Loading...
HomeMy WebLinkAbout20022432.tiff (4 DEPARTMENT OF BUILDING INSPECTION Weld County Administrative Offices 1555 N. 17th Avenue, Greeley, CO WEBSITE: www.co.weld.co.us Phone (970)353-6100, Ext. 3540 111kFax(970) 304-6498 COLORADO May 22, 2002 Tri-State Generation & Transmission A Site Specific Development Plan and a Special Review Permit for a Major Facility of a Public Utility (a 13.2 mile 115kV transmission line and two switching stations) in the A (Agricultural) Zone District USR-1392 1. A building permit shall be obtained for the two switching stations. 2. A plan review is required for each building. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of floor plans and plot plans are required when applying for the permit. 3. Buildings shall conform to the requirements of the 1997 UBC, 1998 IMC, 1997 IPC and Chapter 29 of the Weld County Code. 4. The transmission lines and switching stations are not subject to review or inspection under the 1999 National Electrical Code. No electrical permits will be required. 5. Building height shall be limited to the maximum height allowed per UBC Table 5-B. Wall and opening protection and limitations shall be in accordance with UBC Table 5-A. Separation of buildings of mixed occupancy classifications shall be in accordance with UBC Table 3-B and Chapter 3. Setback and offset distances shall be determined by Chapter 23 of the Weld County Code. Offset and setback distances are measured from the farthest projection from the building. 6. A Flood Hazard Development Permit shall be submitted for buildings constructed within the 100-year flood plain. Please contact me for any further information regarding this project. Sincerely, ,A Jeff Reif Building Official WNW2002-2432 Service,Teamwork, Integrity,Quality vouNrgry MOUNTAIN VIEW FIRE PROTECTION DISTRICT e Administrative Office: 9119 County Line Road• Longmont, CO 80501 (303) 772-0710• FAX (303) 651-7702 VIEW May 28, 2002 Mr. Kim Ogle Weld County Planning Department 1555 North 17th Avenue Greeley, CQ 80631 Dear Mr. Ogle: I have reviewed the submitted material pertaining to the Site Specific Development Plan and Special Review Permit for the construction of a major electrical transmission line and two switching stations in the A Zone District. Approximately location between 1-15 and Weld County Road 15 and Weld County Road 6 and Highway 66 (Case Number: USR-1392, Case Name: Tri State Generation &Transmission). The Fire District does not object to the project provided vehicle access is maintained so that emergency apparatus may have access to structures in the area or the Fire District is made aware of road closures so that alternate routes may be planned for. We apprecipte being involved in the planning process. Should you have any questions, please contact me at(303)772-0710. Sincerely, ( li a JJI G! LuAnn Penfpld Fire Marshal LMP/Ip cc: project file file Ip05.19.O2 Station 1 Station 2 Station 3 Station 4 Station 5 Station 6 Station 7 9119 Cnty Line Rd. 10971 WCR 13 P.O.Box 575 P.O.Box 11 10911 Dobbin Run P.O.Box 666 P.O.Box 40 Longmont,CO Longmont,CO 299 Palmer Ave. 8500 Niwot Road Lafayette,CO 600 Briggs 100 So.Forest St. 80501 80504 Mead CO 80542 Niwot,CO 80544 80026 Erie,CO 80516 Dacono,CO 80514 /4 NT Op d \ DEPARTMENT OF THE ARMY qc�: M• CORPS OF ENGINEERS, OMAHA DISTRICT DENVER REGULATORY OFFICE, 9307 SOUTH WADSWORTH BOULEVARD IDi� 'III m LITTLETON, COLORADO 80128-6901 May 28, 2002 Weld County Planning Department� GREELEY OFFICE MAY 3 0 2002 Kim Ogle RECEIVED Weld County Planning Department 1555 N. 17th Ave. Greeley, CO 80631 RE: Tri State Generation & Transmission,Major Facility of a Public Utility, Case No. USR- 1392 Corps File No. 200180802 : Reference is made to the above-mentioned project located in Parts of Sections 5, 6, 7 & 18, Township 2 North, Range 67 West; Parts of Sections 1, 2, 11,12, 13, 14, 23, 24, 25, 26, 35 & 36, Township 2 North, Range 68 West; Parts of Sections 1, 2, 11, 12, 13, 14, 23, 24, 25 &26, Township 1 North, Range 68 West; Parts of Sections 30 and 31,Township 3 North, Range 67 West; Parts of Sections 25 and 36, Township 3 North, Range 68 West, all in Weld County, Colorado. This project has been reviewed in accordance with Section 404 of the Clean Water Act under which the U.S. Army Corps of Engineers regulates the discharge of dredged and fill material and certain excavation activities in waters of the United States. Waters of the U.S. includes ephemeral, intermittent and perennial streams, their surface connected wetlands and adjacent wetlands and certain lakes,ponds, drainage ditches and irrigation ditches that have a nexus to interstate commerce. Based on the information provided, a Department of the Army permit will not be required for this activity. Although a Department of the Army permit will not be required for this activity, this does not eliminate the requirements that other applicable federal, state,tribal, and local permits are obtained if needed. If there are any questions concerning this matter,please call Mr. Terry McKee of this office at 303-979-4120 and reference Corps File No. 200180802. Sincerely, Tim a y . arey Chie , Ienv rRe!ulato Office tin e..