Loading...
HomeMy WebLinkAbout20022020.tiff RESOLUTION RE: APPROVE ADDENDUM TO CONTRACT FOR PHASE II OF NORTH JAIL AND AUTHORIZE CHAIR TO SIGN - ROCHE CONSTRUCTORS, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Addendum to the Contract for Phase II of the North Jail between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, and Roche Constructors, Inc., with terms and conditions being as stated in said addendum, and WHEREAS, after review, the Board deems it advisable to approve said addendum, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Addendum to the Contract for Phase II of the North Jail between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, and Roche Constructors, Inc., be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said addendum. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 29th day of July, A.D., 2002. BOARD OF COUNTY COMMISSIONERS WELD OUN��O�DO ATTEST: Midi '' E /,` Fr 't le aad, Chair n \ Weld County Clerk to the : rd � � =a CC.�� �.,( 'WI.vid E. g, Pro-Tem BY: lam' , c ��9 Deputy Clerk to the Boars $ 1 M. J. Geile AP E AS TO F `Ti-' � s� "Ilia,m H. Jerke � unt At orn h fV' \� Q Robert D. Masden 8/Date of signature: 2002-2020 PR0023 fs etien-Manager}-for, `-dc--;T4he-Ow+tefand-Genstructien Manager establishaGuaranteed Maximum-Price-and Contract e= ARTICLE I GUARANTEED MAXIMUM PRICE ADDENDUM II WELD COUNTY NORTH JAIL PHASE II The Construction Manager's Guaranteed Maximum Price for the Work,including the estimated Cost of the Work as defined in Article 6 and the Construction Manager's Fee as defined in Article 5, is Six Million Three Hundred Thousand and no/100 Dollars (x6.300.000.00) for the Weld County North Jail Phase II. This is a stipulated sum amount including profit and general conditions. This Price is for the performance of the Work in accordance with the Contract Documents listed and attached to this Amendment and marked Exhibits A through F,as follows: Exhibit A Drawings, Specifications, addenda and General, Supplementary and other Conditions of the Contract on which the Guaranteed Maximum Price is based,pages 1 through 2 dated July 24. 2002. Exhibit B Allowance items,pages 1 through 1 dated July 24. 2002. Exhibit C Assumptions and clarifications made in preparing the Guaranteed Maximum Price,pages 1 through 1,dated July 24. 2002. Exhibit D Completion schedule,pages through,dated Not Applicable Exhibit E Alternate prices,pages 1 through 1,dated July 24. 2002. Exhibit F Unit prices,pages 1 through 1,dated July 24, 2002. The general conditions costs may exceed the $414,000.00 as outlined in the contract. The"restriction" is lifted. This contract excludes Section 08100 (Hollow Metal Doors and Frames). Section 08200 (Wood Doors). Section 08700 Finish Hardware), Section 11191 (Security Metal Doors and Frames). Section 11192 (Security Hardware), and all Division 13. including conduit. devices, and electrical entirely. This work is being performed by others, but Roche Constructors. Inc.,will assist with scheduling and coordination. Paragraph 5.3.4 is hereby amended to reflect that the construction manager's fee will be calculated at a cost plus 10% on any scope changes above the contract amount. ARTICLE II CONTRACT TIME The date of Substantial Completion established by this Amendment is: The date of commencement shall be July 29. 