Loading...
HomeMy WebLinkAbout20020841 C. e Weld County Referral January 28, 2002 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Kerr-McGee Gathering LLC Case Number AmUSR-1280 Please Reply By February 18, 2002 Planner Carla Angeli Project A Site Specific Development Plan and Special Review Permit for an Amine Plant at the Platteville Compressor Station in the A(Agricultural)Zone District. Legal Part of the SE4 of Section 13, T3N, R66W of the 6th P.M., Weld County, Colorado. Location West of WCR 37 and north of WCR 32. Parcel Number 1211 13 000028 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) March 19, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: • UA r \ coJ cw 6* (`t\ ih(c� Gil a-GiK1ot cc UL6h-to' n VOCAL OCAO. Signature Walx(�n Date -(��a J, " t Agency (mot)► itto L mft janc! +Weld County Planning Dept. 41555 N. 17th Ave. Greeley, CO. 80631 •'x(970)353-6100 ext.3540 •'x(970)304-6498 fax 2002-0841LiLlEXHIBff STATE OF COLORADO Bill Owens,Governor Jane E.Norton,Executive Director Dedicated to protecting and improving the health and environment of the people of Colorado l \ 4300 Cherry Creek Dr.S. Laboratory and Radiation Services Division Denver,Colorado 80246.1530 8100 Lowry Blvd, Phone(303)692.2000 Denver,Colorado 60230.6928 TDD Line(303)691-7700 (303)692.3090 Located in Glendale,Colorado Coof PubDe C http;//www.cdphe.state,w,ut of and Environment ironment FACSIMILE TRANSMISSION FROM TO RAM N. SEETHARAM CM R L A AIR POLLUTION CONTROL DIVISION t )&LD Ccu,u?V ptANN/NG PHONE (303)692-3198 PHONE 970--3$3- 6100 x'3168 FAX (303)782-0278 FAX X70=30 j Z4F 98 EMAIL ram.seetharatn@state.co.ua DATE fJ/ et/1002_ TOTAL PAGES 10 TIME /0 t-110in MESSAGE: AMINE GAS TREATMENT SYSTEM AT PLAZTEVILLE COMPRESSOR STATION. 'TRANSMITTING A PUBLIC COMMENT PACKAGE PREPARED FOR THE PERMIT APPLICATION No.02WE0126. EXHIBIT I a-/ . 'APPLICATION FOR A FEDERALLY ENFORCEABLE PERMIT TO LIMIT THE POTENTIAL TO EMIT, AND FOR INSTALLATION OF AN AMINE GAS TREATMENT SYSTEM AT PLATTEVILLE COMPRESSOR STATION BY KERR-McGEE ROCKY MOUNTAIN CORPORATION TABLE OF CONTENTS 1. PUBLIC NOTICE 2. PRELIMINARY ANALYSIS 3. APPLICATION FOR PERMIT 4, AIR POLLUTANT EMISSION NOTICE 5. DRAFT PERMIT Prepared by Rant N. Seetharam Stationary Sources Program Air Pollution Control Division Colorado Department o£Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, CO 80246-1530 STATE OF COLORADO 0111 Owens,Governor Jane E.Norton,Executive Director Dedicated to protecting and improving the health and environment of the people of Colorado 4300 Cherry Creek Dr.S. Laboratory and Radiation Services Division n (iv s• Denver,Colorado 80246-1530 8100 Lowry Blvd. • Phone 1303)692.2000 Denver,Colorado 80230-6928 TDD Line(303)691-7700 (303)692.3090 - Located in Glendale,Colorado Colorado Department hrrpJ/www,cdphe.stare,ro.us of Public Health i) R F T and Environment Released to d ,PUBLIC NOTICE OF A PROPOSED PROJECT OR ACTIVITY WARRANTING PUBLIC COMMENT The Colorado Air Pollution Control Division has declared that the following proposed construction activity warrants public comment, Therefore, the Air Pollution Control Division of the Colorado Department of Public Health and Environment, hereby gives NOTICE,pursuant to Section 25-7- 114(4)(e), C.R.S. 1973, as amended, of the Colorado Air Pollution Prevention and Control Act that an application to the Division has been received for an emission permit on the following proposed project and activity: Kerr-McGee Rocky Mountain Corporation has proposed to construct and operate art amine gas treatment system at the Platteville Compressor Station located in the Southeast 14 of Section 13, Township 3 North, Range 66 West, In Weld County, Colorado. This process system Is a potential major source of hazardous air pollutants and for applicability of case-by-case Maximum Achievable Control Technology(MACT)for control of such pollutants. The applicant has requested that the potential to emit shall ba limited by a federally enforceable permit to below the MACT thresholds. With the installation of this process system, the facility(the entire compressor station)emissions of hazardous air pollutants will exceed the major source thresholds and will become subject to an Operating Permit under Title V of the Federal Clean Air Act. Copy of draft permit is available for review in the public comment package. Thep Division hereby solicits and requests submission ofpublic comment concerning the aforesaid proposed omm�rtemu t be tnvity f r a period of thirty(30) days