Loading...
HomeMy WebLinkAbout20050722.tiff r Weld County Planning Department GREELEY OFFICE ri;;;\) DEC 2 j 2004 Weld County R42tr ,ED 111k. December 13, 2004 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gary and Judy Harkless Case Number MZ-1060 Please Reply By January 10, 2005 Planner Michelle Martin Project A Minor Subdivision Change of Zone from (A)Agriculture to (E) Estate for 9 residential lots (Faith Estates) Legal Lot B of RE-2641; being part of the SE4 Section 13, T6N, R66W of the 6th P.M., Weld County, Colorado. Location %, mile South of CR 70 and West of and adjacent to CR 37. Parcel Number 0805 13 000036 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 1, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: Signature ( \ , Date ` ——AD Agency \,.// (9 t .n +Weld County Planning Dept. +918 10'"Street.Greeley, CO. 80631 ❖(970)353-6100 ext.3540 +(970)304-6498 fax EXHIBIT 2005-0722 1 f 4 Applicant: Gary & Judy Harkless Planner: Michelle Martin Case#: MZ-1060 N \ ; A ) \ _ ____ ,-, ___ __ _ _, ,___, �_,, v WCR��� c) 39 32 16 L_\33 \- 4; 2 \ 47 47 N 3. - - 0.4 0 0.4 0.8 Miles I Weld County Referral Map / v "'Offal's Major Roads A/ Lod Roads I Y Railroads A/ Streams 8 Ditches /_ 0 PLSS ,� C) Soils �� • Lakes - Floodplains S West Greeley Cc,...lvation District (970) 356-8097 Case Number: MZ-1060 Applicant: Gary & Judy Harkle_ss Planner: 'Michelle Martin Below is a list of the soils and their limitations according to the USDA, Weld County Soil Survey. Dwellings I I Small Septic Tank Prime Farm Map Shallow Dwellings with Symbol Soil Name Soil Texture Excavations without I Commercial' Absorption Land (if Additional Comments basements basements j I Buildings I Fields irrigated) 14 Colby Loam Slight Slight Slight Slight - Slight Yes 16,Colby Loam I Sli ht Slight 9 g 'Slight i Slight No 32IKim !Loam Slight ,Slight Yes 33'iKim Loam Slight _ Slight No 39 Nunn Loam Severe Severe Severe I Severe Yes 47,OIney Fine Sandy Loam Slight _ Slight Slight Slight Slight Yes 48'Olney i Fine Sandy Loam (Slight Slight Slight ISlight No The West Greeley Conservation District recommends that the applicant does an on site soils test prior to any construction. For a more complete pp soils description consult the Weld County Soil Survey or contact our office at (970) 356-8097. If you or the applicant have any questions please feel free to call our office. ) UAwr K\.A I luA Produced by the West Greeley Conservation District KitL".•,..), Weld County Referral IDecember 13, 2004 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gary and Judy Harkless Case Number MZ-1060 Please Reply By January 10, 2005 Planner Michelle Martin Project A Minor Subdivision Change of Zone from (A)Agriculture to (E) Estate for 9 residential lots (Faith Estates) Legal Lot B of RE-2641; being part of the SE4 Section 13, T6N, R66W of the 6th P.M., Weld County, Colorado. Location %mile South of CR 70 and West of and adjacent to CR 37. Parcel Number 0805 13 000036 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 1, 2005 O We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ,g We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: UctTheTh )(;uD .aa- a \In CI3-tx\; a (r 1 ruD \A61pAimmi U'Orr fl is , Signature e-e, , n Date ia_to-aa Agency 7 c rThn ❖Weld County Planning Dept. ❖918 10'h Street.Greeley,CO. 80631 ❖(970)353-6100 ext.3540 +(970)304-6498 fax • ' a Weld County Referral I Weld County Planning Department December 13, 2004 C. DEC 2 8 2004 COLORADO RECEIVED The Weld County Department of Planning Services has received the following item for review: Applicant Gary and Judy Harkless Case Number MZ-1060 Please Reply By January 10, 2005 Planner Michelle Martin Project A Minor Subdivision Change of Zone from (A)Agriculture to (E) Estate for 9 residential lots (Faith Estates) Legal Lot B of RE-2641; being part of the SE4 Section 13, T6N, R66W of the 6th P.M., Weld County, Colorado. Location Y2 mile South of CR 70 and West of and adjacent to CR 37. Parcel Number 0805 13 000036 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 1, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. a See attached letter. Comments: Signature lyOfA Date /1- 0 y Agency Clrr OF 6Rce11y- (aim enu ui7''biyetovrue9at - Pcitrws, G ❖Weld County Planning Dept. +918 10'Street.Greeley,CO.80631 ❖(970)353-6100 ext.3540 c•(970)304-6498 fax OFFICE OF COMMUNITY DEVELOPMENT Planning Division 1100 10th Street, Suite 202, Greeley, Colorado 80631 •(970)350-9780• Fax(970) 350-9800 a2 •www.greeleygov.corn City of Greeley December 22, 2004 Michelle Martin Weld County Department of Planning Services 918 10th Street Greeley, CO 80631 Subject: MZ-1060 Change of Zone Dear Ms. Martin, Thank you for the opportunity to comment on this change of zone request. Although the subject site is outside of the City of Greeley Long Range Expected Growth Area, there are some site design issues that the City would like to comment on considering the changes that have been proposed. The City of Greeley Planning staff has reviewed the application and wishes to forward the following comments: 