HomeMy WebLinkAbout20020958.tiff hes" MEMORANDUM ' TO: Chris Gathman, Planning DATE: March 4, 2002 nn\ FROM: Drew Scheltinga, P. E., Engineering Division Manager 1:- SUBJECT: Z-570 Spring Meadows PUD, Olson Brothers LLC COLORADO The Public Works Department has reviewed this PUD Change of Zone request. Comments made during this phase of the process may not be all-inclusive, as other concerns or issues may arise during the remaining application process. COMMENTS: External Roadways: WCR's 42 and 15 are designated as local roads in the Comprehensive Transportation Plan and require 60' rights-of-way. On the final plat, the applicant must indicate the document that created the existing right-of-way or dedicate the right-of-way on the plat. The portion of WCR 42 at the northwest corner of Lot 9 deviates from the quarter section line. At final plat, the existing road location must be verified and a 60' right-of-way established that covers the roadway. Realigning the curves on WCR 42 will not be required. I agree with the conclusions of the Traffic Impact Study dated July 2, 2002, submitted by Matt Delich. The existing traffic counts in the report are consistent with our information and his projections are reasonable. Spring Meadows will increase the traffic on WCR's 15 and 42 approximately 30%. A proposed off site road improvements agreement that will share the cost of future paving, or dust control, proportional to the impact of the development will be required at final plat application. Existing agricultural accesses may be retained for agricultural purposes only. Internal Streets: The geometry of Dove Court and Willow Lane is acceptable. At final plat, roadway construction plans will be required. Page 1 EXHIBIT 2002-0958 Page 2 Z-570 3-04-02 County Code requires all PUD roadways to be paved. The application materials indicate the internal roads will be gravel but also states they will be paved if the County will accept the streets for maintenance. It is presently County policy to accept paved subdivision streets for maintenance. The internal roads should be paved. Landscaping in the intersection sight distance triangles must be less than 3.5' at maturity. Drainage: A Preliminary Drainage Report, dated March 5, 2001, was submitted by Park Engineering Consultants. I agree with the conclusions and recommendations of the report. At final plat application, a final report and plans detailing the construction for drainage facilities will be required. RECOMMENDATION: I recommend approval of the change of zone with the following items to be addressed at the time of final plat application. 1. Determination of rights-of-way on existing County Roads. 2. A proposed off site roadway improvements agreement. 3. Submittal of roadway plans. 4. Final drainage report and drainage plans. PC: Z-570 M:\W PFILES\DREW\Planning\z-570.wpd Memoran urn TO: Chris Gathman, W.C. Planning DATE: March 1, 2002 VI 1 DQ • FROM: Pam Smith, W.C. Department of Public COLORADO Health and Environment CASE NO.: Z-570 NAME: Olson Bros/Spring Meadows The Weld County Health Department has reviewed this proposal. The applicant proposes a 9 lot PUD on 79 acres. The minimum lot size is 1.1 acres with an overall density of one septic system per 8.7 acres does meet current Department policy. It should be noted that Podtburg Dairy is located approximately .75 miles northeast of the site, and Northmoor Acres is located approximately 1 mile northeast of the site. The application has satisfied Chapter 27 of the Weld County Code in regard to water service. Water will be provided by Little Thompson Water District and sewer will be provided by individual sewage disposal systems. A will serve letter from Little Thompson Water District was provided in the application materials. The application has satisfied Chapter 27 of the Weld County Code in regard to sewer service. Sewer is proposed to be provided by individual sewage disposal systems. Preliminary percolation data provided in the Terracon preliminary geotechnical report dated June 5, 2000 indicates that conventional septic systems may be feasible on portions of the site. Some percolation rates were found unsuitable, and shallow groundwater across the site indicates that engineered septic systems will be required. Lots 1 through 3 may be restrictive because of soil and groundwater conditions. Lot 9 has two suggested building sites to preserve the agricultural practices. The Department recommends that septic envelopes be designated on Lot 9 (on the west side because of the size and shape, on the east side because of the gas line and associated easements). The Department recommends approval with the following conditions: 1. Water service shall be obtained from the Little Thompson Water District. 