Loading...
HomeMy WebLinkAbout20020956.tiff Todd Hodges Design, LLC SPRING MEADOWS PUD CHANGE OF ZONE APPLICATION Specific Guide Prepared for: Olson Bros LLC P.O. Box 38 Berthoud, Colorado 80513 Prepared by: Todd Hodges Design, LLC 2412 Denby Court Fort Collins, Colorado 80526 Submitted: December 21 ,2001 EXHIBIT 2412 Denby Court • Fort Collins, Colorado 80526 • (970) 207-0272 email: toddhodgesdesign4Iearthlink.net 2002-0956 n Todd Hodges Design, LLC Spring Meadows PUD Change of Zone - Specific Guide TABLE OF CONTENTS I . Change of Zone Application Sheet 2. Authorization Letter 3. Specific Development Guide 4. Reduced preliminary landscape plan 5. FEMA Map C. Soils Map 7. Letter from Southwest Production Corporation 8. Letter from Sinclair Pipeline Company 9. Letter from Weld County School District Re-5J 10. Letter from Little Thompson Water District I I . Line Extension Agreement with Little Thompson Water District 12. Water Supply Information Summary 13. Deed 14. Affidavit of Surface Owners within 500 feet 15. Affidavit of Interest Owners Minerals and/or subsurface I G. Letter from Church 4 Associates, Inc. concerning OWS Evaluation 17. Letter from Park Engineering concerning Preliminary Drainage Report 18. Preliminary Drainage Report (attached) 19. Traffic Report (attached) 15. Landscape Concept Plan (attached) 1G. Change of Zone plat (attached) 2412 Denby Court • Fort Collins, Colorado 80526 • (970) 207-0272 •fax (561) 828-8059 email: toddhodgesdesign(d?earthlink.net PLANNED UNIT DEVELOPMENT CHANGE OF ZONE APPLICATION PLANNING DEPARTMENT USE ONLY: Case Number Application Fee: Zoning District Receipt Number Date Application Checked By: Planner Assigned to Case TO BE COMPLETED BY APPLICANT: (Print or type only except for required signatures). I(we),the undersigned hereby request hearings before the Weld County Planning Commission and the Board of County Commissioners concerning the proposed PUD rezoning of the following described unincorporated area of Weld County. LEGAL DESCRIPTION: Lot B RE-2746=located in the NE ''A 30-04-67 (If additional space is required,attach an additional sheet of this same size, or a copy of the deed) PARCEL NUMBER: 1059 30 000008 (12 digit number-found on TAX I.D. or obtained at the Assessor's Office) NAME OF PROPOSED PUD SUBDIVISION SorintMeadows EXISTING ZONING Agricultural PROPOSED ZONING PUD Estate/Agricultural/Open Space TOTAL ACREAGE 79.0 acres OVERLAY DISTRICTS none PROPOSED DEVELOPMENT GUIDE SUBMITTAL(Specific or Conceptual) Specific Development Guide PROPERTY OWNERS OF AREA PROPOSED FOR PUD REZONING: NAME Olson Bros LLC PHONE ADDRESS PO Box 38 Berthoud,Colorado 80513 NAME PHONE ADDRESS APPLICANT OR AUTHORIZED AGENT(if different from above') NAME TODD HODGES DESIGN, LLC ADDRESS 2412 Denby Court Fort Collins. Colorado 80526 HOME TELEPHONE NA BUSINESS TELEPHONE (970)207-0272 'if agent is different from the property owner,please submit written documentation from the property owner authorizing said agent to represent the owner. OLSo 's 42 ac c_ 121 dw � d0 ne� Sign at : owner or Authorize�Agent r Specific Development Guide Spring Meadows Planned Unit Development The intent of Chapter 27 of the Weld County Code states in Section 27-1-10.A, "The Planned Unit Development (PUD) is intended to allow an alternative method for property owners and developers to apply flexibility in developing land. This flexibility is generally not possible under the normal application of Chapters 23 or 24 of the Code." The general concept of this proposal is to create a Planned Unit Development (PUD) consisting of eight 1.1 to 1.7 acre PUD Estate lots, one 54.5 acre PUD Agricultural lot and 12.0 acres of common open space. The intent of this application is to create a non-urban scale subdivision composed of single-family residential lots coupled with the preservation of a large amount of common open space. The area proposed as Lot 9 is the most agriculturally productive portion of the property. The proposed land uses include single-family residential uses, passive and active open space, recreational opportunities for the property owners and continued agricultural production. The architectural style of the residential structures will be left to the discretion of the individual lot owners with standard limitations to be specifically outlined in the homeowner's association covenants. The structures within the PUD will include single-family dwellings and accessory structures, all of which will adhere to the setback, offset and other applicable requirements of Chapter 23 of the Weld County Code. This proposal is compatible with the surrounding land-uses, architectural style, character and zoning of adjacent land uses. The applicant wishes to establish a small, non-urban neighborhood consisting of residential and agricultural uses that are consistent and compatible with the uses on surrounding properties. Section 27-1-10.A.1. of the Weld County Code states, "Encourage innovations in residential, commercial and industrial development so that the growing demands of the population may be met by greater variety in type, design and layout of buildings and by the conservation and more efficient use of open space in the development". This proposal addresses the growing demand for this type of residential development as well as meeting several goals of Chapter 22 of the Weld County Code. Such goals include A.Goal 1 and A.Policy 1.1 which sets the goal of preserving agricultural lands through various methods of agricultural land preservation. This application proposes to utilize the Specific Development Guide option as outlined in Section 27-6-20.A of the Weld County Code. The following information is intended to address the eight major components of the PUI) Development as outlined in Section 27-6-30 of the aforementioned code chapter. 27-6 10 Component One-Environmental Impacts: 27.6 10.B.1 —Noise and Vibration 27-6 10.B.2 -Smoke,Dust and Odors 27 6 10.B.3 —Heat,Light and Glare 27-6 40.B.4 —Visual/Aesthetic Impacts 27-6-40.8.5 —Electrical Interference 27-6 40.B.6 —Water Pollution The proposed residential uses and continuation of existing agricultural operations should not pose negative impacts to the above listed environmental concerns on this property or on adjacent properties. In a referral response dated September 26, 2000, the Weld County Department of Public Health and Environment indicated the initial impact plan included in the Sketch Plan submittal, "...appears to adequately address all potential impacts as required by Section 4.2.5.14 TODD HODGES DESIGN,LLC I of the PUD Ordinance [Chapter 27]." Additionally, appropriate measures to mitigate any potential construction impacts will be utilized during all phases of construction. 