Loading...
HomeMy WebLinkAbout20020494.tiff INVENTORY OF ITEMS FOR CONSIDERATION Applicant Shawn and Stacey Greathouse Case Number USR 1366 Submitted or Prepared Prior to At Hearing Hearing 1 Planning Commission Resolution 2 Staff Comments X 3 Department of Planning Services field check form X 4 Planning Commissioner Folsom field check form X 5 Letter to Applicant X 6 Photograph of sign posting X 7 Legal Notifications X 8 Application X 9 Maps X 10 Referral List X 11 Referrals without comment X Larimer County Planning, referral received 12-18-2001 X Referrals with comments X 12 Weld County Department of Public Works, referral received 12-21-2001 X 13 Little Thompson Water District, referral received 12-26-2001 X 14 Hillsboro Ditch Company, referral received 12-28-2001 X 15 Weld County Department of Public Health and Environment, referral X received 1-3-2002 16 Deeds X 17 Surrounding Property / Mineral Owners • 1X 18 Utilities X 19 Soil Survey X PC Exhibits 20 Johnstown Fire Protection District, referral received 1-22-2002 X 21 Weld County Code Compliance, referral received 1-24-2002 X 22 Town of Johnstown, referral received 1-25-2002 X 23 Weld County sheriffs Office, referral received 1-29-2002 X EXIBIT 2002-0494 JJ11 24 Town of Johnstown, letter dated May 30, 2001, received 2-19-2002 X I hereby certify that the 24 items identified herein were submitted to the Department of Planning Services at or prior to the scheduled Planning Commission hearing. KimM Planner Ill r r ‘efo:ri WliD�. LAND USE APPLICATION SUMMARY SHEET COLORADO Case Number: USR-1366 Hearing Date: February 19, 2002 Applicant: Stacey & Shawn Greathouse Address: 444 La Costa Lane, Johnstown, CO 80534 Request: A Site Specific Development Plan and a Special Review Permit for any use permitted as a Use by Right,an Accessory Use,or a Use by Special Review in the Commercial or Industrial Zone Districts (Majestic Fence Company), provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions, in the A (Agricultural)Zone District. Legal Description: Lot B of RE 2720; Pt S2 SW4 Section 32, T5N, R67W of the 6th P.M., Weld County, CO Location: North of and adjacent to Weld County Road 50 and west of and adjacent to Weld County Road 151/2 Size of Parcel: 46 +/-acres POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' staff has received responses from the following agencies: • Larimer County Planning, referral received 12-18-2001 • Weld County Department of Public Works, referral received 12-21-2001 • Little Thompson Water District, referral received 12-26-2001 • Hillsboro Ditch Company, referral received 12-28-2001 • Weld County Department of Public Health and Environment, referral received 1-3-2002 • Johnstown Fire Protection District, referral received 1-22-2002 • Weld County Zoning Compliance, referral received 1-24-2002 • Town of Johnstown, referral received 1-25-2002 • Weld County Sheriffs Office, referral received 1-29-2002 The Department of Planning Services' staff has not received responses from the following agencies: • Big Thompson Soil Conservation District • Town of Milliken • Weld County Department of Building Inspection EXPNBIT GREATHOUSE-USR-1366 page 1 1 2. r SPECIAL REVIEW PERMIT ADMINISTRATIVE REVIEW"Rye COLORADO Planner: Kim Ogle Case Number: USR-1366 Hearing Date: February 19, 2002 Applicant: Stacey & Shawn Greathouse Address: 444 La Costa Lane, Johnstown, CO 80534 Request: A Site Specific Development Plan and a Special Review Permit for Any use permitted as a Use by Right,an Accessory Use,or a Use by Special Review in the Commercial or Industrial Zone Districts (Majestic Fence Company), provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions, in the A (Agricultural)Zone District. Legal Description: Lot B of RE 2720; Pt S2 SW4 Section 32, T5N, R67W of the 6th P.M., Weld County, CO Location: North of and adjacent to Weld County Road 50 and west of and adjacent to Weld County Road 15 1/2 Situs: 24047 Weld County Road 15.5, Johnstown, CO 80534 Size of Parcel: 46 +/-acres Parcel Number: 0957 32 000027 THE DEPARTMENT OF PLANNING SERVICES'STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services' staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: a. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinances in effect. Section 23-2-60.6.1 (A. Goal 2)allows for commercial and industrial uses to locate in the Agricultural Zone District when the impact to surrounding properties is minimal, and where adequate services and infrastructure are available. The Development Standards,Conditions of Approval,and Operations Standards will effectively mitigate any adverse impacts to surrounding areas. Water is provided by Little Thompson Water District and the sewage disposal will be permitted by a septic system. GREATHOUSE-USR-1366 page 2 b. Section 23-2-220.A.2--The proposed use is consistent with the intent of the A(Agricultural) Zone District. Section 23-3-40.R of the Weld County Code provides for a Site Specific Development Plan and a Special Review Permit for Any use permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial Zone Districts(Majestic Fence Company), provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions, in the A (Agricultural) Zone District as a Use by Special Review. c. Section 23-2-220.A.3--The uses which will be permitted will be compatible with the existing surrounding land uses.The surrounding area is primarily agricultural with a few residences associated with the agricultural activities. This application is for the Majestic Fence Company,the proposed building will look similar to other agricultural buildings and will have one office, interior materials storage and parking for vehicles. Exterior storage of equipment and lumber will be in a screened and enclosed area adjacent to the building. Conditions of Approval and Development Standards ensure that the proposal is consistent with surrounding land uses. d. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. This proposal does lie within a three mile referral area of the Towns of Johnstown and Milliken. The Town of Johnstown indicated that their Comprehensive Land Use Plan does not designate this area as commercial. The town would prefer annexation of the property to the Town. The Town of Milliken did not respond indicating a conflict with their interests. The Conditions of Approval and Development Standards will ensure the health, safety and welfare of the citizens of Weld County. e. Section 23-2-220.A.5 --The site does not lie within any Overlay Districts. f. Section 23-2-220.A.6--The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. The property is Lot B of Recorded Exemption 2720 and is considered Prime agricultural land by the Important Farmlands of Weld County Map. The applicant has proposed to place each structure (personal residence and business operations facility)within established building envelopes as required through the Recorded Exemption approval process. Section 22-2-60.1.1 of the Weld County Comprehensive Plan indicates that eighty (80) acres is considered the minimum lot size needed for a viable farming operation. The subject property is 45.8 acres in size and is leased to an adjacent neighbor for agricultural operations. g. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld County Code), Operation Standards(Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services'staff recommendation for approval is conditional upon the following: 1. The attached Development Standards for the Special Review Permit shall be adopted and placed on the Special Review Plat prior to recording. The completed plat shall be delivered to the Weld County Department of Planning Services and be ready for recording in the Weld County Clerk and Recorder's Office within 30 days of approval by the Board of County Commissioners. (Department of Planning Services) GREATHOUSE-USR-1366 page 3 2. Prior to recording the plat: A. The plat shall be amended to delineate the following: 1) The applicant should reserve an additional 20 feet of property parallel to the WCR 50 right-of-way for future build out. This should all be delineated on the USR Plat. There shall be no new residential/commercial accesses allowed on to roadways classified as an arterial. If secondary accesses are available from non-arterial status roads. (Department of Public Works) 1) The off-street parking spaces at the main office parking lot, including the access drive shall be surfaced with gravel,asphalt,concrete or the equivalent and shall be graded to prevent drainage problems. The area shall be delineated on the USR Plat. (Department of Public Works) 2) The apron approach from Weld County Road 15.5 into the property shall have a hard surface access. This apron shall be delineated on the USR Plat. (Johnstown Fire Protection District) 3) Both accesses shall be placed in such a location to have adequate sight distance in either direction and not below the crest of a hill or where physical obstructions are present and shall be clearly delineated on the USR Plat. (Department of Public Works) 4) The location of all security lighting for the structure and storage yard. (Weld County Sheriffs Office) B. The applicant shall submit a Waste Handling Plan to the Weld County Department of Public Health and Environment, Environmental Health Services Division. Evidence of approval shall be submitted to the Weld County Department of Planning Services.The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site, including expected volumes and types of waste generated. 2) A list of the type and volume of chemicals expected to be stored on site. 3) The waste handler and facility where the waste will be disposed, including the facility name, address, and phone number. (Department of Public Health and Environment) C. In event the shop is equipped with a floor drain, the applicant must apply for an Underground Injection Control (UIC) Class V Injection Well permit through the Environmental Protection Agency (EPA), for the floor drain system that serves the maintenance shop, or provide evidence that the applicant is not subject to the EPA Class V requirements. Written evidence of compliance from the Weld County Department of Public Health and Environment shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) D. An individual sewage disposal system is required for the proposed shop/office and shall be installed according to the Weld County Individual Sewage Disposal Regulations. The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. Written evidence of compliance from the