HomeMy WebLinkAbout20060536.tiff • WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND FELSBURG HOLT&ULLEVIG DATED: Q[�' Work Order Number: FHU-3 Project Title: Environmental Analyses; WCR 40.5 at Big Hollow East and WCR 74 west of Severence Commencement Date: February 13,2006 Completion Date: Approx. June 2,2006 Limitations on compensation: Not to Exceed $11,405 (See attached Scopes) Project Description: Wetland Delination, Prebles' Meadow Jumping Mounse Evaluation, Ute Ladies- Tress Orchid Evaluation, 404-Permit Application Preparation for Both Projects Plus a Burrowing Owl Survey for WCR 74 project. Scope of Services: See attached Scopes of Work Professional agrees to perform the services The attached forms are hereby accepted and identified above and on the attached forms in incorporated herein, by this reference, and accordance with the terms and conditions Notice to Proceed is hereby given. contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld County terms of the Professional Services Agreement and this work order (including the attached By: forms) the Professional Services Agreement Project M ger" G�[� shall control. Date: Professional By: , Depa en ad Felsburg Holt&Ullevig Date: 6300 S. Syracuse Way, Suite 600 Centennial, O 80111 /q/ By: . C q By: � (` ICJ- "V"�"� Date:Direc orl EBm4 c U dministration Title: Y` a BY Oiil� Chairma Weld Count Commissioners Date: 2- 7 - 06 Date: FEB 2 2 2006 ATTESTING TO BOARD OF COUNTY 4n COMMISSIONER SIGNATURES ONLY EST: ga l EL COUNTY CLERK 0 THE BOARD • DEP TY CL K TO THE MD E .C?Os ;)bn, 00 ', 1 k), PA- FELSBURG HOLT (Sk, ULLEVIG engineering paths to transportation solutions February 7, 2006 Mr. Wayne Howard Weld County Public Works Department P.O. Box 758 Greeley, CO 80632 RE: Wetland Delineation, Preble's Meadow Jumping Mouse Evaluation, Ute Ladies-Tresses Orchid Habitat Evaluation &404 Permit for WCR 40.5 & WCR 74 Near Severance Proposal for Professional Services Dear Mr. Howard: Felsburg Holt& Ullevig is pleased to submit this proposal as part of our on-call services contract with Weld County. This task-order involves Darcy Tiglas to provide you several environmental services in support of two projects. The effort will primarily involve Darcy's efforts, but we have also incorporated a small amount of time to administer the task order. The following budget is proposed: • FHU Effort— 3 hours fora principal, $135/ hour: $405 • Darcy Tiqlas Effort—See attached proposal from Darcy Tiglas: $11,000.00 From this, we have established a total of budget of$11,405.00 to complete the effort per Darcy's attached scope of work. Should other services be required not anticipated at this point, we will submit a separate proposal for the additional work. If the scope and budget presented here (and in the attachment) is acceptable to you, please sign below and return one copy to serve as a letter of agreement for this task order. If you have any questions, please feel free to call. Also, feel free to call Darcy directly if needed. Sincerely, FELSBURG HOLT& ULLEVIG 7/ /V114411 i „t y ( ) ' Accept By 1 �T+�'�kit) Sr. �i. 5 . Christopher J. Fas hing, P.E. Title Principal 2/0o. Date 6300 South Syracuse Way, Suite 600 Centennial, CO 80111 tel 303.721.1440 fax 303.721.0832 www.fhuent.com info@lnueng.com • DARCY A. TIGLAS D 5015 Swainsona Drive FEB - 1 2006 Loveland, Colorado 80537 970-635-9183 L FELSBURG,HALT&ULLEwG January 30, 2006 Mr. Christopher J. Fasching, PE Felsburg Holt& Ullevig 6300 South Syracuse Way, Suite 600 Centennial, CO 80111 RE: Proposal for Wetland Delineation, Preble's Meadow Jumping Mouse Habitat Evaluation, Ute Ladies-tresses Orchid Habitat Evaluation, and 404-Permit Application Preparation for a Road Improvement Project along Weld County Road 40.5 at Big Hollow East of Berthoud, CO Dear Mr. Fasching: This letter serves as a proposal for a wetland delineation, Preble's meadow jumping mouse habitat evaluation, Ute ladies'-tresses habitat evaluation, and 404-wetland permit application preparation to be completed at a road improvement project site along Weld County Road 40.5 at Big Hollow. I understand that the scope of workfor the wetland delineation would include: • ground reconnaissance of the project area that includes at least four separate wetland sites; • determination of wetlands at project area, including plant species lists, hydric soils determination, and wetland hydrology presence; • photograph wetland communities, if present, at the project area; • prepare report of results of the wetland delineation; • submit report to Weld County and the U.S. Army Corps of Engineers (COE); and • forward COE correspondence to Weld County. I understand that the scope of work for the Preble's meadow jumping mouse habitat evaulation would include: • ground reconnaissance of the project area; • evaluation of habitat at the Big Hollow crossing for the Preble's meadow jumping mouse, including the quality and quantity of habitat present at the