Loading...
HomeMy WebLinkAbout801193.tiff DEPARTMENT OF PLANNING SERVICES PHONE (303)356-4000 EXT.404 915 10TH STREET GREELEY,COLORADO 80631 HeeNovember 11, 1980 COLORADO Mr. Peter A. Morrell City Manager Greeley Civic Center Greeley, Colorado 80631 Re: Site application for sewer lines and land application treatment system Dear Mr. Morrell: This letter is intended to transmit the Planning Commission's posture on the above referenced matter. On November 5, 1980 the Weld County Planning Commission granted a Special Use Permit for the Land Application Treatment System located in Sections'5 and 6, T5N, R63W and in Sectionsl5, 21, 27, 28, 29, 31, 32 and 33 all in T6N, R63W of the 6th P.M. , Weld County, Colorado. The Planning Commission's approval was made with certain conditions and development (performance) standards. These same conditions and standards were to be forwarded to the Water Quality Control Commission as a part of the Commission's action on the site application. These items are attached hereto and intended to be a part of the submittal to the State. If you have further questions please feel free to contact me. V- y tr ly yours, � ZS Th•mas E. Honn Zoning Administrator TEH:rjg Enclosures 8(311°13 The PlE nning Cannissions recommendation for approval is conditional upon the following: 1. The adoption of the attached Development Standards which are designed to set certain standards for the location, operation and maintenance of the proposed wastewater treatment facility. 2. No building or electrical permits being issued on the Special Use Permit area unti the approved Development Standards have been placed on the Special Use Permit plat and said plat has been delivered to the office of the Depart- ment of Planning Services. 3. Submittal of a proyIdnt which details measures to identify, monitor and mitigate potential problems with underground seepage from the facility which could result in contamination of ground water resources. This monitoring program shall be submitted for acceptance with the site plan review. 4. The natural flow capacity of Crow Creek shall be determined by the applicant prior to recordation of the Special Use Permit plat. 5. An assurance agreement as presented at the November 5, 1980 meeting be offered to alladjacent property owners. CAC/dr 11/7/80 • • • 0 City of Greeley SUP-445:80:35 DEVEIAPME r STANDARDS 1. PennLLed uses on the hereon described Special Use Permit area shall be a land application wastewater treatment facility. The facilities may include lagoons, center pivot sprinklers, and associated a storage reservoir, aerated rooesses, structures, maintenance and administrative facilities. Treatment p and facilities shall be of the type and nature described in the Special Use Permit application document titled City of Greeley, Colorado Wastewater Facilities Plan, Weld'Cotnzty, Colorado, Special Use Permit Application, Land Application Treatment-Facility prepared by ARIX and as outlined by the application iii the-Plan- ning Carmission hearings of October 21, 1980 and November 5, 1980. site plans showing the type, nature and location of structures for the 2. Specific aforementioned land application wastewater treatment facility shall be approved by the planning Caamission prior to issuance of building permits for construction of the facility to determine catpliance with the hereon described standards and design concepts. to oorrply with State 3. facility shall be designed, maintained and operated Health Department regulations regarding odor. 4. Landscaping plans as reoarmended by the Colorado Division of Wildlife shall be reviewed and approved at the time of specific site plan approvals as set forth in Development Standard #2. 5. The Special Use Permit area shall be maintained in such a manner so as to prevent soil erosion, fugitive dust and growth of noxious weeds. The site shall be maintained in such a manner as to present a neat and well kept appearance. 6. Lighting provided for security and night operation on the site shall be designed so that the lighting will not adversely affect surrounding property owners. Lighting shall be reviewed and approved at the time of specific site plan approvals as set forth in Development Standard t2. Alles of the wastewater treatment plant facilities and operations shall con- 7. for with State and Federal Health Standards and Regulations form all applicable County, of governmental 1�ies having and any other applicable rules and regulations jurisdiction on the premises. 