Loading...
HomeMy WebLinkAbout20053511.tiff Weld County Planning Departat GgEELEY d rICE 4141 . MEMORANDUM Ai `; zoos W .� �. d VED TO: Chris Gathman, Planning D:p. ent DATE: 29-July-2005 FROM: Peter Schei,P.E., Publl ' epartment WI p � � • SUBJECT: MZ-1081 C Gold Stone Creek Minor Subdivision(Zone Change) COLORADO Weld County Public Works Department has reviewed this change of zone request. Comments made during this phase of the subdivision process may not be all-inclusive, as other concerns or issues may arise during the remaining application process. Comments External Roadways: ❑ This development will introduce additional vehicle trips to the roadway system from the 9 proposed additional lots (approximately 85 vehicle trips to the roadway system). According to the Gold Stone Creek Traffic Analyses(File: 0515ME01) by Matt Delich (PE 15263) dated March 18, 2005, from Traffic & Transportation Engineering, "with the Gold Stone Creek Development, the future average daily traffic will be well below the minimum threshold of 200 VPD to require paving or treatment of WCR 29." Public Works is in agreement with the findings of the report and no off-site improvements are required. ❑ CR 29 is classified by the County(Weld County Roadway Classification Plan, June 2002) as a local gravel road(adjacent to the proposed development) and requires a 60-foot right-of-way. The applicant has verified the existing right-of-way and the documents creating the right-of-way have been noted on the change of zone plat. CR 29 is under the jurisdiction and maintenance of Weld County. 1 CR 94 does not exist adjacent to this development on the section line. The applicant has submitted evidence of vacation of right- of-way recorded with the Weld County Clerk&Recorder. Internal Roadways: ❑ The applicant shall provide a pavement design prepared by a professional engineer along with the final plan submittal. ❑ Public Works has reviewed the revised cul-de-sac design and deemed it acceptable with regards projected floodways and drainage. ❑ The Joint Access, Utility and Drainage Easement Typical Section (Lots 5 and 6) shown on Sheet 2 of 2 of the Intermill Land Surveying, Inc. drawings and Sheet 9 of 10 on the Shear Engineering Corporation drawings must be classified as internal roadway right-of-way and dedicated to the public. o The internal roadway right-of-way shall be 60-feet in width and dedicated to the public. o The typical cross-section of interior road shall be two 13-foot gravel lanes shown on the change of zone plat. o The HOA covenants shall be responsible for maintenance of this segment of the internal roadway. ❑ Stop signs and street name sign locations to be shown on the final roadway construction plans have been included and duly noted with zone change submittal. ❑ Easements to be shown on the final plat (in accordance with County standards (Sec.24-7-60) and / or Utility Board recommendations)have been shown and duly noted with zone change submittal. ❑ Intersection sight distance triangles at the development entrance will be required. All landscaping within the triangles must be less than 3'h feet in height at maturity,and noted on the final roadway plans. o Sight triangles should be shown in reference to lanes of on-coming traffic (see northbound lane of WCR 29). The applicant will be required to follow AASHTO - A Policy on Geometric Design of Highways and Streets 2004, labeling site triangle geometry on the roadway plans. ❑ The applicant shall submit to Public Works stamped, signed and dated final plat drawings and roadway/construction& grading plan drawings for review(with the final plan application) and approval. Construction details to be shown on final plat submittal have been included and duly noted with zone change submittal package. ❑ The applicant shall submit Improvements Agreements According to Policy Regarding Collateral for Improvements with the final plan application. These agreements must be reviewed by Public Works and shall be approved by the Board of County Commissioners(BOCC)prior to recording any final plan. EXHIBIT _____ --------- Page 1 of 2 yb 2005-3511 I Drainage: ❑ The Preliminary Drainage, Erosion Control and Water Quality Report for Gold Stone Creek Minor Subdivision,dated June 2005, by Brian Shear, P.E.