-1O / V`≥-ri'o Weld County Planning Departmc, . � � GREELEY OFFICE 125 JUN 6 2002 RECEIVED MAY 2002 --41-1%1141 Weld County Referral ' May 20, 2002 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Tri State Generation& Case Number USR-1392 Transmission Please Reply By June 10,2002 Planner Kim Ogle Project A Site Specific Development Plan and a Special Review Permit for a Major Facility of a Public Utility(a 13.2 mile 115 kV transmission line and two new switching stations) in the A (Agricultural)Zone District. Legal Parts of Sections 5,6, 7&18,T2N, R67W; Parts of Sections 1,12,13,14,23,24,25,26,35 & 36,T2N, R68W; Parts of Sections 1,2,11,12,13,14,23, 24,25&26, Ti N, R68W; Parts of Sections 30,31,T3N, R67W; Parts of Sections-25,36,T3N, R68W of the 6th P.M.,Weld County, Colorado. Location Commencing South of WCR 6 at the Proposed Erie Switching Station (SE 932), north to WCR 6,west to the WCR 6&WCR 11 intersection, north on WCR 11 to WCR 12; From Dacono Substation (NCU-329) north on WCR 11 to WCR 20.5; east on WCR 20.5 past Rinn Valley Substation to WCR 13; north on WCR 13 &northeasterly on Firestone Trail to WCR 26;west on WCR 26 to WCR 13; north on WCR 13 to Del Camino Substation and Proposed Del Camino Switching Station. Parcel Number Various The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) July 16, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: �KA- ape�ca.tni will vvuz.cd +O 60-tat to access poen, b fo r any Iocol tvt Taf arebrtl as a y' j. j drrve.wH by . bc.t H- , r 1i51Yty Ayivet.t-1ats W,�, log tad W-1-in iti3 a permit . Signature /�y/� }.. tjt kb, Date ,s/2q/0a Agency Q` (Do) A cc. ss :•Weld County Planning Dept. +1555 N. 17th Ave. Greeley, CO.80631 +(970)353-6100 ext.3540 +(970)304-6498 fax 00/ O>ntY Or, a° I�`m CITY AND COUNTY OF BROOMFIELD Pa One DesCombes Drive • Broomfield, CO 80020 • Phone: (303) 469-3301 •°OLoRPP° Weld County Planning Department GREELEY OFFICE June 6, 2002 JUN 1 2 2002 Kim Ogle RECEIVED Weld County Department of Planning Services 1555 N. 17th Avenue Greely, CO 80631 Subject: Referral Comments for Site Specific Development Plan and Special Use Permit for a Major Facility of a Public Utility Dear Ms. Ogle: Thank you for referring to the City and County of Broomfield, the site specific development and special use permit for the above stated project. After review of the project and its location, we have the following comments: • Is the proposed transmission line located within the WCR 11 right-of-way? The portion of WCR 11 ROW in Section 23 is located within the City and County of Broomfield. If the project is within the ROW then the appropriate approvals needs to be requested from The City and County of Broomfield. • Whether the project is or is not within the ROW, we still have concern and would like to talk to you about the following: Within the City and County of Broomfield, the ultimate cross section for WCR 11 calls for a widening of the roadway. At the appropriate time, we will work with the property owners on the east and west sides of WCR 11 to obtain the needed ROW for widening. We request that you contact us as soon as possible to discuss the future ROW needs and to determine the exact location of the transmission line to ensure that future ROW needs are not compromised by this proposal. We thank you for the opportunity to review projects within your County that have potential impact on our community. I look forward to hearing from you. Please do not hesitate to contact me at 303-438-6399. Sincerely, -dui( Ted Malies Acting Planning Director MEMORANDUM 10(412, TO: KIM OGLE, PLANNWERVICES FROM: CHARLOTTE DAVIS, ENVIRONMENTAL HEALTH ill ' T C. DATE: 'II SUUBJEgI U JREI i 0 922TM-STATE GENERATION& COLORADO CC: Environmental Health Services has reviewed this proposal for a major facility of a public utility (a 13.2 mile 115kV transmission line and two new switching stations). We have no objections to the proposal, however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. If applicable, the applicant shall submit an Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit application to the Air Pollution Control Division, Colorado Department of Health and Environment for emissions of criteria, hazardous or odorous air pollutants. 2. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. 4. Fugitive dust shall be controlled on this site. During installation of the transmission line, all land disturbances shall be conducted so that nuisance conditions are not created. 5. The applicant shall adhere to the maximum permissible noise levels allowed in the Light industrial Zone as delineated in 25-12-103 C.R.S., as amended. 6. Bottled water shall be utilized for drinking and hand washing during construction of the project. 7. Adequate portable toilet facilities (port-a-potty) shall be provided during the construction of the project. 8. The applicant shall comply with the requirements of the Air Pollution Control Division, of the Colorado Department of Public Health and Environment. 9. The applicant shall comply with the requirements of the Water Quality Control Division, of the Colorado Department of Public Health and Environment. 2 Weld County Planning Department GREELEY OFFICE -10 JUN 14 2002 MEMORANDUM RECEIVED TO: Kim Ogle, Planner III DATE: June 12, 2002 WI C FROM: Donald Carroll, Engineering Administrator COLORADO• SUBJECT: USR-1392 Tri State Generation & Transmission Major Facility for a Public Utility The Weld County Public Works Department has reviewed this proposal; this project falls primarily under the purview of the Use by Special Review Standards,Weld County Code,Chapter 23,Article 2, Division IV, Section 23. Our comments and requirements are as follows: COMMENTS: The proposed transmission lines will be parallel to three separate County rights-of-way. The remaining route has been annexed by Firestone, Frederick, Dacono, Broomfield, or Northglenn. WCR 13 between WCR 26 and the Del Camino switching station is designated in the Weld County Road Classification Development Area as a major arterial road, which requires a 140-foot right-of- way at full build out. WCR 26 is designated on the Southwest Study Capital Improvements Needs Area as a paved rural road, which requires a 60-foot right-of-way at full build out. There is presently a 60-foot right-of- way. The first 1,300 feet of the road and right-of-way east of WCR 13 on WCR 26 has been annexed by the Town of Firestone. There are plans to upgrade and pave this portion of road to accommodate the French-Lohmann Gravel Pit (USR-1326). The remaining portion of WCR 26 to WCR 13 is maintained by Weld County WCR 6 is designated in the Weld County Road Classification Plan as a collector status road,which requires an 80-foot right-of-way at full build out. There is presently a 60-foot right-of-way. This road is paved and maintained by Weld County. REQUIREMENTS: Future Right-of-way: The applicant indicated that the proposed utility lines will be located 63 feet from the center line to allow for future road expansion. WCR 13 from the proposed Del Camino switching station south to WCR 26 is designated as a major arterial, which requires a 140-foot Page 1 Kim Ogle, Planner Ill June 12, 2002 Page 2 right-of-way for full build out. Weld County requires 70 feet from the roadway center line/section line for future expansion on the west side of WCR 13 though this location. On WCR 26 and WCR 6, the typical set back of 63 feet is adequate from the road center line/section for future roadway expansion. The applicant should verify with the affected municipalities that the typical 63 feet set back from the center line/section line is adequate to meet final widening requirements. Weld County Right-of-Way: A Weld County Right-of-Way Permit is required wherever a transmission line crosses the County right-of-way. There will be no staging or parking of equipment or vehicles on the County right-of-way. Utilize the private easement. Contact the Weld County Public Works Department to acquire a right-of-way permit prior to construction. Bridge Replacement: The Weld County Public Works Department had scheduled to replace the bridge over the St. Vrain River just north of WCR 26 on WCR 13, which is parallel to the proposed transmission lines. The bridge is scheduled for this year. A detour route will be set up to accommodate moving equipment and vehicles around the road closing. Please contact the Weld County Pubic Works Department to verify this route. Switching Stations: The access should be placed in such a location that there is adequate sight distance in both directions and not below the crest of a hill. Off-Street Parking/Access: The off-street parking including the access drive shall be surfaced with gravel,asphalt, concrete,or the equivalent,and shall be graded to prevent drainage problems. Storm Water Detention: The storm water detention facility has accommodated the Del Camino site by retaining and releasing through a culvert