Loading...
HomeMy WebLinkAbout20023196.tiff RESOLUTION RE: APPROVE FINANCIAL POLICY AND PROCEDURE REGARDING INFRASTRUCTURE REPORTING WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Department of Accounting has presented a Financial Policy and Procedure regarding Infrastructure Reporting, to the Board of County Commissioners of Weld County, for consideration and approval, and WHEREAS, after review, the Board deems it advisable to approve said policy and procedure, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Financial Policy and Procedure regarding Infrastructure Reporting be, and hereby is, approved. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 16th day of December, A.D., 2002. BOARD OF COUNTY COMMISSIONERS WEL COUNTY, C LORA O ATTEST: H,, % \u � / fz-6.Pf Glens ad, Chair � Weld County Clerk to t P 1B. .(;; �ojr11 CAE4 a, David E. Lgrfg, Pro-Tem / BY: • Deputy Clerk to the Bo��V � 4 M. J. eile APPROVED AS TO FORM;_, EXCUSED DATE OF SIGNING (AYE) lia H. Jerke t - 1 c ; County Attornby Robert D. Mas en. Date of signature: a/9 2002-3196 AC0017 ��, /Cfj WELD COUNTY POLICIES AND PROCEDURES FINANCIAL POLICY AND PROCEDURE DRAFT SUBJECT: INFRASTRUCTURE REPORTING DATE: November 21, 2002 EFFECTIVE PERIOD: Until Superseded REVIEW SCHEDULE: As needed CANCELLATION: None ENCLOSURE: REFERENCE: Government Accounting Standards Board Pronouncement No. 34. PURPOSE: To document the County's policy and procedure for infrastructure reporting in accordance with GASB 34 SCOPE: This procedure applies to the Departments of Finance, Engineering, and Road & Bridge. POLICY AND PROCEDURE: Introduction: Clearly, the intention of GASB 34 is to bring government financial data accumulation and reporting into a more closely aligned position with that historically expected from for-profit businesses. As we have recognized the same identical need in our daily management of projects, we have tracked road maintenance costs (both total cost and unit cost) by activity within projects for over a decade. This effort is currently facilitated through the use of the Project Accounting module. At the same time, we maintain a general ledger budget and chart of accounts in what has traditionally been thought of as a conventional government accounting module GASB 34 allows for the employment of one of either two separate and distinct reporting methodologies for infrastructure. The first is known as the "Depreciation Approach" and requires the valuation and depreciation of all existing infrastructure assets. The second, known as the "Modified Approach", does not require immediate valuation and depreciation, but rather recognizes the important concepts of expensing maintenance and preservation costs while capitalizing the costs of new or improved assets for future depreciation. Weld County will employ both methods in the County's implementation of GASB 34. The modified approach will be used for gravel roads, and the depreciation approach will be utilized for paved roads, bridges, and culverts. The approach will be reviewed and approved by the County Commissioners at a December 9, 2002 worksession, and will be adopted on December 16, 2002. All indications are that 2002-3196 pg. 2 these approaches can be incorporated utilizing the HUTF reporting model and can be maintained utilizing our Project Cost Accounting system for historical cost tracking of projects for additions or deletions caused by annexations. Future implementation of a PUBWORKS Cost Accounting (road) System will compliment and complete the GASB 34 management systems requirements, as they currently stand. Right of Way (ROW) will not be included in the 2002 GASB presentation because of the immaterial nature of the values. The values are estimated to be immaterial because the majority of ROW's were bequeathed to Weld County upon it's creation, or purchased at minimal historical cost. The actual values will be assimilated, and inserted into the 2003 audit. Appendix "A" Appendix A is the Federal Aid Highway Construction Index, which is utilized to attain historical cost on all of the infrastructure elements. The index is predicated on 1987 being the full amount or 100%with the amounts flowing up and down on the calendar scale. This index will be used globally over the maintenance level assets (gravel roads), as well as the depreciation method assets (paved roads and bridges) Implementation of the Modified Approach: /', In order to better understand our process in employing the Modified Approach for our gravel roads, we have chosen to make our determination of reporting requirements based solely on consideration of the condition of the surface of a road. All other related activities are presumed to merely maintain the current condition. Our use of the Modified Approach requires the definition of several terms as they refer to work performed on both existing and future (new) infrastructure assets. We recognize that the term's maintenance and preservation may conjure up similar images. We have, however, differentiated between the two by the anticipated frequency of which we expect various activities to occur Maintenance and Preservation (expensed in current year): Maintenance: Those maintenance/preservation activities and operations that take place on an annually reoccurring or shorter time frame. Maintenance Examples: Grading (and re-grading) a gravel surface road. Dust control and stabilization treating of a gravel surface road. Preservation: pg. 3 Those preservation/maintenance activities and operations that take place on a less frequent than annual basis. Preservation Examples: Replenishment of gravel on a gravel surface road. At the same time, the term improvement requires definition as an aid in determining the role in any enhancement to the old infrastructure Improvement: Work that results in a change to the basic character, function and/or noticeable structural features of a road. Improvement Examples: Graveling (6"thick and full road width) a native surface road. Reconstruction (horizontal/vertical alignment changes) of a native surface road. Reconstruction (horizontal/vertical alignment changes) of a gravel surface road. Maintenance Level for Modified Approach The modified approach requires the county to set a level of maintenance for its infrastructure systems and to do a condition assessment. At a minimum, every infrastructure segment will be inspected and its condition assessment updated once every three years. Roads are evaluated in one-mile segments. The County's goal is to maintain its gravel road system at or above a FAIR condition. Appendix "B" Appendix B reflects the cost justification to attain the value of the gravel road system in Weld County. A further explanation is given in that section as it pertains to the cost per mile calculation wherein the grader zones are involved. Implementation of the Depreciation Approach: This approach was chosen to track the cost and enhancement of all paved roads in our system as well as the bridge inventory(both major and minor). Activities of culvert installation and cleaning; the mining and crushing of aggregates; tree and brush trimming (and removal); weed mowing; bridge and guard rail pg. 4 /'` repairs; superstructure repairs, and so forth are generally conducted to preserve and maintain the existing road and/or bridge condition, whatever it may be. Therefore, they are considered ancillary to road and bridge maintenance/preservation unless they are included in a construction(new infrastructure) or reconstruction(improvement/new infrastructure)project. As our daily work activities specifically regard bridge structures, we are committed to making similar determinations regardless of them being either major(> 60' in length) or minor(> 5' but<60' in length). Complete deck replacement, complete superstructure replacement, and general bridge replacements will be considered to be new infrastructure and therefore, improvements and capitalized assets. Again the terms maintenance and preservation are utilized in a like minded approach, and are further defined below: Maintenance (expensed in current year): Those maintenance/preservation activities and operations that take place on an annually reoccurring or shorter time frame. Maintenance Examples: Surface repair (patching) of a chip seal surface road. Surface repair(patching) of a hot mix asphalt paved surface road. Preservation (capitalized in current year): Those preservation/maintenance activities and operations that take place on a less frequent than annual basis. Preservation Examples: Structural patching of a chip seal surface road. Crackfilling of the surface of a chip seal surface road. Seal coating of a chip seal surface road. Re-chip sealing of a chip seal surface road. Overlay of a chip seal surface road. Structural patching of a hot mix asphalt paved surface road. Crackfilling of the surface of a hot mix asphalt paved surface road. Seal coating of a hot mix asphalt paved surface road. Re-chip sealing of a hot mix asphalt paved surface road. n Overlay of a hot mix asphalt paved surface road. Bridge or guardrail painting. Bridge or guardrail repair and/or replacement. pg. 5 Bridge deck repair (including <50% replacement). Bridge abutment repair At the same time, the terms acquisition and improvement require definition as an aid in determining their joint roles in any additions to new infrastructure Acquisition and Improvement (capitalized): Acquisition: Anytime we receive new infrastructure or a component of our existing infrastructure system increases substantially in length(greater than 50') or width (greater than 4'). Acquisition Examples: The bare land value of new real estate (ROW) received through a private land development project or Weld County purchases. The value of the improvements constructed on the ROW either by a private developer or by our improvement of an existing road. Improvement: Work that results in a change to the basic character, function and/or noticeable structural features of a road or bridge. Improvement Examples: Overlay of a gravel surface road. Overlay and widen (>4') of a paved surface road. Reconstruction(horizontal/vertical alignment changes) of a paved surface road. Bridge replacement. Bridge superstructure replacement. Bridge widening Appendix "C" Appendix C contains the cost data and analytical reasoning for the paved road system in Weld County. In this section, the reader will easily see the sample projects, which represent a valid cross section of the road projects that were used to determine the current cost, and then applied to the index for historical representation. The spreadsheets that are attached will list each road pg. 6 segment as reported in the HUTF database, and their historical value as of 2000. Projects that are performed in either 2001 or 2002 are added to the segments (assuming non-replacement) at actual value. Appendix "D" Appendix D contains the cost data for both the major and minor bridge inventory. In this section the major structures (>60' length) are cost justified utilizing the average CDOT cost index for 1999, 2000, and 2001, of which copies are included in this section for review. Similarly, the minor inventory(>5' <60' length) utilize the same approach of project costing from the Weld County cost accounting system, by averaging a cross section of seven projects performed in the last few years. Again the historical cost is attained utilizing the Federal Aid Highway Construction Index. Accounting Policies for New Infrastructure • During the construction phase, capitalizable infrastructure will be classified as "Construction in Progress". This may occur at any time during the year. • The cost of land (right of way, easements, etc) will be segregated from other costs. • Construction costs will include engineering (labor & materials) costs. These costs are reclassified as capital on the audit workpapers for financial reporting purposes, but are not reclassed in the financial system. • All ancillary costs (guardrails, signs, etc.) and improvements within the road right of way will be included in the cost of the road or bridge segment. • The detail infrastructure inventory is maintained in Public Works Department; the accounting system only maintains summary information needed for financial reporting. • Once an asset is capitalized, adjustments are required if the asset is improved in the future (ie, if a native surface road is paved; or a new lane is added to a paved road). The accounting procedure for this is: • The section of road that is improved will be added to the HUTF system for tracking. The total amount of value will be forwarded to Accounting for inclusion on the depreciation schedule. • The depreciation schedule will be maintained in the gross up method, whereas each individual sector of road will not be on the financials, but rather the gross amount of roads and bridges. This method utilizes the total cost of each category and the programmed lives of each to calculate the total depreciation percentage and charge each year. • Bridges will be added to the bridge inventory in total for both the major and minor classifications. Reporting Subsystems The County road network will be classified and reported in the following subsystems: • Bridges >60' in length • Bridges >5' <60' in length pg. 7 • Paved Roads • Gravel Roads Recording and depreciation of infrastructure Effective with the 2002 reporting year, the county will report infrastructure in its financial statements. Roads will be depreciated over 20 years, and bridges over 50 years. Execution: As a practical matter, all original source records will be maintained at the Public Works Department. This will simplify the data collection, reporting and future auditing requirements associated with compliance. 1. The Public Works Department will track all Engineering and Road& Bridge cost associated with improvements to the infastructure. Utilization of the PUBWORKS program will facilitate this process as it tracks material, labor and equipment costs on any specific project in the department. 2. The Public Works Department will collect all original source cost documents. 3. The report will be run and furnished either electronically or by hard copy to the Accounting Department, periodically as they have the need. 4. Infrastructure will be reclassified from "Construction in Progress" to a completed fixed asset when either the retainage or final payment is made, or it is determined that the project has reached its completion. This may occur at any time during the year. Frank B. Hempen Jr., Public Works Director Donald D. Warden, Director of Finance & Administration Distribution: Federal Aid Highway Construction Index Year Cost Index 1980 97.2 1981 94.2 1982 88.5 1983 87.6 1984 92.6 1985 102 1986 101 . 1 1987 100 1988 106.6 1989 107.7 1990 108.5 1991 107.5 1992 105. 1 1993 108.3 1994 115. 1 1995 121 .9 1996 120.2 1997 130.6 1998 126.9 1999 136.5 2000 145.6 ' -Highway Construction Price Trends and the Consumer Price Index Page 1 of 2 r Feral Highway Admincstraticn ■�.l,iL..u,��u��a�ui,e:i«.,■ OHPI Office of Highway Policy Information Highway Construction Price Trends and the Consumer Price Index 1 Year I Federal-Aid Highway II Consumer Price Index Construction 1970 34.871 34.15 1971 36.561 35.65 1972 38.601 36.80 1973 42,501 39.08 1974 57.901 43.40 1975 58.101 47.36 1976 56.301 50.09 1977 59.801 53.35 1978 70.701 57.39 1979 85.501 63.91 1980 97.201 72.54 1981 94.201 80.02 1982 88.501 84.95 1983 87.601 87.68 1984 92.601 91.46 1985 102.001 94.72 1986 101.101 96.48 1987 100.001 100.00 1988 106.601 104.14 1989 107.701 109.15 1990 108.501 115.05 1991 107.501 119.89 1992 105.101 123.50 1993 108.301 127.20 1994 115.101 130.46 1995 121.901 134.15 1996 120.201 138.12 1997 130.601 141.29 1998 126.901 143.49 1999 136.501 146.65 2000 145.601 151.58 SOURCE: Federal Highway Administration; Office of Highway Policy Information Back to ONH page This page last modified on April 26,2002 FHWA Home I OHPI Home I Products& Publications I Feedback http://wwvv.fhwa.dot.gov///////ohim/onh00/line15.htm 11/01/2002 PRICE TRENDS FOR FEDERAL-AID HIGHWAY CONSTRUCTION 1/ OCTOBER 2001 1987 BASE YEAR= 100 TABLE PT-1 YEAR EXCAVATION RESURFACING STRUCTURES COMPOSITE 1960 16.1 27.0 21.7 23.0 1965 19.4 27.4 24.8 25.01 coo 000000000000000<><><>0000<>000000000000000<>00000<><>oo oo<>0000. 1970 27.2 34.0 38.2 34.8 1971 27.6 36.8 40.0 36.8 1972 29.7 39.5 40.7 38.6 1973 33.0 42.9 45.4 42.5 1974 41.2 60.0 61.7 57.9 1975 42.5 61.0 60.6 58.1 1976 42.5 60.3 57.2 56.3 1977 47.8 64.3 59.7 59.8 1978 63.5 73.3 70.7 70.7 1979 66.8 89.0 88.6 85.5 1980 75.5 102.2 100.0 97.2 1981 72.6 101.4 94.9 94.2 1982 65.6 95.3 90.0 88.5 1983 71.8 94.4 86.7 87.6 . 1984 78.4 102.7 88.2 92.6 1985 92.4 109.6 98.1 102.0 1986 94.0 107.0 98.0 101.1 1987 100.0 100.0 100.0 100.0 1988 112.2 99.8 111.0 106.6 1989 99.0 99.4 118.4 107.7 1990 98.1 102.3 117.8 108.5 I 1991 95.5 106.5 112.5 107.5 1992 90.8 106.9 108.4 105.1 1993 103.2 113.5 105.3 108.3 1994 113.2 122.3 109.0 115.1 1995 112.8 127.9 119.5 121.9 1996 120.6 118.7 121.6 120.2 1997 117.6 133.0 132.7 130.6 ,V...., 1998 124.3 120.8 133.4 126.9 1999 120.9 140.3 138.3 136.5 2000 124.1 152.2 146.9 145.6 I 140 120 N. 100 - c 80 m m 60 a c 40 20 0 1960 70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 00 YEAR 1/Detailed information is available from the Federal Highway Administration in its quarterly publication "Price Trends for Federal-aid Highway Construction,"prepared by the Office of Program Administration, Office of Infrastructure. Gravel Roads There are 2498 miles of gravel road maintained by Weld County. The modified maintenance method is used to value the gravel roads system. It was determined that the annual gravel plan was the only traceable way the county preserved roadway life during the time period. Total miles of roads graveled in the annual gravel plan were tracked back to 1980, but cost was not traceable during that time period. A present day 2001 cost per mile of road was calculated and applied back to 1980 using the Federal Aid Highway Construction Index value. Weld County maintains a condition inventory of the gravel roads. The condition score rates a road as follows: Good = 4.0, Fair=2.5, Poor=0. In the year 2000 Weld County's gravel roads have an average condition score of 3.18. In viewing the Gravel Road Maintenance, the total roads graveled since 1980 totaled over 9,071 miles which indicated that each road on average was re-graveled every seven years, since the presentation spanned a twenty-one year period. The assumptions utilized included the 2001 cost per mile as tracked by the Public Works Department of$3,091.00 per mile. Given that Weld County in fact does have 2,498 miles of gravel roads the calculated value totaled $7,721,318.00. The following logic was executed to come to a average value of the road graveling system. /^ YEAR: Back- date the road system over the seven year historical trend. AVERAGE MILES: This is a simple calculation taking the 2,498 miles of gravel roads in Weld County and dividing them by seven years. VALUE: The formula utilized here was similar to the one used in the Gravel Road Maintenance spreadsheet. The average miles were then converted to value using the $3,091.00 per mile to gravel. This product was multiplied by the index value for that year and the end product was divided by the base 2000 index. The end result gives Weld County the weighted value of gravel roads of$7,025,096.33 that can be reported with the GASB 34 presentation. ADD-ON The final calculation will be adiusted for the total miles that move from gravel to paved for 2002 ..'>T�J 'J XrtVE COST METHOD MILES OF GRAVEL COST/MILE PRICE EXTENSION 2498 $3,091.00 $7,721,318.00 Assumption that every seven years on average each road would be re-graveled. The price extension would be adjusted for historical value as follows: Year Avg Miles Value 1995 356.8571429 $923,497.51 1996 356.8571429 $910,618.55 1997 356.8571429 $989,407.51 1998 356.8571429 $961,376.82 1999 356.8571429 $1,034,105.09 2000 356.8571429 $1,103,045.43 2001 356.8571429 $1,103,045.43 TOTAL ADJUSTED VALUE $7,025,096.33 /s'N Gravel Roads Maintenance GRAVEL YEAR YEAR MILES COST PER MILE TOTAL COST INDEX HISTORIC COST 1980 454 $3,091.00 $1,403,314.00 97.2 $936,827.75 1981 457 $3,091 .00 $1,412,587.00 94.2 $913,912.74 1982 313 $3,091 .00 $967,483.00 88.5 $588,064.87 1983 253 $3,091 .00 $782,023.00 87.6 $470,502.85 1984 224 $3,091.00 $692,384.00 92.6 $440,348.62 1985 409 $3,091.00 $1 ,264,219.00 102.0 $885,647.93 1986 473 $3,091.00 $1,462,043.00 101.1 $1 ,015,196.07 1987 602 $3,091.00 $1,860,782.00 100.0 $1 ,278,009.62 1988 480 $3,091 .00 $1,483,680.00 106.6 $1,086,265.71 1989 417 $3,091 .00 $1,288,947.00 107.7 $953,431.26 1990 517 $3,091 .00 $1 ,598,047.00 108.5 $1,190,852.33 1991 413 $3,091.00 $1 ,276,583.00 107.5 $942,532.09 1992 408 $3,091.00 $1 ,261,128.00 105.1 $910,333.47 1993 465 $3,091.00 $1,437,315.00 108.3 $1 ,069,101 .75 1994 349 $3,091.00 $1,078,759.00 115.1 $852,782.70 1995 410 $3,091 .00 $1,267,310.00 121.9 $1 ,061 ,023.96 1996 426 $3,091 .00 $1,316,766.00 120.2 $1,087,055.45 1997 419 $3,091 .00 $1 ,295,129.00 130.6 $1,161 ,702.25 1998 432 $3,091.00 $1 ,335,312.00 126.9 $1,163,812.45 1999 341 $3,091.00 $1 ,054,031 .00 136.5 $988,154.06 2000 410 $3,091.00 $1,267,310.00 145.6 $1 ,267,310.00 2001 399 $3,091 .00 $1,233,309.00 $1 ,233,309.00 $28,038,461.00 $21,496,176.93 1' AC 2(20) COs'3NEAk03,..E� -" y 201 ZONE I TONS COST j , a'_ ''a mmt r ° �mo5°ai 8,946 $ 56,642 Mn ss V° ' 12,640 $ 76,400 €. fO ria f 10,543 $ 57,637 A:ffiyi°b l°ri 100' Slisal h iiEii 15,754 $ 60,414 a i5�6rtr'§���r,�, imal�ithi"'� 17,200 $ 71,732 • ' s r5 ii�1a; ;'" Illi iit'.i 22 $ 86 ,' LYE Yl 0 13,921 $ 62,902 • ,as` I ED adi;;;;Irlinra 9,520 $ 35,358 A s1s, �°�,I �I1r$r. '�¢rS,° 9,750 $ 50,503 A'tt i * £ F 8,389 $ 50,230 `,rog i°;°_ ' lid 8,036 $ 31,021 A SpifillalladPIP9414 9,953 $ 47,377 Al 'gam:, sib ;€ 10,658 $ 36,001 _aas1g GAm =x 7,048 $ 22,421 1:410,00015,160101.0ti i 14,619 $ 60,039 A17 s i ° , 1,w j9 Dui 6,984 $ 21,738 B18„ ;��'s ,ihlgo,, ,' ' , ;l 8,936 $ 37,744 Mad"'c 'aPFP;.:11; ',..31iil 7,009 $ 32,491 ro sii .- 4;;F i,;1,* Fa 37,053 $ 83,096 ti-° vi'1a: %in 9,264 $ 39,991 ;.,'lingoommiq't.°a!,ii1' 14,902 $ 81,606 g. agi,x;.. IP a n:Nd 13,117 $ 60,688 iA�a,a "41" ,cs'°I 7,913 $ 33,878 ',-xi 2 '� �lar��.�"i�m n101 1 7,284 $ 38,913 B 4x, RS{i" ,si i°� , i 5,220 $ 36,370 �tpiisaz Inn,M4ari''� , �{ 9,211 $ 1,848 a,a1�°, 1 '; r,°�,c,:,A 1,152 $ 6,765 29, 1€ °NI ,alt 1x,11 1,142 $ 7,638 �yy '"yy; %;;;$ r 2�. Ill - $ Oat 3 - . i_'• 1, tti;m;11. .I 5,424 $ 31,782 TOTAL 291,610 $ 1,233,311 f r. YEAR MILES COST COST PER MILE 1980 454 1981 457 1982 313 1983 253 1984 224 1985 409 1986 473 1987 602 1988 480 1989 417 1990 517 1991 413 1992 408 1993 465 1994 349 1995 410 1996 426 1997 419 1998 432 1999 341 2000 410 /'` 2001 399 $ 1,233,311 $ 3,091 2002 n Paved Roads There are 705.6 miles of paved roads that are within Weld County's jurisdiction in the year 2000. Costing Method On the pages following you will see the six projects that run the gambit of types of project and the related actual cost of each. The summation page is the average of these six projects that are utilized in the HUTF database. HUTF Database This database is updated annually and is the most accurate representation of road segments within Weld County. The data fields extracted for GASB 34 reporting are as follows: ROUTENAME—Name of the road of which the segment belongs to. Segment— Segment identification number assigned to the particular segment. FROM - Beginning location of each segment. TO —End location of each segment. i^ DIR—Orientation of the segment. LENGTH (ft)—Length of the segment. Width (ft)—Width of the pavement. Jurisdiction—If> 0, then road segment is half owned by another jurisdiction. Costs Spreadsheet This database is used to break down and calculate the costs for construction of each segment of paved road. All values are based on year 2000 projects and prices. A three-foot shoulder width was added to the base course and embankment calculations to represent a more accurate cross section of constructed road. HBP-7"—Cost per square foot of hot bituminous pavement 7" thick. ABC—Cost per square foot of aggregate base course. Embankment—Cost per square foot of embankment. Incidental—Cost per square foot of incidental costs which includes: Utility Location Hydrology Design Project Management Material Testing Mobilization Construction Survey Surveying Culvert Installation Shoulder Work Graphics/Drafting Mail Box Reset Permit Acquisition Preliminary Survey Misc. Material Hauling Reclamation Project Design Tree Removal Irrigation Structure Dust Control Demolition Access Permits Construction Inspection Construction Permitting Fence Replacement Download Survey Data Water Hauling Hydrology Design Site Work Striping Silt Fence Survey Monuments Clearing/Grubbing Sanitary Facility HBP Costs —HBP price (derived from the sample six projects) multiplied times the pavement width multiplied times the segment length. ABC Costs—ABC price (derived from the sample projects) multiplied times the width (with an addition of six-foot (three-foot on each shoulder)) multiplied times the segment length. Embankment Costs —Embankment price (derived from the sample six projects) multiplied times the width (with an addition of six-foot (three-foot on each shoulder)) multiplied times the length. Incidental Costs—Incidental price (derived from the sample projects)multiplied times the width multiplied times the length. Jurisdictional Split Loss—Total road value decreased by %2 due to a sharing ownership with another jurisdiction. Typically split roads are just that where the county and a city each owns %2 of the road section in question. TOTAL COST— Sum of the HBP, ABC, Enbankment, and Incidental Cost less the Jurisdictional split cost fields. Historic Cost and Depreciation This spreadsheet uses the Federal Aid Construction Index (2000) to calculate historic construction cost and accumulated depreciation for each road segment. Road lifespan was based on 20 years. Summary of fields included are as follows: Acquisition Year—Year the road was updated or paved. Year Index—Index value for the acquisition year. 2000 Index—Index value for year 2000. Historic Cost—Value of construction in the year built. (Total Cost multiplied times the Acquisition Year Index) /2000 Index Accumulated Depreciation —Amount of historic cost depreciated out of each road segment based on segment age to a 20-year lifespan. (Age of Segment/20) multiplied times the Historic Cost Pages following: Additional projects—This page displays the actual cost of the paving projects for the years 2001 and 2002. Summary Paved Road Value—This page summarizes the HUTF data values with the addition of 2001 and 2002 projects applying the depreciation amounts. The derivative is the book value of both the paved roads at 12-31-02,but also the accumulated depreciation that should be recorded. r (Hot Bituminous Paving:The Following Items are standard with placing asphalt(HBP).The square foot costs listed below represent a 7"thick section. SOFT Cost 9.5 10 24.5 62 65 74 HBP Hot Bituminous Paving Hauling+Placing+Purchase 0 0 $ 1.707 0 $ 1.649 0 Hauling $ 0.180 $ 0.354 $ 0.152 $ 0.168 Placing $ 0.120 $ 0.335 $ 0.138 $ 0.320 Asphalt Purchase $ 0.840 I$ 1.307 $ 1.035 $ 0.851 Admin. $ 0.003 I$ - $ - $ - Traffic $ 0.012 I$ 0.012 $ 0.183 $ 0.183 Total $ 1.155 $ 2.008 $ 1.707 $ 1.508 $ 1.649 $ 1.522 Average Cost $ 1.592 (Aggregate Base Course:The Following Items are standard with placing Gravel(ABC).The square foot costs listed below represent a 6'thick section. 11 l SQ/FT Cost 9.5 10 24.5 62 65 I 74 J ABC I Aggregate Base Course Hauling+Placing+Purchase 0 0 $ 0.582 0 $ 0.5521 01 Hauling $ 0.062 $ 0.101 $ 0.066 1-$ 0.091 1 Aggregate Base Work $ 0.025 $ 0.045 $ - $ 0.026 I$ 0.072 1 Gravel Purchase $ 0.091 $ 0.191 I $ 0.135 I $ 0.069 Total $ 0.178 $ 0.337 $ 0.562 $ 0.227 $ 0.552 $ 0.232 Average Cost $ 0.348 Embakment:The Following Items are standard with placing Embankment.The square foot costs listed below represent a 1.4'thick section. Embankment SOFT Cost 9.5 10 24.5 62 I65 74 Hauling+Placing+Purchase 0 0 $ 0.442 6 $ 0.44 0 Hauling $ 0.109 $ 0.014 $ 0.009 $ x...."‘ �` Earth Work $ 1.896 $ 0.009 $ 0.141 $ 3.118 Borrow Pit Mat.Purchase $ 0.166 I $ - $ 0.005 $ Dirt Purchase $ - I $ - $ 0.007 1 $ Pit Run $ - I $ - $ 0.017 1 $ Total $ 2.171 $ 0.023 $ 0.442 $ 0.179 $ 0.442 $ 3.118 Average Cost $ 1.063 Incidental Cost:Includes all Items necessary to construct a road section excluding HBP,ABC.and Embankment.Incidental lens vary per job depending on necesry tasks needed to complete work.The square foot costs listed below are actual incurred expences. Incidental Cost SQ/FT Cost I 9.5 10 24.5 I 62 I 65 I 74 I I$ 1.114 I 0.386 1.691 1.6491 0.3571 2.8351 Average Cost $ 1.339 I 9.5 I 10 I 24.5 I 62 I 65 I 74 I Total Average Cost Per FT/SQ $ 4.62 $ 2.76 $ 4.40 $ 3.56 $ 3.00 $ 7.71 Overall Average per FTISQ $ 4.34 r Construction Cost Categories and Items. I I EEI! i ii• ,• GE ''lkilE 4"Depth 7"Depth HBP Unit Cost SO/FT Cost SOFT Cost Hot Bituminous Paving Hauling Ton $ 4.27 $ 0.096 $ 0.180 Placing Ton $ 2.81 $ 0.063 $ 0.120 Asphalt Purchase Ton $ 19.96 $ 0.449 $ 0.840 Admin. Mile $ 600.00 $ 0.003 $ 0.003 Traffic Mile $ 2,550.00 $ 0.012 $ 0.012 Total $ 0.623 $ 1.155 8"Depth 6"Depth ABC Unit Cost SO./FT Cost SQ/FT Cost Aggregate Base Course Hauling Ton $ 1.85 $ 0.084 $ 0.062 Aggregate Base Work Ton $ 0.74 $ 0.033 $ 0.025 Gravel Purchase Ton $ 2.70 $ 0.122 $ 0.091 Total $ 0.239 $ 0.178 Embankment 2.9'Depth 1.4'Depth Unit Cost SQ/FT Cost SQ/FT Cost Hauling Ton $ 1.14 $ 0.109 $ 0.109 Earth Work Ton $ 19.83 $ 1.896 $ 1.896 Gravel Purchase Ton $ 1.74 $ 0.166 $ 0.166 r Total $ 2.171 $ 2.171 Additional Cost Unit Cost SCUFT Cost SQ/FT Cost Utility Location Mile $ 4,281.00 0.0184 0.0184 Material Testing Mile $ 3,533.00 0.0152 0.0152 Surveying Mile $ 4,090.00 0.0176 0.0176 Graphics/Drafting Mile $ 8,527.00 0.0367 0.0367 Permit Acquisition Mile $ 796.00 0.0034 0.0034 Preliminary Survey Mile $ 1,409.00 0.0061 0.0061 Project Design Mile $ 516.00 0.0022 0.0022 Hydrology Design Mile $ 163.00 0.0007 0.0007 Project Management Mile $ 10,918.00 0.0470 0.0470 Mobilization Mile $ 3,662.00 0.0158 0.0158 Construction Survey Mile $ 6,450.00 0.0278 0.0278 Culvert Installation Mile $ 109,343.00 0.4707 0.4707 Shoulder Work Mile $ 3,463.00 0.0149 0.0149 Mail box Reset Mile $ - 0.0000 0.0000 Hauling Misc.Materials Mile $ 55,854.00 0.2404 0.2404 Reclamation Mile $ 159.00 0.0007 0.0007 Tree Removal Mile $ 169.00 0.0007 0.0007 Irrigation Structure Mile $ 41,087.00 0.1769 0.1769 Dust Control Mile $ 179.00 0.0008 0.0008 Demolition Mile $ 4,224.00 0.0182 0.0182 Total $ 1.114 $ 1.114 (Total Square Foot Cost Using Average Overall Depths. Job Cost GASB Section $ 4.15 E 4.62 Construction Cost Categories and Items. gatgpi! HBP 3"Depth 7"Depth Hot Bituminous Paving Unit Cost SQ/FT Cost SQ/FT Cost Hauling Ton $ 8.33 $ 0.152 $ 0.354 Placing Ton $ 7.88 $ 0.143 $ 0.335 Asphalt Purchase Ton $ 30.77 $ 0.560 $ 1.307 Admin. Mile $ - $ - $ - Traffic Project $ 1,277.43 $ 0.010 $ 0.012 Total $ 0.865 $ 2.008 ABC 6"Depth 6"Depth Aggregate Base Course Unit Cost SQ/FT Cost SOFT Cost Hauling Ton $ 2.98 $ 0.101 $ 0.101 Aggregate Base Work Ton $ 1.35 $ 0.045 $ 0.045 Gravel Purchase Ton $ 5.66 $ 0.191 $ 0.191 Total $ 0.337 $ 0.337 Embankment 6"'Depth 1.4'Depth Unit Cost SQ/FT Cost SQ/FT Cost Hauling Ton $ 0.15 $ 0.005 $ 0.014 Earth Work Ton $ 0.10 $ 0.003 $ 0.009 On Site Gravel Purchase Ton $ - $ - $ Total $ 0.008 $ 0.023 Incidental Cost Unit Cost SQ/FT Cost SQ/FT Cost r Access Permits Project $ 46.51 0.0004 0.0004 Construction Survey Project $ 6,462.00 0.0528 0.0528 Construction Inspection Project $ 4,753.00 0.0388 0.0388 Construction Permitting Project $ 47.31 0.0004 0.0004 Culvert Installation Project $ - 0.0000 0.0000 Demolition Project $ - 0.0000 0.0000 Dust Control Project $ 179.00 0.0015 0.0015 Download Survey Data Project $ 175.89 0.0014 0.0014 Fence Replacement Project $ 4,175.58 0.0418 0.0418 Graphics/Drafting Project $ 406.67 0.0033 0.0033 Hauling Water Project $ 7,732.96 0.0775 0.0775 Hauling Misc.Materials Project $ 4,740.31 0.0387 0.0387 Hydrology Design Project $ - 0.0000 0.0000 Irrigation Structure Project $ - 0.0000 0.0000 Mail box Reset Project $ 172.68 0.0014 0.0014 Material Testing Project $ 1,906.15 0.0156 0.0156 Mobilization Project $ 1,133.51 0.0093 0.0093 Permit Acquisition Project $ 796.00 0.0065 0.0065 Preliminary Survey Project $ - 0.0000 0.0000 Project Design Project $ 813.35 0.0066 0.0066 Project Management Project $ 2,385.22 0.0195 0.0195 Reclamation Project $ - 0.0000 0.0000 Shoulder Work Project $ 3,026.83 0.0247 0.0247 Site Work Project $ 571.70 0.0047 0.0047 Striping Project $ 305.12 0.0025 0.0025 Silt Fence Project $ 235.99 0.0019 0.0019 Surveying Project $ 4,090.00 0.0334 0.0334 Survey Monuments Project $ 404.61 0.0033 0.0033 Tree Removal Project $ 50.70 0.0004 0.0004 Utility Location Project $ 204.16 0.0017 0.0017 'Total Square Foot Cost Using Average Overall Depths. Total $ 0.388 $ 0.388 Job Cost GABS Section $ 1.60 $ 2.76 r Construction Cost Categories and Items. Contract ConstructionI „!ill I II ifilllll�;l'!i 'llr� II y; I ,{ !!+ h NL.,..„, , I III lIIl3lI 1'iulii a.'Depth 7"Depth HBP Unit Cost SO/FT Cost SQ/FT Cost Hot Bituminous Paving Hauling+Placing+Purchase Ton $ 39.45 $ 0.957 $ 1.676 Admin. Project $ 901.08 $ 0.015 $ 0.015 Traffic Project $ 972.00 $ 0.016 $ 0.016 Total $ 0.989 $ 1.707 ABC 8"Depth 6"Depth Aggregate Base Course Unit Cost SQ/FT Cost SQ/FT Cost Hauling+Placing+Purchase Ton $ 16.64 $ 0.749 $ 0.562 Total $ 0.749 $ 0.562 11" 1.4'Depth Embankment Unit Cost SQ/FT Cost SQ/FT Cost Hauling+Placing+Purchase C.Y. $ 8.44 $ 0.286 $ 0.442 Total $ 0.286 $ 0.442 r Unit Cost SQ/FT Cost SQ/FT Cost Additional Cost Construction Inspection Project $ 4,955.56 0.0851 0.0851 Construction Survey Project $ 4,600.00 0.0790 0.0790 Clearing and Grubbing Project $ 862.00 0.0148 0.0148 Culvert Installation Project $ 4,872.20 0.0837 0.0837 Sanitary Facility Project $ 287.00 0.0049 0.0049 Removal of Structures and Obstructions Project $ 402.00 0.0069 0.0069 Fence Replacement Project $ 6,203.19 0.1065 0.1065 Graphics/Drafting Project $ 2,325.75 0.0399 0.0399 Hauling Misc. Materials Project $ - 0.0000 0.0000 Hydrology Design Project $ - 0.0000 0.0000 Irrigation Structure Project $ 12,396.00 0.2128 0.2128 Mail box Reset Project $ - 0.0000 0.0000 Material Testing Project $ 1,863.31 0.0320 0.0320 Mobilization Project $ 2,691.00 0.0462 0.0462 Permit Acquisition Project $ - 0.0000 0.0000 Preliminary Survey Project $ 1,990.00 0.0342 0.0342 Project Design Project $ 2,740.31 0.0471 0.0471 Project Management Project $ 11,719.00 0.2012 0.2012 Reclamation Project $ 12,033.00 0.2066 0.2066 Shoulder Work Project $ 24,117.00 0.4141 0.4141 Striping Project $ 216.26 0.0037 0.0037 Surveying Project $ 1,124.93 0.0193 0.0193 Tree Removal Project $ 488.80 0.0084 0.0084 Utility Location Project $ 1,889.49 0.0324 0.0324 Total $ 1.679 $ 1.679 ITotal Square Foot Cost Using Average Overall Depths. Job Cost GASB Section I $ 3.70 $ 4.39 Construction Cost Categories and Items. ift lIIIIII Mill, A i, ll 9.a,a ilk Mil I ilitl!I HBP 4"Depth 7"Depth Hot Bituminous Paving Unit Cost SQ/FT Cost SOFT Cost Hauling Ton $ 3.58 $ 0.087 $ 0.152 Placing Ton $ 3.25 $ 0.079 $ 0.138 Asphalt Purchase Ton $ 24.36 $ 0.591 $ 1.035 Admin. Mile $ 85.14 $ - $ - Traffic Mile $ 2,269.43 $ 0.183 $ 0.183 Total $ 0.940 $ 1.508 ABC 8"Depth 6"Depth Aggregate Base Course Unit Cost SOFT Cost SO/FT Cost Hauling Ton $ 1.94 $ 0.087 $ 0.066 Aggregate Base Work Ton $ 0.77 $ 0.035 $ 0.026 Gravel Purchase Ton $ 4.01 $ 0.180 $ 0.135 Total $ 0.303 $ 0.227 11"Depth 1.4'Depth Embankment Unit Cost SQ/FT Cost SO/FT Cost Hauling Ton $ 0.66 $ 0.011 $ 0.009 Earth Work Ton $ 1.48 $ 0.025 $ 0.141 Borrow Pit Mat.Purchase Ton $ 1.12 $ 0.019 $ 0.005 Dirt Purchase Ton $ 1.59 $ 0.027 $ 0.007 Pit Run Ton $ 3.61 $ 0.061 $ 0.017 i^ Total $ 0.143 $ 0.180 Additional Cost Unit Cost SQ/FT Cost SO/FT Cost Utility Location Project $ 477.91 0.0048 0.0048 Material Testing Project $ 4,147.45 0.0416 0.0416 Surveying Project $ 360.46 0.0036 0.0036 As Built Surveying Project $ 515.81 0.0052 0.0052 Graphics/Drafting Project $ - 0.0000 0.0000 Striping Project $ 393.19 0.0039 0.0039 Permit Acquisition Project $ - 0.0000 0.0000 Compaction Project $ 2,152.25 0.0216 0.0216 Preliminary Survey Project $ - 0.0000 0.0000 Project Design Project $ 208.59 0.0021 0.0021 Hydrology Design Project $ - 0.0000 0.0000 Project Management Project $ 7,147.31 0.0716 0.0716 Mobilization Project $ 675.50 0.0068 0.0068 Construction Survey Project $ 15,162.08 0.1519 0.1519 Construction Inspection Project $ 223.81 0.0022 0.0022 Construction Signing Project $ 101.78 0.0010 0.0010 Culvert Installation Project $ 9,044.15 0.0906 0.0906 Shoulder Work Project $ 13,627.79 0.1366 0.1366 Mail box Reset Project $ - 0.0000 0.0000 Silt Fence Project $ 703.03 0.0070 0.0070 Hauling Misc.Materials Project $ 4,850.81 0.0486 0.0486 Hauling Water Project $ 90.067.00 0.9025 0.9025 Hauling Rip Rap Project $ 1,898.00 0.0190 0.0190 Reclamation Project $ - 0.0000 0.0000 Tree Removal Project $ - 0.0000 0.0000 Irrigation Structure Project $ 12.396.00 0.1242 0.1242 Fence Replacement Project $ 390.87 0.0039 0.0039 Dust Control Project $ - 0.0000 0.0000 Demolition Project $ - 0.0000 0.0000 Total $ 1.649 $ 1.649 r1 Total Square Foot Cost Using Average Overall Depths. Job Cost GASB Section $ 3.03 $ 3.56 r^ I Construction Cost Categories and Items. I I Contract Construction I W1IiSUUIiI!i!PI!' 11 3„Depth 7"Depth HBP Unit Cost SOFT Cost SQ/FT Cost Hot Bituminous Paving Hauling+Placing+Purchase Ton $ 38.35 $ 0.698 $ 1.629 Admin. Project $ 256.23 $ 0.0006 $ 0.0006 Traffic Project $ 7,673.70 $ 0.0194 $ 0.0194 Total $ 0.718 $ 1.649 ABC 6"Depth 6"Depth Aggregate Base Course Unit Cost SQ/FT Cost SQ/FT Cost Hauling+Placing+Purchase Ton $ 16.36 $ 0.552 $ 0.552 Total $ 0.552 $ 0.552 Embankment 1.06'Depth 1.4'Depth Unit Cost SQ/FT Cost SOFT Cost Hauling+Placing+Purchase C.Y. $ 7.82 $ 0.308 $ 0.442 Total $ 0.308 $ 0.442 Additional Cost Unit Cost SQ/FT Cost SQ/FT Cost Access Permits Project $ 372.12 0.0009 0.0009 r"� Clearing and Grubbing Project $ 7,500.00 0.0190 0.0190 Construction Inspection Project $ - 0.0000 0.0000 Construction Survey Project $ 17,686.60 0.0447 0.0447 Culvert Installation Project $ 25,111.00 0.0635 0.0635 Fence Replacement Project $ - 0.0000 0.0000 Graphics/Drafting Project $ 2,465.29 0.0062 0.0062 Hauling Misc. Materials(Riprap) Project $ 6,180.89 0.0156 0.0156 Hydrology Design Project $ 46.51 0.0001 0.0001 Irrigation Structure Project $ - 0.0000 0.0000 Mail box Reset Project $ 107.42 0.0003 0.0003 Material Testing Project $ 4,298.18 0.0109 0.0109 Mobilization Project $ 47,625.00 0.1205 0.1205 Permit Acquisition Project $ - 0.0000 0.0000 Preliminary Survey Project $ 3,507.15 0.0089 0.0089 Project Design Project $ 5,363.87 0.0136 0.0136 Project Management Project $ 3,920.18 0.0099 0.0099 Reclamation Project $ 12,033.00 0.0304 0.0304 Removal of Structures and Obstructions Project $ 402.00 0.0010 0.0010 Sanitary Facility Project $ 287.00 0.0007 0.0007 Site Work Project $ 2,087.67 0.0053 0.0053 Shoulder Work Project $ - 0.0000 0.0000 Striping Project $ 471.32 0.0012 0.0012 Survey Monuments Project $ 2,186.49 0.0055 0.0055 Tree Removal Project $ - 0.0000 0.0000 Utility Location Project $ - 0.0000 0.0000 Total $ 0.357 $ 0.357 (Total Square Foot Cost Using Average Overall Depths. I Job Cost GASB Section $ 1.94 $ 3.00 r .