Loading...
HomeMy WebLinkAbout20053657.tiff . CHANGE ORDER NO. 2 Bridge 27/58A Date: Project: The project consists of a new bridge over Sheep Draw with approximately 1500 ft of roadway improvements as described in the bid documents Bid No. B0400232. Owner: Weld County,Colorado Contractor: Hamon Contractors,Inc.,5670 Franklin St..Denver.CO 80216 The following change is hereby made to the Contract Documents: Several contract bid items were adjusted during the course of the project. Change Order No. 2 will reconcile the overruns and underruns of the construction bids items shown in the attachment. CHANGE TO CONTRACT PRICE: Original Contract Price: $ 937.991.51 Current Contract Price adjusted by previous Change Order: $ 955,431.51 The Contract Price due to this Change Order will be increased by: $ 6.504.11 The new Contract Price,including this Change Order,will be$ 961,935.62 CHANGE TO CONTRACT TIME: The Contract Time will be increased by 10 calendar days. RECOMMENDED: Owner Representative: `1.._ /..--Ar.." Date: DEC 1 9 2005 0—, Willi m H.Jerke,Chair Engineer: A Date: /0//�U S e Howard,P.E.,Sr.Engineer APPROVALS:Contractor: -D" c..>✓ Date: 1,9—) (C) o5-- Title: R-Zo5'i77f M 'i7< ATTESTING TO BOARD OF COUNTY 4rvkCf3 6DfS AC3jO„”› VCC COMMISSIONER SIGNATURES ONLY ATTEST: �/�/�it zr� r WELD COUNTY CLERK TO THE BOARD 'qtr c BY: RI/ ckl /aitc (1 �L`W1 1t61tvv __{{-.jjQ _ .4 DEP TY CLE K TO THE BOARD 0 P& ( sup,) ods�1 :,2905-.3657 Weld County Bridge 27/58A Schedule of Values/Pay Request Summary: Pay Request Final Period Ending: 09/31/2005 Contract Summary This Period Previous Total to Date Cost Percent Item S Description Quantity DOM Unit Price Total Amount Quantity Amount Quantity Amount Quantity Amount Remaining Complete 201 Clearing and Grubbing 1 LS 10,000.00 $10,000.00 $0.00 1.00 $ 10000.00 1.00 $ 10000.00 100% 202 Removal of Pipe 270 LF 10.00 $2,700.00 $0.00 270.00 $ 2,700.00 270.00 $ 2700.00 100% 202 Removal of Asphalt Mat 3891 SV 2.50 $9,727.50 $0.00 4,318.00 $ 10790.00 4,316.00 $ 10,790.00 (1,062 SO) 111% 202 Removal of Bridge 1 EACH 15,000.00 $15,000.00 $0.00 1.00 5 15,000.00 1.00 $ 15,000.00 100% 202 Removal of Fence 1858 LF 0.40 $742.40 $0.00 1 856.00 $ 742.40 1,858.00 $ 742.40 100% 203 Embankment Material(Complete in Place) 10152 CV 7.00 $71 064.00 $0.00 10,152.00 $ 71,084.00 10,152.00 $ 71,064.00 100% 203 Proofrolling 5 HR 92.00 $480.00 $0.00 5.00 $ 480.00 5.00 $ 480.00 100% ..208 Structure Backfill(Class 1) 488 CV 12.50 $5,825.00 $0.00 486.00 $ 5,825.00 468.00 $ 5,825.00 100% 206 Structure Backfill(Class 2) 96 CY 7.50 $720.00 $0.00 96.00 $ 720.00 96.00 $ 720.00 100% 206 Filter Material(Class A) 269 CY 18.50 $4,978.50 60.00 289.00 $ 4976.50 269.00 $ 4,976.50 100% 206 Filter Material(Class B) 60 CV 19.50 $1,170.00 $0.00 80.00 $ 1 170.00 80.00 $ 1 170.00 100% 207 Soil Preparation 