Loading...
HomeMy WebLinkAbout20060535.tiff EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND FARNSWORTH GROUP INC. DATED: January 16, 2006 Work Order Number: Survey 020.02 Purchase Order Number: Project Title: WCR 40 1/2 &WCR 5, from WCR 3 to SH-56 Commencement Date: February 6, 2006 Completion Date: April 7, 2006 Limitations on compensation: (time and reimbursable direct costs): $8,700 Project Description: Stake proposed right of way lines Scope of Services: SEE ATTACHED EXHIBIT "B" Professional agrees to perform the services The attached forms consisting of _ (3) pages identified above and on the attached forms in are hereby accepted and incorporated herein, by accordance with the terms and conditions this reference, and Notice to Proceed is hereby contained herein and in the Professional given. Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld County terms of the Professional Services Agreement By: and this work order (including the attached Project Manager forms) the Professional Services Agreement Date: s .%' shall control. Professional c.— Depgr i nt �ead By: Date: ���//y���:vsDavid C. DiFulvio Principal // %/JJ/ 2 Date: /- 2J' o� By: 'f��N' DirectorroLr ice 2p4 Administration Date: �YYjt I8 b0 By: 27 •1'-e."-) Chairman eld Co Commissioners Date: F B 2 2 �ub AP- )• 4.49-, 0 BOARD OF COUNTY R SIGNATURES ONLY e. i • ATTEST: f �` ` aufgod WED COUNTY CLERK TO THE BOARD '3/4a.•01.1 BY:. :J. �I t 4 ('. � 4 (V-11 I L C- OCS4' DEyTY C RK TO THE BARD cike . (; mat Ltd-�_-O4, (Y0 ° Ad,"oLC. p -nom Farnsworth Group PROJECT BUDGET WORKSHEET-2005-2006 WELD COUNTY Rate Schedule Project Name: Weld County•WCR 40 1/2&WCR 5,From WCR 3 to SH-56 Project Number: Project Manager: Steve Dynes ESTIMATED HOURS -- _ ' 1 o u .. a. Task Start Task End Total Task a t- `s1 __ _2 s f- a- it t Total TOTAL COST TASK GROUP WORK TASK Date Date Duration -3 N n I 1 'p 5 t) ° 1, , 0 Routs SUMMARY SUMMARY TOTALS o d i k t a t e _ r '' HOURLYRAWs $128 8109 $94 SB9 $94 $87 $82 $70 008 546 592 5123 — Project Irrltlat50r1 , 0 $O 5392 Scope of wk S contract admin. 1 2 1, - 4 $392 0 50 0 SO 0 50 Stale Proposed Right of Way Lines 0_ $0 $7,920 office calculations 1 8 9 S733 stake 160 points(9 tnps) 5 , 54 59 57.197 0 SO 0 SO SO 0 So o Sot o so o So 0 SO 0 $0' So o $0 o so 0 80 0 So 0 So 0 $0 0 50 So o So 0 So o so I 0 50 SO 0 SO 0 SO 0 SO 0 SO SO 0 SO r 0 so 0 SO 0 s0 so 0 so ` 0 $0 0 50 SUB TOTAL HOURS&FEES 1 3 0 0 0 0 0 8 0 1 0 54 72 58,312 $8,312 , , Reimbursable Expenses,Outside Svcs,etc. research:toots;Cc records at••o ccsti $0 mileage x 0.40 SO SO pacts - -- _ $68 C,PS $320 SO Sub consultant• $0 Sub consultant- SO SUB TOTAL REIMBURSABLE EXPS. _ $383 TOTAL PROJECT FEES(without contingency) $3,7001 P-ofesscra Services f ee Lsh'nare Project Budget Worksheet WCR 40-1-2 WCR Sets Cornorioton rl 1,-,u6 Exhibit B WCR 40 '/z & WCR 5 - WCR 3toSH56 Surveying Scope of Work and Fee Estimate Stake Proposed Right of Way Lines January 16, 2006 The project limits are both sides of WCR 5 from SH 56 to WCR 40 '/2 and WCR 40 '/2 from WCR 3 to WCR 5 being approximately 5 miles of staking. • Office calculations to aid in the staking of the proposed right of way lines. This service will be completed in full prior to performing any staking to ensure the field crew can stake any property that is requested. • Farnsworth Group will set temporary survey points in the field along the proposed right of way lines. Stakes will be set at angle points and every 200 feet along both sides of the new right of way. For budgetary purpose we have estimated the setting of one hundred and sixty (160) points. This service includes nine (9) trips to complete this phase based upon staking a minimum of two properties per trip. • Provide coordination with Client for staking and in house coordination for scheduling of the work. Schedule: The staking of the right of way will be completed within one week from the time of the staking request subject to any adverse weather constraints. Proposed Fee: Farnsworth Group will perform the above-noted Services on an hourly basis not to exceed $8,700, to be billed in accordance with our Weld County Approved Rate Schedule. A more detailed breakdown of estimated maximum fees is provided on the Project Budget Worksheet, attached hereto for reference. a a� MEMORANDUM WII D C. TO: Clerk to the Board DATE : February 14, 2006 COLORADO FROM: Frank B. Hempen, Jr., P.E. Director of Public Works/County Engineer SUBJECT: Consent Agenda Item Exhibit A Work Order Pursuant to an Agreement between Weld County and Farnsworth Group for WCR 40.5 & WCR5, from WCR 3 to SH 66. Enclosures pc: Leon Sievers, Right-of-Way Agent Mona Weidenkeller M:AFrancieAAgendaSignarure.DOC C i') .e6 A - c1?61oa 2006-0535 ECEllVE BOARD OF COUNTY COMMISSIONERS D REVIEW/WORK SESSION REQUEST FEB 13 err.^ D RE: Work Order for Farnsworth Group (Land Surveying Services) WELD COUNTY PUBLIC WORKS DEPT DEPARTMENT: PUBLIC WORKS DATE: January 23, 2006 PERSON REQUESTING: Perry Eisenach, P.E., Engineering Division Manager a Brief description of the problem/issue: Under the present Professional Services Agreement with the Farnsworth Group, Public Works is requesting Farnsworth Group to stake the new right-of-way lines on WCR 40'/ and WCR 5. This project is scheduled for construction by Public Works crews to begin early this summer. It is anticipated that the work will not exceed $8,700 and will most likely be less (depending on the number of parcels that may not require staking). This work is required to be completed during the right-of-way acquisition process and is needed to assist the land owners and appraisers to view the location of the new right-of-way lines. The right-of-way process is anticipated to require four months for completion, thus requiring the staking to begin shortly. The Engineering Division is in the process of filling the two vacant survey positions (Engineering Tech II) and does not have the ability to complete this work in-house at this time. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) The options are to approve this work order or not to approve the work order. If the Board chooses not to approve this work order at this time, possibly delays in the acquisition process could occur thus delaying the start of construction. Recommendation to the Board: To meet the current schedule of completing construction on this project this year, Public Works recommends approval of this Work Order and requests signature on the enclosed Exhibit "A" Work Order form. Thank you for your consideration. Approve Schedule Recommendation Work Session Other Geile ✓ / Vaad Jerke Long Masden v Attachments cc: Leon Sievers, Right-of-Way Agent Hello