Loading...
HomeMy WebLinkAbout20070211.tiff SITE PLAN REVIEW COLORADO Administrative Review Case Number 2nd AMSPR-41 Parcel Number 1309 20 000012 Applicant: Fred & Marcia Rothauge Legal Description: W2 SW4 SW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, CO. Project Legal: 13027 County Road 18, Fort Lupton, CO 80621 Zoning: 1-3 Proposed Use: Warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for a well construction and service company. Site Plan Review Standards Meets the Intent of the Comments Weld County Code Site Plan Certification Included in Application Yes Retention Facilities Engineering Drainage Plan reviewed in memorandum from David Bauer, No Dept. Department of Public Works,dated August 6,2006 Off-street Parking Overall plan approved per memorandum from Don Carroll, No Department of Public Works,dated August 10,2006. Additional spaces required for proposed warehouse. Loading Areas Yes Access Existing accesses approved per memorandum from Don Carroll, No Department of Public Works,dated August 10,2006. Additional review from CDOT required Setback Requirements 25 feet Yes Offset Requirements 10 feet Yes Landscaping 10'landscape area along CR 18 and Highway 85 needs to be No delineated on plat. Trash Collection&Storage Location and screening needs to be delineated on the plat No Potable Water Need copy of well permit No Sewage Disposal Yes Environment Standards Yes Property Maintenance Yes 2007-0211 pi_ 1871 This site plan review is approved with the attached conditions: 1. Prior to recording the Site Plan Review plat, the applicant shall address the following to the Department of Planning Services' satisfaction: A. The plat shall be amended to delineate the following: ,Y.z Off-street parking areas shall be located and screened from the public rights-of-way and adjacent properties and shall meet the requirements of Section 23-3-350.B and Section 23-4-30 of the Weld County Code. (Department of Planning Services) Trash collection areas shall be delineated on the plat and shall be screened from public rights-of-way and adjacent properties and shall meet the requirements of Section 23-2-350.H of the Weld County Code. (Department of Planning Services) XThe access and the equipment parking area shall be gravel, recycled crushed asphalt, or the equivalent. The office/warehouse building parking area shall be hard surfaced asphalt or concrete as in accordance with Section 23-3-350.B of the Weld County Code. (Departments of Planning Services and Public Works) /4< The site shall add an additional thirty five (35) parking spaces for the two new proposed buildings. The site will be required to meet all requirements of the Americans with Disabilities Act. Two (2) accessible sites shall be delineated on the plat. At least one parking space shall be van accessible. A five (5) foot wide aisle will be required adjacent to the van accessible space. The accessible path to the building and public right-of-way shall be delineated on the plat. (Departments of Planning Services, Public Works) %. There are two (2) existing accesses to the facility. The western most access is the original access, which is usually gated and locked shall be closed permanently. The newer access (eastern access) is the main access to the facility. The site shall utilize the exiting 40 foot eastern access as it is wider for the proposed use of the facility. (Department of Public Works) 94 County Road 18 is designated on the Weld County Road Classification Plan as a collector road, which requires 80 feet of right-of-way at full build out. There is presently a 60-foot right-of- way. All setbacks shall be measured from the edge of future right- of-way. The applicant shall verify the existing right-of-way and the documents creating the right-of-way. This road is maintained by Weld County. The plat shall delineate the existing 30-foot and an additional 10-foot for the future expansion of CR 18. (Department of Public Works) ,Y Although not specifically delineated in the application documents, any on-site lighting shall adhere to the requirements of Section 23- 3-360.F and shall be delineated on the Plat. (Department of Planning Services) 8. The applicant shall submit a Landscape and Screening Plan for review and approval to address screening of adjacent properties, including State Highway 85. Due to the nature of the facility, the entire property shall be screened with an opaque screen material at least six feet in height. (Department of Planning Services) The applicant shall include in the Landscape Plan the following information: a. An installation schedule which specifies when the landscaping will be installed on site. (Department of Planning Services) b. A Plant Material List specifying the Botanical and Common names of all plant material to be installed; the size of the plant material at installation and whether the plant material is to be containerized or B&B. (Department of Planning Services) c. A landscape maintenance schedule which specifically states who will perform maintenance and that maintenance is on-going and shall not end upon final acceptance by the Department of Planning Services. (Department of Planning Services) d. Screened outside equipment and material storage areas shall be indicated on the plat. (Department of Planning Services) 2. The following requirements shall be addressed prior to recording the Site Plan Review Plat: A.' The applicant shall provide current evidence that the facility has an adequate water supply to the Department of Public Health and Environment and the Department of Planning Services. The applicant has submitted "permit to construct a well" #137460-A that expired in March 2004. A completed well permit was not submitted. Evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) B The applicant shall submit a dust abatement plan for review and approval to the Environmental Health Services, Weld County Department of Public Health and Environment. Evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) The applicant shall submit to the Department of Public Works a Weld County Road Access Information Sheet. Evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Works) The applicant shall contact the Colorado Department of Transportation (CDOT) to verify if any upgrades or improvements are needed per the U.S. Highway 85 Corridor Plan associated with the CR 18 and U.S. Highway 85 intersection. The applicant may generate an increase of heavy vehicles traffic at the intersection. The access control plan shows left turn and right turn acceleration/deceleration lanes. Evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Works) The applicant shall pay the Department of Public Works for the drainage review. Evidence of payment from the Department of Public Works shall be submitted to the Department of Planning Services. (Department of Public Works) F. The applicant shall submit written evidence to the Department of Planning Services that all conditions and requirements as indicated in the Department of Public Works letter dated August 6, 2006 have been met. (Department of Planning Services) G. The applicant shall submit written evidence to the Department of Planning Services that all conditions and requirements as indicated in the Department of Building Inspection letter dated August 21, 2006 have been met. (Department of Planning Services) The applicant shall submit written evidence to the Department of Planning Services that all conditions and requirements as indicated in the Platteville Irrigation & Milling Company letter dated August 14, 2006 have been met. (Department of Planning Services) The applicant shall submit written evidence to the Department of Planning Services that all conditions and requirements as indicated in the Colorado Department of Transportation letter dated July 21, 2006 have been met. (Department of Planning Services) 7 The applicant shall attempt to address the recommendations (concerns) of the Platte Valley Soil Conservation District as outlined in their referral received August 2, 2006. (Platte Valley Soil Conservation District) yThe applicant shall submit written evidence to the Department of Planning • Services that all conditions and requirements as indicated in the Weld County Sheriff's Office letter dated July 26, 2006 have been met. (Department of Planning Services) L. The applicant shall submitted a Private Improvements Agreement according to policy regarding collateral for improvements and post adequate collateral for all landscaping, transportation (access drive, parking areas, etcetera) and non-transportation (plant materials, fencing, screening, water, signage etcetera). The applicant shall submit to the Department of Planning Services an itemized landscaping and sign bid for review. The agreement and form of collateral shall be reviewed by County Staff and accepted by the Board of County Commissioners prior to recording the Site Plan Review plat. Or the applicant may submit evidence that all the work has been completed and approved by the Department of Planning Services and the Department of Public Works. (Department of Planning Services) 3. The following notes shall be placed on the plat: A. In accordance with the Weld County Code, no land, building or structure shall be changed in use or type of occupancy, developed, erected, constructed, reconstructed, moved or structurally altered or operated in the commercial or industrial zone districts until a Site Plan Review has been approved by the Department of Planning Services. (Department of Planning Services) CAll structures, including signs, on site must obtain the appropriate building permits and conform to the Uniform Building Code as adopted by Weld County. (Department of Planning Services) C. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) D. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. (Department of Public Health and Environment) E. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. (Department of Public Health and Environment) F. The applicant shall operate in accordance with the approved "waste handling plan". (Department of Public Health and Environment) G. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved dust abatement plan at all times. (Department of Public Health and Environment) H. This facility shall adhere to the maximum permissible noise levels allowed in the Commercial Zone as delineated in 25-12-103 C.R.S., as amended. (Department of Public Health and Environment) Adequate handwashing and toilet facilities shall be provided for employees and patrons of the facility. (Department of Public Health and Environment) J. Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. (Department of Public Health and Environment) K. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. (Department of Public Health and Environment) L. All potentially hazardous chemicals must be stored and handled in a safe manner in accordance with product labeling and in a manner that minimizes the release of hazardous air pollutants (HAP's) and volatile organic compounds (VOC's). (Department of Public Health and Environment) M. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. (Department of Public Health and Environment) N. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) O. The applicant is proposing a well as its source of water. The applicant should be made aware that groundwater may not meet all drinking water standards as defined by the Colorado Department of Public Health and Environment. We strongly encourage the applicant to test their drinking water prior to consumption and periodically test it over time. (Department of Public Health and Environment) P. Landscaping materials as indicated in the approved Landscape and Screening Plan shall be maintained at all times. Dead or diseased plant materials shall be replaced with materials of similar quantity and quality at the earliest possible time. (Department of Planning Services) Q. Building permits shall be obtained prior to the construction of any building. (Building Inspection) R. A plan review is required for each building. Plans will require the wet stamp of a Colorado registered architect or engineer. (Building Inspection) S. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. The proposed building will be most likely be classified as a S-1 for the shop area, and a B occupancy for the office area. (Building Inspection) T. Buildings will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. (Building Inspection) U. Fire resistance of walls and openings, construction requirements, sprinkler requirements, maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by the Weld County Code. (Building Inspection) V. Building height shall be measured in accordance with the adopted building code at the time of the building permit application for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. (Building Inspection) W. A letter of approval from Fort Lupton Fire Protection District prior to obtaining a building permit. (Building Inspection) 4. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the paper copies the applicant shall submit a Mylar plat along with all other documentation required as conditions of approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-160.V of the Weld County Code. The Mylar plat and additional requirements shall be submitted within sixty (60) days from the date of approval. The applicant shall be responsible for paying the recording fee. 5. Prior to the release of building permits: A. The applicant shall address the requirements of the Fort Lupton Fire Protection District as stated in their referral received July 19, 2006. (Fort Lupton Fire Protection District) B. A letter of approval from Fort Lupton Fire Protection District prior to obtaining a building permit. (Building Inspection) 6. Prior to the release of the Certificate of Occupancy: A. An individual sewage disposal system is required for the proposed facility and shall be installed according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) B. The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) 7. Prior to Operation: A. A stormwater discharge permit may be required for a development/redevelopment/construction site where a contiguous or non- contiguous land disturbance is greater than or equal to one acre in area. The applicant shall inquire with the Water Quality Control Division (WQCD) of the Colorado Department of Public Health and Environment at www.cdphe.state.co.us/wq/PermitsUnit if they are required to obtain a stormwater discharge permit. Alternately, the applicant can provide evidence from WQCD that they are not subject to these requirements. (Department of Public Health and Environment) Site Plan Review conditionally approved • by: c Date: 9/8/06 Jacqueline Hatch — a r II DEPARTMENT OF PLANNING SERVICES SOUTHWEST OFFICE 4209 CR LONGMONT, COC 80504 PHONE: (720)652-4210, Ext. 8730 ' FAX: (720)652-4211 C. COLORADO July 14, 2006 Fred & Marcia Rothauge c/o Macrum Building Systems 916 38th Av Ct Ste 5 Greeley CO 80634 Subject: 2n°AMSPR-41 -Amended Site Plan Review for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company located in the on a parcel of land described as W2 SW4 SW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, Colorado. Dear Applicants: • Your application and related materials for the request described above are complete and in order at this time. Our Department will be processing the Site Plan within 45 to 60 days upon receipt of the application. You will be notified by this office at the end of the review period regarding the site plan. It is the policy of Weld County to refer an application of this nature to any town or municipality lying within three miles of the property in question or if the property under consideration is located within the comprehensive planning area of a town or municipality. Therefore,our office has forwarded a copy of the submitted materials to the Fort Lupton Planning Commission for their review and comments. It is recommended that you and/or a representative be in attendance at the Fort Lupton Planning Commission meeting to answer any questions the Commission members may have with respect to your application. Please call Fort Lupton at(303)857- 6694, for further details regarding the date, time, and place of the meeting. If you have any questions concerning this matter, please feel free to call or visit our office. Sincerely, Jacqueline tc Planner ••��,. �. 'F' ; p • 1 0 N I it f E 8,1602.4:{ '.3 �. t � '; ..4 d 9. R4:t F x 1, , .''', '''1:1:1':',',,,,,:„:„:S",7,:,,'„',,,i,,7,,, :, a : ' Y }a i . . kb 2 Ri tv i • t '4 Y i ryt o- 'SF _ a^- tr t ' N s"" r z4 • \' • N at • •J?i•ii t w"(, - r ray • as '("'�Mi r t-.• •,,q§ � - 4 .t • i + • . r {I5•ek r t'.{ t ; -,• is dam- t . • t ? Y • t tlr �`� •'s vi 4 t 4;44 "V � �:- 'q 'hr y1 t• .}1. iti . • • „ 4 . . . . . „..,:?„„3_,. • 9..i4 i t. • , 4.t,:i.„.„.• , . sI )F t ,,il.„...4 . .t t 3 { ,si.:.w �.\ t . t xI Y .jp Y+. Y S S. .y ....... -. :,/,, •,. . .:., tit ; ! loc., „ iX, a, jF t • 1 i 1 W ! i, .. \ a • l fA r • i7 •• • • • N t xna yl ! l • • • tea . • t¢ -----,. . : u qir ^�n. i ! - •. t ^ r , ' • E. . k tt�. s . ""YM } dF' <nM1 F • `s • 1 y} I iAt s .d(: 4 tv 17i ivs ? N ' •'i• • cT M1. { 1, 1rPY° ry.i3° (' 4 .:1. pf. ( 4A 44� 4' P' P" 'fay t"�' da.wwnr. PF i •.. -- d � x 9 'j -` Y w. p } • :it;6 .''DI( •m i fit` O4$!.71}t ' r•Y• # Y. ors( s - • "^} Pe • :.. a Z. yi M1!. . ,a„ far !. M it e .., : , • k` ' '1 sg ,. • qy i F j t x i•u *� v Y k r r. e D ty } d 2t h.6.'s+y k ',-""y",'„4?-':,-,*--t",--“, e °',1 'a� a "p'a 3 } i' U + , ti> f y4 y .3. tut°₹ :-.1:":". r.L 6a v s a • �fl�r/--'„7-4.,'-'-‘,:',"4"t uhf }♦a,�" Ut {g'j! 9 -2 fi k b4f 'L i,4 ya. $ • Y q $ d % // i?fti-_,,,',"‘„,,' S J • ' 1 - fS t d S , F�Vy� ,X+4 Y i „lV, 1 ( g + r 3�' a i sx fka ` k.: € r �q tar _ is 2i F:• • Iy a 4'`rrt .{a g ._ • a. .si t *t tyv+ I) Hi �.T"S § • .Cast' it,7['ti +f�' n F:z.;� a e i 1a � k"�'t v i ',-,--N• 1�,x, �y ft � atrc�4. Y t� �" k. u. ,..x,y k a S• tt x e syi ':4. • y �t4 >S- ,>~ 1 4 ,.r � 4k a` tx 4t a61/4 ��'a.. r ter. 'i t §t" tea r:k ., f t yrt.' >� a4a 4 i :S _' ,. 'a 1 ,.4N tk 9£/jV g a Q 4 T .. • :W “•� r +' 'a +# arc=4 s 3 � '.; 5 fa p' f• r (i , k7V- l}E 1 *{i1 4Yft}�`i tjrZ:F �S�gjbLY. Fti,:',,,-;,:,'.,. ' .1 - :',','. , '- ::,11,44;;;;,.,-,-,..::,iff.:,;•,,:;,-;!''i:,.',r:44:::‘,::;,:,::;,:t••:::;4'',44;;;;;;,:kt-,t14;,11'4‘ • n � ,ttf .� f aq , a#5 r �p r _ i S "` s r k# (yr ".y ll may:} ' tFSi3 t p �xF�:k;N�.��{ 9 h4`. YYY rnti 5I4;v f< f Aa �3T. 1 ' ' 'd RkE4 • l it4 S�' ftt,-r•-•,-,u ,,,{ g 1 F 1 A k, r z4 'y3a4�3f n` t t esr 4Ta S a'ta 'ter a .,t -- t a`.a, i' �t tO.v,at �'Pi t ti x tf +ryy tfuw'Fr t}tr ' - h. d •e i .. i • 44} 'x 4 o-:44 I "@hl 4.�e l ca. ..'�. '4 r p :,,.".c......,„. � ..t"••• - • 64- ' J� a9i �+. k [y ..�"� „ � jx t. , r t t}k. C! t t :i 1 • ....�I, •s j' Ptit''5� � ..;,,,;,;.1-:: • s ° g M ..4 S`'b ' ` ..,�ye J iL" i Sd 6 LiI b.g ' x ' !`t -w, t to J. ids u t .,{ au 'i"7 tnl ,YY '� tr ( { M1Y d F J g• x 4 i7 w, ; `t.G I�'s4 -.`,,;1,1P .' i .F a.; z yI iR ia "k tS" i,.t 5 ₹ ! , . `kF � � In€ '�:t .�.°r Y w y�g��ji' f P¢�°�'F u xE,, ����- . �h,�t .f nt v.12 M § ?p .° 1 ; � T { a -. aR04'#Pi -t5i-IY'a`�'1:24,gt , tt.,,; y '41i"S r' ta5'-+ >i t n *: 'i Uzi Poll • .E.• ~i•J t C!�.; c vy,.ltNYs,a ' >Y,,-.4,'t .. 9 ' -i pt t Trot .a.t.' S. s.Y .{ t• 4 S, 8+u x -s` i r.. d .; r � -gS • ,s4 t. z . .! ' iu Yq i k "e • „ a} i TiaA'5 .P' r t. .:, x... tit d • s 9 W.•- ;:What 4tP. �u t „ �: , t *`e ras` t ,t .', ty.5'e« s } t: r ,,, `�� x� t ,� aq }}t t`.4 k 4.§ 4/5. /...5 "t r' E'/44: �m tf � hu tk .1 E3�` .,� �, 3t,/ t"E''C , 1 ar Ott i 4q , - • • S�s ",k -.?••3:1; st irha Pot 1 .. •t ` v'r to-. ' } 3 K e • r�r fig.. xt y d 1� , l.r: She: �f' tc :i , � t � J I•1 ...,,,,,":."...,, :„.,.: -,4O.5.4::',, Y�3.:. tarif * Wt Y g� a a �. ti d { x a Pt i °a.� d'5 r" ° Z ikt, i. ' g 3( ¢t , J t I 9 tiv�s0 1? ;p 0 k' ( i 4. RAY { .. F tz:Al y,tT G § ma.�yy_{ 'it E £ I •i , 4 ': T ,� C.. f :. 1.. TaT I ' �7 me,i R 1 � 1 ry F $ µ E J, j � p� • Fa '� 34 k t +,fi 4 to . a � " k,bait§ iaa +tYRi �' i4 ••..: �f1 "G1 1 Sit tfi .at §... bA ":pl'5. + k:': :fii ry'' 1. I artiiifI ��x6 i§ t...*:.:I.r r" fire . k7 3 d y I E4.0!.'1r7 ry`,^�wM ik .-_.. 1144 l,Y Yl �,S. 'y„'}4q ! 39h t 1 Rt ?.• ', 4 4 .;:..:.;i4.37."::" ,' skc:'rt`i' �' xy x< w''a,y, r•i � ••- ; �, ' `�+ ""w".a' a• t .: a . v m _ �� I . .H +ww M JAI . ° 'tg ott•A-,.. f."— AAS i 4 z a 'x4f d�:'& S #°'-ak tit's Fl£u.•'y J , �R. SM�...a ,ti 1 �),,{' `- p'<t 4tl' t�Ja+,- y rRII t'V. � ccftWYA.y�tt Y t •"°gam y� 1-.T7i 'cT ��"�•a y+a' ';::::;,O•44- 2 i hit s ..11:•••-c.1::::',%•,";1F 'hei{ � 6,w. o '� • x s{ 't:',4 r 7s ''' 704 S:'.#§ µ`5 i• it.1h •' :•1, •'W,..43,' . Y '11**4 %b't' r .W:. 1V # .la "t. ',;a I _ ti ,.) Fi x r ek �;T. c"!'x'% "¢Y' ' k &yj ° a r i -_ i "' 9 ti faw'�.Rs, 1 �,.a It t '�a•' r +� -.-t rv•', •'•! • i a it. ♦ + ''%**,4 'Y1 ,.. ` a"tt s.i •B ‘..'1'... r, ' ' {�,J 'c mar 4 I\ ,:- 118 k } 3 ha r si 'd F s th A %k T 1 r "'is Y � �''. �.1�'1' t �.- • .,a. Sr gTc�M1�L-». >d °� �r 7a is .s + #44, • • 1 t i [ sr St 37.741,1,1"."4., %.c.:5711:.:'t �" ,yyy# � `wt. g \� / '' `5` k Y k. 7:4'4":::':1€4.47 `'t t' d7kY } `n TM T•'5, 4", 'ti pip' / y R c �tt *.* i :h.n ;,: 4v.Ef44 £ 1 is t z '1+{�"+q��j,gi..Y. • 's ii E -" a s,�t4 §a h :i a ri 'C. . li . I ri ' tati # 4 d , t• • • 5 . • , %' _a _ • ' _ t :•-••-•.•-•••.•=3.1: .fit'- ai q4 as ' ..� P. L a *1.k i s ; t 1 £ �' ,Sg'9 c3 § . FIELD CHECK Inspection Date: 8/11/06 APPLICANT: Fred and Marcia Rothauge CASE#: 2nd AMSPR-41 REQUEST: 2n°Amended Site Plan Review for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company. LEGAL: W2 SW4 SW4 of Section 20,T2N, R66W of the 6th P.M.,Weld County, CO. LOCATION: East of and adjacent to State Highway 85 and north of and adjacent to CR 18. PARCEL ID#: 1309 20 000012 ACRES: 10 +/- Zoning Land Use N 1-3 N Industrial E Agricultural E Agricultural S Agricultural S Agricultural W Agricultural W Agricultural Comments: Chain link fence Single family home Industrial uses on site Steel buildings Outdoor storage Two accesses Adjacent to hwy 85 Signatur o House(s) o Derelict Vehicles ❑ Outbuilding(s) ❑ Non-commercial junkyard (list components) ❑ Access to Property o Irrigation Sprinkler o Crop Productions o Crops ❑ Site Distance o Wetlands o Mobile Home(s) o Oil & Gas Structures o Other Animals On-Site o Wildlife o Water Bodies o Utilities On-Site (transmission lines) o Ditch o Topography Note any commercial business/commercial vehicles that are operating from the site. FOR PLANNING DEPARTMENT USE DATE RECEIVED: RECEIPT#/AMOUNT # 1$ CASE #ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: Parcel Number ! 