HomeMy WebLinkAbout20062694 WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
FELSBURG HOLT&ULLEVIG
DATED:
Work Order Number: FHU-7
Project Title: Biological Field Work—Public Works Operations Division 07 Bridge Replacement
And Public Works Operations Division—Gravel Mine Permitting
Commencement Date: July 31,2006
Completion Date: January 15,2007
Limitations on compensation: Not to Exceed$14,114.00(See attached cost details)
Project Description: Weld County Public Works Operations Division is scheduled to replace the bridge
on WCR 74 and WCR 27 east of Severence during 2007. Environmental clearances are required before
construction begins. Permitting of the Fiscus North sand and gravel pit requires environmental clearances
per Colorado Division of Minerals and Geology regulations.
Scope of Services: See attached Scopes of Work
Professional agrees to perform the services The attached forms are hereby accepted and
identified above and on the attached forms in incorporated herein, by this reference, and
accordance with the terms and conditions Notice to Proceed is hereby given.
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the Weld County
terms of the Professional Services Agreement
and this work order (including the attached By: Steve Detienne (bridge), David Bauer
forms) the Professional Services Agreement (Fiscus rt pit) Pr 'd anagers
shall control. Date:
Professional !ett
Head
Felsburg Holt&Ullevig :
6300 South Syracuse Way, Suite 600
Centennial CO 80111 C
B l 1 I Date: of F}llca>tld ministration
y: tY LUUD
Title: Pv;ncr p 4) By: .77/
p Chairman, Countyel C issioners
Date: I - 2O-o6 Date: LUUO
M:'-Active Projects\Misc Projects\Engineering On-Call Services\FHU Contract\Work Order 7-Bauer-Detienne\Work Order No 6 Env Services
07 Bridge Replacement.doc
0,2494e, - atv99'
CO 07.-dg-o‘
ratD
MEMORANDUM
C
TO: Clerk to the Board DATE: 9/20/2006 FranB r.,COLORADO FROM: mp , P.E.
Director of Public Works/County Engineer
SUBJECT: Agenda Item
Work Order Form with Felsburg Holt& Ullevig for Biological Field Work to replace bridge
on WCR 74 and WCR 27.
pc: Frank B. Hempen, P.E., Public Works Director/County Engineer
Wayne Howard, Project Engineer
M:\Francie\Agenda Item.doc
l 6r/J-L , ' ,„,iu� Wol5A2oc U 2006-2694
FELSBURG
rrg HOLT &
ULLEVIG
engineering paths to transportation solruions
September 11, 2006
Mr. David Bauer
Weld County Public Works Department
P.O. Box 758
Greeley, CO 80632
RE: Biological Field Work—WCR Bridge 74/27A and Fiscus North Mine
Work Order 7
Proposal for Professional Services
Dear Mr. Howard:
Felsburg Holt & Ullevig is pleased to submit this proposal as part of our on-call services contract nr ° 7
with Weld County. This task-order involves Darcy Tiglas to provide you biological work eight-" `{I
Weight- 4/o7
county bridges and for the Fiscus North Mine. The effort will primarily involve Darcy's efforts, but
we have also incorporated a small amount of time to administer the task order.
The following budget is proposed:
• FHU Effort—4 hours for a principal, $153.50/hour: $614
• Tides Effort—See attached proposal from Darcy Tiglas: $13,500
From this, we have established a total of budget of$14,114 to complete the effort per Darcy's
attached scope of work. Should other services be required not anticipated at this point, we will
submit a separate proposal for the additional work.
If the scope and budget presented here (and in the attachment) is acceptable to you, please sign
below and return one copy to serve as a letter of agreement for this task order. If you have any
questions, please feel free to call. Also, feel free to call Darcy directly if needed.
Sincerely,
FELSBURG HOLT& ULLEVIG
‘444.14.
(( Accepted By
I"
Christopher J. Fasching, P.E. Title
Principal
Date
cc: Wayne Howard
6300 South Syracuse Way, Suite 600 Centennial, CO 80111 tel 303.721.1440 fax 303.721.0832
www.fhueng.com info@fluteng.com
DARCY A. TIGLAS
5015 Swainsona Drive D F? EP WI
Loveland, Colorado 80537 L D
970-635-9183 AU6 1 4 2006
FELSBURG,HOLT& ULLEVIG
August 10, 2006
Mr. Christopher J. Fasching, PE
Felsburg Holt& Ullevig
6300 South Syracuse Way, Suite 600
Centennial, CO 80111
RE: Proposal for Biological Held Work for Weld County Bridge 74/27A
Dear Mr. Fasching:
This letter serves as a proposal for biological field work at Weld County Bridge 74/27A. Tasks
include a wetland delineation, Preble's meadow jumping mouse live trapping (ZAPR), Ute
ladies'-tresses orchid field surveys (SPDI), and 404-wetland permitting. I understand that the
scope of work for this bridge is as follows:
Bridge 74/27A
• Wetland Delineation- $1500
• ZAPR Live Trapping- $4000
• SPDI Survey- $2000
• 404-Wetland Permit(Nationwide 14)- $1,500
The cost estimate includes the tasks outlined above and drafting, review, and other direct costs
associated with the individual tasks. Dale Elliott of Weld County was handling the contracting
and billing tasks, but now Steve Detienne is the contact person. If you have any questions, or
require additional information, please feel free to call me at 970-635-9183.
Sincerely,
Darcy A. Tiglas
Project Manager, Tiglas Ecological Services
DARCY A. TIGLAS
5015 Swainsona Drive
Loveland, Colorado 80537
970-635-9183
September 7, 2006
Mr. Christopher J. Fasching, PE
Felsburg Holt& Ullevig
6300 South Syracuse Way, Suite 600
Centennial, CO 80111
RE: Proposal for Biological Field Work for a Proposed Gravel Mine Site, the Fiscus
North Mine, in Weld County, Colorado
Dear Mr. Fasching:
This letter serves as a proposal for biological field work for a proposed gravel mine site known
as the Fiscus North Mine in Weld County, Colorado. I understand that the scope of work for
the mine site is as follows:
Initial Site Reconnaissance and Issue Identification
• General site visit and field reconnaissance with Weld County Staff;
• Species list generation and habitat type determination; and
• Issue identification.
Cost for this task: $500.00
Burrowing owl survey
• field reconnaissance and windshield survey of the black-tailed prairie dog town east and
south of the proposed mine site as well as power lines and fence lines in an approximate
one-mile area of the work site to be conducted between March 15 and September 15; and
• if burrowing owls are determined to be present, consultation with the Colorado Division
of Wildlife for impacts analysis or imposition of a timing restriction within the immediate
area of the prairie dog town.
Cost for this survey: $1,500.00
•
Mr. Christopher J. Fasching
Page 2
Mountain plover survey
• field reconnaissance and windshield survey of the short-grass steppe surrounding the
proposed mine site in an approximate one-mile area of the work site to be conducted
between March 15 and September 15; and
• if the plover is detected, consultation with the Colorado Division of Wildlife for impacts
analysis or imposition of a timing restriction within the immediate area of the proposed
mine site.
Cost for this survey: $2,500.00
The cost estimates include the tasks outlined above and drafting, review, and other direct costs
associated with the individual tasks. If you have any questions, or require additional
information, please feel free to call me at 970-635-9183.
Sincerely,
aticeir
a . prc///_Uly1(`aa_
•
Darcy A. Tiglas
Project Manager, Tiglas Ecological Services
Hello