Loading...
HomeMy WebLinkAbout20053234.tiff RESOLUTION RE: GRANT CHANGE OF DESIGNATED ZONE DISTRICTS, AMPZ #1004, FOR LIFEBRIDGE PUD WITH E (ESTATE), R-1 (LOW-DENSITY RESIDENTIAL), R-2 (DUPLEX RESIDENTIAL), R-3 (MEDIUM-DENSITY RESIDENTIAL), R-4 (HIGH- DENSITY RESIDENTIAL), C-1 (NEIGHBORHOOD COMMERCIAL) AND C-2 (GENERAL COMMERCIAL)USES,AND CONTINUED OIL AND GAS PRODUCTION- LIFEBRIDGE CHRISTIAN CHURCH WHEREAS,the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS,a public hearing was held on the 9th day of November, 2005,at 10:00 a.m.for the purpose of hearing the application of LifeBridge Christian Church, 10345 Ute Highway, Longmont, Colorado 80504, c/o 4 C Corporation, P.O. Box 54, Longmont, Colorado 80502, requesting a Change of designated Zone Districts,AMPZ#1004,for LifeBridge PUD with E(Estate), R-1 (Low-Density Residential), R-2(Duplex Residential), R-3(Medium-Density Residential), R-4 (High-Density Residential),C-1 (Neighborhood Commercial)and C-2(General Commercial)uses, and continued oil and gas production, for a parcel of land located on the following described real estate, to-wit: Lot B of Recorded Exemption #1389, and part of Section 5, Township 2 North, Range 68 West of the 6th P.M., Weld County, Colorado WHEREAS,the applicant was represented by Rick Rusaw, Dave Williams, and Barbara Brunk, and WHEREAS,Section 27-6-120 of the Weld County Code provides standards for review of said Change of Zone, and WHEREAS,the Board of County Commissioners heard all the testimony and statements of those present,studied the request of the applicant and the recommendations of the Weld County Planning Commission and, having been fully informed,finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 27-5-30 of the Weld County Code. 2. The request is in conformance with Section 27-6-120.D as follows: a. Section 27-6-120.D.5.a - The proposal is consistent with any Intergovernmental Agreement in effect influencing the PUD,and Chapter 19 (Coordinated Planning Agreements), Chapter 22 (Comprehensive Plan), Chapter23(Zoning),Chapter24(Subdivision),and Chapter26(Mixed Use Development)of the Weld County Code. The site is presently influenced by an Intergovernmental Agreement with the City of Longmont. The proposal is consistent with the aforementioned documents as follows: 2005-3234 �0 : �Z PL1655 "3 t Cep) �L � iaz-046-0s CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 2 1) Chapter 19, Article XIV, of the Weld County Code indicates the Intergovernmental Agreement (IGA) boundary with the City of Longmont presently influences the subject site. However, the Department of Planning Services and the County Attorney's Office determined when the application was submitted and under review, there was no IGA in place between Weld County and the City of Longmont, therefore, it was determined by the Weld County Attorney's Office that this application would not be subject to Chapter 19,Article XIV,of the Weld County Code, because the IGA was not adopted prior to the submittal and the application for Sketch Plan, PK-1004. 2) Section 22-2-110.6 (UGB.Goal 2) states, "Concentrate urban development in or adjacent to existing municipalities orthe 1-25 Mixed Use Development area,and maintain urban growth boundary areas that provide an official designation between future urban and non-urban uses." The PUD is located within the Mixed Use Development(MUD)area, the boundary of the IGA with the City of Longmont, and the Municipal Referral area for the Towns of Mead, Firestone,and Frederick,and Boulder County. The City of Longmont returned its referral indicating the City would like to reiterate the notion that a development of this scope would best be served by an incorporated city where a full range of urban infrastructure and services can be planned and provided. The City of Longmont also has concerns regarding on-site drainage, parking configurations, bicycle lanes,and the incorporation of the"Right to Farm"statement. The City is in support of the Division of Wildlife recommendations for the Oligarchy Ditch. The Town of Mead requests that this development not be approved as an unincorporated project and the applicants should be required to petition the City of Longmont for annexation. In addition, the Town of Mead states the northbound traffic impacts to the Town will likely be significant without providing the Town revenue or control over any of it. The Town of Frederick has indicated it has reviewed the request and finds no conflicts with its interests. No referrals were received from the Town of Firestone or Boulder County. 3) Section 22-2-230.A(MUD.Goal 1) states, "To plan and to manage growth, and to provide for ease of inclusion in the 1-25 Mixed Use Development area and urban development nodes so as to balance relevant fiscal,environmental,aesthetic and economic components of the area." The proposal assures that new development occurs in such a manner as to maintain an attractive working and living environment. Further, all applicable standards and regulations, unless otherwise modified herein, of Chapters 22, 23, 26, and 27 of the Weld County Code, shall be integrated in the design of the Final Plan and will be addressed through the Site Plan Review process. 