HomeMy WebLinkAbout20050539.tiff RECORD OF PROCEEDINGS
MINUTES
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
FEBRUARY 16, 2005
TAPE #2005-12
The Board of County Commissioners of Weld County, Colorado, met in regular session in full conformity
with the laws of the State of Colorado at the regular place of meeting in the Weld County Centennial Center,
Greeley, Colorado, February 16, 2005, at the hour of 9:00 a.m.
ROLL CALL: The meeting was called to order by the Chair and on roll call the following members were
present, constituting a quorum of the members thereof:
Commissioner William H. Jerke, Chair
Commissioner M. J. Geile, Pro-Tem
Commissioner David E. Long
Commissioner Robert D. Masden
Commissioner Glenn Vaad
Also present:
County Attorney, Bruce T. Barker
Acting Clerk to the Board, Debra Miller
Director of Finance and Administration, Donald D. Warden
MINUTES: Commissioner Masden moved to approve the minutes of the Board of County Commissioners
meeting of February 14, 2005, as printed. Commissioner Long seconded the motion, and it carried
unanimously.
AMENDMENTS TO AGENDA: There were no amendments to the agenda.
PUBLIC INPUT: No public input was given.
CONSENT AGENDA: Commissioner Long moved to approve the consent agenda as printed.
Commissioner Masden seconded the motion, and it carried unanimously.
COMMISSIONER COORDINATOR REPORTS: Chair Jerke stated the Commissioners toured the new
jail facility and found it to be secure, safe and clean.
WARRANTS: Donald Warden, Director of Finance and Administration, presented the following warrants
for approval by the Board:
All Funds $122,700.14
2005-0539
BC0016
03-03-OS-
Commissioner Masden moved to approve the warrants as presented by Mr.Warden. Commissioner Long
seconded the motion, which carried unanimously.
BIDS:
PRESENT AND APPROVE SECURITY X-RAY SCANNER AND WALK-THROUGH BID - FINANCE
DEPARTMENT: Pat Persichino, Director of General Services, recommended emergency approval of the
bid from Control Screening, in the amount of$16,450,for the Autoclear#5333 ME(Multi-Energy Field);and
the bid from Galls, Inc., in the amount of$2,299.99, for the walk-through detector. He stated there is a
$2,300 per year service contract on the x-ray machine and there will be one security station at the new court
facility. He explained the emergency approval process is requested because the equipment needs to be
installed before the courts take occupancy on April 1,2005. Commissioner Masden moved to approve said
bid. Seconded by Commissioner Long, the motion carried unanimously.
PRESENT WATERLINE IMPROVEMENT WCR 13 BID-PUBLIC WORKS: Mr. Persichino read the names
of the five vendors who submitted bids. He stated said bid will be considered for approval on March 2,2005.
PRESENT OWENS ILLINOIS ROADWAY IMPROVEMENT BID -PUBLIC WORKS: Mr. Persichino read
the names of the six vendors who submitted bids. He stated said bid will be considered for approval on
March 2, 2005.
PRESENT SIGN MATERIAL BID FOR 2005 - PUBLIC WORKS: Mr. Persichino read the names of the
seventeen vendors who submitted bids. He stated said bid will be considered for approval on March 2,
2005.
APPROVE CATTLE GUARDS BID-PUBLIC WORKS: Mr. Persichino recommended the low bid from Big
R Manufacturing, LLC, in the amount of$42,216, for eight cattle guards. Commissioner Geile moved to
accept said bid. Seconded by Commissioner Vaad, the motion carried unanimously.
APPROVE 2005 STEEL BID - PUBLIC WORKS: Mr. Persichino referenced a memorandum dated
February 8, 2005, from the Jeff Jerome, Department of Public Works (see attached memorandum).
Commissioner Vaad moved to approve said bid as recommended. Seconded by Commissioner Masden,
the motion carried unanimously.