27-6-40.8.7 —Waste Water Disposal This proposal addresses the wastewater disposal on the site through the use of individual sewage disposal (septic) systems. In accordance with the referral response from the Weld County Department of Public Health and Environment, recommended leach field envelopes will be delineated on the plat and language restricting building on the leach field envelopes will be included in the homeowner's association covenants. The Health Department also indicated in its referral response: "The application has satisfied the PUD Ordinance No. 197 Chapter 27 in regard to water and sewer service." The applicant's representative has met with Pam Smith of the Weld County Health Department to discuss the issue of leach field envelopes. Ms. Smith has indicated that the Health Department is flexible in allowing the envelopes to be modified based on individual lot layout and the specific septic system proposed. A letter from Edward Church concerning a OWS Evaluation is included within the application submittal packet. 27-6-40.11.8 —Wetland Removal This application does not propose the removal of any known wetlands. 27-6-40.8.9 —Erosion and Sedimentation 27-6-40.11.10 —Excavating,Filling and Grading 27-6-40.B.11 —Drilling,Ditching and Dredging The design of the proposed PUD and the drainage plan requires minimal on-site grading. A detention/irrigation pond will be constructed at the southern end of the site. All common open space areas will be planted in drought tolerant grasses and should not be disturbed with construction. Erosion will be kept to a minimum in accordance with the preliminary drainage plan included in the application materials. Additionally, effective erosion and sediment control measures will be utilized during all phases of construction. 27-6-40.8.12 -Air Pollution 27-6-40.8.13 —Solid Waste 27-6-40.8.14 —Wildlife Removal 27-6-40.8.15 —Natural Vegetation Removal This proposal does not have a negative impact to the above listed environmental concerns. The residential uses should not create negative impacts to air pollution or contribute to solid waste concerns. As the site has historically been used for agricultural purposes and will continue to be farmed within the 54.5 acre agricultural lot, no removal of wildlife is foreseen resulting from the development of the eight residential lots. Landscape improvements associated with this proposal will increase the amount of vegetative cover in the open space areas. These improvements will provide additional cover for wildlife in the area. 27-6-40.8.16 —Radiation/Radioactive Material To the applicant's knowledge,there are no radioactive materials located on this site. 27-6-40.8.17 —Drinking Water Source Potable water for this proposal will be provided by the Little Thompson Water District. Section 27-6-50.B.9 of the Weld County Code requires "A description of the water source and system and a statement from the representative of the provider of the water system which demonstrates that the water supply quality and quantity is sufficient to meet the requirements of the USES within the PUD Zone District." A "will-serve" letter and a line extension agreement from the Little Thompson Water District has been included in the application materials. Additionally, the Weld TODD HODGES DESIGN,LLC 2 es\ n County Department of Public Health and Environment indicated in its Sketch Plan referral response: "The application has satisfied PUT) Ordinance No. 197 [Chapter 27] in regard to water and sewer service." 27-6-40.B.18 —Traffic Impacts Due to the low-density, non-urban nature of this proposal, the impact of this development on traffic in the area should be minimal. A traffic impact study as required by the Weld County Public Works Department is included in the application materials. The applicant requests the existing agricultural accesses be retained for continued agricultural production on the site. There is an access proposed for the southwest corner of Lot 9 for agricultural access and potential future residential access. The existing and proposed access points are shown on the plat. The adjacent County roads providing access to the PUD are gravel. Gravel interior roads are proposed for the PUD. The applicant would, however, be willing to provide paving of interior streets if the County would accept the streets for maintenance. 27-6-50 Component Two—Service Provision Impacts: 27-6-50.B.1 —Schools Weld County School District RE-5J requested, in a referral response dated September 1, 2000, that the applicant voluntarily contribute a cash-in-lieu of land payment similar to the $750 fee required by intergovernmental agreement with the Towns of Johnstown, Berthoud and Milliken. This fee will be used to offset the impact of the proposed development on the District. The School District has agreed that the cash-in-lieu fee be paid at the time of application for individual building permits. A letter from the school district is included within the application submittal packet. 27-6-50.8.2 —Law Enforcement 27-6-50.8.3 —Fire Protection 27-6-50.B.4 —Ambulance Service providers for this development include the Weld County School District RE-5J, Weld County Sheriff's Office, and the Johnstown Fire Protection District. This proposal should have a minimal impact to the above service providers. The review of this proposal by the public service providers will ensure that any applicable impacts are mitigated. The applicant's representative met with a representative of the Fire Protection District to discuss options for the hydrant locations and access to the properties. 27-6-50.8.5 —Transportation 27-6-50.8.6 —Traffic Impact Analysis The internal roadways of this development are gravel. This is proposed due to the non urban nature of this proposal coupled with the fad that all adjacent roads to this property are gravel. The internal roadways shall be constructed to County Standards. The Weld County Department of Public Works recommended approval of this proposal at the Sketch Plan phase, as outlined in a referral response dated September 11, 2000. One of the conditions of approval outlined in the Weld County Public Works Department referral response dated September 11, 2000, is that the curves on Weld County Road 42 shall be flattened to accommodate a 55-mile per hour speed limit. Unfortunately, such road improvements would remove a major portion of the site's best farm ground from production and render the existing farming operation infeasible. Additionally, such road improvements are not warranted based upon the impact of eight estate residential lots. 27-6-50.B.7 —Storm Drainage TODD HODGES DESIGN,LLC 3 n The storm drainage for the PUD has been addressed in the preliminary drainage plan, which is included as part of the submitted application materials (see attached plan). 27-6-5O.B.8 —Utility Provisions 27-6-50.8.6 —Water Provisions All utilities are available to serve this proposal. As previously stated, a "will-serve" letter from the Little Thompson Water District is included within the application materials. Additionally,the Weld County Department of Public Health and Environment indicated in its referral response: "The application has satisfied PUD Ordinance No. 197 [Chapter 27] in regard to water and sewer service." 