3 O A_- 2 O - O - 0 0 -_o_ (12 digit number-found on Tax I.D.information,obtainable at the Weld County Assessor's Office,or .. Legal Description Sushi , 5I /W , Section 20 , Township? North, Range6(o West Lot/Block: N1A Zone District: NIA , Total Acreage: 16.313 , Overlay District: 4/A FEE OWNER(S) OF THE PROPERTY: N a m e FRED d t aez* RDTHAUGE Work Phone# (303)-851- 4111 Home Phone# NIA EmailAddress: FRo7MAucf e QDFLu7DS.cosi Address: I3o2'i UCR It City / State / Zip Code Foiti lot)io,j r Co $0621 N a m e • Work Phone# Home Phone# Em ail Address: Address: City / State / Zip Code N a m e • Work Phone#_ Home Phone# Email Address: Address: C i t y / S tat e / Z I p Cod e APPLICANT OR AUTHORIZED AGENT (See Below:Authorization must accompany applications signed by Authorized Agent) N a m e MA Murk Suit.b2r1G SY STf m$ , S.4G- WorkPhone# (17o)-351-134'/ Home Phone# 1..)/A Em ail Address: MAcavoi etas ios.,taeroncASr..,ET Address: 91G 38114 Avgauc C.out,T City / State / Zip Code CiftEELE1 t CO 80434 PROPOSED USE: Foil A use c•c•.+Stit4ems AND s@Raace earl P*Jj -3- I (We)hereby depose and state under penalties of perjury that all statements,proposals,and/or plans submitted with or contained within the application are true and correct to the best of my(our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs,a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included showing the signator as to legal authority to sign for the corporation. Signature: Owner or Authorized Agent Date Signature: Owner or Authorized Agent Date SITE PLAN CERTIFICATION I (We) hereby certify that the uses, buildings, and structures located on: SWshN , Su'M , Sten/4 ZO , Tob.NS*IP 2•J , RA,.16E (.G WEST (legal description) are designed and will be constructed and operated in accordance with the applicable Performance Standards and District Requirements for the T -3 zone district as stated in the Weld County Code and in accordance with any conditions imposed by the Board of County Commissioners at the time the property was zoned or rezoned. I understand my failure to comply with the performance standards and/or any conditions could result in the County initialing a compliance action against me. rope y ner The foregoing instrument was subscribed and sworn to before me this /0's _day of lucy 20 04 , by 7c2F-2 Ron gu6E d IQopce nooAJ WITNESS my hand and official seal. ,p 4)PPp�p"' b,,,��z��y My Commission expires: 1-30-200p 2`•�•• ...... •••O� �s �- :•sen• t OTARy. g _ones— : E Notary Public A•• UBLI , O1 2m�co ' -4- GENERAL CONTRACTORS Commercial & Industrial BUILDING SYSTEMS, INC. Design - Build 916 38th Avenue Court • Suite#5 Greeley,Colorado 80634 (970)353-7364 FAX(970)353-2393 Date: July 10, 2006 Application: Fred & Marcia Rothauge Site Plan Review Address: 13027 WCR 18 Fort Lupton, CO (Weld County) Legal Description: SW '/4, SW 14, Section 20, Township 2 North, Range 66 West, Weld County, CO Required Information from Sections 23-2-160 A through Z: A. Site plan review application. See enclosed form. B. Copy of deed. See enclosed form. C. Party wall agreement. Not applicable. D. Condo declaration and condo legal description. Not applicable. E. Description of the proposed use. The office will be a 42'wide X 80'long single story building and the shop will be a 80'wide X 120' long building. The business that will occupy both buildings is a well construction and service company. Work performed in the shop will include assembly of components for pump installation and well development, service pumps and equipment as necessary, build-up ofjobsite components and storage of pump components. F. Evidence of adequate source of potable water. The new buildings will have potable water supplied from the existing well (# 137460-A) located on the site. G. Evidence of adequate sanitary sewer disposal means. The sanitary sewer line will connect to the approved septic tank and leach field(see Septic Permit). H. County Road Access Information Sheet. See enclosed sheet. I. Number of Employees associated with the use. In the office there will be twelve (12) full time employees and in the shop there will be three (3)full time employees. J. Setback and offset requirements. The site is zoned for 1-3 which the proposed use is Allowed by Right. The office building is +/- 690'from the South property line, the shop is 42'from the East property line, the shop is 400'from the North property line and the shop is +/- 230'from the West property line. K. Sketch of the building. See enclosed drawings. L. Proposed signage. There will be a 6'wide X 4'height, double sided, back-lighted monument sign located on the South property line near the east driveway entrance to the site from WCR 18. Any building signage will not exceed a size of 8%of the building wall as allowed by the Weld County code. M. Landscape requirements 1. Maximum Lot Coverage = 76,370 S.F. /449,234 S.F. = 17 % < 85%allowed by the Weld County zoning code. 2. Landscape Setback. The south side of the property that abuts WCR 18 has an existing 10'wide landscape zone to the property line. The West side of the property that abuts HWY 85 (approx. 940 LF) has an existing 5'height earthen berm with a 6'height cedar fence along the Platteville ditch. The remaining West side of the property that abuts HWY 85 (approx. 130 LF) has an existing 10'wide landscape zone extends to the property line. No other sides of the property abut a public right of way. 3. Parking lot landscape buffering. Along the West side of the property line there is an existing 5'height earthen berm that is part of the Plateville Ditch with a 6' height cedar fence which completely screens the parking lot from public view from HWY 85. 4. Landscape plan. See existing as built plan for location of existing landscaping. 5. Maintenance plan. All landscaped areas with living plan materials will be watered by hand or portable tank. Trees and shrubs will be fertilized with granular product as required. Weed control will be accomplished by periodic spraying of broad leaf and noxious weed control agents. Trees and shrubs will be pruned once a year, as required, according to the species and health of the tree or shrub. Organic mulch will be added and replaced as required to maintain a minimum depth of 2"throughout planted areas. N. Storm water runoff plan. See enclosed civil engineered drawings. 0. Parking. The proposed site plan shows a total of sixteen (16) standard paved parking spaces, one (1) ADA paved parking space and six (6) standard gravel parking spaces for customer and employee use. The office consists of 3,360 S.F. and the shop consists of 9,600 S.F. The Weld County parking requirements require 1 parking space for each 2 employees plus 1 space per 500 S.F. of office. The closest use to a shop listed in Appendix 23-B is a warehouse which requires 1 parking space for every 3 employees (but in no event less than 1 space for each 1,000 S.F. devoted to warehouse use). There is no anticipated outdoor display. Use the Weld County requirements for office and warehouse. a. 3,360 S.F. office with twelve employees = 12.72 Parking spaces b. 9,600 SF. shop with three employees = 9.60 Parking spaces Total = 23 Parking spaces P. Loading/service areas. Deliveries to the site will be made with semi trucks and common carriers by vans or light trucks. The 50'gravel drive on the West side of the shop will serve as the loading area for the shop. Common carriers will have short delivery times while on the site and are infrequent in nature. They will use the designated delivery parking space on the South side of the shop on the West side of the office. See enclosed drawings. Q. Street Access. The site will have access to WCR 18 by the existing driveway on the SE corner of the property. See enclosed drawings for location. R. Design of Access. See enclosed drawings. S. Acceleration/Deceleration Lanes. None required. T. Trash Collection. There will be one (1) 6'wide X 8'long X trash concrete pad located against the fence on the East side of the shop that will house up to a maximum of a 8 CY dumpster for the office and shop. The trash pad will be constructed with a 6" thick concrete pad U. Compatible Use. 1. Noises. Noises associated with the equipment used for vehicle service and repair will be limited to inside the building will be below the 60 db (A) limit (from 7.00 am to 7:00 pm), with allowed exceptions, at a distance of 25'or more from the property line. 2. Air Quality. The building will have natural gas heating and cooling systems. There will be no site burning allowed on the site. The building will operate in accordance with the air quality standards established by the Colorado Air Pollution Control Commission. 3. Water Quality. The building will have a drain inside the shop area that will drain into an approved collection tank that will be pumped as required. All other interior fixtures will drain directly into the approved septic system. The building will operate in accordance with the water quality standards established by the Colorado Water Quality Control Commission. 4. Radiation and Radioactive Materials. No radioactive materials will be stored or used on the site. 5. Heat. There will be no uses that will raise the heat levels of the air or materials past the property line more than the allowed 5 degrees. The main building colors will be earth tone in color and the roof will have a aluminum coated metal panel which will limit heat gain on the building. There will be no welding or torching outside of the building. There will be no site burning. 6. Glare. The main building colors will be earth tone in color. All glass used on the exterior of the office will be light tinted and/or clear, non-mirrored glass. 7. Property Maintenance. Dry-land grass areas will be cut periodically so that they do not exceed 12" in height per Weld County requirements. 8. Off-site or on-site agreements. None If you have any questions, please give me a call. Respectfully, 77 Robert Coon General Manager Identify Results .-- Page 1 of 4 WELD COUNTY ASSESSOR PROPERTY PROFILE Account*: R5181886 Parcel#: 130920000012 Tax Area: 2232 Bordering County: Acres:9 Township Range Section Ouart.Sec. Subdivison Name Block# Lot# 02 - 66 - 20 -0 - - Owners Name&Address: Property Address: ROTHAUGE FRED A& Street: 13027 18 CR 7754 UTE HWY City: WELD LONGMONT, CO 80503 Business/Complex: Sales Summary Sale Date Sale Price Deed Tvoe Reception# 11/20/2001 $365,000 WD 2903124 Legal Description I 16173 W2SW4SW4 20-2-66 (3R 7RR 1D) SITUS: 13027 18 CR WELD 00000 J Land Valuation Summary Land Type Abst Code Unit of Number of Assessed yp Measure Units Actual Value Value Industrial 2130 Square Feet 348480 Residential 1112 Square Feet 43560 Land Subtotal: 392040 $156,816 $41,810 Buildings Valuation Summary Bldg# Property Type Actual Value Assessed 1 Residential 2 Out Building 3 Out Building 4 Out Building 5 Commercial 6 Commercial Improvements Subtotal: $549,740 $150,380 Total Property Value $706,556 $192,190 Building Details Account#: R5181886 Parcel#: 130920000012 Owners Name&Address: Property Address: ROTHAUGE FRED A& Street: 13027 18 CR 7754 UTE HWY City: WELD LONGMONT, CO 80503 Building# Property Type 1 Residential http://maps.merrick.com/Website/Weld/setSgl.asp?cmd=QUERY&DET=PP&pin=13092... 07/13/2006 Identify Results Page 2 of 4 Individual Built As Detail Built As: Ranch 1 Story Year Built: 1920 Exterior: Frame Hardboard HVAC: Floor/Wall Furnace Interior Finish: Plaster Built As SQ Ft: 864 # of Baths: 1 Roof Type: #of Bdrms: Roof Cover: Composition Shingle #of Stories: 1 Rooms: Units: 0 Garage: Attached SQ Ft: Detached SQ Ft: Basement: Total SQ Ft: Finished SQ Ft: Account#: R5181886 Parcel#: 130920000012 Owners Name&Address: Property Address: ROTHAUGE FRED A& Street: 13027 18 CR 7754 UTE HWY City: WELD LONGMONT, CO 80503 Building# Property Type 2 Out Building Individual Built As Detail Built As: Farm Office Year Built: 1950 Exterior: HVAC: Radiant Interior Finish: Built As SQ Ft: 420 #of Baths: 0 Roof Type: # of Bdrms: 0 Roof Cover: #of Stories: 1 Rooms: 0 Units: 0 Garage: Attached SQ Ft: Detached SQ Ft: Basement: Total SQ Ft Finished SQ Ft: Account#: R5181886 Parcel#: 130920000012 Owners Name&Address: Property Address: ROTHAUGE FRED A& Street: 13027 18 CR 7754 UTE HWY City: WELD LONGMONT, CO 80503 Building# Property Type 3 Out Building Individual Built As Detail Built As: Miscellaneous OB Year Built: 1975 Exterior: HVAC: None Interior Finish: Built As SQ Ft: 476 # of Baths: 0 Roof Type: #of Bdrms: 0 Roof Cover: # of Stories: 1 Rooms: 0 Units: 0 Garage: Attached SQ Ft: Detached SQ Ft: http://maps.merrick.com/Website/Weld/setSgl.asp?cmd=QUERY&DET=PP&pin=13092... 07/13/2006 Identify Results Page 3 of 4 Basement: Total SQ Ft: Finished SQ Ft: Account#: R5181886 Parcel#: 130920000012 Owners Name&Address: Property Address: ROTHAUGE FRED A& Street: 13027 18 CR 7754 UTE HWY City: WELD LONGMONT, CO 80503 Building# Property Type 4 Out Building Individual Built As Detail Built As: Shed - Equipment Year Built: 1984 Exterior: Steel Frame Siding HVAC: Space Heater Interior Finish: Built As SQ Ft: 2500 # of Baths: 0 Roof Type: # of Bdrms: 0 Roof Cover: #of Stories: 1 Rooms: 0 Units: 0 Garage: Attached SQ Ft: Detached SQ Ft: Basement: Total SQ Ft: Finished SQ Ft: Account#: R5181886 Parcel#: 130920000012 Owners Name&Address: Property Address: ROTHAUGE FRED A& Street: 13027 18 CR 7754 UTE HWY City: WELD LONGMONT, CO 80503 Building* Property Type 5 Commercial Individual Built As Detail Built As: Storage Warehouse Year Built: 2002 Exterior: HVAC: None Interior Finish: Built As SQ Ft: 10860 #of Baths: 0 Roof Type: Gable #of Bdrms: 0 Roof Cover: # of Stories: 1 Rooms: 0 Units: 0 Garage: Attached SQ Ft: Detached SQ Ft: Basement: Total SQ Ft: Finished SQ Ft: Account#: R5181886 Parcel#: 130920000012 Owners Name&Address: Property Address: ROTHAUGE FRED A& Street: 13027 18 CR 7754 UTE HWY City: WELD LONGMONT, CO 80503 Building# Property Type http://maps.merrick.com/Website/Weld/setSgl.asp?cmd=QUERY&DET=PP&pin=13 092... 07/13/2006 Identify Results 1 Page 4 of 4 6 Commercial Individual Built As Detail Built As: Modular Office Year Built: 1992 Exterior: HVAC: Package Unit Interior Finish: Built As SQ Ft: 3108 #of Baths: 0 Roof Type: Gable # of Bdrms: 0 Roof Cover: #of Stories: 1 Rooms: 0 Units: 0 Garage: Attached SQ Ft Detached SQ Ft: Basement: Total SQ Ft: Finished SQ Ft: http://maps.merrick.com/Website/Weld/setSgl.asp?emd=QUERY&DET=PP&pin=13092... 07/13/2006 01/05/2006 06:49 FAX Z001/001 EMERGENCY CONTACT INFORMATION PLEASE TYPE OR PRINT �y Business Name: WEST Phone: 3O3 r ≥ �7 -1/43aE( Address: /30.21 )? Business Owner Al"'4b 1. CMERR/ - FRED Ato-uHA 477 Phone: 303 hs/-9v0 Home Address: f7L` l vfp€ia)j City. mini' CO • ?Qch 3 List three persons In the order to be called in the event of an emergency: ‘.� n�AM \ t'TITL€ n yy� ADDRESS pCi '^' PHON C�g HIC F�nit.CnInpl� In rc' e,J //lk�r 1R ) . ;Q7 tILi-t 3e:D c4- T9 4 JACisl L 11-t3V1SpALCArnkro I 'I 1 3b,1 I y 7�r Sett t4i-4-I'(1 V. P. i 3/13 s`xE?Co 177 Business Hours: 7f00,4M - _S;OQ Phn Days: lrloflclAi - AA Type of Alarm: None Burglar Holdup Fire Silent Audible Name and address of alarm company: Location of Safe: a'4 MISCELLANEOUS INFORMATION: Number of entry/ext doors In this buiding: (a Locatbn(s): 0,.s a c..r THE tJ $r gyps or nrrtcE . ONE a.a COST StpE or errrCE . Out 0w ra6Sr Sibb of Save, DNB Cm SevrlS• Slot of spa, (Ina *Ai EAST STFL —OF 3$.? , odi as ASCOT f no, •F 50sr, Is alcohol stored In building? (40 Location(s): Are drugs stored In building? NO Location(s): Are weapons stored In building? NO Location(s): The following programs are offered as a public service of the Weld County Sheriffs Office. Please Indicate the programs of Interest. Physical Security Check Crime Prevention Presentation UTILITY SHUT OFF LOCATIONS: Main electrical: EAsT sres OF OFFTtE -5- Gas shut off: Ehesr sioE OF OrFSCE Exterior water shutoff: EA)T sSDI OF- oFFTCE Interior water shutoff: WELD COUNTY ROAD ACCESS INFORMATION SHEET Weld County Department of Public Works 111 H Street, P.O. Box 758, Greeley, Colorado 80632 Phone: (970 )356-4000, Ext. 3750 Fax: (970) 304-6497 Road File#: _ Date: _ RE# : Other Case#: 1. Applicant Name FRED 4 M*RCTA RoT144vdE Phone (363)$57- '171 Address 13027 WGR IS City Fvnr Lwro. State co Zip $OGZI 2. Address or Location of Access 13029 welt IS Section 20 Township 2.N Range 4,6 W Subdivision NiA Block N/A Lot N/A Weld County Road #: IS Side of Road Nonni Distance from nearest intersection 1/B MLLE 3. Is there an existing access to the property? Yes X No #of Accesses 4. Proposed Use: Permanent ❑ Residential/Agricultural U Industrial ❑ Temporary ❑ Subdivision 21 Commercial ❑ Other *********************************************************************************************************** 5. Site Sketch Legend for Access Description: I AG = Agricultural RES = Residential L_ O&G = Oil&Gas D.R. = Ditch Road = House O = Shed biF A =Proposed Access • =Existing Access w New BLDG:) T NT WCR IB *************************************** OFFICE USE ONLY: Road ADT Date Accidents Date Road ADT Date Accidents Date Drainage Requirement Culvert Size Length Special Conditions ❑ Installation Authorized ❑ Information Insufficient -6- Stormwater Management Plan (SWMP) Fred and Marcia Rothauge Property 13027 WCR 18, Fort Lupton, Colorado The SWMP was prepared in accordance with good engineering,hydrologic and pollution control practices. The main objective of this plan is to identify Best Management Practices (BMP's) which when implemented will meet the terms and conditions of the general permit. The plan identifies potential sources of pollution, including sediment, which may reasonably be expected to affect the quality of stormwater discharges associated with the construction activity of this facility. In addition, the plan describes the implementation of BMP's which will be used to reduce pollutants in stormwater discharge associated with the construction activity. Construction operations must implement the provisions of the SWMP required under this part as a condition of the permit. 1. Site Description a) The planned construction activity consists of constructing an office/shop building and parking lot/drives. The construction activity will consist of grading to achieve desired grades for the building, parking lot and driveways. The activity will also include the construction of underground utilities and septic leach field. The finished construction will include concrete pavement, concrete walks, gravel driveways and landscaped areas. b) The proposed sequence for major activities is as follows: • Installation of erosion control devices that will include excavation of the stormwater retention pond to be used as a sediment basin during construction activities. • Topsoil stripping and subgrade preparation for cut and fill per the grading plan. • The building pad will be prepared for foundation and slab-on-grade construction. • Construction of underground utilities beginning with leach field and water lines, followed by dry utilities. • Placement of concrete pavement in parking areas and gravel in driveways. • Landscaping c) The total area of disturbance on the 10-acre site will be approximately 3 acres. d) The estimated 100-year runoff coefficient for the site prior to construction is 0.36 and is expected to be 0.52 after construction activities are completed. The percent impervious before and after construction is estimated to be 3%and 39%respectively. e) The site currently consists of buildings and storage areas for the existing Drilling Fluids Engineering, Inc. business. 0 We do not anticipate any other potential pollution sources g) We do not anticipate any non-stormwater discharge from the site during construction. h) The stormwater from this site will be routed to the proposed stormwater retention pond located at the northwest corner of the property. Stormwater in the retention pond will be released by infiltrating the sandy subgrade soils. The site and retention pond is located in the South Platte River basin. 2. Site Map Please refer to sheets C2 and C3 for the site map and SWMP and BMP specifics for this project. These plans identify the area of disturbance, areas of cut and fill, and location of erosion control devices. There are no existing springs, streams, wetlands, or other surface waters on this site. The site is not located within the 100-year floodplain. 3. BMP's for Stormwater Pollution Prevention a) Erosion and Sediment Controls • Structural Practices This project will utilize gravel and rock rip rap to minimize erosion. • Non-structural Practices Contractor is responsible for periodic inspection and maintenance of erosion control devices. b) Materials Handling and Spill Prevention The contractor is responsible for identifying and specifying material handling and spill prevention control to include,but not limited to, exposed materials such as fertilizers,waste piles, and equipment maintenance and fueling areas. 4. Final Stabilization and Long term Stormwater Management Final stabilization will be achieved by the final vegetative cover. The contractor will be responsible for establishing healthy stands of grass and vegetative cover where specified. The landscaped areas will be irrigated and will be maintained by the owner upon completion of construction. 5. Other Controls None. 6. Inspection and Maintenance The contractor is responsible for the inspection and maintenance of erosion control devices. 