Loading...
HomeMy WebLinkAbout20061657.tiff WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND FELSBURG HOLT&ULLEVIG DATED: 5/44l.• Work Order Number: FHU-6 Project Title: Biological Field Work—Public Works Operations Division 07 Bridge Replacement Commencement Date: May 31,2006 Completion Date: January 15, 2007 Limitations on compensation: Not to Exceed$49,900(See attached cost details) Project Description: Weld County Public Works Operations Division is replacing eight bridges scheduled during 2007. Environmental clearances are required before construction begins. Scope of Services: See attached Scope of Work Professional agrees to perform the services The attached forms are hereby accepted and identified above and on the attached forms in incorporated herein, by this reference, and accordance with the terms and conditions Notice to Proceed is hereby given. • contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld County terms of the Professional Services Agreement and this work order (including the attached By: forms) the Professional Services Agreement Project Manager shall control. Date: Professional By: De H d Felsburg Holt&Ullevig Date: ' / 6300 South Syracuse Way, Suite 600 Centennial,C 80111 By: Dire for of Finance and Administration By: i, S 2; Date: 1 D War en 06 19 2006 Title: I Y;^6• S I By: � tt+�'n% Chairman, el ounty Com ssioners Pro—Tem Date: S' 10-06 ��".� idetLe%`� Date: David E. Lon 0 /19/2006 C 'STING TO BOARD OF COUNTY UA1SSIONER SIGNATURES ONLY z v,K M:4-Active Projects\Mist Projects\Engineering of W:n:' ontract\Work Order 6-Wayne\Work Order N Env$ervices 07 Bridge Replacementdoc ATTEST: g / WELD OUNTY CLERK TO THE BOARD t✓lo BY: tik ., DEP CLERPE'T0 THE BOARD Ee evs 5/ ob--1 ef-G'/s (l: Ad flu -/65 7 O7-/c -G,4, FELSBURG (EHOLT & ULLEVIG engineering paths to transportation solutions May 9 2006 Mr. Wayne Howard Weld County Public Works Department P.O. Box 758 Greeley, CO 80632 RE: Biological Field Work—8 Bridges Work Order 6 Proposal for Professional Services Dear Mr. Howard: Felsburg Holt & Ullevig is pleased to submit this proposal as part of our on-call services contract with Weld County. This task-order involves Darcy Tiglas to provide you biological work for eight county bridges. The effort will primarily involve Darcy's efforts, but we have also incorporated a small amount of time to administer the task order. The following budget is proposed: • FHU Effort—6 hours fora principal, $150/hour: $900 • Tiglas Effort—See attached proposal from Darcy Tiglas: $49,000 From this, we have established a total of budget of$49,900 to complete the effort per Darcy's attached scope of work. Should other services be required not anticipated at this point, we will submit a separate proposal for the additional work. If the scope and budget presented here (and in the attachment) is acceptable to you, please sign below and return one copy to serve as a letter of agreement for this task order. If you have any questions, please feel free to call. Also, feel free to call Darcy directly if needed. Sincerely, /^ FELSBURG HOLT & ULLEVIG ' i4 / �'ZA ( F4 Acceyttil By Christopher J. Fasching, P.E. Title Principal S /,o lU� Date / 6300 South Syracuse Way, Suite 600 Centennial, CO 80111 tel 303.721.1440 fax 303.721.0832 www.fhueng.com info@fhueng.com DARCY A.TIGLAS 5015 Swainsona Drive Loveland,Colorado 80537 970-635-9183 May 1, 2006(Revised May 3, 2006) Mr. Christopher J. Fasching,PE Felsburg Holt&Ullevig 6300 South Syracuse Way, Suite 600 Centennial, CO 80111 RE: Proposal for Biological Field Work for Weld County Bridges 3/38A, 12/29.5A, 24.5/25.5A,45/6A,50/59A,50/57A,52/13A, and 87/42.5A Under Work Order No. 6 Dear Mr.Fasching: This letter