` Construction Cost Categories and Items. I4"Depth 7"Depth HBP Unit Cost SQ/FT Cost SQ/FT Cost Hot Bituminous Paving Hauling Ton $ 3.95 $ 0.096 $ 0.168 Placing Ton $ 7.54 $ 0.183 $ 0.320 Asphalt Purchase Ton $ 20.04 $ 0.486 $ 0.851 Admin. Project $ - $ - $ - Traffic Project $ 18,352.00 $ 0.183 $ 0.183 Total $ 0.948 $ 1.522 ABC 8"Depth 6"Depth Aggregate Base Course Unit Cost SQ/FT Cost SQ/FT Cost Hauling Ton $ 2.69 $ 0.121 $ 0.091 Aggregate Base Work Ton $ 2.14 $ 0.096 $ 0.072 Gravel Purchase Ton $ 2.05 $ 0.092 $ 0.069 Total $ 0.309 $ 0.232 Embankment 2.5" 1.4'Depth Unit Cost SO/FT Cost SQ/FT Cost Hauling Ton $ - $ - $ - Earth Work Ton $ 32.62 $ 0.457 $ 3.118 Gravel Purchase Ton $ - $ - $ - Total $ 0.457 $ 3.118 TN Incidental Cost Unit Cost SQ/FT Cost SO/FT Cost Utility Location Project $ 42,111.00 0.4220 0.4220 Material Testing Project $ 4,162.00 0.0417 0.0417 Surveying Project $ 4,090.00 0.0410 0.0410 Graphics/Drafting Project $ 2,098.00 0.0210 0.0210 Striping Project $ 1,321.00 0.0132 0.0132 Permit Acquisition Project $ - 0.0000 0.0000 Preliminary Survey Project $ 1,990.00 0.0199 0.0199 Project Design Project $ - 0.0000 0.0000 Hydrology Design Project $ - 0.0000 0.0000 Project Management Project $ 11,719.00 0.1174 0.1174 Mobilization Project $ 6,055.00 0.0607 0.0607 Construction Survey Project $ 10,665.00 0.1069 0.1069 Construction Inspection Project $ 153.00 0.0015 0.0015 Culvert Installation Project $ 43,545.00 0.4363 0.4363 Shoulder Work Project $ 24,117.00 0.2417 0.2417 Mail box Reset Project $ - 0.0000 0.0000 Hauling Misc. Materials Project $ 90,067.00 0.9025 0.9025 Reclamation Project $ 12,033.00 0.1206 0.1206 Tree Removal Project $ 565.00 0.0057 0.0057 Inigation Structure Project $ 12,396.00 0.1242 0.1242 Fence Replacement Project $ 7,662.00 0.0768 0.0768 Dust Control Project $ 8,157.00 0.0817 0.0817 Demolition Project $ - 0.0000 0.0000 Total $ 2.835 $ 2.835 (Total Square Foot Cost Using Average Overall Depths. I Job Cost GASB Section $ 4.55 $ 7.71 I HBP 7"thick ABC Embankment Incidental Jurisdictional (Acq.Yr.) Square foot Square foot Square Foot Square Foot HBP ABC Embankment Incidental Split TOTAL Acquis. Year 2000 Historic Accumulated ROUTENAME Segment FROM TO DIR LENGTHIf Width(ft Juria. Roadway Roadway Roadway Roadway Costs Costs Costs Costs Loss COST Year Index Index Cost Depreciation COLI RD 950 KENOSHA RD SH52 N 6800 241 $1.59 $0.35 $1.06 $1.34 $251,856.00 $69.300.00 $209.880.00 $212.256.00 -$371.646.00 $371.646.00 1996 120.2 145.6 $306.812.15 $61,362.43 COLI RD 1000 SH52 STR N 1742 241 $1.59 $0.35 $1.06 $1.34 $66,474.72 $18.291.00 $55,395.60 $56,022.72 -$98,092.02 $98,092.02 1993 108.3 145.6 $72.962.68 $25,536.94 COLT RD 1200ISTR CR2O.5 N 17160 241 $1.59 $0.35 $1.06 $1.34 $654.825.60 $180.180.00 $545,688.00 $551.865.60 -$966,279.60 $966.279.60 1997 130.6 145.6 $866.731.56 $130,009.73 COLI RD 13001CR20.5 STR N 4963 241 $1.59 $0.35 $1.06 $1.34 $189.388.08 $52.111.50 $157.823.40 $159.610.08 -$279,466.53 $279.466.53 1997 130.6 145.6 $250.675.34 $37,601.30 COLI RD 1500ISTR RRX N 211 241 $1.59 $0.35 $1.06 $1.34 $8,051.76 $2,215.50 $6,709.80 $6,785.76 -$11,881.41 $11,881.41 1993 108.3 145.6 $8,837.61 $3,093.17 COLI RD 1600IRRX CL LONGMONT N 1056 241 $1.59 $0.35 $1.06 $1.34 $40,296.96 $11,088.00 $33,580.80 $33,960.96 -$59,463.36 $59,463.36 1996 120.2 145.6 $49,089.94 $9,817.99 COLI RD 1800IRRX CL LONGMONT N 2376 241 $1.59 $0.35 $1.06 $1.34 $90,668.16 $24,948.00 $75,556.80 $76,412.16 -$133,792.56 $133,792.56 2000 145.6 145.6 $133,792.56 $0.00 COLI RD 1850ICL LONGMONT(SH 66 N 10824 241 $1.59 $0.35 $1.06 $1.34 $413,043.84 $113,652.00 $344,203.20 $348,099.84 -$609,499.44 $609,499.44 2000 145.6 145.6 $609,499.44 $0.00 COLI RD 19001SH66 BLDRCR6 N 5280 241 $1.59 $0.35 $1.06 $1.34 $201.484.80 $55.440.00 $167.904.00 $169.804.80 -$297316.80 $297,316.80 1992 105.1 145.6 $214,615.35 $85.846.14 COLI RD 2000IBOULDR CR6 STR N 792 241 $1.59 $0.35 $1.06 $1.34 $30.222.72 $8.316.00 $25.185.60 $25.470.72 -$44.597.52 $44,597.52 1992 105.1 145.6 $32.192.30 $12,876.92 COLI RD 22001STR BOULDER NCO N 15154 241 $1.59 $0.35 $1.06 $1.34 $578,276.64 $159,117.00 $481.897.20 $487.352.64 -$853.321.74 $853,321.74 1996 120.2 145.6 $704.459.29 $140,891.86 1 2300 I BOULDER N CdSTR N 12778 201 $1.59 $0.35 $1.06 $1.34 $406.340.40 $116,279.80 $352.161.68 $342,450.40 -$608,616.14 $608,616.14 1996 120.2 145.6 $502.442.72 $100,488.54 1 24001STR CR46 N 8395 201 $1.59 $0.35 $1.06 $1.34 $266,961.00 $76,394.50 $231,366.20 $224,986.00 -$399,853.85 $399,853.85 1992 105.1 145.6 $288,630.77 $115.452.31 10 6001CR27 RRX E 370 24 $1.59 $0.35 $1.06 $1.34 $14,119.20 $3.885.00 $11,766.00 $11,899.20 $0.00 $41,669.40 1998 126.9 145.6 $36,317.63 $3,631.76 10 700IRRX CR31 E 9926 24 $1.59 $0.35 $1.06 $1.34 $378,776.16 $104,223.00 $315,646.80 $319.220.16 $0.00 $1,117,866.12 1998 126.9 145.6 $974,294.03 $97,429.40 100 1001000 CR17 E 10507 24 $1.59 $0.35 $1.06 $1.34 $400,947.12 $110,323.50 $334,122.60 $337,905.12 $0.00 $1,183,298.34 1996 120.2 145.6 $976,871.29 $195.374.26 100 200ICR17 CR27 E 26508 24 $1.59 $0.35 $1.06 $1.34 $1,011,468.96 $278,313.00 $842,890.80 $852,432.96 $0.00 $2,985,105.72 1996 120.2 145.6 $2,464.352.39 $492,870.48 100 3001CR27 CR27.5 E 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27,720.00 $83,952.00 $84,902.40 $0.00 $297,316.80 1997 130.6 145.6 $266.686.64 $40,003.00 100 3501CR27.5 CR29 E 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27.720.00 $83,952.00 $84,902.40 $0.00 $297,316.80 1997 130.6 145.6 $266,686.64 $40,003.00 100 4001CR29 CR29.5 E 2112 26 $1.59 $0.35 $1.06 $1.34 $87,310.08 $23,654.40 $71,639.04 $73,582.08 $0.00 $256,185.60 1997 130.6 145.6 $229,792.85 $34,468.93 CLARA LEE ST 100ICDS CR37 E 2378 22 $1.59 $0.35 $1.06 $1.34 $83,112.48 $23.284.80 $70,519.68 $70,044.48 $0.00 $246,961.44 1998 126.9 145.6 $215,243.18 $21524.32 WREN 2001CR3510 CDS E 454 24 $1.59 $0.35 $1.06 $1.34 $17.324.64 $4.767.00 $14,437.20 $14,600.64 $0.00 $51,129.48 2001 145.6 145.6 $51,129.48 $0.00 DOVE 1001CR3520 CDS E 396 24 $1.59 $0.35 $1.06 $1.34 $15,111.36 $4.158.00 $12,592.80 $12,735.36 $0.00 $44,597.52 2001 145.6 145.6 $44,597.52 $0.00 EAGLE DR 6001CR35 CR3520 E 1716 24 $1.59 $0.35 $1.06 $1.34 $65.482.56 $18.018.00 $54,568.80 $55,186.56 $0.00 $193,255.92 2001 145.6 145.6 $193,255.92 $0.00 RUE DE TRUST, 1001 CR3 ICR5 E 5491 24 $1.59 $0.35 $1.06 $1.34 $209,536.56 $57.655.50 $174,613.80 $176,590.56 $0.00 $618,396.42 1988 106.6 145.6 $452,754.52 $271,652.71 108 5001SH85 CR 108.05 E 21490 30 $1.59 $0.35 $1.06 $1.34 $1.025.073.00 $270.774.00 $820,058.40 $863,898.00 $0.00 $2,979,803.40 1986 101.1 145.6 $2,069,080.52 $1.448.356.36 LONE PINE ST 2001 SPLIT CR25.90 E 422 172 $1.59 $0.35 $1.06 $1.34 $11,406.66 $3.397.10 $10.288.36 $9.613.16 -$17,352.64 $17,352.64 1992 105.1 145.6 $12,525.84 $5,010.34 10805 1001CR 108 CR37 NE 475 30 $1.59 $0.35 $1.06 $1.34 , $22.657.50 $5.985.00 $18.126.00 $19.095.00 $0.00 $65,863.50 1986 101.1 145.6 $45,733.52 $32,013.46 11 8001CR42 CR44 N 5491 24 $1.59 $0.35 $1.06 $1.34 $209.536.56 $57.655.50 $174.613.80 $176.590.56 $0.00 $618,396.42 1988 106.6 145.6 $452754.52 $271652.71 CHOLLA CT 100INMOOR CDS N 686 24 $1.59 $0.35 $1.06 $1.34 $26.177.76 $7.203.00 $21.814.80 $22.061.76 $0.00 $77,257.32 1996 120.2 145.6 $63.779.74 $12,755.95 CACTUS DR 2001CR42 CR11 N 2376 24 $1.59 $0.35 $1.06 $1.34 $90.668.16 $24.948.00 $75.556.80 $76.412.16 $0.00 $267,585.12 1996 120.2 145.6 $220,904.75 $44.180.95 NOLINA CT 4001 CDS NMORR DR NW 686 24 $1.59 $0.35 $1.06 $1.34 $26.177.76 $7.203.00 $21,814.80 $22,061.76 $0.00 $77,257.32 1986 101.1 145.6 $53,645.02 $37.551.51 CATCLAW CT 500INMOOR CDS N 845 24 $1.59 $0.35 $1.06 $1.34 $32.245.20 $8.872.50 $26,871.00 $27,175.20 I $0.00 $95,163.90 1986 101.1 145.6 $66,078.78 $46.255.15 NORTHMOORD 100142 11 N 5227 24 $1.59 $0.35 $1.06 $1.34 $199.462.32 $54,883.50 $166,218.60 $168,100.32 $0.00 $588,664.74 1996 120.2 145.6 $485,971.85 $97,194.37 STAGHORN CT 200INMOOR CDS NE 898 24 $1.59 $0.35 $1.06 $1.34 $34,267.68 $9,429.00 $28,556.40 $28,879.68 $0.00 $101,132.76 1986 I 101.1 145.6 $70.223.37 $49,156.36 120 7001CR77 STR E 22862 24 $1.59 $0.35 $1.06 $1.34 $872.413.92 I $240,051.00 $727,011.60 $735,241.92 $0.00 $2,574,718.44 1992 I 105.1 145.6 $1.858.536.46 $743,414.58 120 900ISTR CR87 E 3854 24 $1.59 $0.35 $1.06 $1.34 $147,068.64 $40,467.00 $122,557.20 $123,944.64 $0.00 $434,037.48 1992 105.1 145.6 $313.305.90 $125,322.36 CHATOGA AV 100ICR87 CL E 2165 22 $1.59 $0.35 $1.06 $1.34 $75,731.70 $21,217.00 $64,257.20 $63,824.20 $0.00 $225.030.10 1999 136.5 145.6 $210,965.72 $10,548.29 1230 2001CR43.8 CR 12.5 NE 2112 22 $1.59 $0.35 I $1.06 $1.34 $73.877.76 $20,697.60 $62,684.16 $62,261.76 $0.00 $219,521.28 1986 101.1 145.6 $152,428.58 $106,700.01 1230 300ICL HUDSON SH 76 ROW NE 4435 9 $1.59 $0.35 $1.06 $1.34 $63.464.85 $23,283.75 $70,516.50 $53,486.10 $0.00 $210,751.20 1996 120.2 145.6 $173,985.54 $34,797.11 1250 4005H52 SERVICE RD E 4752 20 $1.59 $0.35 $1.06 $1.34 $151,113.60 $43,243.20 $130,965.12 $127,353.60 $0.00 $452,675.52 1986 101.1 145.6 $314,323.46 $220,026.42 126 2001CR 128 SFCH E 7814+ 36! $1.59 $0.35 $1.06 $1.34 $447,273.36 $114,865.80 $347,879.28 $376,947.36 $0.00 $1.286.965.80 2001 145.6 145.6 $1,286,965.80 $0.00 126 ++ 250ISFCH RRX F 3749 38 $1.59 $0.35 $1.06 $1.34 $214.592.76 $55,110.30 $166.905.48 $180.851.76 $0.00 $617.460.30 2000 145.6 145.6 $617,460.30 $0.00 126 I 300IRRX STR E 1848 38 $1.59 $0.35 $1.06 $1.34 $105,779.52 $27,165.60 $82,272.96 $89.147.52 $0.00 $304.365.60 2000 145.6 145.6 $304,365.60 $0.00 126 NMI STR SRFCH E 4963 36 $1.59 $0.35 $1.06 $1.34 $284,082.12 $72,956.10 $220,952.76 $239,415.12 $0.00 $817.406.10 2000 145.6 145.6 $817,406.10 $0.00 126 600ISRFCH SH85 E 15418 20 $1.59 $0.35 $1.06 $1.34 $490,292.40 $140,303.80 $424,920.08 $413,202.40 $0.00 $1,468,718.68 1979 0 145.6 $0.00 $0.00 OLD SH52 10015H52 SH52 N 3802 24 $1.59 $0.35 $1.06 $1.34 $145,084.32 $39,921.00 $120,903.60 $122,272.32 $0.00 $428,181.24 2001 145.6 145.6 $428,181.24 $0.00 13 250'SPLIT CR12/SCLDA N 2640 242 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27,720.00 $83,952.00 $84,902.40 -$148,658.40 $148,658.40 1996 120.2 145.6 $122,724.86 $24,544.97 COLORADO AV 400INCL SPLIT N 317 24 2 $1.59 $0.35 $1.06 $1.34 $12.096.72 $3.328.50 $10.080.60 $10,194.72 -$17,850.27 $17,850.27 1996 120.2 145.6 $14,736.28 ' $2,947.26 COLORADO AV 4501 SPLIT WIDCH N 106 24 2 $1.59 $0.35 $1.06 $1.34 $4.044.96 $1.113.00 $3,370.80 $3.408.96 -$5,968.86 $5,968.86 1996 120.2 145.6 $4.927.59 $985.52 COLORADO AV 500IWWDCH CL N 211 202 $1.59 $0.35 $1.06 $1.34 $6.709.80 $1.920.10 $5.815.16 $5.654.80 -$10.049.93 $10,049.93 1996 120.2 145.6 $8,296.71 $1.659.34 13 1050 ICL FIRESTONE STR N 1690 24 $1.59 $0.35 $1.06 $1.34 $64,490.40 $17,745.00 $53.742.00 $54.350.40 $0.00 $190.327.80 2001 145.6 145.6 $190.327.80 $0.00 13 1150ISTR STR N 1267 24 $1.59 $0.35 $1.06 $1.34 $48,348.72 $13,303.50 $40,290.60 $40.746.72 $0.00 $142.689.54 1986 101.1 145.6 $99.079.07 $69,355.35 13 1300ISTR SH 66 N 6864 24 $1.59 $0.35 $1.06 $1.34 $261,930.24 $72,072.00 $218,275.20 $220.746.24 $0.00 $773.023.68 1979 0 145.6 $0.00 $0.00 13 140015H66 CR34 N 10613 24 $1.59 $0.35 $1.06 $1.34 $404,992.08 $111,436.50 $337,493.40 $341,314.08 $0.00 $1,195,236.06 1992 105.1 145.6 $862,769.99 $345,107.99 13 14301CR 34 CR38 N 10666 24 $1.59 $0.35 $1.06 $1.34 $407.014.56 $111.993.00 $339,178.80 $343.018.56 $0.00 $1,201,204.92 1990 108.5 145.6 $895,128.67 $447,564.33 13 14601CR38 RRX N 2587 24 $1.59 $0.35 $1.06 $1.34 $98119.92 $27.163.50 $82.266.60 $83.197.92 $0.00 $291,347.94 1992 105.1 145.6 $210,306.79 $84.122.72 13 1480IRRX STR N 13358 24 $1.59 $0.35 $1.06 $1.34 $509,741.28 $140,259.00 $424.784.40 $429.593.28 $0.00 $1,504.377.96 1992 105.1 145.6 $1.085,921.18 $434,368.47 13 1550ISTR STR N 2693 24 $1.59 $0.35 $1.06 $1.34 $102,764.88 $28,276.50 $85,637.40 $86,606.88 $0.00 $303.285.66 1992 105.1 145.6 $218,923.92 $87,569.57 13 1700 STR RRX N 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55.440.00 $167,904.00 $169,804.80 $0.00 $594,633.60 1992 105.1 145.6 $429,230.71 $171,692.28 13 19501NCLJOHN5T0 CR50 N 3854 24 $1.59 $0.35 $1.06 $1.34 $147.068.64 $40.467.00 $122.557.20 $123.944.64 $0.00 $434,037.48 1999 136.5 145.6 $406,910.14 $20,345.51 13 3150ICL WINDSOR SH 392 N 1003 24 2 $1.59 $0.35 $1.06 $1.34 $38.274.48 $10.531.50 $31.895.40 $32.256.48 -$56,478.93 $56,478.93 1998 126.9 145.6 $49,225.11 $4,922.51 ABEYTA ST 100IWILLIAM5 END N 264 24 $1.59 $0.35 $1.06 $1.34 $10.074.24 $2.772.00 $8.395.20 $8,490.24 $0.00 $29,731.68 1988 106.6 145.6 $21.767.84 $13.060.70 DUNMIRE 100IWILLIAMS SRFCH N 1690 24 $1.59 $0.35 $1.06 $1.34 $64,490.40 $17.745.00 $53,742.00 $54.350.40 $0.00 $190.327.80 1988 106.6 145.6 $139.347.14 $83.608.28 JOHNSON ST 1001CR16 MCCLURE N 2693 36 $1.59 $0.35 $1.06 $1.34 $154.147.32 $39.587.10 $119.892.36 $129.910.32 $0.00 $443,537.10 1979 0 145.6 $0.00 $0.00 , BRIAN AV 100ICL CR76 N 1109 24 $1.59 $0.35 $1.06 $1.34 $42.319.44 $11.644.50 $35,266.20 , $35,665.44 $0.00 $124.895.58 1996 120.2 145.6 $103.107.48 $20,621.50 ' 136 3001 CR 77 STR E 5069 24 $1.59 $0.35 $1.06 $1.34 $193.433.04 $53.224.50 $161.194.20 I $163,019.04 $0.00 $570,870.78 1979 0 145.6 $0.00 $0.00 136 500ISTR STR IE 2112 24 $1.59 $0.35 $1.06 $1.34 $80.593.92 $22.176.00 $67.161.60 I $67,921.92 $0.00 $237,853.44 1979 0 145.6 $0.00 $0.00 iii 136 700 STR CR390 E 1003 24 $1.59 $0.35 $1.06 $1.34 , 38,274.48 $10,531.50 $31,895.40 $32,256.48 $0.00 $112,957.86 1979 0 145.6 $0.00 $0.00 / 136 800 CR390 CR89 E 22757 24 $1.59 $0.35 $1.06 $1.34 $868,407.12 $238,948.50 $723,672.60 $731,865.12 $0.00 $2,562.893.34 1979 0 145.6 $0.00 $0.00 GAVLIN AV 100 CR74.8 CR76 N 1109 24 $1.59 $0.35 $1.06 $1.34 X42.319.44 $11,644.50 $35,266.20 $35,665.44 $0.00 $124.895.58 1996 120.2 145.6 $103,107.48 $20.621.50 COMMANCHEC 100 HOPI CDS N 1003 24 $1.59 $0.35 $1.06 $1.34 X38,274.48 $10,531.50 $31,895.40 $32,256.48 $0.00 $112.957.86 1986 101.1 145.6 $78,434,34 $54.904.04 ARIKAREE RD 200 COMMANCHE AL NE 845 24 $1.59 $0.35 $1.06 $1.34 X32.245.20 $8,872.50 $26,871.00 $27,175.20 $0.00 $95.163.90 1986 101.1 145.6 $66,078.78 $46.255.15 1380 300 CR56.8 CR56.9 N 528 24 $1.59 $0.35 $1.06 $1.34 $20,148.48 $5,544.00 $16,790.40 $16,980.48 $0.00 $59.463.36 1994 115.1 145.6 $47,007.09 $14.102.13 BLACKFOOT RC 100 HOPI ALGONO N 1373 24 $1.59 $0.35 $1.06 $1.34 $52.393.68 $14,416.50 $43,661.40 $44.155.68 $0.00 $154,627.26 1986 101.1 145.6 $107,368.24 $75,157.77 1450 300 CR23 STR E 7128 22 $1.59 $0.35 $1.06 $1.34 $249,337.44 $69,854.40 $211,559.04 $210.133.44 $0.00 $740,884.32 1986 101.1 145.6 $514,446.46 $360,112.52 1450 500 STR CL FT LUPTON E 634 22 $1.59 $0.35 $1.06 $1.34 $22,177.32 $6,213.20 $18,817.12 $18,690.32 $0.00 $65,897.96 1986 101.1 145.6 $45,757.44 $32.030.21 14TH ST 900 CL SPLIT E 581 28 2 $1.59 $0.35 $1.06 $1.34 $25.866.12 $6.913.90 $20,939.24 $21.799.12 -$37,759.19 $37,759.19 1992 105.1 145.6 $27,256.12 $10.902.45 14TH ST I 9501SPLIT CL E 581 2812 $1.59 $0.35 $1.06 $1.34 $25.866.12 $6.913.90 $20939.24 $21,799.12 -$37.759.19 I $37,759.19 1999 136.5 145.6 I $35.399.24 $1.769.96 15 I 4001CR12 SPLIT N 2693 2412 $1.59 $0.35 $1.06 $1.34 $102,764.88 $28.276.50 $85,637.40 $86.606.88 -$151.642.83 I $151.642.83 1996 120.2 145.6 I $125.188.65 $25.037.73 15 I 5001SPLIT SH 52 N 2693 2412 $1.59 $0.35 $1.06 $1.34 $102,764.88 $28.276.50 $85,637.40 $86.606.88 -$151,642.83 I $151.642.83 1996 120.2 145.6 I $125.188.65 $25.037.73 15 I 15001CR44 STR N 3538 221 $1.59 $0.35 $1.06 $1.34 $123.759.24 $34.672.40 $105,007.84 $104,300.24 $0.00 I $367.739.72 1996 120.2 145.6 I $303.587.32 $60.717.46 15 I 17001STR CL JOHNS(CR441N 1690 221 $1.59 $0.35 $1.06 $1.34 $59.116.20 $16,562.00 $50,159.20 $49.821.20 $0.00 $175.658.60 2001 145.6 145.6 I $175.658.60 $0.00 15 2000 CR54 RRx N 1214 241 $1.59 $0.35 $1.06 $1.34 $46.326.24 $12,747.00 $38.605.20 $39.042.24 $0.00 $136.720.68 1999 136.5 145.6 $128,175.64 $6,408.78 15 2100 RRx RRx N 1003 24 $1.59 $0.35 $1.06 $1.34 $38.274.48 - $10,531.50 $31,895.40 $32.256.48 $0.00 $112,957.86 1999 136.5 145.6 $105,897.99 $5,294.90 15 2200 RRx CR56 N 3010 24 $1.59 $0.35 $1.06 $1.34 $114.861.60 $31,605.00 $95,718.00 $96.801.60 $0.00 $338,986.20 1999 136.5 145.6 $317.799.56 $15.889.98 15 2300 CR56 SIR N 950 24 $1.59 $0.35 $1.06 $1.34 $36252.00 $9,975.00 $30.210.00 $30,552.00 $0.00 $106,989.00 1999 136.5 145.6 $100.302.19 $5.015.11 15 2500 STR SH34 N 4277 24 _$1.59 $035 $1.06 $1.34 $163.210.32 $44,908.50 $136,008.60 $137,548.32 $0.00 $481.675.74 1996 120.2 145.6 $397,647.14 $79.529.43 15 32001RRX CR72 N 53861 241 $1.59 $0.35 I $1.06 $1.34 I $205.529.76 $56,553.00 $171,274.80 I $173,213.76 $0.00 $606,571.32 I 1996 120.2 I 145.6 $500.754.62 $100.150.92 15 34001CR74 CL WINDSOR N 42241 24 $1.59 $0.35 I $1.06 $1.34 I $161.187.84 $44,352.00 $134.323.20 I $135,843.84 $0.00 $475,706.88 I 1996 120.2 I 145.6 $392.719.55 $78.543.91 15 34501CL SPLIT N 6861 24 2 $1.59 $0.35 I $1.06 $1.34 I $26.177.76 $7,203.00 $21.814.80 $22,061.76 -$38,628.66 $38,628.66 I 1996 120.2 145.6 $31,889.87 $6.377.97 15 347015PLIT CR76 N 6341 242 $1.59 $0.35 $1.06 $1.34 $24.193.44 $6,657.00 $20.161.20 $20,389.44 -$35,700.54 $35,700.54 1996 120.2 145.6 $29,472.56 $5,894.51 15 360013'114 SIR N 27981 24 $1.59 $0.35 $1.06 $1.34 $106,771.68 $29,379.00 $88.976.40 $89,983.68 $0.00 $315,110.76 1996 120.2 145.6 $260,139.51 $52.027.90 15 370015TR CR88 N 12936 24 $1.59 $0.35 $1.06 $1.34 $493,637.76 $135.828.00 $411.364.80 $416,021.76 $0.00 $1.456,852.32 1996 120.2 145.6 $1,202,703.63 $240,540.73 15 38001CR88 SRFCH N 1848 24 $1.59 $0.35 $1.06 $1.34 $70,519.68 $19,404.00 $58.766.40 $59,431.68 $0.00 $208,121.76 1996 120.2 145.6 $171,814.80 $34,362.96 150 700IBGN SH66 N 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27,720.00 $83.952.00 $84,902.40 $0.00 $297,316.80 1996 120.2 145.6 $245,449.72 $49,089.94 NORTHWESTD 100ICR76 END NE 1637 24 $1.59 $0.35 $1.06 11.34 $62,467.92 $17,188.50 $52.056.60 $52,645.92 $0.00 $184,358.94 1996 120.2 145.6 $152,197.42 $30,439.48 ftEE LAKE AV 100ICR15.10 76.35 NW 2112 24 $1-59 $0,35 $1.06 $1.34 $80.593.92 $22.176.00 $67.161.60 $67,921.92 $0.00 $237.853.44 1996 120.2 145.6 $196,359.78 $39,271.96 IERRAVISTA I 100 CR15 CR22 E 3168 241 $1.59 $0.35 $1.06 $1.34 $120.890.88 I $33,264.00 I $100.742.40 I $101,882.88 $0.00 $356.780.16 I 1986 I 101.1 I 145.6 $247,736.77 I $173,415.74 IAPACHE RD I 100 CR20 DELCOMIN N 3062 24 $1.59 $0.35 $1.06 $1.34 $116,845.92 I $32,151.00 I $97,371.60 $98,473.92 $0.00 $344.842.44 I 1986 I 101.1 I 145.6 $239,447.60 I $167,613.32 INAVAHO CT 1008GN CR22 N 370 24 $1.59 $0.35 $1.06 $1.34 $14,119.20 $3,885.00 I $11,766.00 1 $11,899.20 $0.00 $41.669.40 1 1986 101.1 1 145.6 $28,933.90 $20,253.73 I DEL COMINO Le 100 SVISTA END W 317 24 $1.59 $0.35 $1.06 $1.34 $12,096.72 $3,328.50 $10,080.60 I $10,194.72 $0.00 $35.700.54 I 1986 101.1 I 145.6 $24,789.32 $17,352.52 IDELCOMINO 200 CR20 SVISTA N 5122 24 $1.59 $0.35 $1.06 $1.34 $195.455.52 $53,781.00 $162.879.60 $164,723.52 $0.00 $576.839.64 I 1986 101.1 145.6 $400,539.06 $280,377.34 116 800 SH85 RRx E 581 24 $1.59 $0.35 $1.06 $1.34 $22.170.96 $6,100.50 $18.475.80 $18,684.96 $0.00 $65.432.22 1996 120.2 145.6 $54,017.53 $10.803.51 16 900 RRX CR31 S 9029 30 $1.59 $0.35 $1.06 $1.34 $430,683.30 $113.765.40 $344.546.64 $362,965.80 $0.00 $1,251,961.14 1996 120.2 145.6 $1,033,555.83 $206,711.17 16 1040 CL FT LUPTON CR33 E 1109 24 $1.59 $0.35 $1.06 $1.34 $42,319.44 $11.644.50 $35.266.20 $35.665.44 $0.00 $124,895.58 1996 120.2 145.6 $103.107.48 $20,621.50 16 1400 CR63 CR69 E 15840 24 $1.59 $0.35 $1.06 $1.34 $604,454.40 $166,320.00 $503.712.00 $509,414.40 $0.00 $1,783,900.80 1996 120.2 145.6 $1,472.698.33 $294539.67 16 1500 CR69 CR73 E 10613 24 $1.59 $0.35._ $1.06 $1.34 $404.992.08 $111.436.50 $337.493.40 $341.314.08 $0.00 $1,195,236.06 1979 0 145.6 $0.00 $0.00 16 1600ICR73 CR77 E 10613 24 $1.59 $0.35 $1.06 $1.34 $404,992.08 $111,436.50 $337.493.40 $341.314.08 I $0.00 $1,195,236.06 1979 0 145.6 $0.00 I $0.00 16 17001CR77 CR79 E 5280 20 $1.59 $0.35 $1.06 $1.34 $167,904.00 $48,048.00 $145.516.80 $141.504.00 I $0.00 $502,972.80 1979 0 145.6 $0.00 I $0.00 WILLIAMS 100ICR13.1 CR13.3 E 686 28 $1.59 $0.35 $1.06 $1.34 $30,540.72 $8,163.40 $24,723.44 $25.738.72 I $0.00 $89,166.28 1986 101.1 145.6 $61.914.22 I $43.339.96 KOCH ST 1001CR 13.2 CR13.3 E 317 28 $1.59 $0.35 $1.06 $1.34 $14,112.84 $3,772.30 $11,424.68 $11.893.84 $0.00 $41,203.66 1986 101.1 145.6 $28.610.51 $20.027.36 HEDGES AV 100ICR13.2 CR13 E 317 28 $1.59 $0.35 $1.06 $1.34 $14,112.84 $3,772.30 $11,424.68 $11.893.84 $0.00 $41,203.66 1986 101.1 145.6 $28.610.51 $20.027.36 OLDHWY6 100IBGN CLKEENESBUR E 845 20 $1.59 $0.35 $1.06 $1.34 $26.871.00 $7,689.50 $23,288.20 $22.646.00 $0.00 $80,494.70 1986 101.1 145.6 $55.892.95 $39.125.07 OLDHWY6 200ICL CL E 1320 202 $1.59 $0.35 $1.06 $1.34 $41.976.00 $12,012.00 $36,379.20 $35.376.00 -$62.871.60 $62,871.60 1986 101.1 145.6 $43.656.04 $30.559.22 1650 9001CR59 CR63 E 10666 24 $1.59 $0.35 $1.06 $1.34 $407.014.56 $111,993.00 $339,178.80 $343,018.56 $0.00 $1,201,204.92 1979 0 145.6 $0.00 $0.00 17 150015H66 CR34 N 11669 22 $1.59 $0.35 $1.06 $1.34 $408.181.62 $114,356.20 $346,335.92 $344.002.12 $0.00 $1,212,875.86 1992 105.1 145.6 $875,503.11 $350.201.24 17 16001CR34 CR42/CLJOHN0N 21278 22 $1.59 $0.35 $1.06 $1.34 $744.304.44 $208,524.40 $631.531.04 $627.275.44 $0.00 $2,211,635.32 1992 105.1 145.6 $1,596,448.30 $638.579.32 17 2200 CL CR50 N 4013 22 $1.59 $0.35 $1.06 $1.34 $140,374.74 $39,327.40 $119.105.84 $118.303.24 $0.00 I $417,111.22 1979 0 145.6 I $0.00 $0.00 17 2300 CR 50 CR 17 NW 792 22 $1.59 $0.35 $1.06 $1.34 $27,704.16 $7,761.60 $23.506.56 $23.348.16 $0.00 I $82,320.48 1979 0 145.6 I $0.00 $0.00 WYE INTERSEC 2400 CR 50 CR 17 N 634 22 $1.59 $0.35 $1.06 $1.34 $22,177.32 $6,213.20 $18.817.12 $18.690.32 $0.00 $65,897.96 1996 120.2 145.6 $54.402.02 $10.880.40 17 2500 CR 17 RRx N 686 22 $1.59 $0.35 $1.06 $1.34 $23,996.28 $6.722.80 $20,360.48 $20,223.28 $0.00 $71.302.84 1979 0 145.6 $0.00 $0.00 17 2600 RRx STR N 3538 22 $1.59 $0.35 $1.06 $1.34 $123.759.24 $34.672.40 $105,007.84 $104,300.24 $0.00 $367.739.72 1979 0 145.6 $0.00 $0.00 17 2800 STR CR52 N 422 22 $1.59 $0.35 $1.06 $1.34 $14.761.56 $4,135.60 $12,524.96 $12,440.56 $0.00 $43.862.68 1979 0 145.6 $0.00 $0.00 17 2900 CR52 RRX N 2429 22 $1.59 $0.35 $1.06 $1.34 $84,966.42 $23.804.20 $72,092.72 $71.606.92 $0.00 $252470.26 1979 0 145.6 $0.00 $0.00 17 3000 RRX CR54 N 2851 22 $1.59 $0.35 $1.06 $1.34 $99.727.98 $27,939.80 $84.617.68 $84.047.48 $0.00 $296,332.94 1979 0 145.6 $0.00 $0.00 17 3100 CR54 STR N 4752 22 $1.59 $0.35 $1.06 $1.34 $166.224.96 I $46,569.60 $141.039.36 $140,088.96 $0.00 $493,922.88 1979 0 145.6 $0.00 $0.00 17 3300 STR CL GREELEY N 686 22 $1.59 $0.35 $1.06 $1.34 $23 996.28 I $6,722.80 $20.360.48 $20.223.28 $0.00 $71,302.84 2000 145.6 145.6 $71.302.84 $0.00 17 I 3500IRRX URBANBDY IN 8078 24 I $1.59 $0.35 $1.06 $1.34 $308.256.48 $84,819.00 $256,880.40 $259,788.48 $0.00 $909.744.36 1992 105.1 145.6 $656.690.47 $262,676.19 17 I 3520IURBAN BOY CL WINDSOR N 2112 24 $1.59 $0.35 $1.06 $1.34 $80.593.92 $22,176.00 $67,161.60 $67.921.92 $0.00 $237.853.44 1992 105.1 145.6 $171,692.28 $68,676.91 18 1 700ICR23 STR E 9240 n _ $1.59 $0.35 $1.06 __$1.34 $323,215.20__ $90,552.00 $274,243.20 $272.395.20 $0.00 $960,405.60 1986 101.1 145.6 $666.875.04 $466.812.53 lie 6001 siR 5H 85 NE 2218 22 $1.59 $0.35 $1.06 $1.34 $77,585.64 $21,736.40 $65.830.24 $65,386.64 $0.00 $230,538.92 1986 101.1 145.6 $160,078.88 $112.055.22 18 90015H 85 RRx E 634 24 $1.59 $0.35 $1.06 $1.34 $24.193.44 $6,657.00 $20.161.20 $20,389.44 $0.00 $71,401.08 1993 108.3 145.6 $53,109.46 $18.588.31 18 10001RRx CR33 E 15840 24 $1.59 $0.35 $1.06 $1.34 $604.454.40 $166.320.00 $503,712.00 $509,414.40 $0.00 $1.783,900.80 1993 108.3 145.6 $1.326,898.74 $464,414.56 18 1900IMARKET ST ICL E 686 242 $1.59 $0.35 $1.06 $1.34 $26.177.76 $7,203.00 $21,814.80 $22,061.76 -$38.628.66 $38.628.66 1980 97.2 145.6 $25,787.81 $25,787.81 18 2000ICL CR59 E 3326 24 $1.59 $0.35 $1.06 $1.34 $126,920.16 $34.923.00 $105,766.80 $106,964.16 $0.00 $374.574.12 1980 97.2 145.6 $250.059.10 $250,059.10 19 1001168AV CR4 N 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167.904.00 $169.804.80 $0.00 $594.633.60 1995 121.9 145.6 $497,842.28 $124.460.57 19 150ICR4 SIR N 5069 24 $1.59 $0.35 $1.06 $1.34 $193,433.04 $53.224.50 $161.194.20 $163.019.04 $0.00 $570.870.78 1990 108.5 145.6 $425408.51 $212.704.26 19 250ISTR ICR6 IN 211 241 1 $1.59 $0.35 I $1.06 $1.34 I $8,051.76 $2.215.50 $6.709.80 I $6.785.76 $0.00 I $23,762.82 1990 108.5 145.6 I $17,707.87 I $8,853.94 19 300 CR6 SH52 18850 24 $1.59 $0.35 $1.06 $1.34 $719,316.00 $197.925.00 $599 430.00 $606,216.00 $0.00 $2,122,887.00 1995 121.9 145.6 $1.777334.65 $444,333.66 I 19 400 SH52 CR18 13306 24 $1.59 $0.35 $1.06 $1.34 $507,756.96 $139.713.00 $423,130.80 $427,920.96 $0.00 $1,498,521.72 1979 0 145.6 $0.00 $0.00 I 19 500 CR 18 STR 13728 24 $1.59 $0.35 $1.06 $1.34 $523,860.48 $144,144.00 $436,550.40 $441,492.48 $0.00 $1,546,147.36 1979 0 145.6 $0.00 $0.00 1 19 600 STR SH66 18269 24 $1.59 $0.35 $1.06 $1.34 $697,145.04 $191,824.50 $580,954.20 $587,531.04 $0.00 $2,057,454.78 1979 0 145.6 $0.00 $0.00 1 19 7005H66 CR34 10560 24 $1.59 $0.35 $1.06 $1.34 $402,969.60 $110:880.00 $335,808.00 $339,609.60 $0.00 $1,189,267.20 1992 105.1 145.6 $858,461.42 $343,384.57 1 19 BOO CR38 CR 40 SL 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167,904.00 $169,804.80 $0.00 $594,633.60 2001 145.6 145.6 $594,633.60 $0.00 19 900 CR42 CR44 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167.904.00 $169,804.80 $0.00 $594,633.60 1994 115.1 145.6 $470,070.93 $141,021.28 1 19 1000 CR44 STR 8765 24 $1.59 $0.35 $1.06 $1.34 $334,472.40 $92,032.50 $278.727.00 $281,682.40 $0.00 $987,114.30 1996 120.2 145.6 $814,911.67 $162,982.33 1 19 1200 STR SH60 1690 24 $1.59 $0.35 $1.06 $1.34 $64,490.40 $17,745.00 $53.742.00 $54,350.40 $0.00 $190,327.80 1996 120.2 145.6 $157.125.01 $31,425.00 1 19 1800 CR70 CR74 10771 24 $1.59 $0.35 $1.06 $1.34 $411021.36 $113,095.50 $342,517.80 $346,395.36 $0.00 $1,213,030.02 2000 145.6 145.6 $1,213,030.02 $0.00 1 1950 100 CR34 RRX 4013 24 $1.59 $0.35 $1.06 $1.34 $153,136.08 $42.136.50 $127,613.40 $129,058.08 $0.00 $451,944.06 1992 105.1 145.6 $326,231.60 $130.492.64 1950 200 RRX RRX 422 24 $1.59 $0.35 $1.06 $1.34 $16,103.52 $4,431.00 $13,419.60 $13,571.52 $0.00 $47.525.64 1992 105.1 145.6 $34,305.94 $13,722.38 1950 300 RRX SIR 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167,904.00 $169,804.80 _ $0.00 $594.633.60 1992 105.1 145.6 $429,230.71 1 $171.692.28 1 1950 400 STR CR38 1690 24 $1.59 $0.35 $1.06 $1.34 $64,490.40 $17,745.00 $53,742.00 $54,350.40 $0.00 $190.327.80 1992 105.1 145.6 $137,386.34 $54.954.54 I 168TH AV 100 CL BROOMFIELIRRX 4963 241 $1.59 $0.35 $1.06 $1.34 $189,388.08 $52,111.50 $157,823.40 $159610.08 -$279,466.53 $279.466.53 2001 145.6 145.6 $279.466.53 $0.00 I 168TH AV 200 RRX STR 3274 221 $1.59 $0.35 $1.06 $1.34 $114,524.52 $32,085.20 $97,172.32 $96,517.52 -$170,149.78 $170,149.78 1996 120.2 145.6 $140.467.06 $28,093.41 168TH AV 400 STR CR17 7128 241 $1.59 $0.35 $1.06 $1.34 $272.004.48 $74,844.00 $226,670.40 $229.236.48 -$401,377.68 $401,377.68 1996 120.2 145.6 $331.357.12 $66,271.42 168TH AV 500 CR17 STR 17582 241 $1.59 $0.35 $1.06 $1.34 $670.929.12 $184,611.00 $559.107.60 $565,437.12 -$990.042.42 $990,042.42 1996 120.2 145.6 $817328.98 $163,465.80 168TH AV 700 STR STR 4541 241 $1.59 $0.35 $1.06 $1.34 $173,284.56 $47.680.50 $144,403.80 $146.038.56 -$255.703.71 $255 703.71 1996 120.2 145.6 $211.096.06 $42.219.21 1 168TH AV 900 STR SH85 739 241 $1.59 $0.35 $1.06 $1.34 $28,200.24 $7,759.50 $23,500.20 $23,766.24 -$41.613.09 $41,613.09 1979 0 145.6 $0.00 $0.00 I BASELINE RD 1970 CL CL 370 241 $1.59 $0.35 $1.06 $1.34 $14,119.20 $3.885.00 $11,766.00 $11.899.20 -$20.834.70 $20,834.70 1996 120.2 145.6 $17,200.08 $3,440.02 1 20 500 SEC LINE CR19 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55.440.00 $167.904.00 $169.804.80 $0.00 $594,633.60 1997 130.6 145.6 $533,373.27 $80,005.99 1 2020 200 SRFCH CR25 158 24 $1.59 $0.35 $1.06 $1.34 $6,029.28 $1.659.00 65,024.40 $5.081.28 $0.00 $17,793.96 1993 108.3 145.6 $13,235.48 $4,632.42 1 SIOUX CT 100 CR15 END 422 24 $1.59 $0.35 $1.06 $1.34 $16,103.52 $4.431.00 $13,419.60 $13.571.52 $0.00 $47,525.64 1986 101.1 145.6 $33,000.29 $23,100.20 1 2050 100 CR 1 RRX 8342 20 $1.59 $0.35 $1.06 $1.34 $265,275.60 $75.912.20 $229.905.52 $223.565.60 $0.00 $794,658.92 1986 101.1 145.6 $551.785.83 $386,250.08 I 2050 200 RRX STR 1320 20 $1.59 $0.35 $1.06 $1.34 $41,976.00 $12,012.00 $36,379.20 $35,376.00 $0.00 $125,743.20 1986 _ 101.1 145.6 $87,312.07 $61,118.45 I 2050 400 STR STR 264 20 81.59 $0.35 $1.06 $1.34 $8,395.20 $2.402.40 $7,275.84 $7,075.20 $0.00 $25,148.64 1986 101.1 145.6 $17.462.41 $12,223.69 2050 600 STR CR7 5966 20 $1.59 $0.35 $1.06 $1.34 $189,718.80 $54.290.60 $164422.96 $159,888.80 $0.00 $568,321.16 1986 101.1 145.6 $394.624.10 $276,236.87 I 2080 100 BGN SIERRA VISTA RI 317 24 $1.59 $0.35 $1.06 $1.34 $12,096.72 $3.328.50 $10,080.60 $10,194.72 $0.00 $35,700.54 1986 101.1 145.6 $24.789.32 $17,352.52 DELCOMUNDOI 200 SVISTA END 1901 24 $1.59 $0.35 $1.06 $1.34 $72,542.16 $19.960.50 $60,451.80 $61,136.16 $0.00 $214,090.62 1986 101.1 145.6 $148.657.70 $104,060.39 1 LA ROSA CT 100 BGN SVISTA E 422 24 $1.59 $0.35 $1.06 $1.34 $16,103.52 $4.431.00 $13.419.60 $13.571.52 $0.00 $47,525.64 1986 101.1 145.6 $33,000.29 $23,100.20 LOMALINDA CT 100 BGN SVISTA 581 24 $1.59 $0.35 $1.06 $1.34 $22,170.96 $6,100.50 $18,475.80 $18,684.96 $0.00 $65,432.22 1986 101.1 145.6 _ $45,434.05 $31,803.83 1 21 200 CR6 STR 2693 24 $1.59 $0.35 $1.06 $1.34 $102,764.88 $28.276.50 $85,637.40 $86.606.88 $0.00 $303,285.66 1998 126.9 145.6 $264,333.45 $26,433.34 I 21 300 STR SRFCH 2640 28 $1.59 $0.35 $1.06 $1.34 $117,532.80 $31.416.00 $95,145.60 $99.052.80 $0.00 $343,147.20 1990 108.5 145.6 $255.710.65 $127,855.33 1 21 600 CR28 SH66 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55.440.00 $167,904.00 $169.804.80 $0.00 $594,633.60 1994 115.1 145.6 $470.070.93 $141,021.28 1 21 700 SH66 CR32.5 7973 24 $1.59 $0.35 $1.06 $1.34 $304,249.68 $83.716.50 $253541.40 $256,411.68 _ $0.00 $897,919.26 1994 115.1 145.6 $709.824.91 $212,947.47 I 21 750 CR32.5 CR34 2957 22 $1.59 $0.35 $1.06 $1.34 $103,435.86 $28.978.60 $87,763.76 $87,172.36 $0.00 $307,350.58 1979 0 145.6 $0.00 $0.00 I 21 1300 SH392 STR 1478 24 $1.59 $0.35 $1.06 $1.34 $56,400.48 $15.519.00 $47.000.40 $47,532.48 $0.00 $166,452.36 1991 107.5 145.6 $122,895.80 $55,303.11 1 21 1500 STR RRX 1003 24 $1.59 $0.35 $1.06 $1.34 $38,274.48 $10,531.50 $31,895.40 $32,256.48 $0.00 $112,957.86 1991 107.5 145.6 $83,399.52 $37,529.78 1 21 1600 RRX CR72 8131 24 $1.59 $0.35 $1.06 $1.34 $310.278.96 $85,375.50 $258.565.80 $261.492.96 $0.00 _ $915,713.22 1991 107.5 145.6 $676,093.21 $304,241.94 1 21 1700 CR72 CLSEVERAN 2798 24 $1.59 $0.35 $1.06 $1.34 $106.771.68 $29.379.00 $88.976.40 $89,983.68 $0.00 $315 110.76 2001 145.6 145.6 $315,110.76 $0.00 I 2150 100 CR24.5 CR28 8026 24 $1.59 $0.35 $1.06 $1.34 $306.272.16 $84.273.00 $255.226.80 $258,116.16 $0.00 $903,888.12 1986 101.1 145.6 $627,631.11 $439.341.77 I 12180 100 CR66 RRX 1109 24 $1.59 $0.35 $1.06 $1.34 $42.319.44 $11,644.50 $35.266.20 $35,665.44 $0.00 $124,895.58 1990 108.5 145.6 $93,071.23 $46,535.61 1 12180 200 RRX STR 2270 24 $1.59 $0.35 $1.06 $1.34 $86.623.20 $23,835.00 $72.186.00 $73.003.20 $0.00 $255.647.40 1990 108.5 145.6 $190,506.48 $95,253.24 1 12180 400 STR SH392 1901 24 $1.59 $0.35 $1.06 $1.34 $72.542.16 $19,960.50 $60.451.80 $61,136.16 $0.00 $214.090.62 1990 108.5 145.6 $159,538.68 $79.769.34 1 122 600 CR 15 SRFCH 2640 24 $1.59 $0.35 $1.06 $1.34 $100.742.40 $27,720.00 $83.952.00 $84.902.40 $0.00 $297316.80 1990 108.5 145.6 $221,558.19 $110.779.10 1 122 900 CR19 . CR23 10507 24 $1.59 $0.35 $1.06 $1.34 $400.947.12 $110,323.50 $334,122.60 $337905.12 $0.00 $1,183.298.34 1986 101.1 145.6 $821,644.66 $575,151.26 I 122 1000 SH85 RRX 317 24 $1.59 $0.35 $1.06 $1.34 $12.096.72 $3,328.50 $10.080.60 $10,194.72 $0.00 $35.700.54 1993 108.3 145.6 $26,554.73 $9,294.16 122 1100 RRX CR41 37805 24 $1.59 $0.35 $1.06 $1.34 $1.442.638.80 $396,952.50 $1.202.199.00 $1,215,808.80 $0.00 $4.257.599.10 1993 108.3 145.6 $3,166,881.75 $1,108,408.611 122 1300 CR41 STR 8131 24 $1.59 $0.35 $1.06 $1.34 $310.278.96 $85,375.50 $258.565.80 $261,492.96 $0.00 $915.713.22 1994 115.1 145.6 $723,891.43 $217.167.43 1 122 1500 STR CR49 13200 24 $1.59 $0.35 $1.06 $1.34 $503,712.00 $138,600.00 $419.760.00 $424,512.00 $0.00 $1,486,584.00 1994 115.1 145.6 $1,175,177.32 $352,553.20 I (SKYWAY DR 100 BGN VISTA VIEW DR 3538 44 $1.59 $0.35 $1.06 $1.34 $247,518.48 $61,915.00 $187.514.00 $208,600.48 $0.00 $705,547.96 2001 145.6 145.6 $705,547.96 $0.00 I VISTA VIEW DR 100 BGN CR5 3960 44 $1.59 $0.35 $1.06 $1.34 $277,041.60 $69.300.00 $209.880.00 $233,481.60 $0.00 $789,703.20 2001 145.6 145.6 $789,703.20 $0.00 ' STAGECOACHf 100 CR7.5 END 1214 38 $1.59 $0.35 $1.06 $1.34 $73,349.88 $18.695.60 $56,620.96 $61,816.88 $0.00 $210,483.32 1998 126.9 145.6 $183,450.09 $18,345.01 1 STAGECOACH F 100 CR7.5 END 1214 38 $1.59 $0.35 $1.06 $1.34 $73,349.88 $18.695.60 $56,620.96 $61.816.88 $0.00 $210,483.32 1998 126.9 145.6 $183,450.09 $18,345.01 1 23 350 CR6 STR 3802 24 $1.59 $0.35 $1.06 $1.34 $145.084.32 $39,921.00 $120,903.60 $122.272.32 $0.00 $428.181.24 1986 101.1 145.6 $297,315.41 $208,120.79 1 23 450 STR STR 950 24 $1.59 $0.35 $1.06 $1.34 $36.252.00 $9,975.00 $30,210.00 $30.552.00 $0.00 $106.989.00 1986 101.1 145.6 $74,289.75 $52,002.83 1 ,23 550 STR SIR 1214 24 $1.59 $0.35 $1.06 $1.34 $46,326.24 $12,747.00 $38.605.20 $39,042.24 $0.00 $136 720.68 1986 101.1 145.6 $94,934.48 $66,454.14 1 23 700 STR SH52 13042 24 $1.59 $0.35 $1.06 $1.34 $497.682.72 $136,941.00 $414.735.60 $419,430.72 $0.00 $1,468,790.04 1986 101.1 145.6 $1,019,881.00 $713,916.70 I 23 800 5H 52 CR 14.5 5438 24 $1.59 $0.35 $1.06 $1.34 $207,514.08 $57.099.00 $172,928.40 $174,886.08 $0.00 $612,427.56 1992 105.1 145.6 $442,075.11 $176,830.05 I 23 900 CR 14.5 CR 18 6970 24 $1.59 $0.35 $1.06 $1.34 $265,975.20 $73.185.00 $221,646.00 $224.155.20 $0.00 $784,961.40 1992 105.1 145.6 $566.617.05 $226,646.82 1 ,23 1000 CR 18 CR22.5 13464 24 $1.59 $0.35 $1.06 $1.34 $513.786.24 $141,372.00 $428,155.20 $433 002.24 $0.00 $1.516.315.68 1992 105.1 145.6 $1,094,538.31 $437,815.32 1 23 1100 CR22.5 CR24 2640 24 $1.59 $0.35 $1.06 $1.34 $100.742.40 $27,720.00 $83.952.00 $84,902.40 $0.00 $297.316.80 1986 101.1 145.6 $206,447.31 $144.513.12 I 23 1200 CR24 CR24.5 2376 24 $1.59 $0.35 $1.06 $1.34 $90.668.16 $24,948.00 $75.556.80 $76,412.16 $0.00 $267.585.12 1986 101.1 145.6 $185,802.58 $130,061.81 I 23 2200 CR64.75 CR66 1320 24 $1.59 $0.35 $1.06 $1.34 $50,371.20 $13.860.00 $41,976.00 $42,451.20 $0.00 $148,658.40 1996 120.2 145.6 $122,724.86 $24,544.97 1 123 2250 CR66 SH392 5280 24 $1.59 $0.35 $1.06 $1.34 $201.484.80 $55.440.00 $167,904.00 $169.804.80 $0.00 $594,633.60 1992 105.1 145.6 $429,230.71 $171,692.28 I 123 2300 SH392 CL SEVERANCE 7022 24 $1.59 $0.35 $1.06 $1.34 $267.959.52 $73,731.00 $223,299.60 $225.827.52 $0.00 $790,817.64 1996 120.2 145.6 $652,859.07 $130,571.81 1 ISIASCONE RD 100 BGN CR70 950 24 $1.59 $0.35 $1.06 $1.34 $36.252.00 $9,975.00 $30,210.00 $30.552.00 $0.00 $106,989.00 1986 101.1 145.6 $74.289.75 $52.002.83 1 (CLIFF RD 200 BGN CR70 E 1056 24 $1.59 $0.35 $1.06 $1.34 $40.296.96 $11,088.00 $33.580.80 $33,960.96 $0.00 $118,926.72 1986 101.1 145.6 $82,578.92 $57.805.25 1 ILEONA ST 200 EDWARD CR6 317 24 $1.59 $0.35 $1.06 $1.34 $12,096.72 $3,328.50 $10.080.60 $10,194.72 $0.00 $35,700.54 1996 120.2 145.6 $29,472.56 $5,894.51 1 ICAROLINE AV 100 CR4.4 CR6 E 2798 24 $1.59 $0.35 $1.06 $1.34 $106,771.68 $29,379.00 $88.976.40 _ $89,983.68 $0.00 $315.110.76 1996 120.2 145.6 $260,139.51 $52,027.90 1 l MARY AV 100 CHRISTIAN CR6 N 1584 24 $1.59 $0.35 $1.06 $1.34 $60,445.44 $16.632.00 $50,371.20 $50,941.44 $0.00 $178.390.08 1996 120.2 145.6 I $147,269.83 $29,453.97 I 2375 200 CR64.5 64.75 N 1320 24 $1.59 $0.35 $1.06 $1.34 $5%371.20 $13.860.00 $41,976.00 $42,451.20 $0.00 $148,658.40 1997 130.6 145.6 $133,343.32 $20,001.50 GRACE AV 100 FREDERICK CR6 N 634 24 $1.59 $0.35 $1.06 __ $1.34 $24,193.44 $6.657.00 $20,161.20 $20,389.44 $0.00 $71,401.08 1996 120.2 145.6 I $58,945.12 $11,789.02 I 24 300 RRX CR 19 E 13358 24 $1.59 $0.35 $1.06 $1.34 $509,741.28 $140.259.00 $424,784.40 $429,593.28 $0.00 $1,504.377.96 1979 0 145.6 I $0.00 $0.00 I 24 400 CR19 CR23 E 10507 24 $1.59 $0.35 $1.06 $1.34 $400,947.12 $110.323.50 $334,122.60 $337,905.12 $0.00 $1.183.298.34 1994 115.1 145.6 $935,423.34 $280,627.00 ELMER LINN DR 100 CR 550 PEARL HOWLETINW 1901 37 $1.59 $0.35 $1.06 $1.34 $111,835.83 $28.610.05 $86.647.58 $94,251.58 $0.00 $321.345.04 2000 145.6 145.6 I $321,345.04 $0.00 BLUE MTN RD 100 CR 560 END W 2112 20 $1.59 $0.35 $1.06 $1.34 $67,161.60 $19,219.20 $58,206.72 $56,601.60 $0.00 $201.189.12 1997 130.6 145.6 $180,462.22 $27069.33 ENTRANCE RD 100 CR550 CR560 W 528 24 $1.59 $0.35 $1.06 $1.34 $20,148.48 $5,544.00 $16,790.40 $16,980.48 $0.00 $59,463.36 1996 120.2 145.6 . $49.089.94 $9,817.99 BRYANT DR 100 ELMER LINN DgMONTGOMERY W 1162 37 $1.59 $0.35 $1.06 $1.34 $68.360.46 $17,488.10 $52,963.96 $57.611.96 $0.00 $196,424.48 2000 145.6 145.6 $196.424.48 $0.00 PEARLHOWLE' 100 CR550 MONTGOMERY W 2059 19 $1.59 $0.35 $1.06 $1.34 $62.202.39 $18,016.25 $54,563.50 $52.422.14 $0.00 $187,204.28 2000 145.6 145.6 $187.204.28 $0.00 2450 200 SERV RD SRFCH E 1267 76 $1.59 $0.35 $1.06 $1.34 $153.104.28 $36,362.90 $110,127.64 $129.031.28 $0.00 $428,626.10 2001 145.6 145.6 $428,626.10 $0.00 2450 300 CR21.5 CR23 E 2640 i 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27,720.00 $83.952.00 $84,902.40 $0.00 $297,316.80 1986 101.1 145.6 $206.447.31 $144,513.12 2450 400 CR25.2 SH85 IE 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27,720.00 $83,952.00 $81,902.40 $0.00 $297.316.80 1986 101.1 145.6 $206.447.31 $144,513.12 25 100 CR18 CR20.2 N 6970 24 $1.59 $0.35 $1.06 $1.34 $265.975.20 $73,185.00 $221.646.00 $224,155.20 $0.00 $784,961.40 1993 108.3 145.6 $583.868.95 $204354.13 250 100 5H 85 CR27 E 1267 28 $1.59 $0.35 $1.06 ' $1.34 $56,406.84 $15,077.30 $45,662.68 $47,537.84 $0.00 $164,684.66 1992 105.1 145.6 $118.876.08 $47,550.43 LOWELLLN I 500 CR7 GATE E 2270 24 $1.59 $0.35 $1.06 $1.34 $86623.20 $23,835.00 $72,186.00 $73,003.20 $0.00 $255647.40 1997 130.6 145.6 $229.310.10 $34,396.51 2575 I 100 CR64.5 RRX N 106 22 $1.59 $0.35 $1.06 I $1.34 $3,707.88 $1,038.80 $3,146.08 $3.124.88 $0.00 $11,017.64 1992 105.1 145.6 $7952.98 $3 181.19 2575 200 RRX STR N 5438 22 $1.59 $0.35 $1.06 I $1.34 $190.221.24 $53,292.40 $161,399.84 $160.312.24 $0.00 $565.225.72 1986 101.1 145.6 $392,474.73 $274,732.31 2575 400,STR SH392 N 2376 22 $1.59 $0.35 $1.06 + $1.34 $83,112.48 $23,284.80 $70,519.68 $70,044.48 $0.00 $246,961.44 1986 101.1 145.6 $171 482.15 $120,037.51 DENVER AV 400 CR2.5 CL N 24182 24 $1.59 $0.35 $1.06 I $1.34 $922.785.12 $253,911.00 $768,987.60 $777.693.12 $0.00 $2,723.376.84 1993 108.3 145.6 $2,025,698.57 $708.994.50 83RD AV 950 CL STR N 2851 20 $1.59 $0.35 $1.06 I $1.34 $90.661.80 $25,944.10 $78,573.56 $76.406.80 $0.00 $271,586.26 2001 145.6 145.6 $271,586.26 $0.00 83RD AV 1000 STR CL GREELEY N 950 20 $1.59 $0.35 $1.06 ' $1.34 $30.210.00 $8.645.00 $26,182.00 $25.460.00 $0.00 $90,497.00 2001 145.6 145.6 $90,497.00 $0.00 83RD AV 1050 SH 34 BR CL GREELEY N 5280 24 $1.59 $0.35 $1.06 I $1.34 $201.484.80 $55.440.00 $167,904.00 $169,804.80 $0.00 $594,633.60 2001 145.6 145.6 $594,633.60 $0.00 83RD AV 1300 STR CR64 N 2270 24 $1.59 $0.35 $1.06 I $1.34 $86.623.20 $23,835.00 $72,186.00 $73.003.20 $0.00 $255,647.40 2001 145.6 145.6 $255,647.40 $0.00 27 1400 CR64 CR25.75 N 3432 24 $1.59 $0.35 $1.06 I $1.34 $130.965.12 $36.036.00 $109,137.60 $110.373.12 $0.00 $386,511.84 1992 105.1 145.6 $278,999.96 $111 599.98 27 1500 SH392 CR74 IN 15734 24 $1.59 $0.35 $1.06 I $1.34 $600.409.44 $165.207.00 $500,341.20 $506.005.44 $0.00 $1,771,963.08 1986 101.1 145.6 $1,230.394.69 $861,276.29 2750 100 CR396 STR IN 1637 22 $1.59 $0.35 $1.06 i $1.34 $57,262.26 $16,042.60 $48,586.16 $48.258.76 $0.00 $170,149.78 1979 0 145.6 $0.00 $0.00 2750 300 STR CR50.1 IN 3485 22 $1.59 $0.35 $1.06 I $1.34 $121,905.30 $34.153.00 $103,434.80 $102,737.80 $0.00 $362,230.90 1979 0 145.6 $0.00 $0.00 TWO RIVERS Pd 400 CR50.1 CR52 N 6125 24 $1.59 $0.35 $1.06 I $1.34 $233730.00 $64.312.50 $194,775.00 $196.980.00 $0.00 $689,797.50 1998 126.9 145.6 $601,204.00 $60,120.40 77TH AV 600 BGN SH 34 BR N 1320 24 $1.59 $0.35 $1.06 I $1.34 $50,371.20 $13.860.00 $41,976.00 $42,451.20 $0.00 $148,658.40 1989 107.7 145.6 $109,962.29 $60.479.26 76TH AV 100 CR5870 CR5890 IN 792 24 $1.59 $0.35 $1.06 $1.34 $30,222.72 $8,316.00 $25,185.60 $25,470.72 $0.00 $89,195.04 1990 108.5 145.6 $66,467.46 $33.233.73 75TH AV 100 CR5870 CR5890 N 792 24 $1.59 $0.35 $1.06 $1.34 $30,222.72 $8.316.00 $25,185.60 $25,470.72 $0.00 $89,195.04 1990 108.5 145.6 $66,467.46 $33.233.73 74TH AV 100 CR5870 CR5890 N 792 24 $1.59 $0.35 $1.06 $1.34 $30,222.72 $8.316.00 $25,185.60 $25,470.72 $0.00 $89,195.04 1990 108.5 145.6 $66,467.46 $33,233.73 73RD AV 100 CR5870 CR5890 N 792 24 $1.59 $0.35 $1.06 $1.34 $30.222.72 $8.316.00 $25,185.60 $25,470.72 $0.00 $89,195.04 1990 108.5 145.6 $66,467.46 $33,233.73 72ND AV 100 CR5870 CR5890 N 898 24 $1.59 $0.35 $1.06 $1.34 $34,267.68 $9.429.00 $28,556.40 $28,879.68 $0.00 $101,132.76 1990 108.5 145.6 $75,363.35 $37,681.68 28 650 CR21.5 STR E 7656 24 $1.59 $0.35 $1.06 $1.34 $292.152.96 $80.388.00 $243,460.80 $246,216.96 $0.00 $862,218.72 1986 101.1 145.6 $598,697.20 $419,088.04 28 800 STR SH85 E 2426 24 $1.59 $0.35 $1.06 $1.34 $92.690.64 $25,504.50 $77,242.20 $78.116.64 $0.00 $273,553.98 1986 101.1 145.6 $189,947.17 $132.963.02 28 1100 CR39 CR41 E 5280 24 $1.59 $0.35 $1.06 $1.34 $201.484.80 $55,440.00 $167,904.00 $169.804.80 $0.00 $594,633.60 1992 105.1 145.6 $429,230.71 $171.692.28 JOHNSON LN 100 CR 7 END E 2640 24 $1.59 $0.35 $1.06 $1.34 $100.742.40 $27,720.00 $83,952.00 $84.902.40 $0.00 $297,316.80 1997 130.6 145.6 $266,686.64 $40.003.00 71ST AV 1300 SH34 CL N 2904 24 $1.59 $0.35 $1.06 $1.34 $110.816.64 $30,492.00 $92,347.20 $93.392.64 $0.00 $327,048.48 1990 108.5 145.6 $243,714.01 $121.857.01 29 2100 CR74 RRX N 2587 24 $1.59 $0.35 $1.06 $1.34 $98.719.92 $27.163.50 $82,266.60 $83.197.92 $0.00 $291,347.94 1992 105.1 145.6 $210,306.79 $84,122.72 29 2200 RRX STR IN 7075 24 $1.59 $0.35 $1.06 $1.34 $269.982.00 $74,287.50 $224,985.00 $227.532.00 $0.00 $796,786.50 1992 105.1 145.6 $575,152.89 $230,061.16 29 2400 STR STR IN 9610 24 $1.59 $0.35 $1.06 $1.34 $366.717.60 $100,905.00 $305,598.00 $309.057.60 $0.00 $1.082,278.20 1992 105.1 145.6 $781,232.41 $312,492.96 29 2600 STR SH 14 IN 2059 24 $1.59 $0.35 $1.06 $1.34 $78,571.44 $21,619.50 $65,476.20 $66.217.44 $0.00 $231.884.58 1992 105.1 145.6 $167.383.72 $66,953.49 175TH AV 100 BGN CR7 IE 2112 24 $1.59 $0.35 $1.06 $1.34 $80.593.92 $22,176.00 $67,161.60 $67,921.92 $0.00 $237,853.44 1997 130.6 145.6 $213.349.31 $32,002.40 MILLIKEN RD 600 CR50.1 CR52 IN 4066 24 $1.59 $0.35 $1.06 $1.34 $155,158.56 $42,693.00 $129,298.80 $130.762.56 $0.00 $457,912.92 2000 145.6 145.6 $457,912.92 $0.00 WESTRIDGEAVI 1150 CL 59TH AV IN 4488 24 $1.59 $0.35 $1.06 $1.34 $171,262.08 $47,124.00 $142;718.40 $144,334.08 $0.00 $505,438.56 1994 115.1 145.6 $399,560.29 $119,868.09 64TH AV 100 SERV RD 26TH ST IN 1478 24 $1.59 $0.35 $1.06 $1.34 $56.400.48 $15,519.00 $47.000.40 $47.532.48 $0.00 $166.452.36 1986 101.1 145.6 $115,579.21 $80,905.45 64TH AV 20024TH ST END IN 1003 24 $1.59 $0.35 $1.06 $1.34 $38.274.48 $10,531.50 $31.895.40 $32.256.48 $0.00 $112.957.86 1986 101.1 145.6 $78,434.34 $54,904.04 63RD AV 100127TH ST 26TH ST IN 422 24 $1.59 $0.35 $1.06 $1.34 $16.103.52 $4,431.00 $13,419.60 $13.571.52 $0.00 $47.525.64 1996 120.2 145.6 $39.234.77 $7,846.95 59TH CT 2001BGN 24TH ST IN 528 24 $1.59 $0.35 $1.06 $1.34 $20.148.48 $5,544.00 $16,790.40 $16.980.48 $0.00 $59.463.36 1986 101.1 145.6 $41.289.46 $28,902.62 61ST AV 10015H34 27TH ST N 898 20 $1.59 $0.35 $1.06 $1.34 $28.556.40 $8,171.80 $24,748.88 $24.066.40 $0.00 $85,543.48 1986 101.1 145.6 $59,398.67 $41,579.07 59TH WY 100IBGN 24TH ST NE 422 24 $1.59 $0.35 $1.06 $1.34 $16.103.52 $4.431.00 $13,419.60 $13 571.52 $0.00 $47.525.64 1986 101.1 145.6 $33,000.29 $23,100.20 30 5001CR43 CR49 E 15840 24 $1.59 $0.35 $1.06 $1.34 $604.454.40 $166.320.00 $503,712.00 $509.414.40 $0.00 $1,783,900.80 1997 130.6 145.6 $1,600,119.81 $240,017.97 3050 2001SRFCH SH66 E 158 27 $1.59 $0.35 $1.06 $1.34 $6,782.94 $1.824.90 $5,526.84 $5,716.44 $0.00 $19,851.12 1993 108.3 145.6 $14,765.63 $5,167.97 31 5001CR 16 CR 18 N 5438 24 $1.59 $0.35 $1.06 $1.34 $207,514.08 $57,099.00 $172.928.40 $174,886.08 $0.00 $612,427.56 1993 108.3 145.6 $455,535.06 $159,437.27 31 1900ICLGILCREST CR394 N 17371 22 $1.59 $0.35 $1.06 $1.34 $607,637.58 $170,235.80 $515.571.28 $512,097.08 $0.00 $1.805.541.74 1992 105.1 145.6 $1,303,313.44 $521,325.38 59TH AV 21001WESTRIDGE CL N 317 24 $1.59 $0.35 $1.06 $1.34 $12.096.72 $3,328.50 $10,080.60 $10.194.72 $0.00 $35.700.54 1986 101.1 . 