1. The City of Greeley Public Works Department has identified WCR 37 as a future Minor Arterial in the Greeley Comprehensive Transportation plan. Public Works recommends that 60 feet of right-of-way be dedicated from the centerline of WCR 37. The City of Greeley Public Works Department reviewed the proposed site plan and concluded that the proposed design would create conflicts with existing right-of-way. The proposed right-of-way creates right-of-way that would run parallel to existing right-of-way, with very little separation between both roads. The additional right-of-way that would be needed for a Minor Arterial would encroach into the proposed right-of-way for the subject site. The previous plan had the access to the subject site further north than what is proposed now. The previous plan had a better layout and design and the City of Greeley would recommend that design be used instead of the one proposed. If that plan can't be used, the City of Greeley would recommend that the applicant be required to submit a site plan with a street layout designed that doesn't have right-of-way parallel to existing right-of-way and again, recommends that 60 feet of right-of-way be dedicated from the centerline of WCR 37. 2. There are existing trees on the proposed Lot I. Every effort should be made to preserve and incorporate any healthy trees into the overall site plan. r SERVING OUR COMMUNITY • I T ' S A TRADITION be promise to preserve andimprooe/fie yual/y of /or 9reeley iLzraay1 Iimel5, courteous and cosi effective service. Michelle Martin 12/22/2004 Page Two r 3. The private access road should be paved with concrete or asphalt to reduce the development's impact on air quality. 4. Sidewalks and curbs should be provided to protect pedestrian movements. 5. An internal stub street should be platted to assure connectivity with future subdivisions in the area and to minimize multiple access points on higher volume roads. If any questions arise, please do not hesitate to contact me at 350-9822. Sincerely, C°'114 Darrell Gesick Planner I Weld County Planning I irtment GREELEY 0FFII IAN 13 20th MemoranddiffER/ED TO: Michelle Katyryniuk, W.C. Planning ' DATE: January 10, 2004 C FROM: Pam Smith, W.C. Department of Public ./Q. COLORADO Health and Environment ( � CASE NO.: MZ-1060 NAME: Gary Harkless/Faith Estates The Weld County Health Department has reviewed this proposal. The applicant proposes a 9 lot minor subdivision on 33.5 acres. The minimum lot size is 2.5 acres with an overall density of one septic system per 3.7 acres. The New Cache Canal borders the property on the southwest and the Graham/Childs seepage ditch borders the property on the west. There are improvements on the proposed Lot 6, with a septic system permitted under SP-0200454 (a conventional system). The application has satisfied Chapter 24 of the Weld County Code in regard to water service. The application states that the subdivision will be served by North Weld County Water District. A letter of intent was submitted with the application. Sewer will be provided by individual sewage disposal systems. The minimum proposed lot size (2.5 acres) coupled with the overall density of one septic system per 3.7 acres does meet current Department policy. The preliminary percolation test report conducted by Northern Colorado Geotech (dated October 21, 2004) states that most septic systems could be expected to be conventional systems. Groundwater was found at 8 feet in some places across the site, and percolation rates ranged from 10 to 30 minutes per inch. The existing septic system on the proposed Lot 6 supports these findings. Primary and secondary septic envelopes have been placed on all lots, and meet the setback requirements to the ditches. The Department recommends that language for the preservation and/or protection of the second absorption field envelope be placed in the development covenants. The covenants should state that activities such as landscaping (i.e. planting of trees and shrubs) and construction (i.e. auxiliary structures, dirt mounds, etc.) activities are expressly prohibited in the designated absorption field envelope. The Department recommends approval with the following conditions: 1 Water service shall be obtained from the North Weld County Water District 2. A Weld County septic permit is required for each proposed septic system,which shall be installed in according to the Weld County individual sewage disposal system regulations. Each septic system shall be designed for site-specific conditions, including, but not limited to: maximum seasonal high groundwater, poor soils, and shallow bedrock. 3. Language for the preservation and/or protection of the second absorption field envelope shall be placed in the development covenants. The covenants shall state that activities such as landscaping (i.e. planting of trees and shrubs) and construction (i.e. auxiliary structures, dirt mounds, etc.) are expressly prohibited in the designated absorption field site. 1 CASE NO.: MZ-1060 NAME: Gary Harkless/Faith Estates 4. A stormwater discharge permit may be required for a development/redevelopment /construction site where a contiguous or non-contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and the Environment at www.cdphe.state.co.us/wq/PermitsUnit for more information. 