NEW BUSINESS:
CONSIDER TASK ORDER CHANGE ORDER LETTER #1 FOR THE AIR POLLUTION CONTROL
PROGRAM AND AUTHORIZE CHAIR TO SIGN: Trevor Jiricek, Department of Public Health and
Environment,stated this amendment to an existing contract,with the Colorado Department of Public Health
and Environment,will increase funding for the program by$1,416.64 for 32 additional hours of staff training.
Commissioner Masden moved to approve said task order. Seconded by Commissioner Long,the motion
carried unanimously.
CONSIDER PURCHASE OF SERVICE AGREEMENT FOR MIGRANT AND SEASONAL HEAD START
DENTAL SERVICES AND AUTHORIZE CHAIR TO SIGN - MIKE JONES: Walt Speckman, Director,
Department of Human Services,stated the agreement is for dental services. He explained said dentist will
be reimbursed at a rate of $5.00 per child per checkup. Commissioner Long moved to approve said
agreement. Seconded by Commissioner Geile, the motion carried unanimously.
CONSIDER CHILD CARE SERVICES FISCAL AGREEMENT AND AUTHORIZE CHAIR TO SIGN: Mr.
Speckman stated this is an ongoing agreement with Mesa County Human Services for child care services
for Special Needs children. Commissioner Geile moved to approve said agreement. Seconded by
Commissioner Masden, the motion carried unanimously.
Minutes, February 16, 2005 2005-0539
Page 2 BC0016
CONSIDER PURCHASE OF SERVICES AGREEMENT FOR MIGRANTAND SEASONAL HEAD START
HEALTH SERVICES AND AUTHORIZE CHAIR TO SIGN-MONTROSE MEMORIAL HOSPITAL,OLATHE,
DBA OLATHE MEDICAL CLINIC: Mr. Speckman stated the ongoing agreement is for health services
provided to children in Olathe, Colorado. Commissioner Masden moved to approve said agreement.
Seconded by Commissioner Geile, the motion carried unanimously.
CONSIDER MASTER CONTRACT FOR COMMUNITY SERVICES BLOCK GRANT AND AUTHORIZE
CHAIR TO SIGN: Mr.Speckman stated said contract is with the Colorado Department of Local Affairs. He
explained the contract serves as a boiler plate of information for the grant process. He stated said contract
will be for a period of five years instead of two. Commissioner Geile moved to approve said contract.
Seconded by Commissioner Long, the motion carried unanimously.
CONSIDER PETITION FOR ABATEMENT OR REFUND OF TAXES FOR 2002 - HEALTH SOUTH
CORPORATION: Raelene Anderson,Assessor's Office,stated staff initially recommended approval of an
abatement;however,a continuance is now being requested,by the Division of Property Taxation,to obtain
more information regarding an ongoing investigation of the Corporation's reports of earnings.
Commissioner Vaad moved to continue said matter to May 23, 2005 at 9:00 a.m. Seconded by
Commissioner Geile, the motion carried unanimously.
CONSIDER PETITION FOR ABATEMENT OR REFUND OF TAXES FOR 2004-DAVID PERKINS: Duane
Robson,Assessor's Office,stated Mr. Perkins sold his interest in the farm in December2003 and was not,
therefore, the owner of record on the assessment date of January 1, 2004. He stated staff is
recommending an abatement in the amount of$15,953.84. Commissioner Vaad moved to approve said
abatement. Seconded by Commissioner Long, the motion carried unanimously.
CONSIDER COST SHARING AGREEMENT FOR AERIAL PHOTOGRAPHY AND AUTHORIZE CHAIR TO
SIGN-NORTH WELD COUNTY WATER DISTRICT: Mr.Warden stated North Weld County Water District
agrees to pay $137.77 per section for 98 sections that lie within Weld County and the Water District's
service area for aerial photography. Commissioner Long moved to approve said agreement. Seconded
by Commissioner Vaad, the motion carried unanimously.
PLANNING OLD BUSINESS:
CONSIDER PROBABLE CAUSE HEARING CONCERNING USR#1456-BARBARA SCHOTTELKOTTE
(CON'T FROM 02/14/05): Jacqueline Hatch, Department of Planning Services, requested a continuance
of the matter until February 28, 2005 because the applicant had no transportation to attend the meeting.
