Loading...
HomeMy WebLinkAbout20061362.tiff HEARING CERTIFICATION DOCKET NO. 2006-35 RE: SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT#1540 FOR A ROPING/RODEO ARENA AND A PUBLIC AND QUASI-PUBLIC BUILDING, INCLUDING A CHURCH, IN THE A (AGRICULTURAL) ZONE DISTRICT - CHURCH BARN, LLC A public hearing was conducted on June 14, 2006, at 10:00 a.m., with the following present: Commissioner M. J. Geile, Chair Commissioner David E. Long, Pro-Tern Commissioner William H. Jerke Commissioner Robert D. Masden Commissioner Glenn Vaad Also present: Acting Clerk to the Board, Esther Gesick County Attorney, Bruce Barker Planning Department representative, Brad Mueller Health Department representative, Char Davis Public Works representative, Peter Schei The following business was transacted: I hereby certify that pursuant to a notice dated May 25, 2006,and duly published May 31,2006, in the Fort Lupton Press, a public hearing was conducted to consider the request of Church Barn, LLC, for a Site Specific Development Plan and Use by Special Review Permit #1540 for a Roping/Rodeo Arena and a Public and Quasi-Public Building, including a Church, in the A(Agricultural)Zone District. Bruce Barker, County Attorney, made this a matter of record. Brad Mueller, Department of Planning Services, presented a brief summary of the proposal,entered the favorable recommendation of the Planning Commission into the record as written,and gave a brief description of the location of the site and surrounding land uses. He stated eleven referral agencies reviewed the proposal and responded favorably or provided comments that have been addressed in the Conditions of Approval and Development Standards. Responding to Chair Geile, Mr.Mueller stated the applicant has completed a Recorded Exemption,which is contingent upon approval of this application. He further stated the Recorded Exemption did adjust the lot line to add two acres to ensure the entire arena building is contained within the Use by Special Review Permit boundary. Char Davis, Department of Public Health and Environment, stated the site will be serviced by the North Weld County Water District and a septic system,which will be engineer-designed to handle the hydraulic load for a congregation of 350 people. Peter Schei, Department of Public Works, stated the site will be accessed from Weld County Road 33,which is a paved, collector status road. He stated the site is also north of, and adjacent to, Weld County Road 70. He further stated the Department of Public Works is working with the applicant to complete a Stormwater Drainage Report, and they have already addressed the initial traffic concerns. Mr.Schei stated an Off-Site Improvements Agreement is not required; however, the applicant will be required to pave the entrance leading into the site parking lot, which will be CC /LI fW //t- 2006-1362 , PL1840 OLD- -4-)G HEARING CERTIFICATION - CHURCH BARN, LLC (USR#1540) PAGE 2 surfaced with recycled material. He further stated there will be sufficient parking, and staging of vehicles will not be allowed on the County roads. Robb Casseday, Casseday Creative Designs, LLC, represented the applicant and stated the applicant hosted a bible study at his home, which grew and expanded into the arena, and later expanded further into a church. He stated the property owner, Richard Montera, is very active in rodeo and roping events, the arena is used for his private practice, and the church does have a full-time pastor on staff. He further stated the use is situated entirely on Lot B of Recorded Exemption #3961, and the parking will be used by church members and attendees of the twelve special events allowed each year. Mr. Casseday explained the special events may include fund- raising events, which will be permitted and catered by an outside vendor. In response to Chair Geile, Mr.Casseday stated he understands that the applicant will be required to obtain a Temporary Events Permit from Weld County for each of the twelve