HomeMy WebLinkAbout20060744.tiff Weld County Planning Department GREELEY OFFICE NOV 14 2005CEIV ED Memorandum TO: Sheri Lockman, W.C. Planning IDATE: November 9, 2005 C FROM: Pam Smith, W.C. Department of Public 'J COLORADO Health and Environment CASE NO.: PZ-1099 NAME: Dyecrest Dairy/Shepards Hill Estates The Weld County Health Department has reviewed this Change of Zone application for a 9 lot PUD on 54.6acres. The minimum lot size has been reduced from 5 to 4 acres. This new minimum lot size of 4 acres coupled with an overall density of one septic system per 6.06 acres does meet current Department policy. The reduced lot size allows the detention pond to be placed in the open space (Tract A) instead of Lot 1, as proposed in the Sketch Plan application. The application has satisfied Chapter 27 of the Weld County Code in regard to water service. The application states the water will be supplied by North Weld County Water District. Approval of the draft water service agreement by Assistant County Attorney Lee Morrison has been included in the application materials. The application states that sewer will be provided by Box Elder Sanitation District. However, a letter from Box Elder Sanitation acknowledges that the property is within the District's 208 service area, but goes on to state that no sewer line is within 3 miles of the property 'as the crow flies' and the cost of sewer line expansion is unreasonable. Box Elder Sanitation does not oppose the use of septic systems for this subdivision (all in Sketch Plan application). The applicant submitted a preliminary geotechnical report in the Sketch Plan application. This report, from Earth Engineering Consultants and dated June 16, 2005 states that the site is expected to be suitable for conventional septic systems. The property is bordered by the Cactus Hill Lateral on the west. Because of the large lot sizes and anticipated construction of conventional septic systems the Department is not requiring primary and secondary septic envelopes on the lots. The initial impact plan submitted in the Change of Zone application adequately addresses all impacts. These impacts do not state whether animal husbandry activities will be allowed on the lots. While the Department is not opposed to these activities, we would like to caution the applicant and future owners that should a secondary absorption field become necessary prior to Boxelder Sanitation availability, the associated outbuildings could impede the placement of that field. The Department recommends approval with the following conditions: 1. Water service shall be obtained from the North Weld County Water District. 2. This subdivision is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment,Water Quality Control Division and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. Septic systems shall be designed for site specific conditions including, but not 1 11 EXHIBIT 2006-0744 H limited to, shallow groundwater, bedrock, gravel and/or clay. 3. A stormwater discharge permit may be required for a development/redevelopment /construction site where a contiguous or non-contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and the Environment at www.cdphe.state.co.us/wQ/PermitsUnit for more information. 4. During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Health Department, a fugitive dust control plan must be submitted. 5. In accordance with the Regulations of the Colorado Air Quality Control Commission any development that disturbs more than 5 acres of land must incorporate all available and practical methods that are technologically feasible and economically reasonable in order to minimize dust emissions. 6. If land development creates more than a 25-acre contiguous disturbance, or exceeds 6 months in duration, the responsible party shall prepare a fugitive dust control plan, submit an air pollution emissions notice, and apply for a permit from the Colorado Department of Public Health and Environment. 7. "Weld County's Right to Farm"as provided in Appendix 22-E of the Weld County Code shall be placed on any recorded plat. O:\PAM\Planning\chzone\pz-1099 Dyecrest Dairy Shepard Hill Est.rtf 2 .)Id County Planning Department GREELEY OFFICE MEMORANDUM NOV X 8 2005 RECEIVED TO: Sheri Lockman, Planning /W DATE: 08-Nov-2005 FROM: Peter Schei, P.E., Pu epartment COLORADO SUBJECT: PZ-1099 Shepherds Hill Estates PUD(Zone Change) Weld County Public Works Department has reviewed this zone change request. Comments made during this phase of the subdivision process may not be all-inclusive, as other concerns or issues may arise during the remaining application process. Comments General Comments: ❑ It has come to our attention that there is a spelling discrepancy within this application, regarding the name of this development. The applicant shall decide whether they wish to name this development"Shepherds Hill"or"Shepards Hill". External Roadways: ❑ This development will introduce 