Commissioner Masden moved to continue said matter to February 28, 2005 at 9:00 a.m. Seconded by
Commissioner Long, the motion carried unanimously.
PLANNING:
CONSIDER REQUEST FOR EXTENSION OF TIME TO SUBMIT AUSE BY SPECIAL REVIEW PERMIT
APPLICATION FOR WIND MONITORING TOWERS-GREENLIGHT ENERGY, INC.: Sheri Lockman,
Department of Planning Services, reviewed the history of the application. She explained the applicant is
asking for a six month extension,with an option to request an additional six month extension. She stated
Clerk to the Board's office suggested reviewing the matter again in six months because an optional
extension cannot be granted because of the specific dates on the collateral agreement. She stated there
have been no complaints from surrounding property owners. Commissioner Geile moved to approve said
request. Seconded by Commissioner Long, the motion carried unanimously.
RESOLUTIONS AND ORDINANCES: The resolutions were presented and signed as listed on the
consent agenda. No Ordinances were approved.
Minutes, February 16, 2005 2005-0539
Page 3 BC0016
Let the minutes reflect that the above and foregoing actions were attested to and respectfully submitted by
the Acting Clerk to the Board.
' no further business, this meeting was adjourned at 9:45 a.m.
E�'`�� BOARD OF COUNTY COMMISSIONERS
I,s�„�„ WELD COUNTY, COLORADO
186
♦r. ,�* `
William H. J e, Chair
erk to the Board
BY: /1 liLrl.(�
�/ ro Tem
Deputy Clerk t the oard c
D 'dE. Lo g
Robert D. Map
•"/14 alir2
Glenn
Minutes, February 16, 2005 2005-0539
Page 4 BC0016
,
•
MEMORANDUM
TO: Pat Persichino DATE: February 8, 2005
Director of General Services
' FROM: Jeff Jerome, Operations Manager, Public Works Dept O BJECT: 2005 Steel Bid, B0500054
COLORADO
Attached is a bid tabulation and supporting documents for the 2005 Steel Bid.
The recommendations for award per category are as follows:
Corrugated Metal Pipe
DBE Manufacturing was the low bidder for both round and arch pipe when the
figures were added together. Therefore, we recommend that they be awarded
the bid for corrugated metal pipe.
Corrugated Plastic Pipe
The low bid for corrugated plastic pipe was submitted by Big R. However,
their price is guaranteed only until April 15, 2005. The next low bid was
received from Advanced Drainage. Because the difference in the two bids
is $3 .02, we recommend that Advanced Drainage receive the bid for this
item.
Structural Plate Pipe
Recommend the low bid submitted by Big R be approved and awarded.
MISCELLANEOUS STEEL PRODUCTS
Beam Sections
Recommend the low bid submitted by Norfolk Iron be approved and awarded.
Steel Piling
Recommend the low bid submitted by Norfolk Iron be approved and awarded.
Steel Angles, Black Pipe, Tubing, and Flat Plate
Recommend the low bid submitted by Norfolk Iron be approved and awarded.
Channel Iron" & Sign Posts
Recommend the low bid submitted by DBE Manufacturing be approved and
awarded.
• Memo to Pat Persichino
2005 Steel Bid
Page 2
Fabricated Guard Rail Post & Sheet Piling
Recommend the low bid submitted by Big R be approved and awarded.
Fencing
Recommend the low and sole bid submitted by DBE Manufacturing be approved
and awarded.
Cattle Guard Cross Bars
Recommend the low bid submitted by Big R be approved and awarded.
Guard Rail and Guard Rail Ends
Recommend the low bid submitted by DBE Manufacturing be approved and
awarded.
Curved Guard Rail Sections
Recommend the low bid submitted by DBE Manufacturing be approved and
awarded.
Tubular Guard Rail
Recommend the low and sole bid submitted by DBE Manufacturing be approved
and awarded.