events if they exceed 350 people. He further stated he and the applicant have reviewed and concur with the Conditions of Approval and Development Standards. Mr. Casseday stated a dual septic system will be designed to accommodate the number of people using facilities at the site and remain below the State level. He stated future expansion may need to be completed as a separate structure in order to meet the State standard for the septic design requirements. Pam Smith, Department of Public Health and Environment,stated in order to avoid the Site Approval process through the Colorado Department of Public Health and Environment, the site must meet various requirements. She explained the State regulations indicate a separate roof requires a separate septic system,and she has advised the applicant to connect the buildings with a breezeway,which would meet the State requirements, while allowing the applicant to proceed with the system as designed. Mr. Mueller requested Condition of Approval#1.A be moved from the stricken portion of the Draft Resolution and inserted as a new Condition of Approval #1.D, which must be completed prior to recording the plat. No public testimony was offered concerning this matter. Commissioner Jerke moved to approve the request of Church Barn, LLC, for a Site Specific Development Plan and Use by Special Review Permit#1540 fora Roping/Rodeo Arena and a Public and Quasi-Public Building, including a Church, in the A(Agricultural)Zone District, based on the recommendations of the Planning staff and the Planning Commission, with the Conditions of Approval and Development Standards as entered into the record. His motion also included removing Condition of Approval#1.Afrom the stricken portion of the Draft Resolution and inserting it as a new Condition of Approval#1.D. The motion was seconded by Commissioner Long, and it carried unanimously. There being no further discussion,the hearing was completed at 11:40 a.m. 2006-1362 PL1840 HEARING CERTIFICATION - CHURCH BARN, LLC (USR#1540) PAGE 3 This Certification was approved on the 19th day of June, 2006 ,�"'- e , } J � APPROVED: t 'p' =OARD OF COUNTY COMMISSIONERS ��) ELD COUNTY, COLORADO ATTEST: Ats# �i'I%Li. „ VE ` EXCUSED DATE OF APPROVAL •o� r V \ " M.01 aeile, Chair Weld County Clerk to the Boa '1%..r.10. \_ C� BY: ��1 btil��( tc1�� David (E. Long, Pro-Tern Dep y Clerklto the Board �T tin iam H. Jerke TAPE #2006-23 (lt\Y1 _ Robe D. M71 DOCKET#2006-35 �Q�,�,{,�/( �/ Glenn Vaad 2006-1362 PL1840 EXHIBIT INVENTORY CONTROL SHEET Case USR#1540 - CHURCH BARN, LLC Exhibit Submitted By Exhibit Description A. Planning Staff Inventory of Items Submitted B. Planning Commission Resolution of Recommendation C. Planning Commission Summary of Hearing (Minutes 02/07/2006) D. Clerk to the Board Notice of Hearing E. Planning Staff Memo re: Items prior to scheduling, dated 05/04/2006 F. Terra Logics Consulting, LLC Letter re: Onsite Wastewater System Concept Report, dated 01/26/2006 G. Planning Staff E-mail from applicant re: Conditions of Approval, dated 02/13/2006 H. Public Works Memo re: Drainage Comments, dated 02/22/2006 Public Works Memo re: Drainage Comments, dated 03/31/2006 J. Applicant Preliminary Drainage Report, dated 01/27/2006 K. Applicant Preliminary Drainage Report (Revised), dated 03/24/2006 L. Planning Staff E-mail re: Drainage Maintenance Comments from Brian Varrella, dated 04/04/2006 M. Planning Staff Certification and Photo of sign posting N. O. P. Q. R. NI r A 0 ii i � vio tbo T2 te q -J N-4 Qrt Q. a Lv .._,o � y fa _ o ` o5p /a � %V W o N V $1 re o s nH s w 0 ui 6 ...a 4 § E N o W411 U ] v C : V' Z 8 V ^i o ›v \;. (r) V 7 to z w0 d Z 7 w r z a U, a Q � 4 3 E a) L ' 0 ,_ a = 0 w 3 u Q. V - ' k\1413 4 S N 9 0 z N N T w 0 g0 N U) &' N Ato ZZ0 ,a�0 1 c. _ I v0ia -1 03 rem j c F o IX 0 0Zm T w Har c \ � Q0 t k o O Y = a 7 LL. Gov ,°, ,c• i X 4 N CD LC)� = ),a CC t0 t0 t0 c N O 1 a 0 0 0 a rn V Z W W W y w � oy � — 1 a r ( ^ " 't.c 2 YYY TI w• 000 -I z ' " = 000 a Hello