5. During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Health Department, a fugitive dust control plan must be submitted. 6. In accordance with the Regulations of the Colorado Air Quality Control Commission any development that disturbs more than 5 acres of land must incorporate all available and practical methods which are technologically feasible and economically reasonable in order to minimize dust emissions. 7. If land development creates more than a 25-acre contiguous disturbance, or exceeds 6 months in duration,the responsible party shall prepare a fugitive dust control plan, submit an air pollution emissions notice, and apply for a permit from the Colorado Department of Public Health and Environment. 8. "Weld County's Right to Farm" as provided in Appendix 22-E of the Weld County Code shall be placed on any recorded plat. O:\PAM\Planning\chzone\MZ-1060.RTF 2 rbi „-- (act Weld County Referral 111kDecember 13, 2004 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gary and Judy Harkless Case Number MZ-1060 Please Reply By January 10, 2005 Planner Michelle Martin Project A Minor Subdivision Change of Zone from (A)Agriculture to (E) Estate for 9 residential lots (Faith Estates) Legal Lot B of RE-2641; being part of the SE4 Section 13, T6N, R66W of the 6th P.M., Weld County, Colorado. Location 1/2 mile South of CR 70 and West of and adjacent to CR 37. Parcel Number 0805 13 000036 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 1, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan O We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: Signature ,�� Date / _/U - aZ &s- -Agency ciid; INSAc /o,/ +Weld County Planning Dept. ❖918 10'h Street.Greeley,CO.80631 ❖(970)353-6100 ext.3540 +(970)304-6498 fax DEPARTMENT OF PLANNING SERVICES 6111\111(4114 BUILDING INSPECTION a NORTH OFFICE 918 10th Street GRE (970) COLORADO 0, E80631 354 PHONE (970) 353-6100, 0 FAX (970)304-6498 ' SOUTHWEST OFFICE 4209 CR 24.5 LONGMONT CO 80504 PHONE (720)652-4210 ext. 8730 COLORADO • FAX (720)652-4211 January 10, 2004 Gary and Judy Harkless A Minor Subdivision Change of Zone from (A) Agricultural to (E) Estate for 9 residential lots. (Faith Estates) MZ-1060 1. Building permits shall be obtained prior to the construction of any building. Building permits are required for the principle dwelling and for buildings accessory to the principle dwelling. 2. A plan review is required for each building. Two complete sets of plans are required when applying for each permit. Each building may be required to be designed by a Colorado registered engineer. 3. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. Current adopted codes include the 2003 International Building Code; 2003 International Mechanical Code; 2003 International Plumbing Code; 2003 International Fuel Gas Code; 2002 National Electrical Code and Chapter 29 of the Weld County Code. 4. Each building will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. 5. Fire resistance of walls and openings, construction requirements, maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by the Zoning Ordinance. 6. Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. Please contact me for any further information regarding this project. Sin rely, 0 Roger V it ig Building Official Service,Teamwork,Integrity,Quality Lu Weld County Referral December 13, 2004 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gary and Judy Harkless Case Number MZ-1060 Please Reply By January 10, 2005 Planner Michelle Martin Project A Minor Subdivision Change of Zone from (A)Agriculture to (E) Estate for 9 residential lots (Faith Estates) Legal Lot B of RE-2641; being part of the SE4 Section 13, T6N, R66W of the 6th P.M., Weld County, Colorado. Location 1/2 mile South of CR 70 and West of and adjacent to CR 37. Parcel Number 0805 13 000036 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 1, 2005 U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: r t tide. h „.1f-ziy /nailA- Signature w Date //G /45 Agency Gt/G '&� T2C6 ❖Weld County Planning Dept. +918 10'Street. Greeley,CO. 80631 ❖(970)353-6100 ext.3540 +(970)304-6498 fax FAITH ESTATES MINOR SUBD __Case # MZ-1060 (Change of Zone from Ag to E) Developer: Gary Harkless ?T SE4 13-6-66 Planner: Michelle Martin ZONED ESTATE IS NOT IN FLOOD PLAIN (0626C) NORTH WELD COUNTY WATER DISTRICT INDIVIDUAL SEPTIC SYSTEMS XCEL INDIVIDUAL PROPANE HEAT EATON FPD EATON RE-2 SD QWEST COMMUNICATIONS EATON PO 9 RESIDENTIAL LOTS W/2 OUTLOTS PRELIMINARY ADDRESSING - 1/6/05 jLot 1 33265 *** Lot 2 33269 *** Lot 3 33273 *** Lot 4 33277 *** Lot 5 33281 *** Lot 6 33285 *** Lot 7 33283 *** Lot 8 33279 *** Lot 9 33275 *** Lin Dodge, Building Technician Building Department 918 10th Street Greeley CO 80631 Phone: (970)353-6100, extension 3574 STATE OF CQIQRADO ar OFFICE OF THE STATE ENGINEER Weld County Planning GREEt FY OFFICE of•c