HomeMy WebLinkAbout801193.tiff DEPARTMENT OF PLANNING SERVICES
PHONE (303)356-4000 EXT.404
915 10TH STREET
GREELEY,COLORADO 80631
HeeNovember 11, 1980
COLORADO
Mr. Peter A. Morrell
City Manager
Greeley Civic Center
Greeley, Colorado 80631
Re: Site application for sewer lines and land application treatment system
Dear Mr. Morrell:
This letter is intended to transmit the Planning Commission's posture on
the above referenced matter. On November 5, 1980 the Weld County Planning
Commission granted a Special Use Permit for the Land Application Treatment
System located in Sections'5 and 6, T5N, R63W and in Sectionsl5, 21, 27, 28,
29, 31, 32 and 33 all in T6N, R63W of the 6th P.M. , Weld County, Colorado.
The Planning Commission's approval was made with certain conditions and
development (performance) standards. These same conditions and standards
were to be forwarded to the Water Quality Control Commission as a part of
the Commission's action on the site application. These items are attached
hereto and intended to be a part of the submittal to the State.
If you have further questions please feel free to contact me.
V- y tr ly yours,
� ZS
Th•mas E. Honn
Zoning Administrator
TEH:rjg
Enclosures
8(311°13
The PlE nning Cannissions recommendation for approval is conditional upon the
following:
1. The adoption of the attached Development Standards which are designed to
set certain standards for the location, operation and maintenance of the
proposed wastewater treatment facility.
2. No building or electrical permits being issued on the Special Use Permit
area unti the approved Development Standards have been placed on the Special
Use Permit plat and said plat has been delivered to the office of the Depart-
ment of Planning Services.
3. Submittal of a proyIdnt which details measures to identify, monitor and
mitigate potential problems with underground seepage from the facility which
could result in contamination of ground water resources. This monitoring
program shall be submitted for acceptance with the site plan review.
4. The natural flow capacity of Crow Creek shall be determined by the applicant
prior to recordation of the Special Use Permit plat.
5. An assurance agreement as presented at the November 5, 1980 meeting be offered
to alladjacent property owners.
CAC/dr
11/7/80
•
•
•
0 City of Greeley
SUP-445:80:35
DEVEIAPME r STANDARDS
1. PennLLed uses on the hereon described Special Use Permit area shall be a
land application wastewater treatment facility. The facilities may include
lagoons, center pivot sprinklers, and associated
a storage reservoir, aerated rooesses, structures,
maintenance and administrative facilities. Treatment p
and facilities shall be of the type and nature described in the Special Use
Permit application document titled City of Greeley, Colorado Wastewater Facilities
Plan, Weld'Cotnzty, Colorado, Special Use Permit Application, Land Application
Treatment-Facility prepared by ARIX and as outlined by the application iii the-Plan-
ning Carmission hearings of October 21, 1980 and November 5, 1980.
site plans showing the type, nature and location of structures for the
2. Specific aforementioned land application wastewater treatment facility shall be approved
by the planning Caamission prior to issuance of building permits for construction
of the facility to determine catpliance with the hereon described standards and
design concepts. to oorrply with State
3. facility shall be designed, maintained and operated
Health Department regulations regarding odor.
4. Landscaping plans as reoarmended by the Colorado Division of Wildlife shall be
reviewed and approved at the time of specific site plan approvals as set forth
in Development Standard #2.
5. The Special Use Permit area shall be maintained in such a manner so as to prevent
soil erosion, fugitive dust and growth of noxious weeds. The site shall be
maintained in such a manner as to present a neat and well kept appearance.
6. Lighting provided for security and night operation on the site shall be designed
so that the lighting will not adversely affect surrounding property owners.
Lighting shall be reviewed and approved at the time of specific site plan approvals
as set forth in Development Standard t2.
Alles of the wastewater treatment plant facilities and operations shall con-
7.
for with State and Federal Health Standards and Regulations
form all applicable County, of governmental 1�ies having
and any other applicable rules and regulations
jurisdiction on the premises.