2.5 ACRES 390.00 $975.00 2.5 $975.00 - $ - 2.50 $ 975.00 100% 208 Erosion Bales(Weed Free) 98 EACH 16.00 $1,568.00 75 $1,200.00 3600 $ 578.00 111.00 $ 1,778.00 (208 00) 113% 208 Silt Fence 800 LF 1.20 $720.00 $0.00 60000 $ 720.00 1,300.00 $ 1,580.00 (840 00) 217% 208 Concrete Washout Structure 1 EACH 350.00 $350.00 $0.00 100 $ 350.00 1.00 $ 350.00 100% 208 Stabilized Construction Entrance 1 EACH 1000.00 $1 000.00 $0.00 100 $ 1,000.00 1.00 $ 1,000.00 100% 210 Reset Mailbox Structure 3 EACH 150.00 $450.00 $0.00 300 $ 450.00 3.00 $ 450.00 100% 210 Reset Water service 2 EACH 3,000.00 $6,000.00 $0.00 200 $ 6,000.00 2.00 $ 6,000.00 100% 210 Modify Manhole 1 EACH 2,000.00 $2,000.00 $0.00 100 $ 200000 1.00 $ 2,000.00 100% 212 Seeding(Native) 2.5 ACRES 850.00 $2,125.00 2.5 $2,125.00 $ 2.50 $ 2,125.00 100% 213 Mulching(Weed Free Hay) 2.5 ACRES 750.00 $1,875.00 2.5 $1,875.00 $ 2.50 $ 1,875.00 100% 213 Mulch Tackifier 270 LB 4.50 $1,215.00 270 $1,215.00 $ 270.00 $ 1,215 00 100% 214 Brush Layer Cutting 180 EACH 8.00 $1280.00 50 $400.00 $ 50.00 $ 400.00 88000 31% ' 216 Soil Retention Blanket(Straw/Coconut) 690 SY 3.80 $2822.00 980 $3,724.00 $ 980.00 $ 3,724.00 (1,102 00) 142% 304 Aggregate Base Course(Class 6) 4184 TON 13.64 $57,069.76 229 $3,123.56 4,509.00 $ 81,50276 4,738.00 $ 84,626.32 (7,558 58) 113% 403 Hot Bituminous Pavement(Gr 6)(100)(PG 64-22) 2106 TON 32.40 $88,234.40 $0.00 1,977.00 $ 64,05480 1,977.00 $ 64,054.80 417960 94% 420 Geotextile(Erosion Control-Class B) 1315 SV 2.00 $2,830.00 $0.00 1,455.00 $ 2,91000 1,455.00 $ 2,910.00 (28000) 111% 503 Drilled Caisson(30 inch) 285 LF 130.00 $34,450.00 $0.00 356.38 $ 46,32875 356.38 $ 46,32875 (11,878 75) 134% 506 Riprap(9 Inch) 19 CV 40.00 $760.00 $0.00 90.30 $ 3,81200 90.30 $ 3,812.00 (2,852 00) 475% 507 Grout Riprap Slope&Ditch Paving 1290 CV 75.00 $96,750.00 $0.00 1,317.00 $ 98,77500 1,317.00 $ 98,775.00 (2,02500) 102% 507 Concrete Lined Ditch 520 LF 24.00 $12,480.00 $0.00 520.00 $ 12,48000 520.00 $ 12,480.00 100% 515 Waterproofing(Membrane) 441 SY 8.40 $3,704.40 $0.00 441.00 $ 3,70440 441.00 $ 3,704.40 100% 601 Concrete Class D(Bridge) 353 CV 300.00 $105,900.00 $0.00 353.00 $ 105,90000 353.00 $ 105,900.00 100% 602 Reinforcing Steel 11583 LB 0.65 $7,515.95 $0.00 11,563.00 $ 7 515 95 11583.00 $ 7,515.95 100% 802 Reinforcing Steel(Epoxy Coated) 32084 LB 0.75 $24,083.00 $0.00 32,084.00 $ 24,06300 32,084.00 $ 24,063.00 100% 803 24"Corrugate Steel Pipe 219 LF 20.00 $4,380.00 $0.00 219.00 $ 4,380 00 219.00 $ 4,380.00 100% 600324'Steel End Section 6 EACH 170.00 $1,020.00 $0.00 6.00 $ 1,02000 6.00 $ 1,020.00 100% 606 Transition Type 3G 4 EACH 916.50 $3,666.00 $0.00 4.00 $ 3,68800 4.00 $ 3,686.00 100% 606 End Anchorage(Nonflared) 4 EACH 1,862.00 $7,448.00 $0.00 4.00 $ 7,44800 4.00 $ 7,448.00 100% 606 Bridge Rail Type 10M(Special) 209 LF 