145.6 $24,789.32 $17,352.52 31 4100ICL GREELEY CR66 N 2693 22 $1.59 $0.35 $1.06 $1.34 $94.201.14 $26,391.40 $79,928.24 $79.389.64 $0.00 $279.910.42 1986 101.1 I 145.6 $194,360.88 $136,052.61 31 4300ICL SH392 N 2693 22 $1.59 $0.35 $1.06 $1.34 $94:201.14 $26.391.40 $79,928.24 $79.389.64 $0.00 $279,910.42 1991 107.5 I 145.6 $206,664.63 $92,999.08 31 44001SH392 STR N 3010 22 $1.59 $0.35 $1.06 $1.34 $105,289.80 $29.498.00 $89.336.80 $88,734.80 $0.00 $312,859.40 1986 101.1 I 145.6 $217,239.60 $152,067.72 31 46001STR CR74 N 12672 22 $1.59 $0.35 $1.06 $1.34 $443,266.56 $124,185.60 $376.104.96 $373,570.56 $0.00 $1,317.127.68 1986 101.1 145.6 $914,571.49 $640200.04 31 47001CR74 STR N 3326 24 $1.59 $0.35 $1.06 $1.34 $126.920.16 $34,923.00 $105,766.80 $106.964.16 $0.00 $374,574.12 1993 108.3 145.6 $278,615.23 $97,515.33 31 5000ISTR SH14 N 18533 24 $1.59 $0.35 $1.06 I $1.34 $707.219.28 $194,596.50 $589,349.40 $596021.28 $0.00 $2,087,186.46 1993 108.3 145.6 $1,552,488.28 $543,370.90 ANNE PL 100ICR10.6 END N 845 36 $1.59 $0.35 $1.06 I $1.34 $48,367.80 $12.421.50 $37,619.40 $40,762.80 $0.00 $139,171.50 1996 120.2 145.6 $114,892.96 $22,978.59 BARBARACIRC 2001 BGN CR12 N 53 36 $1.59 $0.35 $1.06 I $1.34 $3,033.72 $779.10 $2.359.56 $2,556.72 $0.00 $8,729.10 1996 120.2 145.6 $7.206.30 $1,441.26 3110 2001CR52.5 CR54 N 2376 24 $1.59 $0.35 $1.06 , $1.34 $90,668.16 $24,948.00 $75.556.80 $76,412.16 $0.00 $267,585.12 1993 108.3 145.6 $199,034.81 $69,662.18 ALTO WY 1001CR396 CABALLO N 1162 24 $1.59 $0.35 $1.06 , $1.34 $44.341.92 $12,201.00 $36,951.60 $37,369.92 $0.00 $130.864.44 1998 126.9 145.6 $114,056.99 $11,405.70 POSTVEJOLN 100IBGN CR5060 N 370 22 $1.59 $0.35 $1.06 I $1.34 $12.942.60 $3,626.00 $10,981.60 $10,907.60 $0.00 $38,457.80 1997 130.6 145.6 $34,495.80 $5,174.37 3160 3001CR52.5 CR54 NW 2429 24 $1.59 $0.35 $1.06 I $1.34 $92.690.64 $25,504.50 $77,242.20 $78.116.64 $0.00 $273.553.98 1993 108.3 145.6 $203,474.56 $71,216.10 GRANJERO RD 100ICR396 CR5060 N 1003 22 $1.59 $0.35 $1.06 I $1.34 $35.084.94 $9.829.40 $29,769.04 $29.568.44 $0.00 $104.251.82 2000 145.6 145.6 $104,251.82 $0.00 32 420 CL MEAD JCR 13 IE 2957 24 $1.59 $0.35 $1.06 $1.34 $112,839.12 $31.048.50 $94,032.60 $95097.12 $0.00 $333,017.34 12000 145.6 145.6 $333.017.34 $0.00 32 500 CLPLATTEVIL CR 39 E 34003 24 $1.59 $0.35 I $1.06 $1.34 $1,297,554.48 $357,031.50 $1,081,295.40 $1,093,536.48 $0.00 $3.829,417.86 1992 105.1 145.6 $2.764.229.51 $1.105,691.81 32 700 CR39 CR43 E 10507 24 $1.59 $0.35 $1.06 $1.34 $400.947.12 $110,323.50 $334,122.60 $337:905.12 $0.00 $1,183,298.34 1997 130.6 145.6 $1.061.392.60 $159,208.89 SYLVIALN 100 CR10.6 END N 898 36 $1.59 $0.35 $1.06 $1.34 $51,401.52 $13,200.60 $39,978.96 $43,319.52 $0.00 $147,900.60 1996 120.2 145.6 $122.099.26 $24,419.85 325 200 DORIS CIRCLE CR12 N 53 36 $1.59 $0.35 $1.06 $1.34 $3,033.72 $779.10 $2.359.56 $2,556.72 $0.00 $8.729.10 1996 120.2 145.6 $7.206.30 $1.441.26 3250 100 CR21 STR E 4013 22 $1.59 $0.35 $1.06 $1.34 $140,374.74 $39.327.40 $119,105.84 $118.303.24 $0.00 $417.111.22 I 1979 0 145.6 $0.00 $0.00 3250 300 STR STR E 317 22 $1.59 $0.35 $1.06 $1.34 $11,088.66 $3.106.60 $9.408.56 $9,345.16 $0.00 $32.948.98 I 1986 101.1 145.6 $22.878.72 $16.015.11 3250 500 STR STR E 3168 22 $1.59 $0.35 $1.06 $1.34 $110816.64 $31,046.40 $94.026.24 $93,392.64 $0.00 $329,281.92 I 1986 101.1 145.6 $228,642.87 $160.050.01 3250 700 STR CL PLATT E 845 22 $1.59 $0.35 $1.06 $1.34 $29,558.10 $8,281.00 $25.079.60 $24.910.60 $0.00 $87,829.30 2000 145.6 145.6 $87,829.30 $0.00 47TH AV 1400 CR396 CR52 N 1901 24 $1.59 $0.35 $1.06 $1.34 $72.542.16 $19.960.50 $60.451.80 $61.136.16 $0.00 $214,090.62 1998 126.9 145.6 $186.594.09 $18,659.41 33 1500 CR 52.5 CR54 N 1003 24 $1.59 $0.35 $1.06 $1.34 $38.274.48 $10,531.50 $31,895.40 $32.256.48 $0.00 $112,957.86 1986 101.1 145.6 $78.434.34 $54,904.04 47TH AV 2270 CL SH392 N 2323 24 $1.59 $0.35 $1.06 $1.34 $88.645.68 $24.391.50 $73,871.40 $74,707.68 $0.00 $261,616.26 1998 126.9 145.6 $228.015.82 $22,801.58 33 2300 SH 392 STR N 158 24 $1.59 $0.35 $1.06 $1.34 $6,029.28 $1.659.00 $5,024.40 $5,081.28 $0.00 $17,793.96 1992 105.1 145.6 $12.844.40 $5.137.76 33 24001STR CR74 N 15734 24 $1.59 $0.35 $1.06 $1.34 $600,409.44 $165.207.00 $500,341.20 $506,005.44 $0.00 $1.771,963.08 1992 105.1 145.6 $1.279.075.00 $511.630.00 33 25001CR74 RRX N 2693 24 $1.59 $0.35 $1.06 $1.34 $102,764.88 $28.276.50 $85.637.40 $86.606.88 $0.00 $303.285.66 1987 100 145.6 $208.300.59 $13539538 33 2600IRRX STR N 9610 24 $1.59 $0.35 $1.06 $1.34 $366,717.60 $100.905.00 $305.598.00 $309,057.60 $0.00 $1.082.278.20 1987 100 145.6 $743,322.94 $483,159.91 33 2700ISIR SH14 N 9134 24 $1.59 $0.35 $1.06 $1.34 $348.553.44 $95,907.00 $290.461.20 $293.749.44 $0.00 $1,028.671.08 1987 100 145.6 $706,504.86 $459,228.16 33 28001SH 14 STR N 10771 24 $1.59 $0.35 $1.06 $1.34 $411.021.36 $113,095.50 $342.517.80 $346395.36 $0.00 $1,213,030.02 1987 100 145.6 $833,125.01 $541,531.26 33 2900ISTR CR88 N 5016 24 $1.59 $0.35 $1.06 $1.34 $191.410.56 $52,668.00 $159.508.80 $161314.56 $0.00 $564.901.92 1987 100 145.6 $387082.09 $252,188.36 KINGCNDR 100152.05 52.15 N 686 38 $1.59 $0.35 $1.06 $1.34 $41.448.12 $10,564.40 $31.995.04 $34.931.12 $0.00 $118.938.68 1996 120.2 145.6 $98,189.76 $19,637.95 KINGCNDR 200152.15 5225 N 475 38 I $1.59 $0.35 $1.06 $1.34 $28.699.50 $7,315.00 $22,154.00 $24.187.00 $0.00 $82,355.50 1996 120.2 145.6 $67,988.54 $13,597.71 SHENANDOAH 30015236 5237 N 370 38 $1.59 $0.35 I $1.06 $1.34 $22.355.40 $5,698.00 $17,256.80 $18.840.40 $0.00 $64,150.60 1996 120.2 145.6 $52,959.49 $10,591.90 LASSEN CT 1001CR 52O5 CR52.1 N 422 40 , $1.59 $0.35 I $1.06 $1.34 $26.839.20 $6,794.20 $20,576.72 $22.619.20 $0.00 $76,829.32 1992 105.1 145.6 $55,458.53 $22,183.41 LAKE MEAD 2001CR52.15 52.25 N 475 38 I $1.59 $0.35 ' $1.06 $1.34 $28.699.50 $7,315.00 $22,154.00 $24.187.00 $0.00 $82,355.50 1992 105.1 145.6 $59,447.55 $23,779.02 LAKE MEAD 3001 CR5225 CR5240 N 1056 38 I $1.59 $0.35 I $1.06 $1.34 $63.803.52 $16,262.40 $49,251.84 $53.771.52 $0.00 $183,089.28 1995 121.9 145.6 $153,286.97 $38,321.74 FLAMINGGRGd 100IBGN CR 52.3 N 158 40 $1.59 $0.35 I $1.06 $1.34 $10.048.80 $2,543.80 $7,704.08 $8.468.80 $0.00 $28,765.48 1992 105.1 145.6 $20,764.09 $8,305.64 EVERGLADECTI 2001 CR 52.3 END N 370 40 $1.59 • $0.35 I $1.06 $1.34 $23.532.00 $5,957.00 $18,041.20 $19.832.00 $0.00 $67,362.20 1992 105.1 145.6 $48,624.77 $19,449.91 DINOSAUR CT 3001CR52.15 END N 264 38 $1.59 $0.35 I $1.06 $1.34 $15.950.88 $4,065.60 $12,312.96 $13.442.88 $0.00 $45,772.32 1992 105.1 145.6 $33,040.32 $13216.13 MT RAINIER CT 400IBGN CR5237 N 158 38 $1.59 $0.35 I $1.06 $1.34 $9.546.36 $2.433.20 $7,369.12 $8.045.36 $0.00 $27,394.04 1995 121.9 145.6 $22,934.98 $5,733.75 HOT SPGSOR 2001 CR 52.1 CR52.15 N 317 40 $1.59 $0.35 I $1.06 $1.34 $20.161.20 $5.103.70 $15,456.92 $16,991.20 $0.00 $57,713.02 1992 105.1 145.6 $41,659.60 $16,663.84 BIG BEND CT 100IBGN CR52.3 N 158 40 $1.59 $0.35 I $1.06 $1.34 $10.048.80 $2.543.80 $7,704.08 $8,468.80 $0.00 $28,765.48 1992 105.1 145.6 $20,764.09 $8,305.64 WHITE SANDS IOOIBGN 52.1 N 370 40 $1.59 $0.35 I $1.06 $1.34 $23.532.00 $5.957.00 $18,041.20 $19,832.00 $0.00 $67,362.20 1996 120.2 145.6 $55,610.83 $11,122.17 CASAGRD 2001CR52.15 CR52.25 NW 422 40 $1.59 $0.35 I $1.06 $1.34 $26.839.20 $6,794.20 $20,576.72 $22,619.20 -$0.00 $76,829.32 1992 105.1 145.6 $55,458.53 $22,183.41 ACADIA ST 3001 CR5235 CR5240 N 528 38 $1.59 $0.35 I $1.06 $1.34 $31.901.76 $8.131.20 $24,625.92 $26.885.76 $0.00 $91,544.64 1995 121.9 145.6 $76,643.49 $19,160.87 BAD LANDS CT 100IBGN CR52.3 N 158 40 $1.59 $0.35 $1.06 $1.34 $10.048.80 $2.543.80 $7,704.08 $8.468.80 $0.00 $28,765.48 1992 105.1 145.6 $20,764.09 $8,305.64 HOT SPGS DR 2001CR52.1 CR52.3 N 1056 40 $1.59 $0.35 $1.06 $1.34 $67.161.60 $17,001.60 $51,490.56 $56.601.60 $0.00 $192,255.36 1992 105.1 145.6 $138,777.74 $55.511.09 ACADIA CT 3001CR5235 END NW 158 38 $1.59 $0.35 I $1.06 $1.34 $9.546.36 $2.433.20 $7,369.12 $8,045.36 $0.00 $27,394.04 1995 121.9 145.6 $22,934.98 $5.733.75 VELLWSTONE 1001CR52 CR52.3 N 1584 40 $1.59 $0.35 I $1.06 $1.34 $100.742.40 $25,502.40 $77,235.84 $84.902.40 $0.00 $288,383.04 1992 105.1 145.6 $208,166.60 $83,266.64 GRANDTETON 1001CR52.2 CR52.2 N 2059 28 $1.59 $0.35 I $1.06 $1.34 $91.666.68 $24,502.10 $74,206.36 $77.253.68 $0.00 $267628.82 1992 105.1 145.6 $193,185.36 $77,274.15 HILNPARK DR 1001CR52 CR52.3 N 317 48 $1.59 $0.35 $1.06 $1.34 $24,193.44 $5,991.30 $18.145.08 $20.389.44 $0.00 $68,719.26 1992 105.1 145.6 $49,604.36 $19,841.74 40TH AV 10014TH ST CR60.9 NE 2112 24 $1.59 $0.35 $1.06 $1.34 $80,593.92 $22,176.00 $67.161.60 $67.921.92 $0.00 $237,853.44 1993 108.3 145.6 $176,919.83 $61,921.94 ZION DR 1001CR52.25 CR52.25 SW 1584 28 $1.59 $0.35 $1.06 $1.34 $70,519.68 $18,849.60 $57.087.36 $59.431.68 $0.00 $205.888.32 1992 105.1 145.6 $148,618.56 $59,447.42 BRYCECNVN 2001 CR 52.05 52.25 N 792 28 $1.59 $0.35 ' $1.06 $1.34 $35,259.84 $9,424.80 $28.543.68 $29,715.84 $0.00 $102.944.16 1992 105.1 145.6 $74,309.28 $29,723.71 38TH AV 10014TH ST CR33.60 NW 1426 34 I $1.59 $0.35 I $1.06 $1.34 $77,089.56 $19,964.00 $60.462.40 $64.968.56 $0.00 $222.484.52 1993 108.3 145.6 $165488.14 $57,920.85 PIKES PK DR 20015H392 CR68.15 N 1267 24 I $1.59 $0.35 I $1.06 $1.34 $48,348.72 $13,303.50 $40.290.60 $40.746.72 $0.00 $142,689.54 1986 101.1 145.6 $99,079.07 $69,355.35 PIKES PEAK DR 3001 CR 68.15 END N 158 15 I $1.59 $0.35 I $1.06 $1.34 $3,768.30 $1.161.30 $3.517.08 $3.175.80 $0.00 $11.622.48 1986 101.1 145.6 $8.070.28 $5,649.20 34 100ICR1 CR5 E 10454 24 I $1.59 $0.35 I $1.06 $1.34 $398,924.64 $109,767.00 $332.437.20 $336.200.64 $0.00 $1,177.329.48 1995 121.9 145.6 $985,690.00 $246,422.50 34 200ICR5 CVMEAD E 3696 24 I $1.59 $0.35 I $1.06 $1.34 $141,039.36 $38,808.00 $117.532.80 $118.863.36 $0.00 $416.243.52 1979 0 145.6 $0.00 $0.00 WELKER AV 50011ST ST SPLIT E 106 36 I $1.59 $0.35 I $1.06 $1.34 $6,067.44 $1,558.20 $4.719.12 $5.113.44 $0.00 $17,458.20 1995 121.9 145.6 $14,616.45 $3,654.11 wELKER AV 700ISPLIT CL E 3326 362 I $1.59 $0.35 I $1.06 $1.34 $190,380.24 $48.892.20 $148.073.52 $160446.24 -$273,896.10 $273.896.10 1995 121.9 145.6 $229.312.74 $57,328.18 WELKER AV 8001CL 1-25 STRE 898 24 I $1.59 $0.35 I $1.06 $1.34 $34,267.68 $9,429.00 $28,556.40 $28.879.68 $0.00 $101.132.76 1988 106.6 145.6 $74.043.63 $44,426.18 34 90011-25 STR CR13 E 10507 24 $1.59 $0.35 I $1.06 $1.34 $400.947.12 $110,323.50 $334,122.60 $337.905.12 $0.00 $1,183.298.34 1992 105.1 145.6 $854.152.85 $341,661.14 1 34 9501CR 13 RRX E 14573 24 $1.59 $0.35 I $1.06 $1.34 $556.105.68 $153,016.50 $463,421.40 $468.667.68 $0.00 $1,641,211.26 1995 121.9 145.6 $1.374.063.55 $343,515.89 34 1000IRRX CR19 E 1056 24 $1.59 $0.35 + $1.06 $1.34 $40.296.96 $11.088.00 $33,580.80 $33,960.96 $0.00 $118,926.72 1995 121.9 145.6 $99.568.46 $24.892.11 34 1100ICR19 CR21 E 5280 22 $1.59 $0.35 I $1.06 $1.34 $184,694.40 $51.744.00 $156,710.40 $155.654.40 $0.00 $548,803.20 1979 0 145.6 $0.00 $0.00 34 16001CR49 CR51 E 5069 24 $1.59 $0.35 I $1.06 $1.34 $193,433.04 $53.224.50 $161.194.20 $163..019.04 $0.00 $570,870.78 1998 126.9 145.6 $497,551.52 $49.755.15 BETTY PL 100ICR10.6 END N 898 36 $1.59 $0.35 I $1.06 $1.34 $51,401.52 $13200.60 $39.978.96 $43.319.52 $0.00 $147.900.60 1996 120.2 145.6 $122,099.26 $24,419.85 340 2001BONNIECIRCL CR 12 N 53 36 $1.59 $0.35 I $1.06 $1.34 $3,033.72 $779.10 $2,359.56 $2.556.72 $0.00 $8.729.10 1996 120.2 145.6 $7,206.30 $1,441.26 3450 100ICR5 CL MEAD E 2482 24 $1.59 $0.35 I $1.06 $1.34 $94.713.12 $26,061.00 $78,927.60 $79.821.12 $0.00 $279,522.84 1999 136.5 145.6 $262,052.66 $13,102.63 BURGHLEY CT 1001CR 3454 CDS E 634 28 $1.59 $0.35 , $1.06 $1.34 $28.225.68 $7,544.60 $22,849.36 $23,787.68 $0.00 $82,407.32 2001 145.6 145.6 $82.407.32 $0.00 BURGHLEV CT i 1001CR3454 CDS E 370 28 $1.59 $0.35 $1.06 $1.34 $16,472.40 $4.403.00 $13,334.80 $13,882.40 $0.00 $48,092.60 2001 145.6 145.6 $48.092.60 $0.00 ESSEX RD SO. 200ICDS CR3942 N 422 28 $1.59 $0.35 $1.06 $1.34 $18,787.44 $5,021.80 $15.208.88 $15.833.44 $0.00 $54.851.56 2001 145.6 145.6 $54,851.56 $0.00 BURGHLEV CT I 100ICR 3940 CR3940 E 2746 28 $1.59 $0.35 $1.06 $1.34 $122,251.92 $32,677.40 $98,965.84 $103.029.92 $0.00 $356.925.08 2001 145.6 145.6 $356.925.08 $0.00 BURGHLEV CT I 2001CR 3940 CR3940 E 2746 28 $1.59 $0.35 $1.06 $1.34 $122.251.92 $32,677.40 $98,965.84 $103.029.92 $0.00 $356,925.08 2001 145.6 145.6 $356,925.08 $0.00 ESSEX RD SO.1 3001CR3942 CDS NE 475 28 $1.59 $0.35 $1.06 $1.34 $21,147.00 $5,652.50 $17,119.00 $17,822.00 $0.00 $61,740.50 2001 145.6 145.6 $61,740.50 $0.00 BEEBE DRAW PI 1001CR 39 ISRFCH E 5681 28 $1.59 $0.35 $1.06 $1.34 $252,918.12 $67.603.90 $204,743.24 $213.151.12 $0.00 $738,416.38 2001 145.6 145.6 $738,416.38 $0.00 ESSEX RD NO.21 2001CDS 'CDS NE 1003 28 $1.59 $0.35 $1.06 $1.34 $44,653.56 $11.935.70 $36.148.12 $37,632.56 $0.00 $130.369.94 2001 145.6 145.6 $130,369.94 $0.00 35 1 501CR 1050 CR 12 N 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27,720.00 $83,952.00 $84,902.40 $0.00 $297.316.80 2001 145.6 145.6 $297.316.80 $0.00 35 1 1001CR 12 SH52 N 2112 24 $1.59 $0.35 $1.06 $1.34 $80.593.92 $22,176.00 $67,161.60 $67.921.92 $0.00 $237.853.44 2000 145.6 145.6 $237,853.44 $0.00 35 I 8001CR44 ICR46 N 5227 22 $1.59 $0.35 $1.06 $1.34 $182.840.46 $51,224.60 $155,137.36 $154.091.96 $0.00 $543.294.38 1992 105.1 145.6 $392,171.97 $156,868.79 35 1 9001CR46 IRRX NW 106 22 $1.59 $0.35 $1.06 $1.34 $3.707.88 $1,038.80 $3,146.08 $3,124.88 $0.00 $11.017.64 1992 105.1 145.6 $7,952.98 $3,181.19 35 950 RRX SH85 NW 106 22 $1.59 $0.35 $1.06 $1.34 $3,707.88 $1,038.80 $3.146.08 $3,124.88 $0.00 $11.017.64 1992 105.1 145.6 $7.952.98 $3,181.19 35 1000 SH 85 CR48 N 5544 22 $1.59 $0.35 $1.06 $1.34 $193,929.12 $54,331.20 $164,545.92 $163,437.12 $0.00 $576.243.36 1986 101.1 145.6 $400.125.03 _ $280.087.52 35 1100 CR48 RRX N 2165 22 $1.59 $0.35 $1.06 $1.34 $75,731.70 $21,217.00 $64,257.20 $63,824.20 $0.00 $225,030.10 1986 101.1 145.6 $156.253.73__ $109.377.61 35 1200 RRX STR N 422 22 $1.59 $0.35 $1.06 $1.34 $14,761.56 $4,135.60 $12,524.96 $12.440.56 $0.00 $43,862.68 1986 101.1 145.6 $30,456.85 _ $21,319.79 35 1300 STR CR394 N 2798 22 $1.59 $0.35 $1.06 $1.34 $97,874.04 $27,420.40 $83.044.64 $82.485.04 $0.00 $290,824.12 1986 101.1 I 145.6 $201,939.00 $141.357.30 35TH AV 2050 SPLIT CR62 N 528 40 $1.59 $0.35 $1.06 $1.34 $33.580.80 $8,500.80 $25.745.28 $28,300.80 $0.00 $96,127.68 1992 105.1 145.6 $69,388.87 $27,755.55 35TH AV 2200 CR62.25 RRX N 264 32 $1.59 $0.35 $1.06 $1.34 $13.432.32 $3.511.20 $10.633.92 $11,320.32 $0.00 $38,897.76 1998 126.9 145.6 $33,901.96 $3,390.20 35 2300 RRX STR N 3062 28 $1.59 $0.35 $1.06 $1.34 $136.320.24 $36,437.80 $110,354.48 $114886.24 $0.00 $397,998.76 1994 115,1 145.6 $314,626.77 $94,388.03 35 2400 STR CR64 N 1373 28 $1.59 $0.35 $1.06 $1.34 $61,125.96 $16,338.70 $49,482.92 $51,514.96 $0.00 $178.462.54 1998 126.9 145.6 $155,541.87 $15,554.19 35 2450 CR64 CR66 N 2693 24 $1.59 $0.35 $1.06 $1.34 $102764.88 $28,276.50 $85,637.40 $86,606.88 $0.00 $303.285.66 1991 107.5 145.6 $223.923.13 $100.765.41 35 25001CR66 CR66 E 2587 24 $1.59 $0.35 $1.06 $1.34 $98,719.92 $27,163.50 $82,266.60 $83,197.92 $0.00 $291,347.94 1998 126.9 145.6 $253.928.94 $25.392.89 35 26001CR66 STR N 5174 24 $1.59 $0.35 $1.06 $1.34 $197,439.84 $54,327.00 $164.533.20 $166,395.84 $0.00 $582,695.88 1998 126.9 145.6 $507.857.88 $50.785.79 35 27001STR SH392 N 528 24 $1.59 $0.35 $1.06 $1.34 $20,148.48 $5,544.00 $16,790.40 $16980.48 $0.00 $59,463.36 1998 126.9 145.6 $51,826.24 $5,182.62 35 280015H 392 CR70 N 5280 22 $1.59 $0.35 $1.06 $1.34 $184,694.40 $51,744.00 $156,710.40 $155,654.40 $0.00 $548,803.20 1986 101.1 145.6 $381,071.45 $266,750.02 35 29001CR70 CR74 N 10560 24 $1.59 $0.35 $1.06 $1.34 $402,969.60 $110880.00 $335808.00 $339,609.60 $0.00 $1,189,267.20 1991 107.5 145.6 $878,064.73 $395,129.13 35 30001CR74 RRX N 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27,720.00 $83,952.00 $84,902.40 $0.00 $297,316.80 1986 101.1 145.6 $206,447.31 $144,513.12 35 31001RRX STR N 12936 24 $1.59 $0.35 $1.06 $1.34 $493,637.76 $135,828.00 $411,364.80 $416,021.76 $0.00 $1,456,852.32 1986 101.1 145.6 $1,011,591.82 $708,114.28 35 32001STR CL N 1584 24 $1.59 $0.35 $1.06 $1.34 $60,445.44 $16,632.00 $50,371.20 $50,941.44 $0.00 $178,390.08 2001 ' 145.6 145.6 $178,390.08 $0.00 FIRST AV 33001OLDCL SPLIT N 792 24 $1.59 $0.35 $1.06 $1.34 $30,222.72 $8,316.00 $25,185.60 $25.470.72 $0.00 $89,195.04 2001 145.6 145.6 $89,195.04 $0.00 VISTA COMM 100IBGN SH119 N 1056 36 $1.59 $0.35 $1.06 $1.34 $60,445.44 $15,523.20 $47,013.12 $50.941.44 $0.00 $173,923.20 1998 126.9 145.6 $151,585.54 $15,158.55 350 1501WIDCH RRX N 3485 24 $1.59 $0.35 $1.06 $1.34 $132,987.60 $36,592.50 $110,823.00 $112.077.60 $0.00 $392,480.70 1996 120.2 145.6 $324,012.23 $64,802.45 34TH AV PL 100134 ST CDS N 422 32 $1.59 $0.35 $1.06 $1.34 $21,471.36 $5,612.60 $16,998.16 $18.095.36 $0.00 $62.177.48 1986 101.1 145.6 $43,174.06 $30,221.84 34TH AV 100135TH ST 34TH ST N 581 3s $1.59 $0.35 $1.06 $1.34 $33,256.44 $8,540.70 $25,866.12 $28.027.44 $0.00 $95.690.70 1986 101.1 145.6 $66,444.57 $46,511.20 FALCON DR 3001SRFCH CR 1050 NW 2798 24 $1.59 $0.35 $1.06 $1.34 $106,771.68 $29,379.00 $88,976.40 $89.983.68 $0.00 $315.110.76 2001 145.6 145.6 $315,110.76 $0.00 34TH AV CT 100134TH ST CDS N 422 32 $1.59 $0.35 $1.06 $1.34 $21,471.36 $5,612.60 $16,998.16 $18,095.36 $0.00 $62.177.48 1986 101.1 145.6 $43,174.06 $30.221.84 33AV CT 100135TH ST CDS N 898 36 $1.59 $0.35 $1.06 $1.34 $51,401.52 $13,200.60 $39,978.96 $43,319.52 $0.00 $147,900.60 1986 101.1 145.6 $102,697.46 $71,888.22 3520 3001SRFCH CANAL N 1959 24 $1.59 $0.35 $1.06 $1.34 $74,755.44 $20,569.50 $62,296.20 $63,001.44 $0.00 $220,622.58 2001 145.6 145.6 $220,622.58 $0.00 GRANDVIEWSII 1001CDS CINDY PL NE 1214 36 $1.59 $0.35 $1.06 $1.34 $69,489.36 $17,845.80 $54,047.28 $58,563.36 $0.00 $199,945.80 1986 101.1 145.6 $138,835.99 $97.185.19 GRANDVIEWDFI 2001CINDY PI END NW 1003 36 $1.59 $0.35 $1.06 ' $1.34 $57,411.72 $14,744.10 $44,653.56 $48,384.72 $0.00 $165,194.10 1986 101.1 145.6 $114,705.52 $80,293.86 26TH AV 1001CR62.9 CR62.95 N 634 20 $1.59 $0.35 $1.06 $1.34 $20,161.20 $5,769.40 $17,473.04 $16,991.20 $0.00 $60,394.84 1986 101.1 145.6 $41,936.25 $29.355.38 25THAVCT 3001CR62.90 CR6295 N 634 20 $1.59 $0.35 $1.06 $1.34 $20,161.20 $5,769.40 $17,473.04 $16,991.20 $0.00 $60,394.84 1986 101.1 145.6 $41,936.25 $29.355.38 ELIZABETH ST 200!SRFCH CR 1020 N 1478 22 $1.59 $0.35 $1.06 $1.34 $51,700.44 $14,484.40 $43,867.04 $43571.44 $0.00 $153,623.32 1998 126.9 145.6 $133.892.85 $13,389.29 25TH AV 1001CR62.25 ISTR N 3010 22 $1.59 $0.35 $1.06 $1.34 $105,289.80 $29,498.00 $89,336.80 $88.734.80 $0.00 � $312,859.40 1979 0 145.6 $0.00 $0.00 25TH AV 3001STR CR64 N 1162 22 $1.59 $0.35 $1.06 $1.34 I $40,646.76 $11,387.60 $34,488.16 $34.255.76 $0.00 $120,778.28 1979 0 145.6 $0.00 $0.00 CEDAR CT 4001CR74 CDS E 422 28 $1.59 $0.35 $1.06 $1.34 $18,787.44 $5,021.80 $15.208.88 $15,833.44 $0.00 $54,851.56 1986 101.1 145.6 $38,087.18 $26,661.02 36 1601CR7 I-25 E 3907 32 $1.59 $0.35 $1.06 $1.34 $198,788.16 $51,963.10 $157,373.96 $167,532.16 $0.00 $575,657.38 2000 145.6 145.6 $575,657.38 $0.00 BEVERLYLN 1001CR10.6 END N 898 36 $1.59 $0.35 $1.06 $1.34 $51,401.52 $13,200.60 $39,978.96 $43.319.52 $0.00 $147,900.60 1996 120.2 145.6 � $122,099.26 $24,419.85 360 2001DELLA CT CR12 N 53 36 $1.59 $0.35 $1.06 $1.34 $3,033.72 $779.10 $2,359.56 $2.556.72 $0.00 $8,729.10 1996 120.2 145.6 $7,206.30 $1,441.26 WAGON TR 1001CR7 CR38 E 8981 22 $1.59 $0.35 $1.06 $1.34 $31,412.04 $8,800.40 $26,652.64 $26.473.04 $0.00 $93.338.12 1986 101.1 145.6 $64,811.02 $45,367.71 FAIRWY DR 2001CR38 CR7.5 S 1901 22 $1.59 $0.35 $1.06 $1.34 $66,496.98 $18,629.80 $56,421.68 $56.041.48 $0.00 $197.589.94 1986 101.1 145.6 $137,200.16 $96,040.11 37 4001CR4 SH52 N 23866 22 $1.59 $0.35 $1.06 $1.34 $834.832.68 $233,886.80 $708,342.88 $703.569.68 $0.00 $2.480.632.04 1992 105.1 145.6 $1,790,621.07 $716,248.43 37 15001CR62 RRX N 53 22 $1.59 $0.35 $1.06 $1.34 $1,853.94 $519.40 $1,573.04 $1,562.44 $0.00 $5.508.82 1986 101.1 145.6 $3,825.15 $2,677.60 37 16001RRX CR62.25 N 370 22 $1.59 $0.35 $1.06 $1.34 $12942.60 $3,626.00 $10,981.60 $10,907.60 $0.00 $38.457.80 1986 101.1 145.6 $26,703.87 $18.692.71 37 17001CR64 SH392 N 1 10560 22 $1.59 $0.35 $1.06 $1.34 $369,388.80 $103,488.00 $313,420.80 $311,308.80 $0.00 $1,097.606.40 1986 101.1 145.6 $762.142.91 $533,500.03 37 180015H392 STR N 581 22 $1.59 $0.35 $1.06 $1.34 $20,323.38 $5,693.80 $17,244.08 $17,127.88 $0.00 $60,389.14 1979 0 145.6 $0.00 $0.00 I 37 20001STR CR74 N 15365 22 $1.59 $0.35 $1.06 $1.34 $537,467.70 $150,577.00 $456,033.20 $452,960.20 $0.00 $1,597,038.10 1979 0 145.6 $0.00 $0.00 37 230016TH WIDCH N 475 44 2 $1.59 $0.35 $1.06 $1.34 $33,231.00 $8,312.50 $25,175.00 $28,006.00 -$47,362.25 $47.362.25 1992 105.1 145.6 $34.188.00 $13.675.20 37 24001WIDCH 7TH ST N 422 33 2 $1.59 $0.35 $1.06 $1.34 $22,142.34 $5,760.30 $17,445.48 $18,660.84 -$32,004.48 $32.004.48 1992 105.1 145.6 $23.102.13 $9.240.85 CHEYENNE AV 25001CL CR76 N 898 24 $1.59 $0.35 $1.06 $1.34 $34,267.68 $9,429.00 $28,556.40 $28,879.68 $0.00 $101.132.76 1992 105.1 145.6 $73,001.74 $29.200.70 37 260015H 85 RRX N 106 20 $1.59 $0.35 $1.06 $1.34 $3,370.80 $964.60 $2,921.36 $2,840.80 $0.00 $10,097.56 1979 0 145.6 $0.00 $0.00 37 27001RRX STR N 9662 20 $1.59 $0.35 $1.06 $1.34 $307,251.60 $87,924.20 $266,284.72 $258.941.60 $0.00 $920,402.12 1979 0 145.6 $0.00 $0.00 37 28001STR SH 14 N 47521 20 $1.59 $0.35 $1.06 $1.34 $151,113.60 $43,243.20 $130,965.12 $127.353.60 $0.00 $452675.52 1979 0 145.6 $0.00 $0.00 37 290015H 14 SRFCH N 4752 22 $1.59 $0.35 $1.06 $1.34 $166,224.96 $46.569.60 $141,039.36 $140.088.96 $0.00 $493,922.88 1986 101.1 145.6 $342,964.31 $240,075.02 37 295015RFCH CR86 N 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27.720.00 $83,952.00 $84,902.40 $0.00 $297,316.80 1986 101.1 145.6 $206,447.31 $144,513.12 37 36001CR108.05 SRFCH N 5491 30 $1.59 $0.35 $1.06 $1.34 $261,920.70 $69.186.60 $209.536.56 $220,738.20 $0.00 $761,382.06 1989 107.7 145.6 $563,192.64 $309,755.95 EDIE PLACE 100ICR10.6 END N 845 36 $1.59 $0.35 $1.06 $1.34 $48,367.80 $12.421.50 $37.619.40 $40,762.80 $0.00 $139,171.50 1996 120.2 145.6 $114,892.96 $22,978.59 SANDY CIRCLE 200 BGN CR12 N 53 36 $1.59 $0.35 $1.06 $1.34 $3.033.72 $779.10 $2,359.56 $2,556.72 $0.00 $8,729.10 1996 120.2 145.6 $7.206.30 $1,441.26 3710 1001BGN CR64 N 370 24 $1.59 $0.35 $1.06 $1.34 $14,119.20 $3,885.00 $11,766.00 $11.899.20 $0.00 $41,669.40 1986 101.1 145.6 $28.933.90 $20,253.73 21ST AV 2001CL RRX N 581 242 $1.59 $0.35 $1.06 $1.34 $22,170.96 $6,100.50 $18.475.80 I $18.684.96 -$32,716.11 $32.716.11 2000 145.6 145.6 $32.716.11 $0.00 21ST AV 3001RRX CR62.25 N 53 24 $1.59 $0.35 $1.06 $1.34 $2,022.48 $556.50 $1.685.40 $1,704.48 $0.00 $5,968.86 1986 101.1 145.6 $4.144.59 $2.901.21 3730 1001CL CR394 NW 1267 24 $1.59 $0.35 I $1.06 $1.34 $48,348.72 $13,303.50 $40.290.60 $40,746.72 $0.00 $142,689.54 1999 136.5 145.6 $133,771.44 $6,688.57 3740 2001RRX CR74.40 NW 53 25 $1.59 $0.35 $1.06 $1.34 $2,106.75 $575.05 $1,741.58 $1,775.50 $0.00 $6,198.88 1993 108.3 145.6 $4,610.84 $1,613.79 3740 3001CR74.40 CR74.50 N 475 25 $1.59 $0.35 $1.06 $1.34 $18,881.25 $5,153.75 $15,608.50 $15,912.50 $0.00 $55.556.00 1993 108.3 145.6 $41,323.59 $14,463.26 17TH AV 250134TH ST GREELEYCL N 1373 482 $1.59 $0.35 $1.06 $1.34 $104,787.36 $25,949.70 $78,590.52 $88,311.36 -$148,819.47 $148.819.47 1985 102 145.6 $104,255.40 $78,191.55 3750 3001CR74.40 CR74.50 N 475 20 $1.59 $0.35 $1.06 $1.34 $15,105.00 $4,322.50 $13,091.00 $12,730.00 $0.00 $45,248.50 1986 101.1 145.6 $31.419.12 $21.993.38 MAIN ST 1001CR39 URBDRY NW 1320 24 $1.59 $0.35 $1.06 $1.34 $50,371.20 $13.860.00 $41.976.00 $42,451.20 $0.00 $148,658.40 1996 120.2 145.6 $122.724.86 $24.544.97 MAIN ST 2001URBDRY CL LASALLE NE 792 24' $1.59 $0.35 $1.06 $1.34 $30,222.72 $8,316.00 $25,185.60 $25,470.72 $0.00 $89,195.04 1996 120.2 145.6 $73.634.92 $14.726.98 BELMONT PK 100152 EVANSCL NE 528 241 $1.59 $0.35 $1.06 $1.34 $20.148.48 $5,544.00 $16,790.40 $16,980.48 $0.00 $59,463.36 1996 120.2 145.6 $49.089.94 $9,817.99 3790 2001SH 392 OLIVE ST N 1003 201 $1.59 $0.35 $1.06 $1.34 $31.895.40 $9,127.30 $27,642.68 $26,880.40 $0.00 $95,545.78 1986 101.1 145.6 $66,343.94 I $46,440.76 38 4001CR13 CR17 E 10296 321 $1.59 $0.35 $1.06 $1.34 $523.860.48 $136,936.80 $414,722.88 $441.492.48 $0.00 $1.517,012.64 1996 120.2 145.6 $1,252,368.95 I $250,473.79 38 4501CR17 CR19 E 6178 221 $1.59 $0.35 $1.06 $1.34 $216.106.44 $60.544.40 $183,363.04 $182.127.44 $0.00 $642,141.32 1992 105.1 145.6 $463,523.71 I $185,409.49 138 500 CR19 RRX 158 22 $1.59 $0.35 $1.06 $1.34 ___ $5,526.84 $1,548.40 __$4,689.44 $4,657.84 $0.00 $16,422.52 1992 105.1 145.6 $11,854.44 $4.741.78 138 550 RRX CR19.5 317 22 $1.59 $0.35 $1.06 $1.34 $11,088.66 $3,106.60 $9,408.56 $9,345.16 $0.00 $32,948.98 1992 105.1 145.6 $23L783.91 $9.513.57 1380 400 SRFCH CR50 E 106 24 $1.59 $0.35 $1.06 $1.34 $4,044.96 $1,113.00 $3,370.80 $3,408.96 $0.00 $11,937.72 1990 108.5 145.6 $8,895.90 $4,447.95 380 510 CR50 69 E 2429 24 $1.59 $0.35 $1.06 $1.34 $92,690.64 $25,504.50 $77,242.20 $78,116.64 $0.00 $273.553.98 1990 108.5 145.6 $203,850.32 $101.925.16 1 CATHY LANE 600 CR 10.6 END 845 36 $1.59 $0.35 $1.06 $1.34 $48.367.80 $12421.50 $37,619.40 $40,762.80 $0.00 $139.171.50 1996 120.2 145.6 $114,892.96 $22,978.59 CLEMMA COUR 700 BGN CR 12 53 36 $1.59 $0.35 $1.06 $1.34 $2633.72 $779.10 $2,359.56 $2,556.72 $0.00 $8,729.10 1996 120.2 145.6 $7.206.30 $1.441.26 388 100 SH37 CR59 E 17107 24 $1.59 $0.35 $1.06 $1.34 $652,803.12 $179623.50 $544,002.60 $550,161.12 $0.00 $1,926,590.34 1996 120.2 145.6 $1,590.495.60 $318.099.12 388 200 CR 59 STR E 7286 24 $1.59 $0.35 $1.06 $1.34 $278,033.76 $76,503.00 $231,694.80 $234,317.76 $0.00 $820,549.32 1996 120.2 145.6 $677,404.04 $135480.81 388 300 STR CR61 792 24 $1.59 $0.35 $1.06 $1.34 $30,222.72 $8,316.00 $25,185.60 $25,470.72 $0.00 $89,195.04 1996 120.2 145.6 $73,634.92 $14,726.98 39 600 CR28 CR32 10560 24 $1.59 $0.35 $1.06 $1.34 $402.969.60 $110,880.00 $335.808.00 $339,609.60 $0.00 $1,189,267.20 1991 107.5 145.6 $878,064.73 $395,129.13 39 8001CR32 ICR40 212261 241 $1.59 $0.35 $1.06 $1.34 $809,984.16 $222.873.00 $674,986.80 $682,628.16 $0.00 $2,390,472.12 1991 107.5 145.6 $1,764,943.36 $794,224.51 39 9001CR40 ICR44 106131 221 $1.59 $0.35 $1.06 $1.34 $371,242.74 $104.007.40 1 $314,993.84 1 $312,871.24 $0.00 I $1,103,115.22 I 1986 101.1 145.6 $765,968.05 $536,177.64 39 10001CR44 ICR37.7 120381 221 $1.59 $0.35 $1.06 $1.34 $421,089.24 $117,972.40 1 $357,287.84 1 $354,880.24 $0.00 $1,251,229.72 I 1979 0 145.6 $0.00 $0.00 111TH AV 16001CR64 ICR66 4699 221 $1.59 $0.35 $1.06 $1.34 $164,371.02 $46,050.20 I $139,466.32 1 $138,526.52 $0.00 $488.414.06 1979 0 145.6 $0.00 $0.00 39 17001CR66 SH392 5280 20 $1.59 $0.35 $1.06 $1.34 $167.904.00 $48048.00 I $145,516.80 $141,504.00 $0.00 $502.972.80 1986 101.1 145.6 $349,248.28 $244,473.80 39 180013H392 STR 158 221 $1.59 $0.35 $1.06 $1.34 $5,526.84 $1,548.40 $4,689.44 $4857.84 $0.00 $16,422.52 1986 101.1 145.6 $11,403.27 $7,982.29 39 20001STR CL EATON 12619 22 $1.59 $0.35 $1.06 $1.34 $441,412.62 $123,666.20 $374,531.92 $372,008.12 $0.00 $1,311,618.86 1996 120.2 145.6 $1,082.806.23 $216.561.25 39 2150 CR74 CR78 10613 24 $1.59 $0.35 $1.06 $1.34 $404,992.08 $111,436.50 $337.493.40 $341,314.08 $0.00 $1,195,236.06 1990 108.5 145.6 $890,680.72 $445,340.36 39 2200 CR78 STR 95571 22 $1.59 $0.35 $1.06 $1.34 $334,303.86 $93,658.60 $283,651.76 $281,740.36 $0.00 $993,354.58 1979 0 145.6 $0.00 $0.00 39 2400 STR SH 14 1056 22 $1.59 $0.35 $1.06 $1.34 $36,938.88 $10,348.80 $31,342.08 $31,130.88 $0.00 $109,760.64 1986 101.1 145.6 $76.214.29 $53.350.00 392 10015H37 IHPMS 132001 241 $1.59 $0.35 $1.06 1 $1.34 1 $503.712.00 $138,600.00 1 $419,760.00 1 $424,512.00 $0.00 I $1,486,584.00 I 1998 126.9 145.6 $1,295,655.97 $129,565.60 392 1501HPMS IHPMS E 55441 241 $1.59 $0.35 $1.06 1 $1.34 1 $211.559.04 $58.212.00 1 $176,299.20 1 $178,295.04 $0.00 I $624,365.28 I 1998 126.9 145.6 $544,175.51 1 $54.417.55 392 2001HPMS ISH 14 E 76507 241 $1.59 $0.35 $1.06 1 $1.34 1 $2.919.507.12 $803.323.50 I $2,432,922.60 I $2,460,465.12 $0.00 $8,616,218.34 I 1996 120.2 145.6 $7,113,114.32 1 $1,422,622.86 FAIRBANKS DR 1001CR3455 (SRFCH 776 28 $1.59 $0.35 $1.06 I $1.34 I $34,547.52 $9,234.40 $27,967.04 $29,115.52 $0.00 $100,864.48 2001 145.6 145.6 $100,864.48 1 $0.00 +BADMINTON RC 1001CR3455 CDS 581 28 $1.59 $0.35 $1.06 I $1.34 $25,866.12 $6.913.90 $20.939.24 $21,799.12 $0.00 $75,518.38 2001 145.6 145.6 $75,518.38 $0.00 BADMINTONRO 1001CR3455 CDS 1214 28 $1.59 $0.35 $1.06 $1.34 $54.047.28 $14.446.60 $43.752.56 $45,549.28 $0.00 $157,795.72 2001 145.6 145.6 $157,795.72 $0.00 394 100 CR31 RRX E 106 24 $1.59 $0.35 $1.06 $1.34 $4.044.96 $1.113.00 $3,370.80 $3.408.96 $0.00 $11,937.72 1979 0 145.6 $0.00 $0.00 394 200 RRX CR33.25 E 7234 24 $1.59 $0.35 $1.06 $1.34 $276.049.44 $75.957.00 $230.041.20 $232,645.44 $0.00 $814,693.08 1979 0 145.6 $0.00 $0.00 394 300 CR33.25 URBAN BDRY E 10032 24 $1.59 $0.35 $1.06 $1.34 $382.821.12 $105.336.00 $319,017.60 $322,629.12 $0.00 $1,129,803.84 1979 0 145.6 $0.00 $0.00 394 400 URBANBDRY SH85 E 5808 24 $1.59 $0.35 $1.06 $1.34 $221,633.28 $60,984.00 $184,694.40 $186.785.28 $0.00 $654,096.96 1979 0 145.6 $0.00 $0.00 SLEDYARD RD 2001CR3455 ICR3454 37491 281 $1.59 $0.35 $1.06 $1.34 $166.905.48 $44.613.10 I $135,113.96 I $140,662.48 1 $0.00 $487,295.02 2001 145.6 145.6 $487,295.02 $0.00 BEEBE DRAW 1001CDS ICR3455 264 281 $1.59 $0.35 $1.06 $1.34 $11.753.28 $3.141.60 $9,514.56 $9,905.28 $0.00 $34,314.72 2001 145.6 I 145.6 1 $34,314.72 I $0.00 ESSEX RD 1001CDS ICR3455 3538 28 $1.59 $0.35 $1.06 $1.34 I $157.511.76 $42.102.20 $127,509.52 $132,745.76 1 .$0.00 $459.869.24 2001 145.6 I 145.6 1 $459.869.24 I $0.00 ESSEX RD 2001CR3455 (SRFCH 1109 28 $1.59 $0.35 $1.06 $1.34 $49372.68 $13.197.10 $39.968.36 $41,609.68 I $0.00 $144,147.82 2001 145.6 I 145.6 1 $144.147.82 $0.00 ESSEX RD NO.1 3001CR3492 CDS E 475 28 $1.59 $0.35 $1.06 $1.34 $21.147.00 $5.652.50 $17,119.00 $17.822.00 $0.00 $61/40.50 2001 145.6 I 145.6 I $61/40.50 $0.00 6TH AV 100 CR64 BARR 2640 24 $1.59 $0.35 $1.06 $1.34 $100.742.40 $27.720.00 $83,952.00 $84,902.40 $0.00 $297,316.80 1986 101.1 I 145.6 I $206,447.31 $144,513.12 6TH AV 10 SIR CL 1742 24 $1.59 $0.35 $1.06 $1.34 $66.474.72 $18.291.00 $55,395.60 $56,022.72 $0.00 $196,184.04 1990 108.5 145.6 $146,194.84 $73,097.42 7TH AV 100 CL SH85 STR OVRI 1056 24 $1.59 $0.35 $1.06 $1.34 $40.296.96 $11.088.00 $33,580.80 $33,960.96 $0.00 $118,926.72 1990 108.5 145.6 $88,623.28 $44,311.64 7TH AV 300 STR STR NW 106 24 $1.59 $0.35 $1.06 $1.34 $4,044.96 $1,113.00 $3,370.80 $3,408.96 $0.00 $11,937.72 1986 101.1 145.6 $8,289.17 $5,802.42 7TH AV 500 STR CR64 W 1003 24 $1.59 $0.35 $1.06 $1.34 $38,274.48 $10,531.50 $31,895.40 $32,256.48 $0.00 $112,957.86 1990 108.5 145.6 $84,175.33 $42,087.66 396 1001SH60 ICR27.5 34321 221 $1.59 $0.35 $1.06 I $1.34 I $120.051.36 $33,633.60 $101,861.76 $101,175.36 I $0.00 $356,722.08 1992 105.1 145.6 $257,496.50 $102,998.60 396 5001CR3150 ICR33 E 2640 24 $1.59 $0.35 $1.06 I $1.34 $100,742.40 $27,720.00 $83,952.00 $84,902.40 I $0.00 $297,316.80 1998 1 126.9 1 145.6 1 $259,131.19 $25,913.12 3985 10o1CR60.5 SERVICE RD 634 20 $1.59 $0.35 $1.06 I $1.34 $20,161.20 $5,769.40 $17,473.04 $16,991.20 I $0.00 $60,394.84 1996 1 120.2 1 145.6 1 $49,858.93 $9,971.79 4 1001CR7 END 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27.720.00 $83,952.00 $84,902.40 $0.00 $297,316.80 1997 1 130.6 I 145.6 1 $266,686.64 $40,003.00 14 600 SH85 CR27 1637 24 $1.59 $0.35 $1.06 $1.34 $62,467.92 $17,188.50 $52,056.60 $52645.92 $0.00 $184358.94 1998 I 126.9 I 145.6 $160,680.97 $16,068.10 4 700 CR 27 RRX 211 24 $1.59 $0.35 $1.06 $1.34 $8,051.76 $2,215.50 $6,709.80 $6,785.76 $0.00 $23,762.82 1998 1 126.9 145.6 $20,710.86 $2,071.09 4 800 RRX CL BRIGHTON 10877 24 $1.59 $0.35 $1.06 $1.34 $415,066.32 $114,208.50 $345,888.60 $349,804.32 $0.00 $1,224,967.74 1998 126.9 145.6 $1,067,640.15 $106,764.02 4 900 CL BRIGHTON STR 6283 24 $1.59 $0.35 $1.06 $1.34 $239,759.28 $65,971.50 $199,799.40 $202,061.28 $0.00 $707,591.46 1998 126.9 145.6 $616,712.61 $61,671.26 4 1000 SIR CR37 4382 24 $1.59 $0.35 $1.06 $1.34 $167,217.12 $46,011.00 $139,347.60 $140,925.12 $0.00 $493,500.84 1998 126.9 145.6 $430,118.52 $43,011.85 4 1200 CR37 CR39 4224 24 $1.59 $0.35 $1.06 $1.34 $161,187.84 $44,352.00 $134,323.20 $135,843.84 $0.00 $475,706.88 1988 106.6 145.6 $348,285.39 $208,971.24 41 5001CR8 ISH 52 E 13411 24 1 $1.59 1 $0.35 $1.06 I $1.34 I $511/63.76 $140,815.50 1 $426,469.80 $431,297.76 $0.00 $1,510,346.82 1995 121.9 1 145.6 $1,264,500.53 $316,125.13 41 60015H52 CR2O 18638 24 1 $1.59 1 $0.35 $1.06 I $1.34 $711.226.08 $195.699.00 1 $592,688.40 $599,398.08 $0.00 $2,099,011.56 1 1992 1 105.1 1 145.6 I $1,515,151.89 $606,060.76 41 700 CR20 CR28 21014 24 I $1.59 1 $0.35 $1.06 $1.34 $801.894.24 $220.647.00 1 $668,245.20 $675,810.24 $0.00 $2.366,596.68 I 1992 1 105.1 1 145.6 I $1.708,305.71 $683,322.28 41 1400 CL CR56 1637 36 2 I $1.59 1 $0.35 $1.06 $1.34 $93.701.88 $24.063.90 I $72,879.24 $78,968.88 -$134,806.95 $134,806.95 I 1998 I 126.9 145.6 $117,493.15 $11,749.31 41 1900 SH85 CR62 2270 24 I $1.59 I $0.35 $1.06 $1.34 $86,623.20 $23.835.00 I $72,186.00 $73,003.20 $0.00 $255,647.40 I 1998 126.9 145.6 $222,813.56 $22,281.36 41 2000 62 64 5808 24 $1.59 $0.35 $1.06 $1.34 $221,633.28 $60,984.00 $184694.40 $1867,785.28 $0.00 $654,096.96 1998 126.9 145.6 $570,088.63 $57,008.86 41 2100 CR64 RRX 2746 24 $1.59 $0.35 $1.06 $1.34 $104,787.36 $28,833.00 $87,322.80 $88,311.36 $0.00 $309,254.52 1992 105.1 145.6 $223,232.49 $89,292.99 41 2200 RRX URBDRY 2218 24 $1.59 $0.35 $1.06 $1.34 $84,638.88 $23,289.00 $70,532.40 $71,330.88 $0.00 $249,791.16 1996 120.2 145.6 $206.214.95 $41,242.99 41 2300 URBDRY SH 392 5280 24 $1.59 $0.35 $1.06 $1.34 $201.484.80 $55.440.00 $167.904.00 $169,804.80 $0.00 $594,633.60 1996 120.2 145.6 $490,899.44 $98,179.89 BALSAM AV 100 CR58 SH 34 BR 1320 20 $1.59 $0.35 $1.06 $1.34 $41.976.00 $12.012.00 $36,379.20 $35,376.00 $0.00 $125.743.20 1986 101.1 145.6 $87,312.07 $61,118.45 1 BALSAM AV 20015H34BR ICR58.5 13201 20 $1.59 $0.35 $1.06 I $1.34 $41976.00 $12.012.00 1 $36,379.20 $35,376.00 $0.00 $125.743.20 1 1986 1 101.1 I 145.6 I $87,312.07 $61.118.45 4180 200ISRFCH ISH34BR 422 20 $1.59 $0.35 $1.06 $1.34 $13,419.60 $3,840.20 I $11,630.32 $11,309.60 $0.00 I $40,199.72 1 1986 1 101.1 I 145.6 I $27,913.40 $19,539.38 4190 1001SH34 BR CR58.5 1320 22 $1.59 1 $0.35 $1.06 $1.34 $46,173.60 $12.936.00 I $39,177.60 $38,913.60 $0.00 I $137,200.80 1 1986 101.1 I 145.6 I $95,267.86 $66,687.50 42 300 CR 11 CR 13 5069 24 $1.59 1 $0.35 $1.06 $1.34 $193.433.04 $53.224.50 $161,194.20 $163,019.04 $0.00 I $570,870.78 I 1988 106.6 145.6 $417,958.96 $250,775.38 42 800 SH60 CR29 5386 22 $1.59 I $0.35 $1.06 $1.34 $188.402.28 $52.782.80 $159,856.48 $158.779.28 $0.00 I $559,820.84 1986 101.1 145.6 $388,721.75 $272,105.23 I 42 900 CR29 CL/BIRCH ST 4013 22 $1.59 $0.35 $1.06 $1.34 $140,374.74 $39,327.40 $119,105.84 $118,303.24 $0.00 $417.111.22 1996 120.2 145.6 $344,345.94 $68,869.19 I42 940 CR31 SPLIT 475 30 2 $1.59 $0.35 $1.06 $1.34 $22,657.50 $5,985.00 $18,126.00 $19,095.00 -$32,931.75 $32.931.75 1995 121.9 145.6 $27,571.29 $6,892.82 142 960 SPLIT CL 422 30 2 $1.59 $0.35 $1.06 $1.34 $20,129.40 $5,317.20 $16,103.52 $16,964.40 -$29,257.26 $29,257.26 1995 121.9 145.6 $24,494.92 $6,123.73 142 980 CL SH85 792 22 $1.59 $0.35 $1.06 $1.34 $27.704.16 $7.761.60 $23,506.56 $23,348.16 $0.00 $82,320.48 1995 121.9 145.6 $68,920.79 $17,230.20 1SAGE CT 100 NORTHMOOR CDS 370 24 $1.59 $0.35 $1.06 $1.34 $14.119.20 $3.885.00 I $11,766.00 $11,899.20 $0.00 $41,669.40 1996 120.2 145.6 $34.400.15 $6,880.03 (YUCCA CT 1001CDS (CACTUS I 5811 241 $1.59 $0.35 $1.06 $1.34 $22.170.96 $6.100.50 1 $18,475.80 $18.684.96 I $0.00 $65,432.22 1 1986 I 101.1 I 145.6 I $45,434.05 I $31,803.83 11 OCOTILLO CT 100 CDS NORTHMOOR SE 634 24 I $1.59 $0.35 $1.06 $1.34 $24,193.44 $6,657.00 $20,161.20 $20.389.44 I $0.00 $71,401.08 1986 101,1 145.6 $49.578.63 _ $34,705.04 SAGUARO CT 100 CDS CACTUS E 581 24 $1.59 $0.35 $1.06 $1.34 $22,770.96 $6,100.50 $18,475.80 $18,684.96 $0.00 $65,432.22 1986 101.1 145.6 $45.434.05 $31,803.83 MESQUITE CT 100 CDS NORTHMOOR E 634 24 $1.59 $0.35 $1.06 $1.34 $24,193.44 $6,657.00 $20,161.20 $20,389.44 $0.00 $71,401.08 1996 120.2 145.6 $58.945.12 $11,789.02 BRITTLEBUSH 100 CR 11 CDS E 739 24': $1.59 $0.35 $1.06 $1.34 $28,200.24 $7,759.50 $23,500.20 $23,766.24 $0.00 $83,226.18 1986 101.1 145.6 $57.789.61 $40,452.72 43 500 CR30 CR32 N 5227 24 $1.59 $0.35 $1.06 $1.34 $199,462.32 $54,883.50 $166,218.60 $168,100.32 $0.00 $588,664.74 1997 130.6 145.6 $528.019.33 $79,202.90 43 800 CR44 STR N 13094 22 $1.59 $0.35 $1.06 $1.34 $458,028.12 $128.321.20 $388,629.92 $386,011.12 $0.00 $1,360,990.36 1979 0 145,6 $0.00 $0.00 43 9001STR CR50 N 2746 22 $1.59 $0.35 $1.06 $1.34 $96,055.08 $26.910.80 $81,501.28 $80.952.08 $0.00 $285,419.24 1979 0 145.6 $0.00 $0.00 43 10001CR50 RRX N 4699 22 $1.59 $0.35 $1.06 $1.34 $164.371.02 $46,050.20 $139,466.32 $138.526.52 $0.00 $488,414.06 1979 0 145.6 $0.00 $0.00 43 11001RRX CR54 N 5808 22 $1.59 $0.35 $1.06 $1.34 $203,163.84 $56,918.40 $172.381.44 $171.219.84 $0.00 $603,683.52 1979 0 145.6 $0.00 $0.00 CHERRY AV 1400150TH AV SH34 N 3802 22 $1.59 $0.35 $1.06 $1.34 $132,993.96 $37,259.60 $112.843.36 $112,082.96 $0.00 $395,179.88 1986 101.1 145.6 $274,400.32 $192,080.22 43 15001SH263 CR62 N 3907 24 $1.59 $0.35 $1.06 $1.34 $149,091.12 $41,023.50 $124.242.60 $125,649.12 $0.00 $440,006.34 1989 107.7 145.6 $325.471.72 $179,009.45 43 1600ICR62 URBDRY N 5280 22 $1.59 $0.35 $1.06 $1.34 $184,694.40 $51,744.00 $156,710.40 $155,654.40 $0.00 $548,803.20 1996 120.2 145.6 $453,064.18 $90.612.84 43 16501URBDRY RRX N 2798 22 $1.59 $0.35 $1.06 $1.34 $97,874.04 $27,420.40 $89,044.64 $82,485.04 $0.00 $290,824.12 1996 120.2 145.6 $240,089.69 $48.017.94 43 17001RRX STR N 7339 22 $1.59 $0.35 $1.06 $1.34 $256,718.22 $71.922.20 $217,821.52 $216,353.72 $0.00 $762,815.66 1979 0 I 145.6 $0.00 $0.00 43 18o01STR -H392 N 528 22 $1.59 $0.35 $1.06 $1.34 $18.469.44 $5.174.40 $15,671.04 $15.565.44 $0.00 $54,880.32 1979 0 145.6 $0.00 $0.00 43 185015H392 STR N 3907 22 $1.59 $0.35 $1.06 $1.34 $136.666.86 $38,288.60 $115,959.76 $115,178.36 $0.00 $406,093.58 1979 0 145.6 $0.00 $0.00 43 19501STR STR N 2904 22 $1.59 $0.35 $1.06 $1.34 $101.581.92 $28459.20 $86,190.72 $85,609.92 $0.00 $301 L841.76 1979 0 145.6 $0.00 $0.00 43 205015TR STR N 686 22 $1.59 $0.35 $1.06 $1.34 $23.996.28 $6,722.80 $20.360.48 $20.223.28 $0.00 $71.302.84 1979 0 145.6 $0.00 $0.00 43 215015TR STR N 1584 22 $1.59 $0.35 $1.06 $1.34 $55.408.32 $15,523.20 $47.013.12 $46,696.32 $0.00 $164,640.96 1979 0 145.6 $0.00 $0.00 43 23001STR CR74 N 7128 22 $1.59 $0.35 $1.06 $1.34 $249,337.44 $69,854.40 $211.559.04 $210,133.44 $0.00 $740,884.32 1979 0 145.6 $0.00 $0.00 43 2350 CR 74 STR N 475 22 $1.59 $0.35 $1.06 $1.34 $16,615.50 $4,655.00 $14,098.00 $14,003.00 $0.00 $49,371.50 1979 0 145.6 $0.00 $0.00 43 2450 STR STR N 10771 22 $1.59 $0.35 $1.06 $1.34 $376,769.58 $105,555.80 $319.683.28 $317,529.08 $0.00 $1.119,537.74 1979 0 145.6 $0.00 $0.00 43 260015TR SH 14 N 10190 22 $1.59 $0.35 $1.06 $1.34 $356,446.20 $99,862.00 $302,439.20 $300,401.20 $0.00 $1,059,148.60 1979 0 145.6 $0.00 $0,00 43 27001SH 14 CR90 N 21014 22 $1.59 $0.35 $1.06 $1.34 $735,069.72 $205,937.20 $623,695.52 $619,492.72 $0.00 $2.184,195.16 1979 0 145.6 $0.00 $0.00 DELWOOD AV 1001BGN CR58.25 N 686 54 $1.59 $0.35 $1.06 $1.34 $58,899.96 $14,406.00 $43,629.60 $49,638.96 $0.00 $166.574.52 1996 120.2 145.6 $137.515.50 $27,503.10 4380 100IFRONTAGE CR12.5 N 1214 20 $1.59 $0.35 $1.06 $1.34 $38,605.20 $11,047.40 $33,457.84 $32,535.20 $0.00 $115,645.64 1986 101.1 145.6 $80.300.65 $56,210.45 144 1001SERV RD STR E 2429 24 $1.59 $0.35 $1.06 $1.34 $92,690.64 $25.504.50 $77,242.20 $78,116.64 $0.00 $273,553.98 1992 105.1 145.6 $197.462.39 $78,984.95 44 25015TR CR 11 E 2957 24 $1.59 $0.35 $1.06 $1.34 $112,839.12 $31.048.50 $94,032.60 $95,097.12 $0.00 $333,017.34 1988 106.6 145.6 $243.816.27 $146,289.76 44 300ICR11 CR13 E 5333 24 $1.59 $0.35 $1.06 $1.34 $203,507.28 $55.996.50 $169,589.40 $171,509.28 $0.00 $600,602.46 1992 105.1 145.6 $433,539.28 $173,415.71 44 60015H85 RRX E 264 22 $1.59 $0.35 $1.06 $1.34 $9,234.72 $2.587.20 $7.835.52 $7,782.72 $0.00 $27,440.16 1979 0 145.6 1 $0.00 $0.00 44 7001RRX CR39 E 15101 22 $1.59 $0.35 $1.06 $1.34 $528,232.98 $147.989.80 $448,197.68 $445,177.48 $0.00 $1,569,597.94 1979 0 145.6 $0.00 $0.00 44 8001CR39 STR E 6494 22 $1.59 $0.35 $1.06 $1.34 $227,160.12 $63.641.20 $192,741.92 $191,443.12 $0.00 $674,986.36 1979 0 145.6 $0.00 $0.00 44 10001STR STR E 2429 22 $1.59 $0.35 $1.06 $1.34 $84,966.42 $23.804.20 $72.092.72 $71,606.92 $0.00 $252,470.26 1979 0 145.6 $0.00 $0.00 44 12001STR CR43 E 1637 22 $1.59 $0.35 $1.06 $1.34 $57,262.26 $16,042.60 $48,586.16 $48,258.76 $0.00 $170,149.78 1979 0 145.6 $0.00 $0.00 44 13001CR43 STR E 11141 22 $1.59 $0.35 $1.06 $1.34 $389,712.18 $109,181.80 $330.664.88 $328,436.68 $0.00 $1,157,995.54 1979 0 145.6 $0.00 $0.00 44 140015TR CR49 E 4646 22 $1.59 $0.35 $1.06 $1.34 $162,517.08 $45,530.80 $137,893.28 $136,964.08 $0.00 $482.905.24 1979 0 145.6 $0.00 $0.00 44 15001CR49 STR E 9398 24 $1.59 $0.35 $1.06 $1.34 $358,627.68 $98,679.00 $298,856.40 $302,239.68 $0.00 $1,058,402.76 1986 101.1 145.6 $734.921.15 $514.444.80 44 16001STR CR53 E 1003 24 $1.59 $0.35 $1.06 1 $1.34 $38.274.48 $10,531.50 $31,895.40 $32,256.48 $0.00 $112.957.86 1986 101.1 145.6 $78.434.34 $54.904.04 44 17001CR53 CR57 E 10560 24 $1.59 $0.35 $1.06 $1.34 $402,969.60 $110,880.00 $335,808.00 $339.609.60 $0.00 $1.189,267.20 1986 101.1 ' 145.6 $825,789.24 $578.052.47 45 1001168AV CR4 _ N 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55.440.00 $167,904.00 $169.804.80 $0.00 $594,633.60 1979 0 145.6 $0.00 $0.00 45 1501CR4 STR N 5544 24 $1.59 $0.35 $1.06 $1.34 $211.559.04 $58,212.00 $176,299.20 $178.295.04 $0.00 $624.365.28 1992 105.1 145.6 $450,692.25 $180.276.90 45 25015113 STR N 7445 24 $1.59 $0.35 $1.06 $1.34 $284.101.20 $78,172.50 $236.751.00 $239,431.20 $0.00 $838.455.90 1992 105.1 145.6 $605,231.56 $242,092.62 45 40015TR JCL HUDSON N 2534 24 $1.59 $0.35 $1.06 $1.34 $96.697.44 $26,607.00 $80,581.20 $81,493.44 $0.00 $285.379.08 2000 145.6 145.6 $285,379.08 $0.00 45 11001CR54 SH34 N 5914 24 $1.59 $0.35 $1.06 $1.34 $225,678.24 $62,097.00 $188,065.20 $190.194.24 $0.00 $666,034.68 1998 126.9 145.6 $580,493.14 $58,049.31 45 13001CR58.25 STR N 2429 22 $1.59 $0.35 $1.06 $1.34 $84,966.42 $23,804.20 $72,092.72 $71.606.92 $0.00 $252,470.26 1992 105.1 145.6 $182,243.30 $72,897.32 45 1500 STR STR N 475 22 $1.59 $0.35 $1.06 $1.34 $16,615.50 $4,655.00 $14,098.00 $14.003.00 $0.00 $49,371.50 1992 105.1 145.6 $35,638.36 $14,255.34 45 1700 STR SH263 N 1690 22 $1.59 $0.35 $1.06 $1.34 $59,116.20 $16,562.00 $50,159.20 $49.821.20 $0.00 $175,658.60 1992 105.1 145.6 $126,797.52 $50,719.01 45 1800 CR62 CR64 N 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167,904.00 $169.804.80 $0.00 $594,633.60 1992 105.1 145.6 $429,230.71 $171,692.28 45 19001CR64 CR66 N 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167,904.00 $169,804.80 $0.00 $594.633.60 1997 130.6 145.6 $533,373.27 $80,005.99 45 20001CR66 SH392 N 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167,904.00 $169,804.80 $0.00 $594,633.60 1997 130.6 145.6 $533,373.27 $80,005.99 CHRISTIAN ST 2001CAROLI MARY E 317 24 $1.59 $0.35 $1.06 J $1.34 $12.096.72 $3,328.50 $10,080.60 $10,194.72 $0.00 $35,700.54 1996 120.2 145.6 $29,472.56 $5,894.51 BUSS AV 10015H263 PRKNG LOT N 1373 24 $1.59 $0.35 $1.06 $1.34 $52,393.68 $14,416.50 $43,661.40 $44,155.68 $0.00 $154.627.26 1992 105.1 145.6 $111,616.24 $44.646.50 CROSIER AV 10015H263 TERMI N 1214 22 $1.59 $0.35 $1.06 $1.34 $42,465,72 $11,897.20 $36,031.52 $35.788,72 $0.00 $126.183.16 1992 105.1 1 145.6 $91,084.14 $36.433.65 46 70015H60 CR29 E 5597 22 $1.59 $0.35 $1.06 $1.34 $195.783.06 $54,850.60 $166.118.96 $164.999.56 $0.00 $581.752.18 1992 105.1 145.6 $419,932.38 $167.972.95 46 6001CR29 CR33 NE 10560 22 $1.59 $0.35 $1.06 $1.34 $369.388.80 $103.488.00 $313,420.80 $311.308.80 $0.00 $1.097.606.40 1986 101.1 145.6 $762,142.91 $533.500.03 46 9001CR33 CR35 E 5333 22 $1.59 $0,35 $1.06 $1.34 $186,548.34 $52.263.40 $158,283,44 $157.216.84 $0.00 $554,312.02 J 1986 101.1 145.6 $384.896.60 $269.427.62 46 18001CR57 CR59 E 5280 24 $1.59 $0.35 $1.06 $1.34 $201.484.80 $55,440.00 $167,904.00 $169.804.80 $0.00 $594,633.60 1979 0 145.6 $0.00 $0.00 JULIUS ST 100ICAROLINE MARY E 317 24 $1.59 $0.35 $1.06 $1.34 $12.096.72 $3,328.50 $10.080.60 $10,194.72 $0.00 $35,700.54 1996 120.2 145.6 $29,472.56 $5,894.51 47 2001SERVICE RD CRSRFCH N 1637 24 $1.59 $0.35 $1.06 $1.34 $62,467.92 $17,188.50 $52.056.60 $52,645.92 $0.00 $184.358.94 1996 120.2 145.6 $152,197.42 $30,439.48 47 10001CR54 SH34 N , 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55.440.00 $167,904.00 $169,804.80 $0.00 $594,633.60 1995 121.9 145.6 $497,842.28 $124,460.57 47 110015H263 CR64 N 8870 24 $1.59 $0.35 $1.06 $1.34 $338,479.20 $93,135.00 $282,066.00 $285,259.20 $0.00 $998,939.40 1997 130.6 145.6 $896,026.69 $134.404.00 47 11501CR64 CR66 N 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167,904.00 $169,804.80 $0.00 $594,633.60 1997 130.6 ' 145.6 $533,373.27 $80.005.99 4750 30015H34 CR58 N 5438 24 $1.59 $0.35 $1.06 $1.34 $207.514.08 $57,099.00 $172,928.40 $174886.08 $0.00 $612,427.56 1993 108.3 145.6 $455,535.06 $159,437.27 FREDERICK ST 300ICAROLINE GRACE E 739 24 $1.59 $0.35 $1.06 $1.34 $28.200.24 $7,759.50 $23,500.20 $23,766.24 $0.00 $83,226.18 1996 120.2 145.6 $68.707.33 $13,741.47 4850 2001CR 17 SRFCH E 1531 24 $1.59 $0.35 $1.06 $1.34 $58,422.96 $16,075.50 $48,685.80 $49,236.96 $0.00 $172.421.22 1986 101.1 145.6 $119.723.80 $83.806.66 49 3001SH76 STR N 22757 22 $1.59 $0,35 $1.06 $1.34 $796.039.86 $223.018.60 $675,427.76 $670.876,36 $0.00 $2,365,362.58 1979 0 145.6 $0.00 $0.00 49 500 STR W1DCH N 9451 22 $1.59 $0.35 $1.06 $1.34 $330,595.98 $92.619.80 $280,505.68 $278,615.48 $0.00 $982,336.94 2001 145.6 145.6 $982,336.94 $0.00 49 600 WDCH CR40 N 31838 40 $1.59 $0.35 $1.06 $1.34 $2.024.896.80 $512,591.80 $1,552,420.88 $1,706.516.80 $0.00 $5,796,426.28 2001 145.6 145.6 $5,796,426.28 $0.00 49 700 CR40 CR48 N 21120 40 $1.59 $0.35 $1,06 $1.34 $1.343,232.00 $340,032.00 $1,029,811.20 $1,132,032.00 $0.00 $3,845.107.20 2000 145.6 145,6 $3,845,107.20 $0.00 49 8001CR48 RRX N 16157 401 $1.59 $0.35 $1,06 $1.34 $1.027,585.20 $260,127.70 $787.815.32 $866.015.20 $0.00 $2,941,543.42 1999 136.5 145,6 $2,757,696.96 $137.884.85 49 9001RRX SH34 N 5016 401 $1.59 $0.35 $1.06 $1.34 $319,017.60 $80.757.60 $244.580.16 $268.857.60 $0.00 $913,212.96 1999 136.5 145.6 $856.137.15 $42,806.86 49 1000 SH263___ CR62.5 51741 20 $1.59 $0.35 $1.06 $1.34 $164,533.20 $47,083.40 $142695.44 $138663.20 $0.00 $492,875.24 1986 101.1 145.6 $342,236.86 $239,565.80 EDWARD ST 300 LEONA MARY ST 739 24 $1.59 $0.35 $1.06 $1.34 $28,200.24 $7,759.50 $23.500.20 $23,766.24 $0.00 $83,226.18 1996 1292 145.6 $68.70733 $13.741.47 GRANDVIEW 100 3RD ST 1ST ST 792 20 $1.59 $0.35 $1.06 $1.34 $25,185.60 $7,207.20 $21,827.52 $21,225.60 $0.00 $75,445.92 1986 101.1 145.6 $52.387.24 $36,671.07 5 200 CR8 _ _ CR10 5227 24 $1.59 $0.35 $1.06 $1.34 $199,462.32 $54,883.50 $166218.60 $168,100.32 $0.00 $588,664.74 1990 108.5 145.6 $438,668.44 $219,334.22 5 300 CR 10 RRX 2429 24 _ $1.59 $0.35 $1.06 $1.34 $92,690.64 $25,504.50 $77,242.20 $78,116.64 $0.00 $273,553.98 1990 108.5 145.6 $203,850.32 $101,925.16 5 400 RRX CR12 2904 24 $1.59 $0.35 $1.06 $1.34 $110,816.64 $30,492.00 $92,347.20 $93,392.64 $0.00 $327.048.48 1990 108.5 145.6 $243.714.01 $121,857.01 5 500 CR 12 SH 52 5227 24 $1.59 $0.35 $1.06 $1.34 $199,462.32 $54,883.50 $166,218.60 $168,100.32 $0.00 $588.664.74 1986 101.1 145.6 $408.750.04 $286,125.03 VISTA COMM 750 BGN SH 119 422 38 $1.59 $0.35 $1.06 $1.34 $25,497.24 $6,498.80 $19,682.08 $21,488.24 $0.00 $73,166.36. 2000 145.6 145.6 $73,166.36 $0.00 5 900 SH 66 CR34 10613 27 $1.59 $0.35 $1.06 $1.34 $455,616.09 $122,580.15 $371,242.74 $383,978.34 $0.00 $1.333,417.32 1995 121.9 145.6 $1.116,370.68 $279,092.67 5 1000 CR 34 CR 34.7 3907 20 $1.59 $0.35 $1.06 $1.34 $124,242.60 $35,553.70 $107,676.92 $104,707.60 $0.00 $372,180.82 1992 105.1 145.6 $268,655.25 $107,462.10 50 200 CR13 CR13 581 24 $1.59 $0.35 $1.06 $1.34 $22,170.96 $6,100.50 $18,475.80 $18,684.96 $0.00 $65,432.22 1999 136.5 145.6 $61,342.71 $3,067.14 50 300 CR 13 CR 17 10349 24 $1.59 $0.35 $1.06 $1.34 $394,917.84 $108,664.50 $329,098.20 $332,823.84 $0.00 $1,165,504.38 1999 136,5 145.6 $1,092,660.36 $54,633.02 TODD AV 500 ELM ST CL 158 222 $1.59 $0.35 $1.06 $1.34 $5,526.84 $1,548.40 $4,689.44 $4,657.84 -$8,211.26 $8,211.26 1979 0 145.6 $0.00 $0.00 TODD AV 6001C1 CR41 4699 22 $1.59 $0.35 $1.06 $1.34 $164,371.02 $46,050.20 $139,466.32 $138,526.52 $0.00 $488,414.06 1986 101.1 145.6 $339,139.16 $237,397.41 50 7001CR41 CR43 5333 22 $1.59 $0.35 $1.06 $1.34 $186,548.34 $52,263.40 $158,283.44 $157,216.84 $0.00 $554.312.02 1986 101.1 145.6 $384.896.60 $269.427.62 50 19001CR380 RRX 106 24 $1.59 $0.35 $1.06 $1.34 $4,044.96 $1,113.00 $3,370.80 $3,408.96 $0.00 $11,937.72 1990 108.5 145.6 $8,895.90 $4,447.95 50 2000IRRX STR 1795 24 $1.59 $0.35 $1.06 $1.34 $68,497.20 $18,847.50 $57,081.00 $57,727.20 $0.00 $202,152.90 1990 108.5 145.6 I $150.642.79 $75,321.39 5010 1001CR27.5 CR29.5 E 5544 24 $1.59 $0.35 $1.06 $1.34 $211,559.04 $58,212.00 $176,299.20 $178,295.04 $0.00 $624,365.28 1979 0 145.6 $0.00 $0.00 ARADO WAY 100IBGN CR3165 422 22 $1.59 $0.35 $1.06 $1.34 $14.761.56 $4,135.60 $12.524.96 $12,440.56 $0.00 $43.862.68 2000 145.6 145.6 $43.862.68 $0.00 BECERRO DR 2001CR3165 END 581 22 $1.59 $0.35 $1.06 $1.34 $20,323.38 $5,693.80 $17.244.08 $17.127.88 $0,00 $60,389.14 2000 145.6 145.6 $60,389.14 $0.00 5060 2001CR3150 +CR3155 422 24 $1.59 $0.35 $1.06 $1.34 $16,103.52 $4,431.00 $13,419.60 $13.571.52 $0.00 $47525.64 1998 126.9 145.6 $41,421.73 $4,142.17 5060 3001CR3155 I+CR3165/NAME 317 22 $1.59 $0.35 $1.06 $1.34 $11.088.66 $3.106.60 $9,408.56 $9,345.16 $0.00 $32.948.98 1996 120.2 145.6 $27.201.01 $5.440.20 51 13001SH263 15H 392 18638 24 $1.59 $0.35 $1.06 $1.34 $711.226.08 $195.699.00 $592.688.40 $599,398.08 $0.00 $2.099,011.56 1992 105.1 145.6 $1.515.151.89 $606.060.76 51 15001SH392 STR 2270 24 $1.59 $0.35 $1.06 $1.34 $86,623.20 $23,835.00 $72,186.00 $73.003.20 $0.00 $255,647.40 1979 0 145.6 $0.00 $0.00 51 1700ISTR STR 10718 24 $1.59 $0.35 $1.06 $1.34 $408,998.88 $112,539.00 $340,832.40 $344.690.88 $0.00 $1,207,061.16 1979 0 145.6 $0.00 $0.00 MAIN ST 1900ISTR CR74 2904 24 $1.59 $0.35 $1.06 $1.34 $110916.64 $30,492.00 $92,347.20 $93,392.64 $0.00 $327,048.48 1979 0 145.6 $0.00 $0.00 51 19501CR74 STR 15523 24 $1.59 $0.35 $1.06 $1.34 $592,357.68 $162,991.50 $493,631.40 $499.219.68 $0.00 $1,748,200.26 1991 107.5 145.6 $1,290.738.52 $580,832.33 51 2200ISTR SH 14 9082 24 $1.59 $0.35 $1.06 $1.34 $346,569.12 $95,361.00 $288,807.60 $292977.12 $0.00 $1 022,814.84 1979 I 0 145.6 $0.00 $0.00 DAVIS RD 100IBGN CR54.4 792 24 $1.59 $0.35 $1.06 $1.34 $30.222.72 $8,316.00 $25,185.60 $25,470.72 $0.00 $89,195.04 1986 I 101.1 145.6 $61,934.19 $43,353.94 52 14001CR35 CL 8184 28 $1.59 , $0.35 $1.06 $1.34 $364,351.68 $97,389.60 $294951.36 $307,063.68 $0.00 $1,063,756.32 1996 120.2 145.6 $878,183.45 $175,636.69 52 17501CL SERVICE RD E 2218 24 $1.59 $0.35 $1.06 $1.34 $84,638.88 $23,289.00 $70,532.40 $71,330.88 $0.00 $249,791.16 1996 120.2 145.6 $206,214.95 $41,242.99 52 2000IRRX CR43 E 10560 24 ' $1.59 $0.35 $1.06 $1.34 $402969.60 $110,680.00 $335,808.00 $339,609.60 $0.00 $1189,267.20 1997 130.6 145.6 $1,066,746.54 $160,011.98 KING CN DR 1001CR 33.05 CR33.13 475 40 $1.59 $0.35 $1.06 $1.34 $30,210.00 $7,647.50 $23,161.00 $25,460.00 $0.00 $86,478.50 1992 105.1 145.6 $62,423.70 $24,969.48 GLACIER DR 2001CR33.45 CR52.25 E 1742 28 $1.59 $0.35 $1.06 $1.34 $77,553.84 $20729.80 $62,781.68 $65,359.84 $0.00 $226,425.16 1992 105.1 145.6 $163.442.89 $65,377.15 LASSEN CT 1001BGN CR33.13 317 40 $1.59 $0.35 $1.06 $1.34 $20.161.20 $5,103.70 $15.456.92 $16.991.20 $0.00 $57,713.02 1992 105.1 145.6 $41.659.60 $16,663.84 HTSPGS DR 200ICR33.2 CR33.33 686 40 $1.59 $0.35 $1.06 $1.34 $43.629.60 $11,044.60 $33.449.36 $36.769.60 $0.00 $124.893.16 1992 105.1 145.6 $90,152.96 $36,061.18 CRLSBD DR 1001CR33.05 CR33.33 1584 40 $1.59 $0.35 $1.06 $1.34 $100,742.40 $25,502.40 $77,235.84 $84,902.40 $0.00 $288,383.04 1992 105.1 145.6 $208,166.60 $83,266.64 SCOTTSBLUFF 5oIeGN CR33.13 211 38 $1.59 $0.35 $1.06 $1.34 $12.748.62 $3,249.40 $9.841.04 $10.744.12 $0.00 $36,583.18 1992 105.1 145.6 $26,407.23 $10,562.89 NAVAJO CT 100IBGN CR33.28 E 264 40 $1.59 $0.35 $1.06 $1.34 $16.790.40 $4,250.40 $12,872.64 $14.150.40 $0.00 $48,063.84 1992 105.1 145.6 $34,694.43 $13,877.77 BLACK CAN CT 200IBGN CR33.33 E 264 40 $1.59 $0.35 $1.06 $1.34 $16.790.40 $4,250.40 $12,872.64 $14.150.40 $0.00 $48,063.84 1992 105.1 145.6 $34,694.43 $13,877.77 OLYMPIC 3001CR33.40 CR33.45 792 28 $1.59 $0.35 $1.06 $1.34 $35,259.84 $9,424.80 $28,543.68 $29,715.84 $0.00 $102,944.16 1992 105,1 145.6 $74,309.28 $29,723.71 CASAGRNDDRI 2001CR33 CR33.28 1162 38 $1.59 $0.35 $1.06 $1.34 $70.208.04 $17,894.80 $54,195.68 $59,169.04 $0.00 $201,467.56 1992 105.1 145.6 $145,427.48 $58,170.99 GR CANYON 3001CR33.45 CR52 E 1742 281 $1.59 $0.35 $1.06 $1.34 $77,553.84 $20,729.80 $62,781.68 $65,359.84 $0.00 $226,425.16 1992 105.1 145.6 $163,442.89 $65,377.15 HOMESTEADCI 50IBGN CR3313 475 38 $1.59 $0.35 $1.06 $1.34 $28,699.50 $7,315.00 $22,154.00 $24,187.00 $0.00 $82,355.50 1995 121.9 145.6 $68,950.11 $17,237.53 YOSEMITE 1001CR33.13 CR52.35 5016 40 $1.59 $0.35 $1.06 $1.34 $319,017.60 $80,757.60 $244,580.16 ' $268,857.60 $0.00 $913,212.96 1992 105.1 145.6 $659,194.25 $263,677.70 5235 100IBGN CR52.3 E 475 40 $1.59 $0.35 $1.06 $1.34 $30,210.00 $7,647.50 $23,161.00 I $25,460.00 $0.00 $86,478.50 1992 105.1 145.6 $62,423.70 $24,969.48 5235 2001CR52.3 CR52.4 E 1003 40 $1.59 $0.35 $1.06 $1.34 $63,790.80 $16,148.30 $48,906.28 I $53,760.80 $0.00 $182,606.18 1992 105.1 145.6 $131,812.57 $52,725.03 SHENANDOAH 1001CR3305 CR3328 1214 38 $1.59 $0.35 $1.06 $1.34 $73,349.88 $18,695.60 $56,620.96 $61,816.88 $0.00 $210,483.32 1995 121.9 145.6 $176,221.96 $44,055.49 SHENANDOAH 1001CR3305 1CR5235 1 1848 38 $1.59 $0.35 $1.06 $1.34 $111,656.16 $28,459.20 $86,190.72 I $94,100.16 $0.00 $320,406.24 1995 121.9 145.6 $268.252.20 $67,063.05 KIOWA DR 1001CR52.8 CR52.5 I E 1742 24 $1.59 $0.35 $1.06 $1.34 $66,474.72 $18,291.00 $55,395.60 I $56,022.72 $0.00 $196,184.04 I 1993 108.3 145.6 $145,925.35 $51,073.87 KIOWA DR 2001CR52.5 SRFCH 1 E 1320 24 $1.59 $0.35 $1.06 $1.34 $50,371.20 $13,860.00 $41,976.00 $42,451.20 $0.00 $148,658.40 1993 108.3 145.6 $110,574.90 $38,701.21 MESAVERDAD 4001CR33 CR5235 , 2534 38 $1.59 $0.35 $1.06 $1.34 $153,104.28 $39,023.60 $118,185.76 $129.031.28 $0.00 $439,344.92 1995 121.9 145.6 $367,830.67 $91,957.67 VICTOR DR + 100IPEARLHOWLE BRYANT DR 686 37 $1.59 $0.35 $1.06 $1.34 $40,357.38 $10,324.30 $31,267.88 $34,011.88 $0.00 $115,961.44 2000 145,6 145,6 $115,961.44 $0.00 5250 I 2001CR31.1 CR31.6 2376 24 $1.59 $0.35 $1.06 $1.34 $90,668.16 $24,948.00 $75,556.80 $76,412.16 $0.00 $267,585.12 1993 108.3 145.6 $199,034.81 $69,662.18 5250 3001CR31.6 STR E 2534 24 $1.59 $0.35 $1.06 $1.34 $96,697.44 $26,607.00 $80,581.20 $81,493.44 $0.00 $285,379.08 1992 105.1 145.6 $205,998.22 $82,399.29 5250 50OISTR CR33 E 422 24 $1.59 $0.35 $1.06 $1.34 $16,103.52 $4,431.00 $13,419.60 $13,571.52 $0.00 $47.525.64 1992 105.1 145.6 $34,305.94 $13,722.38 UTE DR 1001CR31.1 END 845 24 $1.59 $0.35 $1.06 $1.34 $32,245.20 I $8,872.50 $26,871.00 $27,175.20 $0.00 $95,163.90 1992 105.1 145.6 $68,693.17 $27,477.27 UTE DR 200IBGN CR 31.6 E 898 24 $1.59 $0.35 $1.06 $1.34 $34,267.68 $9,429.00 $28,556.40 $28,879.68 $0.00 $101,132.76 1992 105.1 145.6 $73,001.74 $29.200.70 UTE DR 3001CR31.6 CR52.4 1162 24 $1.59 $0.35 $1.06 $1.34 $44,341.92 $12.201.00 $36,951.60 $37,369.92 $0.00 1 $130,864.44 1993 108.3 145.6 $97,339.42 $34,068.80 PAWNEE LN 100ICR31.1 END 898 24 $1.59 $0.35 $1.06 I $1.34 $34,267.68 $9.429.00 $28,556.40 $28,879.68 $0.00 $101,132.76 1992 105.1 145,6 $73,001.74 $29,200.70 PAWNEE LN 200IBGN CR31.6 E 686 24 $1.59 $0.35 $1.06 $1.34 $26,177.76 $7,203.00 $21.814.80 $22,061.76 $0.00 $77.257.32 1992 105.1 145.6 $55,767.47 $22,306.99 PAWNEE DR 3001CR316 CR52.5 E 2957 24 $1.59 $0.35 $1.06 $1.34 $112,839.12 $31,048.50 $94,032.60 $95,097.12 $0.00 $333.017.34 1993 108.3 145.6 $247,704.52 $86,696.58 PAWNEE DR /MICR 52.5 END E 422 24 $1.59 $0.35 $1.06 $1.34 $16,103.52 $4,431.00 $13,419.60 $13,571.52 $0.00 $47,525.64 1993 108.3 145.6 $35,350.46 $12,372.66 KIOWA PR 1001CR54 END E 1954 24 $1.59 $0.35 $1.06 $1.34 $74,564.64 $20,517.00 $62.137.20 $62,840.64 $0.00 $220,059.48 1992 105.1 145.6 $158,847.88 $63,539.15 53 800ICR44 CL KERSEY 27245 22 $1.59 $0.35 $1.06 $1.34 $953.030.10 $267.001.00 $808.631.60 $803,182.60 $0.00 $2,831,845.30 2000 145.6 145.6 $2.831,845.30 $0.00 MONTGOMERY 100IPEARLHOWLEPEARLHOWLETI 3010 37 $1.59 $0.35 $1.06 $1.34 $177.078.30 $45.300.50 $137.195.80 $149,235.80 $0.00 $508.810.40 2000 145.6 145.6 $508.810.40 $0.00 PLEASANT HILL 100IPEARL HOWL END 1426 37 $1.59 $0.35 $1.06 $1.34 $83,891.58 $21,461.30 $64,997.08 $70,701.08 $0.00 $241,051.04 2000 145.6 145.6 $241,051.04 $0.00 54 1001CR 13 ISTR 3590 22, $1.59 $0.35 $1.06 $1.34 $125,578.20 $35,182.00 $106,551.20 $105,833.20 $0.00 $373,144.60 1996 120,2 145.6 $308,049.32 $61,609.86 54 300ISTR RRX 2746 22 $1.59 $0.35 $1.06 $1.34 $96,055.08 $26,910.80 $81,501.28 $80,952.08 $0.00 $285,419.24 1979 0 145.6 $0.00 $0.00 54 400IRRX IRRX 634 22 $1.59 $0.35 $1.06 $1.34 $22,177.32 $6,213.20 $18.817.12 $18,690.32 $0.00 $65,897.96 1979 0 145.6 $0.00 $0.00 54 500IRRX ICR 17 I 3485 22 $1.59 $0.35 $1.06 $1.34 $121.905.30 $34,153.00 $103.434.80 $102,737.80 $0.00 $362,230.90 1979 1 0 145.6 $0.00 $0.00 54 600 CR 17 STR E 7550 22 $1.59 $0.35 $1.06 $1.34 $264,099.00 $73 890.00 $224,084.00 $222.574.00 I $0.00 $784.747.00 1979 0 145.6 $0.00 _ $0.00 54 700 STR SH257 E 2957 22 $1.59 $0.35 $1.06 $1.34 $103,435.86 $28,978.60 $87,763.76 $87,172.36 i $0.00 $307.350.58 1979 0 145.6 $0.00 $0.00 37TH ST 900 CL(GREELEY) CR25 E 2640 22 $1.59 $0.35 $1.06 $1.34 $92,347.20 $25372.00 $78,355.20 $77.827.20 $0.00 $274,401.60 2001 I 145.6 145.6 $274.401.60 $0.00 54 215011ST AV STR E 1056 22 $1.59 $0.35 $1.06 $1.34 $36,938.88 $10,348.80 $31,342.08 $31,130.88 $0.00 $109.760.64 1979 0 145.6 $0.00 $0.00 54 2250 STR SIR E 30101 20 $1.59 $0.35 $1.06 $1.34 $95718.00 $27,391.00 $82,955.60 $80,668.00 $0.00 $286.732.60 1979 0 145.6 $0.00 $0.00 54 2400 STR CR45 E 6600 20 $1.59 $0.35 $1.06 $1.34 $209,880.00 $60,060.00 $181,896.00 $176,880.00 $0.00 $628.716.00 1979 0 145.6 $0.00 $0.00 54 25001CR45 CR49 E 109301 24 $1.59 $0.35 $1.06 $1.34 $417088.80 $114.765.00 $347,574.00 $351,508.80 $0.00 I $1.230.936.60 1993 108.3 145.6 $915,593.64 $320,4.57.77 BEASLY RD 1001PEARLHOWLE PLEASANT HILL SW 10561 37 $1.59 $0.35 1 • $1.06 $1.34 $62.124.48 I $15,892.80 I $48,132.48 I $52-356.48 $0.00 I $178,506.24 2000 145.6 145.6 $178,506.24 $000 35TH ST 100135TH AV 33RD AV E 14281 36 $1.59 $0.35 I $1.06 $1.34 $81.624.24 I $20,962.20 I $63,485.52 I $68,790.24 $0.00 I $234362.20 1996 120.2 145.6 $193,890.36 $38,778.07 34TH ST 100ICDS 34TH AV E 3701 36 $1.59 $0.35 I $1.06 $1.34 $21,178.80 I $5,439.00 I $16,472.40 1 $17.848.80 $0.00 1 $60,939.00 1996 120.2 145.6 $50,308.16 $10.061.63 34TH ST 100135TH AV 34TH AV E 6341 40 $1.59 $0.35 $1.06 $1.34 $40,322.40 $10,207.40 I $30,913.84 $33882.40 $0.00 $115.426.04 1979 0 145.6 $0.00 $0.00 34TH ST 20034 AV 33AVCT E 6861 40 $1.59 $0.35 $1.06 $1.34 $43,629.60 $11,044.60 $33,449.36 $36,769.60 $0.00 $124,893.16 1979 0 145.6 $0.00 $0.00 SANDYKNOLLS 3001BGN CR53 E 26401 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27720.00 883,952.00 $84,902.40 $0.00 $297,316.80 1979 0 145.6 $0.00 $0.00 5440 1001CR54 CR53 NE 110881 24 $1.59 $0.35 $1.06 $1.34 I $423.118.08 I $116,424.00 1 $352,598.40 1 $356,590.08 $0.00 1 $1,248,730.56 1993 108.3 145.6 $928,829.12 $325.090.19 550 1001511119 SRFCH NE 26401 24 $1.59 $0.35 $1.06 $1.34 1 5100.742.40 I $27,720.00 I $83,952.00 I $84,902.40 $0.00 I $297,316.80 1998 126.9 145.6 $259,131.19 $25.913.12 3RD ST 10013RD AV 6TH AV N 11621 24 81.59 $0.35 $1.06 $1.34 I $44,341.92 I $12,201.00 I $36,951.60 1 $37,369.92 $0.00 I $130,864.44 1986 101.1 145.6 $90,868.10 $63.607.67 5TH ST 20014TH AV END N 3701 30 $1.59 $0.35 $1.06 $1.34 I $17.649.00 I $4,662.00 I $14,119.20 I $14,874.00 $0.00 I $51,304.20 1986 101.1 145.6 $35,624.00 $24,936.80 28TH ST 50019TH AV 8TH AV 1E 4221 402 $1.59 $0.35 $1.06 $1.34 $26.839.20 1 $6,794.20 820,576.72 $22,619.20 -$38,414.66 $38,414.66 ' 1986 101.1 145.6 $26,673.92 $18.671.74 28TH ST 70011 ST AV SRFCH E 3432 24 $1.59 $0.35 $1.06 $1.34 $130,965.12 $36.036.00 $109,137.60 $110.373.12 $0.00 $386,511.84 1998 126.9 145.6 $336,870.55 $33.687.06 56 1100ISH 34 BYPASS CDS E 6600 24 $1.59 $0.35 $1.06 $1.34 $251,856.00 I $69,300.00 $209,880.00 $212.256.00 $0.00 1 $743,292.00 1994 115.1 145.6 $587,588.66 $176.276.60 MEADOW VALE 1001BGN CR2410 NE I 3326 20 I $1.59 $0.35 $1.06 $1.34 1 $105.766.80 1 $30266.60 I $91.664.56 1 $89.136.80 $0.00 I $316,834.76 1997 130.6 145.6 $284.193.82 $42.629.07 28TH ST 200ISRFCH CR29.8 E I 264 24 I $1.59 $0.35 $1.06 $1.34 I $10,074.24 I $2.772.00 I $8,395.20 I $8.490.24 $0.00 I $29,731.68 1986 101.1 145.6 $20,644.73 $14,451.31 28TH ST 3001CR29.8 END E I 1162 24 I $1.59 $0.35 $1.06 $1.34 I $44,341.92 I $12,201.00 I $36,951.60 1 $37.369.92 $0.00 1 $130,864.44 1993 108.3 145.6 $97339.42 $34.068.80 27TH ST 1001CR29.6 CR29.65 E 792 24 $1.59 $0.35 $1.06 $1.34 $30,222.72 $8316.00 $25,185.60 $25,470.72 $0.00 $89,195.04 1996 120.2 145.6 $73.634.92 $14.726.98 27TH ST 200 CR29.65 CR29.8 E 792 24 $1.59 $0.35 $1.06 $1.34 $30,222.72 $8.316.00 $25,185.60 $25.470.72 $0.00 $89,195.04 1996 120.2 145.6 $73.634.92 $14,726.98 26TH ST 100 CDS WESTRIDGE AV NE 158 24 $1.59 $0.35 $1.06 $1.34 $6,029.28 $1,659.00 $5,024.40 $5.081.28 $0.00 $17/93.96 1986 101.1 145.6 $12355.56 $8,648.89 26TH ST 200 WESTRIDGE CR29.7 SE 1373 24 $1.59 $0.35 $1.06 $1.34 $52.393.68 $14,416,50 I $43.661.40 $44,155.68 $0.00 $154.627.26 1986 101.1 145.6 $107.368.24 $75.157.77 26TH ST I 3001CR29.7 ICR29.8 E 1 634 201 1 $1.59 1 $0.35 $1.06 $1.34 $20,161.20 $5,769.40 1 $17.473.04 1 $16.991.20 $0.00 $60.394.84 1986 101.1 145.6 $41.936.25 $29,355.38 26TH ST I 4001CR29.8 IEND E I 739 201 I $1.59 I $0.35 $1.06 $1.34 $23,500.20 $6.724.90 I $20,366.84 I $19.805.20 $0.00 $70,397.14 1986 101.1 145.6 $48,881.53 $34,217.07 24TH ST I 10018GN IWESTRIDGE AV E I 1320 241 I $1.59 I $0.35 $1.06 $1.34 $50,371.20 $13,860.00 I $41.976.00 I $42,451.20 $0.00 $148.658.40 1986 101.1 145.6 $103.223.66 $72.256.56 24TH ST 200 WESTRIDGE END SE 1690 24 $1.59 $0.35 $1.06 $1.34 $64,490.40 $17/45.00 $53.742.00 $54,350.40 $0.00 $190.327.80 1986 101.1 145.6 $132.157.56 $92.510.29 24TH ST 800 CR43 SRFCH E 211 24 $1.59 $0.35 $1.06 $1.34 $8,051.76 $2.215.50 $6,709.80 $6.785.76 $0.00 $23,762.82 1992 105.1 145.6 $17,152.97 $6,861.19 HOPI TR 100 CR 13.8 CR 13.9 E 2165 22 $1.59 $0.35 $1.06 $1.34 $75,731.70 $21,217.00 $64.257.20 $63,824.20 $0.00 $225,030.10 1986 101.1 145.6 $156,253.73 $109.377.61 5660 200 CDS 23RD ST CT N 528 24 $1.59 $0.35 $1.06 $1.34 $20,148.48 $5.544.00 $16.790.40 I $16,980.48 $0.00 $59.463.36 1986 101.1 145.6 $41.289.46 $28.902.62 5660 300123RD ST CT CDS NE 370 241 $1.59 I $0.35 $1.06 $1.34 $14,119.20 $3.885.00 $11,766.00 I $11.899.20 I $0.00 $41,669.40 1986 101.1 145.6 $28:933.90 $20,253.73 23RD ST CT I 1001CR56.8 WESTRDGE SE 475 241 $1.59 I $0.35 $1.06 $1.34 $18,126.00 $4.987.50 I $15.105.00 I $15.276.00 I $0.00 $53,494.50 1986 101.1 145.6 $37,144.88 $26,001.41 23RD ST CT 1 200IWESTRDGE CDS SE 317 241 $1.59 I $0.35 $1.06 $1.34 $12,096.72 $3,328.50 $10,080.60 $10,194.72 I $0.00 $35,700.54 1986 101.1 145.6 $24,789.32 $17,352.52 IALGONOUIN D1 1001 BGN CR15 SE 2270 24 $1.59 $0.35 $1.06 $1.34 $86.623.20 $23.835.00 $72,186.00 $73.003.20 $0.00 $255,647.40 1986 101.1 ' 145.6 $177,513.41 $124,259.39 LAKOTAH CT I 100 CR56.8 END NE 1426 24 $1.59 $0.35 $1.06 $1.34 $54,416.16 $14.973.00 $45346.80 $45.860.16 $0.00 $160,596.12 1994 115.1 145.6 $126,954.76 $38,086.43 157 4001CR44 CR46 N 5438 24 $1.59 $0.35 $1.06 $1.34 $207.514.08 $57099.00 $172.928.40 I $174,886.08 $0.00 $612,427.56 2001 145.6 145.6 $612,427.56 $0.00 158 1001CR25 CL GREELEY IE 39601 241 $1.59 $0.35 $1.06 $1.34 $151,113.60 $41.580.00 I $125.928.00 I $127,353.60 I $0.00 $445,975.20 1991 107.5 145.6 $329,274.27 $148,173.42 120TH STREET 3001CR27 CL GREELEY IE 2641 241 $1.59 I $0.35 $1.06 $1.34 $10,074.24 $2,772.00 I 88,395.20 I $8,490.24 $0.00 $29,731.68 1993 108.3 145.6 $22,114.98 $7,740.24 120TH ST 1700ICL GREELEY CR43 IE 15791 241 $1.59 I $0.35 $1.06 $1.34 $60,254.64 $16,579.50 I $50,212.20 I $50,780.64 I $0.00 $177,826.98 2000 145.6 145.6 $177,826.98 $0.00 120TH ST 18001CR43 SH34 BR IE 20061 24 $1.59 $0.35 $1.06 $1.34 $76,548.96 $21,063.00 $63,790.80 $64,512.96 $0.00 $225,915.72 1986 101.1 145.6 $156,868.68 $109.808.07 t158 20001CR47.5 SH37 E 13358 24 $1.59 $0.35 $1.06 $1.34 $509,741.28 $140,259.00 $424,784.40 $429.59328 _ $0.00 $1,504,377.96 1992 105.1 145.6 $1.085,921.18 $434,368.47 18TH ST 100 SH34 CR43.6 E 2640 20 $1.59 $0.35 $1.06 $1.34 $83,952.00 $24,024.00 $72,758.40 $70,752.00 $0.00 $251,486.40 1992 105.1 145.6 $181,533.11 $72.613.24 8TH ST 2001CR43.6 CR45 E 2482 201 $1.59 $0.35 $1.06 $1.34 I $78,927.60 $22,586.20 I $68,403.92 $66,517.60 $0.00 I $236,435.32 1992 105.1 145.6 $170.668.63 §68.267.45 5825 3001CR45 STR IE 61781 201 $1.59 I $0.35 I $1.06 $1.34 I $196,460.40 $56,219.80 1 $170,265.68 $165,570.40 1 $0.00 1 $588,516.28 1992 105.1 145.6 $424.814.98 $169,925.99 5825 5001STR CR 47,5 ISE 17951 201 $1.59 I $0.35 $1.06 $1.34 I $57.081.00 $16,334.50 I $49,470.20 $48,106.00 $0.00 I $170,991.70 1986 101.1 145.6 $118,731.19 883.111.83 16TH ST 200ICL CR43.6 IE 67581 241 $1.59 $0.35 I $1.06 $1.34 I $257.885.28 $70,959.00 I $214,904.40 $217,337.28 I $0.00 I $761,085.96 1986 101.1 145.6 $528,473.84 $369.931.69 16TH ST 300 CR 436 CR 45 E ' 2112 24 $1.59 $0.35 $1.06 $1.34 $80,593.92 $22,176.00 $67.161.60 _ $67,921.92 $0.00 $237,853.44 1992 105.1 145.6 $171,692.28 $68.676.91 12TH ST 100 CR2750 CR2755 E I 422 24 $1.59 $0.35 $1.06 $1.34 $16,103.52 $4.431.00 $13,419.60 $13.571.52 $0.00 $47,525.64 1990 108.5 145.6 $35,415.74 $17.707.87 5870 2001CR2760 CR29 E 1 1690 24 $1.59 $0.35 _ $1.06 $1.34 _ $64.490.40 $17.745.00 $53.742.00 _ $54.350.40 $0.00 $190327.80 1990 108.5 145.6 $141,830.81 $70,915.41 11TH ST PL 1001CR2790 CDS E I 211 24 $1.59 $0.35 $1.06 $1.34 $8.051.76 $2.215.50 I $6.709.80 $6.785.76 $0.00 $23.762.82 1990 108.5 145.6 $17,707.87 $8,853.94 11TH ST RD 1 1001CR2790 CDS E 211 24 $1.59 $0.35 1 $1.06 $1.34 $8.051.76 $2.215.50 I $6,709.80 $6.785.76 I $0.00 I $23.762.82 1990 108.5 145.6 $17.707.87 $8,853.94 11TH ST 1oo1CR2750 CR2790 E I 2218 24 $1.59 $0.35 1 $1.06 $1.34 $84,638.88 $23,289.00 I $70,532.40 $71,330.88 I $0.00 I $249.791.16 1990 108.5 145.6 $186,142.45 $93,071.23 59 I 2501CR10 SH52 N I 5386 24 $1.59 $0.35 I $1.06 _ $1.34 $205,529.76 $56,553.00 I $171,274.80 $173,213.76 I $0.00 I $606.571.32 1992 105.1 145.6 $437.847.84 $175,139.14 59 30015H52 CR 16.5 N 13200 24 $1.59 $0.35 $1.06 $1.34 $503.712.00 $138.600.00 $419.760.00 $424,512.00 $0.00 $1,486,584.00 1979 0 145.6 $0.00 $0.00 59 450ICLKEENESBU RRX N 634 24 $1.59 $0.35 $1.06 $1.34 $24,193.44 $6.657.00 $20,161.20 $20.389.44 $0.00 $71,401.08 1998 126.9 145.6 $62,230.75 $6.223.07 59 500IRRX CR398 N 158 24 $1.59 $0.35_ $1.06 $1.34 $6.029.28 $1.659.00 I $5.024.40 $5.081.28 $0.00 I 517793.96 1979 0 145.6 $0.00 $0.00 59 7001CR18 CR20 N 1 3960 24 $1.59 $0.35 I $1.06 $1.34 $151,113.60 $41.580.00 1 $125,928.00 $127,353.60 I $0.00 1 $445.975.20 1986 101.1 145.6 $309.670.97 $216,769.68 59 8001CR 20 LG N I 5333 24 $1.59 $0.35 1 $1.06 $1.34 $203,507.28 $55,996.50 I $169,589.40 $171,509.28 I $0.00 I $600,602.46 1986 101.1 145.6 $417.039.21 $291,927.45 59 9001CR46 CR50 N 1 10613 22 $1.59 $0.35 I $1.06 $1.34 $371,242.74 $104,007.40 I $314,993.84 $312,871.24 I $0.00 I $1.103,115.22 1986 101.1 145.6 $765.968.05 $536,177.64 59 1000 CR50 SIR N 3168 22 $1.59 $0.35 $1.06 $1.34 $110,816.64 $31.046.40 $94.026.24 _ $93,392.64 $0.00 $329,281.92 1986 101.1 145.6 $228.642.87 $160,050.01 59 1100 STR SH34 N 5544 22 $1.59 $0.35 _ $1.06 $1.34 $193.929.12 $54.331.20 $164.545.92__1 $163.437.12 $0.00 $576,243.36 1986 101.1 145.6 $400,125.03 $280,087.52 6 250 CL ERIE SERVICE RD E 2587 24 $1.59 $0.35 $1.06 $1.34 $98.719.92 $27,163.50 $82,266.60 $83.197.92 $0.00 $291,347.94 2000 145.6 145.6 $291,347.94 $0.00 6 550 CR 11 RRX E 1 1742 24 $1.59 $0.35 $1.06 $1.34 $66,474.72 $18,291.00 I $55395.60 $56.022.72 1 $0.00 I $196,184.04 2000 145.6 145.6 $196.184.04 $0.00 6 600IRRX ICR13 E I 3590 241 1 $1.59 $0.35 1 $1.06 $1.34 $136,994.40 $37,695.00 1 $114,162.00 $115,454.40 1 $0.00 1 $404,305.80 1979 0 145.6 $0.00 $0.00 6 7001CR 13 ICR 19 E 1 15787 241 I $1.59 $0.35 I $1.06 $1.34 $602.431.92 $165.763.50 I $502,026.60 $507,709.92 I $0.00 I $1.777,931.94 1979 1 0 145.6 $0.00 $0.00 1 6 8001CR 19 !SIR E 1 1373 241 I $1.59 $0.35 I $1.06 $1.34 $52.393.68 $14,416,50 I $43.661.40 $44,155.68 I $0.00 I $154,627.26 1990 1 108.5 145.6 $115,227.04 $57,613.52 1 6 10o01STR ISTR E I 528 241 1 $1.59 $0.35 I $1.06 $1.34 $20.148.48 $5.544.00 I $16.790.40 $16,980.48 I $0.00 I $59,463.36 1990 1 108.5 145.6 i $44,311.64 $22,155.82 1 II i 6 1200 STR STR IE 2323I 24 $1.59 $0.35 $1.06 I $1.34 $88.645.68 $24,391.50 $73,871.40 $74.707.68 $0.00 $261.616.26 1990 108.5 145.6 $194.954.42 I $97.477.21 6 1210 STR SIR '.E 6547' 24 $1.59 $0.35 $1.06 I $1.34 $249.833.52 $68.743.50 $208.194.60 $210.551.52 $0.00 $737323.14 1990 : 108.5 145.6 $549,447.53 $274,723.77 6 1220 SIR STR E 4594 24 $1.59 $0.35 $1.06 I $1.34 $175,307.04 $48,237.00 $146,089.20 $147,743.04 $0.00 $517,376.28 1990 108.5 145.6 $385,544.82 $192,772.41 6 1230 STR STR E 1373 24 $1.59 $0.35 $1.06 $1.34 $52.393.68 $14,416.50 $43,661.40 $44.155.68 $0.00 $154.627.26 1990 108.5 145.6 $115,227.04 $57.613.52 6 1240 SIR STR E 1637 24 $1.59 $0.35 $1.06 $1.34 $62,467.92 $17,188.50 $52,056.60 $52,645.92 $0.00 $184,358.94 1990 108.5 145.6 $137,382.86 $68,691.43 6 1250ISTR 5H85 E 886 24 $1.59 $0.35 $1.06 $1.34 $26,177.76 $7,203.00 $21,814.80 $22,061.76 $0.00 $77,257.32 1990 108.5 145.6 $57.571.56 $28785.78 6 13001SH85 CR27 E 2640 24 $1.59 $0.35 $1.06 $1.34 $100/42.40 $27,720.00 $83,952.00 $84,902.40 $0.00 $297,316.80 1979 0 145.6 $0,00 $0.00 6050 1001CR27 CL E 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27720.00 $83952.00 $84,902.40 $0.00 $297,316.80 1986 101.1 145.6 $206,447.31 $144,513.12 4TH ST 200ICL SPLIT E 264 242 $1.59 $0.35 $1.06 $1.34 $10,074.24 $2,772.00 $8,395.20 $8,490.24 -$14,865.84 $14,865.84 1998 126.9 145.6 $12,956.56 $1.295.66 4TH ST 250ISPLIT CL GREELEY E 317 242 $1.59 $0.35 $1.06 $1.34 $12,096.72 $3,328.50 $10080.60 $10,194.72 -$17,850.27 $17,850.27 1998 126.9 145.6 $15,557.69 $1,555.77 6051 1001CR33.6 CDS SE 211 24 $1.59 $0.35 $1.06 $1.34 $8,051.76 $2,215.50 $6,709.80 $6,785.76 $0.00 $23,762.82 1993 108.3 145.6 $17,675.23 $6,186.33 6055 100ICR41 END E 686 24 $1.59 $0.35 $1.06 $1.34 $26,177.76 $7,203.00 $21,814.80 $22,061.76 $0.00 $77257.32 1986 101.1 145.6 $53,645.02 $37,551.51 ST 100ICL GREELEY END SE 634 24 $1.59 $0.35 $1.06 $1.34 $24,193.44 $6,657.00 $20,161.20 $20,389.44 $0.00 $71,401.08 1993 108.3 145.6 $53.109.46 $18,588.31 61 600ISH 34 RRX N 4963 24 $1.59 $0.35 $1.06 $1.34 $189,388.08 $52,111.50 $157,823.40 $159,610.08 $0.00 $558,933.06 1996 120.2 145,6 $461.426.88 $92,285.38 61 700IRRX STR N 1162 24 $1.59 $0.35 $1.06 $1.34 $44,341.92 $12,201.00 $36,951.60 $37,369.92 $0.00 $130,864.44 1996 120.2 145.6 $108,035.07 $21,607,01 61 900ISTR STR N 1795 24 $1.59 $0.35 $1.06 $1.34 $68,497.20 $18,847.50 $57,081.00 $57,727.20 $0.00 $202,152.90 1996 120.2 145.6 $166,887.22 $33,377.44 61 1100ISTR CR388 N 2640 24 $1.59 $0.35 $1.06 $1.34 $100742.40 $27,720.00 $83,952.00 $84.902.40 $0.00 $297,316.80 1996 120.2 145.6 $245,449.72 $49,089.94 CST 150010R41 CR41.50 E 2746 22 $1.59 $0.35 $1.06 $1.34 $96,055.08 $26,910.80 $81,501.28 $80,952.08 $0.00 $285.419.24 1998 126.9 145.6 $248,761.69 $24,876.17 CST 15501CR41.50 CR43 E 2640 22 $1.59 $0.35 $1.06 $1,34 $92,347.20 $25372.00 $78.355.20 $77,827.20 $0.00 $274,401.60 1998 126.9 145.6 $239,159.09 $23,915.91 62 16001CR43 CL GREELEY E 2693 22 $1.59 $0.35 $1.06 $1.34 $94,201.14 $26.391.40 $79.928.24 $79389.64 $0.00 $279910.42 1998 126.9 145.6 $243,960.39 $24396.04 ST 1700ICL GREELEY CR45 E 686 24 $1.59 $0.35 $1.06 $1.34 $26,177.76 $7,203.00 $21,814.80 $22,061.76 $0.00 $77,257.32 1998 126.9 145.6 $67,334.85 $6,733.48 ST 18001CR45 CR47 E 5280 22 $1.59 $0.35 $1.06 $1.34 $184,694.40 $51,744.00 $156,710.40 $155,654.40 $0.00 $548,803.20 1992 105.1 145.6 $396,148.46 $158,459.39 62 19001CR47 URBDRY E 1056 22 $1.59 $0.35 $1.06 $1.34 $36,938.88 $10,348.80 $31.342.08 $31,130.88 $0.00 $109,760.64 1996 120.2 145.6 $90,612.84 $18,122.57 62 1950I URBDRY 1CR49 E 4277 22 $1.59 $0.35 $1.06 $1.34 $149,609.46 $41,914.60 $126.941.36 $126,085.96 $0.00 $444,551.38 1996 120.2 145.6 $366,999.15 $73,399.83 6225 4001CR 31 STR NE 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27,720.00 $83,952.00 $84,902.40 $0.00 $297,316.80 2001 145.6 145.6 $297,316.80 $0.00 6225 600ISTR CL GREELEY NE 5702 24 $1.59 $0.35 $1.06 $1.34 $217,588.32 $59,871.00 $181.323.60 $183,376.32 $0.00 $642,159.24 1986 101.1 145.6 $445,894.91 $312,126.44 F ST 6201CL CR35 E 2746 242 $1.59 $0.35 $1.06 $1.34 $104,787.36 $28,833.00 $87.322.80 $88,311.36 -$154,627.26 $154,627.26 1998 126.9 145.6 $134,767.85 $13,476.79 6225 6501CR35 RRX E 1003 24 $1.59 $0.35 $1.06 $1.34 $38,274.48 $10,531.50 $31.895.40 $32,256.48 $0.00 $112,957.86 1986 101,1 145.6 $78,434.34 $54,904.04 ST 700IRRX CR 35.75 E 2957 24 $1.59 $0.35 $1.06 $1.34 $112,839.12 $31,048.50 $94,032.60 $95,097.12 $0.00 $333,017.34 1986 101.1 145.6 $231,236.63 $161,865.64 ST 8001 CR 35.75 21ST AV SE 3115 24 $1.59 $0.35 $1.06 $1.34 $118,868.40 $32,707.50 $99,057.00 $100,178.40 $0.00 $350,811.30 1979 0 145.6 $0.00 $0.00 ST 1001CR35.65 CR35.75 E 422 20 $1.59 $0.35 $1.06 $1.34 $13,419.60 $3,840.20 $11,630.32 $11.309.60 $0.00 $40,199.72 1986 101.1 145.6 $27,913.40 $19,539.38 6295 100ICR35.65 CR35.70 E 422 20 $1.59 $0.35 $1.06 $1.34 $13,419.60 $3,840.20 $11,630.32 $11.309.60 $0.00 $40,199.72 1986 101.1 145.6 $27,913.40 $19,539.38 63 5001CR 16 CR 18.5 N 2534 24 $1.59 $0.35 $1.06 $1.34 $96,697.44 $26,607.00 $80.581.20 $81.493.44 $0.00 $285,379.08 1979 0 145.6 $0.00 $0.00 64 400 RRX 5H257 E 53 24 $1.59 $0.35 $1.06 $1.34 $2,022.48 $556.50 $1.685.40 $1,704.48 $0.00 $5,968.86 1992 105,1 145.6 $4,308.57 $1723.43 64 500 CR27 CR29 E 5386 24 $1.59 $0.35 $1.06 $1.34 $205,529.76 $56,553.00 $171,274.80 $173,213.76 $0.00 $606,571.32 1979 0 145.6 $0.00 $0.00 64 6001CR29 CR29.3 E 1584 24 $1.59 $0.35 $1.06 $1.34 $60,445.44 $16632.00 I $50.371.20 $50,941.44 $0.00 $178,390.08 1992 105,1 145.6 $128,769.21 $51,507.69 64 6101CR29.3 RRX E 2059 24 $1.59 $0.35 $1.06 $1.34 $78,571.44 $21,619.50 $65,476.20 $66,217.44 $0.00 $231,884.58 1992 105.1 145.6 $167,383.72 $66,953.49 64 700IRRX CR31 E 2270 24 $1.59 $0.35 $1.06 $1.34 $86,623.20 $23,835.00 $72,186.00 $73,003.20 $0.00 $255.647.40 1992 105.1 145.6 $184,536.69 $73,814.68 0ST 110015H85 RRX E 264 22 $1.59 $0.35 $1.06 $1.34 $9,234.72 $2,587.20 $7,835.52 $7,782.72 $0.00 $27.440.16 1988 106.6 145.6 $20,090.12 $12,054.07 64 1200IRRX STR E 3854 22 $1.59 $0.35 1 $1.06 $1.34 $134,812.92 $37,769.20 $114,386.72 $113,615.92 $0.00 $400.584.76 1988 106.6 145.6 $293,285.27 $175,971.16 05T 1400ISTR CR41 E 422 22 $1.59 $0.35 $1.06 $1.34 $14.761.56 $4.135.60 $12,524.96 $12,440.56 $0.00 $43,862.68 1996 120.2 145.6 $36,210.81 $7,242.16 0ST 15001CR41 ,CR 41.5 E 2640 22 $1.59 $0.35 $1.06 $1.34 $92,347.20 $25,872.00 $78,355.20 $77,827.20 $0.00 $274,401.60 1996 120.2 145.6 $226,532.09 $45,306.42 0ST 15501CR41.5 CR45 E 6026 22 $1.59 $0.35 $1.06 $1.34 $280.749.48 $78,654.80 $238,211.68 $236,606.48 $0.00 $834,222.44 1996 120.2 145.6 $688,691.88 $137,738.38 3RD AV 100ISH 37 3RD ST E 739 24 $1.59 $0.35 $1.06 $1.34 $28,200.24 $7,759.50 $23,500.20 $23,766.24 $0.00 $83,226.18 1986 101.1 145.6 $57,789.61 $40,452.72 4111 AV 20013RD ST 6TH ST E 1162 20 $1.59 $0.35 $1.06 $1.34 $36,951.60 $10,574.20 $32,024.72 $31,141.60 $0.00 $110,692.12 1986 101.1 145.6 $76,861.08 $53,802.76 6450 100ICR23.75 CR25.75 E 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167,904.00 _ $169,804.80 $0.00 $594,633.60 1996 120.2 145.6 $490,899.44 $98,179.89 6TH AV 30013RD ST 6TH E 1162 20 $1.59 $0.35 $1.06 $1.34 $36,951.60 $10,574.20 $32,024.72 $31,141.60 $0.00 $110,692.12 1986 101.1 145.6 $76,861.08 $53,802.76 6475 1001CR23 CR 23.75 E 3960 24 $1.59 $0.35 $1.06 $1.34 $151.113.60 $41,580.00 $125,928.00 $127,353.60 $0.00 $445,975.20 1996 120.2 145.6 $368,174.58 $73,634.92 SEELEY CT 100ICDS CR35 E 370 36 $1.59 $0.35 $1.06 $1.34 $21.178.80 $5,439.00 $16,472.40 $17,848.80 $0.00 $60,939.00 1986 101.1 145.6 $42,314.10 $29,619.87 OGILVY CT 1001C05 CR35 E 317 36 $1.59 $0.35 $1.06 $1.34 $18.145.08 $4,659.90 $14,112.84 $15,292.08 $0.00 $52,209.90 1986 101.1 145.6 $36,252.89 $25,377.02. HOLMAN CT 100IBGN 35TH AV E _ 317 16 $1.59 $0.35 $1.06 $1.34 $8,064.48 $2,440.90 $7,392.44 $6,796.48 $0.00 $24,694.30 1986 101.1 145.6 $17,146.93 $12,002.85 'CONNECTER 1001CR35 CR66 NE 317i 22 $1.59 $0.35 $1.06 $1.34 $11,088.66 $3,106.60 $9,408.56 $9,345.16 $0.00 $32,948.98 1986 101.1 145.6 $22,878.72 $16,015.11 66 130ICL/URBDRY CR23 E 2006 24 $1.59 $0.35 $1.06 $1.34 $76,548.96 $21,063.00 $63,790.80 $64,512.96 $0.00 $225,915.72 1996 120.2 145.6 $186,504.60 $37,300.92 66 400ICL CR35 F 3485 22 $1.59 $0.35 $1.06 $1.34 $121,905.30 $34,153.00 $103,434.80 $102,737.80 $0.00 $362,230.90 1986 101.1 145.6 $251,521.59 $176,065.12 66 5001CR35 CR37 E 3960 22 $1.59 $0.35 $1.06 $1.34 $138,520.80 $38,808.00 $117,532.80 $116,740.80 $0.00 $411,602.40 1986 101.1 145.6 $285,803.59 , $200,062.51 66 5501CR37 SH85 E 5333 22 $1.59 $0.35 $1.06 $1.34 $186.548.34 $52,263.40 $158,283.44 $157,216.84 $0.00 $554,312.02 1986 101.1 145.6 $384,896.60 $269,427.62 66 600ISH 85 RRX E 106 22 $1.59 $0.35 $1.06 $1.34 $3,707.88 $1,038.80 $3,146.08 _ $3.124.88 $0.00 $11,017.64 1986 101.1 145.6 $7,650.30 $5,355.21 66 700IRRX URBDRY E 7920 22 $1.59 $0.35 $1.06 $1.34 $277.041.60 $77,616.00 $235,065.60 $233,481.60 $0.00 $823,204.80 1996 120.2 145.6 $679,596.27 $135,919.25 66 750IURBDRY CR45 E 7920 22 $1.59 $0.35 $1.06 $1.34 $277,041.60 $77616.00 $235,065.60 $233,481.60 $0.00 $823.204.80 1996 120.2 145.6 $679,596.27 $135,919.25 66 8001CR45 CR47 E 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 __ $55.440.00 $167,904.00 $169,804.80 $0.00 $594,633.60 1997 130.6 145.6 $533.373.27 $80,005.99 LYNN ST 100ICDS CR35 E 634 36 $1.59 $0.35 $1.06 $1.34 $36,290.16 $9.319.80 $28,225.68 $30,584.16 $0.00 $104.419.80 1986 101.1 145.6 $72.505.78 $50,754.05 CINDY PL 100ICDS GRANDVIEWDFI NE 422 36 $1.59 $0.35 $1.06 $1.34 $24,155.28 $6,203.40 $18,787.44 $20,357.28 $0.00 $69,503.40 1986 101.1 145.6 $48,260.95 $33,782.66 DIANA PL 100IBGN GRANDVIEWDFINE_ 422 36 $1.59 $0.35 $1.06 $1.34 $24,155.28 $6,203.40 $18,787.44 $20,357.28 _ $0.00 $69,503.40 1986 101,1 145.6 $48,260.95 $33.782.66 DIANA ST 100IGRANDVIEW D 35TH INC 264 36 $1.59 $0.35 $1.06 $1.34 $15,111.36 $3,880.80 $11,753.28 $12,735.36 $0.00 $43,480.80 1986 101.1 145.6 $30,191.68 $21,134.18 68 100ISH 392 STR E 1848 24 $1,59 $0.35 $1.06 $1.34 $70,519,68 _ $19,404,00 $58.766.40 $59,431.68 $0.00 $208,121/6 1979 0 145.6 $0.00 $0.00 68 300ISTR CR61 E 1478 24 $1.59 $0.35 $1.06 $1.34 $56,400.48 $15,519.00 $47,000.40 $47,532.48 $0.00 $166.452.36 1979 0 145.6 $0.00 $0.00 68 4001CR61 STR E 3379 24 $1.59 $0.35 $1.06 $1.34 $128,942.64 $35479.50 $107,452.20 $108,668.64 $0.00 $380.542.98 1979 0 145.6 $0.00 $0.00 68 600ISTR STR E 1531 24 $1.59 $0.35 $1.06 $1.34 $58.422.96 $16,075.50 $48,685.80 __ $49.236.96 $0.00 $172.421.22 1979 0 145.6 $0.00 $0.00 se 800ISTR CR63 E 264 24 $1.59 $0.35 $1.06 $1.34 $10.074.24 $2,772.00 $8,395.20 $8,490.24 $0.00 $29,731.68 1979 0 145.6 $0.00 $0.00 68 9001CR63 SRFCH E 3115 24 $1.59 $0.35 $1.06 $1.34 $118,868.40 $32,707.50 $99,057.00 $100,178.40 $0.00 $350.811.30 1979 0 145.6 $0.00 $0.00 LONGS PK RD 100IEND PIKES PEAK DR E 370 22 $1.59 $0.35 $1.06 $1.34 $12.942.60 $3,626.00 $10,981.60 $10,907.60 $0.00 $38,457.80 1998 126.9 145.6 $33.518.51 $3,351.85 1 TWIN PK RD 200 PIKES PEAK CR3 NE 1056 22 $1.59 $0.35 61.06 $1.34 $36,938.88 $10,348.80 $31.342.08 $31,130.88 $0.00 $109.760.64 1998 126.9 145.6 $95.663.63 $9,566.36 MAY DR 400 CR23 CDS E 686 24 $1.59 $0.35 $1.06 $1.34 $26,177.76 $7,203.00 $21,814.80 $22,061.76 $0.00 $77.257.32 1986 101.1 145.6 $53.645.02 $37,551.51 PADAKET RD 100 CR2320 CR 2340 NE 1214 24 $1.59 $0.35 $1.06' $1.34 $46,326.24 $12,747.00 $38,605.20 $39,042.24 $0.00 $136.720.68 1986 101.1 145.6 $94,934.48 $66,454.14 69 300 SH34 STR N 3802 24 $1.59 $0.35 $1.06 $1.34 $145,084.32 $39,921.00 $120.903.60 $122,272.32 $0.00 $428,181.24 1990 108.5 145.6 $319,077.37 $159,538.68 69 500 SIR CR380 N 3115 24 $1.59 $0.35 $1.06 $1.34 $118,668.40 $32,707.50 $99,057.00 $100.178.40 $0.00 $350,811.30 1990 108.5 145.6 $261,421.88 $130,710.94 7 100 CL BROOM CL ERIE N 5333 24 $1.59 $0.35 $1.06 $1.34 $203,507.28 $55.996.50 $169,589.40 $171,509.28 $0.00 $600,602.46 2001 145.6 145.6 $600,602.46 $0.00 7 350 CR 12 SH 52 N 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55.440.00 $167,904.00 $169,804.80 $0.00 $594,633.60 1995 121.9 145.6 $497.842.28 $124,460.57 7 4001SH52 CR16 N 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167904.00 $169,804.80 $0.00 $594,633.60 1999 136.5 145.6 $557,469.00 $27,873.45 7 500ISTR CR18 N 2746 24 $1.59 $0.35 $1.06 $1.34 $104,787.36 $28,833.00 $87,322.80 $88,311.36 $0.00 $309,254.52 1999 136.5 145.6 $289,926.11 $14,496.31 7 600ICR18 CR20 N 5280 22 $1.59 $0.35 $1.06 $1.34 $184,694.40 $51,744.00 $156,710.40 $155,654.40 $0.00 $548,803.20 1999 136.5 145.6 $514,503.00 $25,725.15 7 6501CR2050 STR N 1690, 22 $1.59 $0.35 $1.06 $1.34 $59.116.20 $16,562.00 $50.159.20 $49,821.20 $0.00 $175,658.60 1999 136.5 145.6 $164,679.94 $8,234.00 7 700ISTR SH 119 IN 5808 22 $1.59 $0.35 $1.06 $1.34 $203,163.84 $56,918.40 $172.381.44 $171,219.84 $0.00 $603,683.52 1986 101.1 145.6 $419,178.60 $293,425.02 7 80015H119 CR24.5 N 2587 24 $1.59 $0.35 $1.06 $1.34 $98,719.92 $27.163.50 $82,266.60 $83.197.92 $0.00 $291,347.94 1996 120.2 145.6 $240,522.13 $48.104.43 7 100015H66 SCL MEAD N 9821 24 $1.59 $0.35 $1.06 $1.34 $374,769.36 $103.120.50 $312,307.80 $315.843.36 $0.00 $1,106.041.02 . 