8. Additional design criteria of the dam and reservoir shall be submitted 2at the time
of specific site plan approvals as set forth in Development
Standard not9. The applicant shall insure that the flow capacity of Craw Creek from the be
increased beyond the natural flow limits due to discharge
treatment facility. During periods of high natural flows of Crow Creek,: releases
fran the wastewater treatment facility shall be terminated to prevent damage to
Crow Creek and downstream properties or users.
10. Al]. design and construction shall conform to applicable local, state and national
building tures• l with the minimum setback requirements as defined in -
11. All structures shall carp Y
the Weld County Zoning Resolution.
12. Signs warning the public that the site is a wastewater treatment facility shall
be placed on all sides of the facility where a County Road exists. All warning
signs shall be of sufficient size to be read at a distance of 200 feet.Department.
13. Al] accesses shall have the approval of the Weld County Engineering�
and/or
All accesses shall be constructed in accordance with the recommendations
requirements of the Weld County Engineering Department.
14. The Special Use Permit shall be limited to the plans shown hereon and governed
by the Development Standards stated above and all applicable Weld C7ounty Regulations
Any material deviations fran the plans and/or Development Standards as shown or
stated above shall require the approval of an amendment to the Special Use Permit
by the Planning Carmission before such changes fran the plans and/or Development
Standards shall be perniLled. Any other changes fran the plans and/or Dev,elogrent
Standards shall be filed in the Office of the Department o₹ Planning Services,
Development Standards ® 0
' City of Greeley - SUP-445:80:35
Page 2
15. A minimum setback of a single pivot sprinkler diameter (approximately one-
half mile) shall be provided fran the east side of the reservoir and treat-
ment lagoons or western boundary of the Special Use Permit boundary, whichever
is greatest, to the closest sprinkler. This setback shall be required, at
least, during the initial phase of the land application construction which will
include placement of approximately six sprinklers. Placement of the sprinklers
shall be reviewed and approved at the time of specific site plan approvals as
required in Development Standard #2.
• CAC/dr
• 11/7/80
I
1 3 .' AIM
v: 5,..4.,„. . 5 `^'+w�.><f4.` ._ s �. }I P��Y�P�a..'+-i f '+';�-�x..vli.s
4
e' Li, I „igta64, _ , . .z
i? lilt
!1 y �..�4
All
' f ,....1. w.a y 'm .�• y� � 41.406.
v► t' s 1:, AN', ' i vIL'
•
GREELEY CIVIC CENTER September 22, 1980
GREELEY COLORADO 80631
PHONE (303) 353-6123
Weld County
Planning Commission
P.O. Box 758
Greeley, Colorado 80632
Gentlemen:
The City of Greeley is presently in the process of developing a new wastewater
treatment system to meet the future needs of the community. The regulations of
the Colorado Water Quality Control Commission require that a Site Application
be submitted to the Commission before construction can be started. The Commis-
sion further requires that various local and State agencies be given the oppor-
tunity to review and comment on the Site Application before they approve the
request.
The enclosed materials provide information relating to the entire project as
well as the Site Application(s) for those parts of the system which your agency
must be given the opportunity to review. The City of Greeley requests that you
review this information, sign and return the Site Applications) as soon as
possible.
If you have any questions concerning this request, please contact me or Bill
Hargett at 353-6123 as soon as possible. It is extremely important that the
Site Application approval be obtained promptly in order to meet the implementa-
tion schedule established for the project.
Thank you for your assistance in this matter. Again, if you have any questions
or desire additional information, please advise us right away.
Sincerely,
@,_e&oa'911(fillIa' - '-
Peter A. Morrell •
City Manager
4
SEP 1,4)PAM/PAM/id _ RECEI VE,O . .
iL,�, Ovoid County -
FianninC Commission
"A COMMUNITY OF PROGRESS" -": G
COLORADO DEPARTMENT OF HEALTH (Submit One Set With WQ-3-A
Water Quality Control Division All Copies Attached)
421Q East 11th Ave.; Denver, Colo. 80220
APPLICATION FOR APPROVAL OF SEWAGE COLLECTION FACILITIES AND SMALL LIFT STATIONS
Required if: A) Serving MORE than Twenty Persons and MORE than 2,000 GPD of flow
and/or B) Lift station having less than 20,000 GPD capacity.
