Loading...
HomeMy WebLinkAbout20053656.tiff EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND FARNSWORTH GROUP INC. DATED: November 14, 2005 Work Order Number: Survey 050.01 Purchase Order Number: Project Title: FISCUS PIT Commencement Date: December 12, 2005 Completion Date: February 13, 2006 Limitations on compensation: (time and reimbursable direct costs): $19,250 Project Description: Aerial Mapping and Topographic Survey Scope of Services: SEE ATTACHED EXHIBIT "B" Professional agrees to perform the services The attached forms consisting of _ (5) pages identified above and on the attached forms in are hereby accepted and incorporated herein, by accordance with the terms and conditions this reference, and Notice to Proceed is hereby contained herein and in the Professional given. Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld Coun / .--[/,) L' Jwff terms of the Professional Services Agreement By: „..14.,.._--- and this work order (including the attached Project Manager / forms) the Professional Services Agreement Date: _ ,,605 shall control. B i� By; Professional Departme ea. By: G(�/ � � � Date: /' c. / David C. Di -0 Principal -VS Date: ///8 5 By: Director o Finance, U -'ministration Date: DEC 19 L I3jI., i '�:` *. an, Weld Count CQomissioners del f _),; 1 1 ' EST: 124,44444 ®„„, ELD COUNTY CLERK TO THE BOARD BY: utt' ieLkl ' ' DE TY CLLR '1 K TO THE $ MD [;< ; pi,o( 1 614:(s) :e05--.3654, Exhibit B FISCUS PIT Surveying Scope of Work and Fee Estimate Aerial Mapping and Topographic Survey November 14, 2005 The project limits of this survey are per the attached map being approximately 470 acres. • Establish horizontal and vertical project control based upon using OPUS and adjustment based upon CORS or NGS control if readily available in the area. The control information will be noted on the survey drawings with their description, coordinated and elevations. • Aerial Mapping —We propose to use the photogrammetric mapping firm of Kucera International as our sub consultant for this project. The aerial mapping will be output at scale of 1" = 100 ft. with two foot contour intervals. The limits of the mapping will be as noted above for the project limits. A digital ortho photo will also be provided, with a pixel resolution of approximately 0.5-ft. that will cover the entire mapping area. • Set approximately six (6) aerial photo control points and tie into the control network. • We will perform field surveys to locate three (3) of the previous located aliquot land corners that were located by Weld County and look for additional two corners. The county will be responsible for providing section corner information prior to starting of the survey and aiding us in the finding of the points along with assisting us in downloading of data and merging their previous data with ours. • Utility information will be researched at the respective public utility agencies, and field verified where possible, within the limits of the survey. Rim elevations on all exposed manholes and valves will be obtained in addition to invert and pipe sizes confirmed to the best of our ability for culvert, irrigation, storm and sanitary lines, if any, without entry into manholes. Underground utility lines for which no surface evidence exists and for which reliable map information is unavailable will not be shown, if not marked by utility agencies. Per our phone conversation utilities should be minimal for this project. • This scope of work does not include the