86 additional(9.57 x 9) vehicle trips per day to the off-site roadway system based on 9 single- family residential homes. Based on the proposal of limited development and anticipated low transportation impact on surrounding roads,a traffic study is currently not required. ^7 CR 15 is recognized as a County local paved roadway (60-foot right-of-way) adjacent to the west boundary of the proposed development. Public Works asks the applicant to verify the existing section line right-of-way and the documents creating the right-of-way shall be noted on the change of zone plat. If the section line right-of-way cannot be verified, it will be dedicated on the final plat. o CR 15 is under maintenance of Weld County adjacent to the west boundary of the proposed development. ❑ It was noted by the applicant in the change-of-zone application materials that they had verified the right-of-way for CR 15, however this was not located on the plans by Public Works. Internal Roadways: ❑ Internal roads shall meet Weld County criteria for a PUD. The internal roadway right-of-way shall be sixty (60) feet in width including cul-de-sacs with a sixty-five(65) foot radius, and dedicated to the public. The typical section of interior roadway shall be shown as two 12-foot paved lanes with 4-foot gravel shoulders on the change of zone plat. The cul-de-sac edge of pavement radius shall be fifty(50) feet. Stop signs and street name signs will be required at all intersections. Roadside drainage shall be contained within the right-of-way. o The change-of-zone plat shall be amended to include the typical roadway cross-section, and resubmitted to Public Works prior to the change-of-zone hearing before the Weld County Planning Commission. o The applicant shall submit to Public Works the standard detail for the corner of the internal road. o It has come to light that the proposed internal road is longer than Weld County Code's permitted block length, therefore the applicant shall be required to install an "eyebrow" turn-around at some strategic midpoint in the alignment, or propose some other alternative to be approved by the Public Works Department and the local emergency response districts. ❑ The applicant must provide a pavement design prepared by a professional engineer along with the final plat submittal. ❑ Easements shall be shown on the final plat in accordance with County standards (Sec.24-7-60) and / or Utility Board recommendations. ❑ Intersection sight distance triangles at the development entrance(s)will be required. All landscaping within the triangles must be less than 3'h feet in height at maturity,and noted on the final roadway plans. --❑ The applicant shall submit to Public Works stamped,signed and dated final plat drawings and roadway/construction &grading plan drawings for review with the final plan application and approval. Construction details must be included. -------- Page 1 of 2 _ ❑ Stop signs and street name signs wit. oe required at all intersections and shown as _fining plan on final roadway plans. The current edition of the Manual on Uniform Traffic Control Devices(MUTCD)shall govern the signing plan. ❑ The applicant shall submit Improvements Agreements According to Policy Regarding Collateral for(on-site) Improvements with the final plan application. These agreements must be reviewed by Public Works and shall be approved by the Board of County Commissioners(BOCC)prior to recording any final plat. Drainaee- ❑ A final drainage report stamped, signed and dated by a professional engineer licensed in the State of Colorado shall be submitted with the final plan application. The 5-year storm and 100-year storm drainage studies shall take into consideration off-site flows both entering and leaving the development. Increased runoff due to development will require detention of the 100-year storm developed condition while releasing the 5-year storm existing condition. The final drainage report shall include a flood hazard review documenting any FEMA defined floodways. The engineer shall reference the specific map panel number, including date. The development site shall be located on the copy of the FEMA map. ❑ The applicant shall prepare a construction detail for typical lot grading with respect to drainage for the final plan application. Front, rear and side slopes around building envelopes must be addressed. In addition, drainage for rear and side lot line swales shall be considered. Building envelopes must be planned to avoid storm water flows, while taking into account adjacent drainage mitigation. o Note uphill drainage on west curb line of southbound lane of Shepherds Hill Drive, adjacent to proposed Lot 7 (shown on PUD Sketch Plan—Drainage Report for Shepherds Hill Estates by JR Engineering,dated June 15,2005). ❑ Final drainage construction and erosion control plans (conforming to the drainage report) stamped, signed and dated by a professional engineer licensed in the State of Colorado