Applicant: City of Greeley, Colorado
Address: Civic Center Complex Phone: 353-6123
Name and Address of Consulting Engineer: ARIX, A Professional Corporation,
2021 Clubhouse Drive, Greeley, Colorado 80631 Phone: 330-2749
A. Size of Lift Station: gpm
B. Sizes and approx. lengths of Sewer Lines:
Two 30" inch each 44,500 ft. inch ft.
inch ft. inch ft.
C. Average flow when fully developed: 12.0 mgd.
D. Will any structure serviced by the collection facilities be located in a 100 year
flood plain? N/A Pressure Line
E. Connection: accept flow from proposed
This sewer system will wommortx.tm a 66inch a is*Ang sewer owned by City of Greeley
and discharge to a new proposed treatment facility Munic. or District
which has/kaxxRait approved this connection RR Approved
upon completion of the project. Date Disapproved
Signature and Title ryucJ
F. Treatment:
. Treatment Entity City of Greeley, Colorado has the capacity and
agrees to treat this sewage X Yes No (Subject to construction of new
Date r treatment facilities-Site
Signature and le application in process)
G. Comments of Governmental Authority (City or County) :
This project (meets) (does not meet) our planning requirements for the service area.
Recommend: Approval Disapproval No Comment II l,2 OD
Date
Sig ature an ' 1 r /
H. Applicant's Signatu 9/22/80
Date Mailed to
Commenting Authority
Copies must be sent to local health department and Council of
Governments. If over 50,000 gpd, also send to local and regional
planning agency and to any other city or town within three miles
of the proposed facilities.
(Enclose copies of postal receipt showing copies were sent by Certified Mail .)
I . District Engineer comments and recommendation:
Date Signature
J. Commission Action:
The Water Quality Control Commission (Approved) (Disapproved) this application on
. Chief, Field Services Section
Date Date
Interested persons may comment to the Water Quality Control Commission. The application
will be considered in not less than 30 days from the date mailed to commenting authority.
PP Item H
CO1LORADO DEPARTMENT OF HEALTH
Water Quality Control Division
421'U East 11th Avenue
Denver, Colorado 80220
APPLICATION FOR SITE APPROVAL OF CONSTRUCTION OR EXPANSION OF:
A) SEWAGE TREATMENT PLANT AND
B) LIFT STATIONS HAVING OVER 20,000 GPD. CAPACITY
• .
APPLICANT: City of Greeley, Colorado
ADDRESS: Civic Center Complex, Greeley, Colorado 80631 PHONE: 353-6123
Consulting Engineer's Name and Address: ARIX A Professional Corporation,
2021 Clubhouse Drive, Greeley, Colorado 80631 PHONE: 330-2749
A. Information regarding new sewage treatment plant:
1 . Briefly_ describe on a separate sheet of paper the reason for locating the sewage
treatment plant on this particular site. This should include, but is not
necessarily limited to, a description of the present and possible development
of the site location and service area.
Aerated lagoon, land application
2. Size and type of treatment facility proposed: (Includes storage res. & center
Type pivot sprinklers)
GPD: t2,00,0,000,0 0 PE design Present PE
(gal/day) capacity 120,000 to be served 66,000
% Domestic: 86% % Industrial : 14%
3. Location of facility:
Attach a map of the area which includes the following:
(a) 10-mile radius: all sewage treatment plants and lift stations.
(b) 5-mile radius: domestic water supply intakes. None
(c) 1-mile radius: habitable buildings, location of potable water wells, and
an approximate indication of the topography.