2002. provided all necessary permits can be obtained by this date. The Weld County North Jail Phase II portion shall be substantially complete within 430 calendar days of the date of commencement. ® 1991 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006-5292. AIA DOCUMENT AIA121/CMC AND AGC DOCUMENT 565 - OWNER-CONSTRUCTION MANAGER AGREEMENT - 1991 EDITION - AIA® - AGC - ® 1991 - THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA, 1957 E STREET, N.W., WASHINGTON, D.C., 20006-5209. WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: aia121 weld county jail ph ii.aia -- 7/25/2002.AIA License Number 1014374,which expires on 3/31/2003. Electronic Format A121/CMc-1991 28 Pcoo1)3 2002-2020 OWNER Weld County Board CONSTRUCTION MANAGER of Commissioners BY: ��r� , BY Thomashe. President Glenn ` /Chair DATE DATE 07/29/2002 ATTEST 7 / i���r� ATTEST Clerk to the Boa • By: AM • Deputy Clerk to the • ♦� �I ® 1991 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006-5292. AIA DOCUMENT AIA121/CMC AND AGC DOCUMENT 565 - OWNER-CONSTRUCTION MANAGER AGREEMENT - 1991 EDITION - AIA® - AGC - m 1991 - THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA, 1957 E STREET, N.W., WASHINGTON, D.C., 20006-5209. WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: aia121 weld county jail ph ii.aia 7/25/2002.AIA License Number 1014374, which expires on 3/31/2003. Electronic Format A121/CMc-1991 9 WELD COUNTY NORTH JAIL PHASE II Exhibit "A" Construction Documents issued by Bley Associates: Titled-Weld County North Jail Phase II Greeley, Colorado Dated 05/04/01 Ti.0 PROJECT INFORMATION Mar. 2002 Cl ROOF DRAINAGE STORM SEWER 11/15/01 C2 DEMOLITION PLAN & EROSION CONTROL PLAN 01/10/02 C3 GRADING PLAN 01/22/02 C4 CURB & GUTTER LAYOUT 01/23/02 C5 SANITARY SEWER PLAN & PROFILE-WATER LINE PLAN & PROFILE 11/15/01 C6 STORM SEWER PLAN & PROFILE LINES "A", "B", "C" OCT. 2001 C7 MISCELLANEOUS DETAILS & GENERAL NOTES-SANITARY SEWER 8, WATER OCT. 2001 C8 MISCELLANEOUS DETAILS-WATER OCT. 2001 C9 MISCELLANEOUS DETAILS- DRAINAGE OCT. 2001 C10 MISCELLANEOUS DETAILS & GENERAL NOTES-DRAINAGE OCT. 2001 Cl 1 MISCELLANEOUS DETAILS & GENERAL NOTES-STREETS 06/12/02 S1.1 FOUNDATION PLAN 06/13/02 51.2 MEZZANINE PLAN 06/13/02 51.3 ROOF FRAMING PLAN 06/13/02 51.4 PRECAST LOAD FLOOR PLAN 06/12/02 52.0 STRUCTURAL NOTES 06/12/02 S2.1 SECTIONS AND DETAILS 06/12/02 S2.2 SECTIONS AND DETAILS 06/12/02 52.3 SECTIONS AND DETAILS 06/12/02 S2.4 SECTIONS AND DETAILS 03/04/98 A0.0 SITE PLAN 05/04/02 A1.0 FLOOR PLANS 05/04/02 A1.1 FLOOR PLANS 06/12/02 A1.2 REFLECTED CEILING 06/12/02 A1.3 SECOND FLOOR REFLECTED CEILING 06/12/02 A1.4 ROOF PLANS 05/04/02 A1.5 1ST FLOOR PLANS WEST/ADMIN/EAST 05/04/02 A1.6 2ND FLOOR PLANS WEST/ADMIN/EAST 05/04/02 A1.7 FIRST FLOR WALL TYPES 05/04/02 A1.8 SECOND FLOOR WALL TYPES 05/04/02 A1.9 BUILDING FLOOR ELEVATIONS 05/04/02 A1.10 FIRE RATINGS 06/12/02 A1.11 DOOR/WINDOW FRAME TYPES 06/12/02 A1.12 DOOR/WINDOW FRAME TYPES 05/04/02 A1.13 SECURITY CEILING DETAILS 05/04/02 A1.14 SECURITY CEILING DETAILS 05/04/02 A2.0 ELEVATIONS 06/12/02 A3.0 BUILDING SECTIONS 7/24/02 ROCHE CONSTRUCTORS, INC. �i� WELD COUNTY NORTH JAIL PHASE II 06/12/02 A3.1 EXTERIOR WALL SECTIONS 05/04/02 A3.2 INTERIOR WALL SECTIONS 05/04/02 A3.3 MISC. ARCH. DETAILS 06/12/02 A3.4 STAIR SECTION /STAIR DETAILS 06/12/02 A3.5 INDR/OUTDR EXER COURT DETAILS 06/12/02 A3.6 OUTDR EXER/VIST. PLANS 06/12/02 A3.7 ELEVATOR DETAILS 05/04/02 A3.8 BUILDING DETAILS 05/04/02 A5.0 INMATE CELLS PLANS/ELEVATIONS 