Loading...
HomeMy WebLinkAbout20061539.tiff RESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF PORTIONS OF WELD COUNTY ROADS 8 AND 17 FOR 30 DAYS,FOR INSTALLATION OF A WATER LINE WHEREAS,the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS,pursuant to Section 42-4-410(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance,temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS,the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate,warn and guide vehicular traffic on said County roads by posting signs thereon. NOW,THEREFORE,BE IT RESOLVEDthatthe Board of County Commissioners of Weld County,Colorado,deems it necessary to regulate,warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that Weld County Road 8 between Weld County Roads 15 and 17, and Weld County Road 17 between Weld County Roads 8 and 10 be temporarily closed, with said closure being effective June 14,2006,for approximately 30 days for installation of a water line, and further,that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. 2006-1539 EG0024 CO: PW, So Corr CSfi 017 - ROAD CLOSURE - WCR 8, WCR 17 PAGE 2 The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 12th day of June, A.D., 2006. BOARD OF UNTY COMMISSIONERS a' WELD CO TY, COLORADO ATTEST: iludi M. eile, Chair Weld County Clerk tot tRis David E. Long, Pro-Tem BY: (ti 2 s De ty Cler to the Board ' Wiliam H. Jerke AP V AS TO • Robert D. Masd rf' u ty A orney Glenn Vaad Date of signature: -1!H0 C° 2006-1539 EG0024 L*** ,Kitt MEMORANDUM CTO: Clerk to the Board DATE: June 8, 2006 • COLORADO FROM: Frank B. Hempen, Jr., P.E. Director of Public Works/County Engineer SUBJECT: Agenda Item WCR 8 between WCR 15 and WCR 17 and WCR 17 between WCR 8 and WCR 10 will be closed from June 14, 2006, to July 14, 2006. Central Weld County Water District is installing an 8-inch water line. pc: Ted Eyl, Engineering Tech II M:\Francie\Agenda Road Closures.doc 2006-1539 rittL-H. MEMORANDUM ' TO: Frank Hempen DATE: 6/7/06 C. FROM: Ted Eyl COLORADO SUBJECT: Road Closure for WCR 8 from WCR 15 to 17 and WCR 17 from WCR 8 to WCR 10 This is a road closure to be submitted to the BOCC for the 6/12/06 agenda. Northern Colorado Constructors is requesting the closure of WCR 8 from WCR 15 to WCR 17 and WCR 17 from WCR 8 to WCR 10 for the installation of an 8" water line for Central Weld County Water District. The requested closure is scheduled to take place starting on June 14, 2006 and go until July 14, 2006. This is a 2.5 mile water project which started at WCR 8 and WCR 13, heading East to WCR 17 and then going North on WCR 17 for one half mile. WCR 8 from WCR 13 to WCR 15.5 is in the town of Dacono. WCR 8 from WCR 15.5 to WCR 17 is in Weld County's jurisdiction as is WCR 17 going North. The detour routes for the WCR 8 portion will be WCR 15 to WCR 6 or WCR 17 to WCR 6. For the WCR 17 portion of the project the detour route will be either WCR 8 or WCR 10 to WCR 15. Traffic counts for the affected roads are as follows; WCR 8 from WCR 15 to WCR 17 has an ADT count of 49, WCR 17 from WCR 8 to WCR 10 has an ADT count of 94. Northern Colorado Constructors has agreed to put a dust suppressant in front of all houses on the detour routes. FROM :CRRNES SERVICE FAX NO. :9705683165 May. 24 2006 02:32PM P4 N w -seev:>- S 0 II (I) 4) WCR 10 - . . ... . ... .. . ... [DETOUR 0 0 0oL7k[q 031 Al Trafc Control Devices to G C Conform to the M.U.tC.D ^ o Camas Servke Does N otAccept Any Uebrty Mother Company Cr Individual Sets up the Traffic Control Represented an This —" I (,j1 PIaNM.H.T. V gEt GOS 4) [mama - WCR 8 ���, 4:t$ RCA(A)-6 (t) . RCA(A)-22 DA (A)•4 type III w/RCDR-1 Type III w/RCDL-1 Type III blank-44) Detour Tracker Right-2 Detour Tracker Left-2 PLAN NOT DRAWN TO SCALE, N. Weld County TCP shows full closure and detour route '" °' "°p°"°""� Wd'ater Line Excavations during water line excavations. TM"°�Mao Mces Northam Colorado Constructors Camas Services Work area protectionprovided as needed,P 970 588 3832 3 ofn3 TBA Sign spacing to be 500' min. rawww Andrew Troy Farago-TCS 5/18/06 j FROM :CARNES SERVICE FAX NO. :9705683165 May. 24 2006 02:31PM P3 N 1> t 4) W4- E ® S • 1 . 4:1> WCR 8 . . 4) f".... I- -, . U U it aes- a WCR 6 a 4130 RWA(A)-6 RCA(A)-2 1, DA (A)-4 Type III w/RCDR-1 Type III w/RCDL-1 All Traffic Control Devices to Type III blank-4 Contemn to the M.U.T.C.D Detour Tracker Right-2 Carnes Service Does Not Accept Detour Tracker Lett-2 My Liability du Another Company Or Individual Sets W the Traffic Control Represented on This Plan!M.H.T. omw PLAN NOT DRAWN TO SCALE. Weld County TCP shows full closure and detour route Plane.VaterL �"'°"°" Line W during water line excavations. NorQe n Colorado Constructors CarneItins tt Work area protection provided as needed.o ees 3632 2 TB Sign spacing to be 500' min. '"°`°` Andrew Troy F#rago-TC8 5/1&/06 Hello