(Colorado PE#20262)with Shear Engineering Corporation(Project No: 2136-01-04)is satisfactory. o The report notes a flood zone(Spring Creek drainage)passing through the proposed development site. o The report shows calculated drainage and channel cross-sections using HEC-RAS models o The report outlines design alternatives and analysis concluding on a levee system solution ❑ The applicant shall address building envelope locations (for Lot#4, Lot #5, Lot #7, and Lot #6) with the final plan application materials. "In no case shall a one-hundred-year design storm frequency cause inundation to any structure or pose a hazard." It is the Public Works recommendation to locate all building structures out of the known flood zone. Any structures located in close proximity to a flood zone may consider standard flood protection measures,which may include raising the main floor elevation. o Proposed building footprint locations have been shown to be compliant; however minimum building envelope locations should also be included on final plat submittal. ❑ The applicant shall amend the required dimensions for the box culvert under the interior gravel roadway. ❑ A final drainage report stamped, signed and dated by a professional engineer licensed in the State of Colorado shall be submitted with the final plan application,since a flood zone is noted as passing through the proposed site. o The final drainage report shall include a flood hazard review documenting any FEMA defined floodplains or floodways. The engineer shall reference the specific map panel number, including date. The development site shall be located on the copy of the FEMA map. o Stormwater runoff shall not adversely impact downstream storm drainage facilities. o The report must include discussion of the flood zone and the impacts / implications with-respect-to the proposed development, building structures, roadway, developed stormwater drainage, and HOA covenants /restrictions for a major drainage way. ❑ The applicant shall prepare a construction detail for typical lot grading with respect to drainage for the final plan application. Front, rear and side slopes around building envelopes must be addressed. In addition, drainage for rear and side lot line swales shall be considered. Building envelopes must be planned to avoid storm water flows, while taking into account adjacent drainage mitigation. ❑ Final drainage construction and erosion control plans (conforming to the drainage report) stamped, signed and dated by a professional engineer licensed in the State of Colorado shall be submitted with each final plan (phase) application. These plans (stormwater management plans) may be based on Urban Drainage methodology. Recommendation ❑ The Public Works Department recommends approval of this change of zone. The alpplicant shall address the comments listed above at the specific step of the review process stated. The review process will continue only when all appropriate elements have been submitted. Issues of concern must be resolved with the Public Works Department prior to recording the change of zone and final plates.' PC: MZ-1081 Gold Stone Creek Minor Subdivision(Zone Change) Email&Original: Planner(Chris Gathman) PC by Post: Applicant(Gold Stone Center, LLC) PC by Post: Engineer(Shear Engineering) Page 2 of 2 Me m o ra oM�tlE} OFFIrrtment Kits TO: Chris Gathman, W.C. Planning AUG X 8 2005 lDATE: August5, 2005 RECEIVED •C FROM: Pam Smith, W.C. Department of Public � COLORADO Health and Environment CASE NO.: MZ-1081 NAME: Walter Huang/Gold Stone Center LLC The Department has reviewed this application. The applicant proposed a 9 lot minor subdivision on 74.11 acres. The minimum proposed lot size, 3.9 acres, and coupled with an overall density of one septic system per 8.2 acres does meet current Department policy. The application has satisfied Chapter 24 of the Weld County Code in regard to water and sewer service. A letter of intent from North Weld County Water District was submitted with the Sketch Plan application materials. A draft Agreement was submitted in the Change of Zone application materials. Sewer will be provided by individual sewage disposal systems. No new percolation data was submitted in the Change of Zone application. Therefore, the Sketch Plan comments will be repeated: Preliminary percolation data submitted in the application materials from Terra Logics Consulting, dated October 11, 2004 indicates that most of the site is suitable for conventional septic systems. Portions of Lots 4, 5, 6, and 7 are located within the boundary of the 100 year flood plain, with significant portions of Lots 4 and 7 being within this boundary. Spring Creek also lies within this flood plain boundary. No septic systems are permitted to be installed within the flood way as stated in Colorado Department of Public Health and Environment ISDS Guidelines Section VIII (17). The flood way has not been delineated on the plat map; therefore, the Department recommends two options for the applicant: place primary and secondary septic envelopes on Lots 4, 5, 6, and 7 that are located outside the