Loading...
HomeMy WebLinkAbout20050904.tiff riicti;;.. Weld County Referral 111k. February 4, 2005 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Stephan Brancucci/do Glen Case Number USR-1493 Droegemueller Please Reply By November 28, 2004 Planner Jacqueline Hatch Project A Site Specific Development Plan and Special Review Permit for a Use by Special Review in the Industrial Zone District (Commercial Junkyard or Salvage Yard)in the 1-3 (Industrial)Zone District Legal Pt NE4 SE4 and Lot B of RE-3932; Section 30, T1 N, R66W of the 6th P.M., Weld County, Colorado. Location West of and adjacent to CR 27(Hwy 85 Business); approximately 1/4 mile north of /— CR4. Parcel Number 1471 30 000012& 1471 30 000025 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) December 21, 2004 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. See attached letter. rnrnrnon/c• r• Signature . ag Date i - 4-O5- �� EXHIBIT Mixic,c_ ItI o- -/��.� 2005-0904 I Weld County Placr:i ?, Di Y:r.ment 7-e GREELEY '1��FiCE ° MEMORANDUM FEB a ?oo5 RECE TO: Jacqueline Hatch, Planner DATE: February 4, 2005 WII FROM: Donald Carroll, Engineering Administrator Q 7 C N'L SUBJECT: USR-1493, Stephan Brancucci/ COLORADO do Glen Droegemueller This is a follow-up of your previous memo dated January 6, 2005, to the changes that have occurred since the last planning commission meeting. Item 1. The applicant is increasing the number of employees on the site from the original 10 employees to 20 employees. Response: The applicant is identifying 41 parking places being proposed for the site. This should accommodate the additional employees. Item 2. The applicant is indicating adding additional storage for vehicles and equipment. A greater part of the larger equipment will have to be brought in by Low Boy (semi tractor trailer rigs). Response: The Weld County Public Works recommends coming in from the south (Brighton area) on WCR 27 id not utilize WCR 6 to the north. The corner at WCR 6 and WCR 27 will not accommodate turning radiuses tor large vehicles in a safe condition. pc: USR-1493 M:\PLANNING-DEVELOPMENT REVIEW\USR-Use by Special Review\RE-1493-A.DOC riti64;-) Weld County Referral D E C E r U 1 November 1, 2004 COLORADO WELD COUNTY PUBLIC WORKS DEPT The Weld County Department of Planning S..,v;1/4.,.s iu, tic f Ile..;n-tem for review: Applicant Stephan Brancucci/do Glen Case Number USR-1493 Droegemueller Please Reply By November 28, 2004 Planner Jacqueline Hatch Project A Site Specific Development Plan and Special Review Permit for a Use by Special Review in the Industrial Zone District(Commercial Junkyard or Salvage Yard) in the 1-3 (Industrial)Zone District Legal Pt NE4 SE4 and Lot B of RE-3932; Section 30, T1 N, R66W of the 6th P.M., Weld • County, Colorado. Location West of and adjacent to CR 27(Hwy 85 Business); approximately 1/4 mile north of CR 4. Parcel Number 1471 30 000012 & 1471 30 000025 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. • Weld County Planning Commission Hearing (if applicable) December 21, 2004 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: Signature 6r_ei/1// y Date II- 9- or Agency to t \� o- / �+-;Li ❖Weld County Planning Dept. ❖918 10'Street,Greeley,CO.80631 ❖(970)353-6100 ext.3540 :•(970)304-6498 fax Weld County Planning n • GREELEY OFF NOV 152 MEMORANDUM RECEIv TO: Jacqueline Hatch, Planner DATE: November 12, 2004 WI I PC. FROM: Donald Carroll, Engineering Administrator Ptt- COLORADO SUBJECT: USR-1493, Stephan Brancucci/ do Glen Droegemueller The Weld County Public Works Department has reviewed this proposal. This project falls primarily under the purview of the Use by Special Review Standards, Weld County Code, Chapter 23, Article II, Division 4, Section 23. Our comments and requirements are as follows: COMMENTS: WCR 27 is designated on the Weld County Road Classification Plan (FHU) as a major arterial road, which requires a 140-foot right-of-way at full build out. There is presently a 60-foot right-of-way. The road is maintained by Weld County. Pursuant to the definition of SETBACK in the Weld County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of-way line. ""EQUIREMENTS: Access: The applicant has identified on the plat drawing the utilization of the two existing gated accesses from WCR 27. The existing north access by the office building will be abandoned where the proposed parking area will be . Off-Street Parking: The applicant proposed to pave three± acres adjacent to the existing office and warehouse area. Match existing grades and adequate turning radiuses to WCR 27. The remaining gravel storage lot for vehicles shall be surfaced with gravel for a minimum of six inches as identified on the plat drawing. Each parking place shall be appropriately striped and equipped with wheel guards where needed to prevent vehicles from extending beyond the boundaries of their space and coming into contact with other vehicles, walls, fences, sidewalks, or plantings. Storm Water Drainage: The applicant shall provide a storm water drainage report. The drainage report/erosion control plan and the Storm Water Management Plan (SWMP) is a part of the site development. The proposed detention/water quality pond shall be located outside the future right-of-way identified for WCR 27. The storm water drainage report and erosion control plan (SWMP) shall be submitted to the Weld County Public Works Department for review and approval. USR-1493 M:\PLANNING—DEVELOPMENT REVIEW\USR-Use by Special Review\USR-1493-DOC Page 1 of 1 Jacqueline Hatch From: Charlotte Davis it: Monday, February 07, 2005 4:33 PM To: Jacqueline Hatch Subject: USR-1493 Additional Condition memo memorandum to: Weld