2. Septic areas shall be designated on both building sites of Lot 9. 3. This subdivision is in rural Weld County and is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. The final plat documents for this subdivision were prepared by Alles and Associates, Inc., Job Number: Olson-0102 and dated December 12, 2001. These final plat drawings indicate proposed primary and secondary envelopes for the absorption fields. These envelopes may be movable, provided the envelopes are of equal or greater area, meet all required setbacks,and are documented by an affidavit of correction per Section 24-5-50 of the Weld County Code. The lot owner shall not place any permanent landscaping,structures,dirt mounds or other items that would interfere with the construction, maintenance, or function of the fields in the primary and secondary envelope. 4. Language for the preservation and/or protection of the second absorption field envelope shall be placed in the development covenants. The covenants shall state that activities such as permanent landscaping, structures, dirt mounds or other items are expressly prohibited in the absorption field site. EXHIBIT IZ 5. If required, the applicant shall obtain a storm water discharge permit from the Water Quality Control Division of the Colorado Department of Public Health and the Environment. Silt fences shall be maintained on the down gradient portion of the site during all parts of the construction phase of the project. 6. During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions,at the request of the Weld County Health Department, a fugitive dust control plan must be submitted. 7. In accordance with the Regulations of the Colorado Air Quality Control Commission any development that disturbs more than 5 acres of land must incorporate all available and practical methods that are technologically feasible and economically reasonable in order to minimize dust emissions. 8. If land development creates more than a 25-acre contiguous disturbance, or exceeds 6 months in duration, the responsible party shall prepare a fugitive dust control plan, submit an air pollution emissions notice, and apply for a permit from the Colorado Department of Public Health and Environment. 9. "Weld County's Right to Farm" as provided in Appendix 22-E of the Weld County Code shall be placed on any recorded plat. O:\PAM\PLANNING\CHZO N E\Z570.RTF j ^1 , I iatWeld County Referral ' January 8, 2002 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Olson Brothers LLC Case Number Z-570 Please Reply By January 29, 2002 Planner Chris Gathman Project Change of Zone from A(Agricultural)to PUD for 8 residential lots for Estate uses, one 54.5 acre PUD agricultural outlot, and 12 acres of common open space. Legal Lot B of RE-2746; a part of the NE4 of Section 30, T4N, R67W of the 6th P.M., I Weld County, Colorado. Location South of and adjacent to WCR 42, approximately'/2 mile east of WCR 13. Parcel Number 1059 30 000016 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) March 19, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ ,We have reviewed the request and find no conflicts with our interests. O" See attached letter. Comments: Signature �. o r Date \Ito-m 2-2 1-Uo o Agency A't c� F A!�-�7—e) �r EXHIBIT :Weld County Planning Dept. +•1555 N. 17th Ave.Greeley,CO.80631 "(970)353-6100 ext.3540 +•(970) 13 a DEPARTMENT OF BUILDING INSPECTION Weld County Administrative Offices 1555 N. 17th Avenue, Greeley, CO 80631 WEBSITE: www.co.weid.co.us Phone (970) 353-6100, Ext. 3540 111k. Fax (970) 304-6498 COLORADO January 22, 2002 Olson Brothers LLC Change of Zone from A (Agricultural) to PUD for 8 Residential Lots for Estate uses, one 54.5 acre PUD agricultural Outlot, and 12 acres of Common Open Space. Z-570 1. Building permits shall be obtained prior to any construction. A plan review is required for each building. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. 2. Buildings shall conform to the requirements of the 1997 UBC, 1998 IMC, 1997 IPC, 1999 NEC and Chapter 29 of the Weld County Code. 3. Each building will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. 