1995 121.9 145.6 $926,005.50 $231,501.37 7 14001CL CR38 N 8448 24 $1.59 $0.35 $1.06 $1.34 $322,375.68 $88.704.00 $268,646.40 $271,687.68 $0.00 $951,413.76 1996 120.2 145.6 $785,439.11 $157,087.82 70 100ICR 19 CR 21 E 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167,904.00 $169.804.80 $0.00 $594,633.60 1992 105.1 145.6 $429,230.71 $171,692.28 70 1701CR23 SRFCH E 2957 24 $1.59 $0.35 $1.06 $1.34 $112,839.12 $31,048.50 $94,032.60 $95,097.12 $0.00 $333,017.34 1990 108.5 145.6 $248,161.96 $124,080.98 70 5001CR37 SH 85 E 3802 24 $1.59 $0.35 $1.06 $1.34 $145,084.32 $38:921.00 $120,903.60 $122,272.32 $0.00 $428,181.24 1986 101.1 145.6 $297,315.41 $208,_120.79 72 2001511257 STR E 422 24 $1.59 $0.35 $1.06 $1.34 $16,103.52 $4,431.00 $13,419.60 $13,571.52 $0.00 $47,525.64 1991 107.5 145.6 $35,089.33 $15,790.20 72 300ISTR CR19 E 4805 24 $1.59 $0.35 $1.06 $1.34 $183.358.80 $50,452.50 $152,799.00 $154,528.80 $0.00 $541,139.10 1991 107.5 145.6 $399,536.08 $179,791.24 73 300151152 CR16 N 10613 36 $1.59 $0.35 $1.06 $1.34 $607,488.12 $156,011.10 $472,490.76 $511,971.12 $0.00 $1,747,961.10 1984 92.6 145.6 $1,111,684.05 $889,347.24 73 4001CR16 RRX N 23918 24 $1.59 $0.35 $1.06 $1.34 $912,710.88 $251,139.00 $760,592.40 $769,202.88 $0.00 $2,693,645.16 , 1979 0 145.6 $0.00 $0.00 73 5001RRX SERVICERO N 264 24 $1.59 $0.35 $1.06 $1.34 $10,074.24 $2,772.00 $8.395.20 $8,490.24 $0.00 $29,731.68 1996 120.2 145.6 $24,544.97 $4,908.99 74 1001CR 13 WIDCH E 3960 22 $1.59 $0.35 $1.06 $1.34 $138,520.80 $38,808.00 $117.532.80 $116,740.80 $0.00 $411,602.40 2001 145.6 145.6 $411.602.40 $0.00 74 1301WIDCH WIDCH E I 1320 60 $1.59 $0.35 $1.06 $1.34 $125,928.00 $30,492.00 $92.347.20 $106,128.00 $0.00 $354,895.20 2001 145.6 145.6 $354,895.20 $0.00 74 1701WIOCH 5H257 E 4805 22 $1.59 $0.35 $1.06 $1.34 $168.078.90 $47,089.00 $142,612.40 $141,651.40 $0.00 $499,431.70 2001 145.6 145.6 $499,431.70 $0.00 74 2001311257 STR E 3062 24 $1.59 $0.35 $1.06 $1.34 $116,845.92 $32,151.00 $97,371.60 $98,473.92 $0.00 $344,842.44 1992 105.1 145.6 $248,921.29 $99,568.52 74 25015TR WCLSEVERANdE 7286 24 $1.59 $0.35 $1.06 $1.34 $278,033.76 $76,503.00 $231,694.80 $234,317.76 $0.00 $820,549.32 1996 120.2 145.6 $677,404.04 $135,480.81 74 400IECL/CR25 CR29 IE 10930 22 $1.59 $0.35 $1.06 $1.34 $382.331.40 $107,114.00 $324,402.40 $322,216.40 $0.00 $1,136,064.20 1998 126.9 145.6 $990,154.86 $99,015.49 74 5001CR29 CR33 E 10718 22 $1.59 $0.35 $1.06 $1.34 $374,915.64 $105,036.40 $318,110.24 $315,966.64 $0.00 $1,114,028.92 1979 0 145.6 $0.00 $0.00 COLLINS ST 6001CR 33 CL E 8290 22 $1.59 $0.35 $1.06 $1.34 $289.984.20 $81,242.00 $246,047.20 $244,389.20 $0.00 $861,662.60 1979 0 145.6 $0.00 $0.00 COLLINS ST 8001CL ASH ST E 634 22 $1.59 $0.35 $1.06 $1.34 $22.177.32 $6,213.20 $18.817.12 $18,690.32 60.00 $65,897.96 1998 126.9 145.6 $57,434.42 $5,743.44 COLLINS ST 900IASH ST 51185 E 2693 222 $1.59 $0.35 $1.06 $1.34 $94.201.14 $26,391.40 $79,928.24 $79,389.64 -$139,955.21 $139,955.21 , 1998 126.9 145.6 $121,980.19 $12,198.02 74 12001CR39 SIR E 10349 24 $1.59 $0.35 $1.06 $1.34 $394.917.84 $108,664.50 $329.098.20 $332,823.84 $0.00 $1,165,504.38 1979 0 145.6 $0.00 $0.00 74 130OISTR CR43 E 264 24 $1.59 $0.35 $1.06 $1.34 $10,074.24 $2,772.00 $8.395.20 $8,490.24 $0.00 $29,731.68 1979 0 145.6 $0.00 $0.00 74 14001CR43 CR51 E 21067 24 $1.59 $0.35 $1.06 $1.34 $803,916.72 $221,203.50 $669,930.60 $677,514.72 $0.00 $2,372,565.54 1979 0 145.6 $0.00 $0.00 74 15001CR51 STR E 739 24 $1.59 $0.35 $1.06 $1.34 $28,200.24 $7,759.50 $23,500.20 $23,766.24 $0.00 $83,226.18 1990 108.5 145.6 $62,019.51 $31.009.75 74 1600ISTR CR59 E 20434 24 $1.59 $0.35 $1.06 $1.34 $779,761.44 $214,557.00 $649,801.20 $657,157.44 $0.00 $2,301,277.08 1990 108.5 145.6 $1,714,893.98 $857,446.99 74 16201CR59 SRFCH E 158 24 $1.59 $0.35 $1.06 $1.34 $6,029.28 $1,659.00 $5,024.40 $5,081.28 $0.00 ' $17,793.96 1996 120.2 145.6 $14,689.79 $2.937.96 7440 100ICR37.40 RRX E 475 20 $1.59 $0.35 $1.06 $1.34 $15,105.00 $4,322.50 $13,091.00 $12,730.00 $0.00 $45,248.50 1986 101.1 145.6 $31,419.12 $21.993.38 7440 200IRRX CR37.5 E 264 20 $1.59 $0.35 $1.06 $1.34 $8,395.20 $2,402.40 $7,275.84 $7,075.20 $0.00 $25,148.64 1986 101.1 145.6 $17,462.41 $12,223.69 7450 100ICL CR37.40 E 106 20 $1.59 $0.35 $1.06 $1.34 $3,370.80 $964.60 $2,921.36 $2,840.80 $0.00 $10,097.56 1986 101.1 145.6 $7,011.42 $4,908.00 7450 500ICR37.5 CR39 E 2904 20 $1.59 $0.35 $1.06 $1.34 $92,347.20 $26.426.40 $80,034.24 $77,827.20 $0.00 $276,635.04 1986 101.1 145.6 $192,086.56 $134,460.59 RODNEY ST 100ICR 13.5 CR15 E 2112 24 $1.59 $0.35 $1.06 $1.34 $80,593.92 $22.176.00 $67,161.60 $67,921.92 $0.00 $237.853.44 1996 120.2 145.6 $196.359.78 $39,271.96 STEVEN ST 100 CR 13.5 CR 13.75 E 1584 24 $1.59 $0.35 $1.06 $1.34 $60,445.44 $16.632.00 $50,371.20 $50;941.44 $0.00 $178,390.08 1996 120.2 145.6 $147.269.83 $29,453.97 MOUNTAINVIEYJ 150 BGN SH 119 N 845 38 $1.59 $0.35 $1.06 $1.34 $51,054.90 $13.013.00 $39,410.80 $43,027.40 $0.00 $146.506.10 1998 126.9 145.6_ $127.689.73 $12.768.97 FRONTIER RD Zoo FAIRwY CR 38 N 1109 22 $1.59 $0.35 $1.06 $1.34 $38,792.82 $10.868.20 $32,915.12 $32,693.32 $0.00 $115.269.46 1986 101.1 145.6 $80.039.44 $56,027.61 76 5001CR27 CR29 E 5386 22 $1.59 $0.35 $1.06 $1.34 $188,402.28 $52.782.80 $159,856.48 $158,779.28 $0.00 $559.820.84 1986 101.1 145.6 $388,721.75 $272,105.23 76 8001CR33 SH85 E 10824 22 $1.59 $0.35 $1.06 $1.34 $378,623.52 $106,075.20 $321,256.32 $319,091.52 $0.00 $1.125,046.56 1986 101.1 145.6 $781,196.48 $546,837.53 76 900151185 RRX E 158 20 $1.59 $0.35 $1.06 $1.34 $5,024.40 $1,437.80 $4,354.48 $4,234.40 $0.00 $15,051.08 1986 101.1 145.6 $10,450.99 $7,315.69 76 11001CR39 SRFCH E 1056 24 $1.59 $0.35 $1.06 $1.34 $40,296.96 $11.088.00 $33,580.80 $33.960.96 $0.00 $118926.72 1979 0 145.6 $0.00 $0.00 7630 100IBGN CR15.15 E 211 24 $1.59 $0.35 $1.06 $1.34 $8,051.76 $2,215.50 $6,709.80 $6,785.76 $0.00 $23,762.82 1986 101.1 145.6 $16.500.14 $11,550.10 LAKE VIEW CT 10OICR 15.15 END E 475 24 $1.59 $0.35 $1.06 $1.34 $18,126.00 $4,987.50 $15,105.00 $15,276.00 $0.00 $53,494.50 1996 120.2 145.6 $44,162.36 $8,832.47 77 1o0ISH52 CR16 N 10560 24 $1.59 $0.35 $1.06 $1.34 $402,969.60 $110,880.00 $335.808.00 $339,609.60 $0.00 $1,189,267.20 1990 108.5 145.6 $886,232.77 $443,116.38 77 300ISH 14 STR N 9610 24 $1.59 $0.35 $1.06 $1.34 $366.717.60 $100,905.00 $305,598.00 $309,057.60 $0.00 $1,082,278.20 1979 0 145.6 $0.00 $0.00 77 5001STR CR100 N 16579 24 $1.59 $0.35 $1.06 $1.34 $632,654.64 $174,079.50 $527,212.20 $533,180.64 $0.00 $1,867,126.98 1979 0 145.6 $0.00 $0.00 77 600ICR100 STR N 5491 28 $1.59 $0.35 $1.06 $1.34 $244,459.32 $65,342.90 $197,895.64 $206.022.32 $0.00 $713,720.18 1992 105.1 145.6 $515,192.25 $206,076.90 77 800ISTR STR N 12883 28 $1.59 $0.35 $1.06 $1.34 $573,551.16 $153,307.70 $464,303.32 $483,370.16 $0.00 $1,674,532.34 1992 105.1 145.6 $1,208,745.53 $483,498.21 77 1000ISTR CR 114 N 19325 28 $1.59 $0.35 $1.06 $1.34 $860,349.00 $229,967.50 $696,473.00 $725.074.00 $0.00 $2.511,863.50 1992 105.1 145.6 $1,813,165.21 $725,266.08 77 1300ICR 114 CR 120 N 15998 28 $1.59 $0.35 $1.06 $1.34 $712,230.96 $190,376.20 $576,567.92 $600,244.96 $0.00 $2.079,420.04 1992 105.1 145.6 $1,501,009.93 $600.403.97 77 14001CR 120 CR 124 N 10877 30 $1.59 $0.35 $1.06 $1.34 $518,832.90 $137,050.20 $415,066.32 $437,255.40 $0.00 $1.508,204.82 1992 105.1 145.6 $1,088,683.56 $435,473.42 77 15001CR124 CR136 N 31469 30 $1.59 $0.35 $1.06 $1.34 $1,501,071.30 $396,509.40 $1,200,857.04 $1,265.053.80 $0.00 $4,363,491.54 1992 105.1 145.6 $3,149,745.61 $1,259,898.24 77 18001CR77 CR136 N 422 30 $1.59 $0.35 $1.06 $1.34 $20,129.40 $5.317.20 $16,103.52 $16.964.40 $0.00 $58.514.52 1992 105.1 145.6 $42,238.16 $16,895.26 5TH AV 100ILEE ST SH 14 N 2587 20 $1.59 $0.35 $1.06 $1.34 $82,266.60 _ $23,541.70 $71,297.72 $69,331.60 $0.00 $246.437.62 1986 101.1 145.6 $171,118.43 $119,782.90 79 12001CR136 CR140 NW 12091 26 $1.59 $0.35 $1.06 $1.34 $499,841.94 $135,419.20 $410.126.72 $421,250.44 $0.00 $1,466,638.30 1979 0 145.6 $0.00 $0.00 790 200ISRFCH SH 119 N 1162 32 $1.59 $0.35 $1.06 $1.34 $59,122.56 $15,454.60 $46,805.36 $49,826.56 $0.00 $171,209.08 1986 101.1 145.6 $118,882.13 $83.217.49 PIPER ST 1001CR79 CR136.3 NE 264 20 $1.59 $0.35 $1.06 $1.34 $8.395.20 $2.402.40 $7,275.84 $7,075.20 $0.00 $25,148.64 I 1986 101.1 145.6 $17,462.41 $12,223.69 7970 1001CR79 CR136.3 NE 264 20 $1.59 $0.35 $1.06 $1.34 $8,395.20 $2,402.40 $7,275.84 $7,075.20 $0.00 $25,148.64 I 1986 101.1 145.6 $17.462.41 $12,223.69 8 1300151185 CR27 E 2640 24 $1.59 $0.35 $1.06 $1.34 $100,742.40 $27/20.00 $83,952.00 $84,902.40 $0.00 $297,316.80 I 1992 105.1 145.6 $214,615.35 $85,846.14 8 14001CR27 RRX E 686 24 $1.59 I $0.35 $1.06 $1.34 $26,177.76 $7,203.00 $21,814.80 $22.061.76 $0.00 $77,257.32 I 1992 105.1 145.6 $55.767.47 $22,306.99 8 1500IRRX CR31 E 9979 24 $1.59 I $0.35 $1.06 $1.34 $380,798.64 $104,779.50 $317.332.20 $320,924.64 $0.00 $1,123,834.98 1 1992 105.1 145.6 $811,229.78 $324,491.91 ' 8 1600 CR31 CR37 E 15998 24 $1.59 $0.35 $1.06 $1.34 $610.483.68 $167,979.00 $508.736.40 $514,495.68 $0.00 $1.801,694.76 1992 I 105.1 145.6 $1.300.536.53 $520.214.61 8 1700 CR37 SH 76 E 12619 24 $1.59 $0.35 $1.06 $1.34 $481.541.04 $132499.50 $401.284.20 $405.827.04 $0.00 $1.421,151.78 1992 105.1 145.6 $1.025.845.14 $410.338.06 8 1800 SH 76 STR E 5544 24 $1.59 $0.35 $1.06 $1.34 $211,559.04 $58,212.00 $176,299.20 $178.295.04 $0.00 $624.365.28 1992 105.1 145.6 $450.692.25 $180.276.90 8 2000 SIR CR45 E 3115 24 $1.59 $0.35 $1.06 $1.34 $118,868.40 $32.707.50 $99,057.00 $100,178.40 $0.00 $350,811.30 1992 105.1 145.6 $253,229.86 $101.291.94 80 1300 RRX SRFCH E 1637 24 $1.59 $0.35 $1.06 $1.34 $62.467.92 $17,188.50 $52.056.60 $52,645.92 $0.00 $184,358.94 1990 108.5 145.6 $137.382.86 $68.691.43 84 100 CR 13 STR E 3010 24 $1.59 $0.35 $1.06 $1.34 $114,861.60 $31,605.00 $95.718.00 $96,801.60 $0.00 $338,986.20 1991 107.5 145.6 $250.281.71 $112,626.77 84 13001CR33 SH85 E 4805 22 $1.59 $0.35 $1.06 $1.34 $168,078.90 $47,089.00 $142612.40 $141,651.40 $0.00 $499,431.70 1986 101.1 145.6 $346.789.46 $242752.62 SAGEBRUSHWI 1001 CR37 COS E 1109 24 $1.59 $0.35 $1.06 $1.34 $42,319.44 $11,644.50 $35,266.20 $35.665.44 $0.00 $124,895.58 1986 101.1 145.6 $86.723.51 $60,706.46 86 7001CR31 SIR E 6864 22 $1.59 $0.35 $1.06 $1.34 $240.102.72 $67,267.20 $203,723.52 $202.350.72 $0.00 $713.444.16 1986 101.1 145.6 $495,392.89 $346,775.02 86 900ISTR SH85 E 1584 22 $1.59 $0.35 $1.06 $1.34 $55.408.32 $15,523.20 $47,013.12 $46,696.32 $0.00 $164.640.96 1986 101.1 145.6 $114.321.44 $80.025.01 86 10001SH85 RRX E 106 22 $1.59 $0.35 $1.06 $1.34 $3,707.88 $1,038.80 $3,146.08 $3.124.88 $0.00 $11.017.64 1986 101.1 145.6 $7650.30 $5.355.21 88 1100IRRx SYSCH E 9662 24 $1.59 $0.35 $1.06 $1.34 $368.701.92 $101,451.00 $307251.60 $310,729.92 $0.00 $1,088,134.44 1996 120.2 145.6 $898,308.79 $179.661.76 86 1150ISVSCH CR39 E 3010 24 $1.59 $0.35 $1.06 $1.34 $114.861.60 $31,605.00 $9%718.00 $96,801.60 $0.00 $338.986.20 1996 120.2 145.6 $279.849.87 $55,969.97 86 12001CR39 CR43 E 10771 20 $1.59 $0.35 $1.06 $1.34 $342,517.80 $98.016.10 $296,848.76 $288,662.80 $0.00 $1,026,045.46 1996 120.2 145.6 $847,051.27 $169,410.25 87 20001CR120 CHATOGA AV N 4224 24 $1.59 $0.35 $1.06 $1.34 $161,187.84 $44.352.00 $134,323.20 $135.843.84 $0.00 $475,706.88 1992 105.1 145.6 $343,384.57 $137.353.83 88 300ICR31 FIRST ST E 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55440.00 $167,904.00 $169,804.80 $0.00 $594633.60 1986 101.1 145.6 $412894.62 $289.026.24 88 500ISH85 RRX E 211 26 $1.59 $0.35 $1.06 $1.34 $8,722.74 $2,363.20 $7.157.12 $7.351.24 $0.00 $25,594.30 1986 101.1 145.6 $17.771.87 $12.440.31 88 600IRRX SRFCH E 3696 26 $1.59 $0.35 $1.06 $1.34 $152.792.64 $41,395.20 $125,368.32 $128.768.64 $0.00 $448.324.80 1986 101.1 145.6 $311.302.45 $217.911.72 89 15001CR122 WDCH N 26928 28 $1.59 $0.35 $1.06 $1.34 $1.198.834.56 $320,443.20 $970,485.12 $1.010,338.56 $0.00 $3.500.101.44 1991 107.5 145.6 $2.584.209.51 $1.162.894.28 89 1600IW JC R CR 136 N 10560 24 $1.59 $0.35 $1.06 $1.34 $402.969.60 $110,880.00 $335,808.00 $339,609.60 $0.00 $1.189.267.20 1991 107.5 145.6 $878.064.73 $395.129.13 90 600ISTR CR31 E 1478 24 $1.59 $0.35 $1.06 $1.34 $56.400.48 $15,519.00 $47.000.40 847.532.48 $0.00 $166.452.36 1979 0 145.6 $0.00 $0.00 ROWE AV 7001CR31 SH85 E 5280 24 $1.59 $0.35 $1.06 $1.34 $201,484.80 $55,440.00 $167,904.00 $169,804.80 $0.00 $594.633.60 1992 105.1 145.6 $429,230.71 $171,692.28 ROWE AV 80015H85 RRX E 106 24 $1.59 $0.35 $1.06 $1.34 $4.044.96 $1,113.00 $3.370.80 $3,408.96 $0.00 $11.937.72 1979 0 145.6 $0.00 $0.00 90 900IRRX CR43 E 26684 24 $1.59 $0.35 $1.06 $1.34 $1.017.498.24 $279.972.00 $847.915.20 $857.514.24 $0.00 $3.002.899.68 1979 0 145.6 $0.00 $0.00 90 10001CR43 CR45 E 5227 24 $1.59 $0.35 $1.06 $1.34 $199.462.32 $54.883.50 $166.218.60 $168,100.32 $0.00 $588.664.74 1979 0 145.6 $0.00 $0.00 90 11001CR45 SIR E 1954 24 $1.59 $0.35 $1.06 $1.34 $74.564.64 $20,517.00 $62.137.20 $62,840.64 $0.00 $220.059.48 1979 0 145.6 $0.00 $0.00 90 1300ISTR CR49 E 8606 24 $1.59 $0.35 $1.06 $1.34 $328.404.96 $90,363.00 $273.670.80 $276,768.96 $0.00 $969.207.72 1979 0 145.6 $0.00 $0.00 90 14001CR49 SH 14 1E 21278 24 $1.59 $0.35 $1.06 $1.34 $811.968.48 $223,419.00 $676.640.40 $684,300.48 $0.00 $2.396.328.36 1979 0 145.6 $0.00 $0.00 950 10015H66 CR32 IN 5280 40 $1.59 $0.35 $1.06 $1.34 $335.808.00 $85,008.00 $257.452.80 $283,008.00 $0.00 $961.276.80 2001 145.6 145.6 $961.276.80 $0.00 I I I I Tot Miles $145,111,582.14 $39,766,924.40 $184,878,506.54 $122,295,295.64 -$8,809,726.281 $418,801,046.94 $267,212,620.70 $85,898,404.08 2001 Location Cost WCR 126 (Carr city limits to 15.5) $ 281,414.00 WCR 9.5 (Hwy 66 to 32) $ 814,075.00 WCR 74 @ 15 (3,000 ft Intersection Imp.) $ 661,439.00 2002 Location Cost WCR 10 (Martin Sub. @ 37) $ 195,367.00 WCR 65 (Hwy 52 to 8) $ 809,883.00 WCR 62 (13 to 17) $ 688,220.00 WCR 24.5 (E. of 73) $ 157,991.00 PAVED ROAD CURRENT BALANCE Historical Value Acc. Depreciation Book Value HUTF 2000 values $267,212,620.76 $85,898,404.08 $181,314,216.68 2001 projects: WCR 126 $281,414.00 WCR 9.5 $814,075.00 WCR 74 @15 $661,439.00 Total Additions 2001 $1,756,928.00 Total Available for depreciaion 2001 $268,969,548.76 $85,898,404.08 2001 Depreciation $13,448,477.44 2001 year end value $268,969,548.76 $99,346,881.52 $169,622,667.24 2002 projects: WCR 10 $195,367.00 WCR 65 $809,883.00 WCR 62 $688,220.00 WCR 24.5 $157,991.00 Total Additions 2002 $1,851,461.00 Total Available for depreciaion 2002 $270,821,009.76 $99,346,881.52 2002 Depreciation $13,541,050.49 2002 year end value $270,821,009.76 $112,887,932.01 $157,933,077.75 r^ BRIDGE INVENTORY On the following pages you will see the presentation of the bridge inventory. The inventory is broken down into two segments for costing and presentation. The first is what is considered the MAJOR STRUCTURE segment that is inclusive of any bridge structure that exceeds sixty feet in length. The other is called MINOR STRUCTURE that is any bridge (which includes what many of us would consider culverts) that are above five feet in length,but under sixty feet in length. The attached sheets break down the major and minor bridges based on a twenty foot length,but in reality any structure over sixty foot is built through the State of Colorado. This being the fact, the major bridge spread is broken down into the two segments. The costing approach utilized two separate methods because of the structure size and complexity. The Major structures were priced utilizing the CDOT cost data for a three year period as published, and averaged to calculate the value. The Minor structures were priced similarly to the paved road system in actual project cost data of Weld County was extracted to calculate the average cost per square foot. The same logic was applied to the indexing of these structures as it relates to the year it was built. Every bridge built in 2000 or earlier was applied to the Federal Aid Construction Index (2000). Subsequent structures (listed as either 2001 or 2002) are put onto the spreadsheet at their actual value. These structures are presented through October 31, 2002, and any additional structures will modify the final value for the year end presentation of 2002. The last page in this section is a representative summary of the two structures discussed above with the value schematic as described. As you will see the 539 structures has a total historic value of$33,758,405.16. Bridges Database Columns Structure Number - This is a number identifying what road the bridge is on and what road it is either north or east of The letter at the end identifies if it is the first, second,third... etc. in that mile section of road. Structure Type - This is a code that identifies what kind of deck and superstructure the bridge is made of(Example SSM=Steel Stringer Metal Plank Floor) Acquisition Year - Referenced the Year Built column. The year the bridge was built unless the bridge was built prior to 1970. If the bridge was built prior to 1970,the value defaults to 1970. This is due to the Federal Index only providing information back to 1970 for depreciation. Year Built - Actual year the bridge was built Out to Out Width - Item recorded in Inspection Reports. Width in feet of bridge deck Structure Length - Item recorded in Inspection Reports. Length in feet of bridge deck Square Feet - (Out to Out Width)x(Structure Length) Unit Cost Year 2000 - Average cost/sq. ft. of constructing a new bridge. Two values are used, $70.71/sq. ft. if the Structure Length value is greater than 60', $68.16/sq. ft. if the Structure Length is less than or equal to 60'. ^ Total Cost - (Square Feet)x(Unit Cost Year 2000) Cost Index - Number corresponding with Federal-Aid Highway Construction Index based on Acquisition Year. Accumulated Depreciation - [(Age of Structure)/(Life Expectancy)]x(Acquisition Year Value) Acquisition Year Value - [(Total Cost)x(Cost Index)]/(Year 2000 Cost Index"145.6") Acq.Yr.Value Struc>60' Long - (Acquisition Year Value)of Structure if(Structure Length)is Greater Than 60',otherwise blank Acq. Yr. Value Struc<=60' Long - (Acquisition Year Value)of Structure if(Structure Length)is Less Than or Equal to 60',otherwise blank Acc. Depric. of Struc>60' - (Accumulated Depreciation)of Structure if(Structure Length) is Greater Than 60',otherwise blank Acc. Depric. of Struc<=60' - (Accumulated Depreciation)of Structure if(Structure Length)is Less Than or Equal to 60',otherwise blank Deck Area of Bridges >60' - (Square Feet)of Structure if(Structure Length)is Greater Than 60', otherwise blank Deck Area of Bridges<=60' - (Square Feet)of Structure if(Structure Length) is Less Than or Equal to 60',otherwise blank #of Struc. L>60' - 1 if(Structure Length)is Greater Than 60',otherwise blank #of Struc. L<=60' - 1 if(Structure Length)is Less Than or Equal to 60',otherwise blank ) ) ) 2001 CDOT COST INDEX 2000 CDOT COST INDEX 1999 CDOT COST INDEX AVG. AVG. AVG. DECK COST DECK COST DECK COST AREA PER SF MULT AREA PER SF MULT AREA PER SF MULT CSG 35,942 $ 87.91 3,159,696 CBG 97,117 $ 64.63 6,276,701 CBGP 33,288 $ 50.18 1,670,371 CS 1,689 $228.29 385,490 CBGS 139,616 $ 108.47 15,144,142 29,658 $ 82.83 2,456,590 CBG 121,747 $ 54.03 6,577,963 CBGP 50,586 $ 83.03 4,200,164 CPG 151,874 $ 53.63 8,145,009 CBGP 25,072 $ 136.20 3,414,861 CPG 140,906 $ 55.13 7,768,162 CBC 63,511 $ 50.23 3,190,155 CPG 147,906 $ 53.64 7,933,662 CBC 24,258 $ 89.01 2,159,238 WG 5,797 $106.94 619,938 CPG 5,526 $ 136.75 755,612 SSM 71,250 $ 82.80 5,899,529 11,522 $ 65.57 755,475 CPG 11,512 $ 51.03 587,432 523,734 41,447,936 WGC 34,218 $ 98.76 3,379,398 CBC 16,776 $ 103.46 1,735,645 weighted average $ 79.14 2,117 $ 54.81 116,023 SSM 6,630 $ 80.59 534,312 331,985 20,332,957 372,799 25,084,674 weighted average $ 61.25 weighted average $ 67.29 $ 70.71 total weighted average ) ) ) COLORADO DEPARTMENT OF TRANSPORTATION BRIDGE COST PER SQUARE FEET BB YEAR 1999 BID LET I PROJECT I LOCATION I RAIN I STRUCTURE R I LENGTH I WIDTH I TOTAL O AREA I ELIGIBLE LOSL I ATT TOTAL I COST PER DATE NUMBER +I CONCRETE BOX CULVERT 01/21/99 BR 0741-006 MORRISON TO KITTREDGE M F-15-DD 123.10 34.04 4,190.32 $344,562.00 $828,049.50 $82.23 02/11/99 IM 0251-147 125/29TH STREET-SOUTH U K-18-GD 99.87 22.15 2,212.12 $154,459.34 $154,459.34 $69.82 04/01/99 SP 0501-037 WHITEWATER-EAST R I-03-N 216.08 62.32 13,466.11 $551,895.40 $776,505.40 $40.98 05/20/99 BR 0503-052 BRIDGE-TAYLOR GULCH M K-13-F 116.00 42.50 4,930.00 $289,749.50 $381,882.90 $58.77 07/08/99 NH 0342-034 HARDIN WEST(ROADWAY) R C-19-AJ 79.00 26.50 2,093.50 $129,156.66 $129,156.66 $61.69 07/08/99 NH 0503-055 SH 50/SH 47/I-25-PACKAGED U PUENFR-0.2-CLU 661.61 17.52 11,591.41 $635,648.40 $799,649.90 $54.84 07/15/99 BR 0243-054 FALCON AREA BRIDGES U 1-18-O 47.00 39.33 1,848.51 $94,881.70 $102,059.70 $51.33 07/15/99 BR 0243-054 FALCON AREA BRIDGES U I-18-R 75.00 26.50 1,987.50 $122,776.53 $132,282.53 $61.77 07/15/99 BR 0243-054 FALCON AREA BRIDGES U I-18-BB 47.00 26.50 1,245.50 $72,385.33 $79,453.33 $58.12 10/14/99 IM 0253-142 125 AND SH 52 R D-17-DR 113.04 26.96 3,047.56 $91,722.56 $100,788.83 $30.10 10/14/99 IM 0253-142 125 AND SH 52 R D-17-DS 123.50 26.96 3,329.56 $102,918.68 $109,469.12 $30.91 10/14/99 IM 0253-142 I25 AND SH 52 R D-17-DT 239.25 26.96 6,450.18 $187,559.51 $200,490.56 $29.08 10/14/99 IM 0253-142 125 AND SH 52 R D-17-DU 205.10 22.00 4,512.20 $186,141.63 $207,088.68 $41.25 11/04/99 BR 0402-051 DIAMOND CREEK R C-10-D 67.24 20.50 1,378.42 $97,653.25 $189,983.75 $70.84 12/09/99 BRS-RS(CX)0012(27) EAST OF STONEWALL M P-17-AF 47.84 25.67 1,228.05 $128,614.40 $141,848.40 $104.73 WEIGHTED AVERAGE COST= 63,510.94 $3,190,124.89 $50.23 CONCRETE BOX GIRDER CONTINUOUS PRESTRESSED 01/21/99 BR0741-006 MORRISON TO KITTREDGE M F-15-AC 219.14 41.87 9,174.33 $925,240.50 $1,164,445.50 $100.85 04/08/99 C 0006(019) S OF MERINO SH 6 P C-23-AO 229.60 40.42 9,281.05 $764,502.80 $916,298.00 $82.37 08/19/99 C138A-006 W OF JULESBURG,RR BRIDGE P A-27-P 264.48 42.36 11,202.83 $766,810.50 $970,981.00 $68.45 WEIGHTED AVERAGE COST= 29,658.21 $2,456,553.80 $82.83 j ) ) ) COLORADO DEPARTMENT OF TRANSPORTATION BRIDGE COST PER SQUARE FEET cc YEAR 1999 BID LET I PROJECT I LOCATION I RAIN I STRUCTUR E I LENGTH I WIDTH I TOTAL FT FT SQ FT I COSTS AREA ELIGIBLE I ALL COST I COST S FT R DATE NUMBER NUMBER . CONCRETE BOX GIRDER PRESTRESSED 07/15/99 BR 0403-025 EMPIRE JCT BRIDGE AT 1-70 M E-14-BH 79.60 34.88 2,776.11 $204,289.00 $315,532.50 $73.59 10/14/99 IM 0253-142 125 AND SH 52 R D-17-AP 322.52 94.60 30,511.47 $1,465,936.26 $2,007,042.98 $48.05 WEIGHTED AVERAGE COST= 33,287.58 $1,670,225.26 $50.18 CONCRETE PRESTRESSED GIRDER CONTINUOUS(PRECAST) 03/18/99 SP 0821-047 S1-182 SNOWMASS CREEK ENV M G-09-I 113.03 99.02 11,192.34 $816,793.00 $1,088,632.50 $72.98 04/01/99 IM0253-154 EAST OF LONGMONT R D-17-AJ 301.85 46.33 13,984.11 $515,620.60 $646,378.70 $36.87 04/08/99 STA 006A-029 DILLON TO KEYSTONE M F-12-I 86.16 85.70 7,383.81 $318,671.42 $524,060.56 $43.16 05/06/99 NH(CX)550-1(005) N/O NEW MEXICO STATE LINE R P-05-H 57.06 52.23 2,980.27 $187,148.74 $339,478.89 $62.80 05/06/99 NH(CX)550-1(005) N/O NEW MEXICO STATE LINE R P-05-I 150.14 46.33 6,955.58 $509,251.91 $706,243.37 $73.21 06/17/99 BR 0242-017 W OF LAKE GEORGE M I-15-AV 120.28 61.55 7,403.51 $392,995.42 $585,175.58 $53.08 07/29/99 BR 0361-056 BOULDER,88TH ST AT US 36 U E-16-QU 324.88 57.32 18,622.08 $1,222,730.18 $1,488,286.73 $65.66 09/30/99 BR 287-3(061) FEDERAL/US 36,PHS 5 U E-16-PX 344.37 114.77 39,523.56 $2,121,779.65 $2,537,360.15 $53.68 10/21/99 FC-NH(CX)024-3(36) SH 24&1-70,W OF LIMON P G-22-BY 495.14 43.01 21,297.72 $935,013.47 $1,116,403.31 $43.90 10/21/99 FC-NH(CX)024-3(36) SH 24&1-70,W OF LIMON P G-22-BZ 238.07 43.01 10,240.29 $478,478.81 $632,732.16 $46.73 10/14/99 NH 0341-046 WELD/MORGAN COUNTY LINE R C-19-AK 127.89 46.66 5,966.97 $406,174.00 $608,525.88 $68.07 10/21/99 STR 0361-045 SH 36,LYONS TO BOULDER R O-15-I 121.07 52.23 6,323.85 $240,840.14 $420,370.04 $38.08 WEIGHTED AVERAGE COST= 151,874.11 $8,145,497.34 $53.63 WELDED GIRDER 12/16/99 BR 0403-034 N OF 1-70,W OF GOLDEN M F-15-AD 175.63 33.01 5,797.06 $619,936.14 $741,712.03 $106.94 I COLORADO DEPARTMENT OF TRANSPORTATION BRIDGE COST PER SQUARE FEET DD YEAR 1999 BID LET I PROJECT I LOCATION I RAIN I STRUCTURE NUMBER RUCTE I LENGTH I WIDTH I TOTFT FT AL L AREA COSTS I ELIGIBLE I ALL COST I COST S FT R DATE NUMBER WELDED GIRDER CONTINUOUS I 06/24/99 STR 0131-037 SH 13 SOUTH OF ME EKER R D-05-A 271.80 42.39 11,521.66 $755,514.25 $893,243.70 $65.57 WELDED GIRDER CONTINUOUS&COMPOSITE 10/02/99 CC 2254-061 I-225 AT ALAMEDA U F-17-AX 420.20 39.01 16,392.37 $1,669,031.10 $1,823,634.20 $101.82 10/28/99 CC 2254-061 I-225 AT ALAMEDA U F-17-DZ 456.94 39.01 17,825.92 $1,710,456.10 $1,864,705.00 $95.95 WEIGHTED AVERAGE COST= 34,218.29 $3,379,487.20 $98.76 WELDED GIRDER COMPOSITE 01/07/99 BRO C140-004 WILLIAMSBURG,S/O FLORENCE R Williamsburg-1 65.06 32.54 2,116.82 $116,027.66 $147,527.66 $54.81 MAJOR REHABILITATION(REPLACE BRIDGE DECK,ETC.) 03/18/99 CC0703-253 I-70:BRIDGE REPAIR/DENVER WEST U F-16-LZ 129.00 109.00 14,061.00 $110,412.00 $110,412.00 $7.85 06/17/99 NH 4701-95 C 470 MORRISON RD TO 170 R F-16-LA,LB 149.50 113.80 17,013.10 $478,353.09 $575,728.99 $28.12 WEIGHTED AVERAGE COST= 31,074.10 $588,765.09 $18.95 MINOR REHABILITATION(REPLACE BRIDGE RAIL,EXPANSION JOINTS,ETC.) 04/01/99 NH 0701-150 DEBEQUE CANYON M H-03-AY 1,127.00 68.00 76,636.00 $263,971.70 $263,971.70 $3.44 04/01/99 NH 0701-150 DEBEQUE CANYON M H-03-BS 991.00 41.00 40,631.00 $99,921.80 $99,921.80 $2.46 04/01/99 NH 0701-150 DEBEQUE CANYON M H-03-BR 1,001.17 41.00 41,047.97 $103,791.50 $103,791.50 $2.53 04/01/99 NH 0701-150 DEBEQUE CANYON M H-03-BQ 998.00 41.00 40,918.00 $70,168.00 $70,168.00 $1.71 04/01/99 NH 0701-150 DEBEQUE CANYON M H-03-BP 998.02 41.00 40,918.82 $63,871.40 $63,871.40 $1.56 04/08/99 C 0006(019) S OF MERINO SH 6 P C-23-N 89.00 31.30 2,785.70 $17,305.54 $17,305.54 $6.21 / ) ) COLORADO DEPARTMENT OF TRANSPORTATION BRIDGE COST PER SQUARE FEET EE YEAR 1999 BID LET I PROJECT I LOCATION I RAIN I STRUCTURE RUCT NUMBER E I LENGTH I WIDTH I TOTAL O AREA I ELIGIBLE LOSL I ATT TOTAL I COST SO PER DATE NUMBER +I MINOR REHABILITATION(REPLACE BRIDGE RAIL,EXPANSION JOINTS,ETC.) 01/07/99 NH 0503-056 WEST OF PUEBLO P K-17-AC 164.00 42.00 6,888.00 $25,501.00 $25,501.00 $3.70 01/07/99 NH 0503-056 WEST OF PUEBLO P K-17-I 162.00 42.00 6,804.00 $25,340.00 $25,340.00 $3.72 04/08/99 C 0006(019) S OF MERINO SH 6 P C-23-O 407.00 31.50 12,820.50 $78,230.03 $78,230.03 $6.10 04/08/99 C 0006(019) S OF MERINO SH 6 P C-23-P 812.00 31.50 25,578.00 $155,933.20 $155,933.20 $6.10 05/06/99 STA 0061-067 S.H.6,GOLDEN TO FLOYD HILL M F-15-X 588.00 34.00 19,992.00 $160,719.00 $160,719.00 $8.04 06/03/99 SHE 0502-042 US 50 GUARDRAIL M K-11-F 37.00 37.99 1,405.63 $19,640.00 $19,640.00 $13.97 06/03/99 SHE 0502-042 US 50 GUARDRAIL M K-11-G 39.04 35.00 1,366.40 $12,882.00 $12,862.00 $9.43 06/03/99 SHE 0502-042 US 50 GUARDRAIL M J-12-Y 40.00 24.00 960.00 $7,155.00 $7,155.00 $7.45 06/03/99 SHE 0502-042 US 50 GUARDRAIL M J-12-Z 40.00 26.42 1,056.80 $7,155.00 $7,155.00 $6.77 07/15/99 BR 0403-025 EMPIRE JCT BRIDGE AT I-70 M E-14-S 330.00 30.00 9,900.00 $35,877.00 $35,877.00 $3.62 08/26/99 STA C 030-018 W/O AULT B W/BRIGGSDALE P B-17-L 116.00 30.00 3,480.00 $72,169.30 $72,169.30 $20.74 10/14/99 NH 0341-046 WELD/MORGAN COUNTY LINE R C-20-D 68.00 44.00 2,992.00 $57,724.54 $57,724.54 $19.29 11/18/99 STA 2873-103 N/O VIRGINIA DALE AT DALE CR R A-15-A 165.00 34.00 5,610.00 $277,400.00 $277,400.00 $49.45 12/06/99 M 06-001 SH 121,BROOMFIELD U E-16-HR 114.00 30.50 3,477.00 $106,492.00 $106,492.00 $30.63 12/06/99 M 06-001 SH 121,BROOMFIELD U E-16-HS 115.00 42.50 4,887.50 $119,853.00 $119,853.00 $24.52 12/06/99 M 06-001 SH 121,BROOMFIELD U E-16-HV 232.00 35.20 8,166.40 $125,882.00 $125,882.00 $15.41 12/06/99 M 06-001 SH 121,BROOMFIELD U E-16-FK 231.00 34.00 7,854.00 $165,948.00 $165,948.00 $21.13 12/06/99 M 06-001 SH 121,BROOMFIELD U E-16-IM 161.08 72.50 11,678.30 $163,657.00 $163,657.00 $14.01 12/16/99 NH 0062-011 US 6,UNION TO WADSWORTH U F-16-ER 132.00 96.00 12,672.00 $149,760.70 $149,760.70 $11.82 12/16/99 NH 0062-011 US 6,UNION TO WADSWORTH U F-16-O 52.00 112.00 5,824.00 $131,049.70 $131,049.70 $22.50 12/16/99 NH 0062-011 US 6,UNION TO WADSWORTH U F-16-EP 170.00 116.00 19,720.00 $105,703.70 $105,703.70 $5.36 WEIGHTED AVERAGE COST= 416,070.02 $2,623,102.11 $6.30 Note: The costs for the new bridges are calculated using the requirements of the Federal Highway Administration(FHWA). TERRAIN LEGEND In a letter dated February 7,2000,the FHWA includes a list of items which should not be included when calculating the M (MOUNTAINOUS unit cost for bridges. These items include: Mobilization,Removal of Existing Bridge,Slope Paving,Lighting, Electrical P I PLAINS Conduits and Structure Backfill(Flow-Fill). The costs for all items mentioned in the FHWA letter have been removed R 'ROLLING from the eligible costs. Some information such as structure length and width were obtained from ad plans. All english U 'URBAN and metric projects have been converted to english units for this summary. 3 2000 COST DATA (ENGLISH) Wanatom= Compiled By Engineering Estimates and Market Analysis Unit of the Agreements and Market Analysis Branch January 1, 2001 COLORADO COST DATA FOREWORD The Colorado Department of Transportation's Engineering Estimates and Market Analysis (EEMA) Unit, of the Agreements and Market Analysis Branch,publishes the Cost Data Book annually. A joint effort has been made between the Department's sections and the EEMA Unit to gather and record cost data for this publication. The following data includes weighted average prices for items on highway construction projects that were bid during the 2000 calendar year. Caution should be used in applying these historical averages to specific projects. Allowances for varying geographic, climatic, social, and economic conditions should be made. Changes and improvements are continually being made to update and increase the usefulness for future issues. Comments and suggestions for improvements for users of this publication are welcome. A copy of this book is also available on CD-ROM. Copies of this publication may be obtained Colorado Department of Transportation for$25.00 per hard copy, $10 CD-ROM,from: Bid Plans, Room 117 4201 E. Arkansas Avenue Denver, Colorado 80222 Phone: 303-757-9313 2000 COST DATA ENGLISH TABLE OF CONTENTS # OF PAGES LIST OF 2000 BID PROJECTS 4 PROJECT COST DIVIDED BY CATEGORIES 8 BRIDGE COST PER SQUARE FEET 5 ITEM AVERAGE BID PRICES 38 ITEM UNIT COSTS BY PROJECT 697 Colorado Dept.of Transportation Cost Data Book Part One From 01/01/2000 TO 12/31/2000 List of Bid Projects Bid Project # of Bids Awarded Letting Number Contractor Locations Region Terrain Received Bid *index 00010601 IM 0704-190 ASPHALT PAVING CO. I-70,SH2 TO 1-270 6 U 5 $3,646,951.80 92.90 00010603 R600-133 COLORADO STRIJPE WRIGHT LTD R-6 FREEWAY STRIPING 6 U 3 $1,396,000.00 105.36 00010604 R600-134 KOLBE STRIPING INC. R-6 ARTERIAL STRIPING 6 U 2 $1,241,760.00 92.38 00010605 SHE R500-039 MARK RITE LINES OF MONTANA,INC. R5-EPDXY PVT 5 R 4 $997,266.00 69.45 00010606 SHE R500-043 WARNING LITES&EQUIPMENT,INC. R5-SIGN REPLACEMENT 5 R 7 $398,440.00 74.16 00010607 STA 165A-006 K.R.SWERDFEGER INC. PUEBLO COUNTY SLIDE 2 R 6 $199,802.10 93.66 00010608 NH 1603-014 D.G.HUSKIN CONSTRUCTION CO. SII10&US160 E&W OF WALSNBRG 2 R 5 $2,959,600.17 75.45 00010609 STA 0091-015 ASPHALT PAVING CO. FRISCO&BRECKENRIDGE OVERLAY 1 M 4 $1,345,629.50 100.19 00010610 STR 0343-017 LAFARGE dba WESTERN MOBILE NORTHERN AKRON TO WRAY 4 P 3 $3,693,844.43 88.74 00011302 NH 050A-005 KIRKLAND CONSTRUCTION NW OF PUEBLO 2 R 5 $2,815,677.70 89.98 00011305 M 05-001 ARMOR COATINGS,INC. ALAMOSA JOINT&CRACK SEALANT 5 P 5 $222,145.42 63.20 00011306 MC 0711-013 TLM CONSTRUCTORS,INC. DAM BET ORDWAY&ROCKY FORD 2 P 8 $227,569.55 88.56 00011307 M 06-001 HALLMARK,INC. SH 121,BROOMFIELD 6 U 2 $612,459.80 97.62 00011308 STA 1151-010 EVEN CONST INC.dba EVEN-PREISSER,INC. SH 115&STARR RANCH,SAFETY 2 R 4 $472,765.95 101.00 00012001 IM 0252-329 SEMA CONSTRUCTION,INC COLO.SPGS.I-25 NB 2 R 6 $13,635,156.32 84.24 00012002 IM 0702-222 LAFARGE dba WESTERN MOBILE NORTHERN EAGLE TO AVON 3 M 4 $5,223,168.97 85.53 00012003 IM 0251-157 SCHMIDT CONSTRUCTION COMPANY I-25 N/O PUEBLO 2 P 4 $4,768,496.39 84.13 00012004 M 02-001 TLM CONSTRUCTORS,INC. REGION 2 BRIDGE DECK REPAIRS 2 R 2 $166,533.00 124.45 00012005 M 02-002 TLM CONSTRUCTORS,INC. REGION2 BRIDGEJNT REPAIRS 2 R 2 $176,271.00 100.12 00012006 STA 0131-040 BURDICK PAVING,INC. MEEKER 3 R 8 $1,029,865.12 69.29 00012007 STA141A-027 D.G.BUSKIN CONSTRUCTION CO. SH 141,MINOR OVERLAY 5 M 6 $1,556,918.71 89.75 00012008 NH 0402-057 CONNELL RESOURCES,INC. W SIDE OF RABBIT EARS 3 M 5 $1,987,231.10 84.22 00012009 NH 0252-331 SCHMIDT CONSTRUCTION COMPANY NEVADA AVE N/O I-25 2 U 5 $1,224,477.50 98.99 00012701 STA 149A-018 D.G.BUSKIN CONSTRUCTION CO. CREEDE-NORTH 5 M 4 $2,788,822.08 97.22 00012703 IM 0703-248 PCL CIVIL CONSTRUCTORS,INC. WIIEATRIDGE NOISEWALL 6 U 9 $1,448,805.25 79.46 00012704 SHE R600-141 DKS ENTERPRISES INC. SIGNAL AT I25/HWY7 6 P 3 $179,300.25 71.19 00012705 NH 0501-042 ELAM CONSTRUCTION,INC SE OF GRAND JCT 3 R 2 $1,373,126.70 91.48 00012706 BR 0641-010 COLORADO CONSTRUCTORS,INC. BETWEEN RANGELY AND MEEKER 3 R 7 $447,071.20 101.15 00012707 IM 0703-264 KIMSEY ELECTRICAL CONTRACTING SOUTH BORE TUNNEL LIGHTING 1 M 2 $7,479,437.00 76.50 00021001 M 06-002 RANDALL&BLAKE,INC. I-76,I-70&I-225 BRIDGE REHAB 6 U 4 $521,691.00 98.09 00021002 M 04-002 BEST-WAY PAVING CO. R-4 EXP JOINTS INSTALLATION 4 R 4 $94,865.76 63.60 00021003 M 04-001 KIEWIT WESTERN CO US 34 BRIDGE REHABILITATION 4 R 4 $473,841.50 103.78 00022401 SHE R300-060 MARK RITE LINES OF MONTANA,INC. R-3 STRIPING 3 M 1 $1,371,053.41 81.71 Thursday,March 22,2001 Page 1 of 4 Bid Project # of Bids Awarded Letting Number Contractor Locations Region Terrain Received Bid *Index 00022402 STA 1192-008 KIEWIT WESTERN CO SH I I9,BLACK HAWK-MISSOURI LK 1 M 1 $2,713,984.50 117.05 00022403 NH 0703-262 ROCKY MOUNTAIN SIGNING CO.INC. GEORGETOWN TO IDAHO SPRINGS 1 M 1 $746,301.41 93.52 00030201 C M240-047 LAWRENCE CONSTRUCTION CO. COLO SPGS,POWERS BLVD 2 U 12 $2,007,400.07 73.54 00030202 C 0852-041 DONE RIGHT STRIPING&BARRICADE,INC. STRIPING,GREELEY BYPASS 4 R 5 $348,320.00 55.14 00030203 STA 0831-083 JACKSON CONST.MGMT. CHATFIELD MTNCE FACILITY 6 U 2 $236,904.95 110.11 00030901 CR 400-103 HALCO PATCHING&SEALING,INC. CRACK SEAL-R4 4 R 6 $135,770.00 70.35 00030902 SHE 1602-072 COMMERCIAL ROCK PRODUCTS,INC. E/O DURANGO ROCK FALL MAT. 5 R 8 $474,398.00 100.04 00030903 BR 067A-010 BLUE RIDGE CONSTRUCTION,INC. TROUT CRK BRDG REPLACEMENT 2 M 11 $1,663,166.37 98.31 00040601 NH 0505-032 A&S CONSTRUCTION CO.&AFFILIATED CO. LAS ANIMAS 2 P 5 $2,587,000.00 105.02 00040602 SP 0821-053 SEMA CONSTRUCTION,INC. SH 82 ABC TO BUTTERMILK 3 R 3 $11,366,679.65 117.04 00041302 NH 0503-058 LAFARGE dba WESTERN MOBILE NORTHERN CANON CITY TO COTOPAXI 2 M 5 $4,262,199.28 93.38 00041303 SHE R300-061 WARNING LITES&EQUIPMENT,INC. R3 SIGN REPLACEMENT 3 M 4 $815,640.00 76.66 00042001 IM 2706-030 IIAMON CONTRACTORS,INC. I-270 EXTENSION,PH II&III 6 U 11 $20,935,636.04 90.18 00042003 NH 0404-036 ASPHALT SPECIALTIES CO.,INC. COLFAX,TABOR TO KIPLING 6 U 4 $1,423,249.00 89.07 00042004 NH 0243-062 EDWARD KRAEMER&SONS INC. PLATTE/POWERS INTERCHG,COLO SP 2 U 8 $10,451,623.57 74.42 00042701 IM R400-091 IN-LINE TRAFFIC MARKING CO,INC. R-4 PAVEMENT'MARKING 4 R 3 $1,071,900.00 81.98 00042702 STA 145A-026 LAFARGE dba WESTERN MOBILE NORTHERN LIZARD HEAD PASS 5 M 6 $2,485,525.50 111.36 00042703 IM 0704-196 POWER ELECTRIC COMPANY I-70&E-470 VMS 1 U 6 $354,926.05 96.31 00042704 STA 062A-009 D.G.HUSKIN CONSTRUCTION CO. SH 62,EAST OF PLACERVILLE 5 M 6 $2,376,437.52 107.53 00042706 BR 067A-008 LAWRENCE CONSTRUCTION CO. SOUTH OF FLORENCE 2 R 12 $1,872,723.39 79.37 00050401 IM 0704-184 CASTLE ROCK CONSTRUCTION 1-70 PEORIA-EAST 1 U 4 $8,286,657.80 79.54 00050402 SHE R600-135 KOLBE STRIPING INC. REGION 6 SIGNING,FY 2000 6 U 3 $139,670.20 65.13 00051101 STA 0852-085 KIEWIT WESTERN CO SANTA FE NEAR CHATFIELD 1 U 2 $549,463.00 87.42 00051103 NH R300-070 ELAM CONSTRUCTION,INC. GRAND JUNCTION VARIOUS LOCS. 3 U 2 $2,805,934.30 99.83 00051104 MTCE 02-003 LAFARGE dba WESTERN MOBILE SOUTHERN SH 67,TELLER COUNTY 2 M 4 $734,531.65 98.10 00051105 C R200-092 KOLBE STRIPING INC. REGIONWIDE STRIPING 2000 2 P 2 $1,444,904.20 86.78 00051801 PLH-FH-065A-0 D.G.HUSKIN CONSTRUCTION CO. SH65,GRAND MESA 3 M 6 $1,842,704.78 109.75 00051802 R 400-090 KOLBE STRIPING INC. R4 WEST STENCIL MKGS 4 P 5 $248,604.25 76.05 00051803 IM R400-093 COLORADO BARRICADE CO.,INC. R4 SIGN UPGRADE 4 P 4 $967,676.50 100.54 00051804 SHE 141A-026 MYR GROUP,INC.dba Sturgeon Electric GRAND JUNCTION SIGNALS 3 U 3 $93,346.00 99.62 00060101 C R300-071 WAY WESTERN L.L.C. R3 FENCING 3 M 3 $404,771.50 77.24 00060801 STA 0402-060 INTERMOUNTAIN SLURRY SEAL,INC. NORTH OF KREMMLING 3 M 4 $835,538.00 100.60 00060802 STU R600-146 W.L.CONTRACTORS,INC. REGIONWIDE VAR MSG SIGNS 6 U 3 $294,523.00 98.48 00060803 STA 0961-005 LAFARGE dba WESTERN MOBILE NORTHERN SH 96,TOWNER 2 P 6 $1,648,226.00 106.95 00061502 STA 3851-012 TLM CONSTRUCTORS,INC. SH 385,BURLINGTON 1 P 3 $2,739,142.00 110.68 00061503 CM 240-055 ELECTRICAL EXCELLENCE COLD SPGS INTERSECT. 2_____U 3 $787,729.99 106.43 Thursday,March 22,2001 Page 2 of 4 4. ) ) Bid Project # of Bids Awarded Letting Number Contractor Locations Region Terrain Received Bid *Index 00062202 STA 0821-057 ELAM CONSTRUCTION,INC GLENWOOD SOUTH 3 M 3 $2,271,045.70 79.90 00062901 C C4701-093 CONCRETE EXPRESS,INC. CIIATFIELD BIKE TRAIL 6 U 11 $497,119.55 93.44 00062902 NH 0701-154 M.A.CONCRETE CONSTRUCTION,INC. GRAND JUNCTION OVERLAY 3 U 2 $1,527,699.25 87.04 00070601 CSW00-164 WARNING LITES&EQUIPMENT,INC. STATEWIDE ART.INT.SIGNS 6 U 4 $918,480.00 106.15 00072001 STA 086A-031 LAFARGE dba WESTERN MOBILE NORTHERN ELIZABETH,E&W 1 R 2 $2,239,198.45 98.07 00072003 NH 0405-028 KIEWIT WESTERN CO COLFAX,TOWER TO I-70 1 U 5 $896,256.80 83.89 00072701 NH 0243-060 C&K OF FOUNTAIN,INC. SH 24,W OF FALCON TO PEYTON 2 P 9 $3,150,394.20 119.04 00072703 IM 0703-250 RANDALL&BLAKE,INC. STRAIGHT CRK/I-70 SLOPE REHAB 1 M 4 $1,712,891.00 128.98 00072704 C 1603-017 ASPHALT CONSTRUCTORS INC. FT.GARLAND 5 P 2 $769,619.05 103.55 00072705 C6662-007 A&S CONSTRUCTION CO.&AFFILIATED CO. OVERLAY,N/O CAHONE-UTAH 5 M 7 $4,237,531.00 86.00 00072706 STA 0741-012 GRIMM CONSTRUCTION COMPANY,INC. SH 74,KITTREDGE 1 M 4 $414,736.90 109.01 00080301 NHB 0821-052 AMES CONSTRUCTION,INC SH 82 SNOWMASS CANYON 3 M 3 $93,398,000.00 106.08 00080303 IM 0703-260 YENTER COMPANIES,INC. GEORGE TOWN ROCK FALL FENCE 1 M 3 $301,117.97 56.31 00080304 C 0403-043 KIEWIT WESTERN CO EAST OF BLACKHAWK 1 M 1 $892,319.37 90.64 00081001 NH 1602-074 KIEWIT WESTERN CO WOLF CREEK PASS UPPER NARROWS 5 M 4 $10,346,810.80 85.63 00081002 IM0252-321 PCL CIVIL CONSTRUCTORS,INC. 5TH ST.OVERPASS-CASTLE ROCK 1 R 8 $3,277,942.00 88.03 00081003 NH 2854-068 LAWRENCE CONSTRUCTION CO. FOXTON RD.TO EAGLE CLIFF RD. 1 M 5 $21,100,930.37 101.23 00081701 IM 0252-214 CENTRIC-JONES,LLC RAMPS,H AT COLFAX&A AT 6TH 6 U 4 $6,984,230.09 91.07 00081702 SHE R500-047 MARK RITE LINES OF MONTANA,INC. R5-EPDXY 5 R 4 $182,563.00 67.09 00083103 C 133A-027 VENTER COMPANIES,INC. SH133 GUNNISON COUNTY 3 M 3 $273,461.20 82.95 00090702 MC 0502-051 KAESS CONTRACTING,INC. EAST OF MONTROSE 3 R 3 $1,084,340.00 123.38 00091401 NH 2873-109 YENTER COMPANIES,INC. LAFAYETTE INTERSECTION 4 R 2 $408,882.07 99.46 , 00091402 NH 0341-052 MARQUO,INC. R4 SIGNING 4 U 5 $121,860.10 107.03 00091403 MTCE 05-004 BFC,INC. R-5 JOINT&CRACK SEAL 5 M 3 $577,509.00 82.74 00092801 NH 2873-104 ASPHALT SPECIALTIES CO.,INC. LOVELAND TO CAMPION 4 R 9 $8,759,789.75 70.06 00092802 SHE 0505-034 CARDER,INC. SH 50 E OF LAMAR AT WAL-MART 2 P 4 $235,346.22 94.18 00100501 NH 0761-164 CONCRETE WORKS OF COLORADO INC WIGGINS REST AREA 4 R 4 $2,919,432.11 101.37 00100502 SHE 402A-004 MOUNTAIN CONSTRUCTORS,INC. SE OF LOVELAND 4 P 4 $212,459.00 88.16 00101201 NH 0403-039 CONCRETE WORKS OF COLORADO INC. EMPIRE DRAINAGE 1 M 5 $572,051.98 114.11 00101902 BR 0504-029 TARCO,INC. SII50&SANTAFE DRIVE INT. 2 U 8 $8,987,666.74 97.99 00101904 C R200-101 KOLBE STRIPING INC. R-2,SIGN MTCE 2 R 5 $598,760.00 137.85 00102602 IM 0762-041 CASTLE ROCK CONSTRUCTION ATWOOD TO US6 4 P 4 $21,197,303.87 104.18 00102603 IM R100-066 UNITED RENTALS TECHNOLOGIES,INC. RI-STRIPING 1 R 3 $1,428,556.00 91.32 00102604 R600-149 MYR GROUP,INC.dba Sturgeon Electric SH 121 SH RR&US 6'UPGRADE SIG 6 U 4 $764,938.50 110.79 00102605 C 110-013 MYR GROUP,INC.dba Sturgeon Electric SIGNALS AT SH58,SI I93,&SH26/U540 6 U 4 $585,689.35 109.60 00102607 STA 119A-045 VENTER COMPANIES,INC. US6&SHI 19 RCKFALL MITIGATN 1 M 3 $308,946.51 89.48 Thursday,March 22,2001 Page 3 of 4 Bid Project # of Bids Awarded Letting Number Contractor Locations Region Terrain Received Bid 'Index 00110901 C030-020 LAFARGE dba WESTERN MOBILE NORTHERN R-4 OVERLAY,WELD COUNTY 4 R 6 $6,048,484.40 105.39 00110902 BR 144A-018 LAWRENCE CONSTRUCTION CO. NW OF F.MORGAN 4 P 12 $2,167,349.73 101.11 00111604 STA 0362-019 LAFARGE dba WESTERN MOBILE NORTHERN LAST CHANCE-E/O ANTON 4 P 5 $5,330,589.10 98.21 00111605 C M356-018 MYR GROUP,INC.dba Sturgeon Electric SH287,SH7 TRAFFIC SIGNALS 6 P 0 $249,428.47 87.50 00111606 CC 2873-110 JALISCO INTERNATIONAL,INC. COLFAX/FEDERAL INT 6 U 8 $1,598,073.03 101.15 00111607 R 600-156 RANDALL&BLAKE,INC. R-6 BRIDGE DECK REPAIR 6 U 3 $1,295,609.00 72.66 00113001 BR 0401-016 CIVIL CONSTRUCTORS,INC. EAST OF MAYBELL 3 R 8 $779,011.70 118.91 00113002 STU C100-011 ASPHALT SPECIALTIES CO.,INC. ARAPAHOE&PARKER RD. 6 U 8 $2,080,794.90 110.82 00113003 NH 0252-335 KIEWIT WESTERN CO NEVADA AVE-COLO SPGS 2 U 3 $1,621,938.00 85.76 00113004 C R400-111 ARMOR COATINGS,INC. R-4 CRACK SEAL FY 2001 4 P 0 $263,275.20 117.98 00113006 STA C 370-004 LAWSON CONSTRUCTION CO. SH 6 PHILLIPS CO 4 P 5 $7,033,260.32 95.71 00120701 STA 095A-004 AGGREGATE INDUSTRIES-WCR,INC, SHERIDAN,HAMPDEN TO EVANS 6 P 6 $1,425,374.96 101.08 00120702 NH 2854-084 A&S CONSTRUCTION CO.