shall be submitted with each final plan (phase) application. These plans (stormwater management plans)may be based on Urban Drainage methodology. Recommendation 1 The Public Works Department recommends approval of this zone change based on the above observations. The applicant shall address the comments listed above at the specific step of the review process stated. The review process will continue only when all appropriate elements have been submitted. Any issues of concern must be resolved with the Public Works Department prior to recording the change of zone and final plat. PC: PZ-1099 Shepherds Hill Estates PUD(Zone Change) Email&Original: Planner:Sheri Lockman PC by Post: Applicant:Dyecrest Dairy LLC PC by Post: Engineer:JR Engineering --------- Page 2 of 2 Weld County Referral N�s�d co�n�y I ccinyO�easpa October 13, 2005 C. 0CT 704. timant • RFC&i. os COLORADO ',to The Weld County Department of Planning Services has received the following item for review: Applicant Soaring Skies Ventures LLC Case Number PZ-1099 Please Reply By November 11, 2005 Planner Sheri Lockman Project Change of Zone from A (Agriculture) to PUD for nine (9) residential lots (Shepherds Hills Estates). Legal Lot B of RE-3685; Pt S2 of Section 5, T7N, R67W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 15 approximately 1/4 mile north of CR 84. Parcel Number 0705 05 300018 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) December 6, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ; See attached letter. Comments: Signature Date /�P'or Agency 41Cc& doci•vrr JntZt"?C b/-7-•tcF- ❖Weld County Planning Dept. +918 10'"Street, Greeley, CO.80631 +(970)353-6100 ext.3540 +(970)304-6498 fax Weld County Sheriff's Office M e mo To: Sheri Lockman From: Ken Poncelow Date: October 28,2005 Re: PK-1099 The Sheriffs Office recommends the following improvements for this housing sub-division: 1. The Sheriffs Office requests that builders and developers designate an area by the entrance of the sub-division in which to place a shelter for school children awaiting the school bus. This area should also include a pull off for the school bus which enables it to safely load and unload children out of the roadway. 2. Either mail distribution within the sub-division or a central drop off location within the sub-division should be developed so that residents do not have to cross a county road to obtain their mail. 3. A permanent sign should be placed at the entrance to the subdivision detailing the name of the sub-division, address, and a graphical presentation of the roadways within the subdivision. There should be a plan developed to maintain this sign. 4. If the roadways within this sub-division are not maintained or adopted by the county, individuals purchasing property in this sub-division should be notified that the Sheriffs Office will have limited traffic enforcement powers. 5. A plan should be developed to maintain roadways within the sub-division especially during inclement weather conditions for emergency vehicles. 6. The Sheriffs Office is very supportive of homeowner funded homeowner's associations. These associations provide a contact for the Sheriffs Office and a means of maintaining common areas. 7. If there are oil or gas production facilities within this sub-division,they need to be fenced off in order to mitigate the potential for tampering. These facilities are known to create an attractive nuisance for young people. Tampering not only creates a significant danger to safety but also of environmental damage with extensive mitigation and clean-up costs. 8. The names of all streets within the sub-division should be presented to the Sheriffs Office for approval. This will eliminate duplication of street names within the county. 9. The Sheriffs Office encourages Law Enforcement Authorities to provide additional funding for law enforcement requirements in the future. The Sheriff's Office lacks the ability to absorb any additional service demand without the resources recommended in the multi-year plan provided to the Weld County Board of County Commissioners or as 1 indicated by growth not considered at the time the plan was developed. I have no other comments on this proposal. • Page 2 \---(Cunt- Weld County Referral IOctober 13, 2005 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Soaring Skies Ventures LLC Case Number PZ-1099 Please Reply By November 11, 2005 Planner Sheri Lockman Project Change of Zone from A(Agriculture)to PUD for nine (9) residential lots (Shepherds Hills Estates). Legal Lot B of RE-3685; Pt S2 of Section 5, T7N, R67W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 15 approximately 1/4 mile north of CR 84. Parcel Number 0705 05 300018 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) December 6, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ,. See attached letter. Comments: Signature 79 -ce ,t Date / //Au Agency 7/9-14.7224/44-, +Weld County Planning Dept. ❖918 