4. Building height shall be limited to the maximum height allowed per UBC Table 5-B. Wall and opening protection and limitations shall be in accordance with UBC Table 5-A. Separation of buildings of mixed occupancy classifications shall be in accordance with UBC Table 3-B and Chapter 3. Setback and offset distances shall be determined by the Zoning Ordinance. 5. A Flood Hazard Development Permit shall be submitted for buildings constructed within the 100-year flood plain. Please contact me for any further information regarding this project. Sincerely, Jeff Reif ,.� Building Official • Service,Teamwork, Integrity,Quality it L"*N) Weld County Referral January 8, 2002 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Olson Brothers LLC Case Number Z-570 Please Reply By January 29, 2002 Planner Chris Gathman Project Change of Zone from A (Agricultural) to PUD for 8 residential lots for Estate uses, one 54.5 acre PUD agricultural outlot, and 12 acres of common open space. Legal Lot B of RE-2746; a part of the NE4 of Section 30, T4N, R67W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to WCR 42, approximately 1/2 mile east of WCR 13. Parcel Number 1059 30 000016 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) March 19, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments:U � � 5mn n Alt C C16`Y¢�71L ck'≥SYC C1'cn b puce I t ` htziu3h nut PJ 5f&pt t 4-ur & tK,D, ran vi 6la i n' (4.7 &rand, Signature Date I/a)(fn ✓1 Agency (`7^ lT\� lyf� W11A�1aut Q. Id d J 4-Weld County Planning Dept. 41555 N. 17th Ave. Greeley, CO. 80631 +(970)353-6100 ext.3540 •'(970) I Li 4KI:t 41116 Weld County Referral WI ' January 8, 2002 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Olson Brothers LLC Case Number Z-570 Please Reply By January 29, 2002 Planner Chris Gathman Project Change of Zone from A(Agricultural)to PUD for 8 residential lots for Estate uses, one 54.5 acre PUD agricultural outlot, and 12 acres of common open space. Legal Lot B of RE-2746; a part of the NE4 of Section 30, T4N, R67W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to WCR 42, approximately 1/2 mile east of WCR 13. Parcel Number 1059 30 000016 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) March 19, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan it We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: \ ((' \\ f ( ++ \ I / J Qcl(Pd c0...: Lrc -k 'Ib S c1 tt -rroe $(wr✓, CAI Wke-� FIC.Ac) IN aft a l+•vt (o"IS.tdry CJ)r t - Ic Cc...,ceri art Ins�r, 4L de.relcpr 514.. 4I4 Plow Cr 54verr,l ye4rs cc skpplerhe---4I L,c 1er: a,g 9-per Iod1)ic jail cry. Q.—do-or-4s 40 1AtCr'tc s0 jar Vivo( 40 McJor,4y Signature \--Sictyr, ',cry 1 p aisl p) Date rl io to Agency Q,_vISIQ./ cW WiId lcF. r •:•Weld County Planning Dept. 41555 N. 17th Ave. Greeley,CO.80631 :•(970)353-6100 ext.3540 4•(970) °tomErr (us STATE OF COLORADO COLORADO GEOLOGICAL SURVEY Weld County Planning uepartment Division of Minerals and Geology GREELEY OFFICE Pre DepartmentSherman reetl Resources 7 I15 JAN 2 9 2002 1313 S Stater,, e m Denver,Colorado 80203 PFAX: (303) 11 RECEIVED FAX:(303)866-2461 DEPARTMENT OF January 22,2002 NATURAL Legal Location : N Y, NE Y,S30,T4N, R67W RESOURCES Bill Owens CGS Case No.WE-02-0042 Governor Greg E.Watcher Mr.Chris Gathman M Executive Director Weld County Planning Department /n\� Michael B.Long 1555 North 17th Avenue I-act-dam Division Director Greeley, CO 80631 Vicki Cowan State Geologist and Director Re:Spring Meadows, Weld County, Colorado Dear Mr.Gathman: In response to your request and in accordance with Senate Bill 35(1972), I visited this property to review the plat.A Change of Zone PUD Application prepared by Todd Hodges Design, LLC(12-21-01) was included in the referral. Geotechnical and drainage reports were not included in this referral. The site is located on seventy-nine acres of topographically flat land that is currently used for farming. The proposed zoning change will create eight-one to two acre residential lots,approximately twelve acres of common open space and a fifty-four and a half acre agricultural lot which will contain a gas well envelope. The site geology consists of Quaternary-age eolian sand deposits mantling the Tertiary- age Denver Formation. The following conditions were described in the referral and observed during the site visit: 1) Groundwater.Shallow groundwater is evident in this area and may affect excavation and building design at this site. Groundwater conditions should be investigated by a geotechnical engineer and considered in the design on the subdivision. If shallow groundwater is found to be present at