boundary of the 100 year flood plain, or 2) determine and delineate the flood way boundary on the plat map and locate the primary and secondary septic envelopes outside the designated flood way boundary. The Department further recommends that language for the preservation and/or protection of the second absorption field envelope be placed in the development covenants. The covenants should state that activities such as landscaping (i.e. planting of trees and shrubs) and construction (i.e. auxiliary structures, dirt mounds, etc.) activities are expressly prohibited in the designated absorption field envelope. The applicant has delineated the Floodway (Flood Zone A) boundary on the Change of Zone plat. The applicant has also added a General Note#5 that is misleading and should be amended. The wording implies that a lot owner could install a septic system in a Flood Zone A provided that they apply for a Flood Hazard Development Permit through the Department of Planning Services. As stated above: No septic systems are permitted to be installed within the flood way (Flood Zone A) as stated in Colorado Department of Public Health and Environment ISDS Guidelines Section VIII (17). There is no exception to this prohibition. 1 The Department recommends approval with the following conditions: i 1. Water service shall be obtained from North Weld County Water District 2. This subdivision is in rural Weld County and is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. '3. General Note #5 on the Rezoning Plat, Vicinity, and Land Use map must be reworded to exclude any inferred or implied language that septic systems can be installed in Flood Zone A at any time. 3. Primary and secondary septic envelopes shall be placed on each lot. All septic system envelopes must meet all setbacks, including the 100-foot setback to any well. Language for the preservation and/or protection of the absorption field envelopes shall be placed in the development covenants. The covenants shall state that activities such as permanent landscaping, structures, dirt mounds or other items are expressly prohibited in the absorption field site. 6. A stormwater discharge permit may be required for a development/redevelopment /construction site where a contiguous or non-contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and the Environment at www.cdphe.state.co.us/wq/PermitsUnit for more information. 7. During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Health Department, a fugitive dust control plan must be submitted. 8. In accordance with the Regulations of the Colorado Air Quality Control Commission any development that disturbs more than 5 acres of land must incorporate all available and practical methods that are technologically feasible and economically reasonable in order to minimize dust emissions. If land development creates more than a 25-acre contiguous disturbance, or exceeds 6 months in duration, the responsible party shall prepare a fugitive dust control plan, submit an air pollution emissions notice, and apply for a permit from the Colorado Department of Public Health and Environment. 10. "Weld County's Right to Farm"as provided in Appendix 22-E of the Weld County Code shall be placed on any recorded plat. O:\PAM\Planning\chzone\MZ-1081 Gold Stone Center Flood Way issues.RTF 2 07/27/2005 07:25 9708342851 TOWN OF PIERCE PAGE 01 • it,St 14V ' Weld County Referral July 8, 2005 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gold Stone Center, LLC Case Number MZ-1081 Please Reply By August 5, 2005 Planner Chris Gathman Project A minor subdivision change of zone from A(Agriculture) to E (Estate)for nine (9) single family residential lots. Legal N2NW4 of Section 16,T8N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 29 and 1 3/4 miles north of CR 90. Parcel Number 0553 16 200014 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. My response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) October 4, 2005 O We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. O See attached tier. oonmme C #11. Signature .5.6.4 gat, Date 74.2/Q c Agency /n�.GJL0„„i4iy *Weld County Planning Dept. 4918 10t Street,Greeley, CO.80631 +(970)353-6100 ext.3540 •(970)304-6498 fax ' t, rice -6---...' Weld County Referral wilg July 8, 2005 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gold Stone Center, LLC Case Number MZ-1081 Please Reply By August 5, 2005 Planner Chris Gathman Project A minor subdivision change of zone from A(Agriculture) to E (Estate)for nine (9) single family residential lots. Legal N2NW4 of Section 16, T8N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 29 and 1 3/4 miles north of CR 90. Parcel Number 0553 16 200014 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) October 4, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: Signature ,•:41141 es.. Date 0/S— Agency Sad4 . anaspeddeo +Weld County Planning Dept. +918 10th Street, Greeley, CO. 80631 +(970)353-6100 ext.3540 +(970)304-6498 fax - DEPARTMENT OF PLANNING it°tki.