HomeMy WebLinkAbout20023006.tiff CHANGE ORDER NO. 1 Bridge Rehabilitations Date: November 13.2002 Project: Bridge Rehabilitations described in the Invitation for Bids. Bid No. B0200191 Owner: Weld County.Colorado Contractor: Can-Do Concrete Construction. Inc. The following change is hereby made to the Contract Documents: Add structure WEL088.0-027.0A to contract for lump sum amount of$17,250.00, structure WEL029.0- 088.0A to contract for lump sum amount of$19,700.00, and structure WEL003.0-012.0C to contract for lump sum amount of$23,000.00. CHANGE TO CONTRACT PRICE: Original Contract Price: $ 134.030.00 Current Contract Price adjusted by previous Change Order: $ 134,030.00 The Contract Price due to this Change Order will be increased by: $ 59.950.00 The new Contract Price, including this Change Order,will be $ 193,980.00 CHANGE TO CONTRACT TIME: The Contract Time will be increased by 54 calendar days. The date for completion of all Work will be May 29.2003 . RECOMMENDED: .--— / i /A. Owner Representative: i'" -��--"" "'— Date: A .7 Engineer: l/t M Date: //MA 02 APPROVALS: /..2 Contractor: / " _��_�7 r/yl� Date: I/— /3 -O - / Can-Do-Concrete Constru tion c. Owner: Date: // lc� 7<)O Glenn Vaad,Chair S02-3OO(r �r MEMORANDUM Otti� Date: November 13, 2002 To: Frank B. Hempen, Jr., P.E., Director of Public Works/County Engineer IIWD€ From: Cameron Parrott, E.I.T., Civil Engineer COLORADO RE: Change Order No. 1 for Bridge Rehabilitation Contract The annual bridge rehabilitation contract was awarded on October 7, 2002 to Can-Do Concrete Construction, Inc. There are ten (10) bridges on this year's contract. Currently five of those bridges have been started or completed. The other five bridges remaining in the contract are crossing irrigation ditches that are currently flowing water. When this contract was awarded, Can-Do Concrete Construction was informed that there were additional structures that could be added to the contract, time permitting. Can-Do Concrete Construction has given the County bids for four(4) additional structures as shown below: WEL088.0-027.0A - $17,250.00 WEL029.0-088.0A - $19,700.00 WEL003.0-012.0C - $23,000.00 WEL038.0-003.0A - $25,000.00 Our current budget will allow us to award the top three bridges in this list. The top two bridges on this list are crossing the Pierce Lateral Canal and are dry for the season. Since water is out of the Pierce Lateral until April next year,Can-Do Concrete Construction Inc. would be able to start on them immediately. The third bridge on the list is located in southwestern Weld County and crosses the Lower Boulder Ditch, which is also currently dry. These three bridges are good candidates for rehabilitation. It is my recommendation to accept this Change Order for adding bridges WEL088.0-027.0A, WEL029.0-088.0A, and WEL003.0-012.0C to the Bridge Rehabilitation Contract for an additional $59,950.00 and increasing the contract time by 54 calendar days. MEMORAND JM C `\ Q TO: Clerk to the Board DATE: Nov. 13, 2002 • COLORADO FROM: Frank B. Hempen, Jr., Director of Public Works/County Engineer SUBJECT: Agenda Item Please submit the enclosed item for the Board's next agenda: Change Order No. 1 for the 2002-2003 Bridge Rehabilitation Contract. The appropriate documentation is attached. Enclosures pc: Wayne Howard, Project Manager M:\W PFI LES\Francie\AGENDA-I.M EM.wpd 2002-3006 Hello