HomeMy WebLinkAbout20061658.tiff EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND FARNSWORTH GROUP INC. DATED: May 10, 2006 Work Order Number: Survey 070.01 Purchase Order Number: Project Title: Sheep Draw Gravel Pit Commencement Date: June 12, 2006 Completion Date: August 7, 2006 Limitations on compensation: (time and reimbursable direct costs): $46,000 Project Description: Land Survey Plat and Topographic Survey Scope of Services: SEE ATTACHED EXHIBIT "B" Professional agrees to perform the services The attached forms consisting of _ (5) pages identified above and on the attached forms in are hereby accepted and incorporated herein, by accordance with the terms and conditions this reference, and Notice to Proceed is hereby contained herein and in the Professional given. Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld County terms of the Professional Services Agreement By: and this work order (including the attached Project Ma forms) the Professional Services Agreement Date: shall control. e By: . Professional Depa� ent e.. 7 BY Date: . / O. Steven A. Dynes, Pro' ct Manager Date: By: 7 , ' Directo of Finance and Administration Date: I) ld ID Warden (06/19/2006) a Chairman, Weld County Commit/loners Pro-Tem +n� ate: David E. Long (06119/2006) � ATTESTING TO BOARD OF COUNTY \ i'..--1, kalh COMMISSIONER SIGNATURES ONLY (,1 ATTEST: WEL COUNTY CLERK TO/�BOARID BY: '� ('l- -'I `,ile LF(C�. EGA CD 4/ DEP Y CLE f.4( TO THE BOARD An __/ ' Exhibit B SHEEP DRAW GRAVEL PIT Surveying Scope of Work and Fee Estimate Land Survey Plat and Topographic Survey May 10, 2006 Land Survey Plat • Farnsworth Group will perform a Land Survey Plat on the property described in Reception Number 2649512 recorded on 10/27/98 being approximately 140.50 acres and located within the east half of section 33, township 6 north, range 66 west. The land survey plat will also contain the adjacent landowner's name and a vicinity map. Please note the county GIS mapping is depicting a larger area than what is contained in the deed. This scope of work does not include performing extensive research to determine rights for the Poudre River or the Greeley# 3 ditch. • Farnsworth group will order a title commitment for the project. We propose to utilize Land Title Guarantee Company to perform this service. We will use the title commitment, for identification of record ownership and easements. We will perform supplemental research, if required, for the establishment of the boundaries of this property as a part of our services, including survey records at City, County, and other offices. • Record easements will be computed and shown based upon their respective legal descriptions in title document noted in the title commitment. • We will perform field surveys, calculations and review of record documents. • The Land Survey Plats will be output on 24" x 36" sheet at a suitable scale to be determined later combined with the Topographic Survey. • The survey will be performed in accordance with applicable State Statutes Topographic Survey The project limits of the topographic survey are per the attached map being approximately 228 acres. Please note we have included the extra area based upon the county's GIS for area located at northeast corner of the site. • Establish horizontal project control based upon the NAD 83. The vertical datum will be based upon NAVD 88 datum. All control information will be noted on the survey drawings with their description, coordinated and elevations. • Aerial Mapping —We propose to use the photogrammetric mapping firm of Kucera International as our sub consultant for this project. The aerial mapping will be output at scale of 1" = 50 ft. with one foot contour intervals. The limits of the mapping will be as noted above for the project limits. DERR GRAVEL PIT Page 2 of 3 May 10, 2006 • A digital ortho photo will also be provided, with a pixel resolution of approximately 0.3-ft. that will cover the entire mapping area. • Set approximately seven (7) aerial photo control points and tie into the control network. • Utility information will be researched at the respective public utility agencies, and field verified where possible, within