Loading...
HomeMy WebLinkAbout20061185.tiff AGREEMENT 2006 Slurry Seal\Rejuvenator\Crack Seal Project THIS AGREEMENT,made this day of , 20 , by and between Weld County,Colorado,hereinafter called"Owner" and 6c%4' Ave doing business as(an individual,) or(a partnership,)or a corporation hereinafter called"Contractor". _' WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned: 1. The Contractor will commence and complete the following: 2006 Slurry Seal\Rejuvenator\Crack _, Seal Projects described in the Invitation for Bids,Bid No.B0600068 2. The Contractor will furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the Project described herein. 3. The Contractor will commence the work required by the Contract Documents within ten(10)calendar days after the date of the Notice to Proceed and will complete the 2006 Slurry Seal\Rejuvenator\ _. Crack Seal Project as specified in Commencement and Completion of Work Page 42 unless the period for completion is extended otherwise by the Contract Documents. _ 4. The Contractor agrees to perform all of the Work o described in the e s osno acct Documents n in cuBnSchedule. and coply — with the terms therein for the sum of$ icy/ oon 5. The term"Contract Documents"means and includes the following: (A) Invitation for Bids (B) Instructions to Bidders — (C) Bid Proposal (D) Bid Bond (E) Statement of Qualifications and Subcontractors (F) Required Project Forms — (G) Agreement (H) Labor and Materials Payment Bond (I) Insurance Requirements — (I) Performance Bond (K) Notice of Award (L) Notice to Proceed — (M) Change Order (N) Certificate of Substantial Completion (O) Lien Waiver (P) Notice of Acceptance — (Q) Specifications prepared or issued by the Weld County Public Works Department. (R) Colorado Department of Transportation "Standard Specifications for Road and Bridge Construction" _ (S) Colorado Department of Transportation Standard Plans"M&S Standards" (T) Addenda: No. , dated ,20 — No. , dated , 20 — 6. The Owner will pay to the Contractor in the manner and at such times as set forth by the Contract Documents, or otherwise agreed upon in writing. 27 ELFary 1U-a1/-0� fie : Ptt) Pal, aco� //PS / di-i • a6-olc 7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators,successors,and assigns. 8. Contract Appropriations: The Owner hereby states and affirms that the amount of money appropriated for this Contract is equal to or in excess of the Contract amount. No change order to this Contract requiring additional compensable work to be performed, which work causes the aggregate amount payable under the Contract to exceed the amount appropriated for the original Contract shall be issued by the Owner unless the Owner assures the Contractor,in writing,that lawful appropriations to cover the costs of the additional work has been made or unless such work is covered under a remedy- granting provision contained in the Contract. — IN WITNESS WHEREOF,the parties hereto have executed, or caused to be executed by their duly authorized officials,this Agreement in three(3)copies each of which shall be deemed an original on the date first above written. ORDERED BY: ACCEPTED BY: THE BOARD OF WE COUNTY COMMISSIONERS CONTRACTOR BY e6rs BY caair /4Jc✓ uy — NAME M.J. Geile NAME //M'b /'&$5o (Please Type) TITLE Chair TITLE Uc+ f7+o.Jor1 — Date PR 2 4 2006 ADDRESS CAln -/114-or. Cruet �E It ti-rnobrica cam, fl Y.fr Imo' ► a I ay r lit ( .., _ 1 f el te:, AO - ♦ ad (SEAL)•4 (SEAL) ATTEST: !i � ATTEST: Weld County Clerk to the Board BY ,---- (1.774.1, BY � ��C eputy Clerk to the Board (Please Type) — TITLE — M:\Maintenance Contracts\Slurry Seal\2006\Slurry Seal Contract 2006.doc _28 006 -//8 6 ' MEMORANDUM C. COLORADO TO: Clerk to the Board DATE : April 18, 2006 FROM: Perry Eisenach, P.E. Engineering Division Manage • SUBJECT: Item for Consent Agenda Agreement with Quality Resurfacing for 2006 Slurry Seal Project. Enclosed is the appropriate documentation. Enclosures pc: Frank B. Hempen, Jr., Director of Public Works/County Engineer M:UFrancie\AgendaSignature.DOC L2, ocsvr Ci�Ln a c _A)/ .2oce Hello