Concrete Products
Recommend the low bid submitted by Carder Concrete be approved and
• awarded. •
Steel Bridge Deck
Big R Manufacturing was the low bidder per foot for steel bridge deck.
Due to the design profile of the decking, the lump sum cost per bridge
will be approximately $342 lower than the Big R decking with an estimated
savings of $3, 000 in bridge replacement costs for 2005. We recommend
rejecting the low bid from Big R and accepting the next low bid from DBE
Manufacturing which is to the best interests of Weld County and meets the
needs of Weld County.
Wpfiles\bidspecs\steel&cattleguards\steelmemo05
•
cc: Don Warden, Director of Finance
Bid File
BID REQUEST NO. B0500054 Mar-05
Page 1
m:\steelbidtab\steelbidtab.xls-cover
•
Bids for various Road and Bridge construction materials were received from the vendors listed below.
The price submitted by vendors is tabulated herein also.
Big "R" Manufacturing & Distributing, Inc. DBE Manufacturing
P.O. Box 1290 • 24435 Hwy 392
Greeley, CO 80632 Greeley, CO 80631
•
JD Fields & Company Carder Concrete
3773 Cherry Creek Dr North, Ste 575 8311 W. Carder Ct.
Denver, CO 80209 Littleton, CO 80125
Contech Construction Products Advanced Drainage Systems
4891 Independence, Ste 195 - 2808 S. Wheeling Way
Wheatridge, CO 80033 Aurora, CO 80014 •
Norfolk Iron & Metal
P.O. Box 1776
Greeley, CO 80632
BID REQUEST NO.B0500054 Mar-05
Page 2
BID TABULATION
CORRUGATED METAL PIPE
(Price per Foot) BIG"R" * DBE MANUF** CONTECH CONSTRUCTION
ROUND PIPE: Polymer Alum. Galv. Polymer Alum. Galv. Polymer Alum. Galv.
15" - 14 Ga. - 1/2 x 2-2/3 Corrugation $12.56 $10.23 $8.35 kiii $12.85 $11.59 $10.59 $20.68 $18.09 $14.44
18" - 14 Ga. - 1/2 x 2-2/3 Corrugation
g $15.08 $12.27 $10.01 $15.44 $13.76 $12.58 r $25.01 $21.89 $17.48
24" 14 Ga. 1/2 x 2-2/3 Corrugation $20.29 $16.52 $13.48 rP. $20.63 $18.45 $16.90 $33.67 $29.46 $23.53
�al
30" - 14 Ga. - 1/2 x 2-2/3 Corrugation $25.25 $20.56 $16.76 $25.28 $22.60 $20.70 $43.23 $3T.70 $30.21
36" - 14 Ga. - 1/2 x 2-2/3 Corrugation $30.21 )
$2459 $20.05 $29.84 $26.98 $23.83 t ; $54.18 $47.42 $37.86
48" - 14 Ga. - 1 x 3 Corrugation $50.96 $41.44 $33.37 [""l $46.42 $40.55 35.82
€�� ._.. $ $7L67 .. .$62.72 _... $50.08.
TOTALS $154.35 $125.61 $102.02 $150.46 $133.93 $120.42 $248.44 $217.28 $173.60
* -Round culverts in lengths to 50'
* -Arched culverts in lengths to 32'
** -Corrugation on 48" is 1/2 X 2-2/3
BID REQUEST NO.60500054
Mar-05
Page 3
BID TABULATION
• CORRUGATED METAL PIPE
(Priced per Foot)
BIG"R" DBE MANUFACTURING CONTECH CONSTRUCTION
ARCH PIPE: Polymer Mum. Galv. Polymer Mum. Galv. Polymer Alum. Galv.