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 3 The site design integrates residential, neighborhood commercial, environmental,aesthetic,and economic components into a cohesive unit that is attractive and compatible with surrounding land uses. Two letters have been received from surrounding property owners with concerns regarding the height of the proposed structures,visual obstruction, and traffic patterns. The Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of the health,safety,and welfare of the inhabitants of the neighborhood and County. 4) Section 26-1-50.6.1.a(MUD.C.Goal 1)states,"Establish a sense of community identity within the Mixed Use Development area by planning and managing residential, commercial, industrial, environmental, aesthetic, and economic components of the area." The land uses shown on the Change of Zone plat reflect the uses shown on the MUD Structural Land Use Map 2.1,dated September8, 2004. 5) Section 26-1-50.B.4.a(MUD.C.Goal 4)states, "The coordination of municipal,county,regional,and state growth policies and programs, which includes the Mixed Use Development area, may be evaluated in order to minimize discrepancies, promote a better understanding of growth dynamics in the area, avoid duplication of services, and provide economies of scale." The project is compatible with existing surrounding uses in terms of general uses, building height, scale, density, traffic, dust, and noise. The PUD process allows for flexibility and variety needed to offer a range of products, services, and uses. 6) Section 26-1-60.C.1.a(MU D.P.Goal 1)states,"Provide efficient and cost-effective delivery of adequate public facilities and services which assure the health, safety, and general welfare of the present and future residents of the area." The site is located in an area where infrastructure needs will be provided when construction begins on the LifeBridge PUD. The application has signed agreements in place with the Saint Vrain Sanitation District, Left Hand Water District,and Longs Peak Water District. The Weld County Attorney's Office has indicated the agreements submitted by the applicant are adequate. 7) Section 26-1-70.C.2(MU D.T.Goal2)states,"Promote a pedestrian trail system to service transportation and recreation purposes within the Mixed Use Development area." Several pedestrian and open space connections are proposed to connect the components of the development and the surrounding properties and developments. 8) Section 26-1-70.C.3.a (MUD.T.Goal 3) states, "New development within the Mixed Use Development area shall provide a mechanism 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 4 for balancing relevant fiscal and economic components of transportation systems." An overall Traffic Impact Analysis has been prepared for this development, which will address the cumulative development impacts created by this project and suggest appropriate mitigation measures. 9) Section 22-3-50.B (P.Goal 2) "Require adequate facilities and services to assure the health, safety, and general welfare of the present and future residents of the County." The PUD will be serviced by the Left Hand Water District and Longs Peak Water District for potable water and fire protection requirements, and the Saint Vrain Sanitation District will handle the effluent flow. The Mountain View Fire Protection District has reviewed the proposal and does not object to the proposed changes. b. Section 27-6-120.D.5.b - The uses which will be allowed in the PUD will conform with the Performance Standards of the PUD Zone District contained in Chapter 27, Article II, of the Weld County Code. 1) Section 27-2-20, Access standards -The site layout will provide a network of local, collector, and arterial classified streets. A greenway/trail system is designed to connect the various components of the development for pedestrian and bicycle traffic,as well as provide recreational opportunities. The project offers an opportunity to accommodate significant transportation improvements in the area. Weld County Road 3.5 will connect to Weld County Road 5 between State Highway 119 and Weld County Road 26. Weld County Road 26 will be re-aligned north of the site, as part of the proposed expansion of Union Reservoir. The existing railroad crossing at Weld County Road 3.5 will be moved west to Fairview Street. A traffic signal will be installed at the intersection of State Highway 119 and Fairview Street as part of the Sandstone Ranch (City of Longmont) improvements. The PUD site will be connected to the re-aligned Weld County Roads 3.5 and 26 at regular intervals, with traffic signals as warranted. The Colorado Department of Transportation(COOT),in its referral dated October 6, 2005,states it is not in support of a direct access (right-in/right-out) off of State Highway 119. • 2) Section 27-2-40, Bulk requirements-The applicant has proposed a deviation from the bulk requirements as set out in the Weld County Code for the residential component, and Section 23-3-250 Performance Standard of the Commercial Zone District. The applicant has proposed a maximum building height of sixty(60)feet for the entire church campus,with an additional seventy-five(75)feet of height for approximately twenty percent of the building. Additionally, the applicant proposed a maximum building height of 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 5 thirty(30)feet for the residential component along the