tk vision of Water Resources i�b Department of Natural Resources JAN1 8 2005 1313 Sherman Street, Room 818 Denver,Colorado 80203 \\� /�°� /'� rg7gys+' Phone(303)866-3581 January 12, 2005 RE E L V FAX(303)866-3589 Bill Owens www.watecstate.co.us Governor Russell George Executive Director Ms. Michelle Martin Hal D.Simpson,RE. Weld County Planning Department State Engineer 918 10th Street Greeley, Co 80631 Re: Faith Estates Case No. MZ-1060 SE 1/4 of Sec. 13, T6N, R66W, 6th P.M. Water Division 1, Water District 3 Dear Ms. Martin: Pursuant to the State Engineer's Office Memorandum dated August 7, 1995, effective August 31, 1995, this office will no longer respond to land use actions (lot line adjustments, zone change request, special use land and division by exemption) that do not involve the subdivision of land as defined in Section 30-28-101(10)(a) C.R.S. (see-attached memorandum). The material submitted this time appears to be only for a change in zoning on the proposed Faith Estates. Additionally, we have previously commented on the above-referenced proposal to subdivide a 33.51-acre into 9 single-family residential lots ranging in size from 2.6 acres to 3.6 acres. Information from this referral material indicates that the North Weld County Water District (District) is still listed as the water provider for the residential lots. Proposed lot 6 already has water service provided by the District. The District has agreed to serve eight additional lots per terms and conditions of the District. The developer will be responsible for the extension of the water line to the subdivision. Furthermore, based on the information provided in this second submittal the District can also provide 300 gallons per minute fire flow with a residual pressure greater than 20 psi. In order to provide such flow the developer will have to extend an 8-inch water line to the subdivision. The minimum fire flow as required by the Eaton Fire Protection District is 500 gallons per minute, therefore the proposal is to construct a well that will be used exclusively for fire-fighting purposes, until such time that improvements to the existing North Weld County Water District infrastructure are made to increase the fire flow rates in the area. Based on the information provided we cannot determine if a well permit for a well to be used exclusively for fire fighting purposes may be available. Applicant will need to verify if the District objects to the construction of a fire fighting well within the District's water service area and provide a letter of "no objection" with any well permit application submitted to this office. If a permit for a fire fighting well is issued, the permit will require the well and/or storage tank filled by the well, to be capped and looked and available only for fighting fires. The fire fighting well cannot be used to provide water to the central water distribution system. In addition, we consider that with adequate storage water provided by the District, the minimum fire flow required by the Eaton Fire Protection District may be satisfied. -Weld County Planning Department Page 2 Faith Estates Since no changes on the water supply for the subdivision were identified in this second submittal, the comments from our letter (copy enclosed) dated June 14, 2004 still apply. In addition, since insufficient information was provided regarding the proposed well for fire fighting purposes, we cannot comment on the potential for injury to decreed water rights. If you have any questions in this matter, please contact loana Comaniciu of this office. Sincerely, ick Wolfe, P.E. Chief of Water Supply cc: Jim Hall, Division Engineer Water Supply Branch Subdivision File DW/IC/Faith Estates(change zone) STATE OF COLORADO STATE ENGINEER c 510- Water Resources ate ' �°*, t of Natural Resources `� Part ei,aE `_n_ r n. 13 Shdttnan Street.Room 818 1 � y6ado 80203 tees. 8663581 (304),466-3589 Roy Romer 1.^ Governor lames S Lochhead August 7, 1995 Executive Director Hal 0.Simpson State Engineer ga4ORANDUM TO: ALL COUNTY LAND USE PLANNING `\ OQ',f FROM: HAL D. SIMPSON, STATE ENGINEER ,Q )) SUBJECT: STATE ENGINEER'S COMMENTS ON PROPOSED WATER SUPPT TFS FOR LAND USE ACTIONS THAT DO NOT INVOLVE THE SUBDIVISION OF LAND AS DEFINED IN SECTION 30-28-101(10)(a), • C.R.S. 'this memorandum is to inform you of procedural changes in providing "an opinion regarding material injury likely to occur to decreed water rights by virtue of diversion of water necessary or proposed to be-used to supply the proposed subdivision and the adequacy of the proposed water supply to meet requirements of the proposed subdivision", as required under section 30-28-136(h)(I), C.R.S. (1986 Repl, Vol.). In June of 1992, HB92-1156, required that recommendations be made within 21 days after the mailing by the county. No additional staff was allocated to implement this accelerated review. I find that with the increased development activity in the state, my staff cannot respond in a timely manner to all of the land use referrals we receive. therefore, in order to allow our timely comments on all SUBDIVISION OF LAND referrals as mandated by section 30-28-136(h)(I) C.R.S., effective AUGUST 31, 1995, THIS OFFICE WILL NO LONGER RESPOND TO LAND USE ACTIONS THAT DO NOT INVOLVE 1'ai, SUBDIVISION OF LAND AS DEFINED IN SECTION 30-28-101- .