HomeMy WebLinkAbout20022060.tiff FOXPOINTE
ANNEXATION IMPACT REPORT
July 15, 2002
Annexation of Property to the Town of Lochbuie, Colorado
2002-2060
t/,%� <t) �� : 4/* OC, Scfig ��r��
Foxpointe Annexation Impact Report
INTRODUCTION
The following report has been prepared pursuant to Section 31-12-108.5 of the Colorado
Revised Statutes(C.R.S.) and concerns the proposed annexation of certain real property
known as the Foxpointe Annexation to the Town of Lochbuie. The property is proposed
to be annexed in four parcels comprising a total of 54.05 acres more or less in the
following annexations:
Annexation No. 1, (parcel 1) approximately 46.68 acres
Annexation No. 2, (parcel 2)approximately 0.71 acres
Annexation No. 3, (parcel 3) approximately 1.69 acres
Annexation No. 4, (parcel 4) approximately 4.97 acres
The Property is generally located in Section 31,Township 1 North,Range 65 West, of
the 6th Principal Meridian, Weld County, Colorado. The Property is located south of
Weld County Rd. 4 with Annexations 1 —3 west of the Interstate 76 right-of-way and
access road, and Annexation 4 east of the Interstate 76 right-of-way. The Town of
Lochbuie is adjacent to the Property along all lands bordering I-76 and along the eastern
portion of Annexation 1 where the current Town wastewater plant is located. A portion of
the Property is crossed by the 75' right-of-way of the Beebe Seep Ditch and a number of
utility right-of-ways.
CURRENT ZONING/USES/PROCESS
The Property is currently zoned A-1 (Agriculture) in Weld County, Colorado. A change
is zoning to a mix of commercial and industrial uses are being proposed as a part of this
application.
An oil well and service road, and single-family residence(751 I-76 Frontage Rd.)with
associated outbuildings are the only current uses found on the Property. A historic
drainage way across a portion of this Property was identified in the Town of Lochbuie
Comprehensive Plan. The drainage way entered the Property from below I-76 south of
Weld County Rd. 4 crossing in a northwesterly direction to the Beebe Seep Ditch. While
the drainage channel is in evidence under I-76, little evidence of any drainage way can be
seen with a casual observation.
The Annexation Petition for the Foxpointe Property was submitted to the Town of
Lochbuie on June 12, 2002. On June 20, 2002,the Town of Lochbuie Board of Trustees
approved Resolution No. 13-2002 acknowledging receipt of the petition for annexation
for the Foxpointe Property, adopting findings regarding said Property, and setting the
date, time, and place for the Public Hearing as August 8,2002, at 7:00 p.m., at Town
Hall. Advertising and notice, pursuant to C.R.S.,has been directed by the Town of
Lochbuie. Copies of the annexation petitions,the referenced resolution, and the published
notice of the hearing,were previously mailed to the Weld County Board of County
Commissioners and the County Attorney, among others, in accordance with C.R.S. §31-
12-108.
1
Foxpointe Annexation Impact Report
(a],MAPS
Three maps serve as attachments to this report and are included as required by
Subparagraph(a) of C.R.S. 31-12-108.5:
ATTACHMENT A: Annexation Map
The Annexation Map reflects that the boundaries of each of the proposed annexations are
contiguous with the Town of Lochbuie. The contiguity established with the Town is
indicated on the Annexation Map with a cross-hatch pattern along the contiguous portion
of the boundary line. The approximated percentage of the perimeter of each parcel of the
Property contiguous with the Town of Lochbuie is:
Annexation No. 1, approximately 86% contiguous
Annexation No. 2, approximately 61%contiguous
Annexation No. 3,approximately 40% contiguous
Annexation No. 4, approximately 43% contiguous
The combined perimeter of all 4 parcels included in this annexation is contiguous with
the boundaries of the Town of Lochbuie for approximately 71.4%. This meets the
requirement found in the Colorado Revised Statues §31-12-104 that property is at least
1/6(16.6%)contiguous with the municipality that is being petitioned for annexation.
ATTACHMENT B: Conceptual Plan Map
The Conceptual Plan Map generally identifies present and proposed street improvements
and zoning in the proposed annexation.
ATTACHMENT C: Easements/Utilities
The easement/utility map generally identifies the location of current Town water,
proposed extension of that water to the Property, proposed sewer connections and the
easements of United Power as they relate to the Property.