27-6-50.B.10 —Sewage Disposal Provisions The individual lots will utilize individual sewage disposal (septic) systems for sewage disposal. All of the lot sizes meet the requirements of the Weld County Health Department. A septic permit will be applied for with each individual residential building permit. In accordance with the referral response from the Weld County Department of Public Health and Environment, recommended leach field envelopes will be delineated on the plat and language restricting building on the leach field envelopes will be included in the homeowners association covenants. As stated above, the Health Department has indicated that there is flexibility in modifying the envelopes based on individual lot layout and design. The Health Department indicated in its referral response that "The application has satisfied PUD Ordinance No. 197 [Chapter 27] in regard to water and sewer service." Included in the packet is a letter from Edward Church concerning the OWS Evaluation. 27-6-60 Component Three—Landscaping Elements: 27-6-60.11.1 —Landscape Plan 27-6-60.11.2 —Treatment,Buffering and/or Screening Included in the application materials is a preliminary landscape plan that shows the existing and proposed landscape elements within this proposal. A formal landscape plan will be submitted with the Final Plan application. Landscaping within the development will be focused primarily around the entry points to the development. Open space areas will be planted with drought tolerant grass species. The proposed landscaping will be native and/or drought tolerant species, which will be maintained as necessary. 27-6-60.8.7 —Maintenance Schedule for Landscaping Elements 27-6-60.B.6 —On-site Improvements Agreement 27-6-60.8.5 —Evidence of Water The homeowner's association will conduct the maintenance for all landscape improvements in the common open space areas. All plant material will be maintained in a healthy state. Any dead or dying plant material will be replaced at the earliest planting time possible. All plant species selected will be drought tolerant and should require minimal water usage. If needed, plant materials will be irrigated by either an installed watering system or by truck. The site will not be using potable water to maintain the landscape in the open space areas. Landscape species have also been selected to adapt to the soil conditions of the site. An on-site improvements agreement with all proposed landscaping elements will be included with the Final Plan application. 27-6-70 Component Four—Site Design: 27-6-70.B.1 —Unique Features TODD HODGES DESIGN,LLC 4 An underground irrigation ditch is located in the northwest corner of the subject site. This irrigation ditch has been incorporated into the design of the proposal and into the agricultural lot to allow for continued agricultural use on site with minimal impacts. The site design is based on a potential pivot sprinkler system, which creates a unique land constraint. The proposal is designed to accommodate this farming practice and will not conflict with the agricultural activities occurring on the site. No other unique natural features exist on this site. 27-6-70.B.2 —Rezoning Consistent with Comprehensive Plan The Weld County Comprehensive Plan directs the County to provide a process to subdivide agriculturally zoned property. This proposal supports A.Goal4 by proposing a low-density, non- urban scale subdivision that will have minimal impact on the service providers of the area. The proposed configuration of the lots, open space and agricultural lot are consistent with the existing and surrounding land uses by adhering to the principle of A.Policy 4.1.8. The design of the proposal provides for eight 1.1 to 1.7 acre estate lots with associated open space areas and one large 54.5 acre agricultural lot. This proposal allows for efficient and orderly development of the area and the protection of passive open space for the existing and future citizens of Weld County. Section 27-2-60 supports the use of passive open space through the definition of Common Open Space by stating, "Common open space shall be designed to be useful to the occupants and/or residents of the PUD Zone District for recreational and scenic purposes. Furthermore, Section 27-6-174 defines a Scenic Area as, "A scenic area is an open area with natural features that are visually significant or geologically or botanically unique." As Weld County communities continue to experience a rapid population increase, preserving vistas to the Front Range Mountains is becoming an important goal. This goal is achieved through the allocation of the large agricultural lot and common open space. This proposal preserves a large portion of the site (69.3%) in a large agricultural lot that will remain in agricultural production. The proposal will allow for the installation of a pivot sprinkler, thus enhancing the continued agricultural productivity of the site. In accordance with Section 22- 2-60.A.1, A.Goal 1, the proposed configuration has been designed to preserve the prime agricultural soils and production area through a 54.5 acre agricultural lot. The configuration of the development provides for an efficient use of the land by allowing the continued farming practices with little impact on the proposed estate lots. As depicted in the application materials, the subject parcel has an odd shape that has made the site difficult to farm. The proposed future pivot sprinkler system will make the fanning practices more efficient. Alternative building envelopes have been placed on the agricultural lot (Lot 9) to ensure continued protection of the productive area. Rather than take "prime" farmland out of production, the proposal strives to preserve the prime soils and production areas existing on site. Included within the submittal packet are two letters from existing operators of oil and gas facilities on-site. This proposal takes into account the existing and future operations of oil and gas facilities on this site. Existing facilities and a future designated drill site is delineated on the plat. It is the intent of the property owners to comply with, and enhance goals and policies outlined in Chapters 22, 23, 24,and 27 of the Weld County Code. 27-6-70.B.3 —Compatibility of uses allowed within the PUD Zone District 27-6-70.B.4 —Compatibility with Surrounding Land Uses The proposed design of the eight estate lots, one agricultural lot and open space takes into consideration the existing uses of the surrounding properties, as well as the site advantages. The site is designed to provide for a non-urban scale development with both passive and active TODD HODGES DESIGN,LLC 5 common open space areas while preserving the agricultural viability of the site. The proposal is consistent with the general development practices and overall development trends in the area. Careful consideration has been given to adequately buffer the existing agricultural, proposed residential, and existing railroad land uses. Compatibility will be further addressed by referencing Weld County's "Right to Fann" statement found in Appendix 22-E of the Weld County Code on the plat. 27-6-70.03 —Overlay Districts This proposal is not located within any of the overlay districts, as identified by maps officially adopted by Weld County. Please refer to the F.E.M.A. map included in this packet. 