1 1 Drainage Report for Fred & Marcia Rothauge Property 13027 WCR 18 Fort Lupton, Colorado Prepared For: Macrum Building Systems, Inc _ 916 38th Avenue Court, Ste 5 Greeley, CO 80634 _ Prepared By: Laube Engineering, LLC 6250 W 10th Street, Ste 3 Greeley, CO 80634 (970) 356-3099 it\ PI rill Project No. 304 July 6, 2006 Revised August 23, 2006 LA AU BE E 6250 W 10th Street, Ste 3 „ .. ENGINEERING, LLC Greeley. CO 80634-8856 e-mail: IauheengCw 9wcs1 net Fax: (970) 356-3143 Telephone: (970)356-3099 August 23, 2006 Project No.: 304 Robert Coon Macrum Building Systems, Inc. 916 38th Avenue Court, Ste 5 Greeley, CO 80634 Subject: Drainage Report for Fred & Marcia Rothauge Property 13027 WCR 18 Fort Lupton, Colorado Dear Robert: This submittal is a drainage study for the proposed development. A drainage variance to Weld County Code Chapter 24-7-130 will be required because a stormwater retention pond (release by infiltration into the subgrade soils) has been designed instead of a detention pond (release to an existing drainage system). It has been a pleasure being part of your project. If you have any questions, please call me at (970) 356-3099. Sincerely, LAUBE ENGINEERING, LLC P��REEr'�S _ t ea " 'G�aM` 113 G Ova � F9 31874 Tn. t Keith A. Laube, P.E. � Civil Engineer ,'�9�L�,oG•` � ALA`:. teLAUBE 6250 W 10th Street,Ste 3 Greeley,CO 80634-8856 ENGINEERING, LLC e-mail: lanbeeng@gwest.net Fax: (970)356-3143 Telephone: (970) 356-3099 August 23, 2006 Project No.: 304 Robert Coon Macrum Building Systems, Inc. _ 916 38th Avenue Court, Ste 5 Greeley, CO 80634 _ Subject: Drainage Variance Request for Fred & Marcia Rothauge Property 13027 WCR 18 Fort Lupton, Colorado Dear Robert: A variance is requested to the Weld County Code for a stormwater detention pond (Chapter 24- 7-130). Due to site characteristics, we recommend that the existing stormwater retention pond be made larger to accommodate the proposed site improvements, instead of constructing a detention pond. The site is located between two drainage barriers. The Platteville Irrigating and Milling Company Ditch extends along the west side of the site and the Union Pacific Railroad extends in a north-south direction east of the site. The site currently drains into a stormwater retention pond located at the north end of the site, designed and constructed in 2002. Previous reports recognized that the irrigation ditch and railroad create drainage basin barriers that prevent stormwater from leaving the site. Western Technical Services performed a drainage study in 1984 for Patterson Pumping Service. North Star Design, Inc. performed a drainage study in 2002 for Quality Drilling Fluids Engineering, Inc. Both of these reports used a stormwater retention pond for site runoff. Due to the native sandy subgrade soils in this area, a retention pond provides a good method to manage stormwater runoff from the site. We recommend that the stormwater runoff from this site continued to be met by a stormwater retention pond. It has been a pleasure being part of your project. If you have any questions, please call me at (970) 356-3099. Sincerely, LAUBE ENGINEERING, LLC Keith A. Laube, P.E. Civil Engineer Table of Contents Engineer Certification General Location and Description 1 Site Location 1 Project Description 1 Drainage Basin and Site Design Information 1 Drainage Basin 1 Site Drainage 1 Adjacent Site Drainage Conditions 1 Site Flood Hazard 1 Soil and Groundwater Conditions 2 Drainage Design Criteria 2 Storm Drainage Criteria 2 Development Criteria References and Constraints 2 Hydrological Criteria 2 Hydraulic Criteria 2 Drainage Facility Design 2 General Concept 2 Specific Details 3 Erosion Control 3 Conclusions 3 Appendix A— Runoff and Detention Volume Calculations 4 ENCLOSURES: 11" x 17" Drainage, Grading and Erosion Control Plan Laube Engineering, LLC Drainage Report Fred& Marcia Rothauge New Office/Shop Building Page i L Engineer Certification L I hereby certify that this report for the drainage design for the Fred & Marcia Rothauge L property located at 13027 Weld County Road 18, Fort Lupton, Colorado was prepared by me (or under my direct supervision) in accordance with the provisions of the Weld County Storm Drainage Criteria for the owners thereof. 00 REG/ �� t A �0.�co� t C. 31874 Q1'512.3 ab i r "rXVAI ' Keith A. Laube, P.E. Registered Professional Engineer State of Colorado No. 31874 Laube Engineering, LLC Drainage Report Fred& Marcia Rothauge New Office/Shop Building Page I General Location and Description Site Location The site is located in the southwest quarter of the southwest quarter of Section 20, Township 2 North, Range 66 West of the 6'h P.M. in Weld County, Colorado. More specifically, the site is located at the northeast corner of U.S. Highway 85 and Weld County Road 18. In general, land within the site vicinity is agricultural. Renewable Fiber is located on the property north of the site. The Platteville Irrigating and Milling Company Ditch extends along the west side of the site and the Union Pacific Railroad extends along the east side of the site. Project Description The property is 10.15 acres and presently consists of Quality Drilling Fluids Engineering, Inc. facility. The project will consist of constructing a 12,960 ft4 office/shop building and a future 9,600 ft2 building. Access to the lot will remain from Weld County Road 18. Previous drainage reports have been prepared for this site for past development activities. Western Technical Services performed a drainage study in 1984 for Patterson Pumping Service. North Star Design, Inc. performed a drainage study in 2002 for Quality Drilling Fluids Engineering, Inc. Both of these previous reports recognized that the irrigation ditch and railroad create drainage basin barriers that prevent stormwater from leaving the site as historical. Since the 2002 study, the Platteville Irrigating and Milling Company Ditch has been relocated along the west side of the site. Drainage Basin and Site Design Information Drainage Basin The site is located in the South Platte River basin. The South Platte River is located approximately '/2 miles northwest of the site. In general, drainage within the site vicinity flows northwest to the South Platte River. Site Drainage The site is located between two drainage barriers. The Platteville Irrigating and Milling Company Ditch extends along the west side of the site and the Union Pacific Railroad extends in a north-south direction east of the site. The site currently drains into a stormwater retention pond located at the north end of the site. The topography of the site slopes to the north/northwest at about 1 to 2% with a total relief of about 7 feet across the site. Adjacent Site Drainage Conditions The site does not receive any off-site flows. The north borrow ditch of WCR 18 intercepts and divert runoff away from the site. The Union Pacific right-of-way drains northeast towards the railroad tracks. The proposed exit, located southwest of the site, drains northwest to an existing concrete pan that conveys the runoff into the irrigation ditch. Site Flood Hazard The site is in a flood zone "C" according to the Flood Insurance Rate Map (Community Panel Number 080266 0868C) dated September 28, 1982. The flood zone "C" designation includes areas of minimal flooding. Lauhe Engineering, LW Drainage Report Fred& Marcia Rothauge New Office/Shop Building Page 2 Soil and Groundwater Conditions Soil information was been obtained from the Soil Survey for Weld County. The Soil Survey indicates Altvan and Dacona soil types on the site. The Altvan and Dacona soils are poorly graded sands that are classified as Hydrologic Group B and C, respectively. Drainage Design Criteria Storm Drainage Criteria This drainage report was prepared to conform to the Weld County criteria and the Urban Storm Drainage Criteria Manuals (Volumes 1 and 2 issued June 2001 and Volume 3 issued September 1999), prepared by the Denver Urban Drainage and Flood Control District. _ Development Criteria References and Constraints Site grading was performed to match existing grades where appropriate. Proposed site grades match existing grades at property lines. Due to the existing watershed barriers and relatively flat topography within the site vicinity, it is our opinion that it is not feasible to gravity drain a site detention pond. Since the native sandy soils provide good infiltration rates, the existing retention pond has been redesigned for the proposed development. Hydrological Criteria Stormwater runoff was analyzed using the Rational Method, which is considered acceptable for sites less than 160 acres. The rainfall intensity data used for this site is from the City of Greeley Storm Drainage Manual (Table 3.3). Drainage calculations and referenced information is included in the appendices. The drainage structures on the site have been designed for a minor storm with a 5-year return period and a major storm with a 100-year return period. Hydraulic Criteria The FAA Method, as described in Volume 2 of the Urban Storm Drainage Criteria Manual, was used to calculate the pond volume. The retention pond volume has been sized based on 1.5 times the capacity required for the 100-year storm event for the developed conditions plus 1- foot freeboard. Since there is not an emergency spillway, the pond has been oversized to accommodate the 2-hour, 100-year storm event assuming no infiltration. Drainage Facility Design General Concept The proposed grading tries to minimize the amount of disturbance to the land while providing a site plan that provides adequate drainage for the proposed development. Stormwater runoff will continue to drain north across the site. Runoff coefficients have been calculated using proposed surfaces and includes a future 9,600 ft2 building and future gravel surfaces. A drainage swale is proposed along the west side of the site, east of the irrigation ditch. Site runoff will sheet flow to this swale which will convey stormwater to the proposed retention pond. Specific Details A percolation test performed in the bottom of the existing retention pond yielded a percolation rate of 0.7 minute per inch. Conservatively estimating the percolation rate at 1.4 minute per Lauhe Engineering, LLC Drainage Report Fred& Marcia Rothauge New Office/Shop Building Page 3 inch, the infiltration rate through the approximate 8,300 ft2 pond bottom is 8.2 cfs. Using an outflow of 8.2 cfs, the pond volume to store the 100-year storm is 22,836 ft3. The retention pond has been designed to retain 34,254 ft3 (1.5 times the volume required for the 100-year storm event) plus 1-foot freeboard (this follows the recommendation for retention ponds - Volume 2, USDCM). The bottom of the retention pond is at elevation 4869.0 and the top of the pond is at elevation 4878.00. The depth of water in the retention pond will be about 7.2 feet (elevation 4876.2) during a 100-year storm event and 8 feet (elevation 4877.0) for a volume of 1.5 times the 100- - year storm event. The retention pond drain time for the 100-year storm event has been estimated to about 3 to 6 hours. Because a feasible discharge location for emergency flows is not available, an emergency spillway has not been designed. Instead, the pond capacity has been designed to accommodate _ the 2-hour, 100-year storm event assuming no infiltration of water through the pond bottom. The pond volume required for the 2-hour, 100-year storm event is 51,384 ft3. The designed pond has capacity for this volume with 6 inches of freeboard. Since the pond does not have a _ built-up berm, it is our opinion that 6 inches of freeboard is sufficient for the assumption that no infiltration will occur through the pond bottom. The drainage easement shown on the plans includes the pond area required to hold the 2-hour, 100-year storm event. Site conditions before 2002: Storm Event Existing Conditions Runoff(cfs) _ 5-Year 3.0 100-Year 20.4 Proposed and future conditions for site: Storm Event Total Runoff(cis) 5-Year 9.7 100-Year 29.0 Erosion Control Erosion control during construction of the project should consist of constructing the proposed retention pond as a sediment basin prior to other earthwork operations. It is our opinion that silt fence is not required because the site has a 6-foot high wood privacy fence along the west side and composting piles are located east and north of the site. Because the proposed earthwork and construction activity is more than 700 feet from the Weld County Road 18 access driveway, it is our opinion that vehicle tracking control is not required. We suggest seeding proposed grass areas and placing gravel and crushed recycled asphalt in drive/storage areas upon completion of grading. Conclusions This drainage design conforms to the Weld County stormwater drainage criteria. Laube Engineering, LLC 1 1 Appendix A — Runoff and Detention Volume Calculations 1 Site Location Map (8%2" x 11") Al Stormwater Runoff Coefficient A2 1 Table RO-3 Imperviousness Values A3 Table RO-5 Runoff Coefficients A4 Time of Concentration A5 Figure RO-1 Average Overland Flow Velocity A6 Peak Runoff Flowrate A7 Table 3.3 —Extended Duration-Intensity-Frequency Tabulation, Greeley, Colorado A8 Retention Pond Infiltration Rate A9 Retention Pond Sizing During 100-Year Storm Event A10 Retention Pond Sizing During 100-Year Storm Event (no infiltration) A 1 1 Retention Pond Stage-Storage Table A 12 Drainage swale along west property line to retention pond Al3 Rundown channel into retention pond A 14 Laube Engineering, LLC Site Location Map 4 N .. Fred & Marcia Rothauge Property 13027 WCR 18 Fort Lupton, Colorado 3 3 , O �.. . welt- V�, 2 1:2B1 �C. � 1<v� 20 \ .. .tee _.� 19 °ela 85 �L reba o � 0 4682 ��I.� �— _ Well Well 4878 , o , ,00A •Flume - _ arw �� ., 4BB/ woe I� ��� •4867 . _, 48 I. 917 1/1 i II i pe'° ��� w ' ' Site ) .., : a 30. 2? 29 ; r . 4 ask - �i A 'I' -. . , - IA ♦ BM 4592 • i_._ ....-___ ((y? 495. , ,: 494 I — 4B5J Lip Ulc I ai i 132 , I1{ I ;/ 'mo ti \ Lancaste Ar{11I —` Foe L I Pak l �� i Sa]Ion� 1 �e / � 1 C// I' __ B rl ,. t`..:1' / , __ 9Q6 ) es o<�.I A .1°. c c974 So.,4e D spcoll. ���'' (- _ _— as Po �Is iI�LI __ elf�� 11'.•2)L a ` I Al �o] e wa el pt n i /Pearson — '� Tani. ■ - Olt Ln Park/ . I ti/ ( { e SP O �� .1 - - ® I L. �� I<esa . 6 5 Al _ STORM RUNOFF COEFFICIENT, C Site Conditions Before 2002: Surface Area fiz Percent C Weighted Weighted Weighted ( ) Impervious 5 Average C1° Average Cioo Average grass/landscape 373,773 0 0.08 0.07 0.15 0.14 0.35 0.33 gravel 21,550 40 0.30 0.02 0.36 0.02 0.50 0.03 — roofs 4,720 90 0.73 0.01 0.75 0.01 0.81 0.01 Total 400,043 Avg=3°/0 Cs = 0.10 C10 = 0.17 C100 = 0.36 Proposed Conditions for Basin A (includes future building): Surface Area (ft2) Percent C5 Weighted C Weighted Weighted Impervious Average 10 Average C+oo Average lawn/landscape 94,279 0 0.08 0.02 0.15 0.04 0.35 0.08 _ gravel 236,828 40 0.30 0.18 0.36 0.21 0.50 0.30 roofs 42,576 90 0.73 0.08 0.75 0.08 0.81 0.09 concrete/asphalt 26,360 90 0.73 0.05 0.75 0.05 0.81 0.05 _ Total 400,043 Avg=39% C5 = 0.32 C10 = 0.38 C100 = 0.52 Runoff Coefficient(C) based on Hydrologic Soil Group B (per Weld County Soil Survey) Macrum Building Systems, Inc. Laube Engineering, LLC Fred& Marcia Rothauge — 7/6/2006 13027 WCR 18, Fort Lupton, Colorado Az 1 DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF 1 TABLE RO-3 J. Recommended Percentage Imperviousness Values Land Use or Percentage Surface Characteristics Imperviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family Multi-unit (detached) 60 Multi-unit (attached) 75 Half-acre lot or larger Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 _ Playgrounds 10 Schools 50 Railroad yard areas 15 Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off-site flow analysis 45 (when land use not defined) Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 See Figures RO-3 through RO-5 for percentage imperviousness. Based in part on the data collected by the District since 1969, an empirical relationship between C and the percentage imperviousness for various storm return periods was developed. Thus, values for C can be determined using the following equations (Urbonas, Guo and Tucker 1990). CA = KB + (1.3 li' — 1.4412 + 1.135i— 0.12) for CA ≥0, otherwise CA =0 (RO-6) CCD = KCD + (0.858i3 - 0.7861' + 0.774i+ 0.04) (RO-7) CB = (/CA + CCD)/2 in which: =% imperviousness/100 expressed as a decimal (see Table RO-3) 06/2001 RO-9 Urban Drainage and Flood Control District - DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF TABLE RO-5 — Runoff Coefficients, c Percentage Imperviousness Type C and D NRCS Hydrologic Soil Groups 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 0% 0.04 0.15 0.25 0.37 0.44 0.50 5% 0.08 0.18 0.28 0.39 0.46 0.52 - 10% 0.11 0.21 0.30 0.41 0.47 0.53 15% 0.14 0.24 0.32 0.43 0.49 0.54 20% 0.17 0.26 0.34 0.44 0.50 0.55 - 25% 0.20 0.28 0.36 0.46 0.51 0.56 30% 0.22 0.30 0.38 0.47 0.52 0.57 35% 0.25 0.33 0.40 0.48 0.53 0.57 - 40% 0.28 0.35 0.42 0.50 0.54 0.58 45% 0.31 0.37 0.44 0.51 0.55 0.59 50% 0.34 0.40 0.46 0.53 0.57 0.60 55% 0.37 0.43 0.48 0.55 0.58 0.62 60% 0.41 0.46 0.51 0.57 0.60 0.63 65% 0.45 0.49 0.54 0.59 0.62 0.65 70% 0.49 0.53 0.57 0.62 0.65 0.68 - 75% 0.54 0.58 0.62 0.66 0.68 0.71 80% 0.60 0.63 0.66 0.70 0.72 0.74 85% 0.66 0.68 0.71 0.75 0.77 0.79 - 90% 0.73 0.75 0.77 0.80 0.82 0.83 95% 0.80 0.82 0.84 0.87 0.88 0.89 100% 0.89 0.90 0.92 0.94 0.95 0.96 — Type B NRCS Hydrologic Soils Group 0% 0.02 0.08 0.15 0.25 0.30 0.35 5% 0.04 0.10 0.19 0.28 0.33 0.38 10% 0.06 0.14 0.22 0.31 0.36 0.40 - 15% 0.08 0.17 0.25 0.33 0.38 0.42 20% 0.12 0.20 0.27 0.35 0.40 0.44 25% 0.15 0.22 0.30 0.37 0.41 0.46 30% 0.18 0.25 0.32 0.39 0.43 0.47 35% 0.20 0.27 0.34 0.41 0.44 0.48 40% 0.23 0.30 0.36 0.42 0.46 0.50 - 45% 0.26 0.32 0.38 0.44 0.48 0.51 50% 0.29 0.35 0.40 0.46 0.49 0.52 55% 0.33 0.38 0.43 0.48 0.51 0.54 60% 0.37 0.41 0.46 0.51 0.54 0.56 65% 0.41 0.45 0.49 0.54 0.57 0.59 70% 0.45 0.49 0.53 0.58 0.60 0.62 75% 0.51 0.54 0.58 0.62 0.64 0.66 - 80% 0.57 0.59 0.63 0.66 0.68 0.70 85% 0.63 0.66 0.69 0.72 0.73 0.75 90% 0.71 0.73 0.75 0.78 0.80 0.81 - 95% 0.79 0.81 0.83 0.85 0.87 0.88 100% 0.89 0.90 0.92 0.94 0.95 0.96 06/2001 RO-11 — Urban Drainage and Flood Control District 4- C N - m N L O- O H C - H $ .E w aA DE DE c- - U , n E E E uc m m E H E E H E v oC C — E 'E m N LL Etico N •a c N N Yu - o ` r H— D d r H O aD a) r U J J N- N H C co H E c cn E E N a) C a) C r F.EI HE HHE N T T @ U 4 a 3 dE o 3 —5 o O 1 O 7 LL. LL N 12 O U O U a) — C �` a't 2a t Co O C.47 T J > C T J R c H N O H (q rn s- o O O O U a) U a) V o 0 0 00 0 - U > a).1:-.. N > O)^ Lo O y.. N is 4c- co a) co c N O H J v m H - v d — E m d a) E )n a TU a' E v) c F E m _ H H E 3 3 o E o c — L1 w m O N co in re 8 a`8 o a`8 0 — > > O d o m a^ o a— o CO ra O c '° `'' O o N - L _ t O 0] m O O) m o O •�. C w O • C w O N E a) " C _I J` ca O J m N O C N co < cii m C 9 O O a 0 C w 8O U mE o. ; cu — o 'J) 'p r O 'N 'E r .O N r. a) a L d J ili in o a o As DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF I 1 50 / I 30 - 3 0 Z20 to _ 4. w 'r = 149 ¢ * 4�o w 4. W • a. =S. • b V a10 We St V 3 — z v o a. ° t W • ar I• 7 W Jro v ,pb 4P 4WD b= a • r Q • b U, 5 ;O L Q• eV W 3 c �• r bb , bb 4v W U) S I , i •R• Wr fie• k m 3 O .e Cr ¢ O y 0 2 t 4 I 4 n r 4i• bI C IL! 4 P- ? 4• f 4O W a Qf 1 — .5 ► 1 .1 .2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE RO-1 Estimate of Average Overland Flow Velocity for Use With the Rational Formula — • 06/2001 6 RO-13 — Urban Drainage and Flood Control District lak 1 1 1 Peak Runoff Flowrates I 5-Year Storm Runoff for Conditions Before 2002: Design Runoff Time of Rainfall Area Runoff, Q Basin Coefficient Concentration, Intensity Point acres (C5) t,(minutes) (15) (acres) (cfs) 1 Site 0.10 16 3.27 9.18 3.0 100-Year Storm Runoff for Conditions Before 2002: Design Runoff Time of Rainfall Area Runoff, Q — Basin Coefficient Concentration, Intensity Point (acres) (cfs) (Coo) t,(minutes) (lioo) 1 Site 0.36 16 6.10 9.18 20.4 5-Year Storm Runoff for Proposed Conditions: — Design Runoff Time of Rainfall Area Runoff, Q Point Basin Coefficient Concentration, Intensity (acres) (cfs) (C5) tc(minutes) (15) 1 Site 0.32 18 3.27 9.18 9.7 _ 100-Year Storm Runoff for Proposed Conditions: Design Runoff Time of Rainfall Area Runoff, Q Basin Coefficient Concentration, Intensity Point (C100) t,(minutes) (Iwo) (acres) (cfs) 1 A 0.52 18 6.10 9.18 29.0 Macrum Building Systems, Inc. Laube Engineering, LLC Fred & Marcia Rothauge 7/6/2006 A7 13027 WCR 18, Fort Lupton, Colorado Table 3.3. Extended Duration-Intensity-Frequency Tabulation, Greeley, Colorado. W i i♦ tz � ' " :' M `x I� StormTkeyuency a¢Stapp t ke. 5 svR �,-p rt i -. ` __ Drirafohr2 yeal�, 5year 10 year 25-year 50 pear 100 year rs.,«.�.,; orivils.>:.;'. skfiiiltr}: . . (1n/hr) (inthr}...: (in/hr) .,, :;(irinii 5 min 3.62 5.19 6.12 7.31 8.73 9.67 - 10 2.81 4.02 4.75 5.67 6.78 7.51 15 2.37 3.4 4.01 4.79 5.72 6.34 20 2 2.86 3.38 4.03 4.81 5.34 25 1.77 2.54 3 3.58 4.28 4.74 30 1.64 2.35 2.78 3.22 3.97 4.39 40 1.34 1.92 2.27 2.7 3.23 3.59 _ 50 1.16 1.66 1.96 2.34 2.8 3.1 - 60 (I hr) 1.04 1.49 1.76 2.1 2.51 2.78 80 0.8 1.14 1.47 1.61 1.91 2.16 100 0.67 0.94 1.2 1.3 1.58 1.79 120 (2 hr) 0.58 0.8 0.96 1.14 1.3 1.5 150 0.49 0.66 0.78 0.93 1.1 1.23 - 180 (3 hr) 0.42 0.56 0.67 0.8 0.92 1.05 4 hr 0.33 0.44 0.53 0.62 0.72 0.81 _ 5 0.27 0.36 0.43 0.5 0.57 0.66 6 0.23 0.3 0.37 . 