(10)(a) C.R.S. (1986 REFL. VOL.). These actions include but are not limited to lot line adjustments, zone change requests, special use of land, and division by exemption. After August 31, 1995, we will not respond to or maintain records on any referral we receive that does not address the subdivision of land as defined in section 30-28-101(10)(a) C.R.S. Enclosed is a "Water Supply Information Summary" form which as of August 31, 1995 we will require to be submitted along with each subdivision referral in order for us to be able to respond in a timely manner. I ask that you provide copies of this form to all future subdivision applicants along with your application package. The data required for this ‘?"1"..•,. ( t \ Weld County Referral Weld County Department GREELEYPlanning OFFICE December 13, 2004 C. ta COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gary and Judy Harkless Case Number MZ-1060 Please Reply By January 10, 2005 Planner Michelle Martin Project A Minor Subdivision Change of Zone from (A)Agriculture to (E) Estate for 9 residential lots (Faith Estates) Legal Lot B of RE-2641; being part of the SE4 Section 13, T6N, R66W of the 6th P.M., Weld County, Colorado. Location 1/2 mile South of CR 70 and West of and adjacent to CR 37. Parcel Number 0805 13 000036 ,�--, The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 1, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: I "- d'0 ,o �ur GDNIn't� An atr�t het, l- t, t asp i t,, Lao 7'ifb�( Signature 11424 Date /-4 . Or Agency ' �tc. . f1 r1 +Weld County Planning Dept. ❖918 10'Street.Greeley, CO.80631 +(970)353-6100 ext.3540 +(970)304-6498 fax THE NEW CACHE LA POUDRE IRRIGATING COMPANY THE CACHE LA POUDRE RESERVOIR COMPANY ( 352-0222 970 November 19, 2004 Weld County Planning Dept. Attn: Michelle Katyryniuk 1555 N. 17th Ave Greeley, CO 80631 Re: Case # MK-1060 Dear Ms. Katyryniuk, This follow-up letter is in regard to the Faith Estates Minor Subdivision. The New Cache La Poudre Irrigating Company has been contacted by the owner, Gary Harkless, and Mr. Harkless' engineering firm, Pickett Engineering, Inc. The concerns of the New Cache La Poudre Irrigating Company with regard to the right-of-way of the canal have been worked out. The owner has agreed to plat a right-of-way width of 75 feet from the center of the canal . This r-o-w will be labeled as the easement of the New Cache La Poudre Irrigating Company. There are two locations where the easement of the canal will be encroached upon. First, the oil company has an access road and facilities that encroach upon the r-o-w. The second encroachment will be the access road that parallels the north bank of the canal. A portion of the road will be in the right-of-way along this area. The owner has stated that there will be about 25 feet between the top of the canal bank and the edge of the road. The New Cache La Poudre Irrigating Company is willing to allow both of these encroachments as presented. No other landscaping, fences for buildings are permitted within the r-o-w. The concerns of the New Cache La Poudre Irrigating Company with regard to the storm water quality have been worked out. The owner is planning on all the storm water from the property (except a couple of acres on the south tip) being placed into the Graham Seep ditch. This is agreeable to the ditch company. At this time the New Cache La Poudre Irrigating Company is satisfied with the progress of the subdivision and the mitigation of the concerns of the ditch company. Please direct any questions to Don Magnuson or Dale Trowbridge at our office. Sincerely, Dale Trowbridge Office Manager 33040 Railroad Avenue • P.O. Box 104 • Lucerne, Colorado 80646 STATE OF COLORADO COLORADO GEOLOGICAL SURVEY Weld County Planning of Natural Resources g Department 1313 Sherman Street, Room 715 GREELEY OFFICE Denver, Colorado 06 DEC 2 7 2004 �w�Phone (303) 866--261111 AX (303) 866-2461 R E C p/ December 21, 2004 egal: '/< SE Y. of S13, T6N, R66W DEPARTMENT NATURAL Ms. Michelle Martin RESOURCES Weld County Department of Planning Bill Owens 918 10th St. Governor Greeley, CO 80631 p I D Russell George ,r► Executive Director ic2 )( , Ronald W.Cottony Re: Faith Estates Rezoning (MZ-1060) Division Director CGS Review No. WE-04-0031 Vincent Matthews State Geologist Dear Ms. Martin; In response to your request and in accordance with Senate Bill 35 (1972), I visited the site and reviewed the site plan on December 21, 2004. This site was reviewed by CGS as a sketch plan in June, 2004. The site consists of approximately 33.5 acres and includes 9 lots that will be rezoned from agricultural to residential estate. There is an existing residence on proposed lot 6, along with an existing oil/gas easement near proposed lots7 and 8. Supplied water and individual septic systems are being proposed for this subdivision. Included