10th Street,Greeley, CO.80631 4(970)353-6100 ext.3540 4(970)304-6498 fax DEPARTMENT OF PLANNING SERVICES BUILDING INSPECTION PHONE (970)353-6100, EXT.3540 FAX (970)304-6498 WELD COUNTY ADMINISTRATIVE OFFICES W����• 918 W 10`"Street Greely, CO. 80631 COLORADO Applicant: Soaring Skies Ventures LLC Project: Change of Zone from a to PUD for(9) lots with Residential Lots Legal; Lot B OF RE-3685: PT S2of Section 5, T7N, R67W of the 6'h P.M. Weld County Colorado Case Number: PZ-1099 1. Building permits shall be obtained prior to the construction of any building. Buildings that meet the definition of an Ag Exempt Building per the requirements of Section 29-1-20 and Section 29-3-20 B.13 do not need building permits, however a Certificate of Compliance must be filed with the Planning Department and an electrical and/or plumbing permit is required for any electrical service to the building or water for watering or washing of livestock or poultry. 2. A plan review is required for each building except for buildings that meet the definition of Ag Exempt buildings. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. 3. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. Current adopted codes include the 2003 International Building Code; 2003 International Mechanical Code; 2003 International Plumbing Code; 2002 National Electrical Code and Chapter 29 of the Weld County Code. 4. Each building will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. 5. Building height shall be limited to the maximum height allowed per Table 503. Wall and opening protection and limitations shall be in accordance with Table 503 Separation of buildings of mixed occupancy classifications shall be in accordance with Table 302.3.2 and Chapter 3. Setback and offset distances shall be determined by the Zoning Ordinance. 6. Building height shall be measured in accordance with the 2004 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 24 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. 7. A Flood Hazard Development Plan shall be submitted for buildings constructed within the 100-year flood plain. Si�ely,/ � y-- //!e� Frank Piacentino Plans Examiner Weld County Building Inspection Dept. SORREL RIDGE PUD Developer: Soaring Skies LLC (formerly SHEPHERDS HILL ESTATES PUD) Timothy Halopoff Case #PZ-1099 (Change of Zone from Ag to PUD) Planner: Sheri Lockman PT S2 5-7-67 ZONED PUD/ESTATE IS NOTIN FLOOD PLAIN (0475D) NORTH WELD COUNTY WATER DISTRICT BOXELDER SANITATION DISTRICT POUDRE VALLEY REA XCEL ENERGY POUDRE VALLEY FPD WELD COUNTY SD RE-4 QWEST COMMUNICATIONS 9 RESIDENTIAL LOTS -PRELIMINARY ADDRESSING - revised 11/1/05 Lot 1 41212 Sorrel Ridge Road Lot 2 41318 Sorrel Ridge Road Lot 3 41324 Sorrel Ridge Road Lot 4 41330 Sorrel Ridge Road Lot 5 41336 Sorrel Ridge Road Lot 6 41340 Sorrel Ridge Road Lot 7 41346 Sorrel Ridge Road —or- 41355 Sorrel Ridge Road (depending on access) Lot 8 41356 Sorrel Ridge Road Lot 9 41350 Sorrel Ridge Road Tract A 41366 Sorrel Ridge Road Lin Dodge, Building Technician Building Department 918 10th Street Greeley CO 80631 Phone: (970)353-6100, extension 3574 10/21/05 �Neld County Referral wel co coup P C. GREEIEY/an p°OeFfiCeparrmeat October 13, 2005 RE cT 2 Wng ?005 COLORADO �E'VEp The Weld County Department of Planning Services has received the following item for review: Applicant Soaring Skies Ventures LLC Case Number PZ-1099 Please Reply By November 11, 2005 Planner Sheri Lockman Project Change of Zone from A(Agriculture) to PUD for nine (9) residential lots (Shepherds Hills Estates). Legal Lot B of RE-3685; Pt S2 of Section 5, T7N, R67W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 15 approximately 1/4 mile north of CR 84. Parcel Number 0705 05 300018 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) December 6, 2005 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan 1® We have reviewed the request and find no conflicts with our interests.( ❑ See attached letter. r Corn ents Q e a-r .( el--11-47 don r-rl-o-a-c-X-sete /JPlc . Signature VIAqw- Date ( O i n( it O S Agency • p'��,r_��� +Weld County Planning Dept. 4918 10`h Street, Greeley, CO.80631 4(970)353-6100 ext.3540 4(970)304-6498 fax STATE OF COLORADO OFFICE OF THE STATE ENGINEER ^•Division of Water Resources / \, Department of Natural Resources 1313 Sherman Street, Room 818 Denver,Colorado 80203 *1876 Phone(303)866-3581 -� FAX(303)866-3589 October4 2005 C� Bill www.water.state.co.us 0 U�1 f Governor Yp OREL ianoip Russell George 0 ‘Lek CFg Dana�t Executive Director Ms. Sheri Lockman Cj CF inapt Hal D.Simpson,P.E. Weld County Planning Department 2 6 ?