site, and its likelihood of the mouse occurring within the project area; • evaluation of the isolation or connectivity of the project site to other potential habitat; • history of the mouse's occurrence in the immediate area or within the drainage; • evaluation of the nature of any proposed development project within the potential mouse habitat; Mr. Christopher J. Fasching Page 2 • evaluation of the potential extent of direct, secondary, or cumulative impacts the project may cause; • prepare a written report for submission to the U.S. Fish and Wildlife Service for their concurrence with our evaluation; and • submission of report to Weld County. I understand that the scope of work for the orchid habitat evaluation includes: • conduct habitat evaluation survey for the Ute ladies'-tresses orchid outside of the flowering period; • ground reconnaissance of the project area; • evaluation of habitat at both crossings for the orchid, including the quality and quantity of habitat present at the site, and its likelihood of the orchid occurring within the project area; • evaluation of the isolation or connectivity of the project site to other potential habitat; • evaluation of the potential extent of direct, secondary, or cumulative impacts the project may cause; • prepare a written report for submission to the U.S. Fish and Wildlife Service for their concurrence with the habitat evaluation; and • submission of report to Weld County. • I understand that the scope of work for the permit preparation would include: • preparation of the appropriate permit application, probably a Nationwide 3 Permit, based on wetland and Waters of the United States acreage and/or purpose for permit at Big Hollow along Weld County Road 40.5; and • forward COE correspondence to Weld County. The estimated cost for the wetland delineation, Preble's meadow jumping mouse habitat evaluation, Ute ladies'-tresses habitat evaluation, and 404-wetland permit preparation for this project would be $1,500.00, $1,500.00, $1,000.00, and $1,000.00 total fixed cost, respectively. The cost estimates include the tasks outlined above and drafting, review, and other direct costs. If you have any questions, or require additional information, please feel free to call me at 970- 635-9183. Sincerely, 100./Dia ' Darcy A. Tiglas Project Manager, Tiglas Ecological Services DARCY A. TIGLAS 5015 Swainsona Drive Loveland, Colorado 80537 970-635-9183 January 30, 2006 Mr. Christopher J. Fasching, PE Felsburg Holt& Ullevig 6300 South Syracuse Way, Suite 600 Centennial, CO 80111 RE: Proposal for Wetland Delineation, Preble's Meadow Jumping Mouse Habitat Evaluation, Ute Ladies-tresses Orchid Habitat Evaluation, 404-Permit Application Preparation, and a Burrowing Owl Survey at a Prairie Dog Site near Windsor Reservoir for a Road Improvement Project along Weld County Road 74 at the Windsor Reservoir Outlet (Greeley No. 2 Canal) south of Thompson Lake west of Severence, CO Dear Mr. Fasching: This letter serves as a proposal for a wetland delineation, Preble's meadow jumping mouse habitat evaluation, Ute ladies'-tresses habitat evaluation, 404-wetland permit application preparation, and a burrowing owl survey (near Windsor Reservoir, proper) to be completed at a road improvement project site along Weld County Road 74 at the Windsor Reservoir Outlet (Greeley No. 2 Canal) south of Thompson Lake. I understand that the scope of work for the wetland delineation would include: • ground reconnaissance of the project area that includes at least four separate wetland sites; • determination of wetlands at project area, including plant species lists, hydric soils determination, and wetland hydrology presence; • photograph wetland communities, if present, at the project area; • prepare report of results of the wetland delineation; • submit report to Weld County and the U.S. Army Corps of Engineers (COE); and • forward COE correspondence to Weld County. I understand that the scope of work for the Preble's meadow jumping mouse habitat evaulation _ would include: • ground reconnaissance of the project area; • evaluation of habitat at the Windsor Reservoir Outlet, the concrete-lined ditch to the east of the outlet, and the wet meadow below Thompson Lake to WCR 74 (the lake is clearly leaking surface and subsurface water) for the Preble's meadow jumping mouse, including the quality and quantity of habitat present at the site, and its likelihood of the mouse Mr. Christopher J. Fasching Page 2 occurring within the project area; • evaluation of the isolation or connectivity of the project site to other potential habitat; • history of the mouse's occurrence in the immediate area or within the drainage; • evaluation of the nature of any proposed development project within the potential mouse habitat; • evaluation of the potential extent of direct, secondary, or cumulative impacts the project may cause; • prepare a written report for submission to the U.S. Fish and Wildlife Service for