eastern side of the property;a maximum building height of thirty-five(35)feet for the residential component located south of Weld County Road 26; and a maximum height requirement of forty-five (45) feet for the mixed use commercial and mixed residential areas. All R-2, R-3, R-4,C-1,and C-2 development in a PUD require a Site Plan Review application as defined in Chapter 23 of the Weld County Code. The building height will be determined by Chapter 23 of the Weld County Code. 3) Section 27-2-70, Compatibility - The site is located north of and adjacent to State Highway 119,east of and adjacent to Weld County Road 3.5, and south of and adjacent to the realigned Weld County Road 26. The Vista Commercial Business Park is located south of the site across State Highway 119. The Elms at Meadow Vale PUD and Meadow Vale Farms PUD are located adjacent to the east, and the Longview PUD is adjacent to the west, across Weld County Road 3.5.The site is designated as residential on the 1-25 Mixed Use Development Area Structural Plan, Structural Land Use Map 2.1, dated September 8, 2004. The applicant has met the remaining Performance Standards as delineated in Section 27-2-10 of the Weld County Code. The Conditions of Approval and Development Standards ensure compliance with Sections 27-2-20 through 27-2-220 of the Weld County Code. c. Section 27-6-120.D.5.c-The uses which will be permitted will be compatible with the existing or future development of the surrounding area as permitted by the existing zoning, and with the future development as projected by Chapter 22 of the Weld County Code or master plans of affected municipalities. The PUD is located within the MUD area,the IGA boundary with the City of Longmont,and the Municipal Referral areas for the Towns of Mead, Firestone,and Frederick,and Boulder County. The City of Longmont returned its referral indicating the City would like to reiterate the notion that a development of this scope would best be served by an incorporated city where a full range of urban infrastructure and services can be planned and provided. The City of Longmont also has concerns regarding the on-site drainage, parking configurations, bicycle lanes, and incorporation of the "Right to Farm"statement. The City is in support of the Division of Wildlife recommendations for the Oligarchy Ditch. The Town of Mead requests this development not be approved as an unincorporated project and the applicants should be required to petition the City of Longmont for annexation. In addition, the Town of Mead states the northbound traffic impacts to the Town will likely be significant without providing the Town revenue or control over any of it. The Town of Frederick indicated it has reviewed the request and finds no conflict with its interests. No referrals were received from the Town of Firestone or Boulder County. 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 6 d. Section 27-6-120.D.5.d - The PUD Zone District shall be serviced by an adequate water supply and sewage disposal system in compliance with the Performance Standards in Chapter 27,Article II, of the Weld County Code. The PUD will be serviced by the Left Hand Water District and the Longs Peak Water District for potable water and fire protection requirements, and the Saint Vrain Sanitation District will handle the effluent flow. The Weld County Attorneys Office has indicated that the agreements submitted by the applicant are adequate for the Change of Zone. The Weld County Department of Public Health and Environment has indicated in a referral response dated September 12, 2005, that the application has satisfied Chapter 27 of the Weld County Code in regard to water and sewer service. e. Section 27-6-120.D.5.e-Street or highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the uses of the PUD Zone District. The Weld County Department of Public Works has reviewed the proposal and is in support of this application,with the conditions outlined in the referral dated September 12,2005. Stop signs and street names will be required at all intersections. f. Section 27-6-120.D.5.f-An Off-Site Road Improvements Agreement and an On-Site Improvements Agreement proposal are in compliance with Chapter 24 of the Weld County Code,and a Road Improvements Agreement is complete and has been submitted, if applicable. The Weld County Departments of Public Works and Planning Services shall require on-site and off-site improvements agreements, in accordance with Section 27-6-120.B.6.f of the Weld County Code, for improvements to the LifeBridge PUD, and all are required at the time of Final Plan. g. Section 27-6-120.D.5.g -There has been compliance with the applicable requirements contained in Chapter 23 of the Weld County Code regarding overlay districts, commercial mineral deposits, and soil conditions on the subject site. The Weld County Department of Public Works stated an amended Final Drainage Report, and construction plans conforming to the Drainage Report, shall be approved prior to recording the Final Plan. The Final Drainage Report shall research and document FIRM Community Panel Maps to determine if a flood hazard exists. h. Section 27-6-120.D.5.h - Consistency exists between the zone district(s) uses, and the Specific Development Guide. The submitted Specific Development Guide accurately reflects the Performance Standards and allowed uses described in the change of designated Zone Districts, as described previously. The Final Plans will be reviewed by the Board of County Commissioners. 