the limits of the survey. Rim elevations on all exposed manholes and valves will be obtained in addition to invert and pipe sizes confirmed to the best of our ability for culvert, irrigation, storm and sanitary lines, if any, without entry into manholes. Underground utility lines for which no surface evidence exists and for which reliable map information is unavailable will not be shown, if not marked by utility agencies. • This scope of work does not include the coordination with the Utility Notification Center to have underground utilities marked. • This scope of work includes using the sub-consultant firm of Utility Locating and Mapping Consultants to mark the location of the dry utilities for which we have budget a maximum of twenty (20) man-hours. We will also field locate the dry utility markings marked by our sub-consultant. This information with then be complied into our overall base map and reconciled with utility company map information. • Perform supplemental design surveys as necessary to supplement the aerial mapping, along with related office support for obtaining miscellaneous data needed for completing the design services. This data will be merged into the overall drawing. • This project does not include preparing permission to enter forms. Our field crew will try to contact any visible homeowners or tenants in the project area. This scope assumes that the county will assist us with access issues on site. Deliverables: • The deliverable for this project will be one set of paper plots and a CD with the electronic copy of the survey information, in AutoCAD format based upon the Farnsworth Group Layering System. In addition, we will provide a file with Farnsworth's CAD standards for surveying that will have the layers, line types, symbols, etc. that are used by our surveying sections. The surface model will also be provided in Eagle Point format. Schedule: We shall commence our fieldwork for the aerial mapping portion within one week of noticed to proceed and shall complete the project within eight weeks after notice to proceed. Proposed Fee: Farnsworth Group will perform the above-noted Services on an hourly basis not to exceed $46,000, to be billed in accordance with our Weld County Approved Rate Schedule. A more detailed breakdown of estimated maximum fees is provided on the Project Budget Worksheet, attached hereto for reference. DERR GRAVEL PIT Page 3 of 3 May 10, 2006 Note: The proposed scope of work does not include re-setting section corners, one-quarter corners and one-sixteenth corners or replacing those corners, if necessary to comply with State Board of Registration monumentation rules. If those services are required, you will be notified immediately and the fee estimate revised accordingly. This proposal assumes that average survey/boundary conditions exist in the area to be surveyed. It is not uncommon to have conflicting monumentation and/or lines of title. These are normally "worked out" during the process of the survey if not excessive. Occasionally major conflicts and/or discrepancies exist that require time and effort beyond "average survey/boundary conditions". If this occurs, you will be immediately notified, the problems discussed, and an appropriate course of action determined (with the owner's input) to complete the survey. Farnsworth Group PROJECT BUDGET WORKSHEET-2005-2006 WELD COUNTY Rate Schedule Project Name: Weld County-Sheep Draw Gravel Pit Project Number: Project Manager: Steve Dynes ESTIMATED HOURS E Ji WORK TASK Task Start Task End Total Task 8 11 I I i I i y s y a Tow TOTAL COST TASK GROUP Date Date Duration Y u] '4 'I' 41._ i .g II? f. Hours SUMMARY SUMMARY TOTALS U HOURLY RAZES $128 $109 $94 $89 $94 $87 $82 S76 SOB $46 $92 S123 Prefect Imitation 0 00 9738 Scope of wk&contract admin 2 4 1 7 S736 I 0 So Research 0 SO $2.398 _ Ownership,LSP,BLM dal&Monument Records 1 10 11 5929 Utilities.Irrigation,Greeley Ditch &Poudre 1 12 13 $1,093 Horizontal&Vertical Control Data 4 4 $376 0 SO Land Survey Plat _ 0 $0 $18 372 Coordination with Title Commitment 1 1 5109 Locate Aliquot Land Corners.Property Corners&set any missing property corners 8 100 108 $13.172 Office