% :'4411" SERVICES BUILDING INSPECTION NORTH OFFICE 918 10thStreet GREELEY, COLORADO 80631 PHONE (970) 353-6100, EXT.3540 IDSOUTHWEST FAX (970) 304-6498 O OFFICE C 24.4209 R 24.5 LONGMONT CO 80504 COLORADO PHONE (720)652-4210 ext. 8730 FAX (720)652-4211 July 11,2005 Gold Stone Center,LLC A Minor Subdivision Change of Zone from the Agricultural (A) Zone District to Estate (E) zone district for nine (9) residential lots. MZ-1081 4. Building permits shall be obtained prior to the construction of any building. Building permits are required for the principle dwelling and for buildings accessory to the principle dwelling. '2. A plan review is required for each building. Two complete sets of plans are required when applying for each permit. Each building may be required to be designed by a Colorado registered engineer. -3. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. Current adopted codes include the 2003 International Building Code; 2003 International Mechanical Code; 2003 International Plumbing Code; 2003 International Fuel Gas Code; 2002 National Electrical Code and Chapter 29 of the Weld County Code. 4. Each building will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. ''5. Fire resistance of walls and openings, construction requirements, maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by the Zoning Ordinance. 6. Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. requirements. Offset and setback requirements are measured to the farthest projection from the building. Please contact me for any further information regarding this project. Sincerely, Frank Piacentino Service,Teamwork, Integrity,Quality ....... ar) r) ......, Weld County Referral VI July 8, 2005 wimiC. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gold Stone Center, LLC Case Number MZ-1081 Please Reply By August 5, 2005 Planner Chris Gathman Project A minor subdivision change of zone from A(Agriculture) to E (Estate)for nine (9) single family residential lots. Legal N2NW4 of Section 16, TBN, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 29 and 1 3/4 miles north of CR 90. Parcel Number 0553 16 200014 '--, The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) October 4, 2005 ❑ ffile have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. ❑ See attache 1 tter / to ..717�//.c) C'O/J )/J 2 l'lld l Comments: t.2/d / fill) (,y / {O-O J 17(71/8/ Signature ( lei//7(.4.-C--(O7 _ Date 7-7-OS Agency gy' IjJC 4/N72//;%/?/r ❖Weld County Planning Dept. +918 101h Street, Greeley, CO. 80631 +(970)353-6100 ext.3540 4(970)304-6498 fax STATE OF COLORADO OFFICE OF THE STATE ENGINEER oe•Cot, Division of Water Resources Nc/ Department of Natural Resources * 1313 Sherman Street, Room 818 4 w Denver,Colorado 80203 eve•+ Phone(303)866-3581 July 28, 2005 FAX(303)866-3589 Bill Owens www.water.state.co.us Weld in Governor ‘10Russell George GREan/11pg D Executive Director Mr. Chris Gathman QUA l£rOFFleepartMeat staHalD.te Engineer Weld Weld County Planning Department h� X 1 2005 918 10th Street K C Greeley, Co 80631 E� Re: Gold Stone Creek Minor Subdivision Case No. MZ-1081 N1/2 of the NW1/4 of Sec. 16, T8N, R66W, 6th P.M Water Division 1, Water District 1 Dear Mr. Gathman: - We have reviewed the above referenced proposal to subdivide a 74.11-acre parcel into 9 single-family residential lots ranging in size from 3.9 acres to 11.5 acres. The Water Supply Information Summary Form included in the referral material indicates that the water requirements for the subdivision are 9 acre-feet. The water use estimate appears to be high compared to a typical estimate based on an average of 3.5 persons per dwelling and 80 gallons per person per day. No outside uses were identified for any of the 9 residential lots. The proposed water source for this subdivision is identified as the North Weld County Water District ("District"). A letter of commitment for service from the District was not provided. Based on current information on file in this office, the District will typically furnish 70% of an acre-foot (228,000 gallons) of water per tap per annual water year if the allotment for the Colorado-Big Thompson (CBT) project water, as determined by the Northern Colorado Water Conservancy District, is 50% or greater. The District will restrict the delivery as necessary when the CBT allotment is less than 50%. In addition, according to our records, well