HomeMy WebLinkAbout20060536.tiff •
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
FELSBURG HOLT&ULLEVIG
DATED: Q[�'
Work Order Number: FHU-3
Project Title: Environmental Analyses; WCR 40.5 at Big Hollow East and WCR 74 west of Severence
Commencement Date: February 13,2006
Completion Date: Approx. June 2,2006
Limitations on compensation: Not to Exceed $11,405 (See attached Scopes)
Project Description: Wetland Delination, Prebles' Meadow Jumping Mounse Evaluation, Ute Ladies-
Tress Orchid Evaluation, 404-Permit Application Preparation for Both Projects Plus a Burrowing Owl
Survey for WCR 74 project.
Scope of Services: See attached Scopes of Work
Professional agrees to perform the services The attached forms are hereby accepted and
identified above and on the attached forms in incorporated herein, by this reference, and
accordance with the terms and conditions Notice to Proceed is hereby given.
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the Weld County
terms of the Professional Services Agreement
and this work order (including the attached By:
forms) the Professional Services Agreement Project M ger" G�[�
shall control. Date:
Professional By: ,
Depa en ad
Felsburg Holt&Ullevig Date:
6300 S. Syracuse Way, Suite 600
Centennial, O 80111 /q/ By: . C q
By: � (` ICJ-
"V"�"� Date:Direc orl EBm4 c U dministration
Title: Y` a BY Oiil�
Chairma Weld Count Commissioners
Date: 2- 7 - 06 Date: FEB 2 2 2006
ATTESTING TO BOARD OF COUNTY
4n COMMISSIONER SIGNATURES ONLY
EST: ga l
EL COUNTY CLERK 0 THE BOARD
•
DEP TY CL K TO THE MD
E .C?Os
;)bn, 00 ', 1 k), PA-
FELSBURG
HOLT (Sk,
ULLEVIG
engineering paths to transportation solutions
February 7, 2006
Mr. Wayne Howard
Weld County Public Works Department
P.O. Box 758
Greeley, CO 80632
RE: Wetland Delineation, Preble's Meadow Jumping Mouse Evaluation,
Ute Ladies-Tresses Orchid Habitat Evaluation &404 Permit for WCR 40.5
& WCR 74 Near Severance
Proposal for Professional Services
Dear Mr. Howard:
Felsburg Holt& Ullevig is pleased to submit this proposal as part of our on-call services contract
with Weld County. This task-order involves Darcy Tiglas to provide you several environmental
services in support of two projects. The effort will primarily involve Darcy's efforts, but we have
also incorporated a small amount of time to administer the task order.
The following budget is proposed:
• FHU Effort— 3 hours fora principal, $135/ hour: $405
• Darcy Tiqlas Effort—See attached proposal from Darcy Tiglas: $11,000.00
From this, we have established a total of budget of$11,405.00 to complete the effort per Darcy's
attached scope of work. Should other services be required not anticipated at this point, we will
submit a separate proposal for the additional work.
If the scope and budget presented here (and in the attachment) is acceptable to you, please sign
below and return one copy to serve as a letter of agreement for this task order. If you have any
questions, please feel free to call. Also, feel free to call Darcy directly if needed.
Sincerely,
FELSBURG HOLT& ULLEVIG 7/ /V114411
i „t
y ( ) ' Accept By
1 �T+�'�kit) Sr. �i. 5 .
Christopher J. Fas hing, P.E. Title
Principal
2/0o.
Date
6300 South Syracuse Way, Suite 600 Centennial, CO 80111 tel 303.721.1440 fax 303.721.0832
www.fhuent.com info@lnueng.com
•
DARCY A. TIGLAS D
5015 Swainsona Drive FEB - 1 2006
Loveland, Colorado 80537
970-635-9183 L FELSBURG,HALT&ULLEwG
January 30, 2006
Mr. Christopher J. Fasching, PE
Felsburg Holt& Ullevig
6300 South Syracuse Way, Suite 600
Centennial, CO 80111
RE: Proposal for Wetland Delineation, Preble's Meadow Jumping Mouse Habitat
Evaluation, Ute Ladies-tresses Orchid Habitat Evaluation, and 404-Permit
Application Preparation for a Road Improvement Project along Weld County Road
40.5 at Big Hollow East of Berthoud, CO
Dear Mr. Fasching:
This letter serves as a proposal for a wetland delineation, Preble's meadow jumping mouse
habitat evaluation, Ute ladies'-tresses habitat evaluation, and 404-wetland permit application
preparation to be completed at a road improvement project site along Weld County Road 40.5 at
Big Hollow. I understand that the scope of workfor the wetland delineation would include:
• ground reconnaissance of the project area that includes at least four separate wetland
sites;
• determination of wetlands at project area, including plant species lists, hydric soils
determination, and wetland hydrology presence;
• photograph wetland communities, if present, at the project area;
• prepare report of results of the wetland delineation;
• submit report to Weld County and the U.S. Army Corps of Engineers (COE); and
• forward COE correspondence to Weld County.
