HomeMy WebLinkAbout20020148 REFERRAL LIST
NAME: Rocky Mountain Energy Center, LLC(Calpine) CASE NUMBER: USR-1339
REFERRALS SENT: May 23,2001 REFERRALS TO BE RECEIVED BY: June 12,2001
COUNTY TOWNS and CITIES
_X Attorney Ault
_X Health Department Brighton
Extension Service Broomfield
_X Emergency Management Office Dacono
_X_Sheriffs Office _Eaton
_X Public Works Erie
Housing Authority Evans
Airport Authority Firestone
_X Building Inspection Fort Lupton
X_Code Enforcement Frederick
STATE Garden City
X _Division of Water Resources Gilcrest
Geological Survey Greeley
Department of Health Grover
_X Department of Transportation _X_Hudson
Historical Society Johnstown
Water Conservation Board _X_Keenesburg
_Oil and Gas Conservation Commission Kersey
Division of Wildlife: LaSalle
Loveland Lochbuie
_X Greeley Longmont
Division of Minerals/Geology Mead
FIRE DISTRICTS Milliken
Ault F-1 New Raymer
Berthoud F-2 Northglenn
Briggsdale F-24 Nunn
Brighton F-3 Pierce
Eaton F-4 Platteville
Fort Lupton F-5 Severance
Galeton F-6 Thornton
X_Hudson F-7 Windsor
Johnstown F-8
La Salle F-9
Mountain View F-10 COUNTIES
Milliken F-11 Adams
Nunn F-12 Boulder
Pawnee F-22 Larimer
Platteville F-13
Platte Valley F-14 FEDERAL GOVERNMENT AGENCIES
Poudre Valley F-15 _X US Army Corps of Engineers
Raymer F-2 USDA-APHIS Veterinary Service
Southeast Weld F-16 Federal Aviation Administration
Windsor/Severance F-17 Federal Communication Commission
Wiggins F-18
Union Colony F-20 SOIL CONSERVATION DISTRICTS
Brighton
OTHER Fort Collins
School District Greeley
_X Ditch Company Jim#1 _Longmont
Central Colo. Water Conservancy Dist. West Adams 2002-0148
X Southeast Weld
COMMISSION/BOARD MEMBER EXHIBIT
_X Cathy Clamp
a
. Weld County Referral
11.9
May 23, 2001
COLORADO
The Weld County Department of Planning Services has received the following item for review:
Applicant Rocky Mountain Energy Case Number USR-1339
Center, LLC (Calpine)
Please Reply By June 12, 2001 " Planner Julie Chester
Project A Site Specific Development Plan and Special Review Permit for a Use by Right,
an accessory Use or a Use by Special Review in the Commercial or Industrial
Zone Districts (Power Generation Facility, including a one hundred seven (107)
acre Wellfield Site, an approximately eight(8) mile long Gas Pipeline and an
approximately twenty-two (22) mile Water Pipeline) in the Agricultural Zone
District.
Legal Power Generation Facility: Section 31, T2N, R64W and Wellfield Site: Section 7, i
T5N, R64W and Various Parcels along the Gas Pipeline and Water Pipeline. ,
(See application for more detailed legal descriptions). 1
Location Power Generation Facility: East of and adjacent to WCR 49, one mile north of `
State Highway 52,just east of 1-76, Wellfield site: North of WCR 58, West of
WCR 51. I
Parcel Number Various parcel numbers
The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this date
may be deemed to be a positive response to the Department of Planning Services. If you have any further
questions regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable) July 17, 2001
❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
X We have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments:
vo \f\6 i01na WfAi. ,c)SLtAds'
•
Signature 1� Date i31 CA
Agency 1�
�6�1 Lt��..on(f. EXHIBIT
4•1/Veld County Planning Dept. +1555 N. 17th Ave. Greeley,CO.80631 +(970)353-6100 ext.3540 +(970)304-6, I 1
Kiik ;w.--
Weld County Referral
WIlD
Weld County Planning Dept. May 23, 2001 D C
1 =; 201
COLORADO REC WED
The Weld County Department of Planning Services has receive t ollowl® item for review:
Applicant Rocky Mountain Energy Case Number USR-1339
Center, LLC (Calpine)
Please Reply By June 12, 2001 Planner Julie Chester
Project A Site Specific Development Plan and Special Review Permit for a Use by Right,
an accessory Use or a Use by Special Review in the Commercial or Industrial I
Zone Districts (Power Generation Facility, including a one hundred seven (107)
acre Wellfield Site, an approximately eight(8) mile long Gas Pipeline and an
approximately twenty-two (22) mile Water Pipeline) in the Agricultural Zone
District. I
Legal Power Generation Facility: Section 31, T2N, R64W and Wellfield Site: Section 7,
T5N, R64W and Various Parcels along the Gas Pipeline and Water Pipeline.
(See application for more detailed legal descriptions).
Location Power Generation Facility: East of and adjacent to WCR 49, one mile north of
State Highway 52,just east of 1-76, Wellfield site: North of WCR 58, West of
WCR 51.