permit no. 254251 was issued on November 26, 2003 as the only well on tract of land of 40 acres described as the S1/2 of the N1/2 of the NW 1/4 of Section 16, Township 8 North, Range 66 West of the 6th P.M. The use of ground water from this well is limited to fire protection, ordinary household use inside three (3) single- family dwellings, the watering of poultry, domestic animals and livestock on a farm or ranch and the irrigation of not more than one acre of home garden and lawns. Our records show that well permit no. 254251 has not been constructed, and the permit is due to expire on November 26, 2005, if the well is not constructed, or an extension is not obtained. Please note that 40 acres of the 74.11-acre parcel proposed to be subdivided is presently encumbered by well permit no. 254251 (copy enclosed), therefore the applicant needs to provide information if well permit no. 254251 (if constructed)will be used to supply water to any of the lots in the subdivision. Since insufficient information was provided, we cannot comment on the potential for injury to existing water rights under the provisions of CRS 30-28-136(1)(h)(II). • • Weld County Planning Departs,,, nt Gold Stone Creek Minor Subdivision If you have any question in this matter please contact loana Comaniciu of this office. Sincerely, 6.57, q Dick Wolfe, P.E. (/ Assistant State Engineer cc: Jim Hall, Division Engineer Bent Schantz, Water Commissioner, District 1 Water Supply Branch Subdivision File DW/IC/Gold Stone Creek Minor Subdivision a Weld County Referral ikJuly 8, 2005 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gold Stone Center, LLC Case Number MZ-1081 Please Reply By August 5, 2005 Planner Chris Gathman Project A minor subdivision change of zone from A (Agriculture) to E (Estate)for nine (9) single family residential lots. Legal N2NW4 of Section 16, T8N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 29 and 1 3/4 miles north of CR 90. Parcel Number 0553 16 200014 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) October 4, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ® See attached letter. Comments: Signature 1 ‘,62AA.IAt aI ' ` Date July 21. 2005 Agency Weld RE-9 School District, Ault Co +Weld County Planning Dept. t918 10'Street, Greeley, CO. 80631 ❖(970)353-6100 ext.3540 G(970)304-6498 fax I Highland Schools Weld Re-9 _.. -.. _.. _.__—__. ____._. if ✓V Fr,t Street PO. Boz 68 Aut, Colo aJo 805,16 :9?0)834-'845 Educational Excellence July 21, 2005 GREELEY Weld County Planning Department Through OFFICE Community Gold Stone Center, LLC JUL 2 6 2005 Unification 1714 Topaz Drive Suite 240 Loveland, CO 80537 RECEIVED MZ-1081 To Whom It May Concern, The Weld Re-9 School district has reviewed the plans and information for the Gold Stone Creek subdivision as referenced in MZ-1081. The District requests a cul-de-sac turn around with a 45 foot turning radius. The plan for this subdivision does meet this requirement. In addition to the transportation requirements, the district would require an in-lieu of fee for the nine lots being created. The total in-lieu payment per parcel of land separated from the original unit with the intent of future residential development is $759. The plan for the property described in MZ-1081 will result in nine new residential lots being created; therefore, your total in-lieu payment will be $6,831.00. Payment should be hand delivered to the Weld RE-9 School District Administration Office, 210 West First Street, Ault, or mailed to Weld RE-9 School District, P.O. Box 68, Ault, Colorado 80610. Please include your Recorded Exemption (RE) number for reference. A receipt will be mailed to the party requesting the exemption. Please direct any questions to Dennis Scheer, Superintendent of Schools, 210 West First Street, Ault CO 80610, or by calling (970) 834-1345. Sincerely, Tzettitc_ Dennis M. Scheer, Ed. D Superintendent of Schools Weld RE-9 School District Weld County Referral IJuly 8, 2005 WI C. COLORADO • The Weld County Department of Planning Services has received the following item for review: Applicant Gold Stone Center, LLC Case Number MZ-1081 Please Reply By August 5, 2005 Planner Chris Gathman Project A minor subdivision change of zone from A (Agriculture) to E (Estate)for nine (9) single family residential lots. Legal N2NW4 of Section 16, T8N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 29 and 1 3/4 miles north of CR 90. Parcel Number 0553 16 200014 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) October 4, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. XSee attached letter. Comments: Signature / /i'e/�l�d7r:- / 14 i red.