Loading...
HomeMy WebLinkAbout20061548.tiff RESOLUTION RE: APPROVE INSTALLATION OF TRAFFIC CONTROL DEVICES ON WELD COUNTY ROAD 28 AT WELD COUNTY ROAD 43 WHEREAS,the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS,the Weld County Department of Public Works has recommended to the Board that stop signs be installed on Weld County Road 28 at Weld County Road 43,to ensure safety to the traveling public, and WHEREAS,the Board has determined that said traffic control devices are necessary for the protection of the general public. NOW,THEREFORE,BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Department of Public Works be, and hereby is, directed to install stop signs on Weld County Road 28 at Weld County Road 43, for the safety of the general public, and said signs shall conform to the State Manual of Uniform Traffic Control Devices. The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 12th day of June, A.D., 2006. BOARD OF COUNTY COMMISSIONERS A♦\ F . / /`WELD COU J , COLORADO ATTEST: 1>�� wb �� ��/r! �,''( �F -ile, Chair Weld County Clerk to the ,® , F J . BY. At ,—U NI David E. Long, Pro-Tem De ity Clerk to the Board _ KZ-,,,/ Wil • m H. Jerke APPR AST OR • D. Masden ty Attorney �? ALA A A4 lia-e ' ) I Glenn Vaad Date of signature: 71 610(0 10(0 2006-1548 EG005 5 00: Pt-L3, SO, Cove csP ov -,6) -oc, a MEMORANDUM CTO: Clerk to the Board DATE: 6/6/2006 FROM: Frank B. Hempen, Jr., P.E. COLORADO Director of Public Works/County Engineer SUBJECT: Agenda Item Intersection Signing of WCR 28 and WCR 43 The appropriate documentation is attached. Enclosures pc: Wayne Howard, Senior Engineer M:Wrancie\Agenda Item.doc 2006-1548 MEMORANDUM *` Date: May 5, 2006 T'11 To: Frank B. Hempen, Jr., P.E., Director of Public Works/County Engineer From: Wayne Howard, P.E., Project Manager/ COLORADO RE: Intersection Signing of WCR 28 and WCR 43 A signing request was received from Roy Wardell concerning the uncontrolled intersection referenced. Mr. Wardell is concerned about the limited sight distance and lack of traffic signing. I telephoned Mr. Wardell to discuss the details. He believes that the traffic at the intersection is too high to not have stop signs. I have looked into the traffic counts and find that recent counts are above 200 ADT in each direction. There is a home with outbuildings in the NW corner of the intersection creating sight restrictions. In my opinion, the request is reasonable and I am recommending that we install a Stop Sign on WCR 28 per MUTCD guidelines. Approved Initial : Approved/ Perry Eisenac ,P.E.,Engineering Division Manager Approved 0 Initial: Frank B. p n,Jr.,P.E.,Director of Public Works/County Engineer Comments : Hello