27-6-80 - Component Five—Common Open Space: This proposal is consistent with, and will maintain compliance with, Sections 27-6-80.B.1 through 27-6-80.B.6 of the Weld County Code. 27-6-80.0.7 —15% Common Open Space Minimum Section 27-6-80.B.7 requires 15% common open space for all PUD's containing a residential element. This PUD application proposes 12.0 acres of common open space contiguous to the eight estate residential lots, or 15.2% of the total acreage of the PUD. The proposed 54.5 acre agricultural lot is a scenic area, as defined in Section 27-6-174. This privately owned and maintained area will contribute to the sense of open space within the development. The combined area of the agricultural lot and the common open space lot contain approximately 66.5 acres of open space or 84.5% of the total site area. Therefore, this proposal exceeds the requirements of Section 27-6-80.8.7 and 22-2-190.D.2.b, PUD.Policy 4.2. 27-6-80.B.6 —Ownership of Common Open Space 27-6-80.B.6.a —Construction of Open Space 27-6-80.11.6.h —On-Site Improvements Agreement The common, usable open space will be owned and maintained by the homeowners association in perpetuity. The construction of the open space amenities is minimal and is mainly vegetation. An on-site improvements agreement will be submitted with the Final Plan application. 27-6-90 -Component Six—Signage: This proposal shall comply with the sign standards, as set forth in Sections 6.3.6.3 and 6.3.6.4 of the Weld County Planned Unit Development Ordinance #197. No monument signs are proposed at this time. It is understood that monument signs require a building permit and if a sign is proposed in the future will be subject to zoning and building permit requirements. 27-6-100 -Component Seven—M.U.D.Impact: This proposal is not located within the M.U.D. Boundary, as delineated in Chapter 27 of the Weld County Code. There is no M.U.D. impact. 27-6-110 -Component Eight—Intergovernmental Agreement Impacts: This proposal is not located within any approved intergovenunental agreement boundaries, as delineated in Chapter 19 of the Weld County Code. TODD HODGES DESIGN,LLC 6 Olson Bros LLC do: Gary Olson, Operating Manager PO Box 38 Berthoud,Colorado 80513 To Whom It May Concern: Please be advised that I, Gary Olson hereby authorize Mr. Todd Hodges of Todd Hodges Design, LLC, to represent me in my endeavor to subdivide Lot B of RE-2746, located in the NE 1/4 30-04-67 west of the 6th P.M., Weld County, Colorado. Olson B os LLC r` Gary O on, Operating Manager CHURCH & Associates Inc. ENGINEERS &GEOLOGISTS October 15, 2001 Olson Bros LLC P.O. Box 38 Berthoud, Colorado 80513 Subject: Onsite Wastewater System (OWS)Evaluation Proposed Spring Meadow P.U.D. Weld County, Colorado Job No. 13822-L Gary G. Olson, As requested, we have reviewed the preliminary plat revised on September 26, 2001. The purpose of the review was to evaluate new locations for the septic system areas for the proposed lots. We made comments in a letter dated August 15, 2001 regarding a previously revised plat. The preliminary plat presents"septic areas" on the 8 residential lots. The "septic areas" on Lots 1, 2 and 3 were 12,000 square feet, where slow percolation rates are anticipated based on a report by Terracon, Project No. 21005065, dated June 5, 2000. The"septic areas" on Lots 4 through 8 were 6000 square feet, where better percolation rates are anticipated. The "septic areas" were located at least 100 feet from irrigation canals and at least 10 feet from property lines. Based on this information, adequate areas exist on the lots for onsite wastewater systems and secondary locations. The locations of proposed structures on each lot have not been determined. We recommend that the "septic areas" depicted on the plat be movable, providing the same square footage and setbacks, to provide flexibility in placing the residences. There is no guarantee that site-specific percolation rates will be the same or similar as presented in the report by Terracon. "Septic areas" may need to be adjusted pending the outcome of site-specific percolation tests. If there are questions or if we may be of further service, please call. Sincerely, CHURCH and Associates, c 'i':g,a Q.r';•;4,3 frO ). 13112 1r; Edward O. Church, P.E. 6''•,70-�5-�,,r SaiAlE � EOC/twf 2 copies sent, 1 copy to Todd Hodges DENVER 4501 Wadsworth Boulevard Wheat Ridge,CO 80033 CASTLE ROCK 303 660 4358 303.463.9317 Fax:303.463.9321 EVERGREEN 303 816 1455 LOVELAND 970 663 2124 WESTERN SLOPE 970 948 5803 11PARK ENGINEERING , CONSULTANTS October 5, 2001 Olson Bros LLC P.O. Box 38 Berthoud, Colorado 80513 RE: Preliminary Drainage Report (Spring Meadows P.U.D. #S-546) Dear Mr. Olson: Upon reviewing your revised layout of the above referenced Project, that changed the access drive for Lots 1, 2 and 3 from the north side of the Lots to the south side of the Lots, we have the following comments. The proposed change does not affect the results of the above referenced Drainage Report. Upon review, the only item that is affected is how the storm water will be conveyed along the south line. Instead of a drainage swale, the roadside ditch will function as the conveyance facility. We therefore submit that the original Drainage Report fully represents the appropriate analysis for your revised plan. No changes to the report are necessary. Respe Su 'tted, Donald W. Park, P.E. Project Manager 420 21st Ave. Suite 101 • Longmont, CO 80501 • (303) 651-6626 • FAX (303) 651-0331 E-mail dpark98@aol.com n n Report Date: 12/19/2001 11:14AM WELD COUNTY TREASURER Page: 1 STATEMENT OF TAXES DUE SCHEDULE NO: R8861400 ASSESSED TO: OLSON BROS LLC PO BOX 38 BERTHOUD, CO 80513 LEGAL DESCRIPTION: PT NE4 30-4-67 LOT B REC EXEMPT RE-2746 (3.34R) SITUS: 6500 42 CR WELD 0 PARCEL: 105930000008 SITUS ADD: 6500 42 CR WELD TAX YEAR CHARGE TAX AMOUNT INTEREST FEES PAID TOTAL DUE 2000 TAX 992.94 0.00 0.00 992.94 0.00 TOTAL TAXES 0.00 GRAND TOTAL DUE GOOD THROUGH 12/19/2001 0.00 ORIGINAL TAX BILLING FOR 2000 TAX DISTRICT 0515- Authority Mill Levy Amount Values Actual Assessed WELD COUNTY 22.038 264.46 AGRICULTURAL L 41,390 12,000 SCHOOL DIST RE5J 42.948 515.37 NCW WATER 1.000 12.00 TOTAL 41,390 12,000 SVW WATER 0.303 3.64 LTW WATER 0.000 0.00 JOHNSTOWN FIRE 6.856 82.27 AIMS JUNIOR COL 6.351 76.21 WELD LIBRARY 3.249 38.99 82.745 992.94 - TAXES FOR 2000 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. CHANGES