Weld County Department of Public Health and Environment shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) GREATHOUSE-USR-1366 page 4 E. In the event vehicles or equipment are washed on site,the applicant shall provide evidence that any vehicle or equipment washing area will be designed and constructed to capture all effluent and prevent any discharges from the washing of vehicles and/ or equipment in accordance with the Rules and Regulations of the Water Quality Control Commission and the Environmental Protection Agency. Written evidence of compliance from the Weld County Department of Public Health and Environment shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) F. Upon completion of items 3.A through and including 3.E, the applicant shall submit a paper copy of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the paper copy the applicant shall submit a Mylar plat along with all other documentation required as conditions of approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2- 260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within sixty (60) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. 4. Prior to Certificate of Occupancy/Operation: A. Submit a dust abatement plan to the Environmental Health Services, Weld County Department of Public Health & Environment, for approval prior to operation. (Department of Public Health and Environment) B. Proper building permits shall be obtained in accordance with the referral response from the i-. Weld County Building Inspection Department dated September 5, 2001, prior to any construction, demolition, or excavation. Part of the permit application process includes a complete plan review. (Dept. of Planning Services) C. Site and building drawings shall be submitted to the Johnstown Fire Protection District. Written evidence of attempt to comply with Fire District requirements shall be submitted to the Weld County Department of Planning Services. (Dept. of Planning Services) D. Submit evidence that the Weld County Sheriffs office has conducted a security review of the property to determine property is secure. (Weld County Sheriffs office) 5. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) GREATHOUSE-USR-1366 page 5 SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Shawn and Stacey Greathouse USR-1366 1. The Site Specific Development Plan and Special Use Permit is for any use permitted as a Use by Right,an Accessory Use,or a Use by Special Review in the Commercial or Industrial Zone Districts (Majestic Fence Company), provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions, in the A (Agricultural) Zone District, as indicated in the application materials on file and subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. The facility shall operate in accordance with the approved dust control plan. (Department of Public Health and Environment) 4. All liquid and solid wastes(as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20- 100.5, C.R.S.,as amended)shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 5. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. (Department of Public Health and Environment) 6. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. (Department of Public Health and Environment) 7. Fugitive dust shall be controlled on this site. (Department of Public Health and Environment) 8. This facility shall adhere to the maximum permissible noise levels allowed in the Commercial Zone as delineated in 25-12-103 C.R.S. (Department of Public Health and Environment) 9. Adequate hand washing and toilet facilities shall be provided for employee and patron use. (Department of Public Health and Environment) 10. The facility shall utilize the existing public water supply. (Little Thompson Water) (Department of Public Health and Environment) 11. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health&Environment,Water Quality Control Division. (Department of Public Health and Environment) 12. Any vehicle or equipment washing area(s)shall capture all effluent and prevent discharges from the washing of vehicle and/or equipment in accordance with the Weld County Code, the Rules and Regulations of the Water Quality Control Commission, and the Environmental Protection Agency. (Department of Public Health and Environment) 13. An I.S.D.S is required for the proposed facility and shall be installed according to the Weld County I.S.D.S. Regulations. (Department of Public Health and Environment) 14. The septic system is required to be designed by a Colorado Registered Professional Engineer GREATHOUSE-USR-1366 page 6 i^ according to the Weld County I.S.D.S. Regulations.(Department of Public Health and Environment) 15. The landscaping on site shall be maintained in accordance with the approved landscape plan. (Department of Planning Services) 16. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. 17. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. 18. Personnel from the Weld County Departments of Public Health and Environment, Public Works and Planning Services shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. 19. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 20. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. GREATHOUSE-USR-1366 page 7 DEPARTMENT OF PLANNING SERVICES d PHONE (970)353-6100, EXT.3540 FAX 70) 304-6498 Y,15 5 N. 17 TH AVENUE 80631 COLORADOGREELEY, 80631 O COLORADO December 13, 2001 Subject: USR-1366- Request for A Site Specific Development Plan and a Special Review Permit for Any use permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial Zone District(Majestic Fence Company), provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions, in the A (Agricultural)Zone District. of the 6'" P.M., Weld County, of the 6th P.M., Weld County, Colorado. Dear Applicant : Your application and related materials for the request described above are being processed. I have scheduled a meeting with the Weld County Planning Commission for February 19, 2002, at 1:30 p.m. This meeting will take place in Room 210, Weld County Planning Department, 1555 N. 17th Avenue, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members may have. It is the applicant's responsibility to comply with state statutes regarding notice to mineral estate owners. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant shall provide the Weld County Planning Department with written certification indicating the above requirements have been met. It is the policy of Weld County to refer an application to any town or municipality lying within three miles of the property or if the property is located within the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the submitted materials to the Town of Johnstown, Town of Milliken Planning Commission for their review and comments. Please call Johnstown 970-587-4664, Milliken 970-587-4331 for further details regarding the date,time, and place of this meeting. It is recommended that you and/or a representative be in attendance at the Town of Johnstown, Town of Milliken Planning Commission meeting to answer any questions the Commission members may have with respect to your application. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time,date,and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission. This recommendation will be available twenty-four(24)hours before the scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services'office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concerning this matter, please call. Respectfully, Kim EXHIBIT �Planner d:;``.`s {` Yfr r • Name: MVC-0165.JPG 42:1-4y-6t2 - evict" Dimensions: 640 x 480 pixels 11 FIELD CHECK CASE NUMBER: USR-1366 DATE OF INSPECTION: 77A 2*, APPLICANT'S NAME: Stacey& Shawn Greathouse a C. PLANNER: Kim Ogle v�y REQUEST: A Site Specific Development Plan and a Special Review Permit for. 4fit47• LEGAL DESCRIPTION: Lob B of RE-2720; Pt S2 SW4 Section 32, T5N, R67W ofFtb M Weld gC, County, of the 6th P.M., Weld County, Colorado. Viirt `<< Or LOCATION: North of and adjacent to Weld County Road 50 and west of and adjacent to Well LAND USE: N Z252' ,F/2Ga S cy'2 ,,ocArr - ,2c'ce`J✓t'.2Y 3.4 a E L/odS neWioss r4 /s• �z ,_/cHVSro ' 24/ Sc;S2 ;leis/os7 S cse:e A)„,03,3 t'7 —4 i774'L- .E Wfj„rJ.f'< /4./g ozJr �./Yl/G t A ?VPX S- a-rr eG //r am of=" "'MS 7— ZONING: N A(Agricultural) ��'E ,Q E A (Agricultural) S A (Agricultural) W A(Agricultural) COMMENTS: A/05 s cdz„7-/t ra /`Lo`77 S• 7-7, T 5 To A/o A'row j'/�✓' C<'�"�L Ail/ ��f'vC�= f7 p>- .z /1/07-- ,S,A- 9, ,AcCriY0T%Cr Si/F41 `-9/V O430 fir"' z/ter'//rz / T,!9f2YAL- ,r 3 t<4' 76 L sc--392).n. I r� Z9' 1-/ G!/ i -ism P.C. Member `���� 2��;�7�� FIELD CHECK inspection date: February 10, 2002 CASE NUMBER: USR 1366 APPLICANT: Shawn and Stacey Greathouse LEGAL DESCRIPTION: Lot B of RE 2720; Part S2 SW4 Section 32, Township 5 North, Range 66 West of the 6th PM, Weld County, CO LOCATION: North of and adjacent to WCR 50; West of and adjacent to WCR 15.5 Zoning Land Use N A (Agricultural) N Agricultural land. Tank Battery & Separator. Single Family Residence 0.25 mile north of property line. E A (Agricultural) E Agricultural land. Single Family Residence with outbuildings and large parking area S A (Agricultural) S Agricultural land. Town of Johnstown 0.5 mile W A (Agricultural) W Agricultural land, slopes up to west COMMENTS: Land is vacant and flat. Little slope from north to south. Appears to be plowed. New Culvert from WCR 15.5 is approximately 300 feet north of WCR 50 intersection. Excavation work underway for new structure. One oil tank battery (Southwestern Production Corp; telephone 970 284 5487, Situs: SE4SW4 32-5-67, Parrish 32-1), and one separator are present 800 feet north of WCR 50 adjacent to WCR 15.5. One well head is visible in line with battery near center of property, west of WCR 15.5. Along north property line is an unimproved irrigation ditch. Hillsborough Irrigation Ditch along west property line. Several moderate to large "mossy rocks" on wood pallets in northeast corner of property. Good view of front range. WCR 15.5 is a two lane gravel road with local traffic. WCR 50 is a two lane paved road. Little Thompson Water District, Telephone Cable, Gas Line buried adjacent to east property line in right-of-way for WCR 15.5. Irrigation improved south of WCR 50 and east of WCR 15.5 on north side of road. Borrow ditch adjacent to east and south property line. Mature cottonwood trees east of WCR 15.5 adjacent to Single Family Residence with outbuildings and large parking area. C Kim Ogl , lanner III EXHIBIT I ---_ Hello