County Planning Commission; Jacqueline Hatch from: Charlotte Davis, Environmental health subject: Change/Addition of Condition to USR-1493 date: 01/03/2005 cc: Jacqueline, the following memo was submitted at the Planning Commission on January 4,2005. Please add this additional condition(prior to recording the plat). Thanks, Char I have just received information from Jacqueline Hatch regarding several requested changes to USR-1493. One of the changes involves increasing the number of employees (from 10 employees to 20 employees) on tV ite. The following additional condition is recommended: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. The septic system serving the existing warehouse/onion shed shall be reviewed by a Colorado Registered Professional Engineer. The review shall consist of observation of the system and a technical review describing the systems ability to handle the proposed hydraulic load. The review shall be submitted to the Environmental Health Services Division of the Weld County Department of Public Health and Environment. In the event the system is found to be inadequately sized or constructed the system shall be brought into compliance with current Regulations. 02/08/2005 MEMORANDUM cal TO: WELD COUNTY PLANNING COMMISSION; JACQUELINE HATCH FROM: CHARLOTTE DAVIS, ENVIRONMENTAL HEALTH 1 i(y O SUBJECT:CHANGE/ADDITION 01/04/2005 OF CONDITION TO USR-1493 COLORADO cc: I have just received information from Jacqueline Hatch regarding several requested changes to USR-1493. One of the changes involves increasing the number of employees (from 10 employees to 20 employees) on the site. The following additional condition is recommended: We recommend that the following requirements be met prior to allowing the plat to be recorded: The septic system serving the existing warehouse/onion shed shall be reviewed by a Colorado Registered Professional Engineer. The review shall consist of observation of the system and a technical review describing the systems ability to handle the proposed hydraulic load. The review shall be submitted to the Environmental Health Services Division of the Weld County Department of Public Health and Environment. In the event the system is found to be inadequately sized or constructed the system shall be brought into compliance with current Regulations. a MEMORANDUM TO: JACQUELINE HATCH, PLANNING SERVICES ' FROM: CHARLOTTE DAVIS, ENVIRONMENTAL HEALTH W 93 DATE: 0/2 04 C. DROEGMUE STEPHAN BRANCUCCI C/O GLEN COLORADO CC: Environmental Health Services has reviewed this proposal for a commercial junkyard or salvage yard. We have no objections to the proposal, however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1 . In the event, the applicant intends to wash vehicles or equipment on site the following shall apply: The applicant shall provide evidence that any vehicle washing area will be designed and constructed to capture all effluent and prevent any discharges from the washing of vehicles or equipment in accordance with the Rules and Regulations of the Water Quality Control Commission and the Environmental Protection Agency. 2. The applicant shall submit evidence to the Department of Planning Services, from the Colorado Division of Water Resources, demonstrating that the well is appropriately permitted for the commercial use. 3. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2) A list of the type and volume of chemicals expected to be stored on site. 3) The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). We recommend that the following requirements be incorporated into the permit as conditions that must be met prior to operation: 1. The Environmental Health Services Division was unable to locate a septic permit for the existing office/warehouse building(s). An individual sewage disposal system is required for the existing office/warehouse and shall be installed according to the Weld County Individual Sewage Disposal Regulations. 2. The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. 4. The applicant shall operate in accordance with the approved "waste handling plan". 5. Fugitive dust and fugitive particulate emissions shall be controlled on this site. 6. This facility shall adhere to the maximum permissible noise levels allowed in the Commercial Zone as delineated in 25-12-103 C.R.S., as amended. 7. Adequate handwashing and toilet facilities shall be provided for employees and patrons of the facility. 8. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. 2 9. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. 10.All potentially hazardous chemicals must be stored and handled in a safe manner in accordance with product labeling and in a manner that minimizes the release of hazardous air pollutants (HAP's) and volatile organic compounds (VOC's). 11.If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. 12.If applicable, the applicant shall comply with all provisions of the Underground and Above Ground Storage Tank Regulations (7 CCR 1101-14). 13. If applicable, any vehicle washing area(s) shall capture all effluent and prevent discharges in accordance with the Rules and Regulations of the Water Quality Control Commission, and the Environmental Protection Agency. 14.The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. 