coordination with the Utility Notification Center to have underground utilities marked. • Prepare overall base map drawing at a scale of 1" = 100' and output on 24" x 36" sheet size or at a suitable scale to be determined later. • This project does not include preparing permission to enter forms. Our field crew will try to contact any visible homeowners or tenants in the project area. This scope assumes that the county will assist us with access issues on site. FISCUS PIT Page 2 of 2 November 14, 2005 Deliverables: • The deliverable for this project will be one set of paper plots and a diskette with the electronic copy of the survey information, in AutoCAD format based upon the Farnsworth Group Layering System. In addition, we will provide a file with Farnsworth's CAD standards for surveying that will have the layers, line types, symbols, etc. that are used by our surveying sections. The surface model will also be provided in Eagle Point format. Schedule: We shall commence our fieldwork for the aerial mapping portion within one week of noticed to proceed and shall complete the proiect within nine weeks after notice to proceed subject to any adverse weather constraints. Proposed Fee: Farnsworth Group will perform the above-noted Services on an hourly basis not to exceed $19,250, to be billed in accordance with our Weld County Approved Rate Schedule. A more detailed breakdown of estimated maximum fees is provided on the Project Budget Worksheet, attached hereto for reference. Farnsworth Group PROJECT BUDGET WORKSHEET-2005 WELD COUNTY Rate Schedule Project Name: Weld County-FISCUS PIT Project Number: . Project Manager: Steve Dynes - - - - ESTIMATED HOURS S 'S• • WORK TASK Task Start Task End Total Task _ —° `o — 4' '> gr ;, —.s 8 a_ g a £ s Total TOTAL COST TASK GROUP Date Data Duration A ' a • , `L `t Y 0 `a a hours n N u _ o to '- • - SUMMARY SUMMARY TOTALS HOURLY RATES $128 $199 $94 $89 $94 $87 $82 $78 $68 $46 $92 $123 Project Initiation Scope of wk&contract admin 2 2 o $O $946 4 $414 Work plan 8.resources logistics Project team kick-off mtg 1 1 1 1 4 $363 4 $363 Ongoing Project Coordination - 0 $0 Project meetings-Client team - 2 0 $0 SW 2 S218 Project meetings-inside team 1 1 1 1 4 $363 Research 0 SO Ownership information for property access OS 0 SO $1,008 Utilities 2 25 $219 Horizontal S Vertical Control Data 0.5 2 2 4.5 $407 Control Surveys o s0 Primary GPS Network 1 0 SO $4,155 Aerial Mapping Control(6 pts) I 8 9 $845 Tie in three(3)Section Corners 4 8 13 $1,113 0.5 8 8.5 $791 data proccessing/calcsichecks/plannng 0.5 12 2 145 $1.3417 Supplemental Surveys 0 $0 culverts,surface evidence of utilities 1 0 $0 $845 8 9 $845 0 50 Base Map Preparation 0 $0 convert aerial mapping layers 05 0 SO $2,395 add utilities to drawing 4 4.5 $383 U 6 4 4.5 $363 Sheet Setup 4 4.2 $QA/QC drawing review 2 218 Dwg.Edits per QC review 2 $218 0.5 2 25 $219 Process final dwg 8 transmit to client etc 0.5 2 1 3.5 $265 convert surface model to Eagle Point format 0.5 6 6.5 5547 0 80 0 $0 $O 0 $0 0 S0 o $o o $O SO 0 So 0 So 0 $0 SUBTOTAL HOURS&FEES 2 17.5 0 0 16 0 38 2 0 1 32 0 108.5 50,930 $9,930 Reimbursable Expenses,Outside Svcs,etc. research costs(Co.records at no cost) mileage 200 x 0.40 $60 GPS plots 81$60 out of town expenses $60 messenger services 5225 $95 Sub consultant-aerial mapping&otho's Kucera International Sub consultant- $1,6$0 SO SUB TOTAL REIMBURSABLE EXPS. — $9320 TOTAL PROJECT FEES(without contingency) 519250 Professional Services Fee Estimate Fiscus Pit 2loot contours sis Completed.11/14/05 ":-..