- Date 1 /jcy[./ 0s Agency l lt1C /c" BCD ❖Weld County Planning Dept. +918 10*Street, Greeley,CO.80631 4(970)353-6100 ext.3540 4(970)304-6498 fax GOLD STONE CREEK MINOR SUBDIVISION Developer: Walter Huang .—Case # MZ-1081 (Change of Zone from Ag to Estate) Gold Stone Ctr LLC PT N2NW4 16-8-66 Planner: Chris Gathman ZONED ESTATE IS PART IN FLOOD PLAIN (0325C) NORTH WELD COUNTY WATER DISTRICT INDIVIDUAL SEPTIC SYSTEMS POUDRE VALLEY REA XCEL ENERGY NUNN FPD HIGHLAND WELD RE9 QWEST COMMUNICATIONS NUNN PO 9 RESIDENTIAL LOTS PRELIMINARY ADDRESSING J Lot 1 45901 ** Lot 2 45905 ** Lot 3 45909 ** Lot 4 45914 ** Lot 5 45920 ** Lot 6 45916 ** Lot 7 45910 ** Lot 8 45906 ** Lot 9 45900 ** Lin Dodge, Building Technician Building Department 918 10th Street Greeley CO 80631 Phone: (970)353-6100, extension 3574 Fax: (970)304-6498 7/14/05 • ^Referral Notes for MZ-1081 - GOLD STONE CREEK MINOR SUB 1. Need to determine actual name of interior road-- preliminary change of zone plat calls out CR 92.75. 2. Weld County Code Ord. 2003-6, Section 2-13-70-H limits the name of east-west cul-de-sacs to "Place". 3. Will there be building envelopes outside the Flood Plain for Lots 4-7, or will plat note #5 be sufficient? Weld County Referral July 8, 2005 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gold Stone Center, LLC Case Number MZ-1081 Please Reply By August 5, 2005 Planner Chris Gathman Project A minor subdivision change of zone from A (Agriculture) to E (Estate)for nine (9) single family residential lots. Legal N2NW4 of Section 16, T8N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 29 and 1 3/4 miles north of CR 90. Parcel Number 0553 16 200014 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) October 4, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. Zr See attached letter. t) ALL.- S4c4.t- c'eartw& L- I.LC I wDII2P/1ww1i ►. 2) A o sv&to VOL Comments: L-tit-5 or r S,Gr 211 . Cf 1atW Vvv2 1 r5 415(. 4.1 . 43-Vyu GA-4r -ri, 1&w'z 1S 47er .tN cl3 ()booV 5 Skketir&g1 Mb 1t. v-%as t S a wa 4 ct- 4 /-' 4S l v to e i, ‘JrcLok965 4 We0224.-Matiev Signature 't � Date . — \c,_cc Agency p 1, 1,1 f kSCc ❖Weld County Planning Dept. 4918 10"Street, Greeley,CO. 80631 ❖(970)353-6100 ext.3540 ❖(970)304-6498 fax Weld County Referral "l ige July 8, 2005 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gold Stone Center, LLC Case Number MZ-1081 Please Reply By August 5, 2005 Planner Chris Gathman Project A minor subdivision change of zone from A (Agriculture) to E (Estate)for nine (9) single family residential lots. Legal N2NW4 of Section 16, T8N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 29 and 1 3/4 miles north of CR 90. Parcel Number 0553 16 200014 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) October 4, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: `` \ N 01(4... \An` 2≥ . Signature Date — \S_ OS Agency W G Lt +Weld County Planning Dept. 4-918 10'"Street, Greeley,CO. 80631 4*(970)353-6100 ext.3540 +(970)304-6498 fax Applicant: Gc,d Stone Center, Li...C Planner: Chris Gathman Case#: MZ-1081 K. ( r� ._ N \ \ , 40 j \6 I 4 , NNWCR29 1 ) 0.4 0 0.4 0.8 Miles Weld County Referral Map \ / Highways Major Roads NLocal Roads S \ / Vlf RailroadsE -., A/ Streams&Ditches Irf: r Lakes r ; Floodplains ,. S West Greeley Co,..,�rvation District . (970) 356-8097 4 Case Number: MZ-1081 Applicant: Gold Stone Center, LLC Planner: Chris Gathman Below is a list of the soils and their limitations according to the USDA, Weld County Soil Survey. Map Shallow Dwellings I Dwellings with Small Septic Tank Prime Farm Symbol i Soil Name Soil Texture , without basements Commercial Absorption Land (if Additional Comments Excavations basements i Buildings Fields irrigated) 4 Ascalon iFine Sandy Loam 1Severe Slight ISlight Slight Yes West Greeley 40 Nunn Loam Severe Severe ;Severe Severe Yes Conservation District ) 65 Terry Sandy Loam Severe Slight Severe No always discourages building withing a floodplain. 1 The West Greeley Conservation District recommends that the applicant does an on site soils test prior to any construction. For a more complete soils description consult the Weld County Soil Survey or contact our office at (970)356-8097. If you or the applicant have any questions please feel free to call our office. ) c)\S1 R1 1I[ON Produced by the West Greeley Conservation District To: Weld County Planning From: Nunn Fire Protection District Subject: District requirements for Gold Stone Creek Date: July, 5, 2005 The requirements of the Nunn Fire Protection District are as follows: 1. No in house sprinklers or fire hydrants will be required; 2. The paved internal public street is acceptable; and 3. The street name should be 92 %. sic_ 702? thief,Nunn Protection District Date Hello