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 7 NOW,THEREFORE,BE IT RESOLVED by the Board of County Commissioners of Weld County,Colorado,that the application of LifeBridge Christian Church for a Change of designated Zone Districts,AMPZ#1004,for LifeBridge PUDwith E(Estate), R-1 (Low-Density Residential),R-2 (Duplex Residential), R-3 (Medium-Density Residential), R-4 (High-Density Residential), C-1 (Neighborhood Commercial)and C-2(General Commercial)uses, and continued oil and gas production,on the above referenced parcel of land be,and hereby is,granted subject to the following conditions: 1. Prior to recording the Change of Zone plat: A. The applicant shall attempt to address the requirements and concerns of the Weld County Sheriffs Office,as stated in the referral response dated August 22,2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. B. The applicant shall attempt to address the requirements and concerns of the Lower Oligarchy Ditch Company, as stated in the referral response dated August 15,2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. C. The applicant shall attempt to address the requirements and concerns of the City of Longmont, as stated in the referral response dated September 21, 2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. D. The applicant shall address the requirements and concerns of the Saint Vrain Valley School District, as stated in the referral response dated September 6, 2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. E. The applicant shall address the requirements and concerns of the Saint Vrain Sanitation District, as stated in the referral response dated September 8, 2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. F. The applicant shall attempt to address the requirements and concerns of the Town of Mead,as stated in the referral response dated September6,2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. G. The applicant shall attempt to address the requirements and concerns of Omni/Trax — Great Western Railroad, as stated in the referral response dated August 22,2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. H. The applicant shall attempt to address the requirements and concerns of the State of Colorado Division of Wildlife,as stated in the referral response dated 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 8 August 18,2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. The applicant shall address the requirements and concerns of the Department of Public Works, as stated in the referral response dated September 12, 2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. J. The applicant shall address the requirements and concerns of the Department of Public Health and Environment, as stated in the referral response dated September 12,2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. K. The applicant shall address the requirements and concerns of the Department of Building Inspection, as stated in the referral response dated September 6, 2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. L. The applicant shall be required to provide written and graphic evidence from the School District and Post Office that the proposed mailbox facility location and proposed school drop off/pick up location and bus shelter plan meets their design standards and delivery requirements. Written evidence of compliance with their standards and requirements shall be submitted to the Department of Planning Services. Further,evidence shall be provided that each facility meets the intent of the Americans with Disabilities Act(ADA)for access. The Department of Building Inspection shall review the proposed structure for compliance with all applicable codes as warranted. Evidence of approval shall be submitted to the Department of Planning Services. M. The applicant shall provide the Department of Planning Services with a Sign Plan that conforms with Chapters 23, 26, and 27 of the Weld County Code. N. The applicant shall address the requirements and concerns of the Colorado Department of Transportation (CDOT), as stated in the referral response dated October6,2005. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. O. The applicant shall provide the Department of Planning Services with a request to vacate a portion of Weld County Road 3.5, north of the railroad and south of Weld County Road 26,for review and approval by the Board of County Commissioners. P. The applicant shall provide the Department of Planning Services with written evidence of a right-of-way dedication for the property located in the southeast corner(parcel number 1 313 04 000057,legal description: Lot A of Recorded Exemption#2540, and part of the NW1/4NW1/4 of Section 4, Township 2 North, Range 68 West of the 6th P.M., Weld County, Colorado) for the 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 9 re-alignment of Weld County Road 3.5 with Weld County Road 26 and Weld County Road 5. Q. The applicant shall provide the Department of Planning Services with evidence of an agreement or Public Utilities Commission application between the Great Western/Omni Trax Railroad, Department of Public Works, and the City of Longmont regarding the railroad crossing and re-alignment. R. The applicant shall contact CDOT and provide written documentation indicating its concerns have been addressed. S. The plat shall be amended to include the following: 1) All pages of the plat shall be labeled AMPZ-1004. 