Manager DENVER • DURANGO 34 Van Gordon Street.Suite 200• Lakewood.Colorado 80226•303/296-9645•Fax 303/296-0117•www.trigon-epc.com TRIGON G O N RED' C Your Pipeline To The Future ENOINEFRI MO.PROC U REM EN 1.C ON SIR U CTI ON Oil&Gas Pipelines Facilities Surveying Permitting Land Services Engineenng February I I, 2005 Design Procurement Construction SENT VIA CERTIFIED MAIL-RETURN RECEIPT REQUESTED Inspection Williams One Williams Center Tulsa,OK 74172 Re: Request for Crossing Requirements Weld County, Colorado To Whom It May Concern: Entrega Gas Pipeline, Inc. is planning the construction of a 42" natural gas pipeline to be constructed from Wamsutter, Wyoming to Rockport, Colorado, with an anticipated construction start as early as 3Q2005. Our linear survey has identified an existing pipeline owned by Williams, which we propose to cross. The approximate location of the crossing(s) are located in following location(s) (described in section township range)S6-T11N-R66W. At your earliest convenience,please provide Entrega with your requirements and or specifications for crossing your pipeline facility. Also, please provide the name and telephone number of a Williams representative that you want to be contacted prior to construction. If a response to this letter is not received within 30 days, your crossing specifications will be assumed to the same as the federal or state regulations affecting such crossings and that the only contact you desire is the required Colorado"Dig-Alert" (One Call)notification just prior to construction. Please direct all communication and correspondence to: Terry Brown Right of Way Supervisor Entrega Gas Pipeline/Trigon EPC 816 W. Spruce Rawlins.WY 82301 Phone: 307-324-4322 Ex.14 If you have any estions or concerns please call. Thank you. Rya zzo Sr. ect Manager DENVER D U RANG O 34 Van Gordon Street,Suite 200•Lakewood,Colorado 80228•303/296-9645•Fax 303/296-0117•www.trigon-epc.com Hello