�O� State Engineer 91810 Street FCC, Greeley, Co 80631 C CO Re: Shepherds Hill Estates PUD C Case No. PZ-1099 SW1/4 of Sec. 5, T7N, R67W, 6th P.M Water Division 1, Water District 3 Dear Ms. Lockman: This referral for a change of zone does not appear to qualify as a "subdivision" as defined in Section 30-28-101(10)(a), C.R.S. Therefore, pursuant to the State Engineer's March 4, 2005 memorandum to county planning directors, this office will only perform a cursory review of the referral information and provide comments. r1 Additionally, we have previously reviewed the above referenced proposal to subdivide a 54.63-acre parcel into 9 single-family residential lots by our letter dated August 1, 2004. The North Weld County Water District ("District") is still listed as the source of domestic water. In our letter dated August 1, this office already rendered an opinion on the proposed water supply indicating that contingent upon water service being provided by the District, the proposed water supply will not cause material injury to existing water rights and the supply is expected to be adequate. Since no changes in the water supply for the Shepherds Hill Estates PUD were identified in this new submittal, the comments from our letter dated August 1, 2005 (copy attached) still apply including the recommendation that the County obtain a signed copy of the Water Service Agreement from the District prior to the final approval of the subdivision. If you have any question in this matter please contact loana Comaniciu of this office. Sincerely, r/D _1-- Dick Wolfe, P.E. Assistant State Engineer cc: Jim Hall, Division Engineer George Varra, Water Commissioner, District 3 Water Supply Branch Subdivision File DW/IC/Shepherds Hill Estates STATE OF COLORADO OFFICE OF THE STATE ENGINEER � 0re Division of Water Resources Department of Natural Resources K'% e 1313 Sherman Street, Room 818 C�U4f • • C:J Denver,Colorado 80203 August 1"i Phone(303)866-3581 co,�,I" ''raja• . FAX(303)866-3589 0 0 www.water.state.co.us CT 2 6+ OctF/Cc pa��B�jt GGovem«ill Owens ^� 21105 Russell George Ms. Sheri Lockman ` Executive Director Weld County Planning Department , Hal D.Simpson,P.E. 918 10th Street CC Shoe Engineer Greeley, Co 80631 Re: Shepherds Hill Estates PUD Case No..PK-1099 SW1/4 of Sec. 5,T7N, R67W,6th P.M Water Division 1,Water District 3 Dear Ms. Lockman: We have reviewed the above referenced proposal to subdivide a 54.63-acre parcel into 9 single- family residential lots ranging in size from 5Th to 6.17 acres. A Water Supply Information Summary Form was not included in the referral material. The proposed water source for this development is identified as the North Weld County Water District ("District"). A letter of commitment for service from the District was not provided. According to the information in the referral material a draft water service agreement from the District has been prepared and the District could provide the required 500-psi for the fire hydrants and 20-psi for each of the 9 lots. Based on current information on file in this office, the District will typically furnish 70% of an acre-foot (228,000 gallons) of water per tap per annual water year if the allotment for the Colorado-Big Thompson (CBT) project water, as determined by the Northern Colorado Water Conservancy District, is 50% or greater.The District will restrict the delivery as necessary when the CBT allotment is less than 50%. Pursuant to Section 30-28-136(1)(h)(II), C.R.S., the State Engineer's office offers the opinion that with the District as the water supplier, the proposed water supply may be provided without causing material injury to existing water rights and the supply is expected to be adequate, provided the applicant obtains a letter of commitment for service from the District for this development. We recommend that the County obtain a signed copy of the water service agreement from the District prior to the final approval of the subdivision. If you have any question in this matter please contact loana Comaniciu of this office. Sincerely, 5-7 Dick Wolfe, P.E. 000 Assistant State Engineer cc: Jim Hall, Division Engineer George Varra,Water Commissioner, District 3 Water Supply Branch Subdivision File DW/IC/Shepherds Hill Estates Othn _ Weld County Referral WIIDe. October 13, 2005 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Soaring Skies Ventures LLC Case Number PZ-1099 Please Reply By November 11, 2005 Planner Sheri Lockman Project Change of Zone from A(Agriculture) to PUD for nine (9) residential lots (Shepherds Hills Estates). Legal Lot B of RE-3685; Pt S2 of Section 5, T7N, R67W of the 6th P.M., Weld County, Colorado. Location East of and adjacent to CR 15 approximately 1/4 mile north of CR 84. Parcel Number 0705 05 300018 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) December 6, 2005 Cl We have reviewed the request and find that it does/does not comply with our Comprehensive Plan •a"-- We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. • Comments: (,/-110-11 ./l,l.. t ti t) Q� My CG Dvv (.C'"4 aI'iO 06_11Z�pd , f'jl1 id1/�T�G�V1/J £ A a nO �e�1 6., • Signature &12.-,741- n�� Date /0 /I-0c Agency 7/2.4w, !Aryl fee'Q/Z.“ +Weld County Planning Dept. +918 100 Street, Greeley, CO. 80631 •:•(970)353-6100 ext.3540 •(970)304-6498 fax Hello