from and after date of this publication. Any writing and be submitted to the following addressee: Ram N. Seetharam Stationary Sources Program Air Pollution Control Division Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South,APCD-SS-B 1 Denver, CO 80246-1530 (more) 1. IIIt Within thirty(30)days following the said thirty(30)-day period for public comment, the Division shall consider comments and, pursuant to Section 25-7-114(4)(f)(11), either grant, deny, or grant with conditions, the emission permit. Said public comment is solicited to enable consideration of approval of and objections to the proposed construction of the subject project and activity by affected persons, A copy of the application for the permit, the Preliminary Analysis of said application, and accompanying data concerning the proposed project and activity are available for inspection in the office of the Clerk and Recorder of Weld County, Colorado, during regular business hours of said office, and also may be inspected at the office of the Mr Pollution Control Division, Colorado Department of Public Health and Environment, 4300 Cherry Creek Drive South, Building B, 1st Floor, Denver, Colorado, 1O4 r^ COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONM ' AIR POLLUTION CONTROL DIVISION PRELIMINARY ANALYSIS R F T Applicant Kerr-McGee Rocky Mountain Corporation Permit Plant Location Platteville Compressor Station Source No o. 123/0552/007 02WE0120 Southeast Y.of Section 13, Township 3 North, Range 66 West, approx. 6 miles east of Platteville, Weld County. Review Engineer Ram N. Seetharam Control Engineer James S. Geier P.E. Date Mar. 13, 2002 Page 1 of 1 Project Description Kerr-McGee Rocky Mountain Corporation has proposed to construct and operate an amine gas treatment system at the Platteville Compressor Station located in the Southeast of Section 13, Township 3 North, Range 66 West, in Weld County, Colorado. This process system is a potential major source of hazardous air pollutants and for applicability of case-by-case Maximum Achievable Control Technology(MACT)for control of such pollutants. The applicant hes requested that the potential to emit shall be limited by a federally enforceable permit to below the MACT thresholds. With the installation of this process system, the facility(the entire compressor station)emissions of hazardous air pollutants will exceed the major source thresholds and will become subject to an Operating Permit under Title V of the Federal Clean Air Act. Emission Sources Volatile Organic Compounds/Hazardous Air Pollutants (HAPs)from the amine regenerator reboiler still vent. Combustion gases from combustion of natural gas In the reboller. Emissions from the amine flash off tank will be routed to the combustion system. ^ Requested Nitrogen Oxides: 6 tons per Emissions P year Volatile Organic Compounds: 12 tons per year Carbon Monoxide; 5 tons per year This process activity will result in following estimated reportable emissions of non-criteria reportable/hazardous air pollutants: Benzene; 19,830 pounds per year; Toluene; 1,305 pounds per year Regulatory Status The proposed amine gas treatment system Is a potential major source for applicability of case-by-case MACT. The emissions of HAPs will be limited by federally enforceable permit to below the MACT thresholds. Therefore such case-by-case MACT is not applicable. With the installation of this process system, the facility(entire compressor station) emissions of hazardous air pollutants will exceed the major source thresholds. The facility will become subject to the Operating Permit program under Title V of the Federal Clean Air Act. Impact on Ambient At the requested emissions, the National Ambient Air Quality Standards for criteria Air Quality pollutants will not be violated. Public Comment To render the permit and permit conditions federally enforceable, and to determine that the Requirement case-by-case MACT is not applicable. DRAFT PERMIT PERMIT NO; 02WE0126 INITIAL APPROVAL DATE ISSUED: ISSUED TO: Kerr McGee Rocky Mountain Corporation THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: Natural gas gathering facility, know as Platteville Compressor Station, located in the Southeast%of Section 13,Township 3 North, Range 66 West,approximately 6 miles east of Platteville, in Weld County, Colorado. THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: One(1)Make,Model, and S/N:not available,amine gas treatment system,design rated at 40,000,000 SCF per day. This system consists of; Amine/natural gas contactor. Amine flash off tank. Emissions routed for combustion. Electrically driven amine solution recirculation pump. Amine regeneration reboller and still vent, heat input rated at 15,000,000 BTU per hour. THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL ACT C.R.S.