Loading...
HomeMy WebLinkAbout20020986.tiff pa() K it ‘H.-- Weld County Referral WI I January 28, f�'p(•. -0 C JAN 3 C ':32 COLORADO COUNTY PUGI,IO WORKS Orr The Weld County Department of Planning Services has received the following item for review: Applicant James Terry/Nelson Pipeline Case Number USR-1375 1 Facility Please Reply By February 18, 2002 Planner Lauren Light Project A Site Specific Development Plan and a Special Review Permit for a use I permitted as a Use-by-Right in the Industrial Zone District (23,000 sq. ft. t contractor's office and shop facility) in the A(Agricultural)Zone District. I Legal Lot B of RE-2765; part of the W2, NE4 of Section 2, Ti N, R67W of the 6th P.M., Weld County, Colorado. Location Approximately 500 feet north of State Hwy 52; 1/4 mile west of WCR 23. I Parcel Number 1469 02 000079 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 16, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan O We have reviewed the request and find no conflicts with our interests. kg See attached letter. Comments: Signature I L Y (/� ( ..r G y Date �._ I aQ` -- Agency 1 f EXHIBIT +Weld County Planning Dept. +1555 N. 17th Ave. Greeley,CO.80631 +(970)353-6100 ext.3540 :•(970)304-649; 1 2002-0986 Weld County Planning Department �ctfl44 GREELEY OFFICE MEMORANDUM FEB 15 2002 RECEIVED 0 TO: Lauren Light, Planner DATE: February 12, 2002 • COLORADO FROM: Donald Carroll, Engineering Administrator le SUBJECT: USR-1375, James Terry Nelson Pipeline Facility The Weld County Public Works Department has reviewed this proposal; this project falls primarily under the purview of the Use by Special Review Standards,Weld County Code, Chapter 23,Article II, Division IV, Section 23. Our comments and requirements are as follows: COMMENTS: The Colorado Department of Transportation(CDOT)has jurisdiction over all accesses to the State highways. Please contact Gloria Hess-Idler of Tess Jones at the Greeley office to verify the access permit or for additional requirements that may be necessary to obtain or upgrade the permit. This access is on State Highway 52. The applicant has supplied a traffic impact study analysis to accompany the application. A copy of this traffic study should be forwarded to CDOT for evaluation and comments. The proposed access, utility, and drainage easement usually are 30 feet to 60 feet in width. By making this easement 60 feet in width, the applicant should include the concrete pads and flower garden, which appear to be half in the easement and half on the James Terry property. REQUIREMENTS: Access Improvements/State Highway 52. The applicant shall provide evidence of consultation from CDOT regarding the adequacy of their intersection to accommodate turning movements of large construction traffic trucks. Any improvements required by CDOT shall be assumed by the applicant. The Weld County Public Works Department recommends a stop sign is placed at the appropriate location prior to entering on to State Highway 52. Off-Street Parking and Circulation:The off-street parking spaces including the access drive shall be surfaced with asphalt or equivalent and shall be graded to prevent drainage problems. The equipment yard shall be surfaced with gravel, asphalt, concrete, or equivalent, and shall also be graded to prevent drainage problems. There is one main access to the internal site, equipment, and storage area. The drawing shows that the gate is at a 45° angle. I recommend the gate is placed across the approach pad at a 90° angle as not to cause back ups at the intersection. The circulation throughout the equipment yard appears to be adequate for the fence facility. The remaining portion of the site approach is paved with adequate parking spaces and turn-a-round capabilities. Lauren Light, Planner February 12, 2002 Page 2 Storm Water Drainage: The applicant submitted a storm water drainage report which has been prepared by a registered professional engineer licensed in the State of Colorado. This report has been certified and signed by this engineer. By certifying this report,the Weld County Public Works accepts the storm water drainage report. Easement: The USR property is defined on the plat drawing. The applicant defines the proposed access, utility, and drainage easement that access the facility. A secondary easement is a proposed utility easement, which is identified as a 15-foot easement that crosses the middle section of James Terry's property. Both easements shall be defined on the plat drawing with adequate documentation of record. pc: USR-1375 M:\W PFI LES\DON-C\PLAN 15USR.W PD Memorandum TO: Lauren Light, Weld County Planning DATE: February 18, 2002 COLORADO FROM: Charlotte Davis, Environmental Services CASE: USR-1375 Terry James-Nelson Pipeline Facility Environmental Health Services has reviewed this proposal for a 23,000 sq. ft. contractor's office and shop facility for a pipeline business. We have no objections to the proposal,however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. In event the shop is equipped with a floor drain, the applicant must apply for an Underground Injection Control (UIC) Class V Injection Well permit through the Environmental Protection Agency (EPA), for the floor drain system that serves the maintenance shop, or provide evidence that the applicant is not subject to the EPA Class V requirements. 