0.43 0.49 0.57 8 0.2 0.24 0.29 0.34 0.39 0.44 10 0.15 0.2 0.24 0.29 0.32 0.36 12 0.13 0.17 0.2 0.25 0.28 0.31 - 14 0.11 0.15 0.18 0.23 0.24 0.27 16 0.1 0.13 , 0.16 0.2 0.22 0.24 18 0.09 0.12 0.14 0.18 0.19 • 0.21 20 0.08 0.11 0.13 0.17 0.18 0.19 22 0.07 0.1 0.12 0.16 0.16 0.17 - 24 0.07 0.09 0.11 0.14 0.15 0.16 - AS 1 1 1 Retention Pond Infiltration Rate Q = k i A where: Q = infiltration rate into bottom of pond k = soil percolation rate i = hydraulic gradient (assumed to be 1.0) A = average area of pond bottom k determined from soil percolation test performed at a depth of 6.5 feet soil classification: poorly graded sand k = 0.7 minutes per inch = 2.0 x 10-3 ft/s Use k = 1.4 minutes per inch = 9.9 x 10-4 ft/s Assumed maximum area of pond bottom = 8,300 square feet Q = KiA =K i A = 8.2 cfs Macrum Building Systems, Inc. Laube Engineering, LLC Fred & Marcia Rothauge 8/22/2006 A9 13027 WCR 18, Fort Lupton, Colorado i. I 1 Retention Pond Sizing for 100-Year Storm Event (Retention Pond Volume Required for Subject Property Only) Site Drainage Basin Area (area being detained) 9.184 acres 1 Time of Concentration t, 18 minutes 100-year Developed Runoff Coefficient, Capp 0.52 Maximum release due to infiltration along bottom of detention poi 8.2 cfs 100-Year Storage Rainfall Rainfall Inflow Average Outflow Volume Storage Duration, t Volume Outflow Volume Volume Intensity, s kQ cfs 3 CIAt - kOa it (minutes) loo (in/hr) CIAt (ft ) out ( ) kQo„tt (ft ) (ft3) (ac-ft) — 5 9.67 13,802 4.5 1,337 12,466 0.286 10 7.51 21,439 6.4 3,861 17,578 0.404 15 6.34 27,148 7.8 7,039 20,109 0.462 20 5.34 30,488 8.0 9,623 20,865 0.479 25 4.74 33,828 8.2 12,300 21,528 0.494 30 4.39 37,596 8.2 14,760 22,836 0.524 35 3.94 39,366 8.2 17,220 22,146 0.508 40 3.59 40,993 8.2 19,680 21,313 0.489 45 3.32 42,649 8.1 21,919 20,730 0.476 50 3.10 44,248 7.9 23,760 20,488 0.470 55 2.93 46,003 7.8 25,809 20,194 0.464 60 2.78 47,616 7.7 27,799 19,817 0.455 70 2.42 48,358 6.9 29,106 19,252 0.442 80 2.15 49,101 6.6 31,838 17,262 0.396 90 1.94 49,843 6.1 33,145 16,698 0.383 - 100 1.76 50,242 5.7 34,452 15,790 0.362 120 1.50 51,384 5.1 37,066 14,319 0.329 180 1.05 53,953 4.1 43,837 10,116 0.232 Required Pond Volume = 1.5 x calculated volume = 34,254 ft3 Macrum Building Systems, Inc. Laube Engineering, LLC Fred & Marcia Rothauge 8/22/2006 13027 WCR 18, Fort Lupton, Colorado Al ° Retention Pond Sizing for 100-Year Storm Event (Retention pond volume required for subject property assuming no infiltration) 1 Site Drainage Basin Area (area being detained) 4.233 acres Time of Concentration tc 14 minutes 100-year Developed Runoff Coefficient, C100 0.54 1 Release due to infiltration along bottom of detention pond (Qa„i) 0.0 cfs 1 Rainfall 100-Year Inflow Average Outflow Storage Storage Rainfall Volume 9 Duration, t Volume Outflow Volume Volume Intensity, CIAt - kQ t I. (minutes) I100 (in/hr) CIAt (ft3) kQo (cfs) kQo tt (ft3) (ft3) ° (ac-ft) 5 9.67 13,802 0.00 0 13,802 0.317 10 7.51 21,439 0.00 0 21,439 0.492 15 6.34 27,148 0.00 0 27,148 0.623 20 5.34 30,488 0.00 0 30,488 0.700 25 4.74 33,828 0.00 0 33,828 0.777 30 4.39 37,596 0.00 0 37,596 0.863 35 3.94 39,366 0.00 0 39,366 0.904 40 3.59 40,993 0.00 0 40,993 0.941 45 3.32 42,649 0.00 0 42,649 0.979 50 3.10 44,248 0.00 0 44,248 1.016 55 2.93 46,003 0.00 0 46,003 1.056 60 2.78 47,616 0.00 0 47,616 1.093 - 70 2.42 48,358 0.00 0 48,358 1.110 80 2.15 49,101 0.00 0 49,101 1.127 90 1.94 49,843 0.00 0 49,843 1.144 - 100 1.76 50,242 0.00 0 50,242 1.153 120 1.50 51,384 0.00 0 51,384 1.180 Required Pond Volume = 51,384 ft3 Macrum Building Systems, Inc. Laube Engineering, LLC Fred & Marcia Rothauge 8/22/2006 13027 WCR 18, Fort Lupton, Colorado /1 II Retention Pond Stage-Storage Table Water Elevation 2 Cumulative Area (ft ) Depth (ft) (feet) Volume (ft3) 0.00 4869.00 0 0 1.00 4870.00 964 321 2.00 4871.00 1,580 1,581 3.00 4872.00 2,297 3,508 4.00 4873.00 3,114 6,203 5.00 4874.00 4,032 9,766 6.00 4875.00 5,050 14,298 7.00 4876.00 8,748 21,113 7.20 4876.20 11,720 23,152 100-year volume 8.00 4877.00 23,650 37,024 1.5 times 100-yr volume 8.50 4877.50 42,793 53,400 2-hr 100-yr storm with no release 9.00 4878.00 72,685 81,941 top of berm Pond volume for 100-year storm = 22,836 ft3 (Elevation = 4876.20) Required 100-year pond volume = 34,254 ft3 (Elevation = 4877.00) Volume for 2-hr 100-yr storm with no infiltration = 51,384 ft3 (Elevation = 4877.50) Pond berm elevation =4878.00 L Macrum Building Systems, Inc. Laube Engineering, LLC Fred& Marcia Rothauge 8/23/2006 I 13027 WCR 18, Fort Lupton, Colorado Normal Flow Analysis - Trapezoidal Channel Project: Fred and Marcia Rothauge Channel ID: Channel along west property line-discharges into retention pond p n T y E � A A Y 1_ V Yo / 1 Z1 Z2 < 8 7 Design Information (Input) Channel Invert Slope So= 0.0050 ft/ft Manning's n n = 0.022 Bottom Width B= 10.00 ft Left Side Slope Z1 = 3.00 ft/ft Right Side Slope Z2= 50.00 ft/ft Freeboard Height F= 0.50 ft Design Water Depth Y= 0.53 ft Normal Flow Condtion (Calculated) Discharge Q= 29.37 cfs Froude Number Fr= 0.70 Flow Velocity V= 2.30 fps Flow Area A= 12.74 sq ft Top Width T= 38.09 ft Wetted Perimeter P= 38.18 ft Hydraulic Radius R= 0.33 ft Hydraulic Depth D= 0.33 ft Specific Energy Es= 0.61 ft Centroid of Flow Area Yo= 0.21 ft Specific Force Fs= 0.30 kip UD-Channels 304 to pond.xls, Basics AI 3 7/6/2006, 12:26 PM .1 I Normal Flow Analysis - Trapezoidal Channel J. Project: Fred and Marcia Rothauge Channel ID: Rundown channel into retention pond F n T Y I • �Y° 1 ZI a B > Z2 — Design Information(Input) Channel Invert Slope So= 0.1000 ft/ft Manning's n n = 0.035 Bottom Width B= 10.00 ft — Left Side Slope Z1 = 4.00 ft/ft Right Side Slope Z2 = 4.00 ft/ft Freeboard Height F = 0.60 ft — Design Water Depth Y= 0.39 ft Normal Flow Condtion(Calculated) Discharge Q= 29.63 cfs Froude Number Fr= 1.98 Flow Velocity V= 6.57 fps Flow Area A= 4.51 sq ft Top Width T= 13.12 ft Wetted Perimeter P= 13.22 ft Hydraulic Radius R= 0.34 ft Hydraulic Depth D= 0.34 ft _ Specific Energy Es= 1.06 ft Centroid of Flow Area Yo= 0.19 ft Specific Force Fs= 0.43 kip if/ SSUME TYPE L„ � ieRAP d, = 9 I,vcNEs 0.031 _ o j i? o,,7 V (6.57) (o. IA d -: p75 _p4- _ 9 /N ' 3 ) o (6 - 0.66 4.5 (2 5 - i)ucoe _ > '?A SE TYPE \l e , P Cis = 9 /NINES UD-Channels 304 rundown into pond.xls, Basics 7/6/2006, 1:25 PM A14 • ---- rwe or.�om, Q01vo lla°�� =amp sJrMY!ra _t .• . 1 a aie .e await NM eta IVY 70?LLN00 NOISOU ! ` aa. OTT JNI2I3aNIJN3 am I awt taiga a aau w wYara °�a{ " �{ i n I e in 4 .l66 Igi i q R91 AN AA kit ) ..et, . i "" I\ 21 ! . IN. 7f— :let age .n+no� craw—. § 1=4; - -- ^ tea _' i <i) ''''''''— — — * 1----f P * : ..'i — ---:.:, - i - iv 44 v I- g it S -4 ci eel 04 .; .I I��� ohs � � I I I u, I \4 . � b S i 8 a ` 1 I ___ I °Le\ IIF� \ le iii iii 0 t l r9M g i I Lll 1.1 7ik Ai RA flkL a e,,1. b�� I i •C q I eg I i \ t. w a b Po i. 6 b a 3 ! I ._I aA r H'. t @ 1 1 'aw l lil I Eã C 1 JA. / i } Y hp A _II f " C I / \N ra _4H fl _.. g _ GG 8!!!!p 4ZI ! d 1 t L 11..1it 1 1 l I 1 �4 li 888333 4 I: y j 1! , i i 1 ix Iil 7 Ain\ Illis , __ Q e i $6 ' a $ 1 '1g$ .g ' t'i a 1 I c .li 61:1 ; ci CD lit I A ih - E l 1111 w !Ii I ; , E . . . — — 1 E.� ., - 66 ' � al jI O is= 'a_� 1' I I I ors 1 � I I •„* __ — II I ` II 1 ` 4 47 1 : lal l la i �"I / + OiiI I I g'I 1 ,; !II 509 ipi i ill i � 1 , , 4 I I s all 3 a t! E1111 I lsb ; kxi b i " bp yasps ► a i t' _ L _; J d[y� < gg� egizeliz ° 9 I z �, \ \ /ill ' I' e�. , I I s1 ; • 5: I 4 g I I ill [ I !I44 . lifts `6 yp9ii 1 I • i p //J 1 c � till S 1 Y I I 'E / I �Y� li g R A y $ Ei $ C I f I l � , a, k k d + [HMI i a il `p I ' I !>,l 1 1 Iki II II 1 rt'I = a' � 4 $ I �i r I ti °•,� I :!! 4I 11 I ' i FAI ,..-. REFERRAL LIST Name: Fred & Marcia Rot. ge se#: 2nd AMSPR-41 County Towns &Cities Fire Districts _Attorney _Ault _Ault F-1 0 Health Department _Berthoud _Berthoud F-2 _Extension Office _Brighton _Briggsdale F-24 __Emergency Mgt Office- Ed Herring _Dacono _Brighton F-3 0 Sheriffs Office _Eaton _Eaton F-4 O Public Works _Erie 0 Fort Lupton F-5 Housing Authority _Evans _Galeton F-6 _Airport Authority _Firestone _Hudson F-7 O Building Inspection 0 Fort Lupton _Johnstown F-8 0 Code Compliance_Ann_Beth _Frederick _LaSalle F-9 Kim Ogle (Landscape Plans) _Garden City _Mountain View F-10 _Lin (Addressing Change of Zone) _Gilcrest _Milliken F-11 _Ambulance Services _Greeley _Nunn F-12 _Grover _Pawnee F-22 State _Hudson _Platteville F-13 _Div. of Water Resources _Johnstown _Platte Valley F-14 _Geological Survey _Keenesburg _Poudre Valley F-15 _Department of Health _Kersey _Raymer F-2 O Department of Transportation _LaSalle _Southeast Weld F-16 _Historical Society _Lochbuie _Union Colony F-20 _Water Conservation Board _Longmont _Wiggins F-18 Oil & Gas Conservation Commission _Mead _Windsor/Severance F-17 _Milliken Division of Wildlife _New Raymer O South Hwy 66 (Loveland) _Northglenn _North Hwy 66 (Greeley) _Nunn Division of Minerals/Geology _Pierce Commissioner _Platteville Soil Conservation Districts _Severance Big Thompson/ FTC _Thornton Boulder Valley/Longmont _Windsor _Brighton/SE Weld Centennial Counties _Greeley/West Greeley _Adams 0 Platte Valley _Boulder _West Adams _Broomfield _Little Thompson _Larimer Federal Government Agencies Other _US Army Corps of Engrs _School District RE- _USDA-APHIS Vet Service _Central Cola Water Cons Federal Aviation Admin (Structures 0 Union Pacific RR over 200 ft or w/in 20000 ft of Pub 0 Platteville Ditch Company Airport _Art Elmquist (MUD Area) Federal Communications Comm REFERRAL LIST Name: ���r r I � .A• � Case#: 2e, (t1 )(ft - Li i County Towns&Cities Fire Districts Attorney Ault Ault F-1 Health Department _Berthoud _Berthoud F-2 _Extension Office _Brighton _Briggsdale F-24 Emergency Mgt Office-Ed Herring _Dacono _Brighton F-3 Sheriffs Office✓ Eaton Eaton F-4 Public Works✓ Erie Fort Lupton F-5'Ll _Housing Authority _Evans Galeton F-6 Airport Authority Firestone _Hudson F-7 Building Inspection✓ �, / Fort Lupton✓ _Johnstown F-8 4.code Compliance S.-Beth N-Ann _Frederick _LaSalle F-9 Kim Ogle (Landscap Plai s) _Garden City _Mountain View F-10 _Lin(Addressing Change of Zone) _Gilcrest _Milliken F-11 Ambulance Services _Greeley _Nunn F-12 Grover _Pawnee F-22 State _Hudson _Platteville F-13 _Div.of Water Resources Johnstown _Platte Valley F-14 _Geological Survey _Keenesburg Poudre Valley F-15 Department of Health _Kersey Raymer F-2 Department of Transportation✓ _LaSalle _Southeast Weld F-16 _Historical Society _Lochbuie _Union Colony F-20 _Water Conservation Board _Longmont _Wiggins F-18 _Oil&Gas Conservation Commission _Mead Windsor/Severance F-17 Milliken Division of Wildlife _New Raymer Legal (.J Z-- S "_ Y )y y 1,-C L-CC., South Hwy 66 (LovelandV _Northglenn Parcel ID# f S c <T ≤,Cc)'"` 'C _North Hwy 66 (Greeley) _Nunn Zone 1 -3 Acres? Division of Minerals/Geology _Pierce USDA _Platteville Airport .L. Soil Conservation Districts _Severance Geo Haz N" Big Thompson/FTC _Thornton FP? No Panel# :-6 `✓C _Boulder Valley/Longmont _Windsor IGA? 'v.. ORD# _Brighton/SE Weld MUD? kL Centennial Counties Greeley/West G eeley Adams Platte Valley _Boulder I z_C _West Adams _Broomfield _Little Thompson _Larimer Federal Government Agencies Other ,, _US Army Corps of Engrs School District RE- -- - -- _ __ USDA-APHIS_ Vet Service Central Cob.Water Consery ncy Dist — `1 _Federal Aviation Admin (Structures .RR 04F - n h;‘- *". • , over 200 ft or w/in 20000 ft of Pub Ditch Company,V-a-ri k`'-'-6 t�t R"✓ Airport Art Elmquist(MUD Area) '- Federal Communications Comm 7 7 Commissioner n ( ( rst (iii;,*) Weld County Referral C� July 14, 2006 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Fred & Marcia Rothauge Case Number 2n°AMSPR-41 Please Reply By August 14, 2006 Planner Jacqueline Hatch Project Amended Site Plan Review for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company. Legal W2 SW4 SW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to SH 85 and north of and adjacent to CR 18. For a more precise location, see legal. Parcel Number 1309 20 000012 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan lat We have reviewed the request and find no conflicts with our interests. U See attached letter.Comments: tlak 1 r,,„„ c— oile.iO Nrsctqs. P\/ ±t & en u tr. no Signature t—j _ Agency 2{yytP .to �1CIYYIt Date +Weld County Planning Dept. 44209 CR 24.5,"Longmont,CO.80504 ❖(720)652-4210 ext.8730 4(720)652-4211 fax A i Cr\H14; Weld County Referral Weld County Planning Department SOUTHWEST BUILDING July 14, 2006 COLORADO • AUG 11 2006 RECEIVED The Weld County Department of Planning Services has received the following item for review: Applicant Fred & Marcia Rothauge Case Number 2nd AMSPR-41 Please Reply By August 14, 2006 Planner Jacqueline Hatch Project Amended Site Plan Review for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company. Legal W2 SW4 SW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to SH 85 and north of and adjacent to CR 18. For a more precise location, see legal. Parcel Number 1309 20 000012 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. ❑i/ ;Ate have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: Signature �/2- �/�/1 -0 Z/Ce/�00 / Agency ( /7 �1 For �t, lyl/ Date +Weld County Planning Dept. +4209 CR 24.5,Longmont,CO. 80504 4(720)652-4210 ext.8730 4(720)652-4211 fax Weld County P. ..,g Department GREELEY OFFICE AUG 2 9 2006 eiret7a CEIVED MEMORANDUM TO: JACQUELINE HATCH,PLANNING SERVICES IDSUBJFCT:2'4' FROM: CHARLOTTE DAVIS, ENVIRONMENTAL HEALTH (4 -41 DATE: 08/21/2006 COLORADO CC: Environmental Health Services has reviewed this proposal for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and equipment. We have no objections to the proposal, however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. The applicant shall submit a dust abatement plan for review and approval, to the Environmental Health Services, Weld County Department of Public Health & Environment. 2. The applicant shall provide current evidence that the facility has an adequate water supply. The applicant has submitted a "permit to construct a well" #137460-A that expired in March 2004. A completed well permit was not submitted. We recommend that the following requirements be incorporated into the permit as conditions that must be met prior to operation: 1. A stormwater discharge permit may be required for a development/redevelopment/construction site where a contiguous or non- contiguous land disturbance is greater than or equal to one acre in area. The applicant shall inquire with the Water Quality Control Division (WQCD) of the Colorado Department of Public Health and Environment at www.cdphe.state.co.us/wq/PermitsUnit if they are required to obtain a stormwater discharge permit. Alternately, the applicant can provide evidence from WQCD that they are not subject to these requirements. We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. 4. The applicant shall operate in accordance with the approved "waste handling plan". 5. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved dust abatement plan at all times. 6. This facility shall adhere to the maximum permissible noise levels allowed in the Commercial Zone as delineated in 25-12-103 C.R.S., as amended. 7. Adequate handwashing and toilet facilities shall be provided for employees and patrons of the facility. 8. Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. 9. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. 10.All potentially hazardous chemicals must be stored and handled in a safe manner in accordance with product labeling and in a manner that minimizes the release of hazardous air pollutants (HAP's) and volatile organic compounds (VOC's). 11.If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. 2 12.The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. Additionally, please note the following: 1. This application is proposing a well as its source of water. The applicant should be made aware that groundwater may not meet all drinking water standards as defined by the Colorado Department of Public Health and Environment. We strongly encourage the applicant to test their drinking water prior to consumption and periodically test it over time. 3 cKis County Referral C, D TB July 14, 2006 COLORADO JUL 18 2003 D The Weld County Department of Planni 0:141108iiiffialiBbIthWORMQfrit ing item for review: Applicant Fred & Marcia Rothauge Case Number 2n° AMSPR-41 Please Reply By August 14, 2006 Planner Jacqueline Hatch Project Amended Site Plan Review for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company. Legal W2 SW4 SW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to SH 85 and north of and adjacent to CR 18. For a more precise location, see legal. Parcel Number 1309 20 000012 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. Yr See attached letter. Comments: Signature idka a / � A., per Agency -Fte.4.G 1147.1 Date +Weld County Planning Dept. +4209 CR 24.5, Longmont,CO.80504 :(720)652-4210 ext.8730 ❖(720)652-4211 fax f Weld County Planning Department GREELEY OFFICE citsD AUG 14 2006 MEMORANDUIVilEcEtvED TO: Jacqueline Hatch, Planning Services DATE: August 10, 2006 111 FROM: Donald Carroll, Engineering Administrators • COLORADO SUBJECT: 2"' AmSPR-41, Fred & Marcia Rothauge The Weld County Public Works Department has reviewed this proposal. This project falls primarily under the Site Plan Review Standards, Weld County Code, Chapter 23-2-160. Our comments and requirements are as follows: COMMENTS: Weld County Road Classification Plan (FHU): (June 2002) WCR 18 is a collector road and requires an 80-foot right-of-way at full build out. There is presently a 60-foot right-of-way. This road is maintained by Weld County. Pursuant to the definition of SETBACK in the Weld County Zoning Ordinance(23-1-90), the required setback is measured from the future right-of-way line. REQUIREMENTS: Access: /The applicant shall complete a Weld County Road Access Information Sheet. There are two existing accesses to the facility. The western most access is the original access, ✓which is usually gated and locked. The newer access (eastern access) is the main access to the facility. Utilize this existing 40-foot access as it is wider for the proposed use of the facility. The applicant should contact CDOT to verify if any upgrades or improvements are needed per the U.S. Highway 85 corridor plan associated with WCR 18 and U.S. Highway 85 intersection. The applicant may generate an increase of heavy vehicle traffic at the intersection. The access control plan show left turn and right turn acceleration/deceleration lanes. Off-Street Parking and Circulation: The applicant is identifying the access and the equipment parking shall be gravel, recycled crushed asphalt,or the equivalent. The office/warehouse buildings �' parking area shall be hard-surfaced(asphalt or concrete)as in accordance with Section 23-3-350(B) Design Standards, industrial zoned district 1-3, The number of parking spaces including the designated areas shall be determined by Planning Services. Parking spaces that do not have a curb line shall be required to install wheel guards or curb stops where needed to prevent vehicles from extending beyond the boundaries of the space and from coming into contact with other vehicles, walls, fences, or plantings. Storm Water Drainage: I have referred the storm water drainage plan and report to Dave Bauer, Drainage Division. Dave has reviewed the plans and drawings. See the memorandum attached for Laube Engineering. We will forward this memo to Keith Laube. There are additional items that need to have follow-up. (Sec 23.2-160N) Jacqueline Hatch, Planning Services 2"d AmSPR-41, Fred & Marcia Rothauge August 10, 2006 Page 2 Please find attached a copy of memo. There is a fee associated with drainage review. Please find the attached invoice and fee schedule associated with any storm water drainage. Improvements Agreement: There are on-site improvements associated with the amended Site Plan Review such as recycled asphalt, paving for parking, storm water retention, etc. You may have additional items to add to the Exhibit A portion. (Section 23-2-160U8) pc: 2"d AmSPR-41 M\PLANNING-DEVELOPMENT REVIEW\SPR-Site Plan Review\2nd AmSPR-41.doc i r-a MEMORANDUM I TO: J. Hatch, Planning Department DATE: 6-August-2006 I� D Carroll, Public Works Department \ f� • FROM: D. Bauer, Public Works Department's COLORADO SUBJECT: 2"d AmSpr-41 —Rothauge site eld County Public Works Department has reviewed the drainage report and plan for the Fred and Marcia Rothauge site located at 13027 WCR 18, Fort Lupton, CO dated July 6, 2006, prepared by Laube Engineering and has the following development referral comments regarding drainage. Comments ❑ All drainage facilities including channels, swales, and detention ponds must be in dedicated drainage easements shown on the Final Plat. ❑ The drainage report and plans dated July 6, 2006, prepared and submitted by Laube Engineering were not stamped and signed by a professional engineer licensed to practice in Colorado. Applicant must submit 3 copies of the final drainage report and construction plan drawings (stamped, signed, and dated) to Public Works for Weld County Field Inspectors' use during construction. ❑ The drainage report and plans dated July 6, 2006, prepared and submitted by Laube Engineering were marked as preliminary,not for construction. Applicant is requested to submit stamped, signed, and dated Final Plans. ❑ The applicant's engineer has submitted a drainage report and plan that does not include proposed detention of stormwater runoff per Weld County Code (Chapters 24-7-130, 23-2-150 (N), 23-2-750, 8-7-440, and Ordinance 2003 -2). Per the Code, applicant's design is required to detain the runoff from the 100-year storm from the developed site and release the detained runoff at a rate not to exceed the runoff from the undeveloped site. The drainage report and plans dated July 6, 2006, prepared and submitted by Laube Engineering proposes stormwater retention; if detention facilities are not to be constructed, a variance from County Code must be requested. ❑ The proposed retention pond is undersized for a commercial, gravel paved site of over 10 acres. Sizing calculations for the retention pond proposed in the July 6, 2006 Laube Engineering drainage report and plans indicate an infiltration rate of 10 cfs (over 4400 gallons per minute!) however no justification for this high infiltration rate was provided in the report. Applicant is requested to provide in-situ evidence for this infiltration rate or increase the size of the detention/retention pond accordingly. ❑ The impacts of offsite contributing areas to the 2nd AmSpr-41 —Rothauge site have not been considered. As shown on the July 6, 2006 Laube Engineering drainage plans, the drainage area that would flow to the proposed retention pond area would include approximately 15 acres (11 acres within the property line, 0.3 acres for the proposed exit, and 2.8 acres of UPRR Right-Of Way. The proposed exit must be included in the design. Detention of the runoff from the UPRR ROW is not required but must be safely managed through the site. ❑ The Laube Engineering drainage report and plans did not provide an emergency spillway/release point for the proposed detention/retention pond. Applicant is requested to provide an emergency overflow design. Recommendation ❑ The applicant is requested to submit a revised drainage report and plans addressing the above comments and issues. Resolution of these deficiencies are prerequisites for Public Works approval of the 2"d AmSpr-41 and shall be fulfilled prior to recording the final plat. M.PI ANNING-DFVFI OPMFNT REVIEWNlrnaI Nat PF..i\F.MIF12ndAm5PR-OI Rnlaugc Gr9oagc dM Page 1 - 6-Aug-2006 INVOICE PUBLIC WORKS DEVELOPMENT REVIEW FEES WELD COUNTY PUBLIC WORKS DEPARTMENT