3 (vicer" ., Weld County Referral WIIDe. November 1, 2004 D COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Stephan Brancucci/c/o Glen Case Number USR-1493 Droegemueller Please Reply By November 28, 2004 Planner Jacqueline Hatch Project A Site Specific Development Plan and Special Review Permit for a Use by Special Review in the Industrial Zone District (Commercial Junkyard or Salvage Yard) in the 1-3 (Industrial)Zone District Legal Pt NE4 SE4 and Lot B of RE-3932; Section 30, T1 N, R66W of the 6th P.M., Weld County, Colorado. Location West of and adjacent to CR 27(Hwy 85 Business); approximately 1/4 mile north of CR 4. Parcel Number 1471 30 000012 & 1471 30 000025 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) December 21, 2004 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ,'We have reviewed the request and find no conflicts with our interests. J 4' See attached letter. Comments: Signature y� ( t J ` Date �� ,0 C` Agency 7/Q!hc Z ti≤ p ct"Orl +Weld County Planning Dept. +918 10'"Street,Greeley,CO.80631 +(970)353-6100 ext.3540 ❖(970)304-6498 fax a DEPARTMENT OF BUILDING INSPECTION Weld County Administrative Offices 918 10th Street, Greeley, CO 80631 WEBSITE: www.co.weld.co.us Phone(970) 353-6100, Ext. 3540 ' Fax(970) 304-6498 C. COLORADO November 16, 2004 Stephen Brancucci do Glen Droegmueller USR-1493 Site Specific Development Plan and Special Review Permit for a Use by Special Review in the Industrial Zone District ( Commercial Junkyard or Salvage Yard) in the 1-3 (Industrial)Zone District. 1. A building permit shall be obtained prior to the construction of any new building, addition or remodel of existing buildings. A building permit is required for change of use of any existing buildings. 2. A plan review is required for each building for which a building permit is required. Plans shall include a floor plan. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans --re required when applying for each permit. Provide a Code Analysis Data sheet provided by the Weld County .gilding Department with each Building permit application. 3. Buildings shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2003 International Building Code; 2003 International Mechanical Code; 2003 International Plumbing Code; 2003 International Fuel Gas Code; and the 2002 National Electrical Code and Chapter 29 of the Weld County Code. 4. The buildings will probably be classified as follows: mixed use B (Office) and S-1 (Warehouse) occupancies. Mixed use S-1 (Warehouse) and S-2 (Vehicle Storage).Fire resistance of walls and openings, construction requirements, maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by the Zoning Ordinance. 5. Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 27 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. Please contact me for any further information regarding this project. rely, )ge Vii Building litti Official Service,Teamwork,Integrity,Quality Jacqueline Hatch .From: Kris Krengel [kkrengel@gbfpd.org] nit: Thursday, February 03, 2005 4:49 PM o: Jacqueline Hatch Subject: USR 1493 Jacqueline, Just a note to let you know that we have received and reviewed your memo dated 1/6/05 regarding the applicant' s changes to USR-1493 . I had a phone conversation with Chris Strong of Otis, Coan & Stewart, LLC on 2/1/05 in which he assured me that the plans for the internal roads/access requested in our response letter dated 11/5/04 would be forthcoming to the Fire District for review and approval. We have not received those plans as of this date. Further, I advised Mr. Strong that the Fire District would request of Weld County that we be included in the review of any plans submitted for application of a Building Permit to construct or modify any structures associated with this case. Also, Mr. Strong assured me that no vehicles of any type would be stored inside of any structures and that no welding or cutting (hot work) would be conducted/performed at the site. The changes made by the applicant do not modify our previous requirements, nor do they promote any additional issues or requirements. Respectfully, Kris Krengel Deputy Fire Marshal Greater Brighton Fire District 425 South Main Street Brighton, CO 80601 (303) 659-4101 1 Weld County Planning Department `gy • p GREELEY 0FFir.F •�\�\;5�b. idgll�j.� GREAT[g GREATER BRIGHTON NOV 0 9 �V \°H , .� � FIRE PROTECTION DISTRIC _ F . -� D 425 South Main Street .x12 1 C \ ' Brighton,Colorado 80601 r4� 1 —., www.gbfpd.org n TECO November 5, 2004 Weld County Department of Planning Services Attn: Jacqueline Hatch 918 10'h Street Greeley,Colorado 80631 Subject: Brancucci/Droegemueller—Case#USR-1493 Dear Jacqueline, The following comments are made in response to the above noted site plan review. The Uniform Fire Code, 1997 Edition,and other codes or standards referenced within the Fire Code,governs these comments and resulting requirements. General Comments: I. No water supplies for fire protection are currently available to this site. Therefore, approved onsite storage of adequate water supplies for firefighting operations shall be provided: if vehicles are parked or stored inside any structures; or, if the applicant(s) conduct welding or hot-work operations on the subject premises. 2. The applicant shall provide the Fire District with a detailed plan of the proposed internal access routes within and upon the property. Please direct/encourage the applicant to contact the Fire District to discuss this issue. 3. The applicant has indicated that the existing structures—9,600 square foot office/warehouse and 7,200 square foot warehouse—will not be utilized for the parking or storage of insurance damaged vehicles. What is the intended use of these structures? Based on the applicant's response to this question, additional fire protection systems or features may be required. Should there be any questions concerning these requirements,please do no hesitate to contact this office. Respectfully, _ Kris ICrengel Deputy Fire Marshal Cc: File—USR-1493 (Weld) Phone#303-659-4101 gbfpdadmin@uos.net Fax#303-659-4103 Hello