Loading...
HomeMy WebLinkAbout20061510.tiff RESOLUTION RE: GRANT CHANGE OF ZONE, PZ#1097, FROM A(AGRICULTURAL) ZONE DISTRICT TO PUD (PLANNED UNIT DEVELOPMENT) ZONE DISTRICT FOR NINE (9) LOTS WITH E (ESTATE) ZONE USES - BREAKNECK WELD PROPERTIES, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS,a public hearing was held on the 28th day of June, 2006,at 10:00 a.m.for the purpose of hearing the application of Breakneck Weld Properties,LLC,P.O. Box 894,Wheat Ridge, Colorado 80034-0894, requesting a Change of Zone from the A(Agricultural)Zone District to the PUD (Planned Unit Development) Zone District for nine (9) lots with E (Estate)Zone uses for a parcel of land located on the following described real estate, to-wit: N1/2 NW1/4 of Section 6, Township 3 North, Range 68 West of the 6th P.M., Weld County, Colorado WHEREAS,the applicant was represented by Tom Radigan, P.O. Box 894,Wheat Ridge, Colorado 80034-0894, and WHEREAS, Section 27-6-120 of the Weld County Code provides standards for review of said Change of Zone, and WHEREAS, the Board of County Commissioners heard all the testimony and statements of those present,studied the request of the applicant and the recommendations of the Weld County Planning Commission and,having been fully informed,finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 27-5-30 of the Weld County Code. 2. The request is in conformance with Section 27-6-120.D as follows: a. Section 27-6-120.D.5.a - The proposal is consistent with any Intergovernmental Agreement in effect influencing the PUD,and Chapter 19 (Coordinated Planning Agreements), Chapter 22 (Comprehensive Plan), Chapter23(Zoning),Chapter 24(Subdivision),and Chapter 26(Mixed Use Development)of the Weld County Code. The proposal is consistent with the aforementioned documents as follows: 1) Section 22-3-50.B.1 (P.Goal 2)states, "Require adequate facilities and services to assure the health, safety and general welfare of the present and future residents of the County." The proposed PUD will be serviced by the Little Thompson Water District, and Individual Sewage Disposal Systems will handle the effluent flow. 2006-1510 PL1843 CO et ho/ tItCep) AA2t— �f 00 - 2O CHANGE OF ZONE, PZ#1097, FROM A (AGRICULTURAL) TO PUD - BREAKNECK WELD PROPERTIES, LLC PAGE 2 b. Section 27-6-120.D.5.b - The uses which will be allowed in the proposed PUD will conform with the Performance Standards of the PUD Zone District contained in Chapter 27,Article II, of the Weld County Code.The applicant has met the Performance Standards as delineated in Section 27-2-10 of the Weld County Code. c. Section 27-6-120.D.5.c-The uses which will be permitted will be compatible with the existing or future development of the surrounding area as permitted by the existing zoning, and with the future development as projected by Chapter 22 of the Weld County Code or master plans of affected municipalities. The proposed site is within the three-mile referral area for the Towns of Berthoud and Mead, City of Longmont,and Boulder County. The Town of Berthoud and the City of Longmont indicated no conflict with their interests. The Town of Mead "...objects to the County considering this site as an unincorporated subdivision and wants the applicant referred to the Town for annexation." Boulder County did not return a referral. d. Section 27-6-120.D.5.d - The PUD Zone District will be serviced by an adequate water supply and sewage disposal system in compliance with the Performance Standards in Chapter 27,Article II, of the Weld County Code. The proposed PUD will be serviced by the Little Thompson Water District and Individual Sewage Disposal Systems will handle the effluent flow. The preliminary percolation data conducted byTerracon,and dated November8, 2005, indicates that most, if not all, of the site will be engineer-designed systems due to shallow bedrock(two to seven feet)and/or because of poor percolation rates(34 to 480 minutes per inch). The applicant has designated two-acre building envelopes on each site, and the primary and secondary septic envelopes will be placed within these two (2) acres. This is acceptable; however, they have not been designated on the proposed Change of Zone plat submitted in the application. The engineer estimates the envelope sizes to be between 2,600 and 5,300 square feet. The Ish Ditch bisects the proposed Lot 6;there are also small unlined ditches on the property, the status of which are unknown at this time. All primary and secondary septic envelopes must meet the 50-foot setback from ditches on the property. The applicant has indicated that they will place language in the Covenants protecting the septic envelopes, as requested. The Covenants should state that activities such as landscaping (planting of trees and shrubs) and construction (auxiliary structures, dirt mounds, etcetera) are expressly prohibited in the designated absorption field envelope. e. Section 27-6-120.D.5.e-Street or highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the uses of the proposed PUD Zone District. The Weld County Department of Public Works has not required improvements to Weld County Road 1. 