P.O.BOX 758 GREELEY,CO 80632 Date 8/8/06 970-356-4000,EXT.3750 APPLICANT Applicant/Owner Email Address Fred Rothauge fothauge@dfluids.com Street Address 1307 WCR 18 City State Zip Phone Number Fax Number Fort Lupton CO 80621 303-857-4171 Case# Subdivision/Case Name County Roads 2na AmSPR-41 U.S. 85/WCR 18 Lot Section Township Range #Proposed Lots 20 T2N R66W FEE SCHEDULE QTY DESCRIPTION UNIT PRICE TOTAL Development Construction Permit(Subdivisions) ❑ Dwelling units $150/lot ❑ Non-Dwelling Units $750/lot Offsite Road Agreement/Haul Route Agreement Review $500 Flood Hazard Development Permit $180 I Storm Water Review $180 $180.00 Geologic Hazard Permit $180 Non-exclusive License Agreement $100 Fabrication and Installation of Cross Road Signs(Blue&white) $150 TOTAL DUE $180.00 Reviewed by: Title: M:\PLANNING—DEVELOPMENT REVIEW\ArnSPR-Amended Site Plan Review\AmSPR-41,Rothauge\2nd AmSPR-41,Rothuage INVOICE-doe ,ng and Zoning - Land Ilse Fees Page 4 of 4 DEVELOPMENT IMPACT FEES 1. Transportation Impact fee Fee schedule in Section 20-1- 2. Capital Expansion fee Fee schedule in Section 5-8-4C $575 per S/F D.U. and/or$95 per 3. Stormwater Drainage fee Fee schedule in Section 5-8-4 $300 per S/F D.U. and/or$300 pc PUBLIC WORKS PERMIT APPLICATION 1. Development Construction Permit Dwelling units $ 150.00/lot Non-Dwelling units $ 750.00/lot 2. Offsite Road Agreements / Haul Route Agreement Review $ 500.00 3. Flood Hazard Development Permit $ 180.00 4. Stormwater Permit $ 180.00 5. Geologic Hazard Permit $ 180.00 6. Non-exclusive license agreements $ 100.00 http://www.co.weld.co.us/departments/planning/plan_fees.html 8/7/2006 Page 1 of 1 Jacqueline Hatch From: David Bauer Sent: Wednesday, August 30, 2006 12:53 PM To: Jacqueline Hatch Cc: Donald Carroll Subject: 2nd AmSPR-41 - Routhauge site- Laube Engineering revised drainage report Jacqueline, On August 24th I received in my little Public Works mailbox, 3 copies of the revised drainage report for the Routhauge site (2nd AmSPR-41). My requests on previous review were that they revise the calculations for their proposed retention pond for site specific conditions of infiltration. The new report states that a percolation test was performed and an infiltration rate is expected to be 8.2 cubic feet per second into underlying sandy soils in communication with the South Platte River for the proposed 8300 square foot retention pond. To be conservative, Laube has sized the proposed retention pond to hold the entire site runoff assuming no infiltration. Given the site topography and surrounding constraints, this is an acceptable compromise to meeting Weld County Code. However I have requested of that they, and the revised drainage report does have a one page letter specifically requesting a variance from the Code requirement of detention. I had also requested that all drainage facilities (swales, retention pond) be placed in recorded easements and shown as such on the Final Plat. I did not get a draft of the Final Plat so this last request has not been met as of today. I called the contact at Macrum Building Systems to re-iterate that request. Assuming that Routhage/Laube will prepare the Final Plat as requested, I would recommend that this case be recommended for approval, at least from a drainage standpoint. The case folder has been restored to the files. Call me if you have questions. David Bauer, P.E. Weld County Public Works 1111 H Street Greeley, CO 80632-0758 (970) 304-6496 8/30/2006 Kit Weld County Referral C. July 14, 2006 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Fred & Marcia Rothauge Case Number 2nd AMSPR-41 Please Reply By August 14, 2006 Planner Jacqueline Hatch Project Amended Site Plan Review for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company. Legal W2 SW4 SW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to SH 85 and north of and adjacent to CR 18. For a more precise location, see legal. Parcel Number 1309 20 000012 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan U We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: Signature / i' e d ' o9/ -O� Agency iv(AO Date •Weld County Planning Dept. .4209 CR 24.5,Longmont,CO.80504 ❖(720)652-4210 ext.8730 ❖(720)652-4211 fax cfe7r4 , DEPARTMENT OF PLANNING SERVICES BUILDING INSPECTION NORTH OFFICE 918 10`"Street IDGREELEY, COLORADO 80631 C. PHONE (970) 353-6100, EXT.3540 FAX (970)304-6498 SOUTHWEST OFFICE COLORADO 4209 CR 24.5 LONGMONT CO 80504 PHONE (720)652-4210 ext. 8730 FAX (720)652-4211 August 21, 2006 Fred & Marcia Rothauge 2nd AMSPR-41 1. Building permits shall be obtained prior to the construction of any building. 2. A plan review is required for each building. Plans will require the wet stamp of a Colorado registered architect or engineer. 3. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. The proposed building will be most likely be classified as a S-1 for the shop area, and a B occupancy for the office area. 4. Buildings will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. 5. Fire resistance of walls and openings, construction requirements, sprinkler requirements, maximum building height and allowable areas will be reviewed at the plan review.Setback and offset distances shall be determined by the Zoning Ordinance. 6. Building height shall be measured in accordance with the adopted building code at the time of the building permit application for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. 7. Provide letter of approval from Fort Lupton Fire Protection District prior to new construction. Please contact me for any further information regarding this project. Sincerely, Bryon Horgen Assistant Building Official Service,Teamwork,Integrity,Quality r.- Weld County Planning Department SOUTHWEST BUILDING JUL 2 0 2006 RECEIVED Weld County Referral C, July 14, 2006 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Fred & Marcia Rothauge Case Number 2n°AMSPR-41 Please Reply By August 14, 2006 Planner Jacqueline Hatch Project Amended Site Plan Review for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company. Legal W2 SW4 SW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to SH 85 and north of and adjacent to CR 18. For a more precise location, see legal. Parcel Number 1309 20 000012 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. r❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan lYJ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: WOU4.10 Lit, 722 l2K, / h/ Fa,PM6.O cl/= 6v746,4/ O9,0.c=sc 4- E'4v eye tc1xa.0 d 12.7-4 [41.41 Al e cif/ /3Pfo<QF ,1 L°c,. /s /SS - dC Signature 7— t9 ^Ob Agency Pt_ YoAv�-/00, Date +Weld County Planning Dept. ❖4209 CR 24.5,Longmont,CO.80504 ❖(720)652-4210 ext.8730 4(720)652-4211 fax 00/14/2006 09:50 9707852730 HERMAN FARMS PAGE 02 VI I Weld County Referral CJuly 14,2006 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Fred &Marcia Rothauge Case Number 2"AMSPR-41 Please Reply By August 14,2006 Planner Jacqueline Hatch Project Amended Site Plan Review for warehousing of drilling fluid products,drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company. Legal W2 SW4$W4 of Section 20,T2N, R66W of the 8th P.M.,Weld County, Colorado. Location East of and adjacent to SH 85 and north of and adjacent to CR 18. For a more precise location,see legal. Parcel Number 1309 20 000012 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request, Please note that new Information may be added to applications under review during the review process. If you desire to examine or obtain this additional Information,please call the Department of Planning Services. U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan a We have reviewed the request and find no conflicts with our interests. U See attached letter. Comments: -The Pi alievdie rr✓itic-lins and MilinsCoPnean> wam44 [Lisa ranee - hrf arty $cefarro apprns'ed b),Se ?lann, emn,i:.ssnn w;11 nrk all& any iaa ' Wafer -{v errIer emmnpony"',t dr44. . Signature a. �„ / e- /t/ a 4 Agency t'1o,Kea, liee 7 rvti7 :4. l ftili4/.' ('o Date +Weld County Planning Dept. 04209 CR 24.5,Longmont,CO.80504 4(720)6524210 ext.8730 0(720)652-4211 fax Weld County.)'wining Department SOUTI A- BUILDING - AUG 1 6 2006dA / ',6 ftotilpg ,,N RECEIVED tut t! j°°Neld County Referral give July 14, 2006 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Fred & Marcia Rothauge Case Number 2nd AMSPR-41 I Please Reply By August 14, 2006 Planner Jacqueline Hatch Project Amended Site Plan Review for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company. Legal W2 SW4 SW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to SH 85 and north of and adjacent to CR 18. For a more precise location, see legal. Parcel Number 1309 20 000012 The app Ic 'ew and recommendation. Any comments or recommendation you consider relevant to this request wo b the above listed date so that we may give full consideration to your recommendation. Any respo this date may be deemed to be a positive response to the Department of Planning Services. If you have regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan U We have reviewed the request and find no conflicts with our interests. ❑ See attached letter.Comments: NoatiLi i n(r_asc O[ _barge; C7-1 C shau-Ld eap planaad for at -Wt2 ie5-1w\oh Ucces3 _ Signature „c--- c-LA-a._, t co tcS- -- Valio (c Date Agency ( 1 ,4)o I +Weld County Planning Dept. ❖4209 CR 24.5, Longmont,CO.80504 c•(720)652-4210 ext.8730 t(720)652-4211 fax Weld County Planning Department Kit O TA) SO'ITHWFST BUILDING AUG 4 2006 RECEIVED Weld County Referral July 14, 2006 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Fred & Marcia Rothauge Case Number 2n° AMSPR-41 Please Reply By August 14, 2006 Planner Jacqueline Hatch Project Amended Site Plan Review for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company. Legal W2 SW4 SW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to SH 85 and north of and adjacent to CR 18. For a more precise location, see legal. Parcel Number 1309 20 000012 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan U We have reviewed the request and find no conflicts with our interests. 381 See attached letter. Comments: Signature { tddi g -4-426( Agency Pji'LD Date :•Weld County Planning Dept. 44209 CR 24.5,Longmont,CO.80504 :•(720)652-4210 ext.8730 ❖(720)6524211 fax JUL 19 2000 Platte Valley Soil Conservation District July 24, 2067 West Bromley Lane- Brighton, CO 80601 - Phone (303) 659-7004- Fax(303) 659-1768 CASE NUMBER: 2""AMSPR-41 PROJECT: Amended Site Plan Review(Well Drilling Equipment, Supplies and Fluid Products Warehousing and Storage) PLANNER: Jacqueline Hatch In consultation with the Natural Resources Conservation Service(NRCS), we have reviewed the above referenced case and have the following comments: SOILS/LIMITATIONS: The proposed warehousing and storage for well drilling equipment, supplies and fluid products is located on Altvan loam(1) soil. For building foundations with or without basements,Altvan soil has moderate limitations due to its shrink-swell potential. For sanitary septic system absorption fields,the Altvan soil has slight limitations. PRIME FARMLANDS: When irrigated, the Altvan soil is considered `prime farmland'. SOIL EROSION POTENTIAL: Altvan soil has moderate potential for wind erosion and should be protected. Appropriate measures should be taken to minimize wind and water soil erosion during future construction activities, such as avoiding disturbances to large areas and preventing soils from moving offsite. As planned by the applicant, at the conclusion of construction activities, disturbed areas and operation areas will be stabilized with perennial vegetation, gravel or asphalt to minimize erosion and control dust. The application does not address re-vegetation of the storm water runoff detention pond on the site. The pond should be re-vegetated immediately following completion, or as appropriate depending on weather and season. Our recommendation for seeding the runoff detention pond as soon as possible is based on soil erosion,both from a wind and water standpoint, as well as from a weed standpoint.Weeds are very invasive and move into disturbed areas quickly. Some of these can be noxious weeds and would require control based on the state noxious weed list. By seeding the runoff detention pond soon after completion, the chances for weed invasion will be lessened, as will the potential for erosion. The following seed mix and application rates are recommended for re-vegetation and are based on NRCS "critical area"seeding rates,which are double our normal rates. SPECIES VARIETY PERCENT OF NRCS RATE NRCS MIX RECOMMENDED RATE (#PLS/ac) Western Arriba 20 16.0 Mac 3.2#PLS/ac. Wheatgrass Side Oats Vaughn 20 9.0#/ac. 1.8#PLS/ac. Grama Blue Grama Hachita 25 3.0#/ac. 0.75 #PLS/ac. Buffalograss Bur 20 16#/ac. 3.2#PLS/ac. Green Lodorm 15 10#/ac 1.5#PLS/ac Needlegrass CONSERVATION - DEVELOPMENT-SELF-GOVERNMENT • Our normal recommended seeding dates are December l'through April 15'". All seeding should take place on unfrozen soils. A good quality seed drill with an agitator and press wheels is recommended. If seed is broadcast, the above recommended rates would be doubled. We recommend mulching with clean weed free straw or native hay. Mulch should be applied at a rate of 4,000 pounds per acre. After the mulch is applied,it should be `crimped' into the soil to help anchor it. Crimping should be cross slope or on the contour, if at all possible. The State of Colorado has a list of certified weed-free straw available on the intemet or through the local county Extension Service office. It is recommended that the storm water runoff detention pond have side slopes of 4:1;this moderate slope will allow the planting, establishment and maintenance of cover vegetation. OTHER: When native vegetation is disturbed,weed infestation can become a problem. Should this occur,the applicant can contact Tina Booten,Vegetation Weed Management Specialist with the Weld County Public Works Department at(970) 304-6496X3772 for assistance in developing a weed management plan. The District welcomes the opportunity to review and comment on proposals such as this. Conservation and wise use of our natural resources are foremost in our goals and objectives. We look forward to working with you in the future. If you or the applicant should have questions, feel free to contact the NRCS representative at 303-659-7004. Sincerely,y7 j( ek District Board of Supervisors Weld County Department a SOllr �? T UILDING AUG 2 2006 Kit ' G;ouaCEIVED Weld County Referral C, July 14, 2006 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Fred & Marcia Rothauge Case Number 2m AMSPR-41 Please Reply By August 14, 2006 Planner Jacqueline Hatch Project Amended Site Plan Review for warehousing of drilling fluid products, drilling supplies, as well as storage and maintenance of drilling equipment for well construction and service company. Legal W2 SW4 SW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to SH 85 and north of and adjacent to CR 18. For a more precise location, see legal. Parcel Number 1309 20 000012 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan U We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: Signature OfroC Agency S/-/c'Rfi"l--S d 7:7 =- D +Weld County Planning Dept. ❖4209 CR 24.5, Longmont,CO.80504 ❖(720)652-4210 ext.8730 +(720)6524211 fax Weld County Sheriffs Office M e mo To: Jacqueline Hatch From: Ken Poncelow Date: July 27,2006 Re: 2nd AMSPR-41 The Sheriffs Office approves this plan. Please notify the developer/owner that the Sheriffs Office would be willing to assist in the development of a security plan for the site free of charge. If this is of interest, please have them contact me. 1 ,.I L. 85 20 i i / c 29 r II I ( I I fr X18 O r :9 r r ''4yyFF d r. fl .!r # .. Jr • • 0,';tr a • I # ° 3 1" yf d { x a • i 03• 3 ( cis t `� : ,,� 4 77 4 t, • fn Yy R - • 1 C, • • S �} y,a },,fif�r . • 'j¢t iN t +j .irt • .. .. ( � t g • i♦ � 4 • u+' • EEry ^A tryjf9'�t. ./" ♦ .,��. ! J:` t —''+�♦.T.. .+Y�a ..mot =A....... �... .5. «..... __ • t • • x � �i� � , 4 t,A 0 Y{ St : ;I ry V{ ,n�s,,,,,.., t, `'Po cs.gr '+ s tt�. fl. a' C.lita r o L. a ink,.:.41. `'rd t` *3h. ° t s' F ;. '41L4',';', 14:!:•••,':;"4iC T. . &: .7, . ,tk,+e p,y s t • i o , t• y ri 4. t n `"" { 'n vn I ` '� �' +' me 7 -asvite,i 7._. � t r"4 A b '4:1: -5yrft ftt ��F' "�{ f4 k. gnu fi4„.„......,...•,„,s,.\.v.4•••• :,...r.,4,4 • , . . , ‘ • �Y f ailatzght4 .. •• . . ...:• ,... t- tg 'atgg.n.iy.. .,,.. ''It.'' 4JYk 4 �{gy '( A Ff},,� S HAS °y Y �2 '♦` .; ii y a `f to . '� r ! '` tM asry J • 0'1'4' . ,,-„,.,.. 3.,....,. ,,, ‘,... \} r' ^� P^„ ::::: i+�y uMY:' 1 ! .£.yt firoi. +-. .+ y .`"' )P #,4vyai 4" 'v n' t a r-. c s y h :'%y s ] .Jt.�T E ( •`) . X �.: ry " ,d:,,{ }1 _ t « }M�� y" • �.- t # 4 YI P "I: t� n s{f� A Y.g f" S leer4O41•4 i 44 'It. x t e" K - 'G w . �". ^t',yty o .� • fit ' { `` /C* FtJ v a. 6 Y rtii Y. ,a•y- 'r' i.e., t #n"',S 4 . I, § of 3M^' • as' • sr � t .°`.?yxy „it }i ^ 113. It - i, • j 1^1 P •11Frz witike • tl, •.'G et `fit �:� awe. t < . - t is t... {.. v.-. I *444.141,4.... ' '' •S h ' 'F t I. ih„ay}x� I #'}x f { 'yy , {3 H iay�,,�,' t* hr't.q j S IS• 4 y`,y' 4?va ? � ' • ::1:::::4:1,,,,s.„• 5 I � b# ,ti 7 '1 0 - .., ......„...„... 7 "a:rre7,-..1-c...;.**"-4,. .--7- .. . ''"7"— " --'.*" Is.• ",,..,;:,:r V.'if ' * . IN'Ej•••:::r.":"•,..1:tri: ' ...... • '4*';',:' . 1 tV" '43i n 4P 'I °''% \ d)S $a r 4.•^,, r' .rt'....'-'s-,-a i' .. C'NN e ° J 4......s., ---i- --..:.I it• . .. Y ;. it °.y \.t t.`',5,, - "\ itsi.i{,aiA s .a _v� _ I'4-fl ffff Q , 4,4.I[ 3)! 11�'... Tk ) ₹ ;.44.47t411:s. { t m4 ilk , 1. � '' \ e a tat v"' � . -^r";- 4u,,. r % a'' qy q -'. yY.d. .4',..4.''..4".../J.)'w #:;$Rp�j 44 Y ' tYx.' j°' r. i,F ' _ d y • # } rw.)d ^ aw z, rtd t } '. tt� l• `i,',`','^•" BP. ..� A 09i . l.i t. qt • :• ire. Z r eld ,"^ ` \ 5v J ,I n�3-#£,u��,3 - nq�; 4<D t ?" €tin r _ •4 w .+. • 't *.x. vx ua" H %g i +npa'a y., 4s " to--5:815,,,,!,:t, 5 H r a_ �:„>_ :�§ ''a. * $x !' 'r` ,`" 5 5 t e a. el ,a5 y+ i — a s is b; 'p4iky".4 y t: v �y ::**W:1 kCan C :to L • k"P k f4 hPH i P a5b"5 t ''i { e *L `a ip' 'YA `¢ d 1. `r' t 4'4 a mg:, ,•�44 a �k. ,' Q ^'ah a i fi r- t eH ces t J i� a a Wat:hint. .".: 'yl"'R`4 tl i s' a'ya f H + t x t. �tt pRtit:**"5 q jp,t,'1tOt:'y ys a gN,a it ttil:R'3ar' tLH LP t?° f w K't' 5 5 .(� .''6 F,L0 d {t �i+ 3},q, tl g7 �{,&F.3 94 � y�� L ?'; '4 L ^taM'y t, j i}. t `.ct' q4t9 YI' M1'u 3 }iki.. 'a )".a d -S$r. �" 'LT't 5 a ryt� t 91N , y 4 "'NH"x.�'q d 2a � 6�# @ �: a@�'�pa� h ty-(�b'Ha a4+� �'A L -0PM �t k 'Y;aF t� gfi5 a-�T5 ! s $s t 1......dd y 4 c4 22.4€ .:t }r' t b v� ti a s ,.tli, y'2't4° A . tt.tt ..S.' " a t' 5R'3 � s as,t;;:a a 7� i A v'€ :ey''or' •4• o f -t t f F gh g� E, n .�wJ y A 55 Hu.. LY t € "e4H a r tk.+,,(tz ,, vvgq. ik kz. �f*A " °k7" ° Nt' i. 5 's@y ' 4ta ae f r p 1 a ''' e'ik,' S^" S F "N k 0 ' E^x aS 0 � 6. ap 46 yy :' e .i3 '}': ^YY %" tr %I ' S i, dit.>a 6..C... yk ,� k.4`ti '4J:sr. tt"#';'•a N• 9 'H GizFytt SSs' r" • ' ��t• :141411:(A t e a`r Hg H �fi d. :�} 9's '1 aka r' �,s '"s... 'a `t."? 'aav` aV:5�a H e€ � b s - k 'km gvs 1i e �' 's a� x.'b s• zz" , s �'`e ' a }' v C k 'i a sR'' i .l t a,fi' pt t S 4. ±:t' ce At ,� 5:r,f bt.; -t� a₹it' niia9 i 11-:° `''a k gg ypiMT"3 L a A i L P ° ° ,a.i,"; r 4 ,.i 'ta.' t ° tv�y 8 uk 4 gH'. �,. ��. yg .9" 'va.3�v `�'3-. r a qsv k m ` • x . y� 7 g� , K a i�@a y .qa r .h }t {.!!.T`-S t .% 2 S T� Zi kit i 4A 'F fffAAA S "Zi H� r 3� a E f €w eta- x .rt`t t " iM1s a u ,t z'x y m a € 4 !' ' - .,g Aar e M k" 4 g. h t ya}. .: t ��{ `� 4 4'i { 4 eit Yi { .{ t{.t h 4 %SSL" t € t 2,�� a t tk„ asi'^i*'r-Vy .rg"�t`4w. ,„, . ' v, 'oA ',tb t k >~r,' ^`. :«. i �aFb ,c Alb�k''w`"k r�. $ ° z'lit r es a 8''ks"r,t:a a.3e A ,s esy A'1 .a 4 ,.y ' 'N4 .,5.}, 34.74.k.'!!...,!:,:: ` *h 2;:: N �z 5• k g:L3 ', �a : ,;:ks R"utIti to piety 57Yviv, "« r ', 'b 8E c NH ' ' ,°b 5" y S $ Y 6,y Hr qt Ny 5a r q" ,�t� �a� $�h�r+ tl �N $�'���, �$.�C°.�s�� "��.� , a • �� g ° a 3,a5�"5a� �'d,� ���1�� € tt6 a' ..ga t' t k° ,€'vy e€'sz"' Sv4 r i,v"as 477, 7nuPAs'NP.: ,,.71ays,. ₹ at _ 5 4' ita 14 N 'ka a A, "-`ks E t w ar '41 3 "F uNtl `c41: 0- w'„ i - tir y2:7 dx ' N t 6°z to e 2 S.F�k3y J f' j�g'gdHaab Ah a »ei ' 4-,: n ''c• " €caa h a q k5Y ' 4 s%a° hi§,i 'k'N� Fpav rI at '° � t t' .5„ x5 k ` : "s s€k k k 'a '`„, '+, 3 o-�cE a it t4 t5�:k sJ't'zts ; i { :c a 6', d t t . sl :5 ka asab k a �yC `^"'ki:0 s zt`5'i - a: j a k x • tsar a r y 1::, 4 f Y !3 c s s 4 „E '"_ ,, ei, u a rw 4 $ p zt Hen i Y E. d ;1 ,r id„ a� 4 6d4L a4• d Ez p a r as � iq.aw a a 3 a "sv s a t� a�x�aY Nb r °�n `�"" pt ? .�b. .u§s � '} `- - k�a ', v of �tt a�q ,tep .$4 4"v�°�3 h� 0;iik ' H !tl2't k ttC+ iY; t - 'liC t t"rz tas b r it" r +r ` ''a;iC k g t' •yi yr } ay 3�r : gb Pm"a �" ( h a'a₹} S [x' i C - --i : � giHtrt ct. e`.� g .5y` `�l; kr:! `� .,," � u . ra. '€S3s�apl: { i rx7 v`i9j y '° ° k i Eyw': 'ss sstl a_.z-744d '. N"" t a • akx�. ' ' �a 6a . s ' p `36`� c k'"C S 5$ rpYi' a r s: '..'rN 't p r : b ',, T` k- a s Hl CC,4q K S a .V. ,1 �} H p ' n H i s'• f" '[6 S 7t Y Y% ° {data pb yF 9 WF ` i i� 1 y i 4 f b } S 4t' 4 -. r - r - a z +2 ,r .'e 4�� ya � 't � ' F ₹ -✓rN ;: fir s y _s `lry a h a w alb z g��5 h 6 z5,a :7 ,s _H - sa t 4 Lyq a'e ,. t z fnc 5' ice . 3 -'z'^"€ �"kzhc. f ',. &"' t} i.Iirc • N y L P t: "€p'a.Ygy p a - SH, 4 `q . °' $'' - t ` & a to 'k< q'i 4 ,. "k 11 ,;;;E;:ti } R* a s YNr .€ -•3 t '' N t N'L$q `4 '4 .�. } `+„Kii,,i i 0'4 .2 4y ='`'` - z`fk�,,$ • 0^n`' , ttl L f 3 '.-„'`fin& L i '� t' as A } q i a 3 N'". °8�` 15 '.t w'iN phi's ;, ₹y A : L � s H` € cea T.t Y L•k.5 y,;: y £ �:a.:s { aNa t -0d i5 H��XFa5 '`' ti i -r4;,:::,,,-:r.:,,-..,„,:. a: Ea R a az57 s., i r`! 6 tftk is r. h }p, x 4 't n'y"''4Ie .r�ax-.—>v,dt �H. saxr �a b' ,fl '�. 5 � .Y ,'..[a.,.,r��,�+^ • "a,. st- _:{ ab, '..r.ir ,:. efi = �yaga 9 -04,..:1 '`₹' ,i ., x+r }F rt.;,: "y t. i . . h t `"v'NfF y P tb 6 J a a E -%t ; 9 psak 65Isi t_ - spa qa• i. €w f wn E� k - tr'a t ` e R 4 2 ajj N ki • S . a } t i$ S ". a 3 ; • 4 risk th,Y� '�� t v - a isg iv, A se r ift 5 � _� � f y,s a 9 ° ro. i tL 5 y i °^vt ` %t i N .i...y' 't ''§a si r. ( .i'.j5Ja4.t ,tCt rt°q-'�p ty' : §3Fr pi.; S i _ y 'a nkf. �q:;„:„ fre A. k '.H y dPd 24 4 - R H.� _ • 1k k !i.:;:!--,,,,,, ,,;,!..,.i.;444,741-, k."' §r e:at _ ` * +,' ::t s,,,,z4nxa v £z�a k{ €",p a t t 'z J y- 1 •'. ', s 9 a>5'�a•� f 7 tk�:f"' 6 tH'Hk'F zi,rc„, €L 'k r A ,{ t r g u. s N y: . f �. 