in the review package were the land use map (12/8/04) by Pickett Engineering, COZ application (12/7/04), responses to sketch plan comments (12/8/04) by Pickett Engineering, change of zone questionnaire (12/8/04) by Pickett Engineering, flood and drainage letter (12/2/04) by Anderson Consulting Engineers, and preliminary geotechnical engineering report (10/21/04) by Northern Colorado Geotech. The site is located east of the juncture of Greeley No. 2 Canal and the Graham Seep west of Lucerne. The site topography is relatively flat with a gentle slope to the south towards the Greeley No. 2 Canal. Several CMP culverts lead from the property into the canal under the access road. The soil is loose silty sand from wind-blown origins, and may erode easily by wind or water if the native vegetation is disturbed. From the boring logs, the soils may be low density in places, and may be prone to settlement or collapse following development. Bedrock is likely the Laramie Formation, which was not encountered within 15 feet of the ground surface at this site. Groundwater was encountered in two of the three boreholes at depths less than 10 feet below ground surface. Perched water and seasonally high groundwater should be expected at this site. Shallow groundwater may pose design restrictions for basements and septic systems. Prior to any new construction on this site, lot-specific foundation and septic investigations should be conducted to determine the subsurface soil conditions at each building site. This should include geotechnical analysis, percolation testing, and recommendations for any mitigation that may be required. Drainage systems should also be incorporated into foundation designs if the foundation elevation will be within 4 feet of the bedrock surface or high groundwater level. Septic systems should be designed by professional engineers to accommodate potentially shallow groundwater. Although active erosion was not observed during the site visit, best management practices should be taken during construction to minimize erosion on the property and sediment transport off the site. Storm water detention may be needed to reduce sediment transport and heavy runoff into the canal. In summary, there are no geologic hazards that would preclude the proposed development of this property, but geologic constraints may affect the development. If you have further questions about this site, please do not hesitate to contact me at 303-866-3518. Sincerel TC Wait Engineering Geologist Cc: file GREE.LEY BM Weld County Planning Department CE IAN 1 $S. 20(15 MEMORANDUM RECEIVED ' TO: Michelle Martin, Planning Di ent DATE: 14-January-2005 W� Q FROM: Peter Schei, P.E., Pub Department C. COLORADO SUBJECT: MZ-1060 Faith Estdtes or Subdivision(Zone Change) Weld County Public Works Department has reviewed this change of zone request. Comments made during this phase of the subdivision process may not be all-inclusive, as other concerns or issues may arise during the remaining application process. Comments ❑ A new geotechnical engineering report was submitted for this change of zone application. ❑ The Preliminary Geotechnical Engineering Report - Proposed Faith Estates —Eaton, Colorado, dated October 21, 2004,by Doug Leafgren, P.G. with Northern Colorado Geotech(Project No. 185-04) is satisfactory. o The report noted groundwater in two test holes. The applicant/engineer should note the groundwater levels on this property with respect to basement construction. ^External Roadways: ❑ The Weld County Roadway Classification Plan currently shows CR 37 with a classification as a collector requiring an 80-foot right-of-way. The applicant shall verify the existing right-of-way and the documents creating the right-of-way shall be noted on the change of zone plat. If the right-of-way cannot be verified, it will be dedicated on the final plat. CR 37 is paved adjacent to the proposed development and maintained by the County. ❑ Based on the proposal of limited development and apparent low traffic impact, a traffic study is not currently required. This 9 residential lot development will add approximately 86 trips per day to the transportation system. For the purpose of simplicity, it will be assumed that 100% of the traffic travels south on CR 37 to/ from the site to SH 392. Should a dispute arise concerning traffic and associated impacts, a traffic impact study would be required. o The current County traffic count on CR 37 adjacent to the development between SH 392 and CR 70 is 1,017aadt. o The existing County Road 37 will handle the proposed additional traffic without improvements. o Off-site improvements to CR 37 will not be required at this time. Internal Roadways: ❑ The internal roadway right-of-way shall be 60-feet in width including cul-de-sacs with a 65- foot radius, and dedicated to the public. The applicant has proposed two 13-foot gravel lanes for the internal road, which satisfies Weld County Code and is acceptable to Public Works. The cul-de-sac edge of roadway radius must be 50-feet. ❑ The change of zone plat shows the ditch easement