&AFFILIATED CO. FAIRPLAY N&S II 1 M 6 $1,127,000.00 92.85 00120703 NH 0242-033 SCHMIDT CONSTRUCTION COMPANY US 24 W/O MANITOU SPRINGS 2 P 5 $4,231,645.82 72.49 00120704 NH 0505-033 KIRKLAND CONSTRUCTION US 50,WEST OF GRANADA 2 P 6 $2,397,947.45 68.52 00121401 STA 1211-053 INTERSTATE HIGHWAY CONSTRUCTION WADSWORTH,BOWLES TO 470 6 U 4 $4,923,611.98 95.37 00121403 NH 0702-217 GRANITE CONSTRUCTION COMPANY GLENWOOD CANYON RESURFACING 3 M 4 $10,597,597.00 106.48 00121404 STM 067A-021 KIRKLAND CONSTRUCTION E/O BEULAH&FLORENCE S 2 P 4 $1,038,350.75 91.64 00121405 STA 0961-009 LAFARGE dba WESTERN MOBILE SOUTHERN PUEBLO 4TH ST 2 U 2 $710,668.26 98.36 00122101 STA 059A-027 RITCHIE PAVING,INC. KIT CARSON TO I-70(SIT 59) 1 P 8 $2,586,296.41 79.62 00122103 STA 177A-002 ASPHALT SPECIALTIES CO,INC. SH 177,BELLEVIEW TO HAMIDEN 6 U 4 $1,599,990.00 94.22 00122104 STA 0402-062 D.G.HUSKIN CONSTRUCTION CO. JCT 134 TO TABERNASH 3 R 6 $3,117,314.54 95.94 00122105 STE C200-003 HENSEN CONSTRUCTION&DEVELOPMENT CO DURANGO PED BRIDGE 5 M 1 $394.775.00 97.90 Total No.of Projects=128 Avg. Cost per Project=$3,321,121.23 Total Awarded Bid=$425,103,517.07 Average#of Bidder per Project=4.6 *Index=100 X(Awarded Bid)/(Enginerring Estimate) Thursday,March 22,2001 Page 4 of 4 ) ) ) Colorado Dept.of Transportation Cost Data Book Part Two From 01/01/2000 TO 12/31/2000 Project Cost Categorized by Five Major Sections* Bid Letting Prl.Num. Work Earth Work Bases Pavements Structures Miscellaneous Total Locations Type Section 200 Section 300 Section 400 Section 500 Section 600 Cost 00010601 IM 0704-190 001 $228,941 $0 $1,725,095 $0 $1,692,915 $3,646,952 I-70,SH2 TO 1-270 00010603 R600-133 017 $525,000 $0 $0 $0 $871,000 $1,396,000 REGION 6 FREEWAY STRIPING 00010604 R600-134 005 $425,250 $0 $0 $0 $816,510 $1,241,760 REGION 6 ARTERIAL STRIPING 00010605 SHE R500-039 017 $31,325 $0 $0 $0 $965,941 $997,266 REGION-WIDE PAVEMENT MARKING 00010606 SHE R500-043 022 $9,375 $0 $0 $0 $389,065 $398,440 REGION-WIDE SIGN REPLACEMENT 00010607 STA 165A-006 005 $50,413 $3,600 $17,600 $0 $128,189 $199,802 RYE SLIDE AREA 00010608 NH 1603-14 001 $240,407 $0 $2,089,038 $0 $630,156 $2,959,600 SH 10 and SH 160,Walsenburg E&W 00010609 STA 0091 015 001 $169,410 $1,775 $691,170 $5,386 $477,889 $1,345,630 FRISCO AND BRECKENRIDGE OVERLAYS 00010610 STR 0343-017 001 $89,991 $481,114 $2,637,519 $16,911 $468,310 $3,693,844 S.H.34 WASHINGTON AND YUMA COUNTIES 00011302 NH 050A-005 001 $249,068 $0 $2,037,726 $2,597 $526,286 $2,815,678 W McCULLOCH BLVD TO BALTIMORE AVE 00011305 M 05-001 022 $0 $0 $221,145 $0 $1,000 $222,145 ALAMOSA JOINT AND CRACK SEALANT 00011306 MC 0711-013 004 $70,089 $1,200 $1,540 $41,059 $113,682 $227,570 Lake Meredith Canal 00011307 M 06-001 022 $157,135 $0 $21,070 $112,515 $321,740 $612,460 SH 121, BROOMFIELD 00011308 STA 1151-010 009 $39,472 $0 $106,799 $192 $326,303 $472,766 SH 115,CHEYENNE MEADOWS/STAR RANCH INTERSECTION 00012001 IM 0252-329 012 $2,617,780 $211,749 $3,814,735 $556,399 $6,434,493 $13,635,156 BIJOU TO FILLMORE(NORTHBOUND) 00012002 IM 0702-222 020 $343,318 $137,260 $3,565,180 $56,973 $1,120,438 $5,223,169 Eagle East Thursday, March22, 2001 Page 1 of 8 Bid Letting Prj.Num. Work Earth Work Bases Pavements Structures Miscellaneous Total Locations Type Section 200 Section 300 Section 400 Section 500 Section 600 Cost 00012003 IM 0251-157 001 $765,567 $0 $2,663,795 $13,232 $1,325,902 $4,768,496 RESURFACING I25-NORTH 00012004 M 02-001 002 $34,625 $0 $44,220 $6,908 $80,780 $166,533 REGION 2 BRIDGE DECK REPAIRS 00012005 M 02-002 002 $32,000 $0 $0 $91,161 $53,110 $176,271 REGION 2 EXPANSION JOINT REPAIRS 00012006 STA0131-040 021 $6,619 $29,394 $782,541 $0 $211,311 $1,029,865 MEEKER 00012007 STA 141A-027 001 $26,413 $32,224 $1,223,331 $4,656 $270,294 $1,556,919 MINOR OVERLAY HWY 141 00012008 NH 0402-057 001 $38,986 $30,472 $1,529,693 $0 $388,080 $1,987,231 WEST SIDE OF RABBIT EARS 00012009 NH 0252-331 001 $163,689 $0 $576,521 $0 $484,268 $1,224,478 NEVADA AVE,UINTAH-S 00012701 STA 149A-018 001 $48,824 $151,643 $2,235,212 $0 $353,143 $2,788,822 CREEDE NORTH 00012703 IM 0703-248 015 $69,653 $0 $51,506 $337,855 $993,242 $1,452,255 170 AND TABOR NOISEWALL 00012704 SHE R600-141 009 $2,384 $0 $605 $0 $176,311 $179,300 HWY 7 AT 1-25 SIGNAL PLACEMENT 00012705 NH 0501-042 020 $32,585 $50,580 $1,016,665 $0 $273,297 $1,373,127 UNAWEEP-EAST 00012706 BR 0641-010 003 $78,338 $62,145 $52,028 $0 $254,561 $447,071 BOISE CREEK 00012707 IM 0703-264 005 $306,680 $0 $0 $0 $7,172,757 $7,479,437 SOUTH BORE TUNNEL LIGHTING 00021001 M 06-002 002 $104,865 $0 $9,276 $0 $407,550 $521,691 1-76, 1-70&1-225 BRIDGE REHABILITATION 00021002 M 04-002 002 $0 $0 $0 $94,866 $0 $94,866 R-4 EXPANSION JOINTS INSTALLATION 00021003 M 04-001 002 $262,936 $0 $23,850 $39,433 $147,623 $473,842 US 34 BRIDGE REHABIUTATION 00022401 SHE R300-060 005 $100 $0 $0 $0 $1,370,953 $1,371,053 PAVEMENT MARKINGS-REGION 3 Thursday, March 22,2001 Page 2 of 8 Bid Letting P7•Num. Work Earth Work Bases Pavements Structures Miscellaneous Total Locations Type Section 200 Section 300 Section 400 Section 500 Section 600 Cost 00022402 STA 1192-008 010 $867,896 $11,590 $611,912 $37,372 $1,185,215 $2,713,985 BLACKHAWK-NORTH__ _ 00022403 NH 0703-262 005 $55,637 $0 $0 $0 $690,664 $746,301 FY 00 1-70 SIGNING 00030201 C M240-047 013 $146,668 $0 $26,079 $275,604 $1,559,049 $2,007,400 POWERS-WOODMEN TO RESEARCH(C) 00030202 C 0852-041 005 $500 $0 $0 $0 $347,820 $348,320 UPGRADE STRIPING-GRLY BYPASS 00030203 STA0831-083 017 $30,938 $5,994 $912 $0 $199,061 $236,905 Chatfield Reservoir COE Maintenance Facility 00030901 C R400-103 020 $0 $0 $127,270 $0 $8,500 $135,770 R-4 CRACK SEAL FY 2000 00030902 SHE 1602-072 020 $174,686 $0 $50,121 $0 $249,591 $474,398 ROCK FALL MITIGATION 00030903 BR 067A-010 003 $473,427 $43,566 $160,032 $399,963 $586,179 $1,663,166 TROUT CREEK BRIDGE REPLACEMENT 00040601 NH 0505-036 004 $373,659 $312,587 $777,473 $0 $1,123,282 $2,587,000 RR OVERPASS TO ARK RIVER BRIDGE 00040602 SP0821-053 011 $2,696,894 $334,990 $1,703,183 $106,129 $6,525,485 $11,366,680 SH 82,ABC TO BUTTERMILK 00041302 NH 0503-058 001 $201,682 $77,330 $2,556,111 $6,791 $1,420,285 $4,262,199 TEXAS CREEK TO PARKDALE 00041303 SHE R300-061 005 $54,570 $0 $0 $0 $761,070 $815,640 SIGN REPLACEMENT,REGION 3 00042001 IM 2706-030 013 $3,728,332 $275,348 $4,586,951 $2,946,047 $9,398,958 $20,935,636 270 EXTENSION PHASE II AND III 00042003 NH 0404-036 001 $251,163 $14,805 $368,781 $3,660 $784,840 $1,423,249 US 40,TABOR TO KIPLING 00042004 NH 0243-062 012 $2,251,242 $20,968 $1,487,580 $526,553 $6,165,281 $10,451,624 PLATTE/POWERS 00042701 IM R400-091 005 $234,897 $0 $0 $0 $837,003 $1,071,900 R-4 EPDXY PAVEMENT MARKINGS 00042702 STA 145A-026 021 $20,364 $38,088 $1,968,564 $0 $458,510 $2,485,526 MINOR OVERLAY SH 145 Thursday, March 22,2001 Page 3 of 8 Bid Letting Prj.Num. Work Earth Work Bases Pavements Structures Miscellaneous Total Locations Type Section 200 Section 300 Section 400 Section 500 Section 600 Cost 00042703 IM 0704-196 005 $7,837 $0 $5,735 $11,375 $329,979 $354,926 1-70 VMS AT TOWER&AT E-470 00042704 STA062-009 004 $14,683 $39,037 $1,875,325 $0 $447,393 $2,376,438 SH 62 OVERLAY 00042706 BR 067A-008 003 $216,083 $0 $515,891 $54,621 $1,086,129 $1,872,723 I BRIDGES 5/O FLORENCE 00050401 IM 0704-184 012 $1,014,211 $24,052 $5,683,451 $120,891 $1,444,053 $8,286,658 Peoria East 00050402 R600-135 009 $24,090 $0 $0 $0 $115,580 $139,670 REGION WIDE SIGN REPLACEMENT 00051101 STA 0852-085 008 $59,297 $2,385 $331,515 $0 $156,266 $549,463 SH85,C470-SOUTH 00051103 NH R300-070 001 $342,861 $16,642 $1,770,757 $10 $675,665 $2,805,934 GRAND JCT.VARIOUS LOCATIONS 00051104 MTCE02-003 020 $16,548 $33,746 $613,184 $0 $71,054 $734,532 SH 67 ASPHALT OVERLAY 00051105 C R200-092 005 $23,652 $0 $6,732 $0 $1,414,520 $1,444,904 REGIONWIDE STRIPING FY00 00051801 PLH-FH 065A-017 021 $45,800 $225,690 $1,363,879 $0 $207,336 $1,842,705 GRAND MESA 00051802 C R400 090 005 $0 $0 $0 $0 $248,604 $248,604 R-4 STENCIL MARKINGS WEST I 00051803 IM R400-093 005 $155,000 $0 $0 $0 $812,677 $967,677 I R-4 SIGN UPGRADE 00051804 SHE 141A-026 009 $0 $0 $0 $0 $93,346 $93,346 B.5 RD SIGNAL 00060101 C R300-071 017 $65,352 $0 $0 $0 $339,420 $404,772 REGION WIDE FENCING 00060801 STA0402-060 021 $0 $150 $488,466 $0 $346,922 $835,538 MUDDY PASS CAMP-EAST 00060802 STU R600 146 017 $9,380 $0 $0 $50,816 $234,327 $294,523 VMS INSTALATION 00060803 STA0961-007 001 $134,397 $0 $1,281,052 $0 $232,777 $1,648,226 SH 96,TOWNER Thursday, March 22,2001 Page 4 of 8 > ) ) Bid Letting Prj.Num. Work Earth Work Bases Pavements Structures Miscellaneous Total Locations Type Section 200 Section 300 Section 400 Section 500 Section 600 Cost 00061502 STA 3851-012 012 $258,693 $34,401 $884,718 $15,653 $1,545,677 $2,739,142 8TH AVENUE/BURLINGTON 00061503 CM 240-055 009 $53,839 $0 $215,782 $0 $518,109 $787,730 TRAFFIC SIGNAL/INTERSECTION IMPROVEMENTS 00062202 STA0821-057 021 $178,517 $74,978 $1,522,313 $0 $495,238 $2,271,046 GLENWOOD SOUTH 00062901 C C4701-093 017 $109,232 $0 $22,398 $0 $365,490 $497,120 CHATFIELD 00062902 NH 0701-154 012 $254,008 $191,590 $381,752 $605 $699,745 $1,527,699 I-706 AT 30 RD. 00070601 C SW00-164 005 $6,600 $0 $0 $0 $911,880 $918,480 ARTERIAL INTERCHANGE SIGNING 00072001 STA 086A-031 020 $104,280 $700 $1,504,305 $14,073 $615,840 $2,239,198 S.H.86 E.&W.OF ELIZABETH 00072003 NH 0405-028 001 $13,350 $23,220 $716,416 $0 $143,271 $896,257 Colfax,Tower Road to 170 00072701 NH 0243-060 005 $631,280 $5,168 $986,050 $222,814 $1,305,082 $3,150,394 INTERSECTIONS AND DRAINAGE 00072703 IM 0703-250 016 $1,235,183 $0 $120,900 $12,300 $344,508 $1,712,891 Straight Creek Erosion Control 00072704 C 1603-017 010 $96,683 $72,798 $214,259 $720 $385,159 $769,619 US 160 SIERRA GRANDE HS,CONSTR 00072705 C 6662-007 001 $249,573 $261,739 $2,999,279 $0 $726,940 $4,237,531 Cahone to Utah State Line 00072706 STA0741-012 005 $77,003 $900 $62,246 $0 $274,588 $414,737 SH 74 LEFT TURN LANE-KITTREDGE 00080301 NHB 0821-052 011 $18,092,321$ 418,058 $4,497,009 $33,236,653 $37,153,959 $93,398,000 SNOWMASS CANYON 00080303 IM 0703-260 005 $19,633 $0 $6,364 $0 $275,121 $301,118 GEORGETOWN HILL ROCKFALL MITIGATION 00080304 C 0403-043 001 $121,983 $21,285 $401,406 $22,184 $325,461 $892,319 SH 40 OVERLAY 00081001 NH 1602-074 012 $7,008,264 $0 $2,560 $571,715 $2,764,272 $10,346,811 WOLF CREEK PASS UPPER NARROWS Thursday, March 22,2001 Page 5 of 8 ) Bid Letting Prj.Num. Work Earth Work Bases Pavements Structures Miscellaneous Total Locations Type Section 200 Section 300 Section 400 Section 500 Section 600 Cost 00081002 IM 0252-321 013 $376,811 $0 $115,748 $1,119,908 $1,665,475 $3,277,942 5th Street Overpass 00081003 NH 2854-068 011 $5,732,957 $191,975 $5,878,053 $311,598 $8,986,347 $21,100,930 FOXTON RD.TO EAGLECLIFF RD. 00081701 IM 0252-214 012 $1,546,758 $0 $824,235 $416,465 $4,196,772 $6,984,230 RAMP H AT COLFAX&RAMP A AT 6TH 00081702 SHE R500-047 005 $0 $0 $0 $0 $182,563 $182,563 R5 REGION WIDE EPDXY PAVEMENT MARKING 00083103 C 133A-027 005 $35,021 $0 $0 $33,000 $205,440 $273,461 SH 133, ROCKFALL 00090702 MC 0502-051 022 $203,971 $13,296 $102,069 $87,000 $678,004 $1,084,340 CERRO SUMMIT 00091401 NH 2873-109 015 $187,229 $0 $1,481 $86,196 $133,976 $408,882 287 AT EMMA ST-LAFAYETTE(WALLS) 00091402 NH 0341-052 005 $10,680 $0 $0 $0 $111,180 $121,860 US 34 US 85 INT RE-SIGNING 00091403 MTCE 05-004 022 $0 $0 $212,625 $0 $364,884 $577,509 R-5 REGION-WIDE 00092801 NH 2873-104 011 $2,706,961 $613,294 $2,770,869 $22,843 $2,645,823 $8,759,790 SH 287 5/0 SH 60 TO SH 402 00092802 SHE 0505-034 005 $18,554 $6,896 $93,245 $0 $116,652 $235,346 SH 50 EAST OF LAMAR AT WALMART 00100501 NH 0761-164 014 $384,130 $96,368 $680,326 $0 $1,758,608 $2,919,432 REST AREA-WIGGINS 00100502 SHE402A-004 005 $37,119 $7,200 $34,320 $0 $133,820 $212,459 SH 402&LARIMER COUNTY RD(13C)SE/0 LOVELAND 00101201 NH 0403-039 017 $52,622 $0 $64,154 $11,381 $443,895 $572,052 SH 40-EMPIRE DRAINAGE 00101902 BR 0504-029 003 $1,978,923 $5,008 $742,466 $1,391,319 $4,869,951 $8,987,667 SALT CREEK(STR. L-18-F) 00101904 C R200-101 005 $198,000 $0 $0 $0 $400,760 $598,760 REGION 2 SIGN REPLACEMENT 00102602 IM 0762-041 003 $3,753,143 $390,380 $11,731,400 $444,762 $4,877,619 $21,197,304 ATWOOD TO US 6(STERLING) Thursday, March 22,2001 Page 6 of 8 ) ) Bid Letting Prj.Num. Work Earth Work Bases Pavements Structures Miscellaneous Total Locations Type Section 200 Section 300 Section 400 Section 500 Section 600 Cost 00102603 IM R100-066 005 $7,500 $0 $0 $0 $1,421,056 $1,428,556 R-1 FY 01 DURABLE STRIPING 00102604 SHE R600-149 009 $43,571 $0 $0 $53,000 $668,368 $764,939 SH 121 &SH 88 UPGRADE SIGNALS 00102605 C C110-013 009 $27,845 $1,070 $13,080 $13,420 $530,275 $585,689 SIGNALS AT SH58,SH93&SH26/US40 00102607 STA 119A-045 006 $94,351 $0 $3,600 $0 $210,996 $308,947 US6-SH119 ROCKFALL MITIGATION 00110901 STA C030-020 001 $229,461 $142,182 $4,702,235 $0 $974,606 $6,048,484 SH 52&85 WELD CO FY01 00110902 BR 144A-018 003 $385,514 $30,851 $158,750 $341,423 $1,250,812 $2,167,350 S PLATTER&BIJOU CANAL 00111604 STA0362-019 021 $202,875 $147,890 $3,970,664 $11,475 $997,686 $5,330,589 JCT SH 71 EAST FY 00 00111605 C M356-018 009 $13,469 $0 $0 $7,094 $228,865 $249,428 SH 287,SH 7 TRAFFIC SIGNALS 00111606 CC 2873-110 018 $368,245 $0 $189,633 $14,500 $1,025,696 $1,598,073 COLFAX AND FEDERAL INTERCHANGE IMPROVEMENTS 00111607 R 600-156 002 $412,457 $0 $93,252 $225,000 $564,900 $1,295,609 REGION 6 BRIDGE DECK REHAB 00113001 BR 0401-016 003 $169,293 $20,320 $38,009 $4,608 $546,783 $779,012 DECEPTION CREEK BRIDGE REPLACEMENT 00113002 STU C100-011 010 $378,181 $8,775 $652,191 $34,617 $1,007,032 $2,080,795 ARAPAHOE/PARKER INTERSECTION IMPV 00113003 NH 0252-335 001 $185,789 $0 $1,100,229 $0 $335,920 $1,621,938 Nevada Avenue,Uintah-N 00113004 C R400-111 022 $0 $0 $243,275 $0 $20,000 $263,275 REGION 4 CRACK SEALING FY 2001 00113006 STA C370-004 001 $89,816 $63,000 $5,733,945 $0 $1,146,499 $7,033,260 U.S.6 PHILLIPS CO. 00120701 STA 095A-004 001 $241,540 $0 $536,587 $7,528 $639,719 $1,425,375 Sheridan,Hampden to Evans 00120702 NH 2854-054 001 $32,825 $42,125 $722,116 $0 $329,934 $1,127,000 FAIRPLAY N.&S.(II) Thursday, March22,2001 Page 7 of 8 ' ) ) ) ) Bid Letting Pd.Num. Work Earth Work Bases Pavements Structures Miscellaneous Total Locations Type Section 200 Section 300 Section 400 Section 500 Section 600 Cost 00120703 001 $433,077 $0 $2,975,152 $0 $823,417 $4,231,646 U.S.24 W/O MANITOU SPRINGS 00120704 NH 0505-033 001 $194,278 $0 $1,846,691 $0 $356,978 $2,397,947 US 50,WEST OF GRANADA 00121401 STA 1211-053 001 $504,385 $1,334 $3,515,694 $0 $943,254 $4,964,667 SH 121:C 470 to Parkhill 00121403 NH 0702-217 020 $1,475,228 $324,477 $5,826,352 $408,683 $2,562,858 $10,597,597 GLENWOOD CANYON 00121404 STM 067A-021 001 $80,978 $0 $687,132 $0 $270,241 $1,038,351 FLORENCE S&E/O BEULAH 00121405 STA0961-009 001 $112,526 $0 $359,046 $0 $239,096 $710,668 ARKANSAS B TO FOUNTAIN B 00122101 STA059A-027 001 $89,090 $0 $1,983,056 $9,511 $504,640 $2,586,296 KIT CARSON TO I-70-SH59 00122103 STA 177A-002 001 $205,629 $0 $775,585 $0 $618,776 $1,599,990 SH 177, BELLEVIEW TO HAMPDEN 00122104 STA 0402-062 001 $26,637 $94,889 $2,508,278 $0 $487,511 $3,117,315 JCT 134 TO TABERNASH 00122105 STE C 200-003 003 $14,130 $1,798 $315 $19,946 $358,586 $394,775 DURANGO PEDESTRIAN BRIDGE •Refer to Item Book, Section Index Page TOTAL---->> $72,664,993 $5,978,085 $131,922,427 $45,091,965 $169,490,553 $425,148,023 Thursday, March 22,2001 Page 8 of 8 ) ) ) COLORADO DEPARTMENT OF TRANSPORTATION BRIDGE COST PER SQUARE FEET (01/01/00 THROUGH 12/31/00) DATE LET PROJECT PROJECT BRIDGE ID TER- LENGTH WIDTH TOTAL AREA TOTAL COST PER NUMBER LOCATION RAIN FT FT SQ FT COST SQ FT BRIDGE REPAIR 5/4/2000IM 0704-184 I-70 PEORIA-EAST F-20-AX 0 93.542 3,927.00$1 06,029.00 $27.00 F-20-AY U 93.5 42 3,927.00 $106,029.00 $27.00 F-20-BG 0 69.5 42 2,919.00 $93,937.00 $32.18 F-20-BI U 69.5 42 2,919.00 $92,735.00 $31.77 F-20-AT U 94 42 3,948.00 $113,117.00 $28.65 F-20-AU U 94 42 3,948.00 $113,117.00 $28.65 F-20-BU U 127.5 38 4,845.00 $4,212.00 $0.87 F-20-BV U 127.5 38 4,845.00 $4,212.00 $0.87 7/27/2000 NH 0243-060 SH 24, W OF FALCON TO PEYTON I-18-G P 25 29 725.00 $7,856.00 $10.84 I-18-I P 94 29 2,726.00 $29,528.00 $10.83 12/7/2000 STA 095A-004 SHERIDAN BLVD FROM BEAR CREEK F-16-FH P 107 37 3,959.00 $70,067.00 $17.70 F-16-FI P 107 37 3,959.00 $70,493.00 $17.81 2/10/2000 M 04-001 US 34 BRIDGE REHABILITAION C-18-AV R 225 38 8,550.00 $188,177.00 $22.01 C-18-BB R 205 44 9,020.00 $185,325.00 $20.55 8/17/2000 IN 0252-214 RAMP H AT COLFAX & RAMP A AT 6TH F-16-DX U 153.75 13.8 2,121.75 $263,933.00 $124.39 F-16-EC 0 220 23 5,060.00 $147,028.00 $29.06 F-16-JX U 623.25 60 37,395.00 $1,224,536.00 $32.75 11/16/2000 STA 0362-019 JCT SH 71 EAST FY00 F-22-F 73 32 2,336.00 $41,021.00 $17.56 F-22-8 163 29 4,727.00 $45,270.00 $9.58 F-22-V 71 29 2,059.00 $16,402.00 $7.97 F-23-F 94 29 2,726.00 $29,246.00 $10.73 F-23-D 195 30 5,850.00 $61,780.00 $10.56 F-23-G 39 44 1,716.00 $99,070.00 $57.73 F-23-H 23 40 920.00 $86,048.00 $93.53 1/13/2000 NE 050A-005 NW OF PUEBLO K-18-O R 108 30 3,240.00 $15,460.00 $4.77 K-18-CW R 189 42 7,938.00 $34,423.00 $4.34 K-18-AC R 184.5 30 5,535.00 $23,074.00 $4.17 Page 1 1) 8/3/2000 C 0403-043 EAST OF BLACKHAWK F-15-CB M 225 40 9,000.00 $60,135.00 $6.68 F-15-CN M 167 32 5,344.00 $21,963.00 $4.11 1/6/2000 SIR 0343-017 AKRON TO WRAY D-24-B P 249 25 6,225.00 $26,139.00 $4.20 D-24-A P 21 29 609.00 $26,422.00 $43.39 11/16/2000 R 600-156 REGION 6 BRIDGE DECK REHAB E-17-JP 218 130 28,340.00 $25,609.00 $0.90 E-17-IQ 156 134.5 20,982.00 $13,521.00 $0.64 E-17-H❑ 210 54 11,340.00 $29,051.00 $2.56 E-17-HT 210 54 11,340.00 $21,151.00 $1.87 E-17-HB 464 34 15,776.00 $34,555.00 $2.19 E-17-AS 77.5 34 2,635.00 $41,294.00 $15.67 F-17-GO 166.5 47 7,825.50 $20,893.00 $2.67 F-16-BM 121 65 7,865.00 $121,912.00 $15.50 F-16-EK 176.5 72.08 12,722.70 $21,638.00 $1.70 F-16-FY 148.83 34 5,060.51 $43,995.00 $8.69 F-16-FZ 148.83 34 5,060.51 $38,682.00 $7.64 F-16-AM 167 34 5,678.00 $126,406.00 $22.26 F-16-AY 167 34 5,678.00 $164,523.00 $28.98 F-16-I 128 42 5,376.00 $55,264.00 $10.28 F-16-J 128 42 5,376.00 $64,247.00 $11.95 F-17-GO 166.5 47 7,825.50 $10,282.00 $1.31 F-17-GO 166.5 47 7,825.50 $27,393.00 $3.50 F-17-GO 166.5 47 7,825.50 $27,793.00 $3.55 7/27/2000 MP 0702-224 EMERG. BRIDGE REPAIR MTN. F-11-AL M 518 38 19,684.00 $30,971.00 $1.57 F-12-X M 554 48 26,592.00 $54,783.00 $2.06 F-13-0 M 288 41.8 12,038.40 $48,786.00 $4.05 F-11-AN M 748 38 28,424.00 $21,880.00 $0.77 F-11-AV M 724 38 27,512.00 $22,617.00 $0.82 F-11-AK M 518 38 19,684.00 $15,078.00 $0.77 WEIGHTED AVERAGE COST: 471,484.87 $4,489,108.00 $9.52 BRIDGE DECK REPLACEMENT 1/13/2000 M 06-001 SH 121, BROOMPIELD E-16-HR D 453 28 12,684.00 $70,428.00 $5.55 E-16-HS ❑ 468 40 18,720.00 $82,707.00 $4.42 e-16-HV ❑ 232 28 6,496.00 $94,591.00 $14.56 E-16-FX ❑ 231 30 6,930.00 $129,279.00 $18.65 Page 2 .. ) E-16-IN U 161 54 8,694.00 $116,865.00 $13.44 WEIGHTED AVERAGE COST: 53,524.00 $493,870.00 $9.23 POST TENSIONED BOX GIRDER 1/20/2000 IN 0252-329 COLO. SPGS. I-25 NB I-17-LR R 207.08 62.5 12,942.50 $994,308.00 $76.83 I-17-LT R 181 62.5 11,312.50 $914,095.00 $80.80 4/20/2000 IM 2706-030 I-270 EXTENSION PH II & III E-17-QD U 158.55 28 4,439.40 $269,690.10 $60.75 E-17-QB U 148.6 59 8,767.40 $478,045.10 $54.53 E-17-QC U 148.6 94.53 14,047.16 $794,109.10 $56.53 E-17-QG U 163 28 4,564.00 $265,336.00 $58.14 E-17-QF U 200 28 5,600.00 $341,242.30 $60.94 4/20/2000 NH 0243-062 PLATTE/POWERS INTERCHG,COLO SP I-18-AC U 266.5 133 35,444.50 $2,219,993.00 $62.63 WEIGHTED AVERAGE COST: 97,117.46 $6,276,818.60 $64.63 PRECAST SEGMENTAL BOX GIRDER 8/3/2000 NEB 0821-052 SH 82 SNOWMASS CANYON G-09-J N 410 39 15,990.00 $1,980,013.00 $123.83 G-09-K N 410 39 15,990.00 $1,733,791.00 $108.43 G-09-L N 203 41 8,323.00 $1,065,257.00 $127.99 G-09-M M 483 48.25 23,304.75 $2,149,114.00 $92.22 G-09-N M 950 39 37,050.00 $4,113,900.00 $111.04 G-09-0 M 950.2 41 38,958.20 $4,101,791.00 $105.29 WEIGHTED AVERAGE COST: 139,615.95 $15,143,866.00 $108.47 PRESTRESS GIRDER (BOX SECTION) 10/19/2000 BR 0504-029 SH50 & SANTA FE DRIVE INT L-18-BE U 113 112 12,656.00 $921,595.00 $72.82 3/9/2000 BR 067A-010 TROUT CREEK BRDG REPLACEMENT H-16-I N 90.5 43 3,891.50 $276,577.00 $71.07 8/17/2000 IN 0252-214 COLFAX TO I 25 SB RAMP H F-16-QJ U 256.1 33 8,451.30 $545,691.00 $64.57 Page 3 9/3/2000 NH 2854-068 FOXTON ROAD TO EAGLE CLIFF ROAD F-15-DJ U 54.4 116.5 6,337.60 $689,997.00 $108.87 F-15-DI U 61 104.37 6,366.57 $751,640.00 $118.06 F-15-DG U 74.45 116.5 8,673.43 $769,571.00 $88.73 4/27/2000 BR 067A-008 SOUTH OF FLORENCE K-16-AP R 97.9 43 4,209.70 $245,065.93 $58.21 WEIGHTED AVERAGE COST: 50,586.10 $4,200,136.93 $83.03 PRESTRESS GIRDER (I-SECTION G-72) 3/2/2000 C M240-047 COLO SPGS, POWERS BLVD I-17-NE U 300.04 134.33 40,304.37 $1,711,857.00 $42.47 10/19/2000 BR 0504-029 SH50 4 SANTA FE DRIVE INT L-18-BD U 310.03 112 34,723.36 $1,830,297.00 $52.71 9/3/2000 NH 2854-068 FOXTON ROAD TO EAGLE CLIFF ROAD F-15-DH U 198.3 46.25 9,171.38 $619,828.00 $67.58 10/26/2000 IM 0762-041 I 76 IMPROVEMENTS S. OF STERLING B-23-BA 113.52 41 4,654.32 $396,948.00 $85.29 8-23-BB 113.52 41 4,654.32 $396,948.00 $85.29 8-24-AD 88.5 41 3,628.50 $245,565.50 $67.68 I 8-24-AI 88.5 41 3,628.50 $245,565.50 $67.68 B-24-AU 88.5 41 3,628.50 $233,205.00 $64.27 B-24-AV 88.5 41 3,628.50 $233,205.00 $64.27 B-24-AW 88.5 41 3,628.50 $232,219.00 $64.00 B-24-AX 88.5 41 3,628.50 $232,219.00 $64.00 8-24-AY 88.5 41 3,628.50 $230,605.00 $63.55 B-24-AZ 88.5 41 3,628.50 $230,605.00 $63.55 11/9/2000 BR 144A-018 NW OF F. MORGAN C-20-O P 496.5 37 18,370.50 $928,562.34 $50.55 WEIGHTED AVERAGE COST: 140,906.25 $7,767,629.34 $55.13 MAJOR STRUCTURE CBC OR PIPES 11/9/2000 BR 144A-018 NN OF F. MORGAN C-22-AA P 26.49 62 1,642.38 $186,200.00 $113.37 Page 4 / 1 \/ 4/20/2000 NE 0243-062 PLATTE/POWERS INTERCHG,COLO SP I-18-BF U 120 126 15,120.00 $1,230,364.00 $81.37 4/27/2000 BR 067A-008 SOUTH OF FLORENCE X-16-BW R 40 40 1,600.00 $160,844.00 $100.53 X-16-BZ R 32 40 1,280.00 $179,886.00 $140.54 11/30/2000 STA C370-004 SE 6 PHILLIPS CO A-28-Z P 35 88 3,080.00 $241,583.00 $78.44 P 96 16 1,536.00 $160,243.00 $104.32 WEIGHTED AVERAGE COST: 24,258.38 $2,159,120.00 $89.01 FABRICATED STEEL GIRDER 4/20/2000 IM 2706-030 I-270 EXTENSION PH II 4 III E-17-QT U 332.33 86 28,580.38 $2,454,369.00 $85.88 E-17-QS U 332.33 59 19,607.47 $1,713,394.00 $87.38 8/10/2000 IM 0252-321 5TH ST.OVERPASS-CASTLE ROCK G-17-DA R 562.5 41 23,062.50 $1,731,630.00 $75.08 WEIGHTED AVERAGE COST: 71,250.35 $5,899,393.00 $82.80 Page 5 ) ) 2001 COST DATA (ENGLISH) calieffiLiff PS SW Compiled By Engineering Estimates and Market Analysis Unit of the Agreements and Market Analysis Branch January 1, 2002 ) ) COLORADO COST DATA FOREWORD The Colorado Department of Transportation's Engineering Estimates and Market Analysis (EEMA) Unit, of the Agreements and Market Analysis Branch, publishes the Cost Data Book annually. A joint effort has been made between the Department's sections and the EEMA Unit to gather and record cost data for this publication. The following data includes weighted average prices for items on highway construction projects that were bid during the 2001 calendar year. Caution should be used in applying these historical averages to specific projects. Allowances for varying geographic, climatic, social, economic conditions and type of project should be made. Changes and improvements are continually being made to update and increase the usefulness for future issues. Comments and suggestions for improvements for users of this publication are welcome. A copy of this book is also available on CD-ROM. Copies of this publication may be obtained Colorado Department of Transportation on hard copy, or CD-ROM, from: Bid Plans, Room 117 4201 E. Arkansas Avenue Denver,Colorado 80222 Phone: 303-757-9313 ) 2001 COST DATA ENGLISH TABLE OF CONTENTS # OF PAGES LIST OF 2001 BID PROJECTS 7 PROJECT COST DIVIDED BY CATEGORIES BRIDGE COST PER SQUARE FEET 4 ITEM AVERAGE BID PRICES 45 ITEM UNIT COSTS BY PROJECT 432 Appendix A—2001 Maintenance Type Projects * to be released on CDOT web-site Colorado Department of ransportation 13:26 Monday, April 8, 2 2 1 ) YR2001 Cost Data B (English) 1 PROJECTS BID FROM 01/01/c_ HROUGH 12/31/01 BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX 01010402 UNITED COMPANIES OF MESA COUNTY 5 $781,177.65 92.20 STA 0641-011 E. OF RANGELY 3 R 01010403 KIEWIT WESTERN CO 4 $3,309,871.75 100.46 STA 0062-014 US 6/VASQUEZ, I-70 to I-76 6 U 01010406 WARNING LITES & EQUIPMENT, INC. 4 $356,219.00 91.21 C R400-100 R-4 STENCIL MARKINGS Southwest 4 U 01010407 DKS ENTERPRISES INC. 5 $288, 913.00 88.93 C 1281-008 SH128/MCCAS US85/112 5H287/67 6 U 01011101 ASPHALT PAVING CO. 4 $1,753,655.73 97.54 STA 1211-054 WADSWORTH, HAMPDEN TO FLORIDA 6 U 01011102 KIRKLAND CONSTRUCTION 9 $5, 990,060.22 94.04 STA 1151-009 BIG TURKEY CREEK - N & S 2 M 01011103 BRANNAN SAND AND GRAVEL COMPANY 7 $1,046, 950.25 113.78 STU 075A-002 PLATTE CANYON RD @ CHRISTENSEN 6 U 01011105 W.L. CONTRACTORS, INC. 2 $374,266.45 103.25 STS R600-126 R-6 SIGNAL IMPROVEMENTS 6 U 01011801 ASPHALT PAVING CO. 5 $4,160,823.01 111.98 NH 4701-088 C470, SH 8 TO KEN CARYL 6 U 01011802 UNITED COMPANIES OF MESA COUNTY 2 $325,267.35 96.72 STA R300-072 VARIOUS LOCATIONS IN DELTA COU 3 U 01011803 UNITED COMPANIES OF MESA COUNTY 2 $273, 964.00 93.61 CC R300-084 CRAWFORD STATE PARK 3 R 01011806 A & S CONSTRUCTION CO. & AFFILIATED CO. 4 $1,583,235.40 111.87 STA 165A-009 SH 165 - N OF RYE 2 M 01012502 COUGAR CONSTRUCTION 5 $531,711.50 84.22 STE SW00-109 HISTORICAL SIGNING 01 U 01012503 KOLBE STRIPING INC. 6 $1,198,914.02 99.95 IM R100-069 I-70, WEST OF GEORGETOWN 1 M 01012504 PALISADE CONSTRUCTORS, INC. 9 $698,882.00 100.47 SHE R500-051 REGION 5 SIGNS 5 R 01012505 D.G. HUSKIN CONSTRUCTION CO. 6 $3,826,244.46 103.81 STA 145A-029 SH 145 TO HWY 62 5 M 01012506 UNITED RENTALS HIGHWAY TECH. INC. (MT) 5 $1,104,165.00 82.28 SHE R500-050 VARIOUS LOCATIONS IN REGION 5 5 R Colorado Department of Transportation 13:26 Monday, April 8, 2nco2 2 YR2001 Cost Data B (English) PROJECTS BID FROM O1/O1/, HROUGH 12/31/01 BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX 01012507 A & S CONSTRUCTION CO. & AFFILIATED CO. 5 $783,301.89 88.56 MC 330A-007 MESA TO COLLBRAN 3 M 01012508 LAFARGE dba WESTERN MOBILE NORTHERN 4 $2, 961,365.80 88.86 IM 0703-266 1-70, FLOYD HILL - IDAHO SPAIN 1 M 01020101 NIELSONS SKANSKA, INC. 7 $2,799,421.82 95.28 STA 1602-084 US 160 RESURF W OF BAYFIELD 5 R 01020801 HARRY'S HEAVY HAULERS, INC. 7 $546,034.61 79.98 STA 0401-017 DINOSAUR EAST AND WEST 3 R 01020802 HARRY'S HEAVY HAULERS, INC. 6 $1,264,648.60 89.77 STA 318A-006 UTAH LINE-EAST 3 R 01020803 BRANNAN SAND AND GRAVEL COMPANY 5 $308,303.00 85.76 SHE 0852-087 SH85 AT DANIELS PARK RD 1 R 01020805 KIMSEY ELECTRICAL CONTRACTING 3 $159, 977.00 99.34 CO10-063 SH 88 (4 Union & Oxford 6 U 01021502 WARNING LITES & EQUIPMENT, INC. 4 $1,300,300.10 78.92 C R400-101 R-4 PAVEMENT MARKINGS 4 p 01021503 KIEWIT WESTERN CO 4 $532,544.40 91.22 IM 0703-274 EISENHOWER TUNNEL RESURFACING 1 M 01021504 GONZALES CONSTRUCTION COMPANY, INC. 4 $133,728.68 83.99 SHE R500-049 REGION 5 (GUARDRAIL) 5 R 01021505 UNITED COMPANIES OF MESA COUNTY 4 $853,400.38 91.78 STA 0502-052 CIMARRON 3 M 01021506 TEZAK HEAVY EQUIPMENT CO. , INC. 9 $1,256,552.64 94.21 BR 0251-150 1.9 Miles South of Walsenburg 2 R 01022201 AMERICAN CIVIL CONSTRUCTORS, INC. 4 $239, 917.50 111.38 SHE 2854-090 US 285, SPRINGS RD & LOG TRAIL 1 M 01022202 G.A. WESTERN CONSTRUCTION CO. 6 $394,172.40 79.70 C 0702-236 EMERGENCY BRIDGE REPAIR 1 M 01030801 LAFARGE dba WESTERN MOBILE NORTHERN 7 $1,100,201.59 91.54 STA 0141-013 EAST OF WALDEN 3 M 01031501 BRANNAN SAND AND GRAVEL COMPANY 4 $1,627,426.60 83.74 STA 095A-003 SHERIDAN BLVD. , 25TH TO I-76 6 R 01031502 D.G. HUSKIN CONSTRUCTION CO. 5 $3, 772,520.01 87.63 NH 0501-045 ON SH 50 FROM DELTA TO OLATHE 3 R Colorado Department of Transportation 13 :26 Monday, April 8, 2Qp2 3 YR2001 Cost Data P (English) ) PROJECTS BID FROM 01/01/, THROUGH 12/31/01 BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX 01032201 WARNING LITES & EQUIPMENT, INC. 7 $738,920.60 67.36 C R300-077 R3 SIGN REPLACEMENT 3 M 01032202 UNITED RENTALS HIGHWAY TECH. INC. (MT) 3 $1,225,372.62 88.18 C R300-078 R3 PAVEMENT MARKINGS 3 M 01032204 OLDCASTLE SW GROUP dba FOUR CORNERS MAT. 2 $518,091.20 83.58 NH 1602-076 US 160 & PIEDRA ROAD 5 R 01032901 UNITED RENTALS HIGHWAY TECH. INC. (MT) 3 $1,931, 962.69 87.68 C R200-102 PAVEMENT MARKING - REGION 2 2 R 01040501 KIEWIT WESTERN CO 4 $1,865,867.20 109.27 IM 0252-344 1-25 (ACADEMY TO CIRCLE) 2 U 01040502 ARROW ELECTRIC SERVICE, INC. 2 $445,156.70 86.62 C R200-106 SH 50/Baltimore, SH24/Peterson 2 U 01041201 OLDCASTLE SW GROUP dba FOUR CORNERS MAT. 1 $407,143.00 114.00 STS 1601-051 MANCOS - SIGNAL 5 R 01041202 G.A. WESTERN CONSTRUCTION CO. 7 $621,276.06 109.72 BR 0402-055 CORRAL CREEK 3 R 01041902 ROCKY MOUNTAIN SIGNING CO. INC. 5 $260,152.00 74.94 C R400-098 US 36 Broomfield to Boulder 4 R 01041903 INTERMOUNTAIN SLURRY SEAL, INC. 1 $905,905.00 94.98 C 0253-159 1-25, SH 52 TO SH 66 OVERLAY 4 R 01042601 HAMON CONTRACTORS, INC. 7 $2,631,428.90 97.94 STU 2254-060 ILIFF AVE: I-225 TO ABILENE ST 6 U 01042602 WEEMINUCHE CONSTRUCTION AUTHORITY 1 $1,515,803.62 68.78 NH 1601-049 6 MILES NORTH OF JCT. US 160 A 5 M 01042603 KOLBE STRIPING INC. 3 $1,041,337.50 78.50 C R600-147 R-6 FREEWAY STRIPING 6 U 01042606 COULSON EXCAVATING CO. INC. 5 $3, 003,177.75 77.65 NH 0342-035 71ST - 47TH AVE (GREELEY) 4 U 01050302 DUCKELS CONSTRUCTION, INC. 3 $2,214,529.00 111.42 NH 0403-046 SH 40 5 MILES WEST OF BERTHOUD 1 M 01050305 CASTLE ROCK CONSTRUCTION 3 $11, 993,047.30 95.18 NH 2872-014 SH 287 in Kiowa County 2 P 01050306 UNITED RENTALS TECHNOLOGIES, INC. 2 $622,350.00 87.93 C R600-160 R6 SPECIAL PAVEMENT MARKINGS 6 U ' Colorado Department of Transportation 13:26 Monday, April 8, 212 4 YR2001 Cost Data P (English) / PROJECTS BID FROM 01/01/. THROUGH 12/31/01 BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX 01050307 KOLBE STRIPING INC. 2 $1,076, 700.00 96.88 C R600-148 REGION 6 ARTERIAL STRIPING 6 U 01050308 LAFARGE dba WESTERN MOBILE NORTHERN 5 $1,739,913.25 79.51 NH 0503-060 SH50 (SH115 TO FREMONT/PUE) 2 R 01051001 CENTRIC-JONES, LLC 9 $6, 778, 000.00 90.66 IM 0252-323 I-25/SH 85 INTERCHANGE 1 R 01051002 TECHNOLOGY CONSTRUCTORS, INC. 3 $381,306.00 100.48 CC 0703-276 DUMONT PORT OF ENTRY 1 M 01051003 LAFARGE dba WESTERN MOBILE NORTHERN 5 $3,059,738.54 82.51 NH 1603-018 WEST OF LA VETA 2 R 01051701 SCHNABEL FOUNDATION COMPANY 4 $697,656.30 131.59 MC 0241-037 MINTURN TO REDCLIFF 3 M 01051702 William D. Hillen, A Corporation 3 $98,600.00 28.17 NH-IRCX 025-3 (109) I-25, NORTH OF SH 7 4 R 01051703 CIVIL CONSTRUCTORS, INC. 4 $1,757,494.40 95.73 BR 5502-031 UNCOMPAHGRE RIVER 3 U 01051704 MYR GROUP, INC. dba Sturgeon Electric 3 $239,201.36 123.19 STA 074A-006 SH74 at Lewis Ridge Rd. 1 M 01051708 ASPHALT SPECIALTIES CO. , INC. 10 $4, 979,966.00 95.35 BR 0073-005 SH7, I25 TO US 85 6 P 01052405 INTERSTATE HIGHWAY CONSTRUCTION 3 $8,859,815.09 89.07 C 0405-023 JCT. 94 SH 40 E & W 1 L 01052406 ADARAND CONSTRUCTORS, INC. 4 $409,593 .13 76.46 IM 0252-350 I-25, South of Greenland 1 R 01052407 KIRKLAND CONSTRUCTION 10 $5,315,495.53 72.29 NH 0242-031 US 24 - DIVIDE EAST 2 M 01053101 HAMON CONTRACTORS, INC. 12 $8,495,150.72 90.13 C 2706-031 270 Extension Phase IV 6 U 01053102 ENVIROCON, INC. 3 $5,282,875.00 128.42 PLH 139A-026 CANON PINTADO 3 M 01060702 WALSENBURG SAND AND GRAVEL 4 $1,329,116.20 112.28 STA 012A-035 SH 12 STONEWALL TO WESTON MP 3 2 M 01061402 LAFARGE dba WESTERN MOBILE NORTHERN 5 $3,379,100.00 86.71 STA 092A-015 ON S.H. 92 WEST OF CRAWFORD 3 M Colorado Department of Transportation 13:26 Monday, April 8, 2 202 5 YR2001 Cost Data B (English) PROJECTS BID FROM 01/01/L HROUGH 12/31/01 BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX 01062102 LAFARGE dba WESTERN MOBILE NORTHERN CONTRACT REJ - NO REASON GIVEN IM 0703-275 I-70 EJMT TO BAKERVILLE 1 M 01062802 KIRKLAND CONSTRUCTION 6 $2, 974,256.10 74.80 NH 2852-011 VILLA GROVE 5 R 01071201 HI-TECH ROCKFALL CONSTRUCTION, INC. 4 $479,753.40 120.24 STE 0821-061 INDEPENDENCE PASS ROCKFALL 3 M 01071203 R.E. MONKS CONSTRUCTION COMPANY 5 $1,297,177.33 110.42 STU 0831-078 SH83-NORTHGATE/HODGEN 2 U 01071204 MYR GROUP, INC. dba Sturgeon Electric 1 $710,797.72 104.21 C R300-085 REGION 3 SIGNALS 3 M 01071207 D.G. HUSKIN CONSTRUCTION CO. 4 $698,299.47 105.88 STA 0131-045 RIFLE NORTH 3 M 01071209 TLM CONSTRUCTORS, INC. 4 $584, 025.65 108.36 STA 0253-170 JCT SH 14 I-25 - FT COLLINS 4 U 01071210 UNITED RENTALS HIGHWAY TECH. INC. (MT) 4 $799,924.05 76.52 C R400-125 PAVEMENT MARKING REGION 4 EAST 4 R 01071901 TEZAK HEAVY EQUIPMENT CO. , INC. 4 $2,986,789.70 105.35 STR 135A-019 Y-BAR N. & S. 3 M 01071903 LAFARGE dba WESTERN MOBILE NORTHERN 3 $3,210,380.99 100.96 IM 0703-275 I-70 EJMT TO BAKERVILLE 1 M 01071904 RENEGADE ENTERPRISES, LLC 2 $23,900.00 85.36 STA 2873-101 BLDG DEMOLITION (LOVELAND) 4 U 01072604 SEMA CONSTRUCTION, INC. 9 $9,032,662.00 80.83 STA 0852-082 Titan Road and SH 85 1 R 01072605 AMES CONSTRUCTION, INC. 7 $4, 930,000.00 117.78 BR 0341-053 Big Thompson R (E & W Drake) 4 M 01080201 LAWRENCE CONSTRUCTION CO. 8 $1,091, 876.79 92.84 C C4701-094 FROM QUINCY AND ELDRIDGE INTER 6 R 01080203 ROCKY MOUNTAIN SIGNING CO. INC. 2 $311,281.00 88.21 C R600-163 FY-1 R-6 SIGN REPLACEMENT 6 U 01080205 ELAM CONSTRUCTION, INC. 5 $2,218,924.56 85.51 STA 006A-034 FRUITA - GRAND JUNCTION 3 U 01080206 ASPHALT CONSTRUCTORS INC. CONTRACT REJ - NO REASON GIVEN NH 2851-003 SOUTH OF LA JARA 5 P Colorado Department of ransportation 13:26 Monday, April 8, 12 6 ) YR2001 Cost Data B (English) PROJECTS BID FROM 01/01/L.. HROUGH 12/31/01 BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX 01080207 LAWRENCE CONSTRUCTION CO. 5 $1,844,533.53 101.41 NH 0242-028 SOUTH OF WOODLAND PARK 2 M 01080208 LAWRENCE CONSTRUCTION CO. 5 $3,387,579.57 84.98 IM 0252-322 Wolfensberger Interchange 1 U 01080904 ASPHALT SPECIALTIES CO. , INC. 5 $4,543,880.70 89.53 NH 0831-084 SH 83 (PARKER RD) Jamison Ave. 1 P 01081606 EDWARD KRAEMER & SONS INC. 7 $9,391,326.82 92.32 IM 0851-002 SH 85/Fountain Interchange 2 U 01081607 ASPHALT PAVING CO. 1 $183,322.50 107.14 STA 119A-047 Golden Gate State Park 1 M 01082301 SOUTHEAST CORRIDOR CONSTRUCTORS 8 $5,750, 134.00 88.03 IM 0252-336 I-25 viaduct over Broadway in 6 U 01082304 TLM CONSTRUCTORS, INC. 2 $955,498.43 117.26 BR 0504-041 OTERO CANAL 2 P 01082305 INTERSTATE HIGHWAY CONSTRUCTION 2 $16,588,329.73 100.35 IM 0705-070 I-70,STRATTON CONCRETE RECONST 1 P 01083001 TLM CONSTRUCTORS, INC. 7 $2,966,786.20 94.11 BR 089A-010 ON SH 89 NEAR BACA/PROWERS COU 2 P 01083002 B & B EXCAVATING < 3 BIDDERS & LOW BID > 10% OVER ENG EST IM 0702-228 ON I-70 AT EAGLE/VAIL. ORIGI 3 M 01083003 EDWARD KRAEMER & SONS INC. 6 $53,544,869.95 85.60 IM 0253-151 I-25 & WCR 8 INTERCHANGE 4 R 01090601 5L, INC. 5 $1, 019,991.00 98.48 R600-168 R-6 DECK REPAIR 6 U 01090602 ASPHALT SPECIALTIES CO. , INC. 6 $4,343,434.34 93.26 IM 0761-182 I76 6 P 01090603 CIVIL CONSTRUCTORS, INC. 5 $1,410, 185.06 109.06 BR 3501-009 SH 350 BRIDGE REPLACEMENT 2 R 01090604 ASPHALT CONSTRUCTORS INC. 1 $744,706.50 100.52 NH 2851-003 SOUTH OF LA JARA 5 P 01091303 HBG FLATIRON INC 7 $1, 916,626.20 94.00 I STA 2873-101 1ST ST AT US 287 (LOVELAND) 4 U 01091304 WARNING LITES & EQUIPMENT, INC. 3 $2,142,403 .50 72.07 C R200-103 I-25, US50 and SH24 2 P Colorado Department of Transportation 13:26 Monday, April 8, 2�.Q{2 7 B YR2001 Cost Data (English) ) PROJECTS BID FROM 01/01/L HROUGH 12/31/01 BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX 01100402 KIRKLAND CONSTRUCTION 11 $1, 924,231.57 90.80 BR 096A-033 Kramer Creek 2 R 01101101 JALISCO INTERNATIONAL, INC. 8 $786,321.00 98.84 STA 2854-089 Intersection of SH 30 (Hampden 6 U 01101801 JALISCO INTERNATIONAL, INC. 5 $453,864.50 103.08 C M320-013 SH 85 (Vasquez Blvd.) from 46t 6 U 01102501 HAMON CONTRACTORS, INC. 11 $4,848,631.79 99.95 STU 1192-010 SH 119/ Ken Pratt Blvd. 4 R 01112902 KOLBE STRIPING INC. 4 $1,714,150.00 98.38 C R600-176 FY02 R6 STRIPING 6 P 01120602 ROCKY MOUNTAIN SIGNING CO. INC. 7 $1,048, 004.00 94.73 NH R100-088 Interstate 25, south of Castle 1 p 01120603 UNITED RENTALS TECHNOLOGIES, INC. 4 $2, 069,376.25 100.29 IM R100-089 Regionwide, various locations. 1 R 01121301 ARROW ELECTRIC SERVICE, INC. 4 $209,841.80 91.34 CC 3921-006 SH 392 & CR 13 in Windsor 4 P 01121302 AMERICAN CIVIL CONSTRUCTORS, INC. 4 $1,045,030.00 77.96 NH 2854-091 US 285 Goddard Ranch Ct. N. 1 M 01122002 KOLBE STRIPING INC. 7 $453,532.00 77.51 STA R400-123 US 34 - ESTES PARK TO GREELEY 4 P TOTALS 528 $290, 096,020.17 91.34 Colorado Department of Transportation 13:26 Monday, April 8, 2002 1 / YR2001 Cost Data Bo( )English) BRIDGE COST PER SQL 1 FOOT (01/01/01 THROUGH 12/31/01) PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT BRIDGE REPAIR 01-02-22 C 0702-236 M EMERGENCY BRIDGE REPAIR F-12-X 554.0000 48.0000 26592.0 $52,362 $1.97 F-11-AN 748.0000 38.0000 28424.0 $40,377 $1.42 F-11-AV 724.0000 38.0000 27512.0 $40,377 $1.47 F-11-AT 354.0000 38.0000 13452.0 $20,189 $1.50 F-11-AS 243.0000 38.0000 9234.0 $26,940 $2.92 F-11-AM 748.0000 38.0000 28424.0 $20,189 $0.71 F-12-AS 732.0000 38.0000 27816.0 $40,377 $1.45 F-11-AL 518.0000 38.0000 19684.0 $40,377 $2.05 01-05-31 C 2706-031 U 270 Extension Phase IV E-17-QA 916.0000 68.0000 62288.0 $82,211 $1.32 01-07-19 IM 0703-275 M I-70 EJMT TO BAKERVILLE F-13-O 288.0000 41.8000 12038.4 $72,366 $6.01 F-13-P 278.0000 40.0000 11120.0 $56,938 $5.12 F-13-J 144.0000 42.0000 6048.0 $84,054 $13.90 F-13-L 144.0000 42.0000 6048.0 $84,054 $13.90 01-08-09 NH 0831-084 P SH 83 (PARKER RD) Jamison Ave. F-17-HI 185.0000 84.0000 15540.0 $110,189 $7.09 01-08-16 IM 0851-002 U SH 85/Fountain Interchange J-18-M 569.0000 36.7500 20910.8 $218,968 $10.47 WEIGHTED AVERAGE COST: NEW STRUCTURES 315131.2 $989,967 $3.14 CONCRETE SLAB AND GIRDER 01-05-10 IM 0252-323 R I-25/SH 85 INTERCHANGE G-17-BG 258.5000 79.5000 20550.8 $1,047,105 $50.95 01-07-26 BR 0341-053 M Big Thompson R (E & W Drake) C-15-O 135.5000 43.0000 5826.5 $1,160,084 $199.10 C-15-Y 145.5000 43.0000 6256.5 $687,273 $109.85 01-08-23 BR 0504-041 P OTERO CANAL M-23-K 70.3958 47.0000 3308.6 $265,334 $80.20 WEIGHTED AVERAGE COST: NEW STRUCTURES 35942.4 $3,159,798 $87.91 CONCRETE SLAB BRIDGE 01-08-02 NH 0242-028 M SOUTH OF WOODLAND PARK EPC1594-00.00 42.7500 39.5000 1688.6 $385,501 $228.29 WEIGHTED AVERAGE COST: NEW STRUCTURES 1688.6 $385,501 $228.29 Colorado Department of Transportation 13:26 Monday, April 8, 2009 11 2 YR2001 Cost Data Bo( -)English) ) BRIDGE COST PER SQL FOOT (01/01/01 THROUGH 12/31/01) PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT POST TENSIONED BOX GIRDER 01-05-31 C 2706-031 U 270 Extension Phase IV E-17-QH 172.3000 85.0000 14645.5 $826,466 $56.43 E-17-QI 819.0000 71.0000 58149.0 $2,903,676 $49.94 01-10-25 STU 1192-010 R SH 119/ Ken Pratt Blvd. D-16-DV 174.0000 57.0000 9918.0 $536,853 $54.13 D-16-DW 174.0000 51.0000 8874.0 $510,366 $57.51 D-16-DX 290.0000 52.0000 15080.0 $908,363 $60.24 D-16-DY 290.0000 52.0000 15080.0 $891,857 $59.14 WEIGHTED AVERAGE COST: NEW STRUCTURES 121746.5 $6,577,579 $54.03 PRESTRES GIRDER (BOX SECTION) 01-05-17 BR 0073-005 P SH7, I25 TO US 85 E-17-UZ 202.5000 47.0000 9517.5 $2,187,018 $229.79 01-08-02 IM 0252-322 U Wolfensberger Interchange G-17-BH 202.5800 45.5000 9217.4 $787,314 $85.42 01-09-06 BR 3501-009 R SH 350 BRIDGE REPLACEMENT M-22-BD 162.5000 39.0000 6337.5 $440,551 $69.51 WEIGHTED AVERAGE COST: NEW STRUCTURES 25072.4 $3,414,883 $136.20 PRESTRES GIRDER (I-SECTION G-54) 01-01-11 STA 1151-009 M BIG TURKEY CREEK - N & S K-16-CH 159.8300 77.0000 12306.9 $618,686 $50.27 01-02-15 BR 0251-150 R 1.9 Miles South of Walsenburg N-18-AA 209.0000 41.0000 8569.0 $530,808 $61.95 01-05-03 NH 2872-014 P SH 287 in Kiowa County K-26-J 138.5000 47.0000 6509.5 $425,855 $65.42 01-05-17 BR 5502-031 U UNCOMPAHGRE RIVER K-05-BQ 150.5417 57.0000 8580.9 $687,517 $80.12 01-05-24 C 0405-023 L JCT. 94 SH 40 E & W I-24-Q 205.0000 40.0000 8200.0 $51,145 $6.24 I-24-R 35.0000 40.0000 1400.0 $10,122 $7.23 I-24-S 139.0000 40.0000 5560.0 $34,954 $6.29 • Colorado Department of Transportation 13:26 Monday, April 8, 2002. 