RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF WELD COUNTY ROAD 25 BETWEEN STATE HIGHWAY 14 AND WELD
COUNTY ROAD 84 FOR APPROXIMATELY ONE MONTH, FOR WIDENING AND
PAVING
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-410(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance,temporarily close to
through traffic or to all vehicular traffic any highway or portion thereof
for a period not to exceed a specified number of work days for
project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
to through traffic and to regulate,warn and guide vehicular traffic on said County roads by posting
signs thereon.
NOW,THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County,Colorado,deems it necessary to regulate,warn and guide vehicular traffic on County roads
and any intersections thereof,and it hereby authorizes and orders the posting of such traffic control
devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the
safety of the general public and that said traffic control devices shall conform to the Federal Manual
on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that Weld County Road 25 between State Highway 14 and
Weld County Road 84 be temporarily closed,with said closure being effective September27,2006,
for approximately one month for widening and paving, and further, that standard official traffic
control devices shall be erected at said closure giving notice of the restrictions.
2006-2686
EG0024
nA 1 /≤it) so, C6Y7 CSd' (0 - 0Y -OC
ROAD CLOSURE - WCR 25
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted by
the following vote on the 25th day of September, A.D., 2006.
BOARD OF COUNTY COMMISSIONERS
r�,/`► ELa; WELD COU TY, COLORADO
ATTEST: >� zia/
�Jt M. J ei e, Chair
Weld County Clerk to ;- +v rcizit
bl ' ,b rs✓U 11 David E. Long, Pro-Tern
BY: Ito 1
Dep t Clerk . the board ` 2 z.-..,
William H. Jerke
A ED AS M: 0 . ( .\It r
Robert D. Masd n
ounty Attorney Z---7,--2.-----..._„ Ail.0 315
Glenn Vaad ---------
Date of signature: it k lac
2006-2686
EG0024
*Kit" t ‘H"-- ,
MEMORANDUM
ivilkTO: Clerk to the Board DATE: September 20, 2006
COLORADO FROM: Frank B. Hempen, Jr., P.E.
Director of Public Works/County Engineer
SUBJECT: Agenda Item
Aggregate Industries will close WCR 25 between SH 14 to WCR 84 will be closed from 9/27/2006 to 10/23/2006
to widen and pave as per the agreement per USR-1527 (Waste Management).
The appropriate documentation is attached.
M1Francie\Agenda Road Closures.doc
2006-2686
09/19/2006 15:04 19703786656 AGGREGATE INDUSTRIES PAGE 02/83
S
AGGREGATE
INDUfTWG6
September 19, 2006
FAO: Mr. Tracy Dyer
Project Engineer
Weld County Public Works Department
1111 H Street
Greeley CO 80632-0758
RE: Waste Management Project—WCR2/Traffic Control
5
Dear Tracy,
Please find enclosed our proposed method for handling traffic on Weld County Road 25 for
the duration of our construction work; estimated to be three weeks.
We have proposed a full road closure for the following reasons:
1. The existing road width does not allow for a full one lane closure to be installed.
2. There is concern over traffic backing on to HW14 during periods of high volume
material delivery.
3. The road alignment is shifting to the East, necessitating the construction of a
shoulder. This will introduce a hazard to the traveling public, even if shouldered
each evening.
It is our intention to complete the work as soon as possible, however due to weather
considerations; we estimate that three weeks will be required.
We should be grateful to receive your decision at your earliest convenience.
Sincerely,
\i(pdAilq
Paddy Murphy
Operations Manager
Aggregate Industries, WCR Inc.
09/19/2006 15:04 19703786856 AGGREGATE INDUSTRIES PAGE 03/03
Aggregate Industries
Paving / Road Widening
September/ November 2006
Road 27
mm
Road 25 •TED 0
-a
km-);i
Road 23
Workzone Traffic Control. Inc,