encroaching on the internal road right-of-way. This is not acceptable to Public Works, since conflicts may arise with-respect-to the roadway, utilities and future construction activities. This concern shall be addressed at the change of zone prior to scheduling public hearings. ❑ Stop signs and street name sign locations must be shown on the final roadway construction plans. Intersection sight distance triangles at the development entrance will be required. All landscaping within the triangles must be less than 3% feet in height at maturity, and noted on the final roadway plans. Page 1 of 2 ❑ The applicant shall submit to Public Works stamped,signed and dated final plat drawings and roadway/construction & grading plan drawings for review (with the final application) and approval. Construction details must be included. This is consistent with County Code: Sec. 24-3-50, "The minor subdivision final plat submitted shall contain the original signatures and seals of all parties required." • The applicant shall submit Improvements Agreements According to Policy Regarding Collateral For Improvements with the final plan application. These agreements must be reviewed by Public Works and shall be approved by the Board of County Commissioners(BOCC)prior to recording the final plat. Drainage: ❑ The Preliminary Drainage Report - Faith Estates Subdivision, dated December 2004, by R. Sean Phipss, P.E., (Colorado PE#37698)with Pickett Engineering, Inc. is acceptable. ❑ A final drainage report stamped, signed and dated by a professional engineer licensed in the State of Colorado shall be submitted with the final application. The 5-year storm and 100-year storm drainage studies shall take into consideration off-site flows both entering and leaving the development. Increased runoff due to development will require detention of the 100-year storm developed condition while releasing the 5-year storm existing condition. ❑ The final drainage report shall include a flood hazard review documenting any FEMA defined floodways. The engineer shall reference the specific map panel number, including date. The development site shall be located on the copy of the FEMA map. ❑ The applicant shall address the concern with the adjacent ditch(es) overflowing its banks during a storm event. It was brought to the Public Works attention that this ditch(es) has overtopped the banks backing up storm waters to the parcel to the north of the proposed development and then sheet-flowed through the development parcel. This concern must be addressed at the change of zone prior to scheduling public hearings with consideration given to lot layout and building envelopes. ❑ The applicant shall prepare a construction detail for typical lot grading with respect to drainage for the final application. Front, rear and side slopes around building envelopes must be addressed. In addition, drainage for rear and side lot line swales shall be considered. Building envelopes must be planned to avoid storm water flows, while taking into account adjacent drainage mitigation. ❑ Final drainage construction and erosion control plans (conforming to the drainage report) stamped, signed and dated by a professional engineer licensed in the State of Colorado shall be submitted with the final plan application. Recommendation ❑ The Public Works Department recommends approval of this change of zone. The applicant shall address the comments listed above at the specific step of the review process stated. The review process will continue only when all appropriate elements have been submitted. Issues of concern must be resolved with the Public Works Department prior to recording the change of zone and final plats." * PC: MZ-1060 Faith Estates Minor Subdivision(Zone Change) '1 Email&Original: Planner I PC by Post: Applicant &art�tf- (Tc4( &kvkk$$ PC by Post: Engineer pieta Egyr ,r;�y _ . .__.. 0 UR Page2of2 . (1 ‘tt Weld County Referral Weld County Planning Department GREELEY OFFICE p December 13, 2004 C. JAN 0 3 2005 COLORADO RECEIVED The Weld County Department of Planning Services has received the following item for review: Applicant Gary and Judy Harkless Case Number MZ-1060 Please Reply By January 10, 2005 Planner Michelle Martin Project A Minor Subdivision Change of Zone from (A)Agriculture to (E) Estate for 9 residential lots (Faith Estates) Legal Lot B of RE-2641; being part of the SE4 Section 13, T6N, R66W of the 6th P.M., Weld County, Colorado. Location 1/2 mile South of CR 70 and West of and adjacent to CR 37. Parcel Number 0805 13 000036 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 1, 2005 ❑ We a reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ have reviewed the request and find no conflicts with our interests. See attached letter. Comments: Signature Agency / �is3� Date (�� «((//l�l� cY�� ❖Weld County Planning Dept. 4.918 10"Street.Greeley,CO.80631 +(970)353-6100 ext.3540 •:•(970)304-6498 fax MEMORANDUM Weld County Planning Department GREELEY OFFICE JAN 0 3 2005 To: Michelle Martin RECEIVED From: David Tuttle Date: December 30, 2004 Subject: MZ -1060 The Sheriffs Office recommends the following improvements for this housing sub- division: 1. The sheriffs office requests that builders and developers designate an area by the entrance of the sub-division in which to place a shelter for school children awaiting the school bus. This area should also include a pull off for the school bus which enables it to safely load and unload children out of the roadway in the event the bus is unable to drive down the street due to road conditions. 