their concurrence with our evaluation; and • submission of report to Weld County. I understand that the scope of work for the orchid habitat evaluation includes: • conduct habitat evaluation survey for the Ute ladies'-tresses orchid outside of the flowering period; • ground reconnaissance of the project area; • evaluation of habitat at both crossings for the orchid, including the quality and quantity of habitat present at the site, and its likelihood of the orchid occurring within the project area; • evaluation of the isolation or connectivity of the project site to other potential habitat; • evaluation of the potential extent of direct, secondary, or cumulative impacts the project may cause; • prepare a written report for submission to the U.S. Fish and Wildlife Service for their concurrence with the habitat evaluation; and • submission of report to Weld County. I understand that the scope of work for the permit preparation would include: • preparation of the appropriate permit application, probably a Nationwide 3 Permit, based on wetland and Waters of the United States acreage and/or purpose for permit at the Windsor Reservoir Outlet and the unnamed irrigation ditch as well as the wet meadow community below Thompson Lake; and • forward COE correspondence to Weld County. I understand that the scope of work for the burrowing owl survey would include: • field reconnaissance and windshield survey of the black-tailed prairie dog town north of WCR 74 just south of Windsor Reservoir east of WCR 19 for burrowing owls just before road improvement work begins if work is conducted between April 1 and September 30; and • if burrowing owls are determined to be present, consultation with the Colorado Division of Wildlife for impacts analysis or imposition of a timing restriction within the immediate area of the town. Mr. Christopher J. Fasching Page 3 • if burrowing owls are determined to be present, consultation with the Colorado Division of Wildlife for impacts analysis or imposition of a timing restriction within the immediate area of the town. The estimated cost for the wetland delineation, Preble's meadow jumping mouse habitat evaluation, Ute ladies'-tresses habitat evaluation, 404-wetland permit preparation and burrowing owl survey for this project would be $2,000.00, $1,500.00, $1,000.00, $1,000.00, and $500.00 total fixed cost, respectively. The cost estimates include the tasks outlined above and drafting, review, and other direct costs. If you have any questions, or require additional information, please feel free to call me at 970-635-9183. Sincerely, (DORN U . d Darcy A. Tiglas Project Manager, Tiglas Ecological Services LH- MEMORANDUM ' TO: Clerk to the Board DATE : February 15, 2006 C. COLORADO FROM: Frank B. Hempen, Jr., P.E. Director of Public Works/County Engineer SUBJECT: Consent Agenda Item Work Order Pursuant to an Agreement between Weld County and Felsburg Hold & Ullevig for Environmental Analyses on WCR 40.5 at Big Hollow East and WCR 74 west of Severance not to exceed $11,405. Enclosures pc: Perry Eisenach, Engineering Division Manager Wayne Howard, Project Manager Mona Weidenkeller M:\Francie\AgendaSignature.DOC J 2006-0536 7 (22 ( 7c L: BOARD OF COUNTY COMMISSIONERS l 'g ib il V ED ill FEB EB 1 5 ?r05 RE: On-Call Engineering Services / Environmental Investigation ? '/GELD COUNTY PUBLIC WORKS DEPT SESSION REVIEW/WORK REQUEST DEPARTMENT: PUBLIC WORKS DATE: February 8,2006 PERSON REQUESTING: Frank B. Hempen, Jr., P.E., Director of Public Works/County Engineer tfi Brief description of the problem/issue: The Public Works Department is currently designing the intersection of WCR 74 and WCR 19 and three miles of WCR 40.5 and WCR 5 just south of SH 56. Environmental clearances are required prior to construction. We have reviewed the projects with Darcy Tiglas, subconsultant to FHU who is currently contracted with PW for On-Call Engineering Services. Attached is Work Order No. 3 with the proposed scope of work and cost estimates for the work. The costs for these services have been budgeted for in the 2006 budget and are consistent with work performed on previous projects. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) The options for the Board are to accept the proposal from FHU and proceed with the work or not accept the proposal from FHU, which will have a direct impact on meeting the project construction deadlines. All projects above are scheduled for 2006 construction. Darcy Tiglas has performed most environmental clearances for PW projects in the past at costs equal to those proposed. Recommendation to the Board: Recommend Option 2. I recommend approving Work Order No.3 and proceeding with the work. ,- Initial: Approve Schedule Recommendation Work Session Other Geile / Long v Jerke / FT71(i Masden Vaad _IL pc: Wayne Howard, PW Cameron Parrott,PW M:\—Active Projects\Misc Projects\Engineering On-Call Services\FHU Contract\Work Order 3-Wayne\Work Session Request Form.doc Hello