15" - 14 Ga. - 1/2 x 2-2/3 Corrugatior $14.01 $11.55 $9.16 =j $13.49. $12.39 $11.18 $22.75 $19.90 $15.88
3 �x
18" - 14 Ga. - 1/2 x 2.2/3 Corrugatior $16.82 $13.85 $11.00 $16.02 $14.73 $13.28 L4 $27.51 $24.08 $19.23
24" - 14 Ga. - 1/2 x 2-2/3 Corrugatior $22.62 $18.63 $14.80 $21.41 $19.87 $17.13 $37.04 $32.41 $25.88
sM
30" - 14 Ga. - 1/2 x 2-2/3 Corrugatior $28.16 $23.20 . $18.41 $26.24 $24.11 $20.45 s^<, $47.55 $41.47 $33.23
36" - 14 Ga. - 1/2 x 2-2/3 Corrugatior $33.69 $27.75 $22.03 $31.31 $28.78 $24.42 $59.60 $52.16 $41.65
48" - 14 Ga. - 1 x 3 Corrugation $56.35 $46.28 $37.10 $47.05 $42.97 $37.13 $106.75 $93.54 $73.43
n k•:
54" - 14 Ga.- 1 x 3 Corrugation $71.54 $58.75 $46.84 ; $53.01 $49.03 $40.47 $126.79 $105.46 $84.26
60" - 14 Ga. - 1 x 3 Corrugation $79.35 $65.15 $51.95 ,1 $59.36 $53.99 $46.56 ti $138.31 $115.14 $91.99
72" - 14 Ga.- 1 x 3 Corrugation $94.94 $77.97 $62.17 $73.23 $66.10 $55.82 $182.75 $151.28 $120.88
TOTALS $417.48 $343.13 .$273.46 $341.12 $311.97 $266.44 $749.05 $635.44 $506.43
Gauge on 48",54",60"is 14 gauge
"Corrugation on 48",54",60",72"
is different than specification
BID REQUEST NO. B0500054 Mar-05
Page 4
BID TABULATION
CORRUGATED PLASTIC PIPE
(Priced per Foot) DBE ADVANCED
BIG R MANUFACTURING DRAINAGE
12" Round Corrugated Plastic Pipe $5.56 $5.60 m $5.75
15" Round Corrugated Plastic Pipe $8.89
$9.52 $8.99
18" Round Corrugated Plastic Pipe $11.12 $11.98 $11.30
24" Round Corrugated Plastic Pipe $17.23 .- $18.13 $17.50
•
30" Round Corrugated Plastic Pipe $27.50 $27.09 $27.90
Ki✓'
36" Round Corrugated Plastic Pipe $32.78 ' $34.05 r $33.00
5?w
48" Round Corrugated Plastic Pipe $58.34 , $60.37 $60.00
TOTALS $161.42 $166.74 . ' $164.44
Prices good thru 4/15/05
BID"REQUEST NO. B0500054 Mar-05
Page 5
BID TABULATION •
STRUCTURAL PLATE CORRUGATION
BIG "R" CONTECH CONSTRUCTION
Price per pound for the following gauges. Price must cover the following structural plate products:
Pipe, Pipe Arch, Arch, or Underpasses. Price must include all required fasteners and assembly.
2 - 1/2" x 9" Aluminum
.100 $5.10 $5.11
.125 $5.10 $5.39
.150 $5.10 $5.29
.175 $5.10 $5.38
.200 $5.10 $5.39
Price /N per lineal foot for assembly. Assembly will be at job site on bed prepared by Weld County.
In the case of live stream or canal, assembly will not be in flow line, but ready to set in place.
Up to 30 N $0.88 $2.50
31N to 45N $0.92 $3.00
46N and Above $0.98 $3.25
`BID REQUEST NO.B0500054 March-05,
--- — _ _— Page 6
BID TABULATION
MISCELLANEOUS STEEL PRODUCTS -
(price per foot) •
BIG"R" * J.D. FIELDS NORFOLK IRON DBE MANUF.