(25.7-101 et sag),TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: 1. Construction of this source must commence within 18 months of initial approval permit Issuance date or within 18 months of date on which such construction or activity was scheduled to commence as stated in the application. If commencement does not occur within the stated time the permit will expire on (See General Condition No. 6., Item 1.) (Reference: Regulation 3, Part B, IV.G,4.) 2. Visible emissions shall not exceed twenty percent(20%)opacity during normal operation of the source. During periods of startup, process modification,or adjustment of control equipment visible emissions shall not exceed 30% opacity for more than six minutes in any sixty consecutive minutes. Opacity shall be measured by EPA Method 9. (Reference; Regulation 1, Section II.A.1. &4.) 3. The permit number shall be marked on the subject equipment for ease of identification, (Reference; Reg. 3, Part B, IV.E.)(State only enforceable) 123/0552/007 ver. 2/00 Kerr McGee Rocky Mountain Corporation Permit No. 02WE0126 ' Initial Approval Colored artme Publi H • I T page 2 Air Poll PERMIT 4, Within one hundred and eighty days (180)after commencement of operation,compliance with the conditions contained on this permit shall be demonstrated to the Division. It is the permittee's responsibility to self certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit, (Information on how to certify compliance was mailed with the permit or can be obtained from the Division at 303-692-3209.) 5. The manufacturer, model number and serial number of the subject equipment shall be provided to the Division prior to Final Approval. (Reference: Reg, 3, Part 8, IV.E.) 6. This source is subject to the odor requirements of Regulation No. 2. (State only enforceable) 7. Prevention of Significant Deterioration(PSD)requirements shall apply to this source at any such time that this source becomes major solely by virtue of a relaxation in any permit condition. Any relaxation that Increases the potenntial to emit above the applicable PSD threshold will require a full source shall review not excef the edd the rce as threh shold until a truction had not is et commenced ran edtl(Reference:on eg 3, Part B, IV.D.3,b,(iv)) 8. This source shall be limited to a maximum process rate as listed below and all other activities, operational ltpprnocesi ates e shanll bears of ms maintained by the apnt as stated iI tcant a In nd made l available to the Division fore Inspection upon request. (Reference: Regulation 3, Part B, III.A.4) Processing of natural gas through the amine gas treatment system shall not exceed 40,000,000 SCF per day, and 14,600,000,000 SCF per year. Consumption of natural gas for combustion in the amine regeneration reboiler shall not exceed 164,000,000 SCF per year. Circulation of amine solution through the amine treatment system shall not exceed 3,000 gallons per ^ hour, 9. Emissions of air pollutants shall not exceed the following limitations (as calculated in the Division's preliminary analysis):Compliance with the annual limits shall be determined on a rolling (12) month total, By the end of each month a new twelve month total is calculated based on the previous twelve months' data. The permit holder shall calculate monthly emissions and keep a compliance record on site for Division review. (Reference: Regulation 3, Part B, III.A.4) Nitrogen Oxides: 5.9 tons per year. Volatile Organic Compounds: 12.0 tons per year. Carbon Monoxide: 4.9 tons per year. 10. Prior to final approval being Issued, the applicant shall submit to the Division for approval an operating and maintenance plan for ail control equipment and control practices, and a proposed record keeping format that will outline now the applicant will maintain compliance on an ongoing basis with the requirements of this permit. (Reference: Reg. 3, Part B, IV.B.2) 11. Emissions of hazardous air pollutant/s shall not exceed dythe thresholds for MACT applicability. tCase-by-case e emiss ons exceedthepplicable thresholds.ntrol MACT shall ll be implemell nted become toe exceeding g these thresholds, and this permit suitably modified to incorporate the MACT. To p ensure