Loading...
HomeMy WebLinkAbout20062116 SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW (USR) APPLICATION FOR PLANNING DEPARTMENT USE DATE RECEIVED: RECEIPT#AMOUNT# /$ CASE#ASSIGNED: tit Art(NA- 1N4 APPLICATION RECEIVED BY PLANNER ASSIGNED: Parcel Number(s) Eastman Kodak 0 8 0 7 - 2 6 - 2 - 0 0 - 0 0 6* Eastman Kodak 0 8 0 7 - 3 5 - 0 - 0 0 - 0 2 6 Broe Land Acquisitions 0 8 0 7 3 5 1 - 0 0 0 3 2 12-digit number found on Tax I.D.information,obtainable at the Weld County Assessor's Office,or www.co.weld.co.us). *Please note Special Warranty Deed dated 11/15/05 indicates Broe Land Acquisitions owns a portion of parcel no.0807-26-2-00-006 Legal Description: Section 34 and 35 , Township 6 North, Range 67 West Flood Plain: A3, A5, A6 Zone District: 11, Total Acreage: 951.56 , Overlay District: n/a Geological Hazard: n/a FEE OWNER(S) OF THE PROPERTIES: Name: EASTMAN KODAK COMPANY Work Phone# (970) 686-4741 Home Phone#n/a Email Address Address: 9952 Eastman Park Drive City/State/Zip Code Windsor, CO 80551 +`•me: BROE LAND ACQUISITIONS II LLC irk Phone# Home Phone# n/a Email Address Address: 252 Clayton St, 4th Floor City/State/Zip Code Denver, Colorado 80206 APPLICANT OR AUTHORIZED AGENT (See Below:Authorization must accompany applications signed by Authorized Agent) Name: PETRO-CANADA RESOURCES (USA INC Work Phone# (303) 297-2300 Home Phone# n/a Email Address Address: 1099 18TH Street, Suite 400 susan.miller@petro-canada.com City/State/Zip Code Denver, Colorado 80202 PROPOSED USE: Drilling, completion and operation of(12) oil and gas wells I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our) knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating that the signatory has to legal authority to sign for the corporation. PETRO-CANADA RESOURCES (USA) INC "-m ure: Owner or Authorized zed Agent Date Signature: Owner or Authorized Agent Date an Miller, Regulatory Analyst EXHIBIT 2006-2116 5- 'EURo-auAUA, Petro-Canada Resources(USA) Inc. May 4, 2005 Ms. Sheri Lockman Weld County Department of Planning 1555 North 17th Avenue Greeley, Colorado 80631 Re: Application for Use by Special Review (USR) - Authority to Sign Township 6 North, Range 67 West Section 35: NE1/4 Weld County, Colorado Dear Ms. Lockman: Please accept this letter as authorization for Susan M. Miller, Operations Technician for Petro-Canada Resources (USA) Inc., to execute the USR application referenced above and all related documents thereto. Thank you for your consideration in this regard. Sincerely, /?citCrA4cVEdward L. McLaughlin, Vice President Land & Business Development and Director ELM/kv Enclosures cc: Susan Miller Suite 400. 1099 18th Street • Denver,CO 80202-1904 Office:(303)297-2300 • Fax(303)297-7708 • www.petro-canada.ca APPLICATION FOR USE BY SPECIAL REVIEW TOWNSHIP 6 NORTH, RANGE 67WEST SECTIONS 34 and 35 PARCEL NO.080726200006 PARCEL NO. 080735100032 PARCEL NO. 080735000026 County of Weld State of Colorado APPLICANT: PETRO-CANADA RESOURCES (USA) INC 1099 18TH STREET, SUITE 400 DENVER, CO 80202 SUBMITTAL DATE: APRIL 5, 2006 SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW (USR) QUESTIONNAIRE The following questions are to be answered and submitted as part of the USR application. If a question does not pertain to your use, please respond with "not applicable", with an explanation as to why the question is not applicable. 1. Explain in detail, the proposed use of the property. (6) straight hole and (6) directional oil and natural gas wells will be drilled on these properties. The oil, water and natural gas produced from the wells will be separated on the properties. The oil and water will be temporarily stored in tanks on the properties until the oil and water can be removed from the facilities by trucks. The natural gas will be metered and gathered through a gas gathering pipeline. 2. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 22 (Comprehensive Plan). Petro-Canada Resources (USA) Inc (Petro-Canada) has discussed well locations with both surface and mineral owners. The well locations have been agreed to. Petro-Canada will follow all state and county regulations and conduct operations as a prudent operator. 3. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 23 (Zoning) and the zone district in which it is located. Petro-Canada is applying for a USR to drill 2 wells in the NE/4, 2 wells in the NW/4 and 2 wells in the SE/4, Section 35, Township 6 North, Range 67 West; 1 well in the NE/4, 1 well in the NW/4, 1 well in the SW/4 and 3 wells in the SE/4 of Section 34, Township 6 North, Range 67 West. 4. What type of uses surrounds the site? Explain how the proposed use is consistent and compatible with surrounding land uses. The primary use surrounding the sites is agricultural and industrial. Petro- Canada will attempt to drill and construct before and/or after the farming season. The sites will be reclaimed to allow the farming to continue. The facilities will be located as per an agreed to location with landowner. Page 2 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW (USR) QUESTIONNAIRE Petro-Canada Resources — Sections 34 and 35 5. Describe, in detail, the following: a. How many people will use each site? 1 — 15. More people will use the sites during the drilling and construction, which will only be for a short period. After this period one to three people will check each facility daily. b. How many employees are proposed to be employed at this site? None c. What are the hours of operation? Twenty-four d. What type and how many structures will be erected (built) on each site? The directional wells will have three to four wellheads. The straight hole wells will have one wellhead per site. The separation, storage and meter facility will include two separators, two to four oil tanks, one to two water tanks (buried) and one to two meter runs. e. What type and how many animals, if any, will be on this site? Not applicable. Oil and gas well. f. What kind (type, size, weight) of vehicles will access the sites and how often? During the initial drilling phase trucks will move in the drilling rig in 12 loads for each well. Total weight of the rig is 125,000 lbs. During the two-week period after the drilling is complete there will be ongoing heavy-duty vehicle traffic with trucks weighing up to 40,000 lbs. During the producing phase there will be one three-quarter ton pickup on each property every day. g. Who will provide fire protection to this site? Town of Windsor Fire District h. What is the water source on the property? (Both domestic and irrigation). Not applicable. Oil and gas well. i. What is the sewage disposal system on the property? (Existing and proposed). Not applicable. Not necessary, oil and gas well. j. If storage or warehousing is proposed, what type of items will be stored? There will be 100 to 200 barrels of water storage capacity and 300 to 1200 barrels of oil storage capacity at each battery facility. Page 3 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW (USR) QUESTIONNAIRE Petro-Canada Resources— Sections 34 and 35 6. Explain the proposed landscaping for the site. The landscaping shall be separately submitted as a landscape plan map as part of the application submittal. Not applicable. Oil and Gas well. 7. Explain any proposed reclamation procedures when termination of the Use by Special Review activity occurs. Each well will require approximately 2 acres of disturbance. Once drilling and construction is complete all the disturbance with the exception of approximately 10' x 10' surrounding the wellhead and access road will be reclaimed in accordance with the rules & regulations of the Colorado Oil & Gas Conservation Commission. 8. Explain how the storm water drainage will be handled on the site. Environmental representative will review all construction plans for potential impacts on storm water quality to determine if proposed construction meets the requirements and will recommend drainage and runoff controls to reduce erosion and peak flows. 9. Explain how long it will take to construct each site and when construction and landscaping is scheduled to begin. The drilling and construction will take about six weeks for each well. The schedule is uncertain depending on USR approval and farming activities. 10. Explain where storage and/or stockpile of wastes will occur on this site. The only waste is drilling mud and is often used by the farmers to improve soil productivity. If the farmers do not want to utilize the mud, the waste will be disposed of offsite. Pr ANADA* Petro-Canada Resources (USA) Inc. April 5 2006 Via Overnight Mail Weld County Department of Planning 1555 N. 17th Avenue Greeley, CO 80631 Attention: Ms. Sheri Lockman Re: Application for Use by Special Review (USR) Township 6 North — Range 67 West Sections 35 and 34 Weld County, CO Dear Ms. Lockman: Enclosed please find our application and required documents for the noted USR permit, along with our check no. 16468 in the amount of $1200 for processing fees. For your reference also enclosed is a copy of a Special Warranty Deed which indicates Broe Land Acquisitions now owns a portion of parcel no. 0807- 26-2-00-006. The Weld County website shows Kodak as owning the entire parcel. Please contact me with any questions or comments. Thank you in advance for your help, it's always appreciated. PETRO-CANADA RESOURCES (USA) INC Very truly yours, usan M. Miller Regulatory Analyst Enclosures r Suite 400, 1099 18th Street • Denver,CO 80202-1904 Office:(303)297-2300 • Fax(303)297-7708 • www.petro-canada.ca EMERGENCY INFORMATION LIST Dave Gipson Petro-Canada (970) 284-6006 Josh Thomason Petro-Canada (303) 297-2300 Business Hours 8:00 A.M. — 5:00 P.M. 24 Hour Answering Service (970) 284-6006 1-800-766-7762 Hello