Parcel Number Various parcel numbers
The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this date
may be deemed to be a positive response to the Department of Planning Services. If you have any further
questions regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable) July 17, 2001
❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
SWe have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments:
Signature ,�/ }gyp Date 5�l 6
Agency jj& A SCL9/1 TS Sift O
C EXHIBIT
+Weld County Planning Dept. •:•1555 N. 17th Ave. Greeley,CO.80631 1'(970)353-. 10 ext.3540 (970)304-6 1 i 1
iticfe‘"-NT,
Weld County Referral
' May 23, 2001
COLORADO
The Weld County Department of Planning Services has received the following item for review:
Applicant Rocky Mountain Energy Case Number USR-1339
Center, LLC (Calpine)
Please Reply By June 12, 2001 Planner Julie Chester
Project A Site Specific Development Plan and Special Review Permit for a Use by Right,
an accessory Use or a Use by Special Review in the Commercial or Industrial
Zone Districts (Power Generation Facility, including a one hundred seven (107)
acre Wellfield Site, an approximately eight(8) mile long Gas Pipeline and an
approximately twenty-two (22) mile Water Pipeline) in the Agricultural Zone
District.
Legal Power Generation Facility: Section 31, T2N, R64W and Wellfield Site: Section 7,
T5N, R64W and Various Parcels along the Gas Pipeline and Water Pipeline.
(See application for more detailed legal descriptions).
Location Power Generation Facility: East of and adjacent to WCR 49, one mile north of
State Highway 52,just east of 1-76, Wellfield site: North of WCR 58, West of
WCR 51.
Parcel Number Various parcel numbers
The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this date
may be deemed to be a positive response to the Department of Planning Services. If you have any further
questions regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable) July 17, 2001
❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
a We have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments:
Signature i' Date rpGd. Q/
Agency 4-CS/ r-C/Li
+Weld County Planning Dept. •31555 N. 17th Ave. Greeley,CO.80631 +(970)353-6100 ext.3540 ÷(970)304-6498 fax
6
4 Ye'S� , AY' 'el--;
'A + y wyry'M..
v^L. . .
ft 1.11 ' '':,\re-----
Y'„''',9cl County Referral
vry, r; zt
"y May 23 2001
ntr .d.eld (: )k (, ngirt
O
DJ 4,.
COLORADO .t.”,,,,,e,- I' '. Y0
The Weld County Department of $ u ved the following item for review
Applicant Rocky Mountair Case Number USR-1339
Center, LLC (CH;
Please Reply By June 12, 2001 Planner ' Julie Chester
Project A Site Specific D, n . i r: ' r nand Special Review Permit for a Use by Right,
an accessory U: , -• -• „, Special Review in the Commercial or Industrial
Zone Districts (I'rr.t=:r t-=e'i .mdcn Facility, including a one hundred seven (101)
acre Wellfield Si n ,gyp r ,rnately eight(8) mile long Gas Pipeline and an
approximately Mc, o mile Water Pipeline) in the Agricultural Zone I
District.
Legal Power Generation Fact iv Section 31, T2N, R64W and Wellfield Site: Section 7,
T5N, R64W arc \/,,i ious Parcels along the Gas Pipeline and Water Pipeline.
(See application to [nor s ac tailed legal descriptions).
Location Power Generation Facility. East of and adjacent to WCR 49, one mile north of
State Highway 52. just east of I-76, Wellfield site: North of WCR 58, West of
WCR51.
Parcel Number Various parcel numbers
The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant td this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this date
may be deemed to be a positive response to the Department of Planning Services. If you have any further
questions regarding the application, please call the Planner associated with the request.
Weld County Planning Commission Hearing (if applicable) July 17, 2001
❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
❑ We have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments:
I\\0 Ccnr1n\ VLQ A/l x1L-
Signature Hu , _lax_ Date CO -(g'0 /
Agency G')U l ,e-SS EXHIBIT
4Weld County Planning Dept. 41555 N. 17th Ave, Greeley CO.80631 4(970)353-6100 ext.3540 4(970)304-649
witge Weld County Referral
COLORADO May 30, 2001
The Weld County Department of Planning Services has received the following item for review:
Applicant Wilbur Hurt Case Number RE-3126
Please Reply By June 13, 2001 Planner Julie Chester
Project Recorded Exemption
Lega/ Part of the S2 of Section 22, T3N, R68W of the 6th R.M., Weld County, Colorado.
Location East of and adjacent to WCR 7, north of state Hwy 66. For a more precise
location, see legal.
Parcel Number 1207 22 000017
The application is submitted to you for review and recommendation. My comments or recommendation you
consider relevant to this request would be appreciated. Please reply by the above listed date so that we may
give full consideration to your recommendation. Any response not received before or on this date may be
deemed to be a positive response to the Department of Planning Services. If you have any further questions
regarding the application, please call the Planner associated with the request.
�❑/ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
b4 We have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments:
•
Signature 41 .9 42i$t./ #-'r/ f,6 wr G/
Agency C[v'/9- /J./r/. t[-1249i Date (• Yzo,
'Weld County Planning Dept. 41555 N. 17th Ave.Greeley,CO.80631 4(970)353-6100 ext.3540 4(970)304-6498 fax