2) The applicant shall adhere to the plat requirements in preparation of the Change of Zone plat, per Section 23-2-690 of the Weld County Code. 3) Weld County's Right To Farm statement, as it appears in the Weld County Code, Appendix 22-E, shall be placed on the plat. 4) The applicant shall contact CDOT regarding the future right-of-way for State Highway 119, and delineate it as existing and future right-of-way for future expansion of State Highway 119. 5) Weld County Road 3.5 is designated on the Weld County Road Classification Plan as a four-lane minor arterial road,which requires 110 feet of right-of-way at full build out. The applicant shall verify the existing right-of-way and the documents creating the right-of-way. If the right-of-way cannot be verified, it shall be dedicated. This road is maintained by Weld County. 6) Weld County Road 26 is designated on the Weld County Road Classification Plan as a four-lane major arterial road,which requires 120 feet of right-of-way at full build out. The applicant shall verify the existing right-of-way and the documents creating the right-of-way. If the right-of-way cannot be verified,it shall be dedicated. This road is maintained by Weld County. 7) Weld County Road 5 is designated on the Weld County Road Classification Plan as a two-lane local road, which requires 60 feet of right-of-way at full build out. The applicant shall verify the existing right-of-way and the documents creating the right-of-way. If the right-of-way cannot be verified, it shall be dedicated. This road is maintained by Weld County. 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 10 8) Fairview Road is designated on the Weld County Road Classification Plan as a four-lane arte rial road, which requires 120 feet of right-of-way at full build out. The applicant shall verify the existing right-of-way and the documents creating the right-of-way with the City of Longmont. This road is maintained by Longmont. 9) Intersection sight distance triangles at the development entrance will be required to be shown on the plat. All landscaping within the triangles must be less then 3.5 feet in height at maturity. 10) The Road Cross Section shall be amended to show a 15-inch diameter Corrugated Metal Pipe(CMP)culvert,as per Weld County Code. 11) The internal local roadway right-of-way shall be 60 feet in width, including cul-de-sacs with a 65-foot radius, and dedicated to the public. The internal collector road right-of-way shall be 80 feet in width and dedicated to the public. 12) The Lower Oligarchy Ditch must be appropriately labeled and dimensioned, including setbacks. 13) The plat shall delineate the 400-foot by 400-foot and the 800-foot by 800-foot drilling envelope locations, per State statute. 2. The Change of Zone is conditional upon the following and that each shall be placed on the Change of Zone plat as notes prior to recording: A. The Change of designated Zone Districts,AMPZ-1004,is for the LifeBridge PUD,including changes in designation of the E,R-1, R-2, R-3, R-4,C-1,and C-2 Zone Districts,and continued oil and gas production,as indicated in the application materials on file and subject to, and governed by,the Conditions of Approval stated hereon and all applicable Weld County regulations. B. The open space and agricultural lots are non-buildable for residential structures or structures providing habitable space. C. Water service shall be obtained from the Left Hand Water District and Longs Peak Water District. D. Sewer service shall be obtained from the Saint Vrain Sanitation District. E. Permanent restroom and hand washing facilities shall be provided within easy access of the public gathering areas. F. If required, the applicant shall obtain a Stormwater Discharge Permit from the Water Quality Control Division of the Colorado Department of Public 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 11 Health and Environment. Silt fences shall be maintained on the down gradient portion of the site during all parts of the construction phase of the project. G. During development of the site,all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Department of Public Health and Environment, a Fugitive Dust Control Plan must be submitted. H. In accordance with the Regulations of the Colorado Air Quality Control Commission,any development that disturbs more than five(5)acres of land must incorporate all available and practical methods that are technologically feasible and economically reasonable in order to minimize dust emissions. If land development creates more than a 25-acre contiguous disturbance,or exceeds six (6) months in duration, the responsible party shall prepare a Fugitive Dust Control Plan, submit an Air Pollution Emissions Notice, and apply for a permit from the Colorado Department of Public Health and Environment. J. A Homeowners'Association shall be established prior to the sale of any lot. Membership in the Association is mandatory for each parcel owner. The Association is responsible for liability insurance,taxes and maintenance of open