2. An individual sewage disposal system is required for the proposed office/shop and shall be installed according to the Weld County Individual Sewage Disposal Regulations. The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. 3. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2) A list of the type and volume of chemicals expected to be stored on site. 3) The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). 4. In the event vehicles or equipment are washed on site, the applicant shall provide evidence that any vehicle or equipment washing area will be designed and constructed to capture all effluent and prevent any discharges from the washing of vehicles and/or equipment in accordance with the ' - . EXHIBIT 1 II USR-1366 Greathouse, Stacey and Shawn Page 2 Regulations of the Water Quality Control Commission and the Environmental Protection Agency. 5. In accordance with the Above Ground Storage Tank Regulations (7 CCR 1101-14) a spillage retention berm shall be constructed around the tank battery. The volume retained by the spillage berm should be greater than the volume of the largest tank inside the berm. Alternative protective measures may be allowed provided they comply with the Above Ground Storage Tank Regulations. 6. If applicable,the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health&Environment,Water Quality Control Division. We recommend that the following requirements be incorporated into the permit as "development standards": 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a"solid waste" in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. 4. Fugitive dust shall be controlled on this site. In the event the Weld County Department of Public Health and Environment determines that an excessive amount of dust is generated from this site, a dust abatement plan and subsequent implementation may be required. 5. This facility shall adhere to the maximum permissible noise levels allowed in the Residential Zone as delineated in 25-12-103 C.R.S., as amended. 6. Adequate hand washing and toilet facilities shall be provided for employee and patron use. 7. The facility shall utilize the existing public water supply. (Central Weld County Water) 8. If applicable,the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health& Environment, Water Quality Control Division. 9. Any vehicle or equipment washing area(s) shall capture all effluent and prevent discharges from the washing of vehicle and/or equipment in accordance with the Weld County Code, the Rules and Regulations of the Water Quality Control Commission, and the Environmental Protection Agency. . X31 ( i (i \ Weld County Referral iii ' January 28, 2002 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant James Terry/Nelson Pipeline Case Number USR-1375 Facility Please Reply By February 18, 2002 Planner Lauren Light Project A Site Specific Development Plan and a Special Review Permit for a use permitted as a Use-by-Right in the Industrial Zone District (23,000 sq. ft. I contractor's office and shop facility) in the A (Agricultural) Zone District. Legal Lot B of RE-2765; part of the W2, NE4 of Section 2, Ti N, R67W of the 6th P.M., Weld County, Colorado. Location Approximately 500 feet north of State Hwy 52; 1/4 mile west of WCR 23. I Parcel Number 1469 02 000079 . —_,._. —_ _ _—, __,, ,,,_--,,,,,,,_,,,_, The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 16, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ ,We have reviewed the request and find no conflicts with our interests. V See attached letter. Comments: Signature C-71�/ . / Qe.ct,D Date /' ,4 7, �jo k Agency Rrr .„ p Mt � - � � n c� �X/�t �{°yt EXHIBIT 1•:•Weld County Planning Dept. 4.1555 N. 17th Ave. Greeley,CO.80631 •>(970)353-6100 ext.3540 •(970)304-6498 Les.. ... 7 DEPARTMENT OF BUILDING INSPECTION Weld County Administrative Offices 1555 N. 17th Avenue, Greeley, CO80631 WEBSITE: www.co.weld.co.us Phone(970) 353-6100, Ext. 3540 Fax(970) 304-6498 WM C. COLORADO February 7, 2002 James Terry/Nelson Pipeline Facility A Site Specific Development Plan and a Special Review Permit for a use permitted as a Use- by-Right in the Industrial Zone District (23,000 sq. ft. contractor's office and shop facility) in the A (Agricultural) Zone District USR-1375 1. Building permits shall be obtained prior to any construction. 2. A plan review is required for each building. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for the permit. 3. Buildings shall conform to the requirements of the 1997 UBC, 1998 IMC, 1997 IPC, 1999 NEC and Chapter 29 of the Weld County Code. 4. Buildings will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. 