Loading...
HomeMy WebLinkAbout20050169 RESOLUTION RE: GRANT CHANGE OF ZONE,CZ#1065, FROM A(AGRICULTURAL) ZONE DISTRICT TO 1-3 (INDUSTRIAL) ZONE DISTRICT - ARNHEIM, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, a public hearing was held on the 2nd day of February, 2005, at 10:00 a.m.for the purpose of hearing the application of Arnheim, LLC, 1575 Weld County Road 27, Brighton, Colorado 80601, requesting a Change of Zone from the A (Agricultural) Zone District to the 1-3(Industrial)Zone District for a parcel of land located on the following described real estate,to-wit: Lot B of Recorded Exemption#2050;being part of the S1/2 S1/2 of the NE1/4 of Section 30, Township 1 North, Range 66 West of the 6th P.M.,Weld County, Colorado WHEREAS, the applicant was represented by Paul Gesso, Banks and Gesso, LLC, 720 Kipling Street, Suite 117, Lakewood, Colorado 80215, and WHEREAS,Section 23-2-40 of the Weld County Code provides standards for review of such a Change of Zone, and WHEREAS, the Board of County Commissioners heard all the testimony and statements of those present,studied the request of the applicant and the recommendation of the Weld County Planning Commission and, having been fully informed,finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 23-2-50 of the Weld County Code. 2. The request is in conformance with Section 23-2-40.B of the Weld County Code as follows: a. Section 23-2-40.6.1 -- The proposal is consistent with the policies of Chapter 22 of the Weld County Code, and changing conditions in the area warrant a Change of Zone. b. Section 23-2-40.B.2 -- The uses which will be allowed on the subject property by granting this Change of Zone will be compatible with the surrounding land uses. c. Section 23-2-40.6.3 -- Adequate water and sewer service can be made available to serve the site. If the rezoning is approved, the applicant shall demonstrate, prior to issuance of building permits on the site,that the water and sewer services are available at the site and are adequate and appropriate to meet the development requirements. � 2005-0169 LL'.- Phi &j i/z(eA) 1/0/6e/rE'ID PL1668 -a� os CHANGE OF ZONE (CZ#1065) -ARNHEIM, LLC PAGE 2 d. Section 23-2-40.B.4 -- Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed Zone District. e. Section 23-2-40.B.5--The applicant has demonstrated compliance with the applicable standards as follows: 1) Section 23-2-40.B.5.a--The applicant has demonstrated compliance with the County regulations concerning Overlay Districts. 2) Section 23-2-40.B.5.b--The proposed rezoning will not permit the use of any area known to contain a Commercial Mineral Deposit as defined by State statutes in a manner which would interfere with the present or future extraction of such deposit by an extractor to any greater extent than under the present zoning of the property. 3) Section 23-2-40.B.5.c -- If soil conditions on the site are such that they present moderate or severe limitations to the construction of structures or facilities proposed for the site,that such limitations will be addressed by the applicant and/or the applicant's successors or assigns prior to development of the property. f. Section 23-2-30.A.1 —The proposed Change of Zone from the A(Agricultural) Zone District to the 1-3(Industrial)Zone District is consistent with Chapter 19, Article XII, Coordinated Planning Agreement for the City of Fort Lupton. Section 19-12-50,titled Planning Coordination, states, "This Agreement is intended to be a Comprehensive Development Plan adopted and implemented pursuant to Section 29-20-105(2), C.R.S. Following the execution of this Agreement by both parties, COUNTY Development approvals in the MUNICIPALITY'S Referral Area will be processed and determined in accordance with the following: Section 19-12-50.B,Development outside Urban Growth Area,states"To the extent legally possible, the COUNTY will disapprove proposals for Urban Development in areas of the MUNICIPAL Referral Area outside the Urban Growth Area." This application was reviewed utilizing the definitions outlined in the Intergovernmental Agreement(IGA)for the City of Fort Lupton. By definition, this application is considered development, as stated in the IGA, "Any land use requiring regulatory approval by the elected governing body of the applicable party in the Urban Growth Area...," This is a rezoning from the A (Agricultural) Zone District to the 1-3 (Industrial) Zone District, and the possible uses in the 1-3 (Industrial)Zone District include any of those listed in Section 23-3-330.B. However, there is no water associated with the site and its small size makes in economically unfeasible for agricultural 2005-0169 PL1668 CHANGE OF ZONE (CZ#1065) - ARNHEIM, LLC PAGE 3 production. As currently zoned there can be no reasonable economic use of the property and rezoning to the l-3(Industrial)Zone District presents the only means by which a reasonable economic use can be made of the property. NOW,THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the application of Arnheim, LLC, for a Change of Zone from the A(Agricultural)Zone District to the 1-3(Industrial)Zone District on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: • 1. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within 60 days of approval by the Board of County Commissioners. 2. Prior to recording the Change of Zone plat: A. All sheets of the plat shall be labeled CZ-1065. B. The plat shall be amended to adhere to Section 23-2-50 of the Weld County Code. C. The City of Fort Lupton Transportation Plan indicates Weld County Road 27 as an arterial road with a total of 120 feet of right-of-way. A total of 60 feet from the centerline of Weld County Road 27 shall be indicated on the plat as future right-of-way reservation for the expansion of Weld County Road 27. The applicant shall verify the existing right-of-way and the documents creating the right-of-way shall be noted on the Change of Zone plat. D. The applicant shall delineate and label all existing structures on the Change of Zone plat. E. The applicant shall do one of the following: 1) The applicant shall provide verification that the existing residence has been converted into an office and that existing permanent kitchen facilities have been disconnected. OR 2) The applicant shall submit a Nonconforming Use application for review and approval by the Department of Planning Services for the existing residence if it is still being used as a single family residence. F. All septic systems located on the property shall have appropriate permits from the Weld County Department of Public Health and Environment. The Department of Public Health and Environment found two permits for 1571 Weld County Road 27. The applicant shall work with the Department of 2005-0169 PL1668 CHANGE OF ZONE (CZ #1065) - ARNHEIM, LLC PAGE 4 Public Health and Environment to clarify the permits on file and to make sure the existing septic systems are adequately sized. In the event the system is found to be inadequate,the system must be brought into compliance with the current Individual Sewage Disposal System (I.S.D.S.) Regulations. G. If the applicant is to keep the existing house for residential use and/or outside office use,the applicant shall provide evidence that the existing commercial well is appropriately permitted for the existing building, or provide evidence that another adequate water supply has been obtained. H. The applicant shall attempt to address the requirements and concerns of the City of Fort Lupton, as stated in its referral dated September 30, 2004. Written evidence of such shall be provided to the Department of Planning Services. The applicant shall submit a letter to the Department of Planning Services requesting the vacation of Use by Special Review Permit#1402. J. The applicant shall submit a Site Plan Review application to the Department of Planning Services that covers the uses and improvements associated with Use by Special Review Permit#1402. K. The following notes shall be delineated on the Change of Zone plat: 1) The Change of Zone allows for Industrial uses which shall comply with the 1-3 (Industrial) Zone District requirements as set forth in Section 23-3-330 of the Weld County Code. 2) Any signage located on the property shall require Building Permits and adhere to Section 23-4-100 of the Weld County Code. 3) The site shall maintain compliance at all times with the requirements of Weld County Government. 4) Any future structures or uses, or additions to existing structures or uses, on the site must obtain the appropriate Zoning and Building Permits. 5) If applicable, installation of utilities shall comply with Chapter 24, Article VII, of the Weld County Code. 6) The applicant shall adhere to all Site Plan Review requirements, as defined in Chapter 23, Division 3, of the Weld County Code. 7) At the time of the Site Plan Review, a drainage report signed by a professional engineer, licensed in the state of Colorado, shall be submitted to the Weld County Department of Public Works. Upon 2005-0169 PL1668 CHANGE OF ZONE (CZ#1065) - ARNHEIM, LLC PAGE 5 approval of the drainage report by the Department of Public Works, final drainage construction plans,conforming to the drainage report, shall be submitted to the Department of Public Works. 8) At the time of the Site Plan Review, final road plans, along with construction details, shall be submitted to, and approved by, the Weld County Department of Public Works. These plans shall include road and intersection improvements, as well as the necessary right-of-way dedication. 