MAY OCCUR AND THE TREASURER'S OFFICE WILL NEED TO BE CONTACTED PRIOR TO REMITTANCE AFTER THE FOLLOWING DATES: PERSONAL PROPERTY AND MOBILE HOMES-AUGUST 1, REAL PROPERTY-AUGUST 1. TAX LIEN SALE REDEMPTION AMOUNTS MUST BE PAID BY CASH OR CASHIERS CHECK. P.O. Box 458 Greeley,CO 80632 (970)353-3845 ext. 3290 \Sifleigir/D March 27, 2001 Weld County Department of Planning Services Dear Sir: Sinclair has no objections to the development as represented in the plan"Spring Meadows P.U.D. #S-546"presented by Olson Bros. LLC, provided the construction does not interfere with our Easement rights or compromise the integrity of our pipeline. Sinclair would like to be kept current on the proposed development as it progresses so that we can provide ongoing input with regard to the safety and integrity of our pipeline If you have any questions regarding this letter please feel free to call me any time at: 307- 328-3578 Thank You, Joh4rown Operations Supervisor CC: D. K. Neuwerth, District Manager R D. Danielson, Area Operator Sinclair Pipeline Co. POST OFFICE BOX 185.SINCLAIR,WYOMING 82334 307/324-2636 FAX 307/328.3571 OLSON BROS LLC A Colorado Limited Liability Company 1208 Wagon Wheel Court—P.O. Box 38 Berthoud Colorado 80513 (970) 532-2948 August 29, 2001 Dr. Jack E. Pendar, Superintendent Weld County School District No. Re—5J 3 North Jay St Johnstown CO 80534 Dear Dr. Pendar The Weld County Department of Planning Services is in review of the Olson Bros LLC application for the Spring Meadows P.U.D. # S-546. This proposed nine-lot P.U.D. is located in the NE 1/4 of Section 30, T4N, R67West, near WCR 15 & WCR 42. We are expecting that a condition of approval for the P.U.D. will be: " The applicant shall address the requirements of Weld County School District No. Re—SJ Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. " We understand that new residential building within the school district creates an impact on the district's facilities. Olson Bros LLC agrees that a $750.00 "cash in lieu" fee will be paid directly to the school district at the time of issuance of a building permit for any new residence on the new lots created by P.U.D. # S-546. May I ask you to sign a copy of this letter on the indicated line at the bottom of the page and return a copy to us at your early convenience as evidence of your acceptance of our agreement. Thank you for your help. Sincerel Gary G. O son Operatin Manager Agreement accepted on behalf of Weld County School District No. Re—SJ by -- Date 9//c/ ck E. Pendar, Superintendent / PRELIMINARY DRAINAGE REPORT SPRING MEADOWS P.U.D.#S-546 WELD COUNTY,COLORADO Prepared for: Olson Bros LLC P.O. Box 38 Berthoud, Colorado 80513 (970)532-2948 Prepared By: PARK ENGINEERING CONSULTANTS 420 21st Avenue Suite 101 Longmont, Colorado 80501 (303)651-6626 March 5, 2001 PEC Project# 279-3 EXHIBIT "I hereby certify that this report(plan)for the drainage design of the Spring Meadows P.U.D. #S- 546 was prepared by me(or under my direct supervision)in accordance with the provision of the Weld County drainage criteria for the owners thereof." 'EG/STF : NUM: • 27 tae , 1.4_. 11, • 'gym'. enneth N. Wield S\r NAI E� Registered Professional Eng .- State of Colorado No. 32527 (Seal) I. INTRODUCTION In general,the proposed improvements for the Spring Meadows P.U.D. #S-546 include grading, roadways, drainage facilities, and utility infrastructure for 8 new low-density single-family homes. This analysis includes a preliminary site drainage plan and report outlining the overall drainage strategy for the entire site. This includes the design of detention areas to limit the 100-year stormwater runoff from the proposed new development areas to be less than the historic 5-year runoff rate. The location of proposed swales to safely direct onsite flows and offsite pass-thru flows are shown on the drainage plan. Supporting calculations and design criteria are contained in the appendix of this report. The drainage design concepts of this project are intended to be in conformance with the Weld County storm drainage requirements as described in the Weld County Subdivision Regulations. In addition to the Weld County Subdivision Regulations, the drainage criteria used for this project was the Urban Drainage and Flood Control District's Storm Drainage Criteria Manual. The Intensity-Duration-Frequency curves used for the rational method and the FAA detention method are those published by the Weld County Tri-Area Sanitation District. H. GENERAL LOCATION AND DESCRIPTION The Spring Meadows P.U.D. #S-546 is located in Lot B of Recorded Exemption RE-2746, Weld County, Colorado, in the Northeast Quarter of Section 30, Township 4 North, Range 67 West of the 6th Principal Meridian. It is generally bounded by Weld County Road 15 on the east side, Weld County Road 42 on the north and west sides, and the Great Western RR on the south side. The P.U.D. of approximately 82 acres will consist of eight 1-to 1.5-acre estate lots, approximately 17.5 acres of accompanying open space, and one approximately 53-acre agricultural lot. The agricultural lot will remain in agricultural production and is planned to be irrigated with a center- pivot sprinkler in a half-circle configuration. The open space parcel will contain irrigation and detention ponds. III. TOPOGRAPHY The project site slopes generally to the southeast at a slope of approximately 1 to 1.5%. The entire site is mostly irrigated cropland or pastureland There are no irrigation ditches or laterals passing through the site, although there are laterals _ bordering the site. In the eastern half of the site,there is a small unnamed flowing brook along the south side of the site, bordering the north side of the RR embankment. This brook flows eastward to WCR 15, and then crosses under WCR 15 via a 24"CMP culvert. From this point, the drainageway winds northeast and eventually to the Little Thompson River. The properties surrounding the site are all used for agriculture, with one house on Lot A of RE- 2746 to the northeast, one house on the property to the east, and one house on the property to the south. IV. EXISTING DRAINAGE CONDITIONS In general,the runoff from the site presently sheet flows southward and eastward across the site and into the unnamed brook along the north side of the RR tracks. Some flows historically enter into the borrow ditch along the west side of WCR 15 before traveling south into the 24"CMP culvert just north of the RR tracks. Up to approximately 800 acres of offsite area to the west and south of the property may contribute flows into the site. The majority of runoff from this offsite area enters into the unnamed tributary on the north side of the RR embankment before entering the site. These offsite up-basin flows will be analyzed more completely in the final drainage report. V. DRAINAGE FACILITY DESIGN In the following paragraphs will be discussed the proposed drainage concepts for the developed