that the emissions of hazardous air pollutants are below the thresholds for MACT ashall bebnducted whession never thereall eiss conducted at in least chace In racteristics (chemical composition,tests etc.) of the incoming gas as to increase the emissions. Periodic chemical analysis of the incoming gas shall be conducted to identify such variations in the analysis of the incoming gas, Frequency of such analysis shall be Included in the required operation and maintenance plan. Records of these tests, analyses, and emissions shall be maintained at site, and made available to the Division for review upon request, r 123/0552/007 ver, 2/00 Kerr McGee Rocky Mountain Corporation Permit No. 02WE0126 Initial Approval Depa De a nt of P He F page 3 Air Poll PERMIT 12. The reboiler source Is subject to Regulation No. 6—Standards of Performance for New Stationary Sources, Part A—Federal Register Regulations Adopted By Reference, Subpart Do- Standards of Performance for Small Industrial-Commercial-Institutional Steam Generating Unite, including, but not limited to,the following: §60.48c Reporting and recordkeeping requirements. In addition,the following requirements of Regulation No. 6, Part A, Subpart A, General Provisions, apply. a. At all times, including periods of start-up, shutdown, and malfunction, the facility and control equipment shall, to the extent practicable, be maintained and operated in a manner consistent with good air pollution control practices for minimaintenanemissions. p o Icedure are being used wrmination of ill be based on iether or not �nfoormation availab and le to the Division, which may include, but is not limited to, monitoring results, opacity observations,review of operating and maintenance procedures, and inspection of the source. (Reference; Regulation 6, Part A. General Provisions from 40CFR60.11 b. No article, machine,equipment or process shall be used p to conceal an emission which would otherwise concealment includes, butconstitute not limited to, the use of gaseous e diluents So achieve comconcentration lth an of a pollutant ll in the gaseswith to the atmosphere.e.on 6O 12) c. Written notification of construction and initial startup dates shall be submitted to the Division as required under§60.7. d. Records of startups,shutdowns, and malfunctions shall be maintained, as required under§60.7. A copy of the complete applicable subparts)is attached. 13. A Revised Air Pollutant Emission Notice (APEN)shall be filed: (Reference: Reg. 3, Part A, II.C) a. Annually whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five tons per year or more, above the level reported on the last APEN submitted. For any non-criteria reportable pollutant: If level reported on tons he lastAPEN y 60% ubmitted to the per whichever is less, above the b. Whenever there is a change in the owner or operator of any facility, process, or activity; or c. Whenever new control equipment Is Installed, or whenever a different type of control equipment replaces an existing type of control equipment; or d. Whenever a permit limitation must be modified;or e. No later than 30 days before the existing APEN expires. Ram N. Seetharam James S. Geier, P.E. Permit Reviewer Unit Leader 123/0552/007 ver. 2/00 r Kerr McGee Rocky Mountain Corporation Permit No. 02WE0126 • Initial Approval page 4 Colorado Depart of Pu e s 1 FT Air Poll PERMIT Notes to Permit Holder; 1) The process limits and emission limits contained in this permit are based on the productlon/proCessing rates requested in the permit application. These limits may be revised ureg�ulatioon or ast ny ambi nt alter qproviding thestandard.�A revis no ed air poll pollution emission emission noticel(APEN)and application form must be submitted with a request for a permit revision, 2) This source is classified as a; Synthetic Minor Source for applicability of Maximum Achievable Control Technology(MACT)for control of hazardous air Major Source for Operating Permit is now applicable for the entire facility. 3) This source is subject to the provisions of Regulation number 3, Part C, Operating Permits (Title V of the 1990 Federal Clean Air Act Amendments). The application for the Operating Permit is due within one year of commencing operation. 