HomeMy WebLinkAbout20051076 TR I G O N � Your Pipeline To The Future
ENGINEERING.PROCNREM E Nt.C ONSTR11CT1 ON
Oil&Gas
Pipelines
Facilities
Surveying
Permitting
Land Services
Engineering
February 17, 2005 Design
Procurement
Construction
SENT VIA CERTIFIED MAIL-RETURN RECEIPT REQUESTED Inspection
Weld County Commissioners
915 Tenth Street
P. O. Box 758
Greeley CO 80632
Re: Request for Crossing Requirements
Weld County, Colorado
To Whom It May Concern:
Trigon EPC has recently sent out requests for crossing requirements to various pipeline
companies in your county. This request is regarding the construction of the 42" Entrega Gas
Pipeline that is to be constructed from Wamsutter, Wyoming to Rockport, Colorado.
Construction is anticipated to start as early as 3Q2005.
Attached you will find a copy of the letter that was sent out to those companies. Please direct all
communication and correspondence to:
Terry Brown
Right of Way Supervisor
Entrega Gas Pipeline/Trigon EPC
816 W. Spruce
Rawlins, WY 82301
Phone: 307-324-4322 Ex.14
If you hi questions or concerns please call. Thank you.
R,aE':.lazzo
:r. poject Manager
6O3 oe•Y.7 m�4 / G 2005-1076
DENVER • D U RANG O
34 Van Gordon Street,Suite 200•Lakewood,Colorado 80228•303/296-9645•Fax 303/296-0117•www.trigon-epc.com
TR I G O N M4 t Your Pipeline To The Future
ENGINEERINO.PR000REMENT.CON5TRUCTION
Oil&Gas
Pipelines
Facilities
Surveying
Permitting
Land Services
Engineering
February 11, 2005 Design
Procurement
Construction
SENT VIA CERTIFIED MAIL—RETURN RECEIPT REQUESTED Inspection
El Paso Corporation
P.O. Box 1087
Colorado Springs, CO 80944
Re: Request for Crossing Requirements
Weld County, Colorado
To Whom It May Concern:
Entrega Gas Pipeline, Inc. is planning the construction of a 42" natural gas pipeline to be
constructed from Wamsutter, Wyoming to Rockport, Colorado, with an anticipated construction
start as early as 3Q2005. Our linear survey has identified an existing pipeline owned by El Paso
Corporation, which we propose to cross. The approximate location of the crossing(s) are located
in following location(s) (described in section township range) S6-T11 N-R66W, S6-T11 N-R66W,
S6-T11 N-R66W, $6-T11 N-R66W, S6-T11 N-R66W.
At your earliest convenience,please provide Entrega with your requirements and or specifications
for crossing your pipeline facility. Also, please provide the name and telephone number of a El
Paso Corporation representative that you want to be contacted prior to construction. If a response
to this letter is not received within 30 days, your crossing specifications will be assumed to the
same as the federal or state regulations affecting such crossings and that the only contact you
desire is the required Colorado "Dig-Alert"(One Call)notification just prior to construction.
Please direct all communication and correspondence to:
Terry Brown
Right of Way Supervisor
Entrega Gas Pipeline/Trigon EPC
816 W. Spruce
Rawlins,WY 82301
Phone: 307-324-4322 Ex.14
If you have any questions or concerns please call. Thank you.
•
Rya zzo
Sr. Iect Manager
•
•
DENVER • DURANGO
34 Van Gordon Street,Suite 200•Lakewood.Colorado 80228•303/296-9645•Fax 303/296-0117•www.trigon-epc.com
TRIGON G O N'*' Your Pipeline To The Future
ENOIN EENi NO.VNOCUNEMENT.CONSTNUCTION
Oil&Gas
Pipelines
Facilities
Surveying
Permitting
Land Services
Engineering
February 11, 2005 Design
Procurement
Construction
SENT VIA CERTIFIED MAIL-RETURN RECEIPT REQUESTED Inspection
Kaneb
7340 West 215`North
Suite 200
Wichita,KS 67205
Re: Request for Crossing Requirements
Weld County, Colorado
To Whom It May Concern:
Entrega Gas Pipeline, Inc. is planning the construction of a 42" natural gas pipeline to be
constructed from Wamsutter, Wyoming to Rockport, Colorado, with an anticipated construction
start as early as 3Q2005. Our linear survey has identified an existing pipeline owned by Kaneb,
which we propose to cross. The approximate location of the crossing(s) are located in following
location(s)(described in section township range) S20-T12N-R67W.
At your earliest convenience, please provide Entrega with your requirements and or specifications
for crossing your pipeline facility. Also, please provide the name and telephone number of a
Kaneb representative that you want to be contacted prior to construction. If a response to this
letter is not received within 30 days, your crossing specifications will be assumed to the same as
the federal or state regulations affecting such crossings and that the only contact you desire is the
required Colorado"Dig-Alert" (One Call) notification just prior to construction.
Please direct all communication and correspondence to:
Terry Brown
Right of Way Supervisor
Entrega Gas Pipeline/Trigon EPC
816 W. Spruce
Rawlins, WY 82301
Phone: 307-324-4322 Ex.14
If you have any .i-stions or concerns please call. Thank you.
•
Ryan
Sr. P. .; t Manager
DENVER • DURANGO
34 Van Gordon Street.Suite 200• Lakewood.Colorado 80226•303/296-9645•Fax 303/296-0117•www.trigon-epc.com
TRIGON G O N RED' C Your Pipeline To The Future
ENOINEFRI MO.PROC U REM EN 1.C ON SIR U CTI ON
Oil&Gas
Pipelines
Facilities
Surveying
Permitting
Land Services
Engineenng
February I I, 2005 Design
Procurement
Construction
SENT VIA CERTIFIED MAIL-RETURN RECEIPT REQUESTED Inspection
Williams
One Williams Center
Tulsa,OK 74172
Re: Request for Crossing Requirements
Weld County, Colorado
To Whom It May Concern:
Entrega Gas Pipeline, Inc. is planning the construction of a 42" natural gas pipeline to be
constructed from Wamsutter, Wyoming to Rockport, Colorado, with an anticipated construction
start as early as 3Q2005. Our linear survey has identified an existing pipeline owned by
Williams, which we propose to cross. The approximate location of the crossing(s) are located in
following location(s) (described in section township range)S6-T11N-R66W.
At your earliest convenience,please provide Entrega with your requirements and or specifications
for crossing your pipeline facility. Also, please provide the name and telephone number of a
Williams representative that you want to be contacted prior to construction. If a response to this
letter is not received within 30 days, your crossing specifications will be assumed to the same as
the federal or state regulations affecting such crossings and that the only contact you desire is the
required Colorado"Dig-Alert" (One Call)notification just prior to construction.
Please direct all communication and correspondence to:
Terry Brown
Right of Way Supervisor
Entrega Gas Pipeline/Trigon EPC
816 W. Spruce
Rawlins.WY 82301
Phone: 307-324-4322 Ex.14
If you have any estions or concerns please call. Thank you.
Rya zzo
Sr. ect Manager
DENVER D U RANG O
34 Van Gordon Street,Suite 200•Lakewood,Colorado 80228•303/296-9645•Fax 303/296-0117•www.trigon-epc.com