conditions of the P.U.D. Please also refer to the Preliminary Drainage Plan drawing included with this report. Supporting calculations and design criteria are contained in the appendix of this report. All aspects of the proposed drainage design will be in accordance with the provisions of the Weld County storm drainage improvements criteria. GENERAL DRAINAGE DESIGN CONCEPT: Runoff from the 53 acres of cropland to be irrigated with the planned center-pivot sprinkler will flow through the cultivated area in the historic direction to the southeast. Swales bordering the planted semi-circle will convey the runoff around the proposed new home lots. Runoff from the western half of the planted semi-circle will be conveyed to Pond A, through which this runoff will be passed through to the existing unnamed drainageway on the north side of the RR embankment, and then to the existing 24" culvert under WCR 15. Runoff from the eastern half of the cultivated semi-circle will be intercepted and then conveyed by swale directly into the WCR 15 borrow ditch and then to the 24" culvert under WCR 15 as it has historically. For the purposes of drainage analysis, since this land is remaining in agricultural use, it is assumed that runoff from this cultivated area will remain as it has historically. It is assumed that the drainage pattern of Lot A of RE-2746 will remain unchanged from its historic condition. Subbasin Al consists of the area of the proposed home Lots 1, 2, and 3, as well as the cul de sac entrance to these lots. Runoff from this subbasin will be intercepted and conveyed by a proposed swale to Pond Al, where the runoff will be detained and released into the existing unnamed drainageway. Pond Al will also function as an irrigation storage pond, with irrigation storage consisting of approximately 3.0 acre-feet of volume below the pond outlet, and approximately 0.5 acre-feet of detention storage volume on top of the irrigation storage volume. Subbasin B1 consists of Lots 4 through 8, as well as the cul de sac entrance to these lots. Runoff from this subbasin will be intercepted and conveyed by a proposed swale to Detention Area B1, from which the flows will be detained and then released into the 24"culvert under WCR 15. Detention Area B1 is intended to be a dry-bottomed detention area, which can also be used for pasture or open space area. The two detention areas will serve to limit the 100-year runoff from the new development area of Lots I —8 to the 5-year historic rate. The historic runoff rates from the combined areas of Lots 1 through 8 during the 100-year and 5-year storms are approximately 18.1 cfs and 2.9 cfs, respectively. The proposed release from the two detention areas after development of Lots I - 8 (not including offsite, agricultural or open-space area pass-through flows)is 2.9 cfs during the 100-year storm. Offsite flows from the west and south will be passed through the site in the location of the existing unnamed drainageway along the north side of the RR embankment. These offsite flows will be analyzed in detail for the final drainage report. Because the 24" culvert under WCR 15 will most likely not accommodate significant offsite flows from the west and southwest, weir flow over WCR 15 is anticipated during large storms. Based upon rough preliminary calculations, the minimum lowest opening elevation(MLOE)of the proposed homes should be at least two feet higher than the existing low point of WCR 15. These MLOE's will be specified more accurately in the final drainage report when the offsite upstream basin is analyzed in more detail. Although the final design for this P.U.D. will conservatively specify a safe elevation for the proposed homes of Lots 1 —8, it is important to note that if County Road 15 is ever regraded and the elevation of it significantly increased, the culvert below the road will need to be increased in order to prevent the future roadway from becoming a dam which could cause inundation of the homes. VI. CONCLUSIONS The drainage concepts for this project are consistent with current policies and practices for storm drainage management and are in accord with Weld County storm drainage criteria. Because of the construction of interception swales and detention facilities, the runoff release rate from the developed area of the proposed home sites during the 100-year storm event will be significantly lower than the historic rate. Offsite and onsite flows will be safely conveyed through the site in the historical directions. APPENDIX U II fi, \ ^ q el 1 \K___:.nyHtin),__C... .-------Thi 10 145 I \kk LO W )) \ Z O� V h �tl ) i r 4., to .§11 i -) 7) / 1 - ?i ,,_," 0 0 y i t--)))1),i . !re' / 4 GI /C-- / tn lil 1 / Sn ci fa/ Ii i 1 )( / ) ? /1:( � a ( ( ____ \\\_ ____ 7, i co. '1,1 io f - -' ir . PT, ll 'cat gl \ 1/ii -DEL, yr— S .) \___O( O ) - < k i _ _ / \ ;0 '- - __* "1 ‘j \ --/-\ 1\ O 0/e 1 %c,) ? / iZ71 - _Xf/'t A 2 c J /I k 0 —.1/ I ° i \ 4" I / ( ( ) C\ \-, n. ii ) i ‘itlitiardalsui cc:15,\) \isz-7"--Th ( 1 . __- 0 70/)32Q \ ( 1,C; s i • g0 / ( ° b os il \\ 1 i f W } 6 n i v SI# CIVO6 AINf103 1113/1 a P I II I 7/ �fii Y J nn oe a i Y -� g 240 qL 267G G-�-G In a L� i G G \ y \ __I +.. \ I I I 41 f 1 �o \ a, " O i d �� on a 1 •� P. \CI ..e I --, W li c i oidw i J; i s i co O a a It i J i in 1 i a i 4* \ g - I 9 Y 1 Q a co�o i 7 t 1ggq3 oN y h oa aJ � 34t. itg i iW J6 It ili o p i I B - J a J ig ci - i ~ � g 0- PI Ella I qe 1 rraN r ` ri Nei " , ',_2. ': s----! .. ' • ' ' ' ' ' - - �1_= _=:_j:-....-__-__-.=.1--___.--- -_ .. C -•- c r =I `I.--_=.7 = :- --===, ==.=,._I='_ - == n •c .... ----- :.._-t=,_.._-_f -1_.-'-•--7 _ _ _ C-II-x.'9:0 -- —�-=-7-14t——;__1___— ____ _�_ .—, �— c 1._8.-0 -_ - - - .._ -- 17:7:1-17"7_ _E- '= - _:P__--.7Z- o- - = - CC _=•_70 -_ �_ MINIM. -rte= - =_}-1__ _ --.3- =5 x__-x-- ..1.E.:4:1_.:7 -. H="6:O I= 1- - --1 - -' Jr----- --. + W - Y-- a — _ = _r t-_,__._-_- - J- Co Ez,---- - - cam_ Ltd. r_= -- = _ ..7÷4:.:_t'2:21 ,,..... !.711".±4±:±:- _. _ _ ';: --'' YEAR _� _ _ CC LI :3. - --- _ L -_.�._.—_ ..TIf,tE_9 C0NC�NTRADDI .,_. _ _.,.S,)tr=t=1:7 : :-.27 --11 1 H. Q E , Jp F- W ..c ^ I — d . E I— Co o g �I �I 0)I 041 NI .c5- CA _>. N : C V V o coC iz.. E N r ai N _ 0 o O N N n n o n n N O o E O r o E > l0 p co C co Z E p F O r r — r r Y p co p O y c E y m — c c = a m )> w C J N N to N h o o E E3 w l0 O) O) O) m m — LLp O E N C in II'''. CO N LL CO C7): W O CD 0 0 W Q) C C o N CO (O O - co N (0 (p N N •- •-- X W C N _ CO TU- O) C E I O c c) o c v o m c0 co H � a > U ~ ~ E r) cam) co 0 Y � C > L.t. E EO E . V) U) U) U) V) 0 \ 1/4- C? L CO M M CO o R V o O 0 O O C N O M a) O C N O Z c3 > O . co co O O O - O 7 d 7 y : N N N N O) ` ~ CO -- E •c Q o o ) t.,?_ i � - O O o a o co LL C N (o+) o — re t- S t « o " 00 I— co Z U, dt t d C _ W > > a m m U • U V0 0 O C C Z .