serves as a proposal for biological field work at a number of bridges in Weld County. Tasks include wetland delineations, Preble's meadow jumping mouse live trapping (ZAPR), Preble's meadow jumping mouse habitat evaluations, Ute ladies'-tresses orchid field surveys (SPDI), Ute ladies'-tresses habitat evaluation, 404-wetland permitting, and applications for extensions to previously obtained clearances and permits. I understand that the scope of work for each bridge is as follows: Bridge 3/38A • Wetland Delineation- $1500 • ZAPR Habitat Evaluation-$1500 • SPDI Habitat Evaluation-$1500 • 404-Wetland Permit-$1000 ASO0 Bridge 12/29.5A • Wetland Delineation-$1500 • ZAPR Live Trapping-$4250 • SPDI Survey-$2000 • 404-Wetland Permit-$1000 118 7So Bridge 24.5/25.5A • Wetland Delineation-$1500 • ZAPR Habitat Evaluation-$1500 • SPDI Habitat Evaluation-$1500 • 404-Wetland Permit-$1000 SS00 Mr. Christopher J. Fasching Page 2 Bridge 45/6A • Wetland Delineation-$1500 • ZAPR Habitat Evaluation-$1500 • SPDI Habitat Evaluation- $1500 • 404-Wetland Permit- $1000 ,s-soe Bridge 50/59A • Wetland Delineation-$1500 • ZAPR Habitat Evaluation-$1500 • SPDI Habitat Evaluation- $1500 `kg-S00 • 404-Wetland Permit- $1000 Bridge 50/57A • Wetland Delineation-$1500 • ZAPR Live Trapping- $4250 • SPDI Survey- $20007s-d • 404-Wetland Permit- $1000 Bridge 52/13A • Wetland Delineation-$1500 • ZAPR Live Trapping- $4000 ,16 • SPDI Survey- $2000 raced • 404-Wetland Permit- $1000 Bridge 87/42.5A • Field Check Wetland Delineation Information from 2002 and apply for extensions to PMJM and SPDI clearances along with extension for the 404-Wetland Permit- $1000 The cost estimates include the tasks outlined above and drafting, review, and other direct costs associated with the individual tasks. If you have any questions, or require additional information, please feel free to call me at 970-635-9183. Sincerely, Darcy A. Tiglas Project Manager,Tiglas Ecological Services KitMEMORANDUM CTO: Clerk to the Board DATE: 6/13/2006 FROM: Perry Eisenach, Engineering Division Manage COLORADO SUBJECT: Agenda Item Work Order Pursuant to an Agreement with Felsburg Holt&Ullevig(FHU-6)for Biological Field Work for Public Works Operations Division on the 2007 Bridge replacements. The appropriate documentation is attached. Enclosures pc: Wayne Howard, Senior Engineer M:\FrancietAgenda Item.doc I,2 LIT-1,C AI \`(Ida Zoos-�ss� Y a . BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: Work Order for FHU—Environmental Clearances for 2007 Bridge Replacements DEPARTMENT: PUBLIC WORKS DATE: June 5,2006 PERSON REQUESTING: Perry Eisenach,P.E., Engineering Division Manager y� Brief description of the problem/issue: The attached Work Order for FHU in the amount of$49,900 would authorize Darcy Tiglas to complete the necessary environmental work and clearances required for the eight (8)bridge replacements currently scheduled to be completed by County crews in FY2007. These environmental clearances must be completed before construction begins. What options exist for the Board? (Include consequences,impacts,costs,etc. of options) Option#1: Approve the work order. This approval would allow for the environmental clearances to be completed in time for County crews to begin the bridge replacements for FY2007. Option #2: Not approve the work order. This could delay County crews in beginning the FY2007 bridge replacements under their current schedule. Recommendation to the Board: Public Works recommends approval of this Work Order and requests signature on the enclosed Exhibit "A" Work Order form. Thank you for your consideration. Approve Schedule Recommendation Work Session Other Geile Vaad 7 Jerke Long v Masden Ni Attachments cc: Hello