I understand that the scope of work for the Preble's meadow jumping mouse habitat evaulation
would include:
• ground reconnaissance of the project area;
• evaluation of habitat at the Big Hollow crossing for the Preble's meadow jumping mouse,
including the quality and quantity of habitat present at the site, and its likelihood of the
mouse occurring within the project area;
• evaluation of the isolation or connectivity of the project site to other potential habitat;
• history of the mouse's occurrence in the immediate area or within the drainage;
• evaluation of the nature of any proposed development project within the potential mouse
habitat;
Mr. Christopher J. Fasching
Page 2
• evaluation of the potential extent of direct, secondary, or cumulative impacts the project
may cause;
• prepare a written report for submission to the U.S. Fish and Wildlife Service for their
concurrence with our evaluation; and
• submission of report to Weld County.
I understand that the scope of work for the orchid habitat evaluation includes:
• conduct habitat evaluation survey for the Ute ladies'-tresses orchid outside of the
flowering period;
• ground reconnaissance of the project area;
• evaluation of habitat at both crossings for the orchid, including the quality and quantity of
habitat present at the site, and its likelihood of the orchid occurring within the project
area;
• evaluation of the isolation or connectivity of the project site to other potential habitat;
• evaluation of the potential extent of direct, secondary, or cumulative impacts the project
may cause;
• prepare a written report for submission to the U.S. Fish and Wildlife Service for their
concurrence with the habitat evaluation; and
• submission of report to Weld County. •
I understand that the scope of work for the permit preparation would include:
• preparation of the appropriate permit application, probably a Nationwide 3 Permit, based
on wetland and Waters of the United States acreage and/or purpose for permit at Big
Hollow along Weld County Road 40.5; and
• forward COE correspondence to Weld County.
The estimated cost for the wetland delineation, Preble's meadow jumping mouse habitat
evaluation, Ute ladies'-tresses habitat evaluation, and 404-wetland permit preparation for this
project would be $1,500.00, $1,500.00, $1,000.00, and $1,000.00 total fixed cost, respectively.
The cost estimates include the tasks outlined above and drafting, review, and other direct costs.
If you have any questions, or require additional information, please feel free to call me at 970-
635-9183.
Sincerely,
100./Dia '
Darcy A. Tiglas
Project Manager, Tiglas Ecological Services
DARCY A. TIGLAS
5015 Swainsona Drive
Loveland, Colorado 80537
970-635-9183
January 30, 2006
Mr. Christopher J. Fasching, PE
Felsburg Holt& Ullevig
6300 South Syracuse Way, Suite 600
Centennial, CO 80111
RE: Proposal for Wetland Delineation, Preble's Meadow Jumping Mouse Habitat
Evaluation, Ute Ladies-tresses Orchid Habitat Evaluation, 404-Permit Application
Preparation, and a Burrowing Owl Survey at a Prairie Dog Site near Windsor
Reservoir for a Road Improvement Project along Weld County Road 74 at the
Windsor Reservoir Outlet (Greeley No. 2 Canal) south of Thompson Lake west of
Severence, CO
Dear Mr. Fasching:
This letter serves as a proposal for a wetland delineation, Preble's meadow jumping mouse
habitat evaluation, Ute ladies'-tresses habitat evaluation, 404-wetland permit application
preparation, and a burrowing owl survey (near Windsor Reservoir, proper) to be completed at a
road improvement project site along Weld County Road 74 at the Windsor Reservoir Outlet
(Greeley No. 2 Canal) south of Thompson Lake. I understand that the scope of work for the
wetland delineation would include:
• ground reconnaissance of the project area that includes at least four separate wetland
sites;
• determination of wetlands at project area, including plant species lists, hydric soils
determination, and wetland hydrology presence;
• photograph wetland communities, if present, at the project area;
• prepare report of results of the wetland delineation;
• submit report to Weld County and the U.S. Army Corps of Engineers (COE); and
• forward COE correspondence to Weld County.
I understand that the scope of work for the Preble's meadow jumping mouse habitat evaulation _
would include:
• ground reconnaissance of the project area;
• evaluation of habitat at the Windsor Reservoir Outlet, the concrete-lined ditch to the east
of the outlet, and the wet meadow below Thompson Lake to WCR 74 (the lake is clearly
leaking surface and subsurface water) for the Preble's meadow jumping mouse, including
the quality and quantity of habitat present at the site, and its likelihood of the mouse
Mr. Christopher J. Fasching
Page 2
occurring within the project area;
• evaluation of the isolation or connectivity of the project site to other potential habitat;
• history of the mouse's occurrence in the immediate area or within the drainage;
• evaluation of the nature of any proposed development project within the potential mouse
habitat;
• evaluation of the potential extent of direct, secondary, or cumulative impacts the project
may cause;
• prepare a written report for submission to the U.S. Fish and Wildlife Service for their
concurrence with our evaluation; and
• submission of report to Weld County.