2006-1510 PL1843 CHANGE OF ZONE, PZ#1097, FROM A (AGRICULTURAL) TO PUD - BREAKNECK WELD PROPERTIES, LLC PAGE 3 f. Section 27-6-120.D.5.f-The Conditions ofApproval ensure that the applicant will complete an On-Site Public Improvements Agreement that addresses all improvements associated with this development, per compliance with Section 24-9-10 of the Weld County Code. g. Section 27-6-120.D.5.g - The applicant has shown compliance with the applicable requirements contained in Chapter 23, Article V, of the Weld County Code regarding overlay districts,commercial mineral deposits,and soil conditions on the subject site. The site does not lie within an overlay district. The Weld County Department of Building Inspection has indicated that each building will require an engineered foundation based on a Site-Specific Geotechnical Report or an open hole inspection performed by a Colorado registered engineer. Effective January 1,2003,building permits issued on the proposed lots will be required to adhere to the fee structure of the County-Wide Road Impact Program. Effective August 1,2005,building permits issued on the proposed lots will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. h. Section 27-6-120.D.5.h - Consistency exists between the proposed Zone District(s), uses, and the Specific Development Guide. The submitted Specific Development Guide accurately reflects the Performance Standards and allowed uses described in the proposed Zone District, as described previously. The applicant has requested an Administrative Review of the Final Plan application, and the Board of Commissioners and staff concur with the request. NOW,THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County,Colorado,that the application of Breakneck Weld Properties,LLC,for Change of Zone,PZ #1097,from the A(Agricultural)Zone District to the PUD(Planned Unit Development)Zone District for nine(9)lots with E(Estate)Zone uses, on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: 1. Prior to recording the Change of Zone plat: A. The plat shall be amended as follows: 1) All sheets of the plat shall be labeled PZ-1097. 2) The applicant shall submit evidence that the following requirements have been satisfied to the satisfaction of the Weld County Department of Public Works: a) Weld County Road 1,adjacent to the proposed development, is classified by the County as a collector road (Weld County Roadway Classification Plan,June 2002)which requires an 80-foot right-of-way. The applicant shall verify the existing 2006-1510 PL1843 CHANGE OF ZONE, PZ#1097, FROM A (AGRICULTURAL) TO PUD - BREAKNECK WELD PROPERTIES, LLC PAGE 4 right-of-way, and the documents creating the right-of-way shall be noted on the Change of Zone plat. b) Internal roads are required to meet Weld County criteria for a PUD. The internal road right-of-way shall be sixty(60)feet in width, including cul-de-sacs with a sixty-five (65) foot radius, and dedicated to the public. The typical section of interior roadway shall be shown as two twelve(12)foot paved lanes with four(4) foot gravel shoulders on the Change of Zone plat. The cul-de-sac edge of pavement radius shall be fifty (50) feet. Stop signs and street name signs will be required at all intersections. Roadside drainage shall be contained within the right-of-way. The Change of Zone plat shall be amended to include the typical roadway cross-section, and resubmitted to the Department of Public Works. c) The typical roadway section shown on the Change of Zone plat must be amended to show the eight(8) inch aggregate base course as recommended in the Geotechnical Engineering Report. The report also suggests four(4)inches of asphalt pavement for the typical roadway section. d) All easements and rights-of-way for all known service providers shall be shown in accordance with Section 24-7-60 of the Weld County Code. 3) An outlot shall be created so that the development sign can be on property owned and maintained by the Homeowners' Association. 4) The plat shall indicate the location of the development sign and verify that the required ten(10)foot setback from the road right-of-way can be met. 5) The applicant shall submit evidence that the School and Postal Districts have approved the locations for the pedestrian shelter and mailbox. 