8. Additional design criteria of the dam and reservoir shall be submitted 2at the time of specific site plan approvals as set forth in Development Standard not9. The applicant shall insure that the flow capacity of Craw Creek from the be increased beyond the natural flow limits due to discharge treatment facility. During periods of high natural flows of Crow Creek,: releases fran the wastewater treatment facility shall be terminated to prevent damage to Crow Creek and downstream properties or users. 10. Al]. design and construction shall conform to applicable local, state and national building tures• l with the minimum setback requirements as defined in - 11. All structures shall carp Y the Weld County Zoning Resolution. 12. Signs warning the public that the site is a wastewater treatment facility shall be placed on all sides of the facility where a County Road exists. All warning signs shall be of sufficient size to be read at a distance of 200 feet.Department. 13. Al] accesses shall have the approval of the Weld County Engineering� and/or All accesses shall be constructed in accordance with the recommendations requirements of the Weld County Engineering Department. 14. The Special Use Permit shall be limited to the plans shown hereon and governed by the Development Standards stated above and all applicable Weld C7ounty Regulations Any material deviations fran the plans and/or Development Standards as shown or stated above shall require the approval of an amendment to the Special Use Permit by the Planning Carmission before such changes fran the plans and/or Development Standards shall be perniLled. Any other changes fran the plans and/or Dev,elogrent Standards shall be filed in the Office of the Department o₹ Planning Services, Development Standards ® 0 ' City of Greeley - SUP-445:80:35 Page 2 15. A minimum setback of a single pivot sprinkler diameter (approximately one- half mile) shall be provided fran the east side of the reservoir and treat- ment lagoons or western boundary of the Special Use Permit boundary, whichever is greatest, to the closest sprinkler. This setback shall be required, at least, during the initial phase of the land application construction which will include placement of approximately six sprinklers. Placement of the sprinklers shall be reviewed and approved at the time of specific site plan approvals as required in Development Standard #2. • CAC/dr • 11/7/80 I 1 3 .' AIM v: 5,..4.,„. . 5 `^'+w�.><f4.` ._ s �. }I P��Y�P�a..'+-i f '+';�-�x..vli.s 4 e' Li, I „igta64, _ , . .z i? lilt !1 y �..�4 All ' f ,....1. w.a y 'm .�• y� � 41.406. v► t' s 1:, AN', ' i vIL' • GREELEY CIVIC CENTER September 22, 1980 GREELEY COLORADO 80631 PHONE (303) 353-6123 Weld County Planning Commission P.O. Box 758 Greeley, Colorado 80632 Gentlemen: The City of Greeley is presently in the process of developing a new wastewater treatment system to meet the future needs of the community. The regulations of the Colorado Water Quality Control Commission require that a Site Application be submitted to the Commission before construction can be started. The Commis- sion further requires that various local and State agencies be given the oppor- tunity to review and comment on the Site Application before they approve the request. The enclosed materials provide information relating to the entire project as well as the Site Application(s) for those parts of the system which your agency must be given the opportunity to review. The City of Greeley requests that you review this information, sign and return the Site Applications) as soon as possible. If you have any questions concerning this request, please contact me or Bill Hargett at 353-6123 as soon as possible. It is extremely important that the Site Application approval be obtained promptly in order to meet the implementa- tion schedule established for the project. Thank you for your assistance in this matter. Again, if you have any questions or desire additional information, please advise us right away. Sincerely, @,_e&oa'911(fillIa' - '- Peter A. Morrell • City Manager 4 SEP 1,4)PAM/PAM/id _ RECEI VE,O . . iL,�, Ovoid