- � A a. a. 0 O — a " d 3 3 t w 0 3 a C g m co LL o = 0 d d Q ¢ m ¢ a a — C it;-3 d m d a WC C,2 O *C. O 0 0 G z in N > O O — isiw n m r r m a o <O V: tric•4 m N6 N V T L O CO f- 0) a CO 0) A C 0 r 0 r Ch r CO U r- i ca N C CO O G O —a O X CO 0 - a m CNi o CIO r co r ; O w ce F°- c 0 O 01 NI v 14) 14)) - n £ CV a) a w To t , O 0a co U0 )) r 6 - a 2• g 0 0 0 0 0 0 to 7 O in 0 N- N = d v co co '7 V co O 0 T — w co c V' R h f� +- CO m a U C) U r N a 'C. U 'C U •` U X CO .y O 'c a N V J Q~ _ N P. N a°.. N_ 2 O, L a C O a w a N a '^ co CO CD 0) eD I- 'a �• .C ,_ L - - co >1— LL 0)• T co0 Cu N 0 0 N co0 U T 0 T T 0) J Z o T O >` O >. O Q N O U) O N O N H N r r r L O 0 - V' `° Q Z LL N Y co — Z # t t > 2 ci ≥ i Ce a LJL LL c m 0 r a 0 co ca r r CC D — U_ 0 U a CC 0 a ce Q re 0 u. ° co O W O 0 0 0 r a) r r m T1 - 0 a a m + O Ca Z Co E a a E O 2 N 2 y 111- .... FAAPondA.xls DETENTION POND VOLUME REQUIREMENT FOR 100-YEAR STORM - - "POND A" _ SPRING MEADOWS P.U.D.#S-546 FAA DETENTION METHOD - RAINFALL INTENSITIES BASED UPON WELD COUNTY TRI-AREA SANITATION DISTRICT TIME-INTENSITY-FREQUENCY CURVES A= 4.48 ACRES - C = 0.60 CA= 2.69 -- RELEASE RATE = 0.9 CFS (=total release of Basins Al+B1-Pond B release = 2.9 -2.1 = 0.9 cfs) — DEVELOPED DEVELOPED TIME 100-YR 100-YR 100-YR DETENTION MIN. SEC. INTENSITY CA INFLOW OUTFLOW VOLUME - 5 300 9.30 2.688 7500 270 7230 10 600 7.30 2.688 11773 540 11233 15 900 6.10 2.688 14757 810 13947 - 20 1200 5.30 2.688 17096 1080 16016 25 1500 4.80 2.688 19354 1350 18004 30 1800 4.30 2.688 20805 1620 19185 35 2100 3.90 2.688 22015 1890 20125 - 40 2400 3.60 2.688 23224 2160 21064 45 2700 3.35 2.688 24313 2430 21883 50 3000 3.10 2.688 24998 2700 22298 55 3300 2.90 2.688 25724 2970 22754 60 3600 2.70 2.688 26127 3240 22887 65 3900 2.55 2.688 26732 3510 23222 70 4200 2.40 2.688 27095 3780 23315 - 75 4500 2.25 2.688 27216 4050 23166 80 4800 2.15 2.688 27740 4320 23420 85 5100 2.05 2.688 28103 4590 23513 - 90 5400 1.95 2.688 28305 4860 23445 95 5700 1.85 2.688 28345 5130 23215 100 6000 1.75 2.688 28224 5400 22824 - !REQUIRED VOLUME = 23513 CU.FT. = 0.54 AC.FT. 0 O E • e ca- o c in go > m o O E O N O To CD O N E l m N — Q O Eo 0 0 Wz O co W> z m 5 ci co o O — W in Y Q ^/ CU U) C4 V O O NCO w — X c ea O , O co O m ,_ v Co Cr) W W Q 0 0 O O — 2 N O C J - N r O R " • Ili <O O > a a > a °' N W O * 2 Q d o I- 0 cc- Z Z a > w w O O3 F w COLL inn. 0 H F'- o ~J o g Z Z g 0 6 o W W0 0 t- F- z O - W W E 0 0a. N d — E — w o c0 •} N v- 0 ci 6 O — N ri E '2' W N EO a) = cr)p N E ci co 01 o` I p d 0 O O O O > U > C C _ W O a) -- o o C) N- CD QN C) CO CO N. co O) Zc0 O ci 6 O O CD W i+ — O N o, 0 0 0 0 0 N c- 0') Ca) Cam')- NV — u) c~,n3 ro al o aa)) S O ^0 o 0 0 0 Q a N O C __ 0 N CO h h CO c aJ a O c i M Q — N C O < < 4 a) Q co Q — Z le Z r4 de O Ili O at a > a 6 Z ? _ 0 w Z a < O 3 2 ~ — Q o z �Q LL 0 CD m _ 2 z I- ~ O Fa. - w 0 N 03 FAAP10OF2HY.x1s DETENTION POND VOLUME REQUIREMENT FOR 100-YEAR STORM - - "POND B" SPRING MEADOWS P.U.D. #S-546 FAA DETENTION METHOD - RAINFALL INTENSITIES BASED UPON WELD COUNTY TRI-AREA SANITATION DISTRICT TIME-INTENSITY-FREQUENCY CURVES A= 7.59 ACRES - C = 0.60 CA= 4.55 - RELEASE RATE= 2.1 CFS (= 5-year historic rate from Basin B1) DEVELOPED DEVELOPED — TIME 100-YR 100-YR 100-YR DETENTION MIN. SEC. INTENSITY CA INFLOW OUTFLOW VOLUME - 5 300 9.30 4.554 12706 630 12076 10 600 7.30 4.554 19947 1260 18687 15 900 6.10 4.554 25001 1890 23111 20 1200 5.30 4.554 28963 2520 26443 - 25 1500 4.80 4.554 32789 3150 29639 30 1800 4.30 4.554 35248 3780 31468 35 2100 3.90 4.554 37297 4410 32887 - 40 2400 3.60 4.554 39347 5040 34307 45 2700 3.35 4.554 41191 5670 35521 50 3000 3.10 4.554 42352 6300 36052 55 3300 2.90 4.554 43582 6930 36652 60 3600 2.70 4.554 44265 7560 36705 65 3900 2.55 4.554 45290 8190 37100 70 4200 2.40 4.554 45904 8820 37084 - 75 4500 2.25 4.554 46109 9450 36659 80 4800 2.15 4.554 46997 10080 36917 85 5100 2.05 4.554 47612 10710 36902 90 5400 1.95 4.554 47954 11340 36614 - 95 5700 1.85 4.554 48022 11970 36052 100 6000 1.75 4.554 47817 12600 35217 N d E — — 7 O r V CO CO N O W G O o o C E 5 7 N W _ 0 W - O 0E � � 0 ro °Dv O b o O O O O I— c _ • Z _ W mCU u O 000 v co co a CO 9 0 0 0 0 0 CO _ iJ Y L9 re -63 0 0 0 0 Q Q C) 0 0 O 00 03 N I— W y N N N 1 O 0 d 1 0 'co E t O O m r co > N O O — 0 G T N C J o O J '� co O O 01 O '4.3N M N7 go' • CO m CD W C4 LL1 Ill # z O Q Qm t a Z Z a > w O 0 W re I - I- 0 in a Z Z g w W LW m O o f r— Z r — W W E 0 y • I $' J . i ; s 2 o s L, oeioa uunoo c13,A ; F. g zr ��------ Z J Pr IQ OO pti O OW : C A ?bd O a a a° ¢ ' 3'l < Oy N x Z, C70Z, ew 4 a, W 2O U = O •, iii ry w • U ma ooj r- -0 o z p - V' s 3 Im im m \ r..e. i8 ,b" H 1, i Z \ z C j — 0 2 di CO C. C < 1 I — j I lt Cr 0, Z h O lJ J m _ C7 in Q ' 0) Cb d d O VU — ZG u4 • m. g - z t LOG OF BORING No. 2 ` CLIENT Page 1 of I ARCHITECT/ENGINEER Olson Brotheres LLC Todd Hodgeses SITE Weld County Roads 15 and 42 I PROJECT Design Johnstown, Colorado Proposed 9-Lot PUT) C j i a I SAMPLES I TESTS I ! s , — U ici L y � DESCRIPTION } ! c z ?Sr_ rn I < _ I C Zi i 7.71 : n .C,. i it. Si F H:T. I U _q C ,?;;;; •(2) .; . , 0.5 TOPSOIL6" CLi t SS i 18" 6 l6 i LEAN CLAY WITH SAND Tan. moist co wet - Very soft to medium 2 ST; [2' 27 95 93O 3 SS , t2., 1 32_ 5 • 4 ST; 12 25 105 — 1 5 SS , 3 i 38 1 10- J 12.0 WEATHERED SANDSTONE Tan to gray, moist, poorly cemented I � i j I 15.0 6; SS 12" 15 I 24 ; L BOTTOM OF BORING i� ; L ; i I HE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES ETWEEN SOIL AND ROCK TYPES: IN-SITU.THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS le n, BORING STARTED 4-17-00 /L 6.2 W D 6.2 AM. BORING COMPLETED +L �erracon4-17-00 RIG CNIE-55 I FOREMAN DBC }IL Water Checked 1 Day A.B. APPROVED DiVIL I108# 21005065 i - LOG OF BORING No. 4 CLIENT Page I of 1 ARCHITECT/ENGINEER -'- ----- Olson Brotheres LLC i Todd Hodges Design - SITE Weld County Roads 15 and 42li PROJECT --- --- - — - Johnstown. Colorado Proposed 9-Lot PUD C : . SAMPLES TESTS -- C ' C U DESCRIPTION L" ! } - c •I L z 'Zr: u ' z C c cn � : =H O . � ' -- IQZ I V Z } -C O �" U-.. C — Z E- C 1 7= .4 ^J ?—:n , 0.5 TOPSOIL 6' C.L... , LEAN CLAY WITH SAND — Tan, moist to wet _ Very soft to medium — . '_ ST 12": 25 97 , 1735 3 SS 12' 2 28 _ 5 a. 4 ST 12" 30 91 — . 5 SS 12" 3 25 , 10— I i : i i — i I •' 14.0 . li WEATHERED SANDSTONE i 6 SS L' 5 22 _. •" 15.0 Tan to gray. moist, poorly cemented — BOTTOM OF BORING I� J THE STRATIFCATION LINES REPRESENT THE APPROXLVATE BOUNDARY LINES j BETWEEN SOIL AND ROCK TYPES: IN-SITU.THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS BORING STARTED 4-17-00 WL 6,8' W.D.:X 6.7' A.B. BORING COMPLETED err acon 4-17-00 J W L � RIG CIE-55 FOREMAN DBC w L Water Checked 1 Day A.B. APPROVED DML ,108 ' 21005065 LOG OF BORING No. 3 CLIENT Page 1 of ! ARCHITECUENGINEER Olson Brotheres LLC Todd Hodges Design — SITE Weld County Roads 15 and 42 PROJECT Johnstown, Colorado Proposed 9-Lot PUD a SAMPLES TESTS I — • c ; DESCRIPTION' c- f z !?