6) The Plat Certificates shall be amended in accordance with Chapter 26, Appendix 26-P, of the Weld County Code. 7) The Change of Zone Map shall be done to a commonly recognized scale such as 1 inch=100 feet. 8) The Change of Zone plat shall have one vicinity map which is in accordance with Section 27-9-10.1 of the Weld County Code. 2006-1510 PL1843 CHANGE OF ZONE, PZ#1097, FROM A (AGRICULTURAL) TO PUD - BREAKNECK WELD PROPERTIES, LLC PAGE 5 9) The building envelopes on proposed Lots 6 and 7 shall be reconfigured,if necessary,to specifically exclude all land within 100 feet of the Ish Ditch. B. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. 2. The Change of Zone is conditional upon the following,and each shall be placed on the Change of Zone plat as notes prior to recording: A. Change of Zone, PZ#1097, is from the A(Agriculture)Zone District to the PUD (Planned Unit Development) Zone District for nine (9) lots with E (Estate) Zone uses, and oil and gas production as indicated in the application materials on file. The residential lots will adhere to the uses allowed in the E (Estate) Zone District. The PUD will be subject to, and governed by, the Conditions of Approval stated herein, and all applicable Weld County regulations. B. All landscaping within the site distance triangles must be less than 3.5 feet in height at maturity. C. A Homeowners'Association shall be established prior to the sale of any lot. Membership in the Association is mandatory for each parcel owner. The Association is responsible for liability insurance,taxes and maintenance of open space, streets, private utilities, and other facilities. Open space restrictions are permanent. D. Weld County's Right to Farm Statement,as delineated on this plat,shall be recognized at all times. E. Water service shall be obtained from the Little Thompson Water District. F. This PUD is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division, and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. Septic systems shall be designed for site-specific conditions including, but not limited to, shallow groundwater, bedrock, gravel and/or clay. G. Primary and secondary septic envelopes shall be placed on each lot. All septic system envelopes must meet all setbacks, including the 100-foot setback to any well. H. Activities such as permanent landscaping, structures, dirt mounds or other items are expressly prohibited in the absorption field site. 2006-1510 PL1843 CHANGE OF ZONE, PZ#1097, FROM A (AGRICULTURAL) TO PUD - BREAKNECK WELD PROPERTIES, LLC PAGE 6 All septic fields shall be located a minimum of 100 feet from streams, intermittent streams and irrigations ditches. J. A Stormwater Discharge Permit may be required for a development/ redevelopment/construction site where a contiguous or non-contiguous land disturbance is greater than,or equal to,one acre in area. The applicant shall contact the Colorado Department of Public Health and Environment,Water Quality Control Division,atwww.cdphe.state.co.us/wq/PermitsUnitformore information. K. During development of the site,all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Department of Public Health and Environment, a Fugitive Dust Control Plan must be submitted. L. In accordance with the Regulations of the Colorado Air Quality Control Commission,any development that disturbs more than five(5)acres of land must incorporate all available and practical methods that are technologically feasible and economically reasonable in order to minimize dust emissions. M. If land development creates more than a twenty-five (25)acre contiguous disturbance, or exceeds six (6) months in duration, the responsible party shall prepare a Fugitive Dust Control Plan,submit an Air Pollution Emissions Notice,and apply fora permit from the Colorado Department of Public Health and Environment. N. The Weld County Sheriffs Office has limited traffic enforcement powers on roadways within subdivisions which are not maintained or adopted by the County. O. Future oil and gas production facilities within this subdivision shall be fenced off in order to mitigate the potential for tampering. P. Building permits shall be obtained prior to the construction of any building. Q. A Plan Review is required for each building for which a building permit is required. Plans shall bear the wet stamp of a Colorado registered engineer or architect, and two complete sets of plans are required when applying for each permit. R. Buildings shall conform to the requirements of the Codes adopted by Weld County at the time of permit application. Current adopted codes include the 2003 International Building Code,2003 International Mechanical Code,2003 International Plumbing Code,2002 