3 lJ YR2001 Cost Data Bo' "English) BRIDGE COST PER SQL FOOT (01/01/01 THROUGH 12/31/01) PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT 01-07-26 STA 0852-082 R Titan Road and SH 85 DOU-007-05.55 267.7000 83.0000 22219.1 $1,182,839 $53.24 DOU-007-05.95 209.5000 83.0000 17388.5 $914,895 $52.61 F-16-JB 216.5000 59.0000 12773.5 $643,147 $50.35 01-08-02 IM 0252-322 U Wolfensberger Interchange G-17-BI 195.0000 42.5000 8287.5 $691,468 $83.44 01-08-16 IM 0851-002 U SH 85/Fountain Interchange J-18-Q 195.0000 94.5000 18427.5 $1,112,394 $60.37 01-10-04 BR 096A-033 R Kramer Creek L-20-A 411.2400 43.0000 17683.3 $1,030,461 $58.27 WEIGHTED AVERAGE COST: NEW STRUCTURES 147905.7 $7,934,290 $53 .64 PRESTRES GIRDER (I-SECTION G-68) 01-07-26 BR 0341-053 M Big Thompson R (E & W Drake) C-15-U 128.5000 43.0000 5525.5 $755,598 $136.75 WEIGHTED AVERAGE COST: NEW STRUCTURES 5525.5 $755,598 $136.75 PRESTRES GIRDER (I-SECTION G-72) 01-01-11 STA 1151-009 M BIG TURKEY CREEK - N & S J-17-AA 149.5000 77.0000 11511.5 $587,461 $51.03 WEIGHTED AVERAGE COST: NEW STRUCTURES 11511.5 $587,461 $51.03 MAJOR STRUCTURE CBC OR PIPES 01-01-11 STA 1151-009 M BIG TURKEY CREEK - N & S J-17-I 34.5000 77.0000 2656.5 $202,774 $76.33 01-04-12 BR 0402-055 R CORRAL CREEK D-12-Z 20.0000 88.0000 1760.0 $149,482 $84.93 01-05-24 NH 0242-031 M US 24 - DIVIDE EAST I-16-A 24.0000 123.5000 2964.0 $151,896 $51.25 01-07-26 BR 0341-053 M Big Thompson R (E & W Drake) C-15-F 32.0000 48.0000 1536.0 $304,820 $198.45 01-08-30 BR 089A-010 P ON SH 89 NEAR BACA/PROWERS COU N-28-L 20.0000 54.0000 1080.0 $226,951 $210.14 Colorado Department of Transportation 13:26 Monday, April 8, 2002 4 YR2001 Cost Data Bor ).English) BRIDGE COST PER SQL ll FOOT J (01/01/01 THROUGH 12/31/01) PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT N-28-N 20.0000 54.0000 1080.0 $227,951 $211.07 01-09-06 BR 3501-009 R SH 350 BRIDGE REPLACEMENT N-21-K 14.5000 61.0000 884.5 $106,354 $120.24 M-23-BE 42.5000 45.0000 1912.5 $149,825 $78.34 01-10-25 STU 1192-010 R SH 119/ Ken Pratt Blvd. D-16-D 22.5000 129.0000 2902.5 $215,517 $74.25 WEIGHTED AVERAGE COST: NEW STRUCTURES 16776.0 $1,735,568 $103.46 ROLLED STEEL GIRDER 01-08-30 BR 089A-010 P ON SH 89 NEAR BACA/PROWERS COU N-28-M 170.0000 39.0000 6630.0 $534,337 $80.59 WEIGHTED AVERAGE COST: NEW STRUCTURES 6630.0 $534,337 $80.59 PEDESTRIAN OR BIKEWAY BRIDGE 01-08-02 C C4701-094 R FROM QUINCY AND ELDRIDGE INTER F-16-NC 260.0000 14.0000 3640.0 $182,625 $50.17 WEIGHTED AVERAGE COST: NEW STRUCTURES 3640.0 $182,625 $50.17 MISCELLANEOUS 01-01-25 STA 145A-029 M SH 145 TO HWY 62 L-04-B 85.0000 24.0000 2040.0 $3,782,799 $1,854.31 WEIGHTED AVERAGE COST: NEW STRUCTURES 2040.0 $3,782,799 $1,854.31 County Average Construction Cost Structure Number Structure Type Length Width Square Feet Total Cost Cost/SF WEL068.0/061.5B SSM 50 36 1800.0 $ 78,217.00 $ 43.45 WEL004.0/051.0A SSM 41 36 1476.0 $ 44,476.00 $ 30.13 WEL021.0/004.0A CBC 18 36 648.0 $ 67,253.73 $ 103.79 WEL017.0/022.0A SSM 29 32.2 933.8 $ 60,460.04 $ 64.75 WEL022.0/017.0A SSM 31 35.8 1109.8 $ 54,273.86 $ 48.90 WEL086.0/045.0A SSM 30 32 960.0 $ 84,730.00 $ 88.26 WEL077.0/092.0A SSM 50 36 1800.0 $ 205,420.50 $ 114.12 8727.6 $ 594,831.13 $ 68.16 Weighted Average Reporting Dates All Dates Weld Cou._tly Public Works j Project 21/4A Bridge replacement l Paying Department All Paying Departments Location Department All Location Departments Project Cost Summary Location of Work All Locations Sorted by Project Number Project Type All Project Types Priority All Priorities Fund All Funds Task All Tasks Task Type All Task Types Completion Status All Projects Complete Proj Number Project Name Labor Cost Eqp Cost Mat Cost Con Cost Overhead Total Cost Pct. Complete Active 24 21/4A Bridge replacement $44,856.33 $7,912.64 $3,733.83 $10,750.92 $0.00 $67,253.73 0.00% Yes No Grand Total $44,856.33 $7,912.64 $3,733.83 $10,750.92 $0.00 $67,253.73 Projects: 1 11/12/02 1 Reporting Dates All Dates Weld COU..i Public Works ) Project 17/22ABridgereplacement Paying Department All Paying Departments Location Department All Location Departments Project Cost Summary Location of Work All Locations Sorted by Project Number Project Type All Project Types Priority All Priorities Fund All Funds Task All Tasks Task Type All Task Types Completion Status All Projects Complete Proj Number Project Name Labor Cost Eqp Cost ,Mat Cost Con Cost Overhead Total Cost Pet. Complete Active 11 17/22A Bridge replacement $31,374.51 $9,397.64 $17,234.94 $2,453.95 $0.00 $60,461.04 0.00% Yes No Grand Total $31,374.51 $9,397.64 $17,234.94 $2,453.95 $0.00 $60,461.04 Projects: 1 11/12/02 • Reporting Dates All Dates Weld Couh2y Public Works ) Project 22/17A bridge replace Paying Department All Paying Departments Location Department All Location Departments Project Cost Summary Location of Work All Locations Sorted by Project Number Project Type All Project Types Priority All Priorities Fund All Funds Task All Tasks Task Type All Task Types Completion Status All Projects Complete Proj Number Project Name Labor Cost Eqp Cost Mat Cost Con Cost Overhead Total Cost Pct. Complete Active 14 22/17A bridge replace $27,959.29 $5,639.56 $17,818.36 $2,856.65 $0.00 $54,273.86 0.00% Yes No Grand Total $27,959.29 $5,639.56 $17,818.36 $2,856.65 $0.00 $54,273.86 Projects: 1 • 11/12/02 1 • Reporting Dates All Dates Weld County Public Works Project 77/92A bridge replacement ) Paying Department All Paying Departments Location Department All Location Departments Project Cost Summary Location of Work All Locations Sorted by Project Number Project Type All Project Types Priority All Priorities Fund All Funds Task All Tasks Task Type All Task Types Completion Status All Projects Complete Proj Number Project Name Labor Cost Eqp Cost Mat Cost Con Cost Overhead Total Cost Pct. Complete Active 42 77/92A bridge replacement $65,711.04 $27,420.83 $82,600.10 $29,688.51 $0.00 $205,420.50 0.00% Yes No Grand Total $65,711.04 $27,420.83 $82,600.10 $29,688.51 $0.00 $205,420.50 Projects: 1 11/12/02 1 1 12-Nov-2002, DEMO _ - _ Detail Report)PPP 205) -- Project Costs with Work Orders 10:6114 66 B BRIDGE REPLACE Type: REPLACE BRIDGE ) Aeaigned:DALE ELLIOTT Statue: COMPLETED / Bus.Unitz Account: Contract Number: 'PROJECT-DETAILS- I -SCHEDULE -- ,HOURS ---COSTS: ESTIMATED/ACTUAL — - - 'Start Date End Date ',Person Work' Labor Material Equipment Contract Other Total 11 estimated! 10 0' 0 0 0 0 0 0! Actual 973 28329 30858 11692 7342 78217:PRODUCTION -WORK ORDERS STRUCTURE TYRE --ACTIVITY/ASSIGNED-TO- - ----- - --- - --- l -— - -- - -- - ":6902 ROAD SECTION Utility Location 0 0 0 0 0 0 01 • COMPLETED DALE ELLIOTT 3 113 15 127. '6903 ROAD SECTION Signing — — 0 0-- —. _—.-� _0.5 p 0 0 a p 8.00 COMPLETED DALE ELLIOTT 24 SES 150 7351 58.00 '6904 PROJECT DESIGN i 0 01 0 0 0 o oI COMPLETED DALE ELLIOTT 9 338 3381 _ __-. -_._-.--.- ._ - _ -__ - _..-. J ',6905 ROAD SECTION Construction Survey 0 0. 0 0 0 0 01 COMPLETED DALE ELLIOTT 2 1 65 65' 16906 ROAD SECTION Mobilization lE pm Hauling) ''qui Cnt Haulm ) 0 0 0 0 0 O 0'. COMPLETED DALE RLLIOTT 17 409 655 3064 6907 ROAD SECTION Demolition j 0 0 0 0 0 0 0'. COMPLETED DALE ELLIOTT 113 3571 2014 5585 16908 COMPLETED ROAD SECTION EartDALEi'ELLIOTT 15 work 0 0 423 p 182 0 605: 16909 ROAD SECTION Aggregate Basework 0 Oi 0 0 0 0 01 COMPLETED DALE ELLIOTT 6 I 194 123 317 :6910 ROAD SECTION Site Work 0 0: 0 0 0 0 01 COMPLETED DALE ELLIOTT 102 - 3265 1862 5127' _ _ _ _ __ _- -. _ _.. __. _ ___..J 0 6911 ROAD SECTION LE ELLIOTT 79 1895 2139 HAULING MATERIALS (MISC 0 p 0 COMPLETED40341 6912 ROAD SECTION HAULING ASPHALT 0 0 0 0 0 0 0' COMPLETED DALE ELLIOTT 6 1 144 3992 134 42691 178.23 16913 HAUL AGO(CRUSHED) 0 0' 0 0 0 0 0I COMPLETED DALE ELLIOTT 51 1215 988 1191 3395' 480.00 ,6914 ROAD SECTION Paving 0 a' 0 O 0 0 0I COMPLETED DALE ELLIOTT 32 858 304 1162! :6915 ROAD SECTION Shoulder Work O 0' 0 0 0 0 01 COMPLETED DALE ELLIOTT J 6916 ROAD SECTION Guard Rail Installation 0 OI 0 0 0 0 OI COMPLETED DALE ELLIOTT I 31 1311 2525 41 387611 ___ 6917 ROAD SECTION Culvert Install/Replace 0 0 0 0 0 0 0' COMPLETED — _ -__—DALE ELLIOTT _--_ _- _1 _ 17 _.- _ -.- --. - 171 - -- P .6918 ROAD SECTION Striping I 0 0. 0 B 0 a aI COMPLETED DALE ELLIOTT li 6919 ROAD SECTION Sub Structure 0 0 o 0 0 0 o COMPLETED DALE ELLIOTT I 272 I 7732 11408 1908 _1047, 16920 ROAD SECTION Superstructure 0 0 0 0 0 0 01 COMPLETED DALE ELLIOTT 204 5984 11945 952 18880! 6921 ROAD SECTION Right-Of Way 0 0, 0 0 0 0 o • COMPLETED DALE ELLIOTT 6922 SURVEYING 0. _.. 0.— _..a—_— .-O_—__— ..0 0 is, _ --.— _— COMPLETED DALE ELLIOTT 1 6 210 22 232 :6923 PERMIT ACQUISITION 0 0' 0 0 0 o o COMPLETED DALE ELLIOTT 6750 6750 i 12:Nov-2002 DEMO Page) 2 _ 1/ Detail Report(POP 205) -- Project Cos: µith Work Orders j6968 A D SECTION Dust Control Application 0 ) 0 0 0 0 01 / COMPLETED DALE ELLIOTT 592 592' L_-._ ._-_.. __ -_L._'__ 12-Nov-2002 DEMO Page: 1 Detail Report)PPP 205) -- Project Cost= with Work Orders ID:6129 NE YlOGE 86/45A Type: ) Assigned:DALE ELLIOTT Statues COMPLETED Bue.Unit: Account: Contract Number: [PROJECT`DETAILS-- - - - - - -- 1 I 1 SCHEDULE -- HOURS ----COSTS: ESTIMATED/ACTUAL Start Date End Date ''Person Work' Labor Material Equipment Contract Other Totals' Estimated 10 0, I Actual 814 !PRODUCTION -WORE-ORDERS STRUCTURE TYPE--- - ACTIVIY/ASSIGNED--TO- - ----- -- --�-- - - — --- -- -�-- ]025 ROAD SECTION Utility Location 0 0 0 0 0 0 0, COMPLETED ; 2 75 7 82 7026 ROAD SECTION Signing 0 01 0 0 0 0 01 12 330 ]0 408 COMPLETED - 25.00 ]OP ROAD S SECTION Project Design 0 0 0 0 0 0 0, COMPLETED 41501 ']028 ROAD SECTION Construction Survey -1 0 0, 0 0 0 0 01 COMPLETED 9 266 22 2881 1]029 ROAD SECTION Mobilization (Equipment Hauling) 0 01 0 0 0 0 0! COMPLETED 30 891 60B 26426 2]9261 ;]030 ROAD SECTION Earthwork 0 0 0 0 0 0 01 ' ' COMPLETED 61 1758 1349 310]' J 7031 ROAD SECTION Aggregate Easework 0 0' 00 O. COMPLETED 275 151 426 7032 ROAD SECTION Site Work 0 0 0 0 0 0 0j COMPLETED 100 3411 1185 45961 -0033 ROAD SECTION HAULING MATERIALS (MISC) 1 0 0' 0 0 0 0 0, COMPLETED 42 1008 953 1962' 7034 ROADCOMPLETED SECTION HAULING AS PIIALT I 0 0 01 0 0 0 0 2I 120 20J 139 542I 14.53 7035 HAUL AGGICRUSNED) 0 0'. 0 0 0 0 0 0 0.00 COMPLETED 136 ; 3061 2530 3073 8663; 1222.00 ] ,7036 ROAD SECTION Paving 0 0., 0 0 0 0 0 COMPLETED • 14 458 468 180 130]1 24.02 '7037 ROAD SECTION Shoulder Work 0 0, 0 0 0 0 01 COMPLETED '"1038 ROAD SECTION Guard Rail Installation i 0 0I 0 00 600 1480 180 235 COMPLETED 2 1. 1]039 ROAD SECTION Culvert Install/Replace 0 0!, 0 0 0 0 01 COMPLETED 7040 ROAD SECTION Striping 0 0 0 0 0 0 0: COMPLETED I 7041 ROAD SECTION Sub Structure 0 0 0 0 0 0 0' COMPLETED 227 6647 9868 3454 1280 21249 Su17042 ROAD PEcTIcil p 138 4040 6598 1113 11"/6011 COMPLETED trurf rr 0 0 0 0 0 0 0 7043 ROAD SECTION Right-Of Way 0 0'1 0 0 0 0 0'' I COMPLETED 7044 SURVEYING 1 0 011 0 0 0 0 01 - COMPLETED 3 113 113, 7049 PERMIT ACQUISITION 0 0 0 0 0 0 01, COMPLETED 12-Nov-200*2 DEMO Page: 2 Detail Repor[(PPP 205) -- Pro]ect. Coo 4th Work Orders 12-Nov-2002 DEMO Page: 1 • Detail Report(PPP 205) -- Project Cost- Yith Work Orders ID:6147 4/ "RIDGE REPLACEMENT Type: REPLACE BRIDGE ) Assigned:DALE ELLIOTT Status: ACTIVE Bue.Unit: ACCOunt: Contract Number: ;PROJECT DETAILS- - -- 1 /SCHEDULE COSTSESTIMATED/ACTUAL Date End Date !Person Work� abor Mate ial!Start Equipment Contract Other Total! Estimated' 1.0 0: Actual 501 ! !PRODUCTION WORK ORDERS--STRUCTURE TYPE ----ACTIVITY/ASSIGNED TO --- - ----- "-- --- -- --- --- - 7221 ROAD SECTION Signing 1 0 0' 0 0 0 0 0 ACTIVE 1 38 934 - 280 228 1442 42.00 --- _ i ']222 ROAD SECTION Utility Location 0 0, 0 0 2 0 8!' 15 ACTIVE505 72 578! PLANNED JecDesign 4 ]22} ROAD SECTION Pro [ 0 0, 0 0 0 0 0! 150 1501 • .7224 ROAD SECTION Construction Survey O 01 0 0 0 0 01 ACTIVE 8 279 15 2941 7225 ROAD SECTION Mobilization )Equipment Hauling) ! 0 0j 0 0 0 0 01 ACTIVE 16 377 553 929! '7226 ACTIVE ROAD SECTION Demolition --- I 50 0 0 1634 00 721 ---�� 2355!'7227 ROAD SECTION Earthwork 0 129 9 0 0 0 0 220!ACTIVE '.. Aggregate ]228 ROAD SECTION Aggrega to 0asework 0 0 I 0 0 0 0 01 PLANNED ! 1 .7229 ROAD SECTION Site Work 0 01 0 0 0 0 OI ! ACTIVE - 16 1 549 284 832, 7230 ROAD SECTION HAULING MATERIALS (RISC) 1 0 0' 0 0 0 0 0! ACTIVE 50 1146 1193 113 24541 17231 ROAD SECTION HAULING ASPHALT 0 01 0 0 0 0 ACTIVE 1 11 287 1294 300 1680 66.34 ]232 HAUL AGG(CRUSHED I 25 0 0 0 0 587 313 604 0 1504! 153.00 ACTIVE :7233 ROAD SECTION Paving 0 0! 0 0 0 0 0' ACTIVE 29 876 228 1105! '7234 ROAD SECTION Shoulder Work 0 0 0 0 0 0 0: PLANNED '7235 ROAD SECTION Guard Rail Installation 0 01 0 0 0 0 01 ACTIVE 20 648 2036 188 2873 :7236 ROAD SECTION Culvert Install/Replace 0 0I 0 0 0 0 0, PLANNED I 723] ROAD SECTION Superstructure 210 01 6284 20150 1414 0 27857 0 —.--�- • ACTIVE 1i2'a ROAD corm oN Doer rnnlrol Application !. 0 0. 0 0 0 0 0' a PLANNED J 7239 PERMIT ACQUISITION • 0 0' 0 0 0 0 0: PLANNED Major Bridges I Cost(PerSF)>6p'= $70/1 Cost(Eer S.F)<$0*-t $56.16! Structure Structure Acquisition Year Out to Out Structure Square unit cost I otai Cost Accumuiatea Acquisition Year ACq. Yr. value ACq. Yr. value ACC. Uepnc. ACC, uepnc. ueck Area or uecK Area or if OT Struc. 8 of Struc Number Type Year Built Width Length Feet Year 2000 Cost Index Depriciation Value Struc>60' Long Struc<=60'Long of Struc>60' of Struc a 60' Bridges>60' Bridges a 60' L>60' L a 60' WEL006.0-023.1B CBC 1989 1989 43.200 31 1339.2 $ 68.16 $ 91,279.87 107.7 $ 14,854.29 $ 67,519.52 $ 67,519.52 $ 14,854.29 1339 1 WEL033.0-052.2A CBC 1970 1970 40.000 38 1520 $ 68.16 $ 103,603.20 34.87 $ 14,887.27 $ 24,812.11 $ 24,812.11 $ 14,887.27 1520 1 WEL033.0/086.0A CBC 1996 1996 38.500 26 1001 $ 68.16 $ 68,228.16 120.2 $ 4,506.06 $ 56,325.72 $ 56,325.72 $ 4,506.06 1001 1 WEL047.0/068.OB CBC 2001 2001 35.400 31 1097.4 $ 68.16 $ 383,538.45 145.6 $ - $ 383,538.45 $ 383,538.45 $ - 1097 1 WEL008.0/025.OA CBGCP 1994 1994 34.500 204 7038 $ 70.71 $ 497,656.98 115.1 $ 47,209.05 $ 393,408.78 $ 393,408.78 $ 47,209.05 7038 1 WEL392.0-075.0A CBGCP 1991 1991 36.600 133 4867.8 $ 70.71 $ 344,202.14 107.5 $ 45,743.90 $ 254,132.76 $ 254,132.76 $ 45,743.90 4868 1 WELO05.0/042.OA CBGP 2000 2000 34.500 70 2415 $ 70.71 $ 170,764.65 145.6 $ - $ 170,764.65 $ 170,764.65 $ - 2415 1 WEL037.0-068.1A CBGP 1986 1986 36.000 51 1836 $ 68.16 $ 125,141.76 101.1 $ 24,330.45 $ 86,894.45 $ 86,894.45 $ 24,330.45 1836 1 WEL064.0/039.0A CBGP 1995 1995 38.600 76 2933.6 $ 70.71 $ 207,434.86 121.9 $ 17,366.97 $ 173,669.70 $ 173,669.70 $ 17,366.97 2934 1 WEL004.0-027.0A CDTPG 1970 1970 27.900 30 837 $ 68.16 $ 57,049.92 34.87 $ 8,197.79 $ 13,662.99 $ 13,662.99 $ 8,197.79 837 1 WEL006.0-025.0A CDTPG 1970 1970 30.100 295 8879.5 $ 70.71 $ 627,869.45 34.87 $ 90,221.73 $ 150,369.56 $ 150,369.56 $ 90,221.73 8880 1 WEL008.0-023.0A CDTPG 1970 1970 32.000 40 1280 $ 68.16 $ 87,244.80 34.87 $ 12,536.65 $ 20,894.41 $ 20,894.41 $ 12,536.65 1280 1 WEL013.0-034.0A CDTPG 1970 1970 28.000 22 616 $ 68.16 $ 41,986.56 34.87 $ 6,033.26 $ 10,055.44 $ 10,055.44 $ 6,033.26 616 1 WEL016.5-001.0B CDTPG 1983 1983 32.000 127 4064 $ 70.71 $ 287,365.44 87.6 $ 58,783.60 $ 172,892.94 $ 172,892.94 $ 58,783.60 4064 1 WEL017.0-050.0A CDTPG 1978 1978 36.300 148 5372.4 $ 70.71 $ 379,882.40 70.7 $ 81,163.34 $ 184,462.13 $ 184,462.13 $ 81,163.34 5372 1 WEL021.0-006.0A CDTPG 1970 1970 32.000 50 1600 $ 68.16 $ 109,056.00 34.87 $ 15,670.81 $ 26,118.01 $ 26,118.01 $ 15,670.81 1600 1 WEL027.0-062.1B CDTPG 1981 1981 36.500 103 3759.5 $ 70.71 $ 265,834.25 94.2 $ 65,355.79 $ 171,988.91 $ 171,988.91 $ 65,355.79 3760 1 WELO27.5-048.0A CDTPG 1970 1970 32.000 154 4928 $ 70.71 $ 348,458.88 34.87 $ 50,071.82 $ 83,453.03 $ 83,453.03 $ 50,071.82 4928 1 WEL028.0-023.OA CDTPG 1970 1965 32.000 344 11008 $ 70.71 $ 778,375.68 34.87 $ 130,490.19 $ 186,414.56 $ 186,414.56 $ 130,490.19 11008 1 WEL031.0-036.0B CDTPG 1973 1973 30.000 31 930 $ 68.16 $ 63,388.80 42.5 $ 9,991.57 $ 18,502.91 $ 18,502.91 $ 9,991.57 930 1 WEL031.0-050.0A CDTPG 1970 1965 28.000 122 3416 $ 70.71 $ 241,545.36 34.87 $ 40,493.69 $ 57,848.12 $ 57,848.12 ' $ 40,493.69 3416 1 WEL031.0/068.0A CDTPG 1997 1997 39.300 54 2122.2 $ 68.16 $ 144,649.15 130.6 $ 7,784.83 $ 129,747.11 $ 129,747.11 $ 7,784.83 2122 1 WEL033.0-038.0A CDTPG 1970 1968 27.800 34 945.2 $ 68.16 $ 64,424.83 34.87 $ 9,874.70 $ 15,429.22 $ 15,429.22 $ 9,874.70 945 1 WEL033.0-068.0A CDTPG 1971 1971 32.300 41 1324.3 $ 68.16 $ 90,264.29 36.56 $ 13,145.85 $ 22,665.26 $ 22,665.26 $ 13,145.85 1324 1 WEL034.0-013.0A CDTPG 1970 1966 28.000 22 616 $ 68.16 $ 41,986.56 34.87 $ 6,837.70 $ 10,055.44 $ 10,055.44 $ 6,837.70 616 1 WEL034.0-017.0A CDTPG 1970 1960 30.000 294 8820 $ 70.71 $ 623,662.20 34.87 $ 119,489.57 $ 149,361.96 $ 149,361.96 $ 119,489.57 8820 1 WEL035.0-062.0A CDTPG 1970 1970 60.000 127 7620 $ 70.71 $ 538,810.20 34.87 $ 77,424.36 $ 129,040.60 $ 129,040.60 $ 77,424.36 7620 1 WEL035.0-078.0A CDTPG 1992 1992 34.500 37 1276.5 $ 68.16 $ 87,006.24 105.1 $ 10,048.74 $ 62,804.64 $ 62,804.64 $ 10,048.74 1277 1 WEL035.7-062.2A CDTPG 1970 1970 31.800 169 5374.2 $ 70.71 $ 380,009.68 34.87 $ 54,605.51 $ 91,009.19 $ 91,009.19 $ 54,605.51 5374 1 WEL038.0-003.0A CDTPG 1970 1960 28.100 30 843 $ 68.16 $ 57,458.88 34.87 $ 11,008.74 $ 13,760.93 $ 13,760.93 $ 11,008.74 843 1 WEL038.0-031.0B CDTPG 1970 1967 27.800 30 834 $ 68.16 $ 56,845.44 34.87 $ 8,985.25 $ 13,614.01 $ 13,614.01 • W $ 8,985.25 834 1 WEL045.0-006.0A CDTPG 1970 1969 28.000 41 1148 $ 68.16 $ 78,247.68 34.87 $ 11,618.60 $ 18,739.67 $ 18,739.67 $ 11,618.60 1148 1 WEL045.0-058.5B CDTPG 1987 1987 36.100 155 5595.5 $ 70.71 $ 395,657.81 100 $ 70,653.18 $ 271,743.00 $ 271,743.00 $ 70,653.18 5596 1 WEL049.0-068.0A CDTPG 1970 1970 28.000 23 644 $ 68.16 $ 43,895.04 34.87 $ 6,307.50 $ 10,512.50 $ 10,512.50 $ 6,307.50 644 1 WEL052.0-021.0B CDTPG 1970 1968 28.000 75 2100 $ 70.71 $ 148,491.00 34.87 $ 22,759.92 $ 35,562.37 $ 35,562.37 $ 22,759.92 2100 1 WEL054.0-013.OA CDTPG 1978 1978 36.300 154 5590.2 $ 70.71 $ 395,283.04 70.7 $ 84,453.74 $ 191,940.32 $ 191,940.32 $ 84,453.74 5590 1 WEL054.0-041.OA CDTPG 1973 1973 32.100 540 17334 $ 70.71 $ 1,225,687.14 42.5 $ 193,197.25 $ 357,772.69 $ 357,772.69 $ 193,197.25 17334 1 WEL059.0-050.0A CDTPG 1973 1973 28.100 22 618.2 $ 68.16 $ 42,136.51 42.5 $ 6,641.71 $ 12,299.46 $ 12,299.46 $ 6,641.71 618 1 WEL061.0-054.08 CDTPG 1970 1970 30.100 101 3040.1 $ 70.71 $ 214,965.47 34.87 $ 30,889.48 $ 51,482.46 $ 51,482.46 $ 30,889.48 3040 1 WEL072.0-041.1A CDTPG 1989 1989 30.000 32 960 $ 68.16 $ 65,433.60 107.7 $ 10,648.24 $ 48,401.09 $ 48,401.09 $ 10,648.24 960 1 WEL088.0-039.0A CDTPG 1970 1970 28.200 33 930.6 $ 68.16 $ 63,429.70 34.87 $ 9,114.53 $ 15,190.89 $ 15,190.89 $ 9,114.53 931 1 WEL090.0-031.08 CDTPG 1970 1960 30.200 31 936.2 $ 68.16 $ 63,811.39 34.87 $ 12,225.84 $ 15,282.30 $ 15,282.30 $ 12,225.84 936 1 WEL090.0-045.0A CDTPG 1970 1970 32.000 146 4672 $ 70.71 $ 330,357.12 34.87 $ 47,470.68 $ 79,117.81 $ 79,117.81 $ 47,470.68 4672 1 WEL129.0-092.0A CDTPG 1983 1983 31.900 67 2137.3 $ 70.71 $ 151,128.48 87.6 $ 30,914.91 $ 90,926.20 $ 90,926.20 $ 30,914.91 2137 1 WEL007.0-036.0A CI 1970 1945 24.700 28 691.6 $ 68.16 $ 47,139.46 34.87 $ 12,418.46 $ 11,289.51 $ 11,289.51 $ 12,418.46 692 1 WEL027.0-058.0A CI 1970 1950 32.100 38 1219.8 $ 68.16 $ 83,141.57 34.87 $ 19,911.72 $ 19,911.72 $ 19,911.72 $ 19,911.72 1220 1 WEL032.5-023.0A CI 1970 1955 26.300 36 946.8 $ 68.16 $ 64,533.89 34.87 $ 13,909.80 $ 15,455.33 $ 15,455.33 $ 13,909.80 947 1 WEL080.5-017.0A CIK 1991 1991 34.600 50 1730 $ 68.16 $ 117,916.80 107.5 $ 15,670.95 $ 87,060.82 $ 87,060.82 $ 15,670.95 1730 1 WEL001.0-022.1A CIKP 1986 1986 37.500 120 4500 $ 70.71 $ 318,195.00 101.1 $ 61,864.45 $ 220,944.47 $ 220,944.47 $ 61,864.45 4500 1 WEL100.0-019.0A CMP 1998 1998 57.800 29 1676.2 $ 68.16 $ 114,249.79 126.9 $ 3,983.05 $ 99,576.23 $ 99,576.23 $ 3,983.05 1676 1 WEL100.0-023.0A CMP 1998 1998 75.500 38 2869 $ 68.16 $ 195,551.04 126.9 $ 6,817.42 $ 170,435.62 $ 170,435.62 $ 6,817.42 2869 1 WEL003.0-042.0A CPG 1987 1987 33.200 79 2622.8 $ 70.71 $ 185,458.19 100 $ 33,117.53 $ 127,375.13 $ 127,375.13 $ 33,117.53 2623 1 WEL015.0-044.1B CPG 1989 1989 34.600 91 3148.6 $ 70.71 $ 222,637.51 107.7 $ 36,230.58 $ 164,684.47 $ 164,684.47 $ 36,230.58 3149 1 WEL077.0-102.0A CPG 1990 1990 34.700 115 3990.5 $ 70.71 $ 282,168.26 108.5 $ 42,053.92 $ 210,269.61 $ 210,269.61 $ 42,053.92 3991 1 WEL014.5/025.0A CPGC 1993 1993 38.600 363 14011.8 $ 70.71 $ 990,774.38 108.3 $ 103,173.91 $ 736,956.49 $ 736,956.49 $ 103,173.91 14012 1 WEL018.0/025.0A CPGC 1994 1994 38.600 240 9264 $ 70.71 $ 655,057.44 115.1 $ 62,140.48 $ 517,837.30 $ 517,837.30 $ 62,140.48 9264 1 WEL019.5/036.0B CPGC 1997 1997 38.500 200 7700 $ 70.71 $ 544,467.00 130.6 $ 29,302.50 $ 488,374.93 $ 488,374.93 $ 29,302.50 7700 1 WEL029.0-062.08 CPGC 1990 1990 34.500 198 6831 $ 70.71 $ 483,020.01 108.5 $ 71,988.56 $ 359,942.80 $ 359,942.80 $ 71,988.56 6831 1 WEL032.5/021.0B CPGC 1995 1995 38.700 333 12887.1 $ 70.71 $ 911,246.84 121.9 $ 76,291.89 $ 762,918.89 $ 762,918.89 $ 76,291.89 12887 1 WEL050.0/067.0A CPGC 1996 1996 38.500 450 17325 $ 70.71 $ 1,225,050.75 120.2 $ 80,907.20 $ 1,011,339.97 $ 1,011,339.97 $ 80,907.20 17325 1 Page 1 of 6 Structure Structure Acquisition Year Out to Out Structure Square unit cost I otai Cost Accumuiatea Acquisition Year Acq. Yr. Value Acq. Yr. Value Act. Depnc. Ace, Uepric. Deck Area of Deck Area of #of Struc. #of Str uc. Number Type Year Built Width Length Feet Year 2000 Cost Index Depriciation Value Struc>60'Long Struc<=60' Long of Struc>60' of Struc a 60' Bridges>60' Bridges<=60' L>60' L<=60' WEL058.0-047.08 CPGC 1990 1990 36.900 596 21992.4 $ 70.71 $ 1,555,082.60 108.5 $ 231,767.12 $ 1,158,835.59 $ 1,158,835.59 $ 231,767.12 21992 1 WEL061.0/054.0A CPGC 1997 1997 38.500 705 27142.5 $ 70.71 $ 1,919,246.18 130.6 $ 103,291.30 $ 1,721,521.64 $ 1,721,521.64 $ 103,291.30 27143 1 WEL025.5-040.0A CS 1970 1940 26.200 33 864.6 $ 68.16 $ 58,931.14 34.87 $ 16,936.23 $ 14,113.52 $ 14,113.52 $ 16,936.23 865 1 WEL033.0-048.0A CS 1970 1940 20.000 23 460 $ 68.16 $ 31,353.60 34.87 $ 9,010.71 $ 7,508.93 $ 7,508.93 $ 9,010.71 460 1 WEL034.0-003.08 CS 1970 1937 28.700 24 688.8 $ 68.16 $ 46,948.61 34.87 $ 14,167.19 $ 11,243.80 $ 11,243.80 $ 14,167.19 689 1 WEL037.0-080.0A CS 1970 1940 24.000 34 816 $ 68.16 $ 55,618.56 34.87 $ 15,984.22 $ 13,320.19 $ 13,320.19 $ 15,984.22 816 1 WEL039.0-068.1A CS 1990 1990 37.800 35 1323 $ 68.16 $ 90,175.68 108.5 $ 13,439.64 $ 67,198.22 $ 67,198.22 $ 13,439.64 1323 1 WEL047.0-054.0A CS 1991 1991 32.000 35 1120 $ 68.16 $ 76,339.20 107.5 $ 10,145.35 $ 56,363.08 $ 56,363.08 $ 10,145.35 1120 1 WEL054.0-041.1B CS 1986 1986 32.200 35 1127 $ 68.16 $ 76,816.32 101.1 $ 14,934.87 $ 53,338.80 $ 53,338.80 $ 14,934.87 1127 1 WEL136.0-079.0A CS 1991 1991 31.900 43 1371.7 $ 68.16 $ 93,495.07 107.5 $ 12,425.34 $ 69,029.67 $ 69,029.67 $ 12,425.34 1372 1 WEL058.0-047.0A CSC 1978 1978 33.000 83 2739 $ 70.71 $ 193,674.69 70.7 $ 41,379.34 $ 94,043.96 $ 94,043.96 $ 41,379.34 2739 1 WEL078.0-013.0A CSC 1991 1991 32.100 68 2182.8 $ 70.71 $ 154,345.79 107.5 $ 20,512.30 $ 113,957.23 $ 113,957.23 $ 20,512.30 2183 1 WEL021.0-068.0A CSG 1970 1920 31.800 36 1144.8 $ 68.16 $ 78,029.57 34.87 $ 29,899.90 $ 18,687.44 $ 18,687.44 $ 29,899.90 1145 1 WEL021.0-076.5A CSG 1970 1930 20.000 44 880 $ 68.16 $ 59,980.80 34.87 $ 20,110.87 $ 14,364.91 $ 14,364.91 $ 20,110.87 880 1 WEL031.0-074.0A CSG 1970 1940 32.200 39 1255.8 $ 68.16 $ 85,595.33 34.87 $ 24,599.25 $ 20,499.38 $ 20,499.38 $ 24,599.25 1256 1 WEL068.0-059.0A CSG 1970 1957 31.900 94 2998.6 $ 70.71 $ 212,031.01 34.87 $ 43,670.52 $ 50,779.68 $ 50,779.68 $ 43,670.52 2999 1 WEL076.5-021.0A CSG 1970 1930 20.400 42 856.8 $ 68.16 $ 58,399.49 34.87 $ 19,580.67 $ 13,986.20 $ 13,986.20 $ 19,580.67 857 1 WEL001.0-020.5A CSP 1995 1995 36.300 31 1125.3 $ 68.16 $ 76,700.45 121.9 $ 6,421.56 $ 64,215.55 $ 64,215.55 $ 6,421.56 1125 1 WEL003.0-012.0A SDG 1975 1975 34.500 41 1414.5 $ 68.16 $ 96,412.32 58.1 $ 19,236.11 $ 38,472.22 $ 38,472.22 $ 19,236.11 1415 1 WEL087.0-040.0A SDG 1978 1978 17.200 41 705.2 $ 68.16 $ 48,066.43 70.7 $ 10,269.58 $ 23,339.95 $ 23,339.95 $ 10,269.58 705 1 WEL091.0-040.0A SDG 1977 1977 34.700 41 1422.7 $ 68.16 $ 96,971.23 59.8 $ 18,320.64 $ 39,827.47 $ 39,827.47 $ 18,320.64 1423 1 WEL002.0-045.0A SSE 1970 1965 25.300 31 784.3 $ 68.16 $ 53,457.89 34.87 $ 8,961.91 $ 12,802.72 $ 12,802.72 $ 8,961.91 784 1 WEL027.0-076.0A SSE 1970 1969 26.300 30 789 $ 68.16 $ 53,778.24 34.87 $ 7,985.26 $ 12,879.45 $ 12,879.45 $ 7,985.26 789 1 WEL029.0-080.0A SSE 1970 1962 32.300 30 969 $ 68.16 $ 66,047.04 34.87 $ 12,021.47 $ 15,817.72 , $ 15,817.72 $ 12,021.47 969 1 WEL035.0-066.0A SSE 1970 1968 24.000 38 912 $ 68.16 $ 62,161.92 34.87 $ 9,527.85 $ 14,887.27 $ 14,887.27 $ 9,527.85 912 1 WEL039.0-080.5A SSE 1970 1954 22.900 30 687 $ 68.16 $ 46,825.92 34.87 $ 10,317.27 $ 11,214.42 $ 11,214.42 $ 10,317.27 687 1 WEL039.0-086.0A SSE 1970 1960 25.000 22 550 $ 68.16 $ 37,488.00 34.87 $ 7,182.45 $ 8,978.07 $ 8,978.07 $ 7,182.45 550 1 WEL043.0-068.0A SSE 1970 1960 24.600 25 615 $ 68.16 $ 41,918.40 34.87 $ 8,031.29 $ 10,039.11 $ 10,039.11 $ 8,031.29 615 1 WEL053.0-066.0A SSE 1970 1961 23.300 25 582.5 $ 68.16 $ 39,703.20 34.87 $ 7,416.70 $ 9,508.59 $ 9,508.59 $ 7,416.70 583 1 WEL068.0-083.0A SSE 1970 1960 24.000 25 600 $ 68.16 $ 40,896.00 34.87 $ 7,835.40 $ 9,794.25 $ 9,794.25 $ 7,835.40 600 1 WEL068.5-013.0A SSE 1970 1953 24.100 43 1036.3 $ 68.16 $ 70,634.21 34.87 $ 15,901.33 $ 16,916.31 $ 16,916.31 $ 15,901.33 1036 1 WEL080.0-023.0A SSE 1970 1957 24.200 30 726 $ 68.16 $ 49,484.16 34.87 $ 10,191.90 $ 11,851.05 $ 11,851.05 $ 10,191.90 726 1 WEL084.0-021.0A SSE 1970 1946 23.400 40 936 $ 68.16 $ 63,797.76 34.87 $ 16,501.36 $ 15,279.04 $ 15,279.04 $ 16,501.36 936 1 WEL086.0-033.0A SSE 1970 1960 24.500 37 906.5 $ 68.16 $ 61,787.04 34.87 $ 11,837.99 $ 14,797.49 $ 14,797.49 $ 11,837.99 907 1 WEL001.0-036.0A SSM 1980 1980 32.000 25 800 $ 68.16 $ 54,528.00 97.2 $ 14,560.77 $ 36,401.93 $ 36,401.93 $ 14,560.77 800 1 WEL002.0-041.0a SSM 1970 1965 34.800 40 1392 $ 68.16 $ 94,878.72 34.87 $ 15,905.87 $ 22,722.67 $ 22,722.67 $ 15,905.87 1392 1 WEL002.0-047.0A SSM 1970 1960 23.900 41 979.9 $ 68.16 $ 66,789.98 34.87 $ 12,796.52 $ 15,995.65 $ 15,995.65 $ 12,796.52 980 1 WEL002.0-047.08 SSM 1970 1960 24.100 41 988.1 $ 68.16 $ 67,348.90 34.87 $ 12,903.60 $ 16,129.51 $ 16,129.51 $ 12,903.60 988 1 WEL003.0-012.0B SSM 1970 1970 30.800 37 1139.6 $ 68.16 $ 77,675.14 34.87 $ 11,161.53 $ 18,602.55 $ 18,602.55 $ 11,161.53 1140 1 WEL003.0-012.0C SSM 1989 1989 31.800 24 763.2 $ 68.16 $ 52,019.71 107.7 $ 8,465.35 $ 38,478.87 $ 38,478.87 $ 8,465.35 763 1 WEL003.0-014.0A SSM 1970 1965 24.400 38 927.2 $ 68.16 $ 63,197.95 34.87 $ 10,594.77 $ 15,135.39 $ 15,135.39 $ 10,594.77 927 1 WEL004.0-015.0A SSM 1970 1965 30.700 31 951.7 $ 68.16 $ 64,867.87 34.87 $ 10,874.72 $ 15,535.32 $ 15,535.32 $ 10,874.72 952 1 WEL004.0-041.06 SSM 1970 1950 23.900 27 645.3 $ 68.16 $ 43,983.65 34.87 $ 10,533.72 $ 10,533.72 $ 10,533.72 $ 10,533.72 645 1 WEL004.0-043.0A SSM 1970 1965 31.500 40 1260 $ 68.16 $ 85,881.60 34.87 $ 14,397.55 $ 20,567.94 $ 20,567.94 $ 14,397.55 1260 1 WEL004.0-045.0A SSM 1970 1968 24.100 32 771.2 $ 68.16 $ 52,564.99 34.87 $ 8,056.88 $ 12,588.88 $ 12,588.88 $ 8,056.88 771 1 WEL004.0/037.0A SSM 1996 1996 32.000 62 1984 $ 70.71 $ 140,288.64 120.2 $ 9,265.22 $ 115,815.21 $ 115,815.21 $ 9,265.22 . 1984 1 WEL004.0/039.0A SSM 1994 1994 32.100 40 1284 $ 68.16 $ 87,517.44 115.1 $ 8,302.14 $ 69,184.46 $ 69,184.46 $ 8,302.14 1284 1 WEL004.0/041.0A SSM 1996 1996 32.000 40 1280 $ 68.16 $ 87,244.80 120.2 $ 5,761.99 $ 72,024.90 $ 72,024.90 $ 5,761.99 1280 1 WEL004.0/051.0A SSM 2001 2001 36.000 41 1476 $ 68.16 $ 44,476.00 145.6 $ - $ 44,476.00 $ 44,476.00 $ - 1476 1 WEL004.5-023.0A SSM 1999 1999 32.250 25 806.25 $ 68.16 $ 54,954.00 136.5 $ 1,030.39 $ 51,519.38 $ 51,519.38 $ 1,030.39 806 1 WEL005.0-014.0A SSM 1978 1978 32.000 23 736 $ 68.16 $ 50,165.76 70.7 $ 10,718.11 $ 24,359.34 $ 24,359.34 $ 10,718.11 736 1 WEL006.0-019.0A SSM 1984 1984 31.500 30 945 $ 68.16 $ 64,411.20 92.6 $ 13,108.74 $ 40,964.82 $ 40,964.82 $ 13,108.74 945 1 WEL006.0-057.0A SSM 1982 1982 32.400 30 972 $ 68.16 $ 66,251.52 88.5 $ 14,497.07 $ 40,269.64 $ 40,269.64 $ 14,497.07 972 1 WEL006.0/025.0B SSM 2001 2001 40.400 59 2383.6 $ 68.16 $ 136,239.00 145.6 $ - $ 136,239.00 $ 136,239.00 $ - 2384 1 WEL006.0/027.0A SSM 1999 1999 32.100 29 930.9 $ 68.16 $ 63,450.14 136.5 $ 1,189.69 $ 59,484.51 $ 59,484.51 $ 1,189.69 931 1 WEL008.0-021.0A SSM 1983 1983 32.500 39 1267.5 $ 68.16 $ 86,392.80 87.6 $ 17,672.55 $ 51,978.09 $ 51,978.09 $ 17,672.55 1268 1 WEL008.0-029.0A SSM 1992 1992 31.500 24 756 $ 68.16 $ 51,528.96 105.1 $ 5,951.31 $ 37,195.70 $ 37,195.70 $ 5,951.31 756 1 WEL008.0-043.0A SSM 1974 1974 31.900 30 957 $ 68.16 $ 65,229.12 57.9 $ 13,488.45 $ 25,939.33 $ 25,939.33 $ 13,488.45 957 1 WEL010.0-051.0A SSM 1982 1982 31.800 39 1240.2 $ 68.16 $ 84,532.03 88.5 $ 18,497.19 $ 51,381.08 $ 51,381.08 $ 18,497.19 1240 1 WEL011.0/016.0C SSM 1997 1997 25.600 42 1075.2 $ 68.16 $ 73,285.63 130.6 $ 3,944.14 $ 65,735.60 $ 65,735.60 $ 3,944.14 1075 1 WEL013.0-026.08 SSM 1975 1975 31.900 40 1276 $ 68.16 $ 86,972.16 58.1 $ 17,352.62 $ 34,705.24 $ 34,705.24 $ 17,352.62 1276 1 WEL013.0-044.08 SSM 1970 1966 24.900 60 1494 $ 68.16 $ 101,831.04 34.87 $ 16,583.63 $ 24,387.69 $ 24,387.69 $ 16,583.63 1494 1 WEL013.0-054.0A SSM 1970 1960 24.400 80 1952 $ 70.71 $ 138,025.92 34.87 $ 26,444.86 $ 33,056.07 $ 33,056.07 $ 26,444.86 1952 1 WEL013.0/048.0A SSM 1999 1999 34.000 23 782 $ 68.16 $ 53,301.12 136.5 $ 999.40 $ 49,969.80 $ 49,969.80 $ 999.40 782 1 WEL014.0-035.0A SSM 1978 1978 31.800 26 826.8 $ 68.16 $ 56,354.69 70.7 $ 12,040.40 $ 27,364.54 $ 27,364.54 $ 12,040.40 827 1 Page 2 of 6 tl r . Structure Structure Acquisition Year Out to out Structure Square Unit cost Total Cost Accumulated Acquisition Year Acq. Yr. Value Acq. Yr. Value Acc. Depric. Acc, Depric. Deck Area of Deck Area of #of Struc. #of Struc Number Type Year Built Width Length Feet Year 2000 Cost Index Depreciation Value Struc>60' Long Struc a 60'Long of Struc>60' of Struc a 60' Bridges>60' Bridges a 60' L>60' L a 60' WEL015.0-002.0A SSM 1974 1974 31.500 29 913.5 $ 68.16 $ 62,264.16 57.9 $, 12,875.34 $ 24,760.27 $ 24,760.27 $ 12,875.34 914 1 WEL015.0-082.0A SSM 1970 1949 25.800 46 1186.8 $ 68.16 $ 80,892.29 34.87 $ 19,760.50 $ 19,373.04 $ 19,373.04 $ 19,760.50 1187 1 WEL015.0/056.OA SSM 1999 1999 31.800 58 1844.4 $ 68.16 $ 125,714.30 136.5 $ 2,357.14 $ 117,857.16 $ 117,857.16 $ 2,357.14 1844 1 WEL017.0-004.0A SSM 1974 1974 31.400 26 816.4 $ 68.16 $ 55,645.82 57.9 $ 11,506.76 $ 22,128.39 $ 22,128.39 $ 11,506.76 816 1 WEL017.0-022.0A SSM 2002 2002 32.200 29 933.8 $ 68.16 $ 60,461.04 145.6 $ - $ 60,461.04 $ 60,461.04 $ - 934 1 WEL017.0-054.0A SSM 1970 1963 29.600 30 888 $ 68.16 $ 60,526.08 34.87 $ 10,726.67 $ 14,495.50 $ 14,495.50 $ 10,726.67 888 1 WEL017.0/022.0B SSM 2000 2000 31.900 31 988.9 $ 68.16 $ 67,403.42 145.6 $ - $ 67,403.42 $ 67,403.42 $ - 989 1 WEL018.0/071.0A SSM 2000 2000 32.200 39 1255.8 $ 68.16 $ 69,434.00 145.6 $ - $ 69,434.00 $ 69,434.00 $ - 1256 1 WEL019.0-004.08 SSM 1984 1984 32.000 30 960 $ 68.16 $ 65,433.60 92.6 $ 13,316.82 $ 41,615.05 $ 41,615.05 $ 13,316.82 960 1 WEL019.0-022.0A SSM 1993 1993 32.000 36 1152 $ 68.16 $ 78,520.32 108.3 $ 8,176.68 $ 58,404.88 $ 58,404.88 $ 8,176.68 1152 1 WEL019.0-046.5A SSM 1970 1960 30.800 55 1694 $ 68.16 $ 115,463.04 34.87 $ 22,121.96 $ 27,652.45 $ 27,652.45 $ 22,121.96 1694 1 WEL019.0-082.0A SSM 1970 1942 21.700 59 1280.3 $ 68.16 $ 87,265.25 34.87 $ 24,243.20 $ 20,899.31 $ 20,899.31 $ 24,243.20 1280 1 WEL020.5-003.OB SSM 1978 1978 32.000 133 4256 $ 70.71 $ 300,941.76 70.7 $ 64,297.36 $ 146,130.37 $ 146,130.37 $ 64,297.36 4256 1 WEL022.0-021.0A SSM 1993 1993 31.800 35 1113 $ 68.16 $ 75,862.08 108.3 $ 7,899.87 $ 56,427.63 $ 56,427.63 $ 7,899.87 1113 1 WEL022.0/017.0A SSM 2002 2002 35.800 31 1109.8 $ 68.16 $ 54,273.86 145.6 $ - $ 54,273.86 $ 54,273.86 $ - 1110 1 WEL022.0/043.0A SSM 1994 1994 32.000 42 1344 $ 68.16 $ 91,607.04 115.1 $ 8,690.09 $ 72,417.38 $ 72,417.38 $ 8,690.09 1344 1 WEL022.5-025.0A SSM 1985 1985 16.100 46 740.6 $ 68.16 $ 50,479.30 102 $ 10,608.97 $ 35,363.24 $ 35,363.24 $ 10,608.97 741 1 WEL023.0-008.0A SSM 1982 1982 32.000 40 1280 $ 68.16 $ 87,244.80 88.5 $ 19,090.79 $ 53,029.98 $ 53,029.98 $ 19,090.79 1280 1 WEL023.0-082.OA SSM 1989 1989 32.100 25 802.5 $ 68.16 $ 54,698.40 107.7 $ 8,901.26 $ 40,460.29 $ 40,460.29 $ 8,901.26 803 1 WEL023.0/006.08 SSM 1995 1995 32.000 40 1280 $ 68.16 $ 87,244.80 121.9 $ 7,304.36 $ 73,043.55 $ 73,043.55 $ 7,304.36 1280 1 WEL023.0/006.0C SSM 1995 1995 32.000 39 1248 $ 68.16 $ 85,063.68 121.9 $ 7,121.75 $ 71,217.46 $ 71,217.46 $ 7,121.75 1248 1 WEL023.0/014.0A SSM 1997 1997 32.100 29 930.9 $ 68.16 $ 63,450.14 130.6 $ 3,414.80 $ 56,913.38 ' $ 56,913.38 $ 3,414.80 931 1 WEL023.0/066.0A SSM 1999 1999 32.000 38 1216 $ 68.16 $ 82,882.56 136.5 $ 1,554.05 $ 77,702.40 $ 77,702.40 $ 1,554.05 1216 1 WEL024.0-021.0A SSM 1993 1993 34.000 31 1054 $ 68.16 $ 71,840.64 108.3 $ 7,481.10 $ 53,436.41 $ 53,436.41 $ 7,481.10 1054 1 WEL024.5-025.OA SSM 1970 1960 23.800 42 999.6 $ 68.16 $ 68,132.74 34.87 $ 13,053.78 $ 16,317.23 $ 16,317.23 $ 13,053.78 1000 1 WEL025.0-048.0A SSM 1984 1984 31.500 80 2520 $ 70.71 $ 178,189.20 92.6 $ 36,264.44 $ 113,326.37 $ 113,326.37 $ 36,264.44 2520 1 WEL025.0-052.OA SSM 1970 1962 24.400 30 732 $ 68.16 $ 49,893.12 34.87 $ 9,081.23 $ 11,948.99 $ 11,948.99 $ 9,081.23 732 1 WEL025.0-062.1A SSM 1988 1988 33.400 100 3340 $ 70.71 $ 236,171.40 106.6 $ 41,498.69 $ 172,911.20 $ 172,911.20 $ 41,498.69 3340 1 WEL026.0-025.OA SSM 1970 1960 29.900 37 1106.3 $ 68.16 $ 75,405.41 34.87 $ 14,447.18 $ 18,058.97 $ 18,058.97 $ 14,447.18 1106 1 WEL027.0-052.1A SSM 1983 1983 32.100 30 963 $ 68.16 $ 65,638.08 87.6 $ 13,426.95 $ 39,491.04 $ 39,491.04 $ 13,426.95 963 1 WEL027.0-066.OA SSM 1970 1952 23.800 52 1237.6 $ 68.16 $ 84,354.82 34.87 $ 19,394.19 $ 20,202.28 $ 20,202.28 $ 19,394.19 1238 1 WEL028.0-025.OA SSM 1970 1964 23.500 37 869.5 $ 68.16 $ 59,265.12 34.87 $ 10,219.33 $ 14,193.51 $ 14,193.51 $ 10,219.33 870 1 WEL029.0-034.0A SSM 1970 1962 32.000 40 1280 $ 68.16 $ 87,244.80 34.87 $ 15,879.75 $ 20,894.41 $ 20,894.41 $ 15,879.75 1280 1 WEL029.0-058.0A SSM 1990 1990 32.000 40 1280 $ 68.16 $ 87,244.80 108.5 $ 13,002.83 $ 65,014.15 $ 65,014.15 $ 13,002.83 1280 1 WEL029.0-076.0A SSM 1981 1981 32.100 47 1508.7 $ 68.16 $ 102,832.99 94.2 $ 25,281.66 $ 66,530.69 $ 66,530.69 $ 25,281.66 1509 1 WEL029.0-084.OA SSM 1990 1990 32.000 39 1248 $ 68.16 $ 85,063.68 108.5 $ 12,677.76 $ 63,388.80 $ 63,388.80 $ 12,677.76 1248 1 WEL029.0-084.06 SSM 1992 1992 33.800 34 1149.2 $ 68.16 $ 78,329.47 105.1 $ 9,046.62 $ 56,541.40 $ 56,541.40 $ 9,046.62 1149 1 WEL029.0-088.0A SSM 1990 1990 31.500 22 693 $ 68.16 $ 47,234.88 108.5 $ 7,039.81 $ 35,199.07 $ 35,199.07 $ 7,039.81 693 1 WEL029.0-088.0B SSM 1989 1989 31.600 20 632 $ 68.16 $ 43,077.12 107.7 $ 7,010.09 $ 31,864.05 $ 31,864.05 $ 7,010.09 632 1 WEL029.0-088.OC SSM 1993 1993 30.000 25 750 $ 68.16 $ 51,120.00 108.3 $ 5,323.36 $ 38,024.01 $ 38,024.01 $ 5,323.36 750 1 WEL029.0/068.0A SSM 1997 1997 31.500 59 1858.5 $ 68.16 $ 126,675.36 130.6 $ 6,817.50 $ 113,625.01 $ 113,625.01 $ 6,817.50 1859 1 WEL031.0-036.OA SSM 1980 1980 32.000 30 960 $ 68.16 $ 65,433.60 97.2 $ 17,472.93 $ 43,682.32 $ 43,682.32 $ 17,472.93 960 1 WEL031.0-088.7A SSM 1989 1989 31.800 26 826.8 $ 68.16 $ 56,354.69 107.7 $ 9,170.80 $ 41,685.44 $ 41,685.44 $ 9,170.80 827 1 WEL031.0/086.0A SSM 1995 1995 31.000 28 868 $ 68.16 $ 59,162.88 121.9 $ 4,953.27 $ 49,532.66 $ 49,532.66 $ 4,953.27 868 1 WEL032.0-025.Oa SSM 1987 1987 30.500 30 915 $ 68.16 $ 62,366.40 100 $ 11,136.86 $ 42,834.07 $ 42,834.07 $ 11,136.86 915 1 WEL033.0-038.0B SSM 1978 1978 31.900 31 988.9 $ 68.16 $ 67,403.42 70.7 $ 14,401.00 $ 32,729.55 $ 32,729.55 $ 14,401.00 989 1 WEL033.0-100.OA SSM 1984 1984 32.000 30 960 $ 68.16 $ 65,433.60 92.6 $ 13,316.82 $ 41,615.05 $ 41,615.05 $ 13,316.82 960 1 WEL033.0/078.OA SSM 2000 2000 36.000 41 1476 $ 68.16 $ 100,604.16 145.6 $ - $ 100,604.16 $ 100,604.16 $ - 1476 1 WEL034.0-025.0A SSM 1974 1974 31.500 30 945 $ 68.16 $ 64,411.20 57.9 $ 13,319.32 $ 25,614.07 $ 25,614.07 $ 13,319.32 945 1 WEL035.0-038.OA SSM 1970 1966 26.000 31 806 $ 68.16 $ 54,936.96 34.87 $ 8,946.73 $ 13,156.95 $ 13,156.95 $ 8,946.73 806 1 WEL035.0-048.0A SSM 1970 1960 30.600 29 887.4 $ 68.16 $ 60,485.18 34.87 $ 11,588.56 $ 14,485.70 $ 14,485.70 $ 11,588.56 887 1 WEL036.0-029.0B SSM 1981 1981 31.900 27 861.3 $ 68.16 $ 58,706.21 94.2 $ 14,433.02 $ 37,981.63 $ 37,981.63 $ 14,433.02 861 1 WEL036.0-029.1A SSM 1985 1985 31.700 30 951 $ 68.16 $ 64,820.16 102 $ 13,622.92 $ 45,409.73 $ 45,409.73 $ 13,622.92 951 1 WEL037.0-114.OA SSM 1992 1992 31.800 47 1494.6 $ 68.16 $ 101,871.94 105.1 $ 11,765.65 $ 73,535.31 $ 73,535.31 $ 11,765.65 1495 1 WEL037.0/086.OA SSM 1998 1998 32.000 28 896 $ 68.16 $ 61,071.36 126.9 $ 2,129.11 $ 53,227.72 $ 53,227.72 $ 2,129.11 896 1 WEL038.0-009.0A SSM 1970 1965 30.800 31 954.8 $ 68.16 $ 65,079.17 34.87 $ 10,910.15 $ 15,585.92 $ 15,585.92 $ 10,910.15 955 1 WEL039.0-040.OA SSM 1988 1988 31.700 28 887.6 $ 68.16 $ 60,498.82 106.6 $ 10,630.51 $ 44,293.78 $ 44,293.78 $ 10,630.51 888 1 WEL039.0-048.5A SSM 1970 1950 23.800 23 547.4 $ 68.16 $ 37,310.78 34.87 $ 8,935.63 $ 8,935.63 $ 8,935.63 $ 8,935.63 547 1 WEL040.0-045.OA SSM 1981 1981 32.000 40 1280 $ 68.16 $ 87,244.80 94.2 $ 21,449.28 $ 56,445.47 $ 56,445.47 $ 21,449.28 1280 1 WEL040.0/041.OA SSM 1996 1996 32.000 49 1568 $ 68.16 $ 106,874.88 120.2 $ 7,058.44 $ 88,230.50 $ 88,230.50 $ 7,058.44 1568 1 WEL041.0-068.OA SSM 1993 1993 30.600 26 795.6 $ 68.16 $ 54,228.10 108.3 $ 5,647.02 $ 40,335.87 $ 40,335.87 $ 5,647.02 796 1 WEL041.0-100.0A SSM 1992 1992 32.000 40 1280 $ 68.16 $ 87,244.80 105.1 $ 10,076.30 $ 62,976.84 $ 62,976.84 $ 10,076.30 1280 1 WEL042.0-039.OA SSM 1991 1991 32.200 39 1255.8 $ 68.16 $ 85,595.33 107.5 $ 11,375.48 $ 63,197.10 • $ 63,197.10 $ 11,375.48 1256 1 WEL042.0-041.OA SSM 1970 1959 25.700 40 1028 $ 68.16 $ 70,068.48 34.87 $ 13,760.28 $ 16,780.82 $ 16,780.82 $ 13,760.28 1028 1 WEL042.0/047.0A SSM 2001 2001 32.100 36 1155.6 $ 68.16 $ 126,449.00 145.6 $ - $ 126,449.00 $ 126,449.00 $ - 1156 1 Page 3 of 6 structure Structure Acquisition year Uut to Uut structure square unit Lost i atal Uost Accumulateo Acquisition Year Acq. Yr.Value Acq. Yr. Value ACC. Ueprlc. Ace, uepnc. Uecx Area of UecK Area or a or Struc. R of Struc Number Type Year Built Width Length Feet Year 2000 Cost Index Depriciation Value Struc>60' Long Struc a 60'Long of Struc>60' of Struc<=60' Bridges>60' Bridges<=60' L>60' L a 60' WEL043.0-066.1A SSM 1985 1985 32.000 30 960 $ 68.16 $ 65,433.60 102 $ 13,751.84 $ 45,839.47 $ 45,839.47 $ 13,751.84 960 1 WEL043.0-070.0A SSM 1981 1981 32.000 25 800 $ 68.16 $ 54,528.00 94.2 $ 13,405.80 $ 35,278.42 $ 35,278.42 $ 13,405.80 800 1 WEL043.0-070.0C SSM 1981 1981 32.300 41 1324.3 $ 68.16 $ 90,264.29 94.2 $ 22,191.62 $ 58,399.01 $ 58,399.01 $ 22,191.62. 1324 1 WEL043.0-074.1A SSM 1985 1985 32.000 39 1248 $ 68.16 $ 85,063.68 102 $ 17,877.39 $ 59,591.31 $ 59,591.31 $ 17,877.39 1248 . 