4 q a° t .ya4 4 � '' �S sH J � h • ', a °�a •y S`yE L i t• h t . At•.::14,k., d .. t .. M b _ iv2�.. .., 9_,, +a^^"T • af'wr`aa :x } 5 t },3- � 4 �h i'Ap"4 it i E tt F' 55 t' ,�tt, b ° 4 5 K 7°tit ' qqa�5' 4-1::$,...yt ' 7 L ,-' N } r�, ' a Y � 'ya� f:A a: a - F€ r° t at _7a's,r ,.t,t"g„i '� b A a .arr 9 tv Nq . 4 t ',I:4i H t t. s a " h a. a S4 aq ti if?„:;;34-t.; 5 r , t '' .y � �aa3row^ ,.!:-.2:1i : 0 A 4 1 3 i 1 • # { • •T .. S D t •t'aS b t�t II.j5 a i4 • t EtI fiy5 t 4 ht q t. PP a, � . �. 4 " •,'.I''-...f.:T :..."2• ' lir'. •:::' •I•••':It:••• : • II; - • •• •• ••' • : :•• • •• : ••: • L . ___ n) Tpl,rs !IIIIi :1R3113 _yq r« ai ua,^ owl oraasamot13 3ann 'avI 9(31815&MUEe Irons 39 tXlOtl MOON s o3u NYld 702LLN03 Df0IS0t13 avrawmre Ma JMQV!!J 'dJVMyE[Q :. 1 t8 U 'vim'' p °s A�� +00 iii. :g ggry g�6 20J' 8��� + A t l; �J2 4::16 LLbVV g: as >d6�iml 'r /4 ) 6. 'Pei, ,? O Qv i L � yy SOY IIIIE 1E il 1 II1S 1 C Y _.. ` (I y£I f8 I� Z� �I k %` 3 a: I ii I gv to ai I j ( ,e e ��flE ' ° i3 V4 �: I Ira ; Y @@ S '�� t `0I' 9�gd W u� I 4= -� $6Y E&&& R i I�C t . I i p -`..i pie' WS @ ll ligM I i �� f ins _LI3in �oG �a ,'e I gO i 'Q93 I ! Z "g C N QI B g I Qi I, w gil Ny let Q 8$ ag' 1 y F y#jppj g:, g , tic'i a� 5I I �_...�4 BYW hi I. ��� a< @s 8 n Q Ilet I a I I 1 t � nW3 Wv9 bd.q3 d-x n = ro I �H fi 8 ® Z4,•w iryJ [F(1 A E 'a Y u ^ I I N; a ,IIgI B eRi 8 g I. 8thld �j k O�- I I .•I ' cc! n .a9: 7x I -J cx � (ITS. �� 1 I i' �T�6 �I�� tit 6 I b It? e ' II `u i_ a II 4,1 a t I �ir ;t 6. . 4 IIS II. 1 .1 �E 11i � Q i IS ^ \q I : i a i r � a I z Elk, = m8 RAM l i a ?i 8 f gtv�3 4 . _ , t ED f 3 f m o of �QlI , .,�Jill :, I I �i I �-g = , Q i t° I ao6 t g { N'i I c I @$q 2 a ₹ zw ILI , ( �j I I t g Il liII $ 1II3 99 s ISIix I �' g . •aES' / 611 1 I m Jv „I I�y " libti pp y 64 55 Ill�i i A g B ] 4I ugi8 W6 2R' 3aC9 d I \�� ' \ r;-iJ,1 0 12 M p i. a I I 4._ g : % 2 W 1 I :\ il .21 1 •i e I I 4 I 1 y; lAtr.ts , . li I i I 3 i 1 \� 2N �� a IWFo 6 t 8 R A y 2 J _ � � k ~ � I I I I I a l i ;I :�� } IIIII /7-- , Ig1l � I 1 rc O yJ �q 0, 1 '� f5II4( _at4Y SIC I }� x s -------- ( _ �t I I c K k c EQ .. �+ njri 1 kill a3 ® j 1 i` I y- 1 J I lla`4 g I i I ,e All: �a.� Ill wR 0 ; 1 4� Fy I I " 'd 'i AIM 11111 MIA 1� dIII 1111111II 11111 III11111 2903124 11/26/2001 03:40P JA Suki Tsukamoto 1 of 2 R 10.00 Co 36.50 Weld County CO 124 WARRANTY DEED LLO 56�,e/ / THIS DEED, Made this 20th day of November , 2001, between Forrest R. Charlesworth State Doc. Fee $ of the County of Weld and State of Colorado grantor,and Fred A. Rothauge and Marcia A. Rothauge whose legal address is 7754 Ute Highway, Longmont, Colorado 80503 of the County of Weld and State of Colorado ,grantees: WITNESS,That the grantor,for and in consideration of the sum of THREE HUNDRED SIXTY FIVE THOUSAND AND NO/100 DOLLARS,($3 6 5, 0 0 0.0 0 ),the receipt and sufficiency of which is hereby acknowledged,has granted,bargained,sold and conveyed, and by these presents does grant,bar- gain,sell,convey and confirm,unto the grantees,their heirs and assigns forever,not in tenancy in common but in joint tenancy, all the real property together with improvements,if any,situate,lying and being in the County of Weld and State of Colorado,described as follows: All that part of the Southwest 1/4 of the Southwest 1/4 Section 20, Township 2 North, Range 66 West of the 6th P.M. lying West of the right of way of the Union Pacific Railroad Company, Except a tract of land conveyed to Fulton Irrigating Company in Quit Claim Deed recorded February 15, 1889 in Book 76 at Page 86, being more particularly described as follows: Strip of Land Beginning at the Southeast corner of Section 20, Township 2 North, Range 66 West of the 6th P.M. and on the North side of the County Road, --Continued alsoknownbystreetandnumberas 13027 WCR 18, Fort Lupton, CO 80621 TOGETHER with all and singular the hereditaments and appurtenances thereunto belonging, or in anywise appertaining,and the reversion and reversions, remainder and remainders, rents, issues and profits thereof, and all the estate,right, title, interest, claim and demand whatsoever of the grantor, either in law or equity, of, in and to the above bargained premises, with the hereditaments and appurtenances. TO HAVE AND TO HOLD the said premises above bargained and described,with the appurtenances,unto the grantees,their heirs and assigns forever. And the grantor,for himself,his heirs and personal representatives,does covenant,grant,bargain and agree to and with the grantees,their heirs and assigns, that at the time of the ensealing and delivery of these presents, he is well seized of the premises above conveyed, has good, sure, perfect, absolute and indefeasible estate of inheritance, in law, in fee simple, and has good right, full power and lawful authority to grant, bargain,sell and convey the same in manner and form as aforesaid, and that the same are free and clear from all former and other grants, bargains, sales, liens, taxes, assessments, encumbrances and restrictions of whatever kind or nature soever, except for taxes for the current year,a lien but not yet due and payable,easements,restrictions,reservations,covenants and rights-of-way of record,if any. The grantor shall and will WARRANT AND FOREVER DEFEND the above-bargained premises in the quiet and peaceable posses- sion of the grantees,their heirs and assigns,against all and every person or persons lawfully claiming the whole or any part thereof. The singular pum r shall include the plural, the plural the singular,and the use of any gender shall be applicable to all genders. IN WIT S rantor has executed this deed on the date set forth above. dirt re 1 . har esworth nI II / YI STATE OF COLORADO COUNTY OF WELD ;ss. The foregoing instrument was acknowledged before me this 2 0th day of November , 2 0 01,by I Forrest R. Charlesworth My Commission expires: %` ' e Witness my hand and cial seal. C C(V( aCCq O • V Id (CRC t' Notary Public/ "LV WARRANTY DEED(to Joint Tenants)(mom EN) File# UO50R74A01 /J � l6 • Fl.}. .4 X111111 IIil IIII 1111111 rill IIIII Oil IIII 11/26/2001 03:40P JA Suki 7sukamoto . R 10.00 D 36.50 Weld County CO 13027 WCR 18 CONTINUATION OF LEGAL DESCRIPTION TO DEED DATED November 20, 2001 the center of which is the section line dividing Section 29 and 20, thence running 10 feet wide along North side of the County Road 1 mile to Section 19 of Same Township and Range, also Except a tract of land as conveyed to the Department of Highways in Warranty Deed recorded March 16, 1956 in Book 1445 at Page 307, being more particularly described as follows: A tract or parcel of land in the Southwest 1/4 of the Southwest 1/4 of Section 20, Township 2 North, Range 66 West, of the 6th P.M. , said tract or parcel being more particularly described as follows: Beginning at a point on the South line of Section 20, Township 2 North, Range 66 West, from which point the Southwest corner of Section 20 bears South 89°56' West a distance of 110.0 feet 1. thence, along the South line of Section 20, South 89°56" West, a distance of 110 .0 feet to the Southwest corner of Section 20; 2 . thence, along the West line of Section 20, North 0'02' West, a distance of 1,340.8 feet to the Northwest corner of the Southwest 1/4 of the Southwest 1/4 of Section 20; 3 . thence, along the North line of Southwest 1/4 of the Southwest 1/4 of Section 20, South 89°56' East, a distance of 34.3 feet; 4. thence, South 0'22' East, a distance of 1,071.9 feet; 5. thence, North 89'56' East, a distance of 69.3 feet; - 6. thence, South 0'04' East, a distance of 268.9 feet, more or less, to the Point of Beginning, County of Weld, State of Colorado b-1,5 v LEGAL DESCRIPTION: That part of- the Southwest 1/4 of the Southwest 1/4 of Section 20, Township 2 North, Range 66 West of the 6th Principal Meridian, Weld County, Colorado, more particularly described as: lying west of the right-of-way of the Union Pacific Railroad Company, Except a tract of land conveyed to Fulton Irrigation Ditch Company in quit claim deed recorded February 15, 1889 in Book 76 at Page 86, being more particularly described as follows: Strip of land be- ginning at the Southeast corner of Section 20, T2N, R66W of the 6th P.M. and on the North side of the County Road, the center of which is the section line dividing Sections 29 and 20; Thence running 10 feet wide along North side of said County Road 1 mile to Section 19 of same Township and Range, also Except a tract of land as con- veyed to the Department of Highways in warranty deed Recorded March 16 , 1956 in Book 1445 at Page 307 , being more particularly described as follows: A tract or parcel of land in the Southwest 1/4 of the Southwest 1/4 of Section 20, T2N, R66W of the 6th P.M. , said tract or parcel being more particularly described as follows: Beginning at a point on the South line of Section 20, T2N, R66W, from which point the Southwest corner of Section 20 bears N89°55 ' 29"W a distance of 110. 00 feet; Thence along the South line of Sec- tion 20; S89°55 ' 29"E a distance of 110. 00 feet to the Southwest corner of Section 20; Thence along the West line of Section 20, N00°09 '23"E a distance of 1321. 58 feet to the Northwest corner of the Southwest 1/4 of the Southwest 1/4 of Section 20; Thence along the North line of the Southwest 1/4 of The Southwest' 1/4 of Sec- tion 20, S89°56 ' 00"F, a distance of 34 . 30 feet; Thence S00°11' 00"E a distance of 1052.70 feet; Thence S89°56 ' 00"E a distance of 69. 30 feet; Thence S00°07 ' 23"W a distance of 268 . 90 feet more or less to THE POINT OF BEGINNING. CONTAINS : 10.313 acres more or less. SURVEYOR' S CERTIFICATE: I hereby certify that this plat was prepared under My supervision, and that the same is correct to the best of my knowledge and belief. COLORADO RLS NO. 3 ` t• PROPERTY OWNERS APPROVAL: I, -,, S;irly} , being sole owner (s) in fee of the above described property, do he �sk ,“; request the zoning as shown on the attached map. O:3 ; •i" J / tr."#�, • t7 The foregoing certification was acknowledged before me thi +a- , 11I if` br'i-y D/- "ItAit/144!L+ A.D. , 19241: Witt• my hand and Seal. My commission expires : /O-a4-- R Notary Pub is , ,coft7 %.u.p7ba., 4sob21 '. PLANNING COMMISSION CERTIFICATION: This is to certify that the Weld County Planning Commission does hereby recommend to the Board of Commissioners, Weld County, Colorado for their dental • " this Z Change as shown and described hereon this (pli, yl y ARCH/ , 199f t. C a man, P anning ommission BOARD OF COUNTY COMMISSIONERS CERTIFICATION: This is to certify that the Board of County Commissioners, Weld County, Colorado do .confirm, approve and adopt this Zone Change as shown and e._hereon this Grit day of Tura& , 19.84/ t vrL_Count 'Clerk Chairman, Board of Co. Comm. t RECORDED: I ` Dep t � _ ` DATE: Surwwo Systems.INC. 916 38Th AVENUE COURT GREELEY,CO 80634 970-353-7364(PHONE) 970.353-2393(FAX) www.MacrumBuildingSysteres.com FACSIMILE TRANSMITTAL SHEET t): WItOM: Ruben Coon COMPANY: Weld County Planning Department 7/10/06 PAX NUMBER. Yo'I'AI.NO.OR PACES INCLUDING COVER: 3 PinONII NIIMEPR: SENnER'S ItItPI4RENCE NUMBER RR' YOUR REPEREN GE NUMBER Fred&Marcia Rothauge 13027 WCR 18 Fort Lupton,CC) URUFENT XFOR REVIEW O PLEASE COMMENT O PLEASE REPLY O PLEASE RECYCL1 NO'1'IiS/COMM I:NTS: here is a copy of the existing well permit# 137460-A per your request fur the Site Plan Review. Thanks. id WdVE:20 900? 01 'Inf 262? 2S2 OL6: '0N XUd SWRISAS OGlE WflDUW: WOdd • Form No. OFFICE OF THE STATE ENGINEER GWS-25 COLORADO DIVISION OF WATER RESOURCES 818 Centennial Bldg., 1313 Sherman St.,Denver, Colorado 80203 (:103)tf6r6-3581 LIC WELL PERMIT NUMBER / 3 7 fie o - APPLICANT DIV, 1 WD 2 DES. BASIN MD • APPROVED WELL LOCATION WELD COUNTY SW 1/4 SW 1/4 Section 20 FRED A&MARCIA A ROTHAUGE Township 2 N Range 66 W Sixth P.M. 7754 UTE HWY DISTANCES FROM SECTION LINES LONGMONT, CO 80503- 465 Ft, from South Section Line 290 Ft. from West Section Lino (303) 651-9409 UTM COORDINATES PERMIT TO CONSTRUCT A WELL Northing: Lasting: ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT CONDITIONS OF APPROVAL 1) This well shall be used in such a way as to cause no material Injury to existing water rights. The issuance of this permit does not assure the applicant that no injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief In a civil court action. 2) The construction of this well shall be in compliance with the Water Woll Construction Rules 2 CCR 402-2,unless approval of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors In accordance with Rule 18. 3) Approved pursuant to CRS 37-92-602(3)(c)for the relocation of an existing well, permit no. 137460. The old well must be plugged In accordance with Rule 16 of the Water Woll Construction Rules within ninety(90) days of completion of the new well. The enclosed Well Abandonment Report forrn must be completed and submitted to affirm that the old well was plugged. 4) The use of ground water from this wall Is limited to drinking and sanitary facilities as described in CRS 37-92-602(1)(c), for a commercial business. Water from this well shall riot be used for lawn or landscape irrigation or for any other purpose outside the business building structure. 5) -Production is limited to the alluvium. The depth of this well shall not exceed50 feet or the depth at which sandstone or shale is first encountered,whichever comes first. 6) The maximum pumping rate of this well shall not exceed 15 GPM. 7) The maximum annual amount of ground water to be diverted by this well shall not exceed 'I acre-foot, 8) This well shall be constructed not more than 200 fact from the location specified on this permit. 9) A totalizing flow meter must be installed on this well and maintained in good working order. Permanent records of all diversions must be maintained by the well owner(recorded at least annually) and submitted to the Division Engineer upon request. 10) The return flew from the use of this well must be through an individual Waste water disposal system of the non-evaporative type where the water is returned to the same stream system in which the well is located. The maximum consumptive use of ground water shall not exceed 10 percent. •3t' -3 321102 APPROVEDzzaiimet JMGV ;z y SietobNhieor LB .E;i.t No.... 88432 DATE ISSUED AR L 4 2002 EXP ZATION DA E: MAR 2 s. C, • Ed WdbE:20 900E OT '1nf 262E 2S2 0L6: 'ON XU.d SW3ISAS DalE wnaDUw: wood ,... �. F•, o • _-_ 3t.a WELL CONSTRUCTION AND TEST REPORT __••.__ For Office W.onyLTOIS 10/94 STATE OF COLORADO,OFFICE OF THE STATE ENGINEER I WELL PERMIT NUMBER /37 4c ,4 _____ G OWNER NAMF_(S)— 6..zr0' a' Me rc.,-4. , v,4, •: �'•"'_.._ Maikrig Address 7149 t(4 /4'y O°City, sr.rip G natal.Ord . gee .ff2,'a?. Phone (?,3 ) d857— '/17/ • ^T. 3 WELL LOCATION AS DRILLED' ≤ IA) 114 S W 1/4,Sec. 2-O Twp. Z ... _N ,Range t,6 Lv ' DISTANCES FROM SEC. LINES; ..... WbS f:. from Sec.line. and 2.4c, It from f Sec. line. OR -erartrrerpratnr _ SUBDIVISION: • LOT BLOCK FILING(UNII) STREET ADDRESS AT WELL LOCATION: - 4. GROUND SURFACE ELEVATION ft. DRJLLNG METHOD Co' irk,' DATE COMPLETED :..7-4.--.1.4 a.1 30 .20011 EP TOTAL DEPTH, ,56 R DEPTH COMPLETED...y r Sr. 5. GEOLOGIC LOG: . B..HOLE DIAfr1.Q ) From (it) To(ft) -.~ Depth Description of Material(type,Sae.Color,wafer Location) /2-4v' O 'O 6 I 5,,r ra+ _...S.e L____._. _L.`f....._44(1 y ra ri _)1- �B 54.-4 t E,,,.Y to r.. .' rill � _ t-crir-50 c'!'a y / T_PLAIN.CASING - � OD��m) i�1�I Wad Size Fram(ft) To aai• • - _, CASING:Screen Slot Size: rOt _ • _ 8. FILTER PACK: . . 9.PACKER PLACEMENT: ._ ��._-..,.� AR2[erial�e�iyoWuv{-er+ Type. Sire Iv• 2v ..-. � Interval 5v Depth — _ 1G GROUTING RECORD: .�._._.. Material Ama1 Deng; Interval Placement REMARKS:_._.—� _—__.. .-..-.4 _ 7 cu� it l 7-20 -7;�>.-. . p 1 DISINFECTION: Type Ntlaw, 4rlci.t 4,1 :4'4 AI Amt. Used 54. - I _ �. _44_44_ s�'-'--- �. ----.—..----4444...-_._ WELL TEST DATA Cipher*box d Test Data is submitted on Form No. GWS 39 Suppletnenta►Wed Test TESTING METHOD 3Q.b'sts..,,1,41,.- A a wyyO� Static Level TS- 1L Date/Thne mamd /rloro'l 2.00 p r,. _, Production Rate / 9pm• Pumping level „2,o ft. Detemme measured 1(42/0y 3:"v 0 4 ,Test length(lee.) ny . Remits I hew reed the sLdmrerar mode herein and knew the tad nts fiemo(,and ant they a this to my ape.[Pursuant to Seaton 24-4-104(1:9(: ' .-QRS.,the looking of bh.stamen,.herein tensihdw perfidy In to aemnd degree and n punidwbb as a okras 1 miadtweeine4 COWIT4AACTOR Ile, Ea. Dv,'t/I'�I�1,[(��i,f r,r_ — phone 6Lo 2 rT—z 3d 1 u No. PO__ M Address )7O, T.7 P A^ .,f7 r & .'t.. ,',F 64 S' . s 4 / ,. Name/Title ✓( or !t)/y V �� Signature ce./s r / .! e Date 1/I).7(1f £d WdVE:£0 900E OT 'Inf. £62E £S£ aL6: '0N XCd SW2ISAS 9118 WldouW: WD?Jd WflR SUPPLY INFORMATION SUM"1RY Section 30.28-133JdL C.R.S. requires that the appicaat submit to the Canty,Adequate evidence that a water supply that is sufficient in terms of quantity, quality and dependability *HI be available to ensure an adequate supply of water. 1. NAME OF DEVELOPMENT AS PROPOSED FRED I f1A(tC=A RcrL4AucE 2. LAND USE ACTION OF fug.cts / S Ho P 3. NAME OF EXISTING PARCEL AS RECORDED Faso a ri Alt nits RoTtiA4i'E SUBDIVISION FILING BLOCK LOT 4. TOTAL ACREAGE 10, 351 5. NUMBER OF LOTS PROPOSED PLAT MAP ENCLOSED El YES B. PARCEL HISTORY- Place attach copies if deeds. plats or other evidence or documentation. A. Was parcel recorded with aunty prior to June 1, 1972? ❑ YES 0 NO B. Has the parcel ever been part of a division of land action since June 1, 1972? 0 YES 0 NO If yes, describe the previous action 7. LOCATION OF PARCEL- Include a map defniathtp the project area and tie to a section caner. S la 114 OF 5 u 114 SECTION to TOWNSHIP 2 BIN ❑ S RANGE 4t: ❑ E W PRINCIPAL MERIDIAN: S 6TH ❑ N.M. 0 UTE 0 COSTIUA & PLAT • Location of all wells on property must be plotted and plait Waft provided Surveyors plat IQ Yes ❑ No If not salad had drawn sketch ❑ Yes ❑ No 9. ESTIMATED WATER REQUIREMENTS • Gallen per Day or Acre Feat per Year 10. WATER SUPPLY SOURCE ® EXISTING 0 DEVELOPED ❑ NEW WELLS • WELLS SPRING PURIM Aare,IGga an HOUSEHOLD USE / of units GPO AF WELL PERMIT NUMBERS ❑MIRK o wren AeArrarE 131440-A o wru mum o tam A rent€ lel COMMERCIAL USE N of S.F. GPO AF o rem o DAKOTA ❑one IRRIGATION X of acres GPO AF STOCK WATERING / of head GPO AF 0 MUNICIPAL ❑ ASSOCIATION WATER COURT DECREE CASE NO.'S OTHER - GPO AF 0 COMPANY ❑ DISTRICT TOTAL GPD AF NAME LETTER OF COMMITMENT FOR SERVICE 0 YES 0 NO 11. ENGINEER'S WATER SUPPLY REPORT 0 YES a NO IF YES, PLEASE FORWARD WITH THIS FORM. Ills ewy be resew e.rars ear rnkw it completed.) 12. TYPE OF SEWAGE DISPOSAL SYSTEM IM SEPTIC TANK/LEACH FIELD 0 CENTRAL SYSTEM -DISTRICT NAME ❑ LAGOON 0 VAULT • LOCATION SEWAGE HAULED TO 1l ENGINEERED SYSTEM (Attach e espy et eapiarie Pep) 0 OTHER DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 Y 17TH AVE GREELEY, CO 80631631 WEBSITE: www.co.weld.co.us ' ADMINISTRATION (970) 304-6410 il FAX (970) 304-6412 O PUBLIC HEALTH EDUCATION AND NURSING (970) 304-6420 FAX (970) 304-6416 ENVIRONMENTAL HEALTH SERVICES (970) 304-6415 COLORADO FAX (970) 304-6411 June 30, 2006 Fred and Marcia Rothauge 13027 WCR 18 Fort Lupton, Colorado RE: Individual Sewage Disposal System Permit No.: SP-0600195 Location: 13027 WCR 18, Fort Lupton Dear Mr. and Mrs. Rothauge: This is to inform you that your Engineer Designed Septic System has been reviewed by the Weld County Board of Health and approved. A copy of the Weld County Board of Health I.S.D.S. Review Form and your I.S.D.S. Permit are enclosed. PLEASE NOTE THAT THE SYSTEM MUST BE INSPECTED BY A REPRESENTATIVE OF THIS DEPARTMENT AND BY THE DESIGNING ENGINEER, BEFORE THE SYSTEM CAN BE APPROVED FOR OPERATION. THE ENGINEER MUST CERTIFY TO THIS DEPARTMENT, IN WRITING, THAT THE SYSTEM HAS BEEN INSTALLED ACCORDING TO HIS/HER SPECIFICATIONS. Should you have any questions regarding your septic system, please contact this office at your earliest convenience at (970) 304-6415. Sincerely, / /r Pam Smith Environmental Health Specialist PS/cs cc: Gary G. Weeks,Northern Colorado Geotech Engineer Job No.: 109-06 WILD COUNTY DI RTMENT OF PUBLIC HEALTH Al' 3NVIRONMENT 1555 NORTH 17TH AVENUE GREELEY, COLORADO 80631 PHONE (970) 304-6415 FAX(970) 304-6411 Permit #: SP-0600195 Sec/Twn/Rng: 20 02 66 PERMIT Owner: ROTHAUGE FRED & MARCIA Applied:06/16/2004 Applicant: MACRUM BUILDING SYSTEMS INC Permit Type: CNEW C=Connnercial,R=Residential + NEW,REPair,VauLT Parcel #: 1309-20-0-00-012 Location: 13027 WCR 18 Legal Desc: 16173 W2SW4SW4 20 2 66 (3R 7RR 1D) %1302 7 WCR 18% SECT,TWN,R Description: OFFICE/SHOP Commercial: Y Residential:N Acres: 0 # of Persons: ! `' Basement Plumbing: N # of Bedrooms: 0 Bathrooms - Full: 0 3/4: 0 1/2: 3 Water Public: N Water Source: Water Private: Y Cistern: N Well: Y Well Permit Number: Percolation Rate c, Limiting Zone') g ft — in Description % Ground Slope — Direction Soil Suitable (Y/N) Engineer Design Required (Y/N) y In 100 Year Flood Plain(Y/N) ►d 1 From the application information supplied and the on-site soil percolation data the following minimum installation specifications are required: Septic Tank I cv—x"> gallons, Absorption Trench sq ft or Absorption Bed I sq ft Chambers: Infiltrator or Hancor Standard or Hi-Capacity, EQ36 or BioDiffuser Trench Bed Infiltrator Quick4 Trench Bed Hancor Narrow (15in) Envirochamber Trench Bed In addition, this permit is subject to the following ALL_additional terms and conditions: -r-a�;c tr w.z a i& r .-" -it - '-Stc, 1 v _ V^I �ou�1-�--. 