200.00 $41,800.00 $0.00 209.00 $ 41,800 00 209.00 $ 41,800.00 100% 607 End Post 4 EACH 108.00 $432.00 $0.00 4.00 $ 43200 4.00 $ 432.00 100% 607 Corner and Line Brace Post 4 EACH 145.00 $580.00 $0.00 5.00 $ 725 00 5.00 $ 725.00 (145.00) 125% 607 Fence Barbed Wire with Metal Posts 1391 LF 1.35 $1,877.85 $0.00 1,391.00 $ 1 877 85 1,391.00 $ 1,877.85 - 100% 607 Fence(Plastic) 400 LF 2.25 $900.00 $0.00 - $ - - $ - 900.00 0% 812 Deliniaor(Type ll 2 EACH 13.00 $26.00 $0.00 2.00 $ 28.00 2.00 $ 26.00 - 100% 812 Deliniator(Type II) 10 EACH 14.50 $145.00 $0.00 10.00 $ 145.00 10.00 $ 145.00 - 100% 612 Deliniator(Type III) 4 EACH 16.00 $84.00 $0.00 4.00 $ 64.00 4.00 $ 64.00 - 100% 6132 Inch Electrical Conduit 417 LF 375 $1563.75 $0.00 981.00 $ 3,603.75 961.00 $ 3,603.75 (2,040.00) 230% 613_4 lath Electrical Conduit 417 LF 5.50 $2,293.50 $0.00 689.00 $ 3,789.50 689.00 $ 3,789.50 (1,498.00) 165% 614 Sign Panel(Class I) 10 SF 14.00 $140.00 9 $126.00 10.00 $ 140.00 19.00 $ 268.00 (128.00) 190% 614 Steel Sign Post(U-2) 24 LF 11.00 $264.00 40 $440.00 24.00 $ 264.00 84.00 $ 704.00 (440.00) 267% 618 Prestressed Concrete Slab(Depth 13 Inches) 5548 SF 27.00 $149,796.00 $0.00 5,104.76 $ 137,828.55 5,104.78 $ 137,828.55 11,98]45 92% 620 Field Office(Cass l) 1 EACH 11,000.00 $11,000.00 $0.00 100 $ 11,000.00 1.00 $ 11,000.00 - 100% 620 Sanitary Facility 1 EACH 1,000.00 $1,000.00 $0.00 1.00 $ 1,000.00 1.00 $ 1,000.00 - 100% 825 Construction Survey 1 LS 20,000.00 $20 000.00 $0.00 1.00 $ 20,000.00 1.00 $ 20,000.00 100% 626 Mobilization 1 LS 73,800.00 $73800.00 $0.00 1.00 $ 73,800.00 1.00 $ 73,800.00 - 100% 627 Pavement Marking Paint 11 GAL 150.00 $1,650.00 $0.00 11.00 $ 1,850.00 11.00 $ 1,650.00 - 100% 629 Survey Monument(Type 6) 18 EACH 125.00 $2,250.00 $0.00 18.00 $ 2,250.00 18.00 $ 2250.00 - 100% • i , I 1! Weld County Bridge 27/5BA Pay Request 629 Monument Box(Type 3A) 1 EACH 3]5.00 $375.00 $0.00 1.00 375.00 1.00 $ 375.00 $ 100% 630 Bamcade(Type 3 M-A)(Temporary) 2 EACH 125.00 $250.00 $0.00 2.00 250.00 $2.00250.00 100% 630 BeiwEe(Type 3 M-B)(Temporary) 6 EACH 125.00 $]50.00 $0.00 8.00 750.00 6.00 $$ ]5000 $$ 100% 830 Construction Traffic Sign(Panel Size A) 24 EACH 51.10 $1 228.40 $0.00 2400 1,228.40 24.00 1,228.40 $ 100% 830 Construction Traffic Sign(Panel Size 8) 4 EACH 104.55 $418.20 0000 4.00 $418.20 4.00 418.20 $ 100% 830 Construcbon Traffic Sign(Spacial) 148 SF 11.15 $1,82].90 $0.00 148.00 1,627.90 148.00 $ 1,82] $90 100% 700 F/A Minor Contract Revisions 1 FA 40,000.00 $40,000.00 - - - § (Flowfill for Manhole) 11 CY 70.00 $770.00 50.00 11.00 770.00 11.00 $ 770.00 $ 100% (Weep holes in riprep) 18 EACH 115.00 $2,070.00 $0.00 18.00 2,070000 18.00 $ 2,070.00 $ 100% (Concrete Encasement) LS 1,900.00 $1,900.00 $0.00 1.00 1,900.00 1.00 $ 1,900.00 $ 100% (Structure concrete coating) - LS 1,157.72 $1 157.72 $0.00 1.00 1,157.72 1.00 $ 1,157.72 $ 100% (Relocate blow off easy&curb stop) LS 3,088.27 $3,088.27 §0.00 1.00 3,088.27 1.00 $ 3,088.27 $ 100% (Belkfill drainage ditch) LS 2,63]27 $2,637.27 $0.00 1.00 2,637.27 1.00 $ 2,63]27 $ 100% (15'CMP B0'long Pipe with Iwo FES) LS 2,580.23 $2,580.23 $0.00 1.00 2,560.23 1.00 $ 2,58023 $ 100% (2.Rail CCA green beefed western rail fence 160'long) LS 3,097.55 $3,097.55 $0.00 1.00 3 097.55 1.00 $ 3,097.55 $ 100% 10'wlde 8'thick sidewalk 32 SY 42.00 $13,104.00 $0.00 312.00 13,104.00 312.00 $ 13,104.00 $ 100% 6'Mick curb and guterw/1'pan(modified) 320 LF 12.75 $1,080.00 *0.00 320.00 4,080.00 320.00 $ 4,080.00 $ 100% 6'PVC Conduit(Install Only) 22 LF 3.50 $952.00 $0.00 272.00 952.00 272.00 $ 952.00 $ 100% Back pay of Retention in June Pay Application 1.00 1,637.88 1.00 $ 1,837.88 Traffic control(Force Account) LS 2,710.34 $2,710.34 1 $2,710.34 - 1.00 $ 2710.34 $234.78 100% 700 F/A On the Job Training FA 525.00 $525.00 $0.00 - - - $ - $ 525.00 0% 700 F/A Asphalt Pavement Incentive(Smoothness) FA 5,200.00 $5,200.00 $0.00 - - - $ - $ 5,200.00 0% 700 F/A Erosion Control 1 FA 3,000.00 *3,000.00 $ - - $ - 0% Repairs to erosion control 1 LS 1,739.11 1 $1,739.11 - 100 $ 1,739.11 $1,260.89 58% 700 F/A OJT Colorado Training Program 1 FA 400.00 $400.00 0 $0.00 - $ - - $ - $ 400.00 0% $940,701.65 $19,653.01 *924.002.61 $944,495.62 48,504.11 100% 1 , Weld County Bridge 27/58A Pay Request ° MEMORANDUM TO: Clerk to the Board O DATE: December 9, 2005 FROM: Frank B. Hempen, Jr., P.E. COLORADO Director of Public Works/County Engineer SUBJECT: Agenda Item Change Order No. 2 for the construction of Weld County Bridge 27/58A over Sheep Draw. Weld County has contracted with Hamon, Inc., contractors for the construction of the Bridge 27/58/A replacement project, in the amount of$937,991.51. Change Order No. 1 included a sidewalk under the bridge and increased this amount by$17,440.00 which was paid by the City of Greeley. Attached is Change Order No. 2 that will increase the contract amount by $6,504.11 for additional services that were needed to complete the project. The additional services are shown on the attached pay request summary and include a miscellaneous of over-runs and under-runs for the contract bid items. The County's portion of this change order is 10% or $650.41. The 10% is being funded by City of Greeley and the bridge grant covers the remaining 80%. The new contract amount will be $961,935.62. The project has been completed and opened to traffic. Attached are two original Change Orders No. 2 for Bridge 27/58A. Please return one original to Public Works as soon as it is signed by the Chair. pc: Wayne Howard, Project Manager Mona Weidenkeller, Public Works M:\-Active Projects\Bridge 27-58A\Construction\Contracts\Agenda CO No 2.doc CZ5.R J 2005-3657 c Hello