1 WEL043.0-078.0A SSM 1975 1975 31.900 24 765.6 $ 68.16 $ 52,183.30 58.1 $ 10,411.57 $ 20,823.14 $ 20,823.14 $ 10,411.57 766 1 WEL043.0-084.0A SSM 1979 1979 31.400 27 847.8 $ 68.16 $ 57,786.05 85.5 $ 14,252.04 $ 33,933.43 $ 33,933.43 $ 14,252.04 848 1 WEL043.0/054.0A SSM 1995 1995 28.100 34 955.4 $ 68.16 $ 65,120.06 121.9 $ 5,452.02 $ 54,520.16 $ 54,520.16 $ 5,452.02 955 1 WEL043.0/070.0B SSM 1998 1998 31.400 29 910.6 $ 68.16 $ 62,066.50 126.9 $ 2,163.80 $ 54,095.04 $ 54,095.04 $ 2,163.80 911 1 WEL044.0-009.0A SSM 1970 1960 25.200 39 982.8 $ 68.16 $ 66,987.65 34.87 $ 12,834.39 $ 16,042.99 $ 16,042.99 $ 12,834.39 983 1 WEL044.0-013.0B SSM 1987 1987 31.600 35 1106 $ 68.16 $ 75,384.96 100 $ 13,461.60 $ 51,775.38 $ 51,775.38 $ 13,461.60 1106 1 WEL044.0-033.0A SSM 1980 1980 29.400 27 793.8 $ 68.16 $ 54,105.41 97.2 $ 14,447.93 $ 36,119.82 $ 36,119.82 $ 14,447.93 794 1 WEL044.0-041.0B SSM 1981 1981 32.000 25 800 $ 68.16 $ 54,528.00 94.2 $ 13,405.80 $ 35,278.42 $ 35,278.42 $ 13,405.80 800 1 WEL044.0-047.0A SSM 1970 1960 32.000 31 992 $ 68.16 $ 67,614.72 34.87 $ 12,954.53 $ 16,193.17 $ 16,193.17 $ 12,954.53 992 1 WEL044.0-051.1A SSM 1981 1981 30.900 24 741.6 $ 68.16 $ 50,547.46 94.2 $ 12,427.18 $ 32,703.09 $ 32,703.09 $ 12,427.18 742 1 WEL044.0/041.0C SSM 2001 2001 36.100 30 1083 $ 68.16 $ 144,058.00 145.6 $ - $ 144,058.00 $ 144,058.00 $ - 1083 1 WEL045.0-058.5A SSM 1986 1986 32.100 39 1251.9 $ 68.16 $ 85,329.50 101.1 $ 16,590.02 $ 59,250.09 $ 59,250.09 $ 16,590.02 1252 1 WEL045.0-068.0B SSM 1976 1976 32.000 30 960 $ 68.16 $ 65,433.60 56.3 $ 12,144.76 $ 25,301.59 $ 25,301.59 $ 12,144.76 960 1 WEL045.0-068.0C SSM 1970 1951 23.500 37 869.5 $ 68.16 $ 59,265.12 34.87 $ 13,909.64 $ 14,193.51 $ 14,193.51 $ 13,909.64 870 1 WEL045.0-084.0A SSM 1990 1990 28.500 30 855 $ 68.16 $ 58,276.80 108.5 $ 8,685.48 $ 43,427.42 $ 43,427.42 $ 8,685.48 855 1 WEL045.0/008.0A SSM 1998 1998 32.000 40 1280 $ 68.16 $ 87,244.80 126.9 $ 3,041.58 $ 76,039.60 $ 76,039.60 $ 3,041.58 1280 1 WEL045.0/054.5A SSM 1996 1996 31.800 39 1240.2 $ 68.16 $ 84,532.03 120.2 $ 5,582.83 $ 69,785.37 $ 69,785.37 $ 5,582.83 1240 1 WEL045.5-054.5A SSM 1970 1970 32.200 38 1223.6 $ 68.16 $ 83,400.58 34.87 $ 11,984.25 $ 19,973.75 $ 19,973.75 $ 11,984.25 1224 1 WEL046.0-047.1A SSM 1983 1983 32.000 26 832 $ 68.16 $ 56,709.12 87.6 $ 11,600.44 $ 34,118.95 $ 34,118.95 $ 11,600.44 832 1 WEL046.5-017.0A SSM 1993 1993 32.000 40 1280 $ 68.16 $ 87,244.80 108.3 $ 9,085.20 $ 64,894.31 $ 64,894.31 $ 9,085.20 1280 1 WEL047.0-068.0A SSM 1990 1990 31.500 29 913.5 $ 68.16 $ 62,264.16 108.5 $ 9,279.75 $ 46,398.77 $ 46,398.77 $ 9,279.75 914 1 WEL047.0-078.0A SSM 1970 1960 27.000 28 756 $ 68.16 $ 51,528.96 34.87 $ 9,872.61 $ 12,340.76 $ 12,340.76 $ 9,872.61 756 1 WEL047.0/040.0A SSM 2000 2000 36.000 41 1476 $ 68.16 $ 100,604.16 145.6 $ - $ 100,604.16 $ 100,604.16 $ - 1476 1 WEL048.0/047.0A SSM 1998 1998 31.800 49 1558.2 $ 68.16 $ 106,206.91 126.9 $ 3,702.65 $ 92,566.33 $ 92,566.33 $ 3,702.65 1558 1 WEL048.5-019.0A SSM 1991 1991 31.600 25 790 $ 68.16 $ 53,846.40 107.5 $ 7,156.10 $ 39,756.10 $ 39,756.10 $ 7,156.10 790 1 WEL049.0-052.0A SSM 1976 1976 32.900 30 987 $ 68.16 $ 67,273.92 56.3 $ 12,486.34 $ 26,013.20 $ 26,013.20 $ 12,486.34 987 1 WEL049.0-054.0A SSM 1970 1960 31.700 31 982.7 $ 68.16 $ 66,980.83 34.87 $ 12,833.09 $ 16,041.36 $ 16,041.36 $ 12,833.09 983 1 WEL049.0-076.0A SSM 1982 1982 32.000 26 832 $ 68.16 $ 56,709.12 88.5 $ 12,409.01 $ 34,469.49 $ 34,469.49 $ 12,409.01 832 1 WEL049.0/070.0A SSM 1997 1997 32.200 37 1191.4 $ 68.16 $ 81,205.82 130.6 $ 4,370.39 $ 72,839.84 $ 72,839.84 $ 4,370.39 1191 1 WEL050.0-013.0A SSM 1999 1999 33.200 30 996 $ 68.16 $ 67,887.36 136.5 $ 1,272.89 $ 63,644.40 $ 63,644.40 $ 1,272.89 996 1 WEL050.0-047.0A SSM 1979 1979 31.300 39 1220.7 $ 68.16 $ 83,202.91 85.5 $ 20,520.72 $ 48,858.85 $ 48,858.85 $ 20,520.72 1221 1 WEL050.0-051.0A SSM 1982 1982 30.800 23 708.4 $ 68.16 $ 48,284.54 88.5 $ 10,565.56 $ 29,348.78 $ 29,348.78 $ 10,565.56 708 1 WEL050.0-057.0A SSM 1970 1960 24.400 29 707.6 $ 68.16 $ 48,230.02 34.87 $ 9,240.55 $ 11,550.69 $ 11,550.69 $ 9,240.55 708 1 WEL050.0-065.0A SSM 1978 1978 30.700 57 1749.9 $ 68.16 $ 119,273.18 70.7 $ 25,483.17 $ 57,916.31 $ 57,916.31 $ 25,483.17 1750 1 WEL051.0-054.2A SSM 1984 1984 30.600 25 765 $ 68.16 $ 52,142.40 92.6 $ 10,611.84 $ 33,161.99 $ 33,161.99 $ 10,611.84 765 1 WEL051.0-068.0A SSM 1982 1982 31.700 49 1553.3 $ 68.16 $ 105,872.93 88.5 $ 23,166.97 $ 64,352.71 $ 64,352.71 $ 23,166.97 1553 1 WEL051.0/072.0A SSM 1999 1999 34.300 48 1646.4 $ 68.16 $ 112,218.62 136.5 $ 2,104.10 $ 105,204.96 $ 105,204.96 $ 2,104.10 1646 1 WEL051.0/078.0A SSM 1999 1999 35.000 59 2065 $ 68.16 $ 140,750.40 136.5 $ 2,639.07 $ 131,953.50 $ 131,953.50 $ 2,639.07 2065 1 WEL052.0-013.0A SSM 1970 1960 24.300 31 753.3 $ 68.16 $ 51,344.93 34.87 $ 9,837.35 $ 12,296.69 $ 12,296.69 $ 9,837.35 753 1 WEL052.0-021.0A SSM 1970 1967 24.600 31 762.6 $ 68.16 $ 51,978.82 34.87 $ 8,216.01 $ 12,448.50 $ 12,448.50 $ 8,216.01 763 1 WEL052.0/043.0A SSM 1998 1998 39.600 29 1148.4 $ 68.16 $ 78,274.94 126.9 $ 2,728.87 $ 68,221.77 $ 68,221.77 $ 2,728.87 1148 1 WEL053.0-042.0A SSM 1990 1990 32.000 30 960 $ 68.16 $ 65,433.60 108.5 $ 9,752.12 $ 48,760.62 $ 48,760.62 $ 9,752.12 960 1 WEL053.0-054.2A SSM 1992 1992 32.000 25 800 $ 68.16 $ 54,528.00 105.1 $ 6,297.68 $ 39,360.53 $ 39,360.53 $ % 6,297.68 800 1 WEL053.0-078.0A SSM 1990 1990 31.800 41 1303.8 $ 68.16 $ 88,867.01 108.5 $ 13,244.60 $ 66,223.01 $ 66,223.01 $ 13,244.60 1304 1 WEL054.0-043.0A SSM 1998 1998 32.100 29 930.9 $ 68.16 $ 63,450.14 126.9 $ 2,212.04 $ 55,300.98 $ 55,300.98 $ 2,212.04 931 1 WEL054.0/019.0A SSM 1999 1999 31.500 38 1197 $ 68.16 $ 81,587.52 136.5 $ 1,529.77 $ 76,488.30 $ 76,488.30 $ 1,529.77 1197 1 WEL055.0-014.1A SSM 1985 1985 32.000 40 1280 $ 68.16 $ 87,244.80 102 $ 18,335.79 $ 61,119.30 $ 61,119.30 $ 18,335.79 1280 1 WEL055.0-052.0A SSM 1970 1960 23.700 31 734.7 $ 68.16 $ 50,077.15 34.87 $ 9,594.45 $ 11,993.07 $ 11,993.07 $ 9,594.45 735 1 WEL056.0/059.0A SSM 1995 1995 36.500 49 1788.5 $ 68.16 $ 121,904.16 121.9 $ 10,206.12 $ 102,061.24 $ 102,061.24 $ 10,206.12 1789 1 WEL057.0-052.0A SSM 1970 1960 28.900 28 809.2 $ 68.16 $ 55,155.07 34.87 $ 10,567.35 $ 13,209.19 $ 13,209.19 $ 10,567.35 809 1 WEL057.0-094.0A SSM 1987 1987 32.000 41 1312 $ 68.16 $ 89,425.92 100 $ 15,968.91 $ 61,418.90 $ 61,418.90 $ 15,968.91 1312 1 WEL057.0-100.0A SSM 1987 1987 31.800 41 1303.8 $ 68.16 $ 88,867.01 100 $ 15,869.11 $ 61,035.03 $ 61,035.03 $ 15,869.11 1304 1 WEL057.0-128.0A SSM 1993 1993 32.000 40 1280 $ 68.16 $ 87,244.80 108.3 $ 9,085.20 $ 64,894.31 $ 64,894.31 $ 9,085.20 1280 1 WEL059.0-016.0A SSM 2001 2001 39.000 50 1950 $ 68.16 $ 133,959.00 145.6 $ - $ 133,959.00 $ 133,959.00 $ - 1950 1 WEL059.0-060.5A SSM 1970 1965 25.900 31 802.9 $ 68.16 $ 54,725.66 34.87 $ 9,174.44 $ 13,106.35 $ 13,106.35 $ 9,174.44 803 1 WEL059.0-064.0A SSM 1970 1965 26.100 40 1044 $ 68.16 $ 71,159.04 34.87 $ 11,929.40 $ 17,042.00 $ 17,042.00 $ 11,929.40 1044 1 WEL059.0-114.0A SSM 1992 1992 32.000 40 1280 $ 68.16 $ 87,244.80 105.1 $ 10,076.30 $ 62,976.84 $ 62,976.84 $ 10,076.30 1280 1 WEL061.0-068.0A SSM 1970 1965 23.800 40 952 $ 68.16 $ 64,888.32 34.87 $ 10,878.15 $ 15,540.22 $ 15,540.22 $ 10,878.15 952 1 WEL061.5/068.0A SSM 2000 2000 36.000 40 1440 $ 68.16 $ 34,931.00 145.6 $ - $ 34,931.00 $ 34,931.00 $ - 1440 1 WEL062.0-057.0A SSM 1970 1965 24.200 30 726 $ 68.16 $ 49,484.16 34.87 $ 8,295.73 $ 11,851.05 $ 11,851.05 $ 8,295.73 726 1 WEL062.0/043.0A SSM 1995 1995 32.000 40 1280 $ 68.16 $ 87,244.80 121.9 $ 7,304.36 $ 73,043.55 $ 73,043.55 $ 7,304.36 1280 1 Page 4 of 6 Structure structure Acquisition Year Out to Out Structure Square Unit Cost I otai Lost Accumulatea Acquisition Year Acq. Yr. Value Acq. Yr. Value ACC. Depric. Acc, Depric. DecK Area of Deck Area of it of Struc. It of Struc Number Type Year Built Width Length Feet Year 2000 Cost Index Depriciation Value Struc>60' Long Struc<=60' Long of Struc>60' of Struc<=60' Bridges>60' Bridges a 60' L>60' L a 60' ; WEL062.5-049.0A SSM 1986 1986 32.200 40 1288 $ 68.16 $ 87,790.08 101.1 $ 17,068.42 $ 60,958.63 $ 60,958.63 $ 17,068.42 1288 1 WEL064.0-049.0A SSM 1986 1986 32.000 41 1312 $ 68.16 $ 89,425.92 101.1 $ 17,386.46 $ 62,094.51 $ 62,094.51 $ 17,386.46 1312 1 WEL066.0-043.0A SSM 1994 1994 32.000 31 992 $ 68.16 $ 67,614.72 115.1 $ 6,414.11 $ 53,450.92 $ 53,450.92 $ 6,414.11 992 1 WEL066.0-049.1A SSM 1985 1985 32.000 46 1472 $ 68.16 $ 100,331.52 102 $ 21,086.16 $ 70,287.19 $ 70,287.19 $ 21,086.16 1472 1 WEL067.0-128.0A SSM 1990 1990 30.700 39 1197.3 $ 68.16 $ 81,607.97 108.5 $ 12,162.73 $ 60,813.63 $ 60,813.63 $ 12,162.73 1197 1 WEL068.0-061.5A SSM 2001 2001 36.000 50 1800 $ 68.16 $ 78,217.00 145.6 $ - $ 78,217.00 $ 78,217.00 $ - 1800 1 WEL068.0/061.5B SSM 1999 1999 36.050 48 1730.4 $ 68.16 $ 117,944.06 136.5 $ 2,211.45 $ 110,572.56 $ 110,572.56 $ 2,211.45 1730 1 WEL069.0-046.7A SSM 1989 1989 32.000 56 1792 $ 68.16 $ 122,142.72 107.7 $ 19,876.71 $ 90,348.70 $ 90,348.70 $ 19,876.71 1792 1 WEL070.0-043.0A SSM 1988 1988 32.000 26 832 $ 68.16 $ 56,709.12 106.6 $ 9,964.60 $ 41,519.18 $ 41,519.18 $ 9,964.60 832 1 WEL070.0-043.08 SSM 1988 1988 30.800 23 708.4 $ 68.16 $ 48,284.54 106.6 $ 8,484.28 $ 35,351.18 $ 35,351.18 $ 8,484.28 708 1 WEL070.0-043.ID SSM 1983 1983 32.000 31 992 $ 68.16 $ 67,614.72 87.6 $ 13,831.30 $ 40,680.28 $ 40,680.28 $ 13,831.30 992 1 WEL070.0-043.2O SSM 1983 1983 32.000 38 1216 $ 68.16 $ 82,882.56 87.6 $ 16,954.49 $ 49,866.16 $ 49,866.16 $ 16,954.49 1216 1 WEL070.0-047.0A SSM 1970 1960 24.000 30 720 $ 68.16 $ 49,075.20 34.87 $ 9,402.48 $ 11,753.11 $ 11,753.11 $ 9,402.48 720 1 - WEL070.0-049.0A SSM 1970 1960 25.200 30 756 $ 68.16 $ 51,528.96 34.87 $ 9,872.61 $ 12,340.76 $ 12,340.76 $ 9,872.61 756 1 WEL070.0-049.18 SSM 1985 1985 32.000 30 960 $ 68.16 $ 65,433.60 102 $ 13,751.84 $ 45,839.47 $ 45,839.47 $ 13,751.84 960 1 WEL070.0/043.0E SSM 1994 1994 33.800 40 1352 $ 68.16 $ 92,152.32 115.1 $ 8,741.81 $ 72,848.43 $ 72,848.43 $ 8,741.81 1352 1 WEL072.0-047.0A SSM 1970 1960 24.200 31 750.2 $ 68.16 $ 51,133.63 34.87 $ 9,796.87 $ 12,246.08 $ 12,246.08 $ 9,796.87 750 1 WEL072.0-047.0B SSM 1970 1960 22.600 29 655.4 $ 68.16 $ 44,672.06 34.87 $ 8,558.87 $ 10,698.59 $ 10,698.59 $ 8,558.87 655 1 WEL072.0-049.0A SSM 1970 1960 24.000 31 744 $ 68.16 $ 50,711.04 34.87 $ 9,715.90 $ 12,144.88 $ 12,144.88 $ 9,715.90 744 1 WEL073.0-018.0A SSM 1970 1965 28.000 31 868 $ 68.16 $ 59,162.88 34.87 $ 9,918.32 $ 14,169.02 $ 14,169.02 $ 9,918.32 868 1 WEL074.0-041.0A SSM 1970 1965 32.100 50 1605 $ 68.16 $ 109,396.80 34.87 $ 18,339.74 $ 26,199.63 $ 26,199.63 $ 18,339.74 1605 1 WEL074.0-047.0A SSM 1982 1982 31.900 24 765.6 $ 68.16 $ 52,183.30 88.5 $ 11,418.68 $ 31,718.56 $ 31,718.56 $ 11,418.68 766 1 WEL074.0-051.0A SSM 1970 1965 26.700 40 1068 $ 68.16 $ 72,794.88 34.87 $ 12,203.64 $ 17,433.77 $ 17,433.77 $ 12,203.64 1068 1 WEL076.0-025.0A SSM 1989 1989 31.200 39 1216.8 $ 68.16 $ 82,937.09 107.7 $ 13,496.64 $ 61,348.38 $ 61,348.38 $ 13,496.64 1217 1 WEL076.0-029.1A SSM 1985 1985 31.300 40 1252 $ 68.16 $ 85,336.32 102 $ 17,934.69 $ 59,782.31 $ 59,782.31 $ 17,934.69 1252 1 WEL076.0-031.0A SSM 1980 1980 31.600 39 1232.4 $ 68.16 $ 84,000.38 97.2 $ 22,430.87 $ 56,077.18 $ 56,077.18 $ 22,430.87 1232 1 WEL076.0-043.1A SSM 1985 1985 31.800 39 1240.2 $ 68.16 $ 84,532.03 102 $ 17,765.66 $ 59,218.87 $ 59,218.87 $ 17,765.66 1240 1 WEL076.0-053.0A SSM 1998 1998 32.000 28 896 $ 68.16 $ 61,071.36 126.9 $ 2,129.11 $ 53,227.72 $ 53,227.72 $ 2,129.11 896 1 WEL077.0-092.0A SSM 2002 2002 36.000 50 1800 $ 68.16 $ 205,420.50 145.6 $ - $ 205,420.50 $ 205,420.50 $ - 1800 1 WEL077.0-106.OA SSM 1990 1990 31.900 40 1276 $ 68.16 $ 86,972.16 108.5 $ 12,962.20 $ 64,810.98 $ 64,810.98 $ 12,962.20 1276 1 WEL078.0-027.0A SSM 1992 1992 31.700 49 1553.3 $ 68.16 $ 105,872.93 105.1 $ 12,227.74 $ 76,423.38 $ 76,423.38 $ 12,227.74 1553 1 WEL078.0-027.0B SSM 1993 1993 31.400 45 1413 $ 68.16 $ 96,310.08 108.3 $ 10,029.21 $ 71,637.24 $ 71,637.24 $ 10,029.21 1413 1 WEL078.0/043.0A SSM 1997 1997 32.100 41 1316.1 $ 68.16 $ 89,705.38 130.6 $ 4,827.83 $ 80,463.75 $ 80,463.75 $ 4,827.83 1316 1 WEL080.0-025.0A SSM 1993 1993 32.100 39 1251.9 $ 68.16 $ 85,329.50 108.3 $ 8,885.76 $ 63,469.68 $ 63,469.68 $ 8,885.76 1252 1 WEL080.0-035.0A SSM 1988 1988 30.900 30 927 $ 68.16 $ 63,184.32 106.6 $ 11,102.39 $ 46,259.95 $ 46,259.95 $ 11,102.39 927 1 WEL080.0-075.0A SSM 1993 1993 32.000 40 1280 $ 68.16 $ 87,244.80 108.3 $ 9,085.20 $ 64,894.31 $ 64,894.31 $ 9,085.20 1280 1 WEL080.0/091.0A SSM 1995 1995 31.800 38 1208.4 $ 68.16 $ 82,364.54 121.9 $ 6,895.77 $ 68,957.68 $ 68,957.68 $ 6,895.77 1208 1 WEL083.0-098.0A SSM 1992 1992 32.000 24 768 $ 68.16 $ 52,346.88 105.1 $ 6,045.78 $ 37,786.11 $ 37,786.11 $ 6,045.78 768 1 WEL084.0-013.0A SSM 1980 1980 32.500 47 1527.5 $ 68.16 $ 104,114.40 97.2 $ 27,801.98 $ 69,504.94 $ 69,504.94 $ 27 801.98 1528 1 WEL084.0-019.0A SSM 1990 1990 31.700 41 1299.7 $ 68.16 $ 88,587.55 108.5 $ 13,202.95 $ 66,014.76 $ 66,014.76 $ 13,202.95 1300 1 WEL084.0-021.0B SSM 1990 1990 32.000 26 832 $ 68.16 $ 56,709.12 108.5 $ 8,451.84 $ 42,259.20 $ 42,259.20 $ 8,451.84 832 1 WEL084.0-025.0A SSM 1990 1990 32.100 30 963 $ 68.16 $ 65,638.08 108.5 $ 9,782.60 $ 48,912.99 $ 48,912.99 $ 9,782.60 963 1 WEL084.0-029.0A SSM 1987 1987 28.500 30 855 $ 68.16 $ 58,276.80 100 $ 10,406.57 $ 40,025.27 $ 40,025.27 $ 10,406.57 855 1 WEL086.0-027.0A SSM 1989 1989 32.100 22 706.2 $ 68.16 $ 48,134.59 107.7 $ 7,833.11 $ 35,605.05 $ 35,605.05 $ 7,833.11 706 1 WEL086.0-029.0A SSM 1990 1990 29.800 23 685.4 $ 68.16 $ 46,716.86 108.5 $ 6,962.61 $ 34,813.05 $ 34,813.05 $ 6,962.61 685 1 WEL086.0/045.0A SSM 2001 2001 32.000 30 960 $ 68.16 $ 84,730.00 145.6 $ - $ 84,730.00 $ 84,730.00 $ ' - 960 1 WEL087.0-042.5A SSM 1970 1960 24.000 361 8664 $ 70.71 $ 612,631.44 34.87 $ 117,376.14 $ 146,720.18 $ 146,720.18 $ 117,376.14 8664 1 WEL087.0-044.0A SSM 1970 1960 26.100 40 1044 $ 68.16 $ 71,159.04 34.87 $ 13,633.60 $ 17,042.00 $ 17,042.00 $ 13,633.60 1044 1 WEL088.0/027.0A SSM 1994 1994 31.100 23 715.3 $ 68.16 $ 48,754.85 115.1 $ 4,625.01 $ 38,541.78 $ 38,541.78 $ 4,625.01 715 1 WEL090.0-023.0A SSM 1980 1980 31.700 39 1236.3 $ 68.16 $ 84,266.21 97.2 $ 22,501.86 $ 56,254.64 $ 56,254.64 $ 22,501.86 1236 1 WEL090.0-029.0A SSM 1993 1993 31.400 27 847.8 $ 68.16 $ 57,786.05 108.3 $ 6,017.53 $ 42,982.34 $ 42,982.34 $ 6,017.53 848 1 WEL090.0-029.1B SSM 1989 1989 31.900 24 765.6 $ 68.16 $ 52,183.30 107.7 $ 8,491.97 $ 38,599.87 $ 38,599.87 $ 8,491.97 766 1 WEL090.0-031.0A SSM 1982 1982 32.700 26 850.2 $ 68.16 $ 57,949.63 88.5 $ 12,680.46 $ 35,223.51 $ 35,223.51 $ 12,680.46 850 1 WEL096.0-021.0A SSM 1991 1991 32.100 40 1284 $ 68.16 $ 87,517.44 107.5 $ 11,630.92 $ 64,616.24 $ 64,616.24 $ 11,630.92 1284 1 WEL096.0-057.0A SSM 1991 1991 32.000 30 960 $ 68.16 $ 65,433.60 107.5 $ 8,696.02 $ 48,311.21 $ 48,311.21 $ 8,696.02 960 1 WEL100.0-035.0A SSM 1991 1991 32.700 40 1308 $ 68.16 $ 89,153.28 107.5 $ 11,848.32 $ 65,824.02 $ 65,824.02 $ 11,848.32 1308 1 WEL100.0-053.0A SSM 1991 1991 31.300 30 939 $ 68.16 $ 64,002.24 107.5 $ 8,505.79 $ 47,254.40 $ 47,254.40 $ 8,505.79 939 1 WEL102.0-039.0A SSM 1987 1987 28.100 39 1095.9 $ 68.16 $ 74,696.54 100 $ 13,338.67 $ 51,302.57 $ 51,302.57 $ 13,338.67 1096 1 WEL102.0-041.0A SSM 1992 1992 30.700 39 1197.3 $ 68.16 $ 81,607.97 105.1 $ 9,425.27 $ 58,907.95 $ 58,907.95 $ 9,425.27 1197 1 WEL102.0-041.0B SSM 1974 1974 30.900 30 927 $ 68.16 $ 63,184.32 57.9 $ 13,065.61 $ 25,126.18 $ 25,126.18 $ 13,065.61 927 1 WEL106.0-035.0A SSM 1992 1992 30.600 25 765 $ 68.16 $ 52,142.40 105.1 $ 6,022.16 $ 37,638.50 $ 37,638.50 $ 6,022.16 765 1 WEL106.0-077.0A SSM 1991 1991 31.500 39 1228.5 $ 68.16 $ 83,734.56 107.5 $ 11,128.19 $ 61,823.25 $ 61,823.25 $ 11,128.19 1229 1 WEL120.0-065.OA SSM 1991 1991 32.400 39 1263.6 $ 68.16 $ 86,126.98 107.5 $ 11,446.13 $ 63,589.63 $ 63,589.63 $ 11,446.13 1264 1 WEL120.0-085.0A SSM 1970 1960 28.000 40 1120 $ 68.16 $ 76,339.20 34.87 $ 14,626.09 $ 18,282.61 $ 18,282.61 $ 14,626.09 1120 1 WEL122.0-029.0A SSM 1986 1986 32.100 40 1284 $ 68.16 $ 87,517.44 101.1 $ 17,015.41 $ 60,769.32 $ 60,769.32 $ 17,015.41 1284 1 • Structure Structure Acquisition Year Uut to Uut Structure Square Unit Lost i otal Lost Accumulates Acquisition Year ACq. Yr. value Acq. Yr. Value Ace. Depnc. Ace, Depnc. Deck Area of Deck Area 01 if of StruC. S 01 Struc Number Type Year Built Width Length Feet Year 2000 Cost Index Depriciation Value Struc>60' Long Struc<=60'Long of Struc>60' of Struc<=60' Bridges>60' Bridges<=60' L>60' L<=60' WEL122.0-031.0A SSM 1984 1984 31.900 79 2520.1 $ 70.71 $ 178,196.27 92.6 $ 36,265.88 $ 113,330.87 $ 113,330.87 $ 36,265.88 2520 1 WEL122.0-085.0A SSM 1993 1993 31.200 50 1560 $ 68.16 $ 106,329.60 108.3 $ 11,072.59 $ 79,089.94 $ 79,089.94 $ 11,072.59 1560 1 WEL124.0-071.0B SSM 1989 1989 31.900 40 1276 $ 68.16 $ 86,972.16 107.7 $ 14,153.29 $ 64,333.12 $ 64,333.12 $ 14,153.29 1276 1 WEL126.0/019.0A SSM 2000 2000 40.200 148 5949.6 $ 70.71 $ 420,696.22 145.6 $ - $ 420,696.22 $ 420,696.22 $ - 5950 *1 WEL153.0-096.0A SSM 1997 1997 32.000 96 3072 $ 70.71 $ 217,221.12 130.6 $ 11,690.55 $ 194,842.57 $ 194,842.57 $ 11,690.55 3072 1 WEL386.0-038.0A SSM 1984 1984 32.000 54 1728 $ 68.16 $ 117,780.48 92.6 $ 23,970.27 $ 74,907.09 $ 74,907.09 $ 23,970.27 1728 1 WEL013.0/072.0A SSM 2002 2002 39.700 24 952.8 $ 68.16 $ 64,942.85 145.6 $ - $ 64,942.85 $ 64,942.85 $ - 953 1 WEL013.0-026.0A SSMC 1970 1960 28.100 201 5648.1 $ 70.71 $ 399,377.15 34.87 $ 76,518.03 $ 95,647.54 $ 95,647.54 $ 76,518.03 5648 1 WEL052.5-065.0A SSMC 1970 1960 30.800 40 1232 $ 68.16 $ 83,973.12 34.87 $ 16,088.70 $ 20,110.87 $ 20,110.87 $ 16,088.70 1232 1 WEL091.0-038.0A SSMC 1970 1970 30.500 41 1250.5 $ 68.16 $ 85,234.08 34.87 $ 12,247.72 $ 20,412.86 $ 20,412.86 $ 12,247.72 1251 1 WEL007.0-016.0A US 1970 1950 24.000 31 744 $ 68.16 $ 50,711.04 34.87 $ 12,144.88 $ 12,144.88 $ 12,144.88 $ 12,144.88 744 1 WEL011.0-016.0B US 1970 1950 24.200 29 701.8 $ 68.16 $ 47,834.69 34.87 $ 11,456.01 $ 11,456.01 $ 11,456.01 $ 11,456.01 702 1 WEL020.0-021.0A US 1970 1955 24.000 33 792 $ 68.16 $ 53,982.72 34.87 $ 11,635.57 $ 12,928.42 $ 12,928.42 $ 11,635.57 792 1 WEL025.0-018.0A US 1970 1950 24.100 27 650.7 $ 68.16 $ 44,351.71 34.87 $ 10,621.87 $ 10,621.87 $ 10,621.87 $ 10,621.87 651 1 611897.35 $42,489,312.64 $5,867,457.02 $25,854,320.16 $12,739,620.51 $ 13,171,641.81 $2,816,071.45 $3,098,869.75 300207 311690 46 288 Page 6 of 6 Minor Bridges ` Cost(Per SF)= $ 68.16 Structure Structure Acquisition Square unit Cost I otal Cost Accumulated Acquisition Year I otar if or Number Type Year Year Built Out to Out Width Structure Length Feet Year 2000 Cost Index Depriciation Value Minor Bridges wel011.0-028.0a AAC 1986 1986 43.000 11 473 $ 68.16 $ 32,239.68 101 $ 6,268.14 $ 22,386.21 1 we1022.0-021.0b MC 1976 1976 40.500 11 445.5 $ 68.16 $ 30,365.28 56.3 $ 5,635.93 $ 11,741.52 1 we1031.0-044.Oa MC 1986 1986 40.000 12 480 $ 68.16 $ 32,716.80 101 $ 6,360.90 $ 22,717.50 1 we1038.0-041.oa MC 1976 1976 40.000 16 640 $ 68:16 $ 43,622.40 56.3 $ 8,096.51 $ 16,867.73 1 we1042.0-041.0b MC 1977 1977 52.000 12 624 $ 68.16 $ 42,531.84 59.8 $ 8,035.48 $ 17,468.43 1 we1045.0-044.0a MC 1990 1990 55.000 12 660 $ 68.16 $ 44,985.60 109 $ 6,704.58 $ 33,522.92 1 we1045.0-058.5C MC 1987 1987 40.000 17 680 $ 68.16 $ 46,348.80 100 $ 8,276.57 $ 31,832.97 1 we1046.0-045.OA MC 1978 1978 39.600 9 356.4 $ 68.16 $ 24,292.22 70.7 $ 5,190.13 $ 11,795.74 1 WEL046.0-049.0a MC 1987 1987 33.000 12 396 $ 68.16 $ 26,991.36 100 $ 4,819.89 $ 18,538.02 1 we1046.0-051.0A MC 1977 1977 48.000 16 768 $ 68.16 $ 52,346.88 59.8 $ 9,889.82 $ 21,499.61 1 we1074.0-053.oa MC 1978 1978 50.000 15 750 $ 68.16 $ 51,120.00 70.7 $ 10,921.98 $ 24,822.69 1 we1076.0-039.OA MC 1994 1994 24.000 12 288 $ 68.16 $ 19,630.08 115 $ 1,862.16 $ 15,518.01 1 we1045.0-068.0A MCA 1978 1978 76.000 15 1140 $ 68.16 $ 77,702.40 70.7 $ 16,601.42 $ 37,730.49 1 we1042.0-029.0a CAC 1970 1930 46.000 15 690 $ 68.16 $ 47,030.40 34.9 $ 6,758.04 $ 11,263.39 1 we1043.0-040.oa CAC 1970 1965 42.000 9 378 $ 68.16 $ 25,764.48 34.9 $ 3,702.23 $ 6,170.38 1 we1043.0-040.0b CAC 1970 1965 59.000 9 531 $ 68.16 $ 36,192.96 34.9 $ 5,200.75 $ 8,667.92 1 we1055.0-044.OA CAC 1970 1950 40.000 12 480 $ 68.16 $ 32,716.80 34.9 $ 4,701.24 $ 7,835.40 1 we1021.0-004.0a CBC 2002 2002 36.000 18 639 $ - $ 67,253.73 146 $ - $ 67,253.73 1 wel0o6.0-011.0a CBC 1970 1945 50.500 13 656.5 $ 68.16 $ 44,747.04 34.9 $ 6,429.93 $ 10,716.55 1 wel013.0-030.oa CBC 1978 1978 40.000 12 480 $ 68.16 $ 32,716.80 70.7 $ 6,990.07 $ 15,886.52 1 wel017.0-040.0a CBC 1984 1984 34.000 16 544 $ 68.16 $ 37,079.04 92.6 $ 7,546.20 $ 23,581.86 1 we1021.0-074.0a CBC 1975 1975 50.000 12 600 $ 68.16 $ 40,896.00 58.1 $ 8,159.54 $ 16,319.08 1 we1024.5-009.oa CBC 1970 1965 33.000 19 627 $ 68.16 $ 42,736.32 34.9 $ 6,141.00 $ 10,235.00 1 we1025.0-058.OA CBC 1975 1975 76.000 19 1444 $ 68.16 $ 98,423.04 58.1 $ 19,637.29 $ 39,274.58 1 we1026.0-011.oa CBC 1970 1957 25.000 11 275 $ 68.16 $ 18,744.00 34.9 $ 2,693.42 $ 4,489.03 1 we1026.0-013.oa CBC 1970 1945 22.000 14 308 $. 68.16 $ 20,993.28 34.9 $ 3,016.63 $ 5,027.72 1 we1027.0-004.oa CBC 1970 1947 51.000 15 765 $ 68.16 $ 52,142.40 34.9 $ 7,492.61 $ 12,487.68 1 we1044.0-045.oa CBC 1976 1976 62.000 10 620 $ 68.16 $ 42,259.20 56.3 $ 7,843.49 $ 16,340.61 1 we1049.0-016.0A CBC 1978 1978 36.500 16 584 $ 68.16 $ 39,805.44 70.7 $ 8,504.59 $ 19,328.60 1 we1058.0-047.oc CBC 1990 1990 57.000 5 285 $ 68.16 $ 19,425.60 109 $ 2,895.16 $ 14,475.81 1 we1059.0-010.oa CBC 1979 1979 60.000 6 360 $ 68.16 $ 24,537.60 85.5 $ 6,051.82 $ 14,409.10 1 we1068.0-057.0a CBC 1975 1975 36.000 19 684 $ 68.16 $ 46,621.44 58.1 $ 9,301.87 $ 18,603.75 1 we1076.0-015.oa CBC 1978 1978 25.000 8 200 $ 68.16 $ 13,632.00 70.7 $ 2,912.53 $ 6,619.38 1 we1392.0-063.0A CBC 1994 1994 44.000 14 616 $ 68.16 $ 41,986.56 115 $ 3,982.96 $ 33,191.30 1 we1392.0-078.0A CBC 1994 1994 52.000 12 624 $ 68.16 $ 42,531.84 115 $ 4,034.68 $ 33,622.35 1 we1001.0-032.0A CDTPG 1972 1972 30.000 20 600 $ 68.16 $ 40,896.00 38.6 $ 6,071.48 $ 10,841.93 1 wel010.0-029.0A CDTPG 1970 1969 32.000 21 672 $ 68.16 $ 45,803.52 34.9 $ 6,581.74 $ 10,969.57 1 wel015.0-012.oa CDTPG 1970 1968 32.000 21 672 $ 68.16 $ 45,803.52 34.9 $ 6,581.74 $ 10,969.57 1 we1015.0-044.OA CDTPG 1970 1963 30.000 20 600 $ 68.16 $ 40,896.00 34.9 $ 5,876.55 $ 9,794.25 1 we1017.0-028.0a CDTPG 1970 1966 21.300 14 298.2 $ 68.16 $ 20,325.31 34.9 $ 2,920.65 $ 4,867.74 1 we1018.0-035.0a CDTPG 1971 1971 30.000 20 600 $ 68.16 $ 40,896.00 36.6 $ 5,955.99 $ 10,268.94 1 wel019.5-036.oa CDTPG 1970 1966 35.100 12 421.2 $ 68.16 $ 28,708.99 34.9 $ 4,125.34 $ 6,875.57 1 welo21.0-008.0a CDTPG 1970 1947 28.400 20 568 $ 68.16 $ 38,714.88 34.9 $ 5,563.14 $ 9,271.89 1 Page 1 of 6 Structure 'Structure Acquisition oquare unit Cost I otal Cost Accumulated Acquisition Year tragiirr Number Type Year Year Built Out to Out Width Structure Length Feet Year 2000 Cost Index Depriciation Value Minor Bridges we1023.0-020.0a CDTPG 1970 1952 28.800 21 604.8 $ 68.16 $ 41,223.17 34.9 $ 5,923.57 $ 9,872.61 1 we1029.0-006.0a CDTPG 1974 1974 32.200 20 644 $ 68.16 $ 43,895.04 57.9 $ 9,076.87 $ 17,455.51 1 we1040.0-041.0b CDTPG 1971 1971 30.200 12 362.4 $ 68.16 $ 24,701.18 36.6 $ 3,597.42 $ 6,202.44 1 we1044.0-055.0A CDTPG 1970 1968 28.200 21 592.2 $ 68.16 $ 40,364.35 34.9 $ 5,800.16 $ 9,666.93 1 we1045.5-056.5A CDTPG 1970 1970 28.200 20 564 $ 68.16 $ 38,442.24 34.9 $ 5,523.96 $ 9,206.60 1 we1046.0-011.0a CDTPG 1970 1967 30.300 21 636.3 $ 68.16 $ 43,370.21 34.9 $ 6,232.08 $ 10,386.81 1 we1050.0-059.0A CDTPG 1973 1973 32.000 21 672 $ 68.16 $ 45,803.52 42.5 $ 7,219.72 $ 13,369.85 1 we1059.0-048.0B CDTPG 1972 1972 28.000 21 588 $ 68.16 $ 40,078.08 38.6 $ 5,950.05 $ 10,625.10 1 we1023.0-006.0A CIC 1970 1945 30.000 16 480 $ 68.16 $ 32,716.80 34.9 $ 4,701.24 $ 7,835.40 1 we1002.0-039.0a CMP 1975 1975 32.000 17 544 $ 68.16 $ 37,079.04 58.1 $ 7,397.98 $ 14,795.96 1 we1008.0-031.0a CMP 1997 1997 34.000 7 238 $ 68.16 $ 16,222.08 131 $ 873.05 $ 14,550.85 1 we1023.0-064.oa CMP 1978 1978 60.000 8 480 $ 68.16 $ 32,716.80 70.7 $ 6,990.07 $ 15,886.52 1 we1025.0-036.0a CMP 1975 1975 91.000 10 910 $ 68.16 $ 62,025.60 58.1 $ 12,375.30 $ 24,750.60 1 we1025.5-036.0a CMP 1975 1975 88.000 10 880 $ 68.16 $ 59,980.80 58.1 $ 11,967.32 $ 23,934.65 1 we1028.0-005.Oa CMP 1994 1994 53.000 7 371 $ 68.16 $ 25,287.36 115 $ 2,398.83 $ 19,990.21 1 wel031.0-016.oa CMP 1988 1988 60.000 6 360 $ 68.16 $ 24,537.60 107 $ 4,311.61 $ 17,965.03 1 we1034.0-003.0a CMP 1979 1979 40.000 11 440 $ 68.16 $ 29,990.40 85.5 $ 7,396.67 $ 17,611.12 1 we1040.0-051.0a CMP 1975 1975 32.000 8 256 $ 68.16 $ 17,448.96 58.1 $ 3,481.40 $ 6,962.81 1 we1049.0-024.0A CMP 1973 1973 36.000 17 612 $ 68.16 $ 41,713.92 42.5 $ 6,575.10 $ 12,176.11 1 we1050.0-047.0B CMP 1981 1981 50.000 4 200 $ 68.16 $ 13,632.00 94.2 $ 3,351.45 $ 8,819.60 1 we1052.0-037.0a CMP 1988 1988 71.000 70 4970 $ 68.16 $ 338,755.20 107 $ 59,524.13 $ 248,017.20 1 we1052.0-061.OA CMP 1979 1979 38.000 10 380 $ 68.16 $ 25,900.80 85.5 $ 6,388.03 $ 15,209.60 1 we1067.0-004.Oa CMP 1989 1989 62.000 7 434 $ 68.16 $ 29,581.44 108 $ 4,813.89 $ 21,881.33 1 we1076.0-045.0a CMP 1997 1997 25.000 7 175 $ 68.16 $ 11,928.00 131 $ 641.95 $ 10,699.15 1 we1079.0-134.oa CMP 1993 1993 45.000 45 2025 $ 68.16 $ 138,024.00 108 $ 14,373.08 $ 102,664.83 1 we1080.0-039.oa CMP 1993 1993 19.000 7 133 $ 68.16 $ 9,065.28 108 $ 944.01 $ 6,742.92 1 we1090.0-043.0a CMP 1992 1992 26.000 6 156 $ 68.16 $ 10,632.96 105 $ 1,228.05 $ 7,675.30 1 we1090.0-051.Oa CMP 1987 1987 26.000 7 182 $ 68.16 $ 12,405.12 100 $ 2,215.20 $ 8,520.00 1 we1090.0-053.0a CMP 1987 1987 70.000 7 490 $ 68.16 $ 33,398.40 100 $ 5,964.00 $ 22,938.46 1 we1124.0-071.OA CMP 1989 1989 70.000 6 420 $ 68.16 $ 28,627.20 108 $ 4,658.60 $ 21,175.48 1 we1132.0-069.0A CMP 1990 1990 32.000 6 192 $ 68.16 $ 13,086.72 109 $ 1,950.42 $ 9,752.12 1 wel030.0-043.OA CMPA 1970 1965 56.000 18 1008 $ 68.16 $ 68,705.28 34.9 $ 9,872.61 $ 16,454.35 1 we1033.0-090.0a CMPA 1989 1989 64.000 10 640 $ 68.16 $ 43,622.40 108 $ 7,098.83 $ 32,267.39 1 we1034.7-003.Oa CMPA 1989 1989 46.000 13 598 $ 68.16 $ 40,759.68 108 $ 6,632.97 $ 30,149.85 1 we1036.0-005.0a CMPA 1989 1989 50.000 13 650 $ 68.16 $ 44,304.00 108 $ 7,209.75 $ 32,771.57 1 we1040.0-027.oa CMPA 1987 1987 68.000 15 1020 $ 68.16 $ 69,523.20 100 $ 12,414.86 $ 47,749.45 1 we1042.0-039.ob CMPA 1981 1981 58.000 17 986 $ 68.16 $ 67,205.76 94.2 $ 16,522.65 $ 43,480.65 1 we1042.0-055.0A CMPA 1990 1990 40.000 13 520 $ 68.16 $ 35,443.20 109 $ 5,282.40 $ 26,412.00 1 we1046.0-055.0a CMPA 1989 1989 50.000 11 550 $ 68.16 $ 37,488.00 108 $ 6,100.55 $ 27,729.79 1 we1048.0-059.0a CMPA 1987 1987 54.000 11 594 $ 68.16 $ 40,487.04 100 $ 7,229.83 $ 27,807.03 1 we1049.0-022.0A CMPA 1978 1978 52.000 6 312 $ 68.16 $ 21,265.92 70.7 $ 4,543.55 $ 10,326.24 1 we1051.0-046.Oa CMPA 1985 1985 40.000 11 440 $ 68.16 $ 29,990.40 102 $ 6,302.93 $ 21,009.76 1 we1072.0-035.0a CMPA 1991 1991 36.000 54 1944 $ 68.16 $ 132,503.04 108 $ 17,609.44 $ 97,830.20 1 we1100.0-087.Oa CMPA 1986 1986 48.000 30 1440 $ 68.16 $ 98,150.40 101 $ 19,082.70 $ 68,152.51 1 we1007.0-030.0a CS 1970 1945 26.000 14 364 $ 68.16 $ 24,810.24 34.9 $ 3,565.11 $ 5,941.85 1 we1022.0-031.0a CS 1970 1948 25.800 12 309.6 $ 68.16 $ 21,102.34 34.9 $ 3,032.30 $ 5,053.84 1 WEL037.7-048.5A CS 1970 1940 23.300 23 535.9 $ 68.16 $ 36,526.94 34.9 $ 5,248.74 $ 8,747.90 1 wel041.0-048.0a CS- 1970 1940 19.400 14 271.6 $ 68.16 $ 18,512.26 34.9 $ 2,660.12 $ 4,433.53 1 Page 2 of 6 Structure )Structure Acquisition oquare Unit Cost l otal Cost Accumulated Acquisition Year oT ta1#of Number Type Year Year Built Out to Out Width Structure Length Feet Year 2000 Cost Index Depriciation Value Minor Bridges we1050.0-039.0a CS- 1970 1940 26.500 18 477 $ 68.16 $ 32,512.32 34.9 $ 4,671.86 $ 7,786.43 1 we1060.0-053.0a CS- 1970 1940 19.200 15 288 $ 68.16 $ 19,630.08 34.9 $ 2,820.75 $ 4,701.24 1 we1007.0-018.0a SAC 1997 1997 45.600 45 2052 $ 68.16 $ 139,864.32 131 $ 7,527.31 $ 125,455.22 1 we1008.0-019.Oa SAC 1991 1991 41.000 12 492 $ 68.16 $ 33,534.72 108 $ 4,456.71 $ 24,759.49 1 wel011.2-024.7a SAC 1978 1978 40.000 10 400 $ 68.16 $ 27,264.00 70.7 $ 5,825.06 $ 13,238.77 1 wel013.0-044.0A SAC 1998 1998 28.000 70 1960 $ 68.16 $ 133,593.60 127 $ 4,657.43 $ 116,435.63 1 we1018.5-027.0A SAC 1979 1979 60.000 12 720 $ 68.16 $ 49,075.20 85.5 $ 12,103.64 $ 28,818.20 1 we1018.5-029.OA SAC 1979 1979 42.000 9 378 $ 68.16 $ 25,764.48 85.5 $ 6,354.41 $ 15,129.55 1 we1019.0-006.0a SAC 1992 1992 36.000 12 432 $ 68.16 $ 29,445.12 105 $ 3,400.75 $ 21,254.68 1 we1020.5-007.Ob SAC 1988 1988 52.000 12 624 $ 68.16 $ 42,531.84 107 $ 7,473.45 $ 31,139.38 1 we1022.0-047.OA SAC 1975 1975 40.000 12 480 $ 68.16 $ 32,716.80 58.1 $ 6,527.63 $ 13,055.26 1 we1030.5-023.0a SAC 1982 1982 40.000 11 440 $ 68.16 $ 29,990.40 88.5 $ 6,562.46 $ 18,229.05 1 we1034.0-009.Oa SAC 1979 1979 90.000 14 1260 $ 68.16 $ 85,881.60 85.5 $ 21,181.38 $ 50,431.85 1 we1035.0-090.0A SAC 1990 1990 45.000 10 450 $ 68.16 $ 30,672.00 109 $ 4,571.31 $ 22,856.54 1 we1043.0-042.0a SAC 1999 1999 36.000 12 432 $ 68.16 $ 29,445.12 137 $ 552.10 $ 27,604.80 1 we1044.0-041.0d SAC 2000 2000 676.000 10 6760 $ 68.16 $ 460,761.60 146 $ - $ 460,761.60 1 we1044.0-049.oa SAC 1982 1982 54.000 12 648 $ 68.16 $ 44,167.68 88.5 $ 9,664.71 $ 26,846.43 1 we1049.0-034.Oa SAC 2001 2001 66.000 14 924 $ 68.16 $ 62,979.84 146 $ - $ 62,979.84 1 we1052.0-063.0A SAC 1997 1997 28.300 8 226.4 $ 68.16 $ 15,431.42 131 $ 830.50 $ 13,841.65 1 we1055.5-058.0a SAC 1988 1988 50.000 10 500 $ 68.16 $ 34,080.00 107 $ 5,988.34 $ 24,951.43 1 we1055.5-058.5a SAC 1985 1985 38.000 9 342 $ 68.16 $ 23,310.72 102 $ 4,899.09 $ 16,330.31 1 we1057.0-046.0a SAC 1989 1989 54.000 11 594 $ 68.16 $ 40,487.04 108 $ 6,588.60 $ 29,948,17 1 wel061.0-046.0a SAC 1978 1978 36.000 8 288 $ 68.16 $ 19,630.08 70.7 $ 4,194.04 $ 9,531.91 1 we1062.2-035.5a SAC 1999 1999 55.000 15 825 $ 68.16 $ 56,232.00 137 $ 1,054.35 $ 52,717.50 1 we1063.0-002.0a SAC 1970 1965 36.000 10 360 $ 68.16 $ 24,537.60 34.9 $ 3,525.93 $ 5,876.55 1 we1064.0-057.OA SAC 1979 1979 30.000 9 270 $ 68.16 $ 18,403.20 85.5 $ 4,538.87 $ 10,806.82 1 we1065.0-002.Oa SAC 1972 1972 36.000 8 288 $ 68.16 $ 19,630.08 38.6 $ 2,914.31 $ 5,204.13 1 we1072.0-017.0a SAC 1990 1990 110.000 14 1540 $ 68.16 $ 104,966.40 109 $ 15,644.03 $ 78,220.15 1 we1076.0-035.Oa SAC 1989 1989 64.000 12 768 $ 68.16 $ 52,346.88 108 $ 8,518.59 $ 38,720.87 1 we1080.0-015.0A SAC 1992 1992 35.500 10 355 $ 68.16 $ 24,196.80 105 $ 2,794.60 $ 17,466.23 1 we1086.0-033.OB SAC 1979 1979 60.000 10 600 $ 68.16 $ 40,896.00 85.5 $ 10,086.37 $ 24,015.16 1 we1102.0-019.OA SAC 1990 1990 26.000 27 702 $ 68.16 $ 47,848.32 109 $ 7,131.24 $ 35,656.20 1 we1058.2-045.Oa SACA 1979 1979 30.000 9 270 $ 68.16 $ 18,403.20 85.5 $ 4,538.87 $ 10,806.82 1 we1394.0-037.0A SSE 1970 1956 24.600 13 319.8 $ 68.16 $ 21,797.57 34.9 $ 3,132.20 $ 5,220.34 1 we1001.0-032.0B SSM 1978 1978 32.000 16 512 $ 68.16 $ 34,897.92 70.7 $ 7,456.07 $ 16,945.62 1 we1002.5-027.0a SSM 1972 1972 22.000 20 440 $ 68.16 $ 29,990.40 38.6 $ 4,452.42 $ 7,950.75 1 we1003.0-038.0A SSM 1970 1957 24.700 17 419.9 $ 68.16 $ 28,620.38 34.9 $ 4,112.61 $ 6,854.35 1 we1003.0-048.OA SSM 1970 1962 24.400 21 512.4 $ 68.16 $ 34,925.18 34.9 $ 5,018.58 $ 8,364.29 1 we1003.0-048.OB SSM 1983 1983 28.600 16 457.6 $ 68.16 $ 31,190.02 87.6 $ 6,380.24 $ 18,765.42 1 we1005.0-012.0a SSM 1979 1979 28.000 16 448 $ 68.16 $ 30,535.68 85.5 $ 7,531.16 $ 17,931.32 1 we1005.0-032.Oa SSM 1970 1945 32.200 16 515.2 $ 68.16 $ 35,116.03 34.9 $ 5,046.00 $ 8,410.00 1 we1005.0-036.Oa SSM 1970 1940 24.400 14 341.6 $ 68.16 $ 23,283.46 34.9 $ 3,345.72 $ 5,576.20 1 we1005.0-048.0A SSM 1970 1948 30.000 20 600 $ 68.16 $ 40,896.00 34.9 $ 5,876.55 $ 9,794.25 1 we1005.0-048.0B SSM 1970 1946 24.600 14 344.4 $ 68.16 $ 23,474.30 34.9 $ 3,373.14 $ 5,621.90 1 wel006.0-017.oa SSM 1993 1993 33.000 20 660 $ 68.16 $ 44,985.60 108 $ 4,684.56 $ 33,461.13 1 we1006.0-019.0B SSM 1970 1963 25.750 18 463.5 $ 68.16 $ 31,592.16 34.9 $ 4,539.64 $ 7,566.06 1 we1006.0-019.0C SSM 1973 1973 25.000 19 475 $ 68.16 $ 32,376.00 42.5 $ 5,103.22 $ 9,450.41 1 we1006.0-023.OA SSM 1970 1957 31.000 13 403 $ 68.16 $ 27,468.48 34.9 $ 3,947.08 $ 6,578.47 1 • Page 3 of 6 ) ) StructureStructure Acquisition oquare Unit Cost -Total Cost Accumulated Acquisition Year troTarircr Number Type Year Year Built Out to Out Width Structure Length Feet Year 2000 Cost Index Depriciation Value Minor Bridges we1006.0-041.0a SSM 1993 1993 23.000 20 460 $ 68.16 $ 31,353.60 108 $ 3,265.00 $ 23,321.39 1 • wel007.0-020.5A SSM 1975 1975 32.000 21 672 $ 68.16 $ 45,803.52 58.1 $ 9,138.68 $ 18,277.37 1 we1007.0-046.oa SSM 1970 1946 24.800 17 421.6 $ 68.16 $ 28,736.26 34.9 $ 4,129.26 $ 6,882.10 1 we1009.5-030.0A CBC 2001 2001 144.000 10 1440 $ 68.16 $ 98,150.40 146 $ - $ 98,150.40 1 wel010.0-057.0a SSM 1972 1972 24.200 17 411.4 $ 68.16 $ 28,041.02 38.6 $ 4,163.01 $ 7,433.95 1 wel011.0-008.Oa SSM 1970 1958 24.900 20 498 $ 68.16 $ 33,943.68 34.9 $ 4,877.54 $ 8,129.23 1 wel012.0-029.5a SSM 1974 1974 29.000 20 580 $ 68.16 $ 39,532.80 57.9 $ 8,174.82 $ 15,720.80 1 wel013.0-006.0a SSM 1973 1973 30.000 20 600 $ 68.16 $ 40,896.00 42.5 $ 6,446.18 $ 11,937.36 1 wel013.0-044.0C SSM 1970 1960 25.500 20 510 $ 68.16 $ 34,761.60 34.9 $ 4,995.07 $ 8,325.12 1 wel013.0-052.2a SSM 1982 1982 32.000 20 640 $ 68.16 $ 43,622.40 88.5 $ 9,545.40 $ 26,514.99 1 wel014.5-023.0a SSM 1970 1948 28.200 15 423 $ 68.16 $ 28,831.68 34.9 $ 4,142.97 $ 6,904.95 1 wel016.0-029.0a SSM 1970 1970 27.250 20 545 $ 68.16 $ 37,147.20 34.9 $ 5,337.87 $ 8,896.45 1 wel017.0-014.0a SSM 1975 1975 25.000 20 500 $ 68.16 $ 34,080.00 58.1 $ 6,799.62 $ 13,599.23 1 we1018.0-023.0a SSM 1970 1958 25.000 20 500 $ 68.16 $ 34,080.00 34.9 $ 4,897.13 $ 8,161.88 1 wel018.0-025.ob SSM 1974 1974 36.300 20 726 $ 68.16 $ 49,484.16 57.9 $ 10,232.62 $ 19,678.11 1 wel019.0-004.0a SSM 1986 1986 32.000 16 512 $ 68.16 $ 34,897.92 101 $ 6,784.96 $ 24,232.00 1 we1020.0-023.0a SSM 1986 1986 33.600 19 638.4 $ 68.16 $ 43,$13.34 101 $ 8,460.00 $ 30,214.28 1 wel020.0-023.0b SSM 1987 1987 31.000 19 589 $ 68.16 $ 40,146.24 100 $ 7,168.97 $ 27,572.97 1 we1020.0-027.oa SSM 1970 1957 22.300 20 446 $ 68.16 $ 30,399.36 34.9 $ 4,368.24 $ 7,280.40 1 we1020.0-035.oa SSM 1970 1970 25.300 17 430.1 $ 68.16 $ 29,315.62 34.9 $ 4,212.51 $ 7,020.85 1 wel020.5-005.0A SSM 1970 1948 24.000 19 456 $ 68.16 $ 31,080.96 34.9 $ 4,466.18 $ 7,443.63 1 we1021.0-012.0a SSM 1976 1976 30.300 19 575.7 $ 68.16 $ 39,239.71 56.3 $ 7,283.06 $ 15,173.05 1 we1022.0-027.Oa SSM 1980 1980 32.000 14 448 $ 68.16 $ 30,535.68 97.2 $ 8,154.03 $ 20,385.08 1 we1022.0-035.0a SSM 1975 1975 32.200 20 644 $ 68.16 $ 43,895.04 58.1 $ 8,757.90 $ 17,515.81 1 we1023.0-048.oa SSM 1992 1992 27.000 19 513 $ 68.16 $ 34,966.08 105 $ 4,038.39 $ 25,239.94 1 we1024.5-007.0A SSM 1994 1994 32.000 20 640 $ 68.16 $ 43,622.40 115 $ 4,138.14 $ 34,484.47 1 we1025.0-022.oa SSM 1991 1991 32.500 21 682.5 $ 68.16 $ 46,519.20 108 $ 6,182.33 $ 34,346.25 1 we1026.0-021.Oa SSM 1987 1987 30.800 16 492.8 $ 68.16 $ 33,589.25 100 $ 5,998.08 $ 23,069.54 1 we1026.0-027.oa SSM 1974 1974 32.000 13 416 $ 68.16 $ 28,354.56 57.9 $ 5,863.32 $ 11,275.61 1 we1026.7-015.0a SSM 1990 1990 32.000 13 416 $ 68.16 $ 28,354.56 109 $ 4,225.92 $ 21,129.60 1 we1028.0-009.0a SSM 1982 1982 31.400 13 408.2 $ 68.16 $ 27,822.91 88.5 $ 6,088.17 $ 16,911.59 1 we1028.0-025.0b SSM 1974 1974 33.500 10 335 $ 68.16 $ 22,833.60 57.9 $ 4,721.66 $ 9,080.12 1 we1029.0-008.Oa SSM 1990 1990 18.500 20 370 $ 68.16 $ 25,219.20 109 $ 3,758.63 $ 18,793.15 1 we1029.0-042.0a SSM 1970 1957 30.000 20 600 $ 68.16 $ 40,896.00 34.9 $ 5,876.55 $ 9,794.25 1 we1029.0-062.Oa SSM 1970 1945 24.600 21 516.6 $ 68.16 $ 35,211.46 34.9 $ 5,059.71 $ 8,432.85 1 we1029.5-012.0a SSM 1974 1974 25.000 19 475 $ 68.16 $ 32,376.00 57.9 $ 6,694.89 $ 12,874.80 1 wel031.0-044.0B SSM 1986 1986 33.000 17 561 $ 68.16 $ 38,237.76 101 $ 7,434.30 $ 26,551.08 1 we1031.0-048.0A SSM 1970 1957 29.000 20 580 $ 68.16 $ 39,532.80 34.9 $ 5,680.67 $ 9,467.78 1 we1032.0-035.Oa SSM 1980 1980 32.000 21 672 $ 68.16 $ 45,803.52 97.2 $ 12,231.05 $ 30,577.62 1 we1035.0-038.0b SSM 1970 1967 25.000 20 500 $ 68.16 $ 34,080.00 34.9 $ 4,897.13 $ 8,161.88 1 we1035.0-086.0A SSM 1983 1983 32.000 18 576 $ 68.16 $ 39,260.16 87.6 $ 8,031.08 $ 23,620.81 1 we1036.0-023.oa SSM 1983 1983 28.500 21 598.5 $ 68.16 $ 40,793.76 87.6 $ 8,344.79 $ 24,543.50 1 we1038.0-041.0b SSM 1974 1974 26.200 16 419.2 $ 68.16 $ 28,572.67 57.9 $ 5,908.42 $ 11,362.35 1 we1039.0-040.0b SSM 1986 1986 31.800 20 636 $ 68.16 $ 43,349.76 101 $ 8,428.19 $ 30,100.69 1 we1039.0-046.0a SSM 1996 1996 30.600 10 306 $ 68.16 $ 20,856.96 120 $ 1,377.48 $ 17,218.45 1 we1039.0-080.0A SSM 1970 1959 26.400 20 528 $ 68.16 $ 35,988.48 34.9 $ 5,171.37 $ 8,618.94 1 we1040.0-021.Oa SSM 1970 1940 16.500 19 313.5 $ 68.16 $ 21,368.16 34.9 $ 3,070.50 $ 5,117.50 1 we1040.5-003.0A SSM 1975 1975 32.000 20 640 $ 68.16 $ 43,622.40 58.1 $ 8,703.51 $ 17,407.02 1 Page 4 of 6 ) ) )Structure Structure Acquisition Square unit cost I otal cost Accumulated Acquisition Year Total#of Number Type Year Year Built Out to Out Width Structure Length Feet Year 2000 Cost Index Depriciation Value Minor Bridges wel041.0-004.0a SSM 1981 1981 32.000 21 672 $ 68.16 $ 45,803.52 94.2 $ 11,260.87 $ 29,633.87 1 we1041.0-050.5a SSM 1994 1994 29.200 21 613.2 $ 68.16 $ 41,795.71 115 $ 3,964.85 $ 33,040.43 1 we1042.0-045.Oa SSM 1970 1968 32.200 13 418.6 $ 68.16 $ 28,531.78 34.9 $ 4,099.88 $ 6,833.13 1 we1043.0-048.oa SSM 1970 1956 32.200 20 644 $ 68.16 $ 43,895.04 34.9 $ 6,307.50 $ 10,512.50 1 we1044.0-041.Oa SSM 1980 1980 32.200 20 644 $ 68.16 $ 43,895.04 97.2 $ 11,721.42 $ 29,303.56 1 we1046.0-013.OA SSM 1970 1963 26.000 20 520 $ 68.16 $ 35,443.20 34.9 $ 5,093.01 $ 8,488.35 1 we1048.0-053.OA SSM 1991 1991 32.500 19 617.5 $ 68.16 $ 42,088.80 108 $ 5,593.53 $ 31,075.18 1 we1048.0-057.0A SSM 1981 1981 32.200 18 579.6 $ 68.16 $ 39,505.54 94.2 $ 9,712.50 $ 25,559.21 1 we1049.0-060.0a SSM 1982 1982 30.800 20 616 $ 68.16 $ 41,986.56 88.5 $ 9,187.44 $ 25,520.68 1 we1050.0-015.Oa SSM 1997 1997 32.000 22 704 $ 68.16 $ 47,984.64 131 $ 2,582.47 $ 43,041.17 1 we1050.5-039.0a SSM 1980 1980 23.700 19 450.3 $ 68.16 $ 30,692.45 97.2 $ 8,195.90 $ 20,489.74 1 we1051.0-052.0a SSM 1973 1973 30.300 19 575.7 $ 68.16 $ 39,239.71 42.5 $ 6,185.11 $ 11,453.90 1 we1052.0-041.Oa SSM 1997 1997 32.000 19 608 $ 68.16 $ 41,441.28 131 $ 2,230.32 $ 37,171.92 1 we1052.0-047.0A SSM 1973 1973 30.800 20 616 $ 68.16 $ 41,986.56 42.5 $ 6,618.07 $ 12,255.69 1 we1052.2-013.0a SSM 1982 1982 32.000 20 640 $ 68.16 $ 43,622.40 88.5 $ 9,545.40 $ 26,514.99 1 we1053.0-048.oa SSM 1986 1986 32.300 20 646 $ 68.16 $ 44,031.36 101 $ 8,560.71 $ 30,573.97 1 we1055.0-074.Oa SSM 1980 1980 32.000 21 672 $ 68.16 $ 45,803.52 97.2 $ 12,231.05 $ 30,577.62 1 we1057.0-066.oa SSM 1970 1970 26.000 21 546 $ 68.16 $ 37,215.36 34.9 $ 5,347.66 $ 8,912.77 1 we1059.0-048.OA SSM 1970 1964 30.000 15 450 $ 68.16 $ 30,672.00 34.9 $ 4,407.41 $ 7,345.69 1 we1059.0-070.Oa SSM 1987 1987 32.000 20 640 $ 68.16 $ 43,622.40 100 $ 7,789.71 $ 29,960.44 1 we1061.0-050.oa SSM 1990 1990 32.000 15 480 $ 68.16 $ 32,716.80 109 $ 4,876.06 $ 24,380.31 1 wel061.0-070.oa SSM 1978 1978 54.000 10 540 $ 68.16 $ 36,806.40 70.7 $ 7,863.83 $ 17,872.34 1 we1062.0-029.0a SSM 1970 - 1967 24.900 20 498 $ 68.16 $ 33,943.68 34.9 $ 4,877.54 $ 8,129.23 1 we1062.0-031.OA SSM 1970 1945 28.700 22 631.4 $ 68.16 $ 43,036.22 34.9 $ 6,184.09 $ 10,306.82 1 we1064.0-049.0b SSM 1986 1986 28.000 12 336 $ 68.16 $ 22,901.76 101 $ 4,452.63 $ 15,902.25 1 we1066.0-043.OB SSM 1970 1940 30.300 8 242.4 $ 68.16 $ 16,521.98 34.9 $ 2,374.13 $ 3,956.88 1 we1066.0-055.OA SSM 1971 1971 29.000 19 551 $ 68.16 $ 37,556.16 36.6 $ 5,469.58 $ 9,430.31 1 we1066.0-055.OB SSM 1978 1978 32.100 19 609.9 $ 68.16 $ 41,570.78 70.7 $ 8,881.76 $ 20,185.81 1 we1070.0-029.0A SSM 1985 1985 30.800 19 585.2 $ 68.16 $ 39,887.23 102 $ 8,382.89 $ 27,942.98 1 wel070.0-035.0A SSM 1985 1985 30.300 20 606 $ 68.16 $ 41,304.96 102 $ 8,680.85 $ 28,936.17 1 we1070.0-057.0A SSM 1980 1980 32.000 20 640 $ 68.16 $ 43,622.40 97.2 $ 11,648.62 $ 29,121.55 1 we1074.0-017.oa SSM 1991 1991 45.500 23 1046.5 $ 68.16 $ 71,329.44 108 $ 9,479.57 $ 52,664.25 1 we1074.0-031.oa SSM 1977 1977 32.000 11 352 $ 68.16 $ 23,992.32 59.8 $ 4,532.83 $ 9,853.99 1 we1076.0-051.0A SSM 1985 1985 30.200 20 604 $ 68.16 $ 41,168.64 102 $ 8,652.20 $ 28,840.67 1 we1084.0-027.0A SSM 1984 1984 32.800 19 623.2 $ 68.16 $ 42,477.31 92.6 $ 8,644.83 $ 27,015.10 1 we1084.0-027.OB SSM 1988 1988 32.000 19 608 $ 68.16 $ 41,441.28 107 $ 7,281.82 $ 30,340.94 1 wel090.0-039.OA SSM 1982 1982 32.500 15 487.5 $ 68.16 $ 33,228.00 88.5 $ 7,270.91 $ 20,196.96 1 we1095.0-024.0a SSM 1970 1965 24.600 19 467.4 $ 68.16 $ 31,857.98 34.9 $ 4,577.83 $ 7,629.72 1 we1380.0-063.oa SSM 1982 1982 30.700 20 614 $ 68.16 $ 41,850.24 88.5 $ 9,157.61 $ 25,437.82 1 WEL016.0-029.OA SSM 1970 1970 28.600 20 572 $ 68.16 $ 38,987.52 34.9 $ 5,602.31 $ 9,337.19 1 we1074.0-027.0a TBC 1970 1934 38.000 8 304 $ 68.16 $ 20,720.64 34.9 $ 2,977.45 $ 4,962.42 1 we1045.0-066.OA TS 1970 1942 22.000 10 220 $ 68.16 $ 14,995.20 34.9 $ 2,154.74 $ 3,591.23 1 we1045.0-074.0A TS 1970 1945 27.000 11 297 $ 68.16 $ 20,243.52 34.9 $ 2,908.89 $ 4,848.16 1 we1039.0-078.0A TS- 1970 1945 30.000 9 270 $ 68.16 $ 18,403.20 34.9 $ 2,644.45 $ 4,407.41 1 wel041.0-048.0b TS- 1970 1939 19.300 11 212.3 $ 68.16 $ 14,470.37 34.9 $ 2,079.32 $ 3,465.53 1 we1046.0-003.0a TS- 1970 1945 33.000 7 231 $ 68.16 $ 15,744.96 34.9 $ 2,262.47 $ 3,770.79 1 we1056.5-043.oa TS- 1982 1982 28.000 15 420 $ 68.16 $ 28,627.20 88.5 $ 6,264.17 $ 17,400.46 1 we1060.0-013.oa TS- 1970 1936 23.000 12 276 $ 68.16 $ 18,812.16 34.9 $ 2,703.21 $ 4,505.36 1 Page 5 of 6 structure Structure Acquisition Square unit Cost Iotal Cost Accumulated Acquisition YearlroTarfrcif— Number Type Year Year Built Out to Out Width Structure Length Feet Year 2000 Cost Index Depriciation Value Minor Bridges we1072.0-025.0a TS- 1970 1939 25.000 11 275 $ 68.16 $ 18,744.00 34.9 $ 2,693.42 $ 4,489.03 1 we1072.0-045.0A TS- 1982 1982 34.500 8 276 $ 68.16 $ 18,812.16 88.5 $ 4,116.45 $ 11,434.59 1 wel078.0-039.0a TS- 1970 1945 24.200 14 338.8 $ 68.16 $ 23,092.61 34.9 $ 3,318.29 $ 5,530.49 1 we1080.5-037.0A TS- 1970 1940 21.000 13 273 $ 68.16 $ 18,607.68 34.9 $ 2,673.83 $ 4,456.39 1 142977 $ 9,769,039.07 $1,510,237.28 $ 5,439,387.68 205 Page 6 of 6 Bridges Structures Longer than 60' Total Number Total Deck Total Cost Total Accumulated Cost of Structures Area @9 Ft) Depriciation (Per SF) 46 300,207 $ 12,739,620.51 $ 2,816,071.45 $ 70.71 Structures Longer than 5' and Less than or Equal to 60' Total Number Total Deck Total Accumulated I Cost of Structures Area (Sq Ft) Total Cost Depriciation I (Per SF) 493 454,668 $ 18,611,029.49 $ 4,609,107.04 L $ 68.15 '' SUMMARY OF VALUES The following is a presentation of the end result of all infrastructure values as it relates to the total asset valuation for Weld County. As we are all aware segments of the infrastructure must be reported if it is valued either above 10% of all general capital assets, or 5% of the individual network. Both of these values exclude land. The following is a summary of both of these categories that currently reside on the ledger: Motor Pool Phone Svsc Finance Corn GFA Total Land Improvement $ 24,756 $ $ $ 4,017,242 $ 4,041,999 Buildings 3,056,362 9,153,946 43,096,260 55,306,569 Equipment 19,156,620 969,792 9.269.689 29.396.101 TOTAL $56,383,191 $88,744,669 Given the above described requirements any network of infrastructure that exceeds the 10% value, or $8,874,466.90 must be reported. The following is a listing of each network or sub-system that was presented and their respective values and percentages of each Network or Sub-system Value GFA % Subsystem % Gravel Roads $ 7,025,096.33 12.46% 100.00% Paved Roads $270,821,009.76 480.32% 100.00% Bridge (Major) $ 12,739,620.51 22.59% 40.64% Bridge (Minor) $ 18,611,029.49 33.01% 59.36% As you can see, all segments will be included because of the percentage that is applied. Hello