space,private utilities,and other facilities. Open space restrictions are permanent. K. The maintenance and snow removal for alleys and interior streets will be the responsibility of the Homeowners' Association, and the current County arterial roads, such as Weld County Roads 3.5 and 26, will remain the responsibility of Weld County. L. Weld County's Right to Farm,as delineated on this plat,shall be recognized at all times. M. Intersection sight distance triangles at the development entrance will be required. All landscaping within the triangles must be less then 3.5 feet in height at maturity. N. All signs,including entrance signs,shall require building permits. Signs shall adhere to the approved Sign Plan. O. Installation of utilities shall comply with Section 24-9-10 of the Weld County Code. P. Building permits shall be obtained prior to grading or the construction of any building or structure. Building permits are also required for signs and structures such as bus shelters, if provided. 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 12 Q. A plan review is required for each building. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. R. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. Current adopted codes include the 2003 International Building Code,2003 International Residential Code,2003 International Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, and Chapter 29 of the Weld County Code. S. Each building will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. T. Building height shall be measured in accordance with the applicable Building Code for the purpose of determining the maximum building size and height for various uses and types of construction,and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Off-set and setback requirements are measured to the farthest projection from the building. U. The property owner shall be responsible for complying with the Performance Standards of Chapter 27, Articles II and VIII, of the Weld County Code. V. Weld County Government personnel shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. W. The site shall maintain compliance at all times with the requirements of the Weld County Departments of Public Works, Public Health and Environment, and Planning Services, and adopted Weld County Code and policies. X. The applicant shall comply with Section 27-8-50 of the Weld County Code, as follows: Failure to submit a Planned Unit Development Final Plan- If a PUD Final Plan application is not submitted within two(2)years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submission of the PUD Final Plan. The Board may extend the date for the submission of the PUD Final Plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LI FEBRIDGE CHRISTIAN CHURCH PAGE 13 determines that conditions or statements made supporting the original approval of the PUD Zone District have changed, or that the landowner cannot implement the PUD Final Plan,the Board of County Commissioners may, at a public hearing, revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original Zone District. Y. The PUD Final Plan shall comply with all regulations and requirements of Chapter 27 of the Weld County Code. 3. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within thirty (30) days of approval by the Board of County Commissioners. With the Change of Zone plat map, the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp(Shape Files),Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif (Group 4) ... (Group 6 is not acceptable). 4. In accordance with Weld County Code Ordinance 2005-7, approved June 1, 2005, should the plat not be recorded within the required thirty(30)days from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance charge may be added for each additional three (3) month period. 5. At the time of Final Plan submission: A. Easements shall be shown in accordance with County standards and/or Utilities Coordinating Advisory Committee recommendations, and dimensioned on the final plat. Easements shall follow rear and side lot lines and shall have a minimum total width of twenty(20)feet apportioned equally on abutting properties. Where front line easements are required,a minimum of fifteen (15) feet shall be allocated as a utility easement. B. The applicant shall provide the Department of Planning Services with a copy of the Restrictive Covenants and Homeowners'Association Incorporation paperwork for Project LifeBridge Christian Church PUD for review by the Weld County Attorney's Office. Any changes requested by the Weld County Attorney's Office shall be incorporated. C. The applicant shall provide an Improvements Agreement According to Policy Regarding Collateral for Improvements. This agreement must be reviewed by the Departments of Public Works and Planning Services, and shall be approved by the Board of County Commissioners. D. The applicant shall provide the Department of Public Works with stamped, signed,and dated final plat drawings and roadway/construction and grading plan drawings for review. Construction details must be included. 