County - FianninC Commission "A COMMUNITY OF PROGRESS" -": G COLORADO DEPARTMENT OF HEALTH (Submit One Set With WQ-3-A Water Quality Control Division All Copies Attached) 421Q East 11th Ave.; Denver, Colo. 80220 APPLICATION FOR APPROVAL OF SEWAGE COLLECTION FACILITIES AND SMALL LIFT STATIONS Required if: A) Serving MORE than Twenty Persons and MORE than 2,000 GPD of flow and/or B) Lift station having less than 20,000 GPD capacity. Applicant: City of Greeley, Colorado Address: Civic Center Complex Phone: 353-6123 Name and Address of Consulting Engineer: ARIX, A Professional Corporation, 2021 Clubhouse Drive, Greeley, Colorado 80631 Phone: 330-2749 A. Size of Lift Station: gpm B. Sizes and approx. lengths of Sewer Lines: Two 30" inch each 44,500 ft. inch ft. inch ft. inch ft. C. Average flow when fully developed: 12.0 mgd. D. Will any structure serviced by the collection facilities be located in a 100 year flood plain? N/A Pressure Line E. Connection: accept flow from proposed This sewer system will wommortx.tm a 66inch a is*Ang sewer owned by City of Greeley and discharge to a new proposed treatment facility Munic. or District which has/kaxxRait approved this connection RR Approved upon completion of the project. Date Disapproved Signature and Title ryucJ F. Treatment: . Treatment Entity City of Greeley, Colorado has the capacity and agrees to treat this sewage X Yes No (Subject to construction of new Date r treatment facilities-Site Signature and le application in process) G. Comments of Governmental Authority (City or County) : This project (meets) (does not meet) our planning requirements for the service area. Recommend: Approval Disapproval No Comment II l,2 OD Date Sig ature an ' 1 r / H. Applicant's Signatu 9/22/80 Date Mailed to Commenting Authority Copies must be sent to local health department and Council of Governments. If over 50,000 gpd, also send to local and regional planning agency and to any other city or town within three miles of the proposed facilities. (Enclose copies of postal receipt showing copies were sent by Certified Mail .) I . District Engineer comments and recommendation: Date Signature J. Commission Action: The Water Quality Control Commission (Approved) (Disapproved) this application on . Chief, Field Services Section Date Date Interested persons may comment to the Water Quality Control Commission. The application will be considered in not less than 30 days from the date mailed to commenting authority. PP Item H CO1LORADO DEPARTMENT OF HEALTH Water Quality Control Division 421'U East 11th Avenue Denver, Colorado 80220 APPLICATION FOR SITE APPROVAL OF CONSTRUCTION OR EXPANSION OF: A) SEWAGE TREATMENT PLANT AND B) LIFT STATIONS HAVING OVER 20,000 GPD. CAPACITY • . APPLICANT: City of Greeley, Colorado ADDRESS: Civic Center Complex, Greeley, Colorado 80631 PHONE: 353-6123 Consulting Engineer's Name and Address: ARIX A Professional Corporation, 2021 Clubhouse Drive, Greeley, Colorado 80631 PHONE: 330-2749 A. Information regarding new sewage treatment plant: 1 . Briefly_ describe on a separate sheet of paper the reason for locating the sewage treatment plant on this particular site. This should include, but is not necessarily limited to, a description of the present and possible development of the site location and service area. Aerated lagoon, land application 2. Size and type of treatment facility proposed: (Includes storage res. & center Type pivot sprinklers) GPD: t2,00,0,000,0 0 PE design Present PE (gal/day) capacity 120,000 to be served 66,000 % Domestic: 86% % Industrial : 14% 3. Location of facility: Attach a map of the area which includes the following: (a) 10-mile radius: all sewage treatment plants and lift stations. (b) 5-mile radius: domestic water supply intakes. None (c) 1-mile radius: habitable buildings, location of potable water wells, and an approximate indication of the topography. 