4) The following emissions of non-criteria reportable air pollutants ere established based upon the process rates es indicated in this permit. This Information is listed to inform the operator of the Division's analysis of the specific compounds. This information is listed on the Division's emission inventory system. CAS SUBSTANCE EMISSIONS (LB/YR1 71.43-2 Benzene 19,830.0 108.88.3 Toluene 1,306.0 123/0552/007 ver. 2/00 Kerr McGee Rocky Mountain Corporation Permit No. 02WE0126RAIf 111 iliF Initial Approval Colorado Department of Public He FT page 5Air Poll PERMIT GENERAL TERMS AND CONDITIONS; (!PORTANTI READ ITEMS 5.6.7 AND 4) 1. This permit is issued in reliance upon the accuracy and completeness of information supplied by the applicant and is conditioned upon conduct of the activity,or construction,installation and operation of the source,in accordance with this Information and With representations made by the applicant or applicants agents. It is valid only for the equipment and operations or activity specifically Identified on the permit. ly stated 2, determinedUnless by thle APCD to be ec�ary to assure cospecific e liance with the�n�mned in o this permit t have been .5( C.R.S. Pprovisions of Section 25.7-114.5(7)(x), 3. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of, a condition hereof shall constitute a rejection of the entire permit and upon such occurrence,this permit shall be deemed denied ab Indio. This permit may be revoked at any time prior to final approval by the Air Pollution Control Division(APCD)on grounds set forth in the Colorado Alr Quality Control Act and regulations of the Air Quality Control Commission(AOCC),including failure to meet any express term or condition of the permit. If the Division denies a permit,conditions imposed upon a permit are contested by the applicant,or the Division revokes a permit, the applicant or owner or operator of a source may request a hearing before the AQCC for review of the Division's action, 4. This permit and any required attachments must be retained and made available for inspection upon request at the location set forth herein. With respect to a portable source that is moved to a new location,a copy of the Relocation Notice(required by law to be submitted to the APCD whenever a portable source is relocated)should be attached to this permit The permit may be reissued toe new owner by the APCD as provided in AOCC Regulation No.3,Par a, Section 111.8.upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 5. Issuance(initial approval)of an emission permit does not provide'Inert authority for this activity or operation of this source. Final approval of the permit must be secured from the APCD In writing in accordance with the provisions of 25.7-114.5(12Xa)C.R.S.and AQCC Regulation No.9,Part B,Section N.H. Final approval cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit If the APCD so determines,it will provide written documentation of ouch final approval, which does constitute°final"authority to operate, Compliance with the permit conditions must be demonstrated within 180 days after commencement of operation. 8. THIS PERMIT AUTOMATICALLY EXPIRES IF you(1)do not commence construction or operation within 18 months after either the date of issuance of this permit or the date on which such construction or activity was scheduled to commence as set forth in the permit,whichever is later;(2)discontinue construction for a period of 18 months or more;or(9)do not complete construction within a reasonable time of the estimated completion date. Extensions of the expiration date may be granted by the APCD upon a showing of good cause by the per ittee prior to the expiration date. 7. YOU MUST notify the APCD at least thirty days(fifteenfor the permitted operation or activity. Failure to do days portable sources)prior( 2)a commencementAOc of Regulation No.3,Part B,Section IV.H.1.,and can result in thvioe revocation of the permit.tion of Section 5You(must C.R.S.and tee compllence with the permit conditions within 180 days after commencement of operation as stated In condition 5. 8. Section 25.7.114.7(2)(a),C.R.S.requires that all sources required to file an Air Pollution Emission Notice(APEN) must pay an annual fee to cover the coats of inspections and administration. If a source or activity is to be discontinued,the owner must notify the Division in writing requesting a cancellation of the permit Upon notification, annual fee billing will terminate. 9. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and control Act or the regulations of the AQCC may result In administrative,civil or criminal enforcement actions under Sections 25-7-115 (enforcement),-121 (injunctions),-122(civil penalties),-122,1 (criminal penalties).C.R.S. 123/0552/007 ver.2/00 Hello