the site, basement or crawlspace construction may not be possible. If subgrade construction is desired, it may be required to raise the grade of the building envelope to an elevation above the high water table elevation,as directed by a design engineer. Shallow groundwater may saturate the soils and cause instabilities leading to a lowered bearing capacity for structures at the site. 2) Soils.The eolian sands at this site could have the potential for significant compression or collapse under structural loads and/or when wetted.All foundation and roadway designs for this site should be based on the recommendations of a qualified geotechnical engineer. I suggest requiring the developer to provide a geotechnical investigation that 1)includes a soil testing program of lot specific soil/bedrock borings,2)characterizes soil/bedrock engineering properties,3)provides a basis for mitigation of any potential hazards and 4)provides recommendations for structural design allowances. 3) ISDS.The referral material indicates that ISDS units are proposed for wastewater management on each of the residential lots. Due to likelihood of shallow groundwater on the site,engineered wastewater systems may be required. I suggest basing the ISDS design on site specific percolation tests and groundwater conditions after the building and absorption field envelopes have been located. Due to the potentially high water table, backup leach field sites should be located on I COr • Page 2 January 22,2002 each lot and should be defined in the site plan as areas that must be used as backup leach fields. Additionally, increasing the size of the residential lots may provide the space necessary to build effective ISDS for each lot. In summary,although there are some hazards at this site that could cause concerns with residential construction,standard engineering techniques typically allow construction to proceed. Provided the above comments are addressed at the preliminary plan stage of the planning process,there appear to be no hazards at this site that would preclude the proposed zoning change.CGS would be pleased to review any other pertinent material you may receive for this project,at your request. Please feel free to contact me at(303)866-2611 if you have any questions or concerns. Sincerely, Sean P. Gaffney Celia Greenman Geologist Reviewing Geologist Cc: Mr. Gary G.Olson, Olson Brothers, LLC Wel aunty Planning Department GREELEY OFFICE JAN 2 5 2002 RECEIVED Weld County Referral iiiID January 8, 2002 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Olson Brothers LLC Case Number Z-570 Please Reply By January 29, 2002 Planner Chris Gathman Project Change of Zone from A (Agricultural)to PUD for 8 residential lots for Estate uses, one 54.5 acre PUD agricultural outlot, and 12 acres of common open space. Legal Lot B of RE-2746; a part of the NE4 of Section 30, T4N, R67W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to WCR 42, approximately Yz mile east of WCR 13. Parcel Number 1059 30 000016 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) March 19, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ have reviewed the request and find no conflicts with our interests. See attached letter. Comments: Scr Signature ..11 nn Date y /Vlo�� II Agency W4Q sD 122-5 z / •:•Weld County Planning Dept. 4.1555 N. 17th Ave.Greeley,CO.80631 4•(970)353-6100 ext.3540 •(970)304-6498 fax EXHIBIT 1 17 Qt- WELD COUNTY SCHOOL DISTRICT No. Re - 5J '.fir 3 NORTH JAY AVENUE JOHNSTOWN, CO 80534 L, 1 10 DR.JACK E.PENDAR SUPERINTENDENT � ,L /5:2 y y Phone(970)587-2336 _t Fax (970)587-2607 January 18, 2002 Weld County Planning Department 1555 N. 17th Avenue Greeley, CO 80631 Chris Gathman: Thank you for referring case number Z-570 to the School District. As stated in previous letters the projected student impact upon the Johnstown-Milliken School district appears to be minimal, except for transportation, as presented at this time. Currently our elementary schools and middle school are above capacity and our secondary school is nearing its capacity. Our facilities plan indicates that we will have the need to build an additional elementary school within the next two years. As of this date the Towns of Johnstown, Milliken and Berthoud have formally passed a resolution and ordinance describing the land dedication or cash in lieu of land dedication for education. At present,the cash in lieu of land dedication fee is $750. This fee is paid at the time of the issuance of a building