--1-l-412-:, H'±:-.;.- ‘;'‘,..,i1,,',;(I -1.-;'" Li.'I �/ � ,:v � ' '` v/ > >%1 , it J �Y • (l l� • V. ,� 1Y s a� a ` v? 5000 'v / �I r/ /v. , r 1 • )- I c ` x� - _ r I � \\ \ J � r t � v �I A r r 1 II HI/ M1 _ 1 s:..----.r J L. .1 ���pp av v 1 t •' { .it*,v , S1�'J III - c \ '3N 1N---‘11 I 1111:177', / V Av / l 1 / V C.) ii I A 111A lamV I� 4 I `kV -1)),M , _\ V A/ `� ' ( I s ,/ i" it fir, ' / •li /mARFtN,G„ MITS ) I / )'mow r 1 // 1 v Ap —,C# yb 1. V �' �'I nil/-/-,trt 1 7 iq,:V �%r. r i 1//6 AI/rig q,1 �H / s 0 V ,; / I , ; II / ,.vl t'A y ,, 1' ) ; '/ y� v jr- v /. 1 , . 1v III II rmm9 11 1-\ vr Iø / I \ X49 J11 / S�! / ICY d� rI ) ^� I r Ay a ' 1v r l V //! it 'T4 p ,,,),?,/,'� / // Hd 1 AV AJ I vA)r \ I r v I 14 I{ \ ' I I / s A v /'i '▪ -) ' ' i � 1�II P.�'� �vA\�)/Ilt � N. i �a v\} r _ A / I��' V I I ' "I r tr Ir 4- r•ter � I /f\"\! t �Wi /J , / I 1 '1 1) yi AvA - 1$\77 Ilri I,kl c ,. i v'/ v V�- ! Av is vv AvA V 1 r l i , IIh ; v r ,) 1 i II / \ („7,/±: 1 ��i/� � I „ '� �,--,..._./ % EQUOT SE ItiN,', , '- 1.� tI % � v.�� H C0Rt RS Lo ATED I vv VA ,.,\;.\--,---,../J)` �/ a/ r �r , ,d ��� �+ e �ITY /° 1nr,\ 1 I/ t' / - I 9 H v yv G { 1 1 I, �V' 6 r I I 6-• _/ ° a �\ I v / s. : f"SV ',A, yes _ A ' �aAG 3"a� I pp '1 1 \\\\,\ «�� :1 \� I RRo I I /, V A )\- 1 -k— yyy h ' cvIv v\\\`‘..y,-. c \ / c L—,/ R �i y A \\,..d \ R �I� A _ \r-1 .� O \ r.�11 I , ) Vn1 nii I ) ,i19 - 4sc r ryL_ 20. ivy r r-'u� , ./,,, I, -- K._ i �, A�_ Avv ? AwO1) t:111 MEMORANDUM ligC. TO: Clerk to the Board DATE: Decemb r 12, 2005 COLORADO FROM: Frank B. Hempen, Jr., P.E. Director of Public Works/County Engineer SUBJECT: Consent Agenda Work Order Form Pursuant to an Agreement between Weld County and Farnsworth Group for aerial mapping and topographic survey. Enclosed are two originals Work Order Forms for the Chair's signature. Please send one original to Public Works upon Chair's approval. pc: Leon Sievers, Right-of-Way Agent Mona Weidenkeller M:AFrancieAAgenda-2.doc efllSeid �tji'et(1( ict_ '�r� 2005-3656 BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: Topographic surveying for Fiscus Gravel Pit—Farnsworth Group DEPARTMENT: PUBLIC WORKS DATE: November 16, 2005 PERSON REQUESTING: Frank B. Hempen, Jr., P.E.,Director of Public Works/County Engineer0 Brief description of the problem/issue: Under the present Professional Services Agreement with the Farnsworth Group, we are asking for a topographic survey of the area around the Fiscus gravel pit site. The survey is needed to prepare the necessary maps, plans and plats for the Use by Special Review process and for the documents required by the Minerals and Geology gravel mining permit. Due to the size of the project and our present workload, we are unable to use our survey crew to complete this survey. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) The options are to accept this work order and allow the plans and permits to proceed in a timely manner or to reject the work order and delay the beginning of the mining operations at this site. Recommendation to the Board: Due to the size of the site and present scheduling, Public Works Department recommends approval of this work order Approve Schedule Recommendation Work Session Other Jerke �� 't1)i . Geile Long V Masden N Vaad / u— ,?i-G�ll- S a ✓F/c 5 • Attachments ( cc: Mona cc: Mona Weidenkeller, Public Works /' Leon Leon Sievers, Public Works p __ mA:wpfiles\eng\work-8 C� n^-t-1�'�- CY` /31 pc to Ain't. Hello