05/04/02 A5.1 INMATE CELLS PLANS/ELEVATIONS 05/04/02 A5.2 INMATE CELL/BATH PLANS/ELEVATIONS 05/04/02 A5.3 INMATE BATHS PLANS/ELEVATIONS 06/12/02 A6.0 ROOM FINISH SCHEDULE 06/12/02 A6.1 ROOM FINISH SCHEDULE 06/12/02 A6.2 DOOR SCHEDULE 06/12/02 A6.3 DOOR SCHEDULE 05/04/02 A6.4 DOOR/WDW DETAILS 05/04/02 AD3.7 FIRST FLOOR PHONE/ DATA 05/04/02 AD3.8 SECOND FLOOR PHONE/ DATA 05/04/02 M-1 MECHANICAL LEGEND 05/31/02 M-2 FIRST FLOOR HVAC PLAN 05/31/02 M-3 SECOND FLOOR HVAC PLAN 05/31/02 M-4 ROOF PLAN 05/04/02 M-5 FIRST FLOOR PLUMBING PLAN 05/04/02 M-6 SECOND FLOOR PLUMBING PLAN 05/04/02 M-7 MECHANICAL DETAILS 05/04/02 M-8 PLUMBING ISOMETRICS 05/04/02 M-9 MECHANICAL SCHEDULES 05/04/02 E-1 ELECTRICAL LEGEND 05/04/02 E-2 ONE LINE DIAGRAM 05/04/02 E-3 1ST FL. E. CELL BLOCK LIGHTING/FIRE ALARM 05/04/02 E-4 2ND FL. E. CELL BLOCK LIGHTING/FIRE ALARM 05/04/02 E-5 FIRST FLOOR E. CELL BLOCK POWER PLAN 05/04/02 E-6 SECOND FLOOR E. CELL BLOCK POWER PLAN 05/04/02 E-7 SECOND FLOOR E. CELL BLOCK POWER PLAN 05/04/02 E-8 ELECTRICAL SCHEDULES AND DETAILS 05/04/02 E-9 PANEL SCHEDULES 05/04/02 SE0.0 SECURITY SITE PLAN 05/04/02 SE1.0 INTERLOCK AND CAMERA LAYOUT 05/04/02 SE1.1 INTERLOCK AND CAMERA LAYOUT 05/04/02 SE1.2 FRONT LOBBY CONTROL PANEL 7/24/02 ROCHE CONSTRUCTORS, INC. WELD COUNTY NORTH JAIL PHASE II NO DATE 2 each manuals labeled Weld County North Jail Phase II Specifications Divisions 1-7 and Weld County North Jail Phase II Specifications Divisions 8-16. Manual number 1 contains a Geotechnical Engineering Report prepared by Northern Colorado Geotech on November 8, 2001. 1. Addendum #1 issued 05/23/02 with 4 pages of modifications to drawings and specifications and attached sketches and drawings. 2. Addendum #2 issued 05/29/02 with 7 pages of modifications to drawings and specifications and attached sketches and drawings. 3. Addendum #3 dated 06/12/02 with 4 pages of modifications to drawings and specifications and attached sketches and drawings. 4. Addendum #4 dated 07/01/02 with 2 pages of modifications to drawings and specifications and attached sketches and drawings. 7/24/02 ROCHE CONSTRUCTORS, INC. WELD COUNTY NORTH JAIL PHASE II EXHIBIT "B" Allowances: 1. This project will carry a $50,000.00 allowance for winter conditions. 7/24/02 ROCHE CONSTRUCTORS, INC. WELD COUNTY NORTH JAIL PHASE II EXHIBIT "C" The following is a list of bid assumptions / clarifications: 1. We exclude the building permit fee, plan check fee, water connection fees, raw water fees, or utility fees. 2. We exclude quality assurance testing. 3. We exclude any fire pumps. 4. We exclude any rock excavation. 5. We exclude the cost of a Builder's Risk Policy. 6. We exclude all city, state, and federal sales and use tax. 7. We have excluded all carpet supply and install and rubber base at carpeted areas. 8. We exclude all furnishings and equipment. 9. We exclude any cost associated with relocation or extension of existing fiber optics and empty conduits within our work area for future fiber optics. 10. We exclude any relocation, repair, or temporary re-routing of existing landscape irrigation system. 11. Maintenance for existing landscape areas to be covered by owner. 12. Sections 08100- Hollow Metal Doors and Frames and 08200-Wood Doors shall be furnished and installed by others. 13. Division 13, Section 11191, and 11192 shall be completed by others, Sierra Steel Company, and contracted directly to the owner. 