4. Effluent will be discharged: To Crow Creek 3.5 miles above confluence with South
• ' - (Watercourse) Platte River
Subsurface disposal : ' • Land: Land application prior to discharge
to Crow Creek
Evaporation: Other:
Crow Creek unclassifie
' State water quality classification of receiving watercourse(s) : South Platte-B? waters
• . •- ,
.i '5. •%4i11 a' State'o_ r 'Federal grant be sought to' finance any portion of this
project? Yes - - The proposed service area
• includes the present City f
6.. What is the present zoning for the proposed service• ar-ea? growth areas which are zonc
Present zoning of site area? Agricultural ' - -agricultural
Zoning within a 1-mile radius of site? Agricultural
WQ-3(rev. 1-78-40) - 1 -
vnow
(7 What is the distance downstream from the discharge to the nearest domestic water
supply intake? None
(name and address of supply)
What is the distance downstream from the discharge to the nearest other point
of diversion Empire res. intake canal 4 miles from discharge into Crow Creek
(name and address of user)
Bijou Irrigation Co. . 35941 U.S. Highway 34, Kersey, Colorado 80644
8. Who has the responsibility for operating the facility? City of Greeley Water
and Sewer Department
9. Who owns the land upon which the facility will be constructed? See the attached
site map for property ownership
Please attach copies of the document creating authority in the applicant to
construct the proposed facility.
10. Estimated project cost: $20.164.000 (1979 Costs-Lagoon, storage and land application)
Who is financially responsible for the construction and operation of the
facility? City of Greeley
•
11 . Names and addresses of all water and sanitation districts within 5 miles downstream
of proposed wastewater treatment facility site. None
e
(Attach a separate sheet of paper if necessary.)
12. Is the facility in a 100 year flood plain? No-
If so, what precautions are being taken?
Has the flood plain been designated by the Colorado Water Conservation Board,
Department of Natural Resources? Yes - outside 100 yr. flood plain
If so, what is that designation? Zone C (Areas of minimal flooding)
Insurance flood study community panel #080266 0675 A
13. Please include all additional factors that might help the Water Quality Control
Commission make an informed decision on your application for site approval .
' The treatment system will provide an advanced level of treatment, whereas the
present system provides only minimal secondary, with limited growth potential .
The Greeley system will ultimately be a regional system treating wastewater
from the Evans Sanitation District and Hill-N-Park Mobile Home development,
in addition to the City of Greeley system. (Other information given on Sheet
No. 1 of the drawings.) The project is in harmony with national goals to
maximize resource utilization.
•
WQ-3(rev. 1-78-40) - 2 -
y i
s: Information regarding lift stations:
1 . The proposed lift station when fully developed will generate the following
xx4bbixamed load:
Population Equivalent
Peak Hydraulic (MGD) 22.0 to be served: 120,000
2. Is the site located in a 100year flood plain? No
If yes, on a separate sheet of paper describe the protective measures to be taken.
3. Where will the overflow be discharged? Standby power and pumping will be provided,
if overflow still occurred it would flow to the Poudre River.
4. Name and address of facility providing treatment: City of Greeley, Civic Center
Complex, Greeley, Colorado 80631
(Proposed Facility at Weld Co. Rds. 61 and 62, 3 miles east of Gill , Colorado)
5. The proposed lift station when fully developed will increase the loading of the
facility to 100 % of hydraulic and 100 % of organic capacity.
(to pump flow from entire City)
C. If the facility will be located on or adjacent to a site that is owned or managed by
a Federal or State agency, send the agency a copy of this application.
D. Recommendation of governmental authorities:
Please address the following issues in your recommendation decision. Are the proposed
facilities consistent with the comprehensive planning for the area and with other plans
including the 201 , 208, 209 and 303(e) plans? If you have any further comments or
questions, please call *88o64XMIxpOommtmAkxx4I0Ek 320-8333, Extension 3459
Recommend Recommend No
Date Approval Disapproval Comment Signature of Representative
Local Government (Cities or Towns, if inside
municipal boundary or within 3 miles, and
Sewer ict)
/_, CLAYLku,—
Board of Countymmissione rs
Local Health Authority
City/County Planning Authority
Regional Planning Agency
Council of Government
State Geologist
Date:
Signature orApp icant
District Engineer Action:
Recommend Approval : Recommend Disapproval : •
Date:
Signature
WQ-3(rev. 1/78-40) - 3 -