Loading...
HomeMy WebLinkAbout20062619.tiff CHANGE ORDER NO. 1 Weld County On-Call Engineering Date: Project: Weld County On-Call General Engineering generally consisting of transportation engineering including road&bridge design,traffic engineering,surveying,environmental studies,construction management and material testing. Owner: Weld County Public Works Department,PO Box 758,Greeley,Colorado 80632 Consultant: Felsburg Holt&Ullevig(FHU)6300 S.Syracuse Way,Suite 600,Centennial,CO 80111 The following change is hereby made to the Contract Documents: Contract Time Extension: The original Agreement for Professional Services is extended one full year as permitted by the contract. This extension is the second year of the four year term limit. Change to Original Rate Schedule: The 2005 Rate Schedule as shown on Exhibit B of the original contract shall be replaced with the attached Exhibit B, 2006 Rate Schedule. The limit of increase does not exceed the Denver Boulder CPI per the contract requirements. CHANGE TO CONTRACT PRICE: See attached Exhibit B,2006 Rate Schedule The limit of$50,000 compensation per work order is not modified by this change order and remains in effect. CHANGE TO CONTRACT TIME: The Contract time will be increased by 365 calendar days. RECOMMENDED: SEP 1 8 2006 Owner Representative: seidal Date: //,t _ JoGeile,Chair Engineer: /�!' lv ' ^1. p Date: ���Dt� APPROVALS: Consultant: Felsb Holt& Ilevi IIq By: - F°14-11: Date: — �9'O6 9 Title: PYtnC' pI ATTESTING TO BOARD OF COUNTY COMMISSIONER SIGNATURES ONLY � EI ca ATTEST: g.occM /0 '°N j 1ti1 I( r�_ 'ia.F WEL OUNTY CLERK TO THE BOA'S t i 1: _ BY: i/U ' "2Ct, 'a JN / L` of�J� DEP CLER TO T E BOARD 2006-2619 pa , l v-u. S o9-oza_oh. !±, "` �r.. i. " �g -c. s �� '`'�� z t �'� came`'�iy ry 'a'`-`�a 4 "'Itt`^a a qzw :y ',v '"'' ti;.ytil ir`r-` . jaT �"J"' ,C R • gala � � y �'' 3 R '3 x� s Y. ;^a Y Z Fa '° t 3'- F. D—� .• £ ,`t,$sue '� i ,, Tk 4 's �.t',-a-n x R a ..F z The following hourly billing rates apply to all"Time and Materials"contracts. LI W Staff Rates Reproductions ,--. _c r- II $153.50 Plots Principal I $138.50 Bond $0.18/sq ft Associate $128.00 Glossy $0.98/sq ft Senior Engineer $118.00 Mylar $0.51/sq ft Engineer V $107.50 Vellum $0.21/sq ft • Engineer IV $102.50 _ Engineer III $ 92.00 Prints YJ Engineer II $ 82.00 Black and White $0.05/print Engineer I $ 76.50 Color $0.11/print Senior Environmental Scientist $118.00 Environmental Scientist IV $102.50 Presentation Boards Environmental Scientist III $ 92.00 Bond Foam Core Mounted $1.15/sq ft H Environmental Scientist II $ 82.00 Glossy Foam Core Mounted $1.93/sq ft ,.--2 Environmental Scientist I $ 76.50 Senior Transportation Planner $118.00 Computer Projector $100.00/meeting C Transportation Planner IV $102.50 `J Transportation Planner III $ 92.00 Travel Transportation Planner II $ 82.00 Mileage $0.415/Mile Transportation Planner I $ 76.50 Senior Bridge Designer $ 92.00 Senior Designer $ 92.00 r Designer IV $ 82.00 Designer III $ 71.50 w Designer II $ 66.50 Designer I $ 61.50 .--J Administrative $ 61.50 ✓i 1 I--I �r I cm•L1 BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: On-Call Engineering Contracts DEPARTMENT: PUBLIC WORKS DATE: August 30, 2006 PERSON REQUESTING: Frank B. Hempen, Jr., P.E., Director of Public Works/County Engineer Brief description of the problem/issue: Weld County Public Works currently has two contracts for On-Call Professional Engineering services. The contracts are held with Felsburg Holt&Ulliveg and Short Elliot Hendrickson. Both contracts were signed in 2005 and are limited to one year,renewable up to four years. The original contracts expired on July 27,2006. Provisions in the contract allow the consultants to increase their billable rates based upon the Denver-Boulder-Greeley Consumer Price Index(CPI). The allowable rate of increase is 2.75%based upon the comparison of the 2005 CPI and the 2006 CPI.Change Order#1 extends both contracts for an additional year and includes new 2006 hourly rate schedules. This is the first of the three extensions allowable in the contract. What options exist for the Board? (Include consequences,impacts, costs, etc. of options) The Board can accept the change order which renews both contracts for an additional year with the allowable rate increases or not accept the change order. Acceptance would permit the Public Works Department to continue to utilize engineering services for smaller projects such as environmental clearances, development traffic study reviews, etc. To date,FHU has performed 6 work orders totaling$175,500 and SEH has performed 4 work orders totaling $123,287. Recommendation to the Board: I recommend the approval of both Change Orders extending the contracts for FHU and SEH for an additional year. Initial: Approve Schedule Recommendation Work Session Other Geile Long Q V Jerke �p06 Masden ���c\\Op\ys Vaad �e pc: Wayne Howard, Project Manager M:\—Active ProjectsVvlisc Projects\F,ngineering On-Call Services\Work Session Request Form CO l.doc MEMORANDUM 1111D TO: Clerk to the Board DATE : September 12, 2006 C FROM. Frank B. Hempen, Jr., P.E. COLORADO Director of Public Works/County Engineer SUBJECT: Consent Agenda Item Per approval of the Board of County Commissioners Review, attached for the Chair's signature are two originals of each Change Order. Please return one original for each of the two change orders to Public Works. 1) On Call Engineering Services Change Order No. 1 with FHU for extension of one full year as permitted by the contract not to exceed $50,000. 2) On Call Engineering Services Change Order No. 1 with Short Elliott Hendrickson for extension of one full year as permitted by the contract not to exceed of$50,000. Enclosed is the appropriate documentation. Enclosures pc: Wayne Howard, Senior Engineer m "J M1Francie\AgendaSignature.DOC F V > N.) EG 0059 2006-2619 Hello