14. Security mesh screen tack welded to tube steel frame and painted per detail A3.3/9. 7/24/02 ROCHE CONSTRUCTORS, INC. WELD COUNTY NORTH JAIL PHASE II EXHIBIT "E" The following is a list of alternates proposed for this project: Alternate #1: Contractor shall furnish and install 10300 detention hardware at Pod Nos. O, R, TM, and TF Cell/dorm doors in lieu of 10120 detention hardware. NOT ACCEPTED Alternate #2: Contractor shall furnish all labor to remove existing visitation lockers from the Centennial Center ( 915 101h Street), haul to project site, and reinstall at Lobby as indicated on drawings. Lockers shall be repainted color as selected by Architect. Base bid is to furnish and install new visitation lockers as specified in Section 10500 Metal Lockers. NOT ACCEPTED. Alternate #3: Contractor shall furnish and install laminate counter tops and painted steel frames at Visitation Room Nos. H5 and H6 in lieu of stainless steel countertops and frames. NOT ACCEPTED. Alternate #4: Contractor shall furnish and install 12 foot wide asphalt paved driveway to maintenance access with (2) 8 foot x 8 foot cyclone fence installed swing gates to be secured with padlock as indicated on drawings. ACCEPTED. Alternate #5: Contractor shall furnish and install fire resistive coating at interior dayroom columns as specified in section 09900. Base bid shall be to finish primed steel columns with one coat of Oil Enamel Undercoat and second coat of Gloss Oil Enamel. NOT ACCEPTED. Alternate #6: Contractor shall furnish and install one layer of fire rated Gypsum Wallboard between the metal deck and the roof insulation to increase the fire rating for the assembly. Contractor shall decrease the amount of sprayed on fire proofing required at the metal decking to maintain the fire rating integrity accordingly. Refer to alternate drawing detail 4 on sheet A1.10. NOT ACCEPTED. Alternate #7: Division 13 Security Contractor to complete intercom and security control at Administration Lobby Room 203 for four (4) Lobby Entry Doors wired to control panel at Administration Reception Room 207. Refer to Sheet SE 1.2. NOT ACCEPTED. 7/24/02 ROCHE CONSTRUCTORS, INC. -lam • WELD COUNTY NORTH JAIL PHASE II EXHIBIT "F" The following is a list of unit prices: 1. Unit Price No. 1 A. Power Outlet-Metal Outlet Box, conduit, code wired, trim out in GDW. $ 121.00 each-includes 18' of conduit. B. Lighting Outlet-Metal outlet box, conduit, code wired. $ 66.00 each 2. Unit Price No. 2-Door Assemblies A. Typical Office door with relite. Division 11 and 13 B. Typical Office door w/o relite. Division 11 and 13 3. Unit Price No. 3- GDW Walls -$/SF A. Wall-GDW metal stud (all widths) $4.94/SF-3-5/8"-20 GA.-no batt insulation- 16'-0" and under B. Ceiling-GDW suspended system $4.06/SF for ceilings under 16'-0" AFF 4. Unit Price No. 4-Acoustical Tile Ceiling A. Type I as specified per SF $ 1.96/SF B. Type II as specified per SF $ 1.98 /SF 5. Unit Price No. 5-Countertops per LF $35.20/ LF 6. Unit Price No. 6-GDW Ceilings per SF $4.06 /SF for ceilings under 16'-0" AFF 7. Imported Fill Material as outlined by soils report per cubic yard. $ 13.64/CY to import and place 8. Imported Topsoil, if required, as per section 02260, per cubic yard. Not Required 9. Re-compact soft soil that is unsuitable for bearing of foundation as outlined by soils report, per cubic yard. $ 3.30/CY 7/24/02 ROCHE CONSTRUCTORS, INC. Hello