I understand that the scope of work for the orchid habitat evaluation includes:
• conduct habitat evaluation survey for the Ute ladies'-tresses orchid outside of the
flowering period;
• ground reconnaissance of the project area;
• evaluation of habitat at both crossings for the orchid, including the quality and quantity of
habitat present at the site, and its likelihood of the orchid occurring within the project
area;
• evaluation of the isolation or connectivity of the project site to other potential habitat;
• evaluation of the potential extent of direct, secondary, or cumulative impacts the project
may cause;
• prepare a written report for submission to the U.S. Fish and Wildlife Service for their
concurrence with the habitat evaluation; and
• submission of report to Weld County.
I understand that the scope of work for the permit preparation would include:
• preparation of the appropriate permit application, probably a Nationwide 3 Permit, based
on wetland and Waters of the United States acreage and/or purpose for permit at the
Windsor Reservoir Outlet and the unnamed irrigation ditch as well as the wet meadow
community below Thompson Lake; and
• forward COE correspondence to Weld County.
I understand that the scope of work for the burrowing owl survey would include:
• field reconnaissance and windshield survey of the black-tailed prairie dog town north of
WCR 74 just south of Windsor Reservoir east of WCR 19 for burrowing owls just before
road improvement work begins if work is conducted between April 1 and September 30;
and
• if burrowing owls are determined to be present, consultation with the Colorado Division
of Wildlife for impacts analysis or imposition of a timing restriction within the immediate
area of the town.
Mr. Christopher J. Fasching
Page 3
• if burrowing owls are determined to be present, consultation with the Colorado Division
of Wildlife for impacts analysis or imposition of a timing restriction within the immediate
area of the town.
The estimated cost for the wetland delineation, Preble's meadow jumping mouse habitat
evaluation, Ute ladies'-tresses habitat evaluation, 404-wetland permit preparation and burrowing
owl survey for this project would be $2,000.00, $1,500.00, $1,000.00, $1,000.00, and $500.00
total fixed cost, respectively. The cost estimates include the tasks outlined above and drafting,
review, and other direct costs. If you have any questions, or require additional information,
please feel free to call me at 970-635-9183.
Sincerely,
(DORN U . d
Darcy A. Tiglas
Project Manager, Tiglas Ecological Services
LH-
MEMORANDUM
' TO: Clerk to the Board DATE : February 15, 2006
C.
COLORADO FROM: Frank B. Hempen, Jr., P.E.
Director of Public Works/County Engineer
SUBJECT: Consent Agenda Item
Work Order Pursuant to an Agreement between Weld County and Felsburg Hold & Ullevig
for Environmental Analyses on WCR 40.5 at Big Hollow East and WCR 74 west of Severance
not to exceed $11,405.
Enclosures
pc: Perry Eisenach, Engineering Division Manager
Wayne Howard, Project Manager
Mona Weidenkeller
M:\Francie\AgendaSignature.DOC
J 2006-0536
7 (22 ( 7c L:
BOARD OF COUNTY COMMISSIONERS l 'g ib il V ED
ill FEB EB 1 5 ?r05
RE: On-Call Engineering Services / Environmental Investigation ? '/GELD COUNTY PUBLIC WORKS DEPT
SESSION
REVIEW/WORK REQUEST
DEPARTMENT: PUBLIC WORKS DATE: February 8,2006
PERSON REQUESTING: Frank B. Hempen, Jr., P.E., Director of Public Works/County Engineer tfi
Brief description of the problem/issue:
The Public Works Department is currently designing the intersection of WCR 74 and WCR 19 and three miles of WCR 40.5
and WCR 5 just south of SH 56. Environmental clearances are required prior to construction. We have reviewed the projects
with Darcy Tiglas, subconsultant to FHU who is currently contracted with PW for On-Call Engineering Services.
Attached is Work Order No. 3 with the proposed scope of work and cost estimates for the work. The costs for these services
have been budgeted for in the 2006 budget and are consistent with work performed on previous projects.
What options exist for the Board? (Include consequences, impacts, costs, etc. of options)
The options for the Board are to accept the proposal from FHU and proceed with the work or not accept the proposal from FHU,
which will have a direct impact on meeting the project construction deadlines. All projects above are scheduled for 2006
construction. Darcy Tiglas has performed most environmental clearances for PW projects in the past at costs equal to those
proposed.
Recommendation to the Board: Recommend Option 2. I recommend approving Work Order No.3 and
proceeding with the work. ,-
Initial: Approve Schedule
Recommendation Work Session Other
Geile /
Long v
Jerke / FT71(i
Masden
Vaad _IL
pc: Wayne Howard, PW
Cameron Parrott,PW
M:\—Active Projects\Misc Projects\Engineering On-Call Services\FHU Contract\Work Order 3-Wayne\Work Session Request Form.doc
Hello