National Electrical Code,and Chapter29 of the Weld County Code. 2006-1510 PL1843 CHANGE OF ZONE, PZ#1097, FROM A (AGRICULTURAL) TO PUD - BREAKNECK WELD PROPERTIES, LLC PAGE 7 S. Each building will require an engineered foundation based on a Site-Specific Geotechnical Report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. T. Building height shall be measured in accordance with the applicable 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction, and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. U. Prior to construction, property owners shall contact the Berthoud Fire Protection Authority to determine if fire sprinkler systems will be required. V. All signs,including entrance signs,shall require building permits. Signs shall adhere to Sections 23-4-80 and 23-4-110 of the Weld County Code.These requirements shall apply to all temporary and permanent signs. W. Effective January 1,2003, building permits issued on the proposed lots will be required to adhere to the fee structure of the County-Wide Road Impact Program. X. Effective August 1,2005,building permits issued on the proposed lots will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater Drainage Impact Fee. Y. Installation of utilities shall comply with Section 24-9-10 of the Weld County Code. Z. The property owner shall be responsible for complying with the Performance Standards of Chapter 27, Articles II and VIII, of the Weld County Code. AA. Weld County Government personnel shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. BB. The site shall maintain compliance,at all times,with the requirements of the Weld County Departments of Public Works, Public Health and Environment, Planning Services, and adopted Weld County Code and policies. CC. No development activity shall commence, nor shall any building permits be issued on the property,until the Final Plan has been approved and recorded. 2006-1510 PL1843 CHANGE OF ZONE, PZ#1097, FROM A (AGRICULTURAL) TO PUD - BREAKNECK WELD PROPERTIES, LLC PAGE 8 DD. The applicant shall comply with Section 27-8-50 of the Weld County Code, as follows: Failure to submit a Planned Unit Development Final Plan - If a PUD Final Plan application is not submitted within three(3)years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submission of the PUD Final Plan. The Board may extend the date for the submission of the PUD Final Plan application,and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board determines that conditions or statements made supporting the original approval of the PUD Zone District have changed, or that the landowner cannot implement the PUD Final Plan,the Board of County Commissioners may, at a public hearing, revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original Zone District. EE. The PUD Final Plan shall comply with all regulations and requirements of Chapter 27 of the Weld County Code. 3. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within thirty(30) days of approval by the Board of County Commissioners. With the Change of Zone plat map, the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp(Shape Files),Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4) ... (Group 6 is not acceptable). 4. In accordance with Weld County Code Ordinance#2005-7,approved June 1,2005, should the plat not be recorded within the required thirty(30)days from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance charge shall be added for each additional three (3) month period. 5. Prior to the submission of the Final Plat application materials: A. The applicant shall provide the Department of Public Works with a pavement design, prepared by a professional engineer. B. The applicant shall provide the Department of Public Works with stamped, signed,and dated final plat drawings and roadway/construction and grading plan drawings for preliminary review and approval. Construction details must be included. C. The applicant shall provide the Department of Public Works with a Final Drainage Report, stamped, signed and dated by a professional engineer licensed in the State of Colorado. The 5-year storm and 100-year storm drainage studies shall take into consideration off-site flows both entering and 2006-1510 PL1843 CHANGE OF ZONE, PZ#1097, FROM A (AGRICULTURAL) TO PUD - BREAKNECK WELD PROPERTIES, LLC PAGE 9 leaving the development. Increased runoff due to development will require detention of the 100-year storm developed condition,while releasing the 5- year storm existing condition. The Final Drainage Report shall include a flood hazard review documenting any FEMA defined floodways. The engineer shall reference the specific map panel number,including date. The development site shall be located on the copy of the FEMA map. The applicant shall confirm flow rates in the northwest corner of the property along Weld County Road 1. D. The applicant shall prepare a construction detail for typical lot grading with respect to drainage for the Final Plan application. Front, rear, and side slopes around building envelopes must be addressed. In addition,drainage for rear and side lot line swales shall be considered. Building envelopes must be planned to avoid stormwater flows, while taking into account adjacent drainage mitigation. 