2. Either a mail distribution within the sub-division or a central drop off location within the sub-division should be developed so that residents do not have to cross a county roadway to obtain their mail. 3. The name of the street and address numbers within the sub-division should be presented to the sheriffs office for approval. This will eliminate duplication of street names within the county. 4. A permanent sign should be placed at the entrances to the sub-division detailing the name of the sub-division, and address. There should be a plan developed to maintain this sign. Individual addresses also need to be clearly visible for each residential site. 5. If the roadways within this sub-division are not maintained or adopted by the county, individuals purchasing property in this sub-division should be notified that the sheriffs office will have limited traffic enforcement powers. 6. A plan should be developed to maintain roadways within the sub-division especially during inclement weather conditions for emergency vehicles. 7. The sheriffs office is very supportive of homeowner funded homeowners associations. These associations provide a contact for the sheriffs office and a means for maintaining common areas. 8. If there is an oil or gas well within this sub-division. This needs to be fenced off in order to mitigate the potential for tampering. These facilities are known to create an attractive nuisance for young people. Tampering not only creates a significant danger to safety but also of environmental damage with extensive mitigation and clean-up costs. 9. Any bodies of water in this subdivision should be fenced to restrict access for safety of the residents. The Sheriffs Office lacks the ability to absorb any additional service demand without the resources recommended in the multi-year plan provided to the Board of County Commissioners or as indicated by growth not considered at the time the plan was developed. I have no other comments on this proposal. 1-27-05; t0: ,4AM:Eaton School Dist. ;8704545193 tt DEC 1 5 2004 a , (71;t iie---**•:), Weld County Referral hiDe . December 13, 2004 COLORADO • The Weld County Department of Planning Services has received the following item for review: Applicant Gary and Judy Harkless Case Number MZ-1060 Please Reply By January 10, 2005 Planner Michelle Martin Project A Minor Subdivision Change of Zone from (A)Agriculture to (E) Estate for 9 residential lots (Faith Estates) Legal Lot B of RE-2641; being part of the SE4 Section 13, T6N, R66W of the 6th P.M., Weld County, Colorado. Location %n mile South of CR 70 and West of and adjacent to CR 37. Parcel Number 0805 13 000036 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you.have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 1, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. j8; See attached letter Comments: Signature v �} Rr;u Ptsm,aus. vutuvc:s ptjote f a` kcs Agency eNTOP4 SeAoot t\t111a.tezt Rt-.l. +Weld County Planning Dept. +91810t Street.Greeley, CO.80631 +(970)353-6100 ext.3540 +(970)304-6498 fax 1-27-05; 10: 14AM;Eeton School DISt. ;9704545193 9 • EATON SCHOOL DISTRICT RE-2 John J. Nuspl 200 Park Avenue superintendent Eaton, Colorado 80615 70)454-3402 e170) 454-5193 Fax January 27, 2005 Michelle Martin Weld County Planning Department 1400 17th Avenue Greeley, CO 80631 RE:Gary&Judy Harkless 9-Lot Minor Subdivision Faith Estates Michelle Martin: We have reviewed the above applicant's land use map prepared December 8, 2004. The proposed bus turnout would be sufficient as long as it is constructed whereby it allows for a rectangular area that is 15' wide by 80' In length to allow our bus to enter and stop to pick up students. As per our earlier letter dated June 18, 2004, a bus shelter approximately 6' x 10' would be sufficient as the district typically does not go into developments to pick up students. The School District has adopted a methodology to determine a cash-In-lieu payment for residential development within the District in order to provide adequate educational opportunities as a result of that development. The cash-in-lieu payment per dwelling lot is $1,043 for a total of $9,387 for this 9-Lot PUD. Payment should be hand delivered or mailed to Eaton School District, 200 Park Avenue, Eaton, Colorado 80615. A receipt will be mailed to the applicant and a copy to the Weld County Planning Department. Payment will be required prior to final plat. Please contact me if you have any questions. Sincerely, Timothy Unrein Business Services Director Eaton School District RE-2 Enc. Date Paid Amount Check # Received By Hello