4. Effluent will be discharged: To Crow Creek 3.5 miles above confluence with South • ' - (Watercourse) Platte River Subsurface disposal : ' • Land: Land application prior to discharge to Crow Creek Evaporation: Other: Crow Creek unclassifie ' State water quality classification of receiving watercourse(s) : South Platte-B? waters • . •- , .i '5. •%4i11 a' State'o_ r 'Federal grant be sought to' finance any portion of this project? Yes - - The proposed service area • includes the present City f 6.. What is the present zoning for the proposed service• ar-ea? growth areas which are zonc Present zoning of site area? Agricultural ' - -agricultural Zoning within a 1-mile radius of site? Agricultural WQ-3(rev. 1-78-40) - 1 - vnow (7 What is the distance downstream from the discharge to the nearest domestic water supply intake? None (name and address of supply) What is the distance downstream from the discharge to the nearest other point of diversion Empire res. intake canal 4 miles from discharge into Crow Creek (name and address of user) Bijou Irrigation Co. . 35941 U.S. Highway 34, Kersey, Colorado 80644 8. Who has the responsibility for operating the facility? City of Greeley Water and Sewer Department 9. Who owns the land upon which the facility will be constructed? See the attached site map for property ownership Please attach copies of the document creating authority in the applicant to construct the proposed facility. 10. Estimated project cost: $20.164.000 (1979 Costs-Lagoon, storage and land application) Who is financially responsible for the construction and operation of the facility? City of Greeley • 11 . Names and addresses of all water and sanitation districts within 5 miles downstream of proposed wastewater treatment facility site. None e (Attach a separate sheet of paper if necessary.) 12. Is the facility in a 100 year flood plain? No- If so, what precautions are being taken? Has the flood plain been designated by the Colorado Water Conservation Board, Department of Natural Resources? Yes - outside 100 yr. flood plain If so, what is that designation? Zone C (Areas of minimal flooding) Insurance flood study community panel #080266 0675 A 13. Please include all additional factors that might help the Water Quality Control Commission make an informed decision on your application for site approval . ' The treatment system will provide an advanced level of treatment, whereas the present system provides only minimal secondary, with limited growth potential . The Greeley system will ultimately be a regional system treating wastewater from the Evans Sanitation District and Hill-N-Park Mobile Home development, in addition to the City of Greeley system. (Other information given on Sheet No. 1 of the drawings.) The project is in harmony with national goals to maximize resource utilization. • WQ-3(rev. 1-78-40) - 2 - y i s: Information regarding lift stations: 1 . The proposed lift station when fully developed will generate the following xx4bbixamed load: Population Equivalent Peak Hydraulic (MGD) 22.0 to be served: 120,000 2. Is the site located in a 100year flood plain? No If yes, on a separate sheet of paper describe the protective measures to be taken. 3. Where will the overflow be discharged? Standby power and pumping will be provided, if overflow still occurred it would flow to the Poudre River. 4. Name and address of facility providing treatment: City of Greeley, Civic Center Complex, Greeley, Colorado 80631 (Proposed Facility at Weld Co. Rds. 61 and 62, 3 miles east of Gill , Colorado) 5. The proposed lift station when fully developed will increase the loading of the facility to 100 % of hydraulic and 100 % of organic capacity. (to pump flow from entire City) C. If the facility will be located on or adjacent to a site that is owned or managed by a Federal or State agency, send the agency a copy of this application. D. Recommendation of governmental authorities: Please address the following issues in your recommendation decision. Are the proposed facilities consistent with the comprehensive planning for the area and with other plans including the 201 , 208, 209 and 303(e) plans? If you have any further comments or questions, please call *88o64XMIxpOommtmAkxx4I0Ek 320-8333, Extension 3459 Recommend Recommend No Date Approval Disapproval Comment Signature of Representative Local Government (Cities or Towns, if inside municipal boundary or within 3 miles, and Sewer ict) /_, CLAYLku,— Board of Countymmissione rs Local Health Authority City/County Planning Authority Regional Planning Agency Council of Government State Geologist Date: Signature orApp icant District Engineer Action: Recommend Approval : Recommend Disapproval : • Date: Signature WQ-3(rev. 1/78-40) - 3 - Hello