5. Building height shall be limited to the maximum height allowed per UBC Table 5-B. Wall and opening protection and limitations shall be in accordance with UBC Table 5-A. Separation of buildings of mixed occupancy classifications shall be in accordance with UBC Table 3-B and Chapter 3. Setback and offset distances shall be determined by Section 23-1-90 of the Weld County Code. 6. A Flood Hazard Development Permit shall be submitted for buildings constructed within the 100-year flood plain. Please contact me for any further information regarding this project. Sincerely, Jeff Reif Building Official Service,Teamwork, Integrity,Quality Coit f11ctiss;No„ , Weld County Referral ' January 28, 2002 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant James Terry/Nelson Pipeline Case Number USR-1375 Facility Please Reply By February 18, 2002 Planner Lauren Light Project A Site Specific Development Plan and a Special Review Permit for a use permitted as a Use-by-Right in the Industrial Zone District (23,000 sq. ft. contractor's office and shop facility) in the A (Agricultural)Zone District. Legal Lot B of RE-2765; part of the W2, NE4 of Section 2, Ti N, R67W of the 6th P.M., Weld County, Colorado. Location Approximately 500 feet north of State Hwy 52; 1/4 mile west of WCR 23. Parcel Number 1469 02 000079 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 16, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ,'I We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: JY1 t exittua tch i`0.t A COC,em ki%CI\ V 6 alp*i cnno (,C3t1_.L Signature Date a11 ha Agency 2-tiniton (pyy / kW1Cc :•Weld County Planning Dept. 41555 N. 17th Ave. Greeley,CO.80631 4(970)353-6100 ext.3540 EXHIBIT4(970)304-6498 f. iq MA COwe,-(.� Weld County play OF FICE cCE�- at&Q_ a FEB 12 2002 JAN 't 2 ' Weld Count Re E ED Wi County lkJanuary 28, 2002 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant James Terry/Nelson Pipeline Case Number USR-1375 Facility Please Reply By February 18, 2002 Planner Lauren Light Project A Site Specific Development Plan and a Special Review Permit for a use . permitted as a Use-by-Right in the Industrial Zone District (23,000 sq. ft. contractor's office and shop facility) in the A (Agricultural)Zone District. Legal Lot B of RE-2765; part of the W2, NE4 of Section 2, Ti N, R67W of the 6th P.M., Weld County, Colorado. r Location Approximately 500 feet north of State Hwy 52; 1/4 mile west of WCR 23. Parcel Number 1469 02 000079 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated: Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 16, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: v accass pc-ern t +t nl t t5+ be- obt'ai r d -RJraTh Mile rox vvit clam + H moo_ acco-Ss . 7-2,OW trtnt 3+- CS I(7a n o r//H,- of -t inQ_ h i9 h wa.y cR..vr4-c r 4 U vtp . Signature (�,,t , -4 <j -lc Date 2/ /t72 Agency Cool :•Weld County Planning Dept. 1.1555 N. 17th Ave. Greeley,CO. 80631 t(970)353-6100 ext.3540 •:•(970)304-6496 f i f i Co' 'y Planning Department [ E C E Y 1EEIEY OFFICE D .-- t2TiD f i Weld Coin-Referral rY January 28, 2002 Will C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant James Terry/Nelson Pipeline Case Number USR-1375 Facility Please Reply By February 18, 2002 Planner Lauren Light Project A Site Specific Development Plan and a Special Review Permit for a use permitted as a Use-by-Right in the Industrial Zone District (23,000 sq. ft. contractor's office and shop facility) in the A (Agricultural) Zone District. Legal Lot B of RE-2765; part of the W2, NE4 of Section 2, Ti N, R67W of the 6th P.M., �--, Weld County, Colorado. Location Approximately 500 feet north of State Hwy 52; 1/4 mile west of WCR 23. ! Parcel Number 1469 02 000079 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 16, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan .51, We have reviewed the request and find no conflicts with our interests. "TS. See attached letter. pc, Nikki-re Comments: WE fled -(•fa err-MEEdi ohl giitM SE i pp.tea trran elEgaFsswtA -re faiLt-Y ec..Ftistt -ju ! Lisa. Fran -r^ nLavtry -tui inf £rtpf1 res5. 2-(Srt 5a -34 EMfwrrYEEs sT 5S et'c t50- st4Q wows Wt%a. Ott -1 to ertE Signature 2�,� -- s3 a4 i� Date >z Z/Z51a2. Agency /141%,* h r loo 't LuprorI EXHIBIT •:-Weld County Planning Dept. 4.1555 N. 17th Ave. Greeley, CO.80631 •0(970)353-6100 ext.3540 (970)304-6498 fa IIC • Weld County Planning Department GREELEY OFFICE FEB 5 2002 ......, re ,iiik:_rt;ts., RECEIVED Weld County Referral 119 January 28, 2002 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant James Terry/Nelson Pipeline Case Number USR-1375 t Facility 1 Please Reply By February 18, 2002 Planner Lauren Light 1 Project A Site Specific Development Plan and a Special Review Permit for a use 1 permitted as a Use-by-Right in the Industrial Zone District(23,000 sq. ft. contractor's office and shop facility) in the A (Agricultural) Zone District. Legal Lot B of RE-2765; part of the W2, NE4 of Section 2, T1 N, R67W of the 6th P.M., 1 Weld County, Colorado. i Location Approximately 500 feet north of State Hwy 52; 1/4 mile west of WCR 23. t Parcel Number 1469 02 000079 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Weld County Planning Commission Hearing (if applicable) April 16, 2002 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: -- Z. /c c jv6ee2 w St-is -4 l0.el, 2Ze t e ,S-e7 o c i 6,t,51 /A EE ty/i OF' L3uicl',t -ru,�/l°srr&2 h/!fs /a- 2Tc-.�,7,4 xL v,C si/)/4, Lf e 5 7w etc /4i27-4-c c �/-7 /z>2 7 /C /-/rw:e<./`,CA: __---2 Signature al .I ��/ ,� Date Fire. V, .�C;C)— Agency ,er icy—Vim/ ATX +Weld County Planning Dept. +1555 N. 17th Ave.Greeley, CO. 80631 +(970)353-6100 ext.3540 :•(970)304-649; EXHIBIT 7 16 Hello