ITEM GREELEY DENVER GREELEY GREELEY
W18 X 76 X 30' $30.09 NO BID �� $26.73 $30.44
W21 X 10 X 50' $40.87 r NO BIDLi $36.28 °J $41.84
W24 X 84 X 50' roll= NO BID i 1 $28.92 $34.34
W27 X 102 X 40' $41.88 NO BID , $42.98
IHP 8 X 36 X 40' NO BID $11.50 l 2 $10.62 $11.98
HP 10 X57 X40' NO BID , r $16.82 : $18.89
IHP 12 X 74 X 40' NO BID $23.70 a $24.49
;Angle 1 X 1 X 1/4 NO BID NO BID $0.63 $0.73
!Angle 3 X 3 X 1/4 NO BID NO BID 1 ' $1.82 $1.97
IAngle 4 X 6 X 3/8 NO BID NO BID N $4.85 $5.66
Black Pipe 2" (Schedule 40) NO BID NO BID 1_ $2.47 ' $2.73
1!Black Pipe 2-1/2" (Schedule 40) NO BID NO BID $3.86 $3.97
rSquare Tubing 1" (14 Ga.) NO BID NO BID $0.66 a.- $0.79
'Square Tubing 1-1/2" (14 Ga.) NO BID NO BID $1.08 $1.16
(Square Tubing 2-1/2" (14 Ga.) NO BID NO BID 1- $1.84 $1.97
Square Tubing 1" (16 Ga.) NO BID NO BID $0.54 �'1 $0.68
Square Tubing 1-1/2" (16 Ga.) NO BIDI.'. NO BID $0.92 - $0.97
Square Tubing 2-1/2" (16 Ga.) NO BID • 11 I r
ri, $1.84 $1.97
I i
* Prices good thru 4/15/05
' BID REQUEST NO.B0500054 Mar-05
Page 7
BID TABULATION
MISCELLANEOUS STEEL PRODUCTS
(Price per Pound)
BIG "R" J.D. FIELDS NORFOLK DBE MANUF.
ITEM GREELEY DENVER GREELEY GREELEY
Flat Plate (2" X 1/4" to 1/2") NO BID NO BID $0.41 r; $0.47
Flat Plate (4" X 1/4" to 1/2") NO BID NO BID $0.38 $0.47
Flat Plate (6" x 1/4" to 1/2") NO BID NO BID ' $0.38 _ $0.46
Flat Plate (8" x 1/4" to 1/2") NO BID NO BID $0.44 € , $0.47
Flat Plate (10" x 1/4" to 1/2") NO BID NO BID G_ $0.45 $0.49
(Price Per Foot) BIG "R" J.D. FIELDS NORFOLK DBE MANUF.
GREELEY DENVER GREELEY GREELEY
8" Channel Iron (11.5 Lbs) NO BID NO BID s $4.58 $4.48
10" Channel Iron (15.3 Lbs) NO BID NO BID- $6.05 $5.99
12" Channel Iron (20.7 Lbs) NO BID NO BID' ` $8.21 $7.79
' BID REQUEST NO.B0500054 Mar-05
Page 8
BID TABULATION
MISCELLANEOUS STEEL PRODUCTS
BIG "R" DBE MANUF. NORFOLK . J.D.FIELDS CONTECH
ITEM GREELEY GREELEY GREELEY DENVER WHEATRIDGE
*
Sign Posts per Each NO BID $22.99 I NO BID S NO BID NO BID
Fabricated Guard Rail Posts Each irk ". "-.L ~`''_ is '" '':. '
W16 x 26 x 1'- 1/2" $13.50 $24.37 t $32.75 NO BID I NO BID
W8 x 17 x 1'-3-1/2" $18.77 $18.43 g $27.90 I NO BID I NO BID
W8 x 17 x 3'-6" $14.63 . $40.10 J( $73.27 NO BID NO BID
W8 x 17 x 4'- 6" $39.71 $49.91 $94.21 NO BID g NO BID
W8 x 17 x 6'-0" $50.38 1 $64.63 I $121.65 I NO BID I NO BID
W6 x 15 x l'-2" $66.38 ;: $22.11 $20.34 I NO BID I NO BID
Guard Rail Price per L.F. $6.58 $5.49 I NO BID NO BID I NO BID
Guard Rail Terminal Ends _ ` !I 7-'''11":4?: ` :3:" gx- ;.4.---•::::7A ,4,4 - .'