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 14 E. The applicant shall provide the Department of Public Works with an amended Traffic Impact Study. The Traffic Impact Stuffy conducted by Matthew J.Delich, P.E.,dated January 2005,does not graphically match with the proposed land use plan. F. Stop signs and street name signs will be required at all intersections, and shall be shown on the final roadway construction plans. G. The applicant shall submit a Final Drainage Report, stamped, signed and dated by a professional engineer licensed in the State of Colorado. The 5-year storm and 100-year storm drainage studies shall take into consideration off-site flows both entering and leaving the development. Increased runoff due to development will require detention of the 100-year storm developed condition while relea sing the 5-year storm existing condition. H. The Final Drainage Report shall include a flood hazard review documenting any FEMA defined floodways. The engineer shall reference the specific FIRM Community Panel Map panel number, including date. The development site shall be located on the copy of the FEMA map. Final Drainage Construction and Erosion Control Plans (conforming to the Drainage Report)stamped, signed, and dated by a professional engineer licensed in the State of Colorado. J. The applicant provided the Department of Planning Services with a deed for recording, with the Final Plat indicating that the open space and mineral rights are deeded to the Homeowners' Association. K. The applicant shall provide an Open Space/Landscape Plan, per Section 24-3-50.G of the Weld County Code, for review and approval. L. The applicant shall provide additional information pertaining to the plant materials, including common and botanical species names, size at installation, and any additional information deemed necessary, if any. M. The applicant shall address the on-site landscape treatment, including the proposed uses associated with the agricultural outlot. N. The applicant shall submit a re-vegetation plan of all disturbed areas during construction. The plan shall include information regarding plant type, installation methods, and maintenance. O. The applicant shall demonstrate how the proposed plant material will be watered. Further,the applicant shall provide evidence that the tap from the Left Hand Water District and Longs Peak Water District is permitted to provide irrigation water to the landscaped areas. 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 15 P. The applicant shall submit a time frame for construction in accordance to Section 27-2-200 of the Weld County Code. Q. The Weld County Building Technician will provide addresses at the time of Final Plan. The PUD street name and lot addresses shall be submitted to the Mountain View Fire Protection District, Weld County Sheriffs Office, Ambulance provider, and the Post Office for review. Written evidence of approval shall be submitted to the Weld County Department of Planning Services. R. Weld County entered into an Off-Site Improvement Reimbursement Agreement with Longview Community, LLC, on February 6, 2002, with the intent that Longview be reimbursed a portion of the cost of constructing the traffic signal at the intersection of State Highway 119 and Weld County Road 3.5. Reimbursement agreements such as these are common for public improvements that are shared as development occurs in a rapidly growing area. The applicant shall be required to reimburse a proportionate share of the signal cost to Longview within the spirit of the February 6, 2002, agreement. S. Prior to recording the Final Plat, the applicant shall present a unanimous petition of all landowners and residents registered to vote in the State of Colorado,thus qualifying the Development for inclusion into the Southwest Weld County Law Enforcement Authority(SWCLEA), if it has been created, or for creation of a separate Law Enforcement Authority(LEA), if it was not created. A LEA is a taxing unit with a maximum mill levy of seven (7) mills created for the purpose of providing additional law enforcement by the County Sheriff to the residents of the developed or developing areas of unincorporated Weld County. The revenues would be initially available to provide directed patrols,and eventually to provide additional deputies to carry out those activities within the LEA. This is intended to offset the demand for law enforcement generated by increased population densities. T. The applicant shall submit a digital file of all drawings associated with the Final Plan application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is.e00. The preferred format for Images is .tif(Group 4) ... (Group 6 is not acceptable). 6. Prior to construction: A. Stop signs and street name signs will be required at all intersections. B. Stormwater Best Management Practices shall be in place in accordance with the Weld County Code and Urban Drainage Standards. Silt fences shall be maintained on the down-gradient portion of the site during all phases of the site construction. 2005-3234 PL1655 CHANGE OF DESIGNATED ZONE DISTRICTS,AMPZ#1004-LIFEBRIDGE CHRISTIAN CHURCH PAGE 16 The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 9th day of November, A.D., 2005. lIe ` BOARD OF COUNTY COMMISSIONERS N.• 4 WELD COUNTY, COLORADO ATTEST: gel, /� f:4çji '1'� illiam H erke, Chair Weld County Clerk to th-`: Eat •Lj.it M. ei e, P o-T BY: C\t/1Ut441 Nail 1III"ar Po.° uty CI@rk to the Bo d David E. Long AP D AS • Robert D. Masden unty o ey RECUSED Glenn Vaad Date of signature: 12 IL* ICS 2005-3234 PL1655 Hello