pipe at the historical flow. The Erie switching site has been designed to collect the run-off and then release it at the historical rate. Both sites will accommodate any storm water that may occur on either site. pc: Ted Eyl, Utility Agent USR-1392 M:\WPFILES\DON-C\9-USR.WPD Page 2 ROCKY MOUNTAIN CONSULTANTS, INC. R C i� A TETRA TECH COMPANY 1900 S.Sunset Street,Suite 1-F Longmont,CO 80501 June 28, 2002 (303) 772-5282 FAX(303)665-6959 Kim Ogle, Planner Weld County Planning Dept. Weld County Planning Department 1555 North 17 Avenue GREELEY OFFICE Greeley, CO 80631 JUL _ 1 2002 RE: Tri-State Generation and Transmission RECITED Dear Kim: We have reviewed the referral information supporting the Site Specific Development Plan and Special Review Permit for a Major Facility of a Public Utility as submitted by Tri-State. The proposed alignment between Weld County Road 8 and Highway 52 is in the City of Dacono Planning Area. The City expects to expand into this area and is concerned about land use and transportation in this area. The County road system will eventually become the major and minor urban arterial street system. The arterial street system will be developed according to the Baseline Standards established for Cities and Towns in this area and supported by Weld County. These standards call for 120 feet of right-of-way and a 25 foot landscape area on both sides adjacent to the right-of-way. The landscape area is intended to provide an attractive streetscape and to buffer the adjacent land uses from the roadway using such features as trees, shrubs and earth berms. The proposed power line route along Weld County Road 11 is through an area that will soon be under development. Tri-State has kept the City Council well informed about the proposed alignment, the alternative alignments and the reasons for selecting the planned route. The City does not oppose the planned alignment but there is some concern about how the installation can be integrated with the planned arterial street improvements and adjacent landscape buffer. We ask that Tri-State establish reasonable standards for landscaping and earth berming in the power line easement so that an attractive streetscape and effective noise buffer can be established along Weld County Road 11. The City looks forward to working with Tri-State on this project. Thank you for your consideration in this matter. Sincerely, ROCKY M UNTAIN CONS ANTS, INC. K nneth C. ell AICP H:\0975 008\Tri-StaieGenemtion&Transmission\CountyResponse.doc CIVIL AND ENVIRONMENTAL ENGINEERING • PLANNING maw www.rmcCO.Corn 11/25/44 08:58 FREDERICK TOWN GOUT 4 970 304 6498 NO.019 D02 1 �y TOWN OF FREDERICK / I `!t� P.O. BOX 435 • FREDERICK, CO 80530 • Phone: (303) 833-2388 AY r!I FAX: (303)833-3817 • METRO: (303) 659-8729 r3• June 28, 2002 Weld County Department of Planning Services attn: Kim Ogle VIA FACSIMILE Dear Mr. Ogle: The Town of Frederick is in receipt of the department's referral for the Tri- State Generation project through the area. The Town of Frederick has no conflict with this project as it is planned iu the County. Very y yours, Sandra M. Newberry Town Clerk EXHIBIT I MEMORANDUM To: Kim Ogle From: Ken Poncelow Date: July 11, 2002 Subject: USR-1392 The sheriff's office has no concerns with this Special Review Permit. The sheriff's office would however be willing to provide a program entitled Crime Prevention Through Environmental Design to the developer. This program reduces the likelihood of criminal activity at a specific location by"hardening" it to crime. The Sheriffs Office lacks the ability to absorb any additional service demand without the .-. resources recommended in the multi-year plan provided to the Board of County Commissioners or as indicated by growth not considered at the time the plan was developed. I have no other comments on this proposal. EXHIBIT Firestone ACommunity Am4K \'➢a. In Motion July 16, 2002 Weld County Planning Department Attn: Kim Ogle 1555 N. 17t Avenue Greeley, CO 80631 Re: Tri State Generation & Transmission, Case USR-1392 Ladies and Gentlemen: The Town has received and is currently processing applications from Tri-State Generation for the facility referenced in the applications the County is processing as USR-1392. The Town's hearings on the applications are expected to be held next month. Town Staff will be supporting the applications with specific recommendations that will be acted upon by the Town Planning Commission and Town Board after the public hearing process, Please contact us if we can be of further assistance. Sincerely, I tE) 7 Bruce Nickerson Town Planner � I 150 Buchanan P.O, Box 100 Firestone, Colorado 80520 (303) 833-3291 Fax (303) 8334863 EXHIBIT 1 6x Hello