Loading...
HomeMy WebLinkAbout810702.tiff ci Special Highway Committee COLORADO COUNTIES INC. COLORADO MUNICIPAL LEAGUE 1500 Grant Street • Denver, Colorado 80203 • Telephone (303) 861-4076 July 21, 1981 ', cornQv J. Chuck Carlson, Chairman JU4.23 1981 '. Weld County Commissioners P.O. Box 758 4:iNiE@jaix Greeley, CO 80632 Clap Dear Chuck: Recently completed bridge inspections and ratings indicate that the following bridges in your jurisdiction have a sufficiency rating of less than 20.0 and are thereby classified as deficient under the guidelines of the Federal Bridge Inventory Program: Structure Feature Sufficiency Number Intersected Rating (Off-Systems) WEL 043.0-054.OA Latham Ditch 15.4 WEL 037.0-068.OA Greeley Canal No. 2 17.3 WEL 014.5-025.OA South Platte River 17.7 WEL 386.0-038.OA Empire Canal 17.8 WEL 017.0-064.OA Poudre River 18 WEL 001.0-022.OA St. Vrain Creek 18.3 WEL 016.5-000.OB Boulder Creek 19.1 WEL 076.0-029.OA Eaton Ditch 19.3 WEL 054.0-041.OB Latham Ditch 19.6 WEL 080.5-017.OA Larimer Canal 20 (Federal Aid Urban Systems) WEL 019.0-004.OB Big Dry Creek 19.3 Approximately 600 thousand dollars in federal funds are available for the rehabilitation of substandard structures. These funds are available on an 80% federal, 20% local matching share. However, it should be noted that work performed with these funds must meet the Federal Bridge Construction/Rehabilitation Guidelines. 910702 J. Chuck Carlson July 21, 1981 Page 2 The Special Highway Committee is soliciting applications from interested local governments for grants under this program. You may submit one or (if applicable) more bridges for funding. In the case of multiple requests the bridges must be listed in the order of their priority. The following information must be submitted for each structure that you are submitting for funding through this program: 1. Photographs of the bridge; 2. A copy of the inspection report; 3. A brief narrative discussing the need for the work. The Special Highway Committee will review all requests and determine priorities for funding within existing revenue enablements. In the event that your application is selected you will be required to submit an engineer' s report which can be funded on an 80% federal-20% local basis. This report is necessary to provide an estimate of the cost of the replacement or rehabilitation and will be the basis for the funding of projects. All requests must be received no later than 5:00 p.m. , August 14, 1981. Requests should be sent to John F. Tomsic, Colorado Counties, Inc. , 1500 Grant St.-Suite 301, Denver, CO 80203. The Special Highway Committee should complete its review process and recommendations for funding by the end of September. For 1982 budget purposes, the replacement cost figure contained in the inventory report should serve as an estimate until such time as the engineer's report is completed. In the event that your project is not selected for funding the budgeted item becomes redundant or a washout due to the lack of funding. Sincerely, /7 Ed Touber Chairman ET:sb Hello