HomeMy WebLinkAbout20061742.tiff RESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF WELD COUNTY ROAD 41 (1ST AVENUE)BETWEEN WELD COUNTY
ROADS 64 (O STREET)AND 62 (C STREET) FOR SIX WEEKS, FOR INSTALLATION
OF A SEWER LINE
WHEREAS,the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS,pursuant to Section 42-4-410(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance,temporarily close to
through traffic orto all vehicular traffic any highway or portion thereof
for a period not to exceed a specified number of work days for project
completion and shall, in conjunction with any such road closure
establish appropriate detours or provide for an alternative routing of
the traffic affected...", and
WHEREAS,the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
to through traffic and to regulate,warn and guide vehicular traffic on said County roads by posting
signs thereon.
NOW,THEREFORE,BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado,deems it necessary to regulate,warn and guide vehicular traffic on County roads
and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control
devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the
safety of the general public and that said traffic control devices shall conform to the Federal Manual
on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that Weld County Road 41 (1st Avenue) between
Weld County Roads 64(O Street)and 62(C Street)be temporarily closed,with said closure being
effective July 10, 2006,for approximately six weeks for the installation of a sewer line, and further,
that standard official traffic control devices shall be erected at said closure giving notice of the
restrictions.
2006-1742
p EG0024
(r0 '. 1 ti)1 CO, CS/° �<, i .{'E
ROAD CLOSURE -WCR 41 (1ST AVENUE)
PAGE 2
The above and foregoing Resolution was,on motion duly made and seconded,adopted by
the following vote on the 28th day of June, A.D., 2006.
BOARD Os COUNTY COMMISSIONERS
_�D ��`► E LS \WELD ,��UNTY, COLORADO
ATTEST: "�'T7vkT������'. _
+. eile, Chair
Weld County Clerk to the '�,r• i
BY:
11-1 fLt Davi. . Long, Pro-Tem
De ty Clerctcthe Board '' ' V
• m H. Jerke
APP AS TO F Ih. �
Robert D. Masde
runty
Attorney i tAk
Glenn Vaad
Date of signature:
2006-1742
EG0024
a
MEMORANDUM
WilkTO: Clerk to the Board DATE: June 23, 2006
COLORADO FROM: Frank B. Hempen, Jr., P.E.
Director of Public Works/County Enginee
SUBJECT: Agenda Item
WCR 41 (151 Avenue) between WCR 64 (O Street) to WCR 62 (C Street) will be closed from July 10, 2006 to
August 21, 2006 by GLH Construction for installation of a 18" sewer line for Swift a& Company.
pc: Ted Eyl, Right-of-Way Agent
M:Wrancie'Agenda Road Closures.doc
2006-1742
MEMORANDUM
TO: Frank Hempen DATE: 6/23/06
C. FROM: Ted Eyl
COLORADO SUBJECT: Road Closure for WCR 41 (1s`Ave) from WCR 64 (O St.) to
WCR 62 (C St.)
This is a road closure to be submitted to the BOCC for the 6/28/06 agenda. GLH Construction is requesting
the closure of WCR 41 (15t Ave) from WCR 64 (O St.)to WCR 62 (C St.) for the installation of an 18" Sewer line
for Swift& Company. The road will be closed twice for a total of 6 days from the period of July 10, 2006 to
August 21, 2006.
The project will take place in two phases. The first phase will have the road closed for a period of 3 to 4 days
to place the sewer line in Weld County ROW. The second phase will be to tie the new line to the existing line
at C Street& 1st Avenue. Swift & Company will have to close the slaughter plant for this phase to take
place. GLH Construction will coordinate with Swift as to when they will shut down their plant. This will be
determined at a later date. Variable message boards will be put up one week prior to both road closures. The
detour route will on Balsom Avenue from WCR 64 to WCR 62. GLH has agreed to put a dust suppressant in
front of all houses on the detour route.
N
i
W E
S
4
'O"ST i WCR
64
4
\
d
a �
F
CD
aoaa l —I,
J / -
•
4
1) SIGNS SHALL BE SPACED APPROX 500'.
2) EMERGENCY SERVICES WILL BE NOTKFED N.1ST ST(WCR 41)CLOSURE: E'C'ST-WCR 64
AS CLOSURE IS SETAND WHEN COMPLETE _
CLOSURE IS FOR 2 WORKING DAYS FOR PIPE Swift&Company
CROSSING.
nlialarn Prat Nola
ForceMain Replacement SJ 3608
--
Taft Ovid Clair
•GLH Construction N.C.T.C.
970.674.0440 MHTt)!2 06/06/O6
Luann Leiding, DS,TCS
Hello