Calculations.Title Review&Boundary determination 4 24 28 $2.308 Prepare Drawing&output 2 32 1.5 35.5 52783 0 SO 0 SO Topographic Survey 0 $0 $10,324 Locate Utilities in the Field I 32 33 54.045 review aerial mapping in the field 1 8 9 11.093 Convert Aerial Mapping into our Layers and convert contours into Eagle Pont Format 1 0 9 3733 add utilities to drawing 1 16 17 $1,357 Prepare drawing&output 1 12 1.5 _ 14.5 $1.114 coordination with Aerial Mapper 1 2 3 3265 coordination with Utility locator __ 1 _ 1 $109 supplemental topo on hard surfaces 8 8 16 $1,608 0 SO Control Surveys r ' 0 $0 $3,922 • Primary GPS Control&Planning 1 0 12 21 $2,337 _ Aerial Mapping (7)Points 1 12 13 $1,585 0 SO • _ • 0 $0 SO 0 SO 0 SO — 0 $0 ti 0 $0 $0 0 SO 0 SO O So 0 SO $0 I , a so ,_ a so' o so ' SUBTOTAL HOURS 5 FEES 2 30 0 0 12 0 22 102 D 4 0 172 344 $35,754 935.754 Reimbursable Expenses,Outside Svcs,etc. research costs(Co.records at no cost) $200 mileage 300 x 0 40 • 5120 _ Delivery Charges � $100 plots GPS $960 so Sub consultant-Utility Locating&Mapping $1,500 Sub consultant-Kucera International , 55.800 Sub consultant•Land Title Guarantee _ _ • S500 , r SUB TOTAL REIMBURSABLE EXPS. 1 $10,246 ~ TOTAL PROJECT FEES(without contingency) $46,000 'ro'essione.Serv-:es r ee Estimate Completed.05/10/06 r.. •• i •.. a _• ,- t =• w as ( ,1. i ng • � . 11 66 a 'i. •4').=6 'e. Off• •yl ..a .YA r • Y=i ,. y, • y•• • • ; •3p • • 1 ra• *.:. wY.i iC1 ♦Mit -4•O•;i r:_ . . iNs, • ' '?:110.1 • 7 •�F: .;,, A % . .1.--. .'-'4,-,.. . Well. •• ' • u".","; • _(• a .,� • • 9.., 1 r'Gr a �c 'R ..Farmers • 1i ,. a . •• fir? :_. ._.... :I;: a <r4; •• :i. ...n.. l 1 9 h• +cab a 'E '��� � ,•. • . . r Yo . ............ . n!� T'U iIt ...,•.; _ .:...... a � 2 �,:., ,�._.. ._ �"28 CUES' j• f, ,•. l: • t;:' i,;.Y 1.111 pitc.. 4• ts' •J f • _ t.I • .<: . .-ii? w. Pr:. 9t'G1s:liP4 i' • '•ll . 1. .Lf. Lh vy t +' !: 4 . • s _." \ c'*_ .Q. •`• • • • Ei. • / • • i mot.. e> ,t........_....._ = : • IZS a '6A1J ...I ..•••••. •• i i:L14_4 ,AM ; r) , "'•�.�r. •' „„,„,1„.„,,...,,,;.„'. ... .,,,;.,;:-..,,,",....„„silf\:-..-..„,..,-:- .: • `• ;.. . " , i e• ry 9. i ti Kit crt: MEMORANDUM ' C TO: Clerk to the Board DATE: 6/13/2006 COLORADO FROM: Perry Eisenach, Engineering Division Manager SUBJECT: Agenda Item Work Order Form Pursuant to an Agreement with Farnsworth Group Dated May 10, 2006, for the Sheep Draw Gravel Pit project. Please return ONE SIGNED ORIGINAL to Leon Sievers at the Public Works Department. The appropriate documentation is attached. Enclosures pc: Perry Eisenach, Engineering Division Manager Leon Sievers, Right-of-Way Agent M:\Francle\Agend-Leon.doc i,.t 1 ,; ,y-/(t. 2006-1658 L(t it, 'r•,,:1 BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: Work Order for Farnsworth Group(Land Surveying Services) DEPARTMENT: PUBLIC WORKS DATE: May 24, 20Qy PERSON REQUESTING: Perry Eisenach,P.E.,Engineering Manager J Brief description of the problem/issue: Under the present Professional Services Agreement with the Farnsworth Group, Public Works is requesting Farnsworth Group to complete topographic survey and land survey plat, legal descriptions and exhibits for the proposed Sheep's Draw Gravel Quarry project. The anticipated work will not exceed $46,000. This work is required to be completed for the permitting process with the State of Colorado. The topographic surveying will be performed using aerial methods, in which the Engineering Division does not have the capability to complete. What options exist for the Board? (Include consequences,impacts, costs,etc.of options) Option#1: Approve the work order. This approval would allow for the permitting process to continue under the current schedule of permitting this proposed pit by the end of 2006. Option#2: Not approve the work order. This action would create a delay in proceeding with the permitting process Recommendation to the Board: Public Works recommends approval of this Work Order and requests signature on the enclosed Exhibit "A" Work Order form. Thank you for your consideration. Approve Schedule Recommendation Work Session Other Geile Vaad f Jerke 1 /Long \J Masden 1\l Attachments cc: m:\:frank\2005\workfrmblk.doc Hello