Each: Half Wrap $54.11 $43.71 I NO BID NO BID NO BID
Full Wrap $116.40 NOT LISTED NO BID NO BID NO BID
Curved Guard Rail Sections k'. .s d`ii„:-T t lkr .1'. , r-, '-..d ';` ` ''. `n 0, ,.;; ,. m i° ,; - ;oil '.-
(10'to 19'Radius Curve)(per L.F $13.65 $12.62 g NO BID NO BID NO 4 --$.„2,i7:-.,-2,:c1
BID
Curved Guard Rail Sections 2 ',..11,-?::ce,e ,"' z ��'� a t 'n �' ' -" - r -.kr *'�,-, " - -
(20'to 50'Radius Curve)(per L.F.; $11.92 ti $11.78 I NO BID I NO BID ' NO BID
Tubular Guard Rail-Per L.F. NO BID i $78.87 NO BID I. NO BID NO BID
Sheet Piling-Per L.F.-Bare Steel $6.95 - $7.81 I NO BID $13.00 I $15.60
Steel Bridge Deck-Per L.F./Primed $7.87 d $8.19 I NO BID I NO BID NO BID •
Cattleguard Crossbar-7 Ga.Per L.I $3.00 $3.29 NO BID g NO BID I NO BID
Steel Fence Post-Price Each NO BID, $3.88 I NO BID NO BID NO BID
Barbed Wire Fence-Price Per Roll NO BID $70.71 I NO BID 5 NO BID 3 NO BID
Snow Fence-Price Per Foot NO BID' $0.93 g NO BID I NO BID I NO BID
Silt Fence-Price Per Roll NO BID $21.48 I NO BID I NO BID 3 NO BID
Barbless Wire-Price Per Roll NO BID $51.03 I NO BID NO BID NO BID
Black Wire Price/100lb Roll NO BID $74.20 I NO BID I NO BID I NO BID
• * -Sheet Piling is 21-5/8" net driving
width •
BID REQUEST NO. B0500054 • Mar-05
Page 9
BID TABULATION
CONCRETE PRODUCTS
CARDER
CONCRETE DBE MANUFACTURING
LITTLETON GREELEY
Unit Cost per End Unit Cost per End
Description Class Linear Foot Sections Total Linear Foot Sections Total
48" RCP V $61.10 $660.00 $721.10 $79.58 $711.34 $790.92
48" RCP IV $48.45 $660.00 $708.45 4 $57.94 $711.34 $769.28
36" RCP V $31.55 $490.00 $521.55 $41.91 $453.61 $495.52
36" RCP IV $26.70 $490.00 $516.70 $31.96 $453.61 $485.57
27" RCP V _' $22.25 $380.00 $402.25 NO BID NO BID $0.00
27" RCP IV $18.80 $380.00 $398.80 NO BID NO BID • $0.00
27" RCP III $16.75 $380.00 $396.75 x:' NO BID NO BID $0.00
24" RCP IV $11.35 $290.00 $301.35 • $20.26 $298.97 , $319.23
24" RCP V $11.55 $290.00 $301.55 $16.86 $298.97 $315.83
29" x 45" ECP IV 4,, $50.70 $490.00 $540.70 $49.47 $719.59 $769.06
29" x 45" ECP III $47.10 $490.00 $537.10 $43.53 $719.59 $763.12
24" x 38" ECP IV $39.85 $320.00 $359.85 $41.36 $513.40 $554.76
24" x 38" ECP III $37.60 $320.00 $357.60 Y . $35.98 $513.40 . $549.38
19" x 30" ECP IV $30.55 $280.00 $310.55 $25.98 $410.31 $436.29
19" x 30" ECP III $28.75 $280.00 $308.75 $23.03 $410.31 $433.34
Grand $6,200.00 $6,683.05 Grand $6,214.44 $6,682.30
Total Total
Hello