Streets:
Current"streets" in the Property consist of a driveway access to the single family
residence. Street extensions into the Property will be developed from both Weld County
Rd. 4 and the I-76 frontage road along the west side of I-76 throughout this area. Street
improvements are also anticipated on both Weld County Rd. 4 and the frontage road due
to the development of the Property. An annexation agreement or development agreement
between the Town and the Annexor will address the phasing and timing of street
improvements related to the Property.
2
Foxpointe Annexation Impact Report
Major trunk water mains,sewer interceptors and outtalk:
There are no water mains, sewer interceptors or outfalls on-site or adjacent to the
property. Sewer service will be provided as set forth below.
Other Utility Lines and Ditches:
A right-of-way was granted to the Public Service Company of Colorado in instrument
recorded November 3, 1959 in Book 1543 at Page 523. A transmission line within the
210 foot right of way runs east/west between parcels 1 and 2 of the Property to be
annexed.
A second power line easement crosses the Property in a northwesterly direction near the
northeast corner of Parcel 1. This line/easement is projected to remain as the Property is
developed.
The Beebe Seep Ditch lies on the western edge of parcels 2 and 3 of the Property and cuts
across the northwest corner of parcel 1 of the Property. The 75 foot wide right of way,
and the ditch, is used to irrigate farmlands supported through this irrigation system. The
Beebe Seep Ditch is owned and operated by the Farmers Reservoir and Irrigation
Company(FRICO).
(h)PREANNEXATION AGREEMENT
A preannexation agreement is not required and has not been prepared. An annexation
agreement is anticipated to be part of the final annexation of the property,but while in
progress, has not been completed. A draft of the annexation agreement will be forwarded
to the Weld County Attorney upon its completion for the County's review.
(c)MUNICIPAL PLAN FOR EXTENDING SERVICES
For all facilities and services,the Annexor will have the obligation to develop and install
all on-site and off-site transmission infrastructure facilities necessary to serve the
Property with water, wastewater and stonnwater facilities and services.
Water:
It is anticipated that the Annexor will convey to the Town a sufficient amount of raw
water or water rights to serve the development of the Property and that water treatment
and water services will be provided to the Property by the Town.
Wastewater:
It is anticipated that the wastewater services and wastewater treatment will be provided
by the Town after Town acceptance of all wastewater facilities as provided by the
Annexor.
Stormwater:
The Annexor will design and construct storm drainage facilities within the Property
including,but not limited to: channels, inlets,piping, detention ponds and water quality
facilities. The Annexor shall convey and manage the 100 year storm events in compliance
3
Foxpointe Annexation Impact Report
with standards approved by the Town and included in the Annexation Agreement for the
Property. It is anticipated that historic flows will be conveyed to the Beebe Seep Ditch
under an agreement with FRICO.
Other Dry Utilities:
Providers other than the Town of Lochbuie will provide services including: telephone
service by Quest, electrical service by United Power, and natural gas service by XCEL
Energy (Public Service Company of Colorado). Service lines are intended to be located
within street or other rights of way dedicated to those purposes within the Property.
Emergency Services:
Police Protection will be provided by the Town of Lochbuie Police Department. Fire
Protection will be provided by the Hudson Fire Protection District.
Open Space/Parks/Public Land Dedication:
The annexation agreement will document the public land dedications and/or fees that will
be suitable for schools, libraries, fire and police substation facilities and other public
facilities.
Streets:
The proposed access to the Property will be from Weld County Rd. 4 and the I-76
frontage road. The Annexor will improve the off-site and on-site streets to urban public
standards as established in the annexation agreement.
(d) FINANCING PLAN FOR EXTENDING MUNICIPAL SERVICES
The extension of municipal services into the Property will occur through one or more of
the following mechanisms:
1. Development Fees,
2. Special Improvement Districts,
3. Developer Funds,
4. Metropolitan Districts,or
5. As otherwise agreed to between the Town and the Owners of the Property as
appropriate.
4
Foxpointe Annexation Impact Report
(e) EXISTING DISTRICTS IN THE AREA TO BE ANNEXED
The Weld County Treasurers office records reflect that the Property is subject to the
following taxing authorities:
Tax District Lew
Aims Junior College District 6.620
Hudson Fire Protection District 3.173
CCW Water District .871
Central Colorado Water Conservation District 1.428
Weld County School District RE-3(j) 40.729
Weld County Library District 3.249
Weld County Administration 20.559
With annexation of the Property to the Town, one or more of the taxing entities noted
above may no longer be appropriate or service the Property.
(0 EFFECT ON SCHOOL DISTRICT RE-3(i)
Development of the Property will have negligible effect on attendance within the School
District as it is proposed to be in commercial and industrial uses. Successful development
of the Property will increase revenues to the School District over the amount currently
generated by this Property.