permit and is paid directly to the school district. As this exemption directly effects the school district adversely, I would request, as a minimum, that the applicant voluntarily contribute the same fee as all other homebuilders in our communities have done since the inception of the local IGAs. It would also be advisable that a common area/shelter be provided for the pickup and drop-off of students in this development. Sincerely, Jac . Pendar Super tendent 03/11/02 13:57 FAX 970 304 6488 WELD PLANNING Q002 e"- 101') Weld County Referral March 11, 2002 C. COLORADO The Weld County Department of Planning Services has received the following item for review Applicant Olson Brothers LLC Case Number Z-570 Please Reply By January 29, 2002 Planner Chris Gathman Project Change of Zone from A(Agricultural)to PUD for 8 residential lots for Estate uses, one 54.5 acre PUD agricultural outlet,and 12 acres of common open space. Legal Lot B of RE-2746;a part of the NE4 of Section 30,T4N,R67W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to WCR 42, approximately pproximately'/�mile east of WCR 13. Parcel Number _ 1059 30000016 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing(if applicable) March 19, 2002 We have reviewed the request and find that itS s/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no eonrts with our interests. ❑ See attached letter. Catcnts: . r / 1 4,6 Q. ro crAS CLA fy t r'// /Cr; Ire /4. 1-17`c r (Aid !' • Signature / Date _ ��'� Agency 7il 'N7j,,it) i r p,0dr e,t/ +Weld County Planning Dept. +1555 N.17th Ave.Greeley,CO.80631 +(970)3536100 ext.3540 +( mew I � STATE OF COLORADO i-. OFFICE OF THE STATE ENGINEER oe coy Division of Water Resources (e p o4„ Department of Natural Resources Fe� eZtB 9p �o 1313 Sherman Street, Room 818 Denver,Colorado 80203 �.lft 8 Phone(303)866-3581 `:, FAX(303)866-3589 March 11, 2002 Bit Owens www.water.state.co.us Weld County Planning DepartmenFOVefn°r GREELEY OFFICE E Greg y lchr Mr. Chris Gathman Director Weld County Planning Dept. MAR 14 2002 Hal o smPsun,PE State Engineer 1555 N. 17th Ave. s Greeley, CO 80631 RECEIVED Re: Olson Brothers PUD, Case Number Z-570 NE1/4, Section 30, T4N, R67W, 61h PM Water Division 1, Water District 4 Dear Mr. Gathman: We have reviewed the above referenced proposal to subdivide a 79-acre parcel into 9 single-family residential lots. The proposed water supply is from the Little Thompson Water District (District) and a letter of obligation was submitted with the referral materials. A water supply information summary sheet was included and the estimated water demand is 93.8 acre-feet per year. This proposed subdivision includes irrigation of 50 acres. It is noted the District letter does not specifically acknowledge supplying other than domestic water supplies, since the referenced tap size is 3/4 inch diameter. Pursuant to Section 30-28-136(1)(h)(II), the State Engineer's Office offers the opinion, that contingent upon domestic water service being provided by the Little Thompson Water District, the proposed water supply will not cause material injury to existing water rights, the supply is expected to be adequate. This recommendation does not infer an opinion as to the water supply for the proposed 50 acres of irrigation. If you have any questions in this matter, please contact Bill McIntyre of this office. Sincerely, Kenneth W. Knox Assistant State Engineer Cc: Richard Stenzel, Division Engineer Water Supply Branch District file File KWK/WCM:OIsonBrothersPUD.doc II 9 03/15/2002 11: 53 19705870141 JOHNSTOWN TOWN I, L PAGE 02 te .J r IP �. • January 8, 2002 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Olson Brothers LLC Case Number Z-570 Please Reply By January 29, 2002 Planner Chris Gathman Project Change of Zone from A(Agricultural) to PUD for 8 residential lots for Estate uses, one 54.5 acre PUD agricultural outlot, and 12 acres of common open space. Legal Lot B of RE-2746; a part of the NE4 of Section 30, T4N, R67W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to WCR 42, approximately Y:mile east of WCR 13. Parcel Number 1059 30 000016 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) March 19, 2002 O We have reviewed the request and find that it does/does not comply with our Comprehensive Plan I, We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: • Signature y� Date A‘;')./ ' Agency s-U- 1 e A :Weld County Planning Dept. +1555 N. 171h Ave.Greeley,CO.80631 4(970)353-6100 ext.3540 4(970)304-6498 fax EXHIBIT 1 z ° Hello