9) At the time of the Site Plan Review, grading plans, along with construction details, shall be submitted to, and approved by, the Weld County Department of Public Works. 10) If eventual use of this site would be a major impact, significant roadway and intersection improvements will be required. 11) This proposed Change of Zone to an industrial use might possibly contribute significant traffic to the surrounding area, including U.S. Highway 85. The applicant may be required to participate and contribute to improvements for the U.S. Highway 85 Highway Access Control Plan at the Site Plan Review application. 12) At the time of the Site Plan Review,the applicant may be required to participate and contribute to improvements to the surrounding transportation infrastructure. The applicant may be required to submit off-site roadway improvements agreements. 13) At the time of Site Plan Review, the applicant will be required to prepare a haul route with respect to the proposed development. 14) All liquid and solid wastes, as defined in the Solid Wastes Disposal Sites and Facilities Act,Section 30-20-100.5,C.R.S.,shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 15) No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, Section 30-20-100.5 C.R.S. 16) Waste materials shall be handled,stored,and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. 17) Fugitive dust shall be controlled on this site. 2005-0169 PL1668 CHANGE OF ZONE (CZ#1065) - ARNHEIM, LLC PAGE 6 18) The facility shall adhere to the maximum permissible noise levels allowed in the Industrial Zone District as delineated in Section 25-12-103, C.R.S. 19) A plan review is required for each building for which a Building Permit is required. Plans shall include a floor plan, and may be required to bear the wet stamp of a Colorado registered architect or engineer. Provide a Code Analysis Date sheet provided by the Weld County Department of Building Inspection. 20) Fire resistance of walls and openings, construction requirements, maximum building height,and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by Chapter 23 of the Weld County Code. 21) New buildings shall conform to the requirements of the codes adopted at the time of permit application. Currently, the following codes have been adopted: 2003 International Building Code; 2003 International Mechanical Code;2003 International Plumbing Code; 2003 International Fuel Gas Code;2002 National Electrical Code,and Chapter 29 of the Weld County Code. 22) Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and type of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. Property lines shall be clearly identified and all property pins shall be staked prior to the first site inspection. Approved building and foundation plans shall be on the site and available to inspectors for each inspection. 23) Approved on-site storage of adequate water supplies for firefighting operations shall be provided for all newly constructed buildings on this parcel. 24) Future development and construction of any new/additional buildings or structures may require additional means of access to this site based upon use, construction type, and building size. The Fire District reserves the right to determine whether additional fire protection issues will need to be addressed. 2005-0169 PL1668 CHANGE OF ZONE (CZ#1065) -ARNHEIM, LLC PAGE 7 25) Effective January 1,2003, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County-Wide Road Impact Program. 3. The Department of Planning Services respectfully requests the surveyor provide a digital copy of this Change of Zone. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4). (Group 6 is not acceptable). This digital file may be sent to maps@co.weld.co.us. 4. Any further development of the site will require a Site Plan Review. Any commercial/industrial development must comply with all applicable Weld County Department of Public Health and Environment, Colorado Department of Public Health and Environment, EPA and/or Oil and Gas regulations. The applicant/developer must contact the appropriate agency for more information regarding the site-specific requirements of each development. The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 2nd day of February, A.D., 2005. BOARD OF COUNTY COMMISSIONERS Ell„, WELD COUNTY, COLORADO Ida e /1,-( AYE iabi William H.H. rke, Chair lerk to the Board eh, Cr NAY ciOrt Deputy Clerk to ' e Board ck &pJ (AYE) D id . Lo O ' D A R D (AYE) Robert D. Mas en ounty Att rn: .-L 4 i4 l/1,244 t (AYE) Glenn Vaad C Date of signature: / AS^ 2005-0169 PL1668 Hello