Loading...
HomeMy WebLinkAbout20061846.tiff RESOLUTION RE: APPROVE CONTRACT FOR FUNDING INCREASE AND APPROVAL LETTER FOR REPLACEMENT OF WELD COUNTY BRIDGE 87/42.5 AND AUTHORIZE CHAIR TO SIGN WHEREAS,the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Contract for Funding Increase and Approval Letter for the Replacement of Weld County Bridge 87/42.5 between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County,on behalf of the Department of Public Works,and the Colorado Department of Transportation,commencing upon full execution of said contract, with further terms and conditions being as stated in said contract, and WHEREAS,after review,the Board deems it advisable to approve said contract,a copy of which is attached hereto and incorporated herein by reference. NOW,THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County,Colorado,that the Contract for Funding Increase and Approval Letter for the Replacement of Weld County Bridge 87/42.5 between the County of Weld,State of Colorado,by and through the Board of County Commissioners of Weld County,on behalf of the Department of Public Works,and the Colorado Department of Transportation be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is,authorized to sign said contract. The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 10th day of July, A.D., 2006. :. BOARD OF C UNTY COMMISSIONERS ;77.,,e,jWELD CO Y, COLORADO / / ATTEST: , /� /CA:. t � M. ` e�Chg{r CLeU Weld County Clerk tot rd , , ► lJ' David E. Long, Pro-Tem BY: \ .A-ft De y Cler to the Board Willis . Jerke APP S Robert . Masden my A rney �r�''G� Glenn sad Date of signature: 1 2006-1846 EG0054 co ; Pw, W-- ors--oa -c>cc #0;HesrP"I MEMORANDUM C. TO: Clerk to the Board DATE : July 5, 2006 COLORADO FROM: Frank B. Hempen, Jr., P.E. Director of Public Works/County Engineer SUBJECT: Agenda Item Weld County Bridge Replacement 87/42.5A: Weld County entered into a contract with CDOT previously(2005-3128) for the Federal Grant to replace bridge 87/42.5A over the South Platte River. At that time only $1,323,690.00 of the $2,386,000 was available which allowed us to begin the design phase. Currently,the full amount of the funds are available and the attached CDOT Form 1186a will permit CDOT to increase the contract amount for the total grant amount. CDOT requires a signed resolution and signature from the chair on the attached form to proceed. Enclosed is the appropriate documentation. Enclosures pc: Wayne Howard, P.E., Sr. Engineer 87/42.5A file M:\—Active Projects\Bridge 87-42.5A\Design\Correspondence\Letters tAgenda CDOT Funding Increase.DOC 2006-1846 STATE OF COLORADO DEPARTMENT OF TRANSPORTATION Region Four OT 1420 2n°Street era® Greeley,CO 80631 DEPARTMENT OF TRANSPORTATION (970)350-2103 Fax(970)350-2177 June 19, 2006 Mr. Wayne Howard BRO C030-032 Weld County Engineering WCR 87 Bridge@S. Platte R. P.O. Box 758 14990 Greeley, CO 80632 Dear Wayne, Attached is a funding letter for project BRO C030-032, WCR 87 Bridge@S. Platte R, to add the 2007 funding into the project. Please have the city government official, who is authorized to sign such contracts for Weld County, sign the letter under Local Agency approval. The funding is broken down as follows: 2006 Funding 2007 Funding Total Funding Federal funds $1,074,952 $ 825,631 $1,900,583 Local Agency funds $ 309,048 $ 237,369 $ 546,417 Total funds $1,384,000 $1,063,000 $2,447,000 Total funding for the project is $2,447,000. The matching ratio for this project is 80% Federal-aid funds and 20% local agency funds. The payment responsibility is as follows: Total amount reimbursable to l eeiey $1,884,583 `✓ Oreetey-match for reimbursable amount $ 475,146 Estimated CDOT charges($20,000) Federal match $ 16,000 C GrePley 3% overmatch for CDOT charges and indirects $ 71,271 TOTAL $2,447,000 When the letter has been signed, attach a copy of the resolution and return to me at the address listed above. Sincerely, Wendy Turner "Taking Care To Get You There" 02-NOV-2006 17:30 FROI/rCDOT GREELEY TRAP +9703502258 7-406 P.002/002 F-890 glai-nr•POO DEPARTMENT OFTRAI :nc1ATlON k .10R1TT: State Controller Policy letter on June 12, 18SC CUN fRAC?FUNDING In 1 and submit AND APPROVAL LETTER COOT Controller letter on May 23, 1996. Regicn:Co ete section 1 and submitto COOT Controllers office. •This form to be used for the following contractslsituations only(check the appropriate situation): _Indefinite quantity,order more/add more ,Utility/Railroad,underestimated total cost —COOT construction,sum of CMO's X LA construction,underestimated cost COOT construction, underestimated total cost CDOT consultant,underestimated cost -'+:r SECTION 1 (Region use) Date: 06/20/06 Project code: 14990 ._. To: COOT Controller(FAX#(303)757-9573 or e-mail CONTROLLER) Project# BRO C030-032 Phone# FAX# From: (970) 350.2219 (970)350.2181 Region# 4 Business Office COOT has executed a contract with: Weld County .h Address: P.O. Box 758 Greeley, Colorado 80632 _�_ FEIN_# - Contract routing# COFRS encumbrance#(indicate PO,SC,or PG#' . 846000813 06-HA4-00032 PO HA4 149904 Proj/SublPhase Fund Orgn. Appro. Prgrm. Fun.. Object/Sub-obiN .. 1P GBL ... tg 400 9991 010 2000 3301 231211P 4610 14990/00/.•- Original contract amount Has a Budget Request been processed to cover the contract amount Increase? 5 1,323,690.00 _Yes ^No Previous Funding Letter(s)total P�gpare /r's Name @ryan O.Schaf $ Ndne (`Qr (X/, --� PHONE NO: (970)350-2219 (Funding letter#1 thru#, ) This Funding Letter total Contra t Administrator's/Business Manager's Approval Julie Powers S 1,063,000:00 PHONE NO:(970)350-2109 (#� Q L . �C'U-Ei'?°^_ Adjusted contract amount CD ST esignee Approval • $ 2,386,690.00 • : Local Agency val M. J. Celle, Chair. Board of County Cominiss.i JUL 10 al 5ECITON 2(Controller's Office use) Total aiiotment amount Commission budget I a - . _ $ d; S< 7 Odd $ z/ v5�7 00d If construction CE charges I Indirect chgs Adjusted contract amount plus total CE&Indirect CE pool elig. S aix J $ `Q15C' charges calculation $ n I have reviewed the financial sta of the project,organization, grant and have determined that sufficient fund are available to cover _ this increase,effective as of 6- 2 ?—a t.. State Pahtrdller or Designee ( h , "6 4 ( Date COOT Form#11Pea 7197 '.. —. Hello