Loading...
HomeMy WebLinkAbout20063029.tiff WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND FELSBURG HOLT&ULLEVIG DATED: 10_Zs—OG Work Order Number: FHU-8 Project Title: Biological Field Work—Public Works Operations Division 07 Bridge Replacement Commencement Date: October 30,2006 Completion Date: January 15,2007 Limitations on compensation: Not to Exceed$11,614.00(See attached cost details) Project Description: Weld County Public Works Operations Division is scheduled to replace two additional bridges (2141A & 22/35A) that were not included in the previous requests. Environmental clearances are required before construction begins. Scope of Services: See attached Scopes of Work Professional agrees to perform the services identified above and on the attached forms in The attached forms arc hereby accepted and accordance with the terms and conditions incorporated herein, by this reference, and contained herein and in the Professional Notice to Proceed is hereby given. Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement Weld County and this work order (including the attached forms) the Professional Services Agreement By: Wayne Howard Pr jest Manager shall control. Date• l0 vc Professional By: 4 - Department Head Felsburg Holt& Ullevig Date: /o I Z/�/06, 6300 South Syracuse Way. Suite 600 Centennial,CO 80111 By: Director of Finance and Administration By: Date: Title: P v l By: Chairman, Weld County Commissioners Date: U.ZS �U6 Date: M:\—Active Projects\Misc Projects\d:ngincering On-Call Services\FHU Contract\Work Order 8\Work Order No 8 Env Services 07 Bridge Replace.doc 2006-3029 FELSBURG (4HOLT & ULLEVIG engineering paths to transportation solutions October 13, 2006 Mr. Wayne Howard Weld County Public Works Department P.O. Box 758 Greeley, CO 80632 RE: Biological Field Work—Bridge 2/41A and 22/35A Work Order 8 Proposal for Professional Services Dear Mr. Howard: Felsburg Holt& Ullevig is pleased to submit this proposal as part of our on-call services contract with Weld County. This task-order involves Darcy Tiglas to provide you biological work for two county bridges. The effort will primarily involve Darcy's efforts, but we have also incorporated a small amount of time to administer the task order. The following budget is proposed: • FHU Effort—4 hours for a principal, $153.50/hour: $614 • Tiglas Effort—See attached proposal from Darcy Tiglas: $11,000 From this, we have established a total of budget of$11,614 to complete the effort per Darcy's attached scope of work. Should other services be required not anticipated at this point, we will submit a separate proposal for the additional work. If the scope and budget presented here (and in the attachment) is acceptable to you, please sign below and return one copy to serve as a letter of agreement for this task order. If you have any questions, please feel free to call. Also, feel free to call Darcy directly if needed. / Sincerely, L1/ /✓FELSBURG HOLT& ULLEVIG Acce7fly C ristopher J. Fasching, P.E. Title Principal l/�VaL Date 6300 South Syracuse Way, Suite 600 Centennial, CO 80111 tel 303.721.1440 fax 303.721.0832 www.flweng.com info@flweng.com DARCY A. TIGLAS D E(D'C D 1J 5015 Swalnsona Drive OCT 1 2 Loveland, Colorado 80537 006 970-635-9183 FELSBURG, HOLT& ULLEVIG October 11, 2006 Mr. Christopher I. Fasching, PE Felsburg Holt&Ullevig 6300 South Syracuse Way, Suite 600 Centennial, CO 80111 RE: Proposal for Biological Field Work for Two Bridge Replacement Project, Weld County Bridges 2/41A and 22/35A,in Weld County, Colorado Dear Mr. Fasching: This letter serves as a proposal for biological field work at two bridges in Weld County. Tasks include wetland delineations, Preble's meadow jumping mouse habitat evaluations, Ute ladies'-tresses habitat evaluations, and 404-wetland permitting application preparation. I understand that the scope of work for each bridge is as follows: Bridge 2/41A • Wetland Delineation-$1500 • ZAPR Habitat Evaluation-$1500 • SPDI Habitat Evaluation-$1500 • 404-Wetland Permit-$1000 Bridge 22/35A • Wetland Delineation- $1500 • ZAPR Habitat Evaluation-$1500 • SPDI Habitat Evaluation-$1500 • 404-Wetland Permit-$1000 The cost estimates include the tasks outlined above and drafting, review, and other direct costs associated with the individual tasks. If you have any questions, or require additional information, please feel free to call me at 970-635-9183. Sincerely, Ouuteki a . 6O, Darcy A. Tiglas Project Manager, Tiglas Ecological Services t714-4. MEMORANDUM WI I P C TO: Clerk to the Board DATE: 10/26/2006 a FROM: Drew Scheltinga, P.E. COLORADO Director of Public Works SUBJECT: Agenda Item Work Order Form with Felsburg Holt& Ullevig for Biological Field Work on replacement of Bridges 2/41A and 22/35A. Enclosed is one original Work Order Form. pc: Wayne Howard, Senior Engineer M:\FrancieWgenda Item.doe hJ —73 J:L{ 0" G. N Hello