= - C i Z:•1 j r,, ! Z z v' _ O _ v .. _ „- • - .. _ • 0.5 TOPSOIL6' CL I SS IS" 5 18 - - _ LEAN CLAY WITH SAND T^ [MSC (0 Wet _ Very sort to medium 2 ST 1'_" 27 94 1190 0 3 SS 12" 3 27 • 4 ST 1'" 27 75 360 5 SS 12" 2 2; I0 - J - 6 '. SS 12.., 3 24 15.0 BOTTOM OF BORING THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES JBETWEEN SOIL AND ROCK TYPES. (N-SITU. THE TRANSITION MAY BE GRADUAL. WATER LEVEL OBSERVATIONS BORING STARTED 417-00 WL = 7.g' W-D..t 6.8' A.B. BORING COMPLETED erracon1700 tV L RIG C�[E-55 FOREMAN DBC wL Water Checked 1 Day A.B. APPROVED DML JOE 21005065 t LOG OF BORING No. 1 - CLIENT Page 1 of I I ARCHITECT/ENGINEER --- Olson Brotheres LLC ! Todd Hodges Design SITE Weld County Roads IS and 42 I PROJECT Johnstown, Colorado Proposed 9-Lot PUD —. SA\IPLES -- - TESTS ------ C DESCRIPTION ` — — z— f 0.5 TOPSOIL 6" — CL, I SS IS" 4 IS LEAN CLAY WITH SAND Tan, moist to wet • Vcv sod to medium ST 1'" 30 94 935 3 SS 1?.. 2 2S — • ? 4 ST I2 N to: .. 3 J - _ WEATHERED SANDSTONE — 5 SS [2 LS a Tan to _ray. moist, pooriy cemented 10— . t?.0 — SANDSTONE - Tan to _gray, moist, well cemented - 6 SS 6 50/.5 [9 _ = 15.0 BOTTOM OF BORING 15— THE STRATIFICATION LINES REPRESENT THE APPRO.CC4.ATE BOUNDARY LINES BET'AEEN SOIL.AND ROCK TYPES. IN-SITU.THE TRANSITION MAY BE GRADUAL WATER LEVEL OBSERVATIONS _ BORING STARTED 4-17-00 ,•VL 7.6' w.D•!T. 7.3' A.B. BORING COMPLETED tbL ` rracon RIG 4-17-00 C�(E-__ .FOREMAN DBC —• L Water Checked 1 Day A.B. APPROVED DML ,JOB., 21005065 0 ,� MEMORANDUM LO op co TO: Gary Olson/Roger Olson, Olson Bros. LLC ' Op REC,� • lO Todd Hodges, Todd Hodges Design ::•OPF:•'wJ' `r •, o a; Diane Houghtaling, Weld County Public Wor 'Ov,�,`t� O•cc 9.O:. ¢ ( 1 O."Q" S,O i OJ o FROM: Matt Delich j 152'' a U a' 'fly,, l+ • a DATE; July 2, 2001 '� • `�t11 o IL a SUBJECT: Spring Meadows PUD - Traffic impact study '•..S�0NAL w (File: 0124ME01) O J •w o Spring Meadows PUD is a nine lot planned unit development ? N proposed in Section 30-4-67 in Weld County. Figure 1 shows the a rn p CD location of Spring Meadows PUD. As indicated on Figure 2, five lots z T will access WCR15 south of WCR42, one lot will access WCR42 west of w so a WCR15, and three lots will access WCR42 east of WCR13. WCR15 and I rn WCR42 are gravel roads. WCR13 is a paved road. Diane Houghtaling, z z Weld County Public Works Department, has indicated that the traffic w d i impact study for Spring Meadows PUD should determine whether the N O_ future traffic will exceed the 200 vehicle per day (vpd) volume n threshold. A volume greater than 200 vph on a gravel road will N require mitigation to provide dust suppression. Typically, the mitigation takes the form of paving the subject road. The determination of the future traffic volume must consider current counts, site generated traffic, and traffic generated from recorded exemptions in the area. Recorded exemptions are land divisions that have been approved by Weld County. These land divisions may be occupied by a dwelling unit at some time in the future. No further approvals are required for recorded exemptions, therefore, it must be assumed that a dwelling unit can and will be constructed. Daily traffic counts were obtained on March and May, 2001, at the locations shown on Figure 3. At the time these counts were W obtained, there was considerable oil/gas activity in the area. Since this oil/gas traffic was considered to be abnormal, manual counts Cl. O 2 were obtained during portions of the day to determine how much impact ¢ the oil/gas activity had on the counted traffic. It was determined, Z I through the manual counting procedure, that a significant amount of Vz the traffic was related to oil/gas activity on all legs of the Z WCR42/WCR15 intersection. Figure 3 shows the daily traffic counts J z with the counted traffic adjusted to reflect normal daily traffic W O conditions. This is considered to be the base condition, prior to o < adding traffic for the subject site generated traffic and traffic rat that might occur due to recorded exemptions. Given the nature of • O o WCR15 and WCR42, it is expected that traffic growth would not occur i due to general traffic growth. 3 H The Spring Meadows PUD will generate approximately 86 daily W oti trip ends. The trip distribution for the site generated traffic is I a shown on Figure 4. The trip distribution was determined by LL estimating the locations of employment activity in the North Front ¢ Range. Employment is the primary attraction for trips produced at Q I— a residential land use. A "most likely" route to that employment 2 activity was determined based upon travel time and in consideration of the road system in the area. Figure 5 shows the assignment of the site generated traffic on the key unpaved public roads in the immediate area of the Spring Meadows PUD. The last component of future traffic on the key unpaved public roads in the area is that which is attributed to the recorded exemptions. Research at the Weld County Planning Department indicated that there were five recorded exemptions along WCR15 (south of WCR42) and three recorded exemptions along WCR42 (between WCR13 and WCR15) . Other recorded exemptions in the area would have little impact on the key unpaved public roads in the area of Spring Meadows PUD. Figure 6 shows the daily traffic that could expected on the key paved and unpaved public roads in the area from the recorded exemptions. The three components of the future traffic were added together to get a future traffic forecast for the key unpaved roads in the area of Spring Meadows PUD. This is shown on Figure 7. The daily traffic volumes shown on Figure 7 indicate that the daily traffic count on the key unpaved roads will not exceed 200 vpd. It is concluded that dust abatement of these county roads is not required since the 200 vpd threshold will not be exceeded in the foreseeable future. ' , 1 ,cl I a N ti N jj>/eS[}JOHNSTOWN U U 1i 1 GREAT WESTERN R.R. WCR44 cni 0 o in Tr- it o WCR42 WCR42 y� fyy�?v'F 3�1 g Spring Meadows CY 4, PUD _ WCR40 Oet- Vi C SCALE: 1"=3000' SITE LOCATION Figure 1 a N IIMG -GE-WC/ ii,______-p__ "` "'"T'�' 1 WELD COUNTY ROAD#42 :20 p V sO _P P-- 0 �— P 1100_.._ ._..1\TmEmw....aT - Arai II 0.E.1Q M LOT B T_________ m0a.� esmr x.0.00 e 40° ° inn. / I 0 SOMME / 1"67LOTS pip Lai 0 $3/1C. RE#27M LOT A y \\ \ \ ca... /ieW.,r. M artw,q� �' W �- LOT1 LOTS .e— A� ��� t21n NINLOT 1 L0T2 _ _1.20 R ,.20 iI- • ,.10 n /CILOTJ : 44 fezmeL7.28 :IAPPRO: lOt5 9 ° rwmowo' 1 LOTI 1.10 I `5e:ra w« y ,.23 g I 11 p 8 i ,64SG- I R °unw ) raPenx/ ! Z , 8 j/ o i W 1 SCALE: 1"=400' Figure 2 SITE PLAN . It a N CD 1111 60 r 69 M -.NIP /W.- "4r WCR42 60 cD N Daily NORMAL DAILY TRAFFIC Figure 3 M Mfr N Z N 5% 30% U) WCR42 5 D. !'- SITE D.U. 7 O M Co `° 4 D.U. Z 5 D.U. TRIP DISTRIBUTION Figure 4 M a E 3 N N 9 16 M WCR42 rn 43 mamas*4 D.U. 5 D.U. d el 1 Daily SITE GENERATED DAILY TRAFFIC Figure 5 1 a 3 N 6 8 I — —WI WCR42 rn 32 .1 — rn v M Daily DAILY TRAFFIC FROM Figure 6 RECORDED EXEMPTIONS N cc U) CD 75 93 L.2 WCR42 co (o r 135 r to Daily TOTAL DAILY TRAFFIC FORECAST Figure 7 Hello