'f�' � -�.c�� -nc^LS NOTICE This permit is granted temporarily to allow construction to commence. This permit may be revoked or suspended by the Weld County Department of Public Health and Environment for reasons set forth in the Weld County Individual Sewage Disposal System Regulations including failure to meet any term or condition imposed thereon during temporary or final approval. The issuance of this permit does not constitute assumption by the department or its employees of liability for the failure or inadequacy of the sewage disposal system. This permit is non transferable and non refundable. Before issuing final approval of this permit the Weld County Department of Public Health and Environment reserves the right to impose additional terms and conditions required to meet our regulations on a continuing basis. Final permit approval is continent upon e final insp n of the completed system by the Weld County Department of Public Health and Environment. x IYY p I „ �AL 1.11/01fi Form:S_PERMITN Environmental Health Specialist Date WELD COUNTY BOARD OF HEALTH ENGINEER DESIGNED SYSTEM REVIEW PROPERTY OWNER: Fred and Marcia Rothauge PERMIT NO.: SP-0600195 (CNEW) LEGAL DESCRIPTION: PT: SECTION: 20 TOWNSHIP: 2 RANGE: 66 SUBDIVISION: LOT: BLOCK: FILING: SITE ADDRESS: 13027 WCR 18, Fort Lupton FACILITY: office/shop w/ 50 workers ACRES: 10.313 PERC RATE: 9.7 SOIL: Suitable WATER SUPPLY: Private well LIMITING ZONE: N/A XXX ENGINEER DESIGN (3.5) EXPERIMENTAL DESIGN (3.14) ENGINEER: Gary G. Weeks ADDRESS: ESTIMATED FLOW: G.P.D. 1125 PRIMARY TREATMENT: Standard tank CAPACITY: 1500 gallons DISPOSAL METHOD: Absorption bed SIZE: 1321 square feet REQUEST FOR VARIANCE: STAFF COMMENTS: The system is adequately sized for the proposed load. STAFF RECOMMENDATION: Approval ENVIRONMENTAL PROTECTION SPECIALIST: Steve Wiatrowski REVIEWED BY BOARD: 7/25/2006 B.O.H. DECISION: APPROVED: A DENIED: TABLED: • ZjeZeo.___„> Chairma Weld County Board of Health .-% Northern fIS‘ Geotech June 12, 2006 2956 29th Street, Unit 21 Greeley, Colorado 80631 Phone: (970)506-9244 Fax: (970)506-9242 Macrum Building Systems 916 38th Avenue Court, Suite #5 Greeley, Colorado 80634 Attn: Mr. Robert Coon Re: Septic System Design Highway 85 and Weld County Road 18 Northern Colorado Geotech Project No. 109-06 Northern Colorado Geotech performed a soil percolation test and septic system design for the commercial structure to be located at the above referenced project site between Platteville and Fort Lupton. The engineered septic system design is attached with this transmittal letter. If you have any questions about this report or if we may be of further assistance, please do not hesitate to contact us at.(9fYr5864. Sincerely, NOR ERN COL' 'AD�) lffECH AIPC Doug Le gre , ' ` t / President U c0-4;tk, / R d byes `--'- r L P ti; ary G. WeeI�,R E ice PresldenN,` ... h nclosures: Site Plan Log of Profile Boring Septic System Cross Section Septic System Design Criteria Copies: Addressee (4) r . ..1-, _a., , qi, PROPOSED • / OFFICE/SHOP PROPOSED f SEPTIC SYSTEM No.4 No.5 No.6 No,7 No.B • No 9 I O I PROFILE CD BORING CO CI7 EXISTING OFFICE AND WAREHOUSE • / • WELD COUNTY ROAD 18 BORING LOCATION PLAN N PROPOSED METAL BLDG AND SEPTIC SYSTEM HIGHWAY 85 AND WELD COUNTY ROAD 18 k FORT LUPTON,COLORADO FOR MACRUM BUILDING SYSTEMS Rgect Na. Northern 109-06 Colorado Scale_ V=200' Geotech Date 6-15-06 2956 29th Street,Unit 21 Greeley.Colorado 80631 Plead Mgr: DML DIAGRAM IS FOR GENERAL LOCATION ONLY, Phone: (970)506-9244 AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES F3%: (970)506-9242 Fgure Ma. 1 • Macrum Building Systems Weld County Road 18 and Highway 85 Northern Colorado Geotech Project No. 109-06 SEPTIC SYSTEM DESIGN CRITERIA 1. Percolation Test Results: Test Boring No. Percolation Rate (min/in) 4 5 5 6 6 8 7 20 8 10 9 9 Design Rate, t = 10 minutes per inch 2. Min Bed Area: Q = max 50 day workers x (15 gal/person/day) = 750 gallons/day 750 gallons/day x 150% = 1,125 gallons/day Area = (Q x It / 3.5) 1.3 = 1,321 square feet of absorption bed SEPTIC SYSTEM DESIGN SPECIFICATIONS 1. Septic Tank— Minimum = 150% of 30 hours avg flow = 1.5 x (750 x 1.25) = 1,500 gallons 2. Bed Area — 1,321 square feet 3. Distribution Box - Installed level to provide equal distribution of effluent. 4. Gravel - 12 inches (minimum) clean gravel graded from %" to 2W in size extending from at least 2 inches above the top of the leach line to at least 6 inches below bottom of leach line for the full width of absorption bed. 5. Leach Line - 3 or 4 inch perforated PVC placed at 6'0" on center and laid level to provide even distribution of the effluent over the entire bed. 6. Cover - Untreated building paper or straw placed over the gravel to minimize infiltration of fines into the gravel and pipe during backfilling operation. 7. Backfill - 12 inches (minimum) to 24 inches (maximum) of on-site soil or imported wicking sand. The top 4 inches shall be a select organic topsoil. 8. If infiltrators are used, a minimum of 72 Quick 4 infiltrators will be necessary (specifications 4 — 6 arg not necessary if infiltrators are used). GENERAL NOTES 1. All construction shall be in compliance with Weld County Health Dept and State regulations. 2. Any deviation from the plan must be approved by WCHD and/or Northern Colorado Geotech prior to construction. 3. All parts of the field shall be located the minimum distances from land features including 100' from any well, pond or ditch, 20' from all dwellings and 10' from all property lines. 4. The system shall be inspected by WCHD and/or Northern Colorado Geotech during critical phases of construction. 5. Positive drainage shall be provided to minimize surface runoff from entering the system. 6. The top of the field shall be seeded or sodded with low-water demand vegetation to control erosion and aid evapo-transpiration. Large trees or shrubs should not be planted within 6 feet of the field. 7. The completed leach field should not be paved or driven over at any time. LOG OF PROFILE BORING Sheet 1 of 1 CLIENT ARCHITECT/ENGINEER Macrum Building Systems SITE 13027 Weld County Road 18 PROJECT Fort Lupton, Colorado Proposed Metal Building SAMPLES TESTS 7 L Z w w c7, z fc ADDITIONAL U LL w CC Lilo z w F DATA/ ≥ > w REMARKS ¢ ~a 0< 2 a •OK N >-u ZO cc O 0 mz z Zz 0o 6"TOPSOIL 0.5 SILTY SAND WITH GRAVEL Tan, dry, medium dense — 5— 16 1 SS 12 8.0 BOTTOM OF BORING i WATER LEVEL OBSERVATIONS Northern STARTED 6/7/06 FINISHED 6/7/06 Colorado jitil\WL None W.D. Geotech DRILL CO. Drilling Eng DRILL RIG CME-55 as WL None A.B. 2956 29th Street,Unit 21 LOGGED BY DBC APPROVED DML u Greeley,Colorado 80631 Phone: 970-506-9244 When Checked 1 Day A.B. Fax: 97D-506-9242 NCG PROJECT NO. 109-06 / \ . -. / (p (0 J O O 2 T in (° N W W H fn > z_ 0 > n 3 2 _ Z 0 S O r w o n P. (.7 F 002 I- n` 0 N W ri C O- P W 00 J§ w a O Z cc d Q m U ZF- Z c'co ce oQ 0 O _err 00 � J N K °' 2 C m `°a'(8 W D O �. ` O d 0 0 ' > O » 0 W O 47 m m. o00 V N O pai •O LLoa (3 Cl. Q � O2 SOU =U-'-' > S U 0 F-W N F- W O O C -0U CL N LL 0 0° O w g16°- oF- 0° NUN NIW z 0 Och ZQ / .ZL /2 / 0 z a 000 X4Z H 0 J ILI° LLB U CO ¢W NIW NUN Z 9 W w n co co <a O O ¢ I QC z) 0 6 ° N O / w p r 00 CJ m I I- a 0 V J W J c j ¢ O 2 < N'U O W u (5 on< a a a o t- O L., x <a soa 0 S N I a H EL W _ O / J CO > to c, a Oa > H 0 UN _ r cri W >- H ..J CD W 0 C 0 Z p CD X w -^. I to in to J O O 2 m • 6 ❑ 0 O N z 0 m P J4a 2 Q C w cc d En z W K w n v, o n 0zz O `er Foco ooq� h > z co 4 U r 0 U Z _i W o fr Oa PoOo mza- Ill z_i r -.-ar W 0> y y 3 o m O O Senn CL O -❑ h O ❑ 7 2 C N O ;a F- K¢ U w < rr W 0 N v000 ta 0 O1 O1 wz< w0 a ° w oU nddK cc 0z f) c o z co-co 0LL x O CC 0 0 r-a 0 Li U tOQ W J 0 W g p I 0 1- w ❑ U) z 6 Cl)I Co v1 J CD 0 NIW N ..ZL XdW 0 CC W 4Z ` 1 CD v z 0 w w > F > 0 < V J O ti / a w ce . a J >P O J ¢ U_ V J 0 W s 0fliZ a a a 0 m hw I- 0 0 zI N -0 N a l /z❑ 0 Z f-- W J K ❑W u \` zW a a 0 J W W Q W Q CO J W CC C7 <O W I H N❑ W(o ❑J 0 >d z cc a CO CL F J N 1 w [ 0 0 0 CD z 1 F N w w Under comment#1: 3. Under section 23-3-250.B it says "Sufficient SCREENED, off-street, paved parking areas . . . " However, under section 23-4-30-C, it says "Off-street parking spaces including access drives shall be surfaced with gravel, asphalt, concrete or equivalent . . . " All of the parking spaces shown on the site for the new buildings are either concrete paved or gravel based. In the past we have been able to use gravel as a parking lot substrate in an I-3 zoned property. 4. How was the# of required parking spaces (35) computed? There is not a classification for a shop in Appendix 23-B so I used a warehouse classification. In fact, under#3 the Planning Dept. addresses the site as an office/warehouse classification. Therefore with an office occupant load of twelve (12) and a shop occupant load of three (3) I come up with: Office = 3,360 SF/500 SF per parking space =6.72 + 6 <12/O space/2 employees)> = 12.76 Shop (Warehouse) = 9,600 SF/1,000 SF per parking space = 9.6 Total = 12.76 + 9.6—22.36 spaces required. We have 23 spaces that were shown on the plans. 8. & 9. The applicant was required to submit a landscaping plan as part of his original SPR plat in Sept. 2002 which shows the landscaping for the entire site. We are not changing any of the existing landscaping. The applicant has already installed a 6' height wood fence on top of the earthen berm (for the ditch), see page C2 for location, along most of the West side of the property. This fence will screen the new building and parking area. Under comment#2: A. Well construction and test report (enclosed). C. Weld County Road Access Information Sheet was submitted with the application but we have enclosed another copy. D. Do we have to resubmit plans to CDOT if they have already reviewed the project and provided comments (see I.). E. Paid (copy of receipt is enclosed) F. Completed (On 8/31/06, Dave Bauer told me he was satisfied with the revisions to the plans and would let the planning dept. know). G. Have not received a copy of the Weld County Building Inspection letter dated 8/21/06. H. Have not received a copy of the Platteville Irrigation & Mining Company letter dated 8/14/06. I. Have not received a copy of the CDOT letter dated 7/21/06. J. Have not received a copy of the Platte Valley Soil Conservation District referral dated 8/02/06. K. Have not received a copy of the Weld County Sheriffs Office letter dated 7/26/06. Under comment#5.: A. Have not received a copy of the Fort Lupton Fire Protection District referral dated 7/19/06. This site plan review is approved with the attached conditions: 1. Prior to recording the Site Plan Review plat, the applicant shall address the following to the Department of Planning Services' satisfaction: A. The plat shall be amended to delineate the following: 1. Off-street parking areas shall be located and screened from the public rights-of-way and adjacent properties and shall meet the requirements of Section 23-3-350.6 and Section 23-4-30 of the Weld County Code. (Department of Planning Services) See comments below#2 and#3 below. 2. Trash collection areas shall be delineated on the plat and shall be screened from public rights-of-way and adjacent properties and shall meet the requirements of Section 23-2-35011 of the Weld County Code. (Department of Planning Services) The trash pad location is shown on page C2 by Laube Engineering. The location is not visible from CR18 (South) because it is screened by the existing building and the fence on the South side of the railroad right-a-way. The location is not visible from Hwy 85 because it is screened by the new building and the 6' height solid wood fence along the West property line. The location is not visible from the property on the East side of the 100' railroad right of way because the railroad right of way East of the property has a solid wood fence along its east boundary. The location is not visible from the property to the North because it is screened by the electrical transformer that is being installed next to it and the new building. 3. The access and the equipment parking area shall be gravel, recycled crushed asphalt, or the equivalent. The office/warehouse building parking area shall be hard surfaced asphalt or concrete as in accordance with Section 23-3-350.B of the Weld County Code. (Departments of Planning Services and Public Works) The access and the equipment parking areas are shown on page C2 by Laube Engineering to be either gravel or recycled asphalt. Under section 23-3-250.6 it says "Sufficient SCREENED, off- street, paved parking areas . . . " However, under section 23- 4-30-C, it says "Off-street parking spaces including access drives shall be surfaced with gravel, asphalt, concrete or equivalent. . . " All of the parking spaces shown on the site for the new buildings are either concrete paved or gravel based. Under the initial Site Plan Review we were able to use gravel as a parking lot substrate in the 1-3 zoned property. 4. The site shall add an additional thirty five (35) parking spaces for the two new proposed buildings. The site will be required to meet all requirements of the Americans with Disabilities Act. Two (2) accessible sites shall be delineated on the plat. At least one parking space shall be van accessible. A five (5) foot wide aisle will be required adjacent to the van accessible space. The accessible path to the building and public right-of-way shall be delineated on the plat. (Departments of Planning Services, Public Works) How was the # of required parking spaces (35) computed? There is not a classification for a shop in Appendix 23-B so I used a warehouse classification. In fact, under#3 the Planning Dept addresses the site as an office/warehouse classification. Therefore with an office occupant load of twelve (12) and a shop occupant load of three (3) I come up with: Office = 3,360 SF/500 SF per parking space = 6.72+ 6 <12/(1 space/2 employees)> = 12.76 Shop (Warehouse) = 9,600 SF/1,000 SF per parking space = 9.6 Total= 12.76 + 9.6— 22.36 spaces required. We have 23 spaces that were shown on the plans. 5. There are two (2) existing accesses to the facility. The western most access is the original access, which is usually gated and locked shall be closed permanently. The newer access (eastern access) is the main access to the facility. The site shall utilize the exiting 40 foot eastern access as it is wider for the proposed use of the facility. (Department of Public Works) The Owner is concerned that if he closes off the West entrance, there will be only one emergency exit to and from the property. 6. County Road 18 is designated on the Weld County Road Classification Plan as a collector road, which requires 80 feet of right-of-way at full build out. There is presently a 60-foot right-of- way. All setbacks shall be measured from the edge of future right- of-way. The applicant shall verify the existing right-of-way and the documents creating the right-of-way. This road is maintained by Weld County. The plat shall delineate the existing 30-foot and an additional 10-foot for the future expansion of CR 18. (Department of Public Works) We will have the Civil Engineer verify the right of way documents and note them on the Site Plan Review plat. 7. Although not specifically delineated in the application documents, any on-site lighting shall adhere to the requirements of Section 23- 3-360.F and shall be delineated on the Plat. (Department of Planning Services) No site lighting is planned for the site. 8. The applicant shall submit a Landscape and Screening Plan for review and approval to address screening of adjacent properties, including State Highway 85. Due to the nature of the facility, the entire property shall be screened with an opaque screen material at least six feet in height. (Department of Planning Services) See comments below#9. 9. The applicant shall include in the Landscape Plan the following information: a. An installation schedule which specifies when the landscaping will be installed on site. (Department of Planning Services) b. A Plant Material List specifying the Botanical and Common names of all plant material to be installed; the size of the plant material at installation and whether the plant material is to be containerized or B&B. (Department of Planning Services) c. A landscape maintenance schedule which specifically states who will perform maintenance and that maintenance is on-going and shall not end upon final acceptance by the Department of Planning Services. (Department of Planning Services) d. Screened outside equipment and material storage areas shall be indicated on the plat. (Department of Planning Services) The applicant was required to submit a landscaping plan as part of his original SPR plat in Sept. 2002 which shows the landscaping for the entire site. We are not changing any of the existing landscaping. The applicant has already installed a 6'height wood fence on top of the earthen berm (for the ditch), see page C2 for location, along most of the West side of the property. This fence will screen the new building and parking area. 2. The following requirements shall be addressed prior to recording the Site Plan Review Plat: A. The applicant shall provide current evidence that the facility has an adequate water supply to the Department of Public Health and Environment and the Department of Planning Services. The applicant has submitted "permit to construct a well" #137460-A that expired in March 2004. A completed well permit was not submitted. Evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) Emailed on 9/11/06 B. The applicant shall submit a dust abatement plan for review and approval to the Environmental Health Services, Weld County Department of Public Health and Environment. Evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) I contacted the Weld County Environmental Health Services department today and left a message for Char Davis who will be back in the office next week. I have not heard of a requirement for a dust abatement plan as part of a standard site plan review for an 1-3 zoning but I will verify what the Environmental Health Services department wants. C. The applicant shall submit to the Department of Public Works a Weld County Road Access Information Sheet. Evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Works) Emailed on 9/11/06 D. The applicant shall contact the Colorado Department of Transportation (CDOT) to verify if any upgrades or improvements are needed per the U.S. Highway 85 Corridor Plan associated with the CR 18 and U.S. Highway 85 intersection. The applicant may generate an increase of heavy vehicles traffic at the intersection. The access control plan shows left turn and right turn acceleration/deceleration lanes. Evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Works) Do we have to resubmit plans to CDOT if they have already reviewed the project and provided comments (see 1. below)? E. The applicant shall pay the Department of Public Works for the drainage review. Evidence of payment from the Department of Public Works shall be submitted to the Department of Planning Services. (Department of Public Works) Emailed on 9/11/06. F. The applicant shall submit written evidence to the Department of Planning Services that all conditions and requirements as indicated in the Department of Public Works letter dated August 6, 2006 have been met. (Department of Planning Services) Per David Bauer we had met all of the Public Works Department requirements on 8/31/06. He was supposed to contact the Planning Department to release the project. G. The applicant shall submit written evidence to the Department of Planning Services that all conditions and requirements as indicated in the Department of Building Inspection letter dated August 21, 2006 have been met. (Department of Planning Services) Have not received a copy of the Weld County Building Inspection letter dated 8/21/06. H. The applicant shall submit written evidence to the Department of Planning Services that all conditions and requirements as indicated in the Platteville Irrigation & Milling Company letter dated August 14, 2006 have been met. (Department of Planning Services) Have not received a copy of the Platteville Irrigation & Mining Company letter dated 8/14/06. The applicant shall submit written evidence to the Department of Planning Services that all conditions and requirements as indicated in the Colorado Department of Transportation letter dated July 21, 2006 have been met. (Department of Planning Services) Have not received a copy of the CDOT letter dated 7/21/06. J. The applicant shall attempt to address the recommendations (concerns) of the Platte Valley Soil Conservation District as outlined in their referral received August 2, 2006. (Platte Valley Soil Conservation District) Have not received a copy of the Platte Valley Soil Conservation District referral dated 8/02/06. K. The applicant shall submit written evidence to the Department of Planning Services that all conditions and requirements as indicated in the Weld County Sheriff's Office letter dated July 26, 2006 have been met. (Department of Planning Services) Have not received a copy of the Weld County Sheriff's Office letter dated 7/26/06. L. The applicant shall submitted a Private Improvements Agreement according to policy regarding collateral for improvements and post adequate collateral for all landscaping, transportation (access drive, parking areas, etcetera) and non-transportation (plant materials, fencing, screening, water, signage etcetera). The applicant shall submit to the Department of Planning Services an itemized landscaping and sign bid for review. The agreement and form of collateral shall be reviewed by County Staff and accepted by the Board of County Commissioners prior to recording the Site Plan Review plat. Or the applicant may submit evidence that all the work has been completed and approved by the Department of Planning Services and the Department of Public Works. (Department of Planning Services) 5. Prior to the release of building permits: A. The applicant shall address the requirements of the Fort Lupton Fire Protection District as stated in their referral received July 19, 2006. (Fort Lupton Fire Protection District) Have not received a copy of the Fort Lupton Fire Protection District referral dated 7/19/06. I contacted the Fire Marshall, Larry, on 9/11/06. He wants one set of the complete building plans so he can address fire code issues. I will get him a set of the building plans when we submit for a building permit so we can get approval from them. B. A letter of approval from Fort Lupton Fire Protection District prior to obtaining a building permit. (Building Inspection) Rothauge - AmSPR 41 Page 1 of 1 Jacqueline Hatch From: Hice-Idler, Gloria [Gloria.Nice-Idler@DOT.STATE.CO.US] Sent: Thursday, September 21, 2006 3:44 PM To: Jacqueline Hatch Subject: RE: Rothauge -AmSPR 41 I love that idea, and they shouldn't object if it's true what they're saying (which is we need if for emergencies). From: Jacqueline Hatch [mailto:jhatch@co.weld.co.us] Sent: Thursday, September 21, 2006 3:42 PM To: Hice-Idler, Gloria Subject: RE: Rothauge -AmSPR 41 Thanks Gloria I am asking that the westmost access be closed unless they get something from the fire district saying they want it. If so then there should be a knox box on it and locked at all times. From: Hice-Idler, Gloria [mailto:Gloria.Hice-Idler@DOT.STATE.CO.US] Sent: Thursday, September 21, 2006 12:57 PM To: Jacqueline Hatch Cc: rcoon.macrum@comcast.netRothauge Subject: Rothauge -AmSPR 41 Jacqueline, Based upon the information provided, CDOT does not have the warrant necessary to require any improvments to the intersection of US 85 and WCR 18 as a result of this proposal. We have no comment. I apologize for not making that clearer in my referral, but I wanted to reiterate that the westmost access (the one closest to US 85)should not be used unless absolutley necessary. If you have any questions, please do not hesitate to call. Gloria Hice-Idler Access Manager CDOT Region 4 1420 2nd Street Greeley CO 80631 (970) 350-2148 09/21/2006 COLORADO DIVISION OF WATER RESOURCES Office Use Only Form GWS•45(1/2001) • DEPAPZMENT OF NATURAL RESOURCES RECEIVED . 