6. At the time of Final Plan submission: A. The applicant shall provide an Improvements Agreements According to Policy Regarding Collateral for On-Site Improvements with the Final Plan application. The agreement must be approved by the Board of County Commissioners prior to recording the final plat. B. The applicant shall provide preliminary Covenants for review by County staff. The Covenants shall address two items:language for the protection of septic envelopes,and the maintenance of roadways until such time that the County may accept maintenance as requested by the Weld County Sheriff's Office. C. All copies of the Final Plan application shall include a copy of the proposed street name and addressing, as indicated in the referral response from Lin Dodge, Building Technician, Weld County Building Inspection. D. The applicant shall provide written evidence in the Final Plan application that the appropriate Postal District has reviewed the proposed addressing and interior street name. E. The applicant shall submit a detailed Landscape Plan for review and approval. F. Easements shall be shown in accordance with Weld County standards and/or Utilities Coordinating Advisory Committee recommendations. G. Intersection sight distance triangles at the development entrance(s)will be required. All landscaping within the triangles must be less than 3.5 feet in height at maturity, and noted on the final roadway plans. 2006-1510 PL1843 CHANGE OF ZONE, PZ#1097, FROM A (AGRICULTURAL) TO PUD - BREAKNECK WELD PROPERTIES, LLC PAGE 10 H. Stop signs and street name signs will be required at all intersections, and shown as a signing plan on final roadway plans. The current edition of the Manual on Uniform Traffic Control Devices(MUTCD)shall govern the signing plan. Final drainage construction and erosion control plans (conforming to the Drainage Report) stamped, signed and dated by a professional engineer licensed in the State of Colorado, shall be submitted with each Final Plan application. The Stormwater Management Plans may be based on Urban Drainage methodology. 7. Prior to recording the final plat: A. The applicant shall provide written evidence from School District RE-1J,to the Department of Planning Services,which indicates that all School District requirements have been met. B. The applicant shall enter into an Improvements Agreement According to Policy Regarding Collateral for On-Site Improvements. The agreement shall be approved by the Board of County Commissioners. C. The applicant shall submit Certificates from the Secretary of State showing the Homeowners' Association has been formed and registered with the State. D. The applicant shall submit a copy of a finalized Water Service Agreement between the applicant and the Little Thompson Water District for service to the PUD. E. Any abandoned septic system must comply with Section 30-4-20.D of the Weld County Code. The applicant shall contact the Department of Public Health and Environment to update existing septic permits for those systems that have been abandoned F. The applicant shall submit finalized Covenants and the appropriate recording fee (currently$6 for the first page and $5 for each additional page) to the Department of Planning Services. G. The applicant shall submit a digital file of all drawings associated with the Final Plan application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is.e00. The preferred format for Images is .tif(Group 4) ... (Group 6 is not acceptable). 2006-1510 PL1843 CHANGE OF ZONE, PZ#1097, FROM A (AGRICULTURAL) TO PUD - BREAKNECK WELD PROPERTIES, LLC PAGE 11 8. Prior to release of collateral: A. The applicant shall submit evidence that ownership of the outlot(s)has been transferred to the Homeowners' Association. The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 28th day of June, A.D., 2006. BOARD OF CeUNTY COMMISSIONERS ,t\ Elide WELD CO- ITY, COLORADO ATTEST: auji , V t♦�' . . c -ile, Chair Weld County Clerk to the tcr f �{ ;k � David E. Long, Pro-Tem BY: "itti i 4 , Dep t Clerk to the Board i\amH. Jerke �(� APP AS TO FO : y� �/�C \VV WL Robert D. Masden my Attorney Glenn aad Date of signature: 1 ill ID( 2006-1510 PL1843 Hello