1313 S'HERMAN ST., RM 818, DENVER, CO 80203 phone—into:(303)866.3587 main:(303)866-3581 MAR 0 1 2002 b\ fax: (303) 866-3589 http://www.water.state.co.us GENERAL PURPOSE Yi ATER REwuny o Water Well Permit Application sTAtEssw C o. Review Instructions on reverse side prior to completing form. The form must be completed In black Ink. 1. Applicant Information 6. Use Of Well (check applicable boxes) Name of applicant Attach a detailed description of uses applied for. HIED A 4 MARcIA A-• Iiof)/AUge 0 Industrial (Other(describe) •Mailing'7 address _l1iLb 1 7! Sy 4fTE 0 Municipal fne-keesq $ Ssset TA A-1/FA :as cif ��(�state zip coo 0 Irrigation I.1 A.% T.4at USS u Al (.AeuMU,v cr-n tI•.q.� W Pa$O 3 0 Commercial Bu1, a...I.( IS , Ter3an•fe O3) 6 or 9�S I - 7YD 7' 0 381-37$8 T• Well Data (proposed) ( Maximum pumping rate Annual amount to be withdrawn 2. Type f Application (check applicable boxes) /5 gpm ' acre-feet 0 Construct new well 0 Use existing well Total depth Aquifer q .,1 r Vi Replaceexisting well 0 Change or increase use 5O feet 4 AJ4X Alt s..4,4 ❑Change source (aquifer) D Reapplication (expired permit) 8. Land On Which Ground Water Will Be Used ❑Other A. Legal Description(may be provided Mtn ettechmerl: 3. Refer To (if applicable) Well permit I Water Court case I 137Yfro Designated Sealn DeterrNnatlon I Well name or I 4. Location Of Proposed Well • (If used for crop irrigation,attach a scaled map that shows irrigated area.) County� ,t C 8. r Acres C. Owner yyt,L1S J cU 1/4 of1M <J� 1/4 • y Section Township N or 5 Range E or W Principal Meridian ao a eQ❑ !o(i I 4A D. List any other wells or water rights used on this land:(es Distance of well Iron section lines(section lines are typically typically not property lines) Par 1A..',,�-41- 137'406 c 137'ICS C1(e,S Ft.from N U s a 90 Ft.1ram❑ E W 9. Proposed Well Driller License #(optional): For replacement walls only-distance and direction from old well to new wee 1O. Signature Of Applicant(s) Or Authorized Agent 9 (, feet �/FS1 direction The making of false statements herein constitutes perjury in the second Well location address Of applicable)) �j a�('1 degree, which is punishable as a class 1 misdemeanor pursuant to /3027 1a/es, eat, RA)�7 IT r/ z1I„/“ C.R.S. 24-4-104(13)(a). I have read the statements herein, know the Optional: GPS well location informatio in UTM format !o contents of and ste - they are true to • ledge. Required settings tot GPS units are as follows: Sign Rata u original aqua ate Format must be UTM -, .2/).51/0L Zone must be13 Northing Print ame a tide units moat be Mews F Et A-. Ifs - A4 g'P - Ow vt2 Datum must be NAo27(CONUSI Easting . Unit must be set to bug north Office Use Only Were points averaged?OYES ❑NO - USGS map name DWR map no. Surface elev. 5. Parcel On Which Well Will Be Located -/d • Receipt area only • A.Legal Descriptioo-imey be provided as an attachment): Invoice 8 488432 3/1/82 -- 1:58:42 PH Cashier ID: 84 • $ 20.88 Check Purchase- 88127 WE 8:l of acres in parcel C. Owner I 0 En ft I h14r2,iwa. go7.4. IWR D.Will this be the only ill on this meal? YES NO if ha-list other wells) CWCB l37Wo(. * 13790S TOPO E. State Parcel MI(optional): MYLAR' 555 DIV I WD a BA _ MD FORM PO. I WELL CONSTRUCTION AND TEST REPORT For Otte.Use any new L STATE OF COLORADO, OFFICE OF THE STATE ENGINEER RECEIVED 1 WELL PERMIT NUMBER /37 4100 -/`I MAR 15 2004 `L'OWNER NAME(S) 1 M4 /c,4 i UuGa WA(ER RESOURCES Mang Address 77 e WY STATE ENGINEER COLO. CIry,StZp L ail Mo..d ! /'.0 105.01 Phone (;03 ) vg s7` vi 71 • 3. WELL LOCATION AS DRILLED: , c W 1/4 .S cci 1/4,Sec. 20 Twp. 2- N . ,Range (O 6 6t) . DISTANCES FROM SEC. tt S;Sec. Zero ft from Sec. line. OR x{65 ft from S n ono fine and (rnwm or souaq SUBDIVISION:. • LOT BLOCK FWNG(UNTT) . STREET ADDRESS AT WELL LOCATION: 4. GROUND SURFACE ELEVATION - • ft. DRILLING METHOD n.O%vY . DATE COMPLETED Tc-u o-. 30'x.200'( TOTAL DEPTH CO ft DEPTH COMPLETED le R 5. GEOLOGIC LOG: • S.HOLE Milk DU (n) From (ft) . To(ft) Depth DDescriptionofMaterial(TWA Size,Color,Water Location) [/l 2-/i< O b - 1 Sur 'we_ So:I (— z $<tr • 4'- Y , .....0 F, t w�a,0 /ft 0vel._ . i/e-5o ["dye OD On)7.PLAIN St K�lpd CASINGS Wall Size •� From(ft) To@ /. g ,3/Z 4Z .Z- PERF.CASING: / Size : rot/0 rc Cio4w(N gal 2 j' 4'R' . It FILTER PACK . 9.PACKER PLACEMENT: Materiallebj. godly, Type. Sae 'to Interval J.0 — So Depth 10. GROUTING RECORD: _ Material Amount Density Interval Placement REMARKS: - avt-s.d 7 tact- /(, (6 7-.ZO 11,4..,.,,e_ • 11. DISINFECTION: Type StAMw t.14,0 4b,:44 4 Amt Used /Z 12 WELL TEST DATA ❑Check box t Test Data is submdted on Form No.GWS 39 Supplemental Wet Tea TESTING METHOD 3,4-h 14 N-P- r;but- f u g Static Level /11 R Date/Time rf Wee //sot of Z;vo pt... , Production Rate /5- 4I Pumping level ,�o ft.Date/Time measured !(3o/4 r(' 3.od it 4.,.� ,Test length(Ms) / hie , Remarks I have mad the atm.meb made heroin and know the cor®.n s thereof,and that they are tars to my knowledge.[Pursuant to Swam 244104(13)(a) -CAS„the making of fabe.tmenarR+herein cogs palmy in the second degree and is punishable as a clam 1 mi.a.na.rwrl CONTRACTOR �/L ®v/t- Q v,'6/r'ny 1fS ,,/ G. T4 L.— Phone bC?�.)277—L 3I T tk.No. PL 3 . MarmAd&ess 170. Do a- 639- f'rja... L'4,>> kJ' �61er4,6 �� // Name/(.4 (Please type a Signature ^-,�,4„s/' O'_ �z -. I� Y/ll/v y ftn�4„�P L, 142,k le �/,a Form No. OFFICE OF THE STATE ENGINEER t3WS-25 'COLORADO DIVISION OF WATER RESOURCES 818 Centennial Bldg.. 1313 Sherman St.,Denver,Colorado 80203 (303)866-3581 / LIC WELL PERMIT NUMBER / 3711410 - - A)" DIV. 1 WD 2 DES. BASIN MD APPLICANT APPROVED WELL LOCATION WELD COUNTY SW 1/4 SW 1/4 Section 20 FRED A&MARCIA A ROTHAUGE Township 2 N Range 66 W Sixth P.M. 7754 UTE HWY DISTANCES FROM SECTION LINES LONGMONT, CO 80503- 465 Ft.from South Section Line 290 Ft.from West Section Line (303)651-9409 UTM COORDINATES PERMIT TO CONSTRUCT A WELL Northing: Easting: ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT CONDITIONS OF APPROVAL 1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit does not assure the applicant that no injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief in a civil court action. 2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2,unless approval of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors in accordance with Rule 18. 3) Approved pursuant to CRS 37-92-602(3)(c)for the relocation of an existing well,permit no. 137460. The old well must be plugged in accordance with Rule 16 of the Water Well Construction Rules within ninety(90)days of completion of the new well. The enclosed Well Abandonment Report form must be completed and submitted to affirm that the old well was plugged. 4) The use of ground water from this well is limited to drinking and sanitary facilities as described in CRS 37-92-602(1)(c), for a commercial business. Water from this well shall not be used for lawn or landscape irrigation or for any other purpose outside the business building structure. 5) Production is limited to the alluvium. The depth of this well shall not exceed 50 feet or the depth at which sandstone or shale is first encountered,whichever conies first. 6) The maximum pumping rate of this well shall not exceed 15 GPM. 7) The maximum annual amount of ground water to be diverted by this well shall not exceed 1 acre-foot. 8) This well shall be constructed not more than 200 feet from the location specified on this permit. 9) A totalizing flow meter must be installed on this well and maintained in good working order. Permanent records of all diversions must be maintained by the well owner(recorded at least annually)and submitted to the Division Engineer upon request. 10) The retum flow from the use of this well must be through an individual waste water disposal system of the non-evaporative type where the water is returned to the same stream system in which the well is located. The maximum consumptive use of ground water shall not exceed 10 percent. \ NaJ 3111102- APPROVED yed 21 a • JMW `" �.•1il� u j State Engineer •y�r� B Receipt No.0488432 DATE ISSUED MAR 2 2 2(x2 EXP ' TION DATE MAR 2 2 2 srr'l, Weld County Public Works Department `� 1111 H Street Mailing Address: j Greeley, CO 80632 P.O. Box 758 IO ��. Phone: (970) 356-4000 x3750 Greeley, Colorado 80632 or (970) 304-6496 CORADO FAX: (970) 304-6497 MACRU:\1 CUILDING SYSTEMS APrr,OVED ACC RECEIPT PROJECT b ,9-fdg-E. DATE -02 CODE 105° Application/Permit Number: NP06-00093 Application/Permit Type: Miscellaneous/NA Applicant Name: Fred Rothauge/Macrum Building Systems Inc. Applicant Address: 1307 WCR 18 Fort Lupton, CO 80621 Receipt Number: 1255 Payment Method: Check Reference Number: 27443 Amount Paid: $180.00 Payment Date/Time: 08/24/06 02:08:57 Cashier: Mad Caudill Comments: Storm Water Permit 2nd AmSPR-41 18108-D Version 4.0 • http://accela-web.co.weld.co.us/operations/permit/index.cfm?FUSEACTION=ShowPayDe... 8/24/2006 Gas shut off: 1:147 SSOe eF OatlCi Exterior water shutoff: Ep>T ,$tpc of oFflt[ tenor water shutoff: _ WELD COUNTY ROAD ACCESS INFORMATION SHEET Weld County Department of Public Works 111 H Street, P.O. Box 758, Greeley, Colorado 80632 Phone: (970 )356-4000, Ext. 3750 Fax: (970) 304-6497 :, Road Flie#: Date: RE# : Other Case#: 1. Applicant Name Fitz i 1aac3A 1Z0TNAVOI: Phone (303)&51- `WIi Address 13031 wCR IS City FIAT LueTo,. State Co Zip ao6zl 2. Address or Location of Access 13O71 4+ak 1$ Section 2O Township Za Range `b tJ Subdivision NrR Block "IA Lot rulA Weld County Road #: IS Side of Road NoeTH Distance from nearest intersection 111 Ms1.E 3. Is there an existing access to the property? Yes X No #of Accesses 4. Proposed Use: 2I Permanent ❑ ResidentiaVAgricultural ❑ Industrial O Temporary ❑ Subdivision at Commercial ❑ Other *******************************************************It*************************************************** 5. Site Sketch Legend for Access Description: AO = Agricultural L._ RES = Residential '4 = Oi&Gas f = Ditch Road = House O = Shed SxiF Q =Proposed Access • =Existing Access 1.2 -r1,44 Ni tacit l *************************************** OFFICE USE ONLY: Road ADT Date Accidents Date Road ADT Date Accidents Date Drainage Requirement Culvert _ Size Length Special Conditions ❑ Installation Authorized Q Information Insuflicient -6- Mar 12 04 04: 32p p.3 usax N0L WELL COKSTRUCTION AND I ES i REPORT For Office Use orOy OWS31 3064 STATE OF COLORADO,OFFICE OF THE STATE ENGINEER 1 wai Po yr NURIBER R 7 440 -n OWNER NAME(S), i and ; • Kis !l(t60_ Mang Address 7 7 Clht,St.Zp G t i o SQSQ3 Phone (3a3 ) vff ST^ Y/?/ _ _ a WELL LOCATION AS DRLL ; C 1/4. .5(.../1/4,Sec. 2-0 Pap_ 2- ICJ ,Range /o 6 W ' DISTANCES FROII SEC. S: ft. from 55 lie. and 2, ft.from lc, avow, sec.Brie.. oR -tnatureritunr woe SUBDMSIOfN LOT BLOCK FAJNG(UNTT) STREET ADDRESS AT WELL LOCATION: • 4. GROUM)SURFACE ELEVATION ft DRILLING METHOD 4' ry DATE COMPLETED""`KR � 3 �u� 'TOTAL DEPTH 5-0 DEPTH COMPLETED ft. 5. GEOLOGIC LOCH • 6.HOLE DIAfL(in.) From (It) To(ft) Oeplh Oes«ipfoe d Maeortel(typo.Sim,Color.Meet Location' /J 4 S0 s-vy_b _t „ r Yom S IS �f • i(r-5g et 7:PLAIN CAS OD/X(n) Wall Si e From �p s r 31 • PEFtF.CASING:Screen Slot Size: ,O I fir- S{ ;H� 4.Q z1 tF8 8.FLIER PACK: . 9_PACKER PLACEMENT: Material eije), it(ar't-•p... Type Size (u- 2'v interval__A Depth 10. GROUTING RECORD: Material Amount Demly, Interval Placement REMARKS: - 7 41.. -- /!o 1 7-20 7�-- 11, DISINFECTION: Type ('a w N410 l a ,1'=a /67 Amt Used 'Z• pce - 'o.2. WEB TEST OAT& El Check box I Test Data is submitted on Form No.GINS 39 Supplemental Weil Test. TESTING I E'THOD s 4 hsi.,- -v'4o.•-- fJ33 Steak Level ed lb" Q Bate f Tirtke mea rid/ to =uv p N..,Prociuttkxt Rate / cgpm. Pumpingtt;rriei o ft Date/TTno messtzed /14o/Q 3:vo (. ,Test length Qtrs.) / h� FielMatiCS t bays tad Si.eztartiwwits wade herein and Ithow the eeeteett thereof.and flat flay we true b my knowledge. [Krum*to Section 24-4-104(13)(al C.R.S.,Si.milking at seise statements honks oanelibik»palmy in the wend degree and is punishable a a cues t miedenre enor_} CONTRACTOR ®r, (1;14 �� rS �w. T t�,. Phone(62•'')277—2 3 i I tic.No. 2C.3 . ANN Adam 0 i.34? Cam' dia Ci�� , 7' 4 Name/Tyne(Please type Or p Sicgnaatce444," Date Y//270,/ Weld County Planning Department SOUTHWEST BUILDING GENERAL CONTRACTORS SEP 2 6 2096 Commercial & Industrial BUILDING SYSTEMS, INC. Design -Build RECEIVED 916 38th Avenue Court G Greeley,Colorado 80634 (970)353-7364 FAX(970)353-2393 September 25, 2006 Kim Ogle Weld County Planning and Zoning 4209 County Road 24'A Longmont,CO 80504 Re: Fred and Marcia Rothauge, Parcel#130920000012 Dear Kim: As we discussed on the phone, I am requesting a Footing &Foundation Permit on the above described property. It appears an amended AMSPR-41 was submitted on July 14, 2006. Please expedite as the steel building package is already on the ground and has been for some time. Respectfully,Oa_ Le Ed Dolan (for Robert Coon) Project Manager IA-. CIFt. Luton O b4 11 1/) Tort Lupton Tire (Protection District a 1121 Denver Ave. Emergency 911 i__N 'Fort Lupton, CO 80621 Office 303-857-4603 m� . Talc 303-857-6619 "Wit DEO Septem6er28, 2006 Erect I received the plans for the Ted and Marcia 1Rgthauge Project and can find no Fire Code issues at this time. I understand they would like to start the foundation workon the shop and office. Larry Rjchardson Fire Marshal Page 1 of 1 Jacqueline Hatch From: Jacqueline Hatch Sent: Tuesday, October 03, 2006 9:30 AM To: Charlotte Davis Subject: RE: 2nd AMSPR-41 Rothauge Project Char, I spoke to Dawn with the State of Colorado Division of Water Resources and she says the permit is okay. I will put this note in our file. Thanks From: Charlotte Davis Sent: Monday, October 02, 2006 4:37 PM To: Jacqueline Hatch Subject: 2nd AMSPR-41 Rothauge Project Jacqueline, I am in receipt of a Dust Abatement Plan for 2nd AMSPR-41. The plan has been reviewed, approved and the condition can be removed. I still have questions regarding the well permit. Everything that has been sent so far is a"permit to construct a well". If they have completed the well and everything has been approved then they should have received or should ask for a Well Permit it may read "Permit to use an existing Well" or something similar. Any other ideas? Regards, Char 10/03/2006 GENERAL CONTRACTORS Commercial& Industrial l'iBUILDING SYSTEMS, INC. Design - Build 916 38th Avenue Court Greeley,Colorado 80634 (970)353-7364 FAX(970)353-2393 October 3, 2006 Weld County Planning and Zoning 4209 County Road 24 1/2 Longmont, CO 80504 RE: Fred & Marcia Rothauge Project Dear Jacqueline Hatch, Please find enclosed two copies of the revised civil drawings and the drainage report by Laube Engineering, LLC that address the site plan review referral comments for the 2nd AMSPR-41 project The following comments are the actions that have been completed to address the referral comments: 1. A 6' height wood privacy fence on the North side of the property has been shown to screen the parking and drive areas from the property to the North. We showed the existing wood privacy fence on the East and South sides of the Union Pacific Railroad right of way. The existing landscaping has been shown on the plans. 2. We showed a 6' height cedar trash fence around the trash pad on the North, East and South sides. 3. We showed three paved parking on the 30'approach pad on the West side of the shop and we paved three spaces on the East side of the office. All parking spaces will have wheel blocks or bumpers installed. 4. The future paved parking spaces for the future warehouse, not included in this permit, have been shown on the civil drawings. 5. The West access will be closed per the plans. 6. We showed on the civil drawings an additional 10'of right-of-way on the North side of WCR18. 7. We added a comment on the site plan that addresses that we have lights on the exterior of the building only and that they will not project light over the property line. 8. The existing landscaping has been shown on the civil drawings along with the existing fence on the East and the new fence on the North. 9. The existing landscaping has been shown on the civil drawings. 10. I emailed the water well information from the Colorado Division of Water Resources to Jacqueline Hatch on 9/21/06. 11. I emailed a dust abatement plan to Jacqueline Hatch on 9/21/06. 12. I emailed the Weld County Road Access Information Sheet to Jacqueline Hatch on 9/11/06 13. Gloria Hice-Idler with CDOT said she had no additional concerns regarding the project. 14. I emailed the Public Work Department receipt to Jacqueline Hatch on 9/11/06. 15. The civil drawings and the drainage report address the Department of Public Works concerns. 16. The Building Plans are currently being reviewed by the Weld County Building Department. 17. We will not be putting storm-water runoff into the Platteville Irrigation & Milling Company ditch. 18. The West drive will be closed so no additional traffic will be created from it. 19. We will comply with the Platte Valley Soil Conservation District's recommendations for re-seeding and soil erosion protection (see civil drawings). 20. We acknowledge the Weld County Sheriff's Department's offer for a site security consultation. 21. The Fort Lupton Fire Department is currently reviewing the project. Please let me know of any other issues or concerns that need to be addressed so we can get the full building permit released. If you have any questions, please give me a call or email me. Respectfully, / J ` (-- Robert Coon General Manager 10/24/2008 10 42 FAH _..._..._..__-..._ w ........� _ ....,...,... • • • October 19, 2006 To: Weld County Planning and Zoning 4209 County Road 24 A Longmont, CO 80504 From: Fred Rothauge 13027 Weld County Road 18 Fort Lupton, CO 80621 RE: Fred & Marcia Rothauge Project Dear Jacqueline Hatch, This letter is per your request, to inform you that at the time of the issuance of the building permits we will comply with all current building codes as adopted by the Weld County departments and organizations having jurisdiction on the project. If you have any questions, please give me a call. Res III" red Rothauge Owner MEMORANDUM TO: Jacqueline Hatch, Planning Services DATE:10/26/2006 FROM: Donald Carroll, Engineering Division Manager SUBJECT: 2"d AmSPR-41, Fred & Marcia Rothauge The applicant has provided a revised set of drawings dated October 2, 2006. I have reviewed the access, the off-street parking, and circulation. These items have been addressed and are acceptable. The storm water drainage plan and report was forwarded to Dave Bauer, Drainage Division. Dave will review the plan and drawings. The applicant shall contact the Drainage Division to obtain a sign-off for storm water drainage. pc: 2nd AmSPR-41 M:\PLANNING-DEVELOPMENT REVIEW\SPR-Site Plan Review\2nd AmSPR-41-D.doc —, Weld County Planning Department GREELEY OFFICE 00 0CT 2 6 7006 alp it' RECFWPD TO: J. Hatch, Planning Department DATE: 25-October-2006 W� � D. Carroll,Public Works Department • FROM: D. Bauer,Public Works Departmentiig COLORADO SUBJECT: 2n°AmSpr-41 —Rothauge site—Revised drainage report Weld County Public Works Department has reviewed the revised drainage report and plan prepared by Laube Engineering for the Fred and Marcia Rothauge site located at 13027 WCR 18, Fort Lupton, CO dated July 6, 2006, revised August 23, 2006, and revised again October 3, 2006. Comments ❑ All drainage facilities including channels, swales, and detention ponds must be in dedicated drainage easements shown on the Final Plat. ❑ The applicant's engineer has submitted a drainage report and plan that does not include proposed detention of stormwater runoff per Weld County Code (Chapters 24-7-130, 23-2-150 (N), 23-2-750, 8-7-440, and Ordinance 2003 -2, and Ordinance 2006-7). Per the Code, applicant's design is required to detain the runoff from the 100-year storm from the developed site and release the detained runoff at a rate not to exceed the runoff from the undeveloped site. The drainage report and plans dated July 6, 2006, prepared and submitted by Laube Engineering proposes stormwater retention; therefore, a variance from County Code has been requested. O The Laube Engineering revised drainage report and plans now show a retention pond with 1.5 times the 100-year storm runoff volume. ❑ As designed, the retention pond will drain in less than the maximum allowable 72 hours specified in Ordinance 2006- 7,and is therefore acceptable providing the BOCC grant the variance. ❑ Weld County will not maintain drainage easements, stormwater detention ponds, channels, swales or drainage related areas. Maintenance of all drainage facilities shall be the responsibility of the property owner or successor. Please add a note to the drawings and Final Plat so stating. Recommendation o The revised drainage report and plans have addressed the prior comments from Public Works. Approval of the revised drainage design is appropriate providing that the BOCC grant the requested variance and provided that all drainage facilities, including channels, swales, and the retention pond, are shown in dedicated drainage easements on the Final Plat. M)PLANNING—DEVELOPMENT REVIEWAmSPR-Amended Svc Plan Revie*An,SPR-0I.Rothauge 2,,dAmSPR<I-RONauXeGamage-2 qw Page 1 Hello