Loading...
HomeMy WebLinkAbout20060606.tiff CORRESPONDENCE RESPONSE DEPARTMENTOFR,3 p�1J_ 4 * * * PLEASE RESPOND WITHIN THREE DAYS.* * * IF RESPONSE WILL BE DELAYED, PLEASE NOTIFY "CTB GROUP" BY E-MAIL OF EXPECTED DATE FOR RESPONSE. RECOMMENDED ACTION: REE CM Narrative: IV LI FEB - 9 200, D WELD COUNTY PUBLIC WORKS DEPT BOARD ACTION: (Initial by Approval) MG RM BJ DL GV Agree with Recommedation Worksession METHOD OF RESPONSE: - Board Action - Work Session N. Letter (Attached) - Telephone Call - No Response (explain) Department Head Sign ture M:\CAROL\OPMAN\RDCOMP2 LAC: �ie„) 2006-0606 a OFFICE OF BOARD OF COUNTY COMMISSIONERS PHONE (970)356-4000, Ext. 4200 FAX: (970)352-0242 ' WEBSITE: www.co.weld.co.us C 910 10th Street,P.O. Box 758 Greeley, Colorado 80632 COLORADO February 15, 2006 Mr. Keith Bolin, President Grandview Estates Homeowners Board 105 Grandview Drive Mead, CO 80542 RE: Restoration Along WCR 13 Dear Mr. Bolin: The Weld County Board of Commissioners is in receipt of your letter dated February 3, 2006, in reference to the restoration work on WCR 13 that needs to be completed following the installation of a water pipeline by the Central Weld County Water District (Water District). The Public Works Department has been in contact with the Water District to ensure this restoration work is completed properly and in a timely manner. The Water District has provided a verbal assurance that they will complete this restoration work in the near future, as weather conditions allow. Public Works has assigned Ted Eyl to inspect and ensure that the restoration work is completed properly. Mr. Eyl can be reached directly at (970) 304-6496, Extension 3764. Thank you for taking the time to write the Board of Commissioners about this matter. Please contact us again if you have any additional concerns about this or any other issue. Sincerely, BOARD OF UNTY COMMISSIONERS 6€1-A2 M.J. eile, Chair pc: Perry Eisenach, Engineering Division Manager Ted Eyl, Right-of-way Permitting WCR 13 file M:\FRANK\2006\MGeileGra ndviewEstates.doc GRANDVIEW ESTATES 105 Grandview Drive Mead,CO 80542 February 3, 2006 Mr. Mac McCellan Central Weld County Water District 2235 2nd Avenue Greeley, CO 80631 Re: Restoration of Boulevard along WCR 13 by Grandview Estates Keith Bolin(President of the Grandview HOA) has been in contact with Mac McCellan concerning the restoration work required along WCR 13 to restore the boulevard to its previous condition prior to the pipe line installation. Following is a list of the work that needs to be done. 1. Repair torn up areas to the north of Grandview Drive 2. Repave the walkway(path) that was damaged 3. Reseed the area south of irrigation ditch 4. Add fill dirt and reseed by Grandview Circle 5. Drain ditch needs to be re-dug south of Grandview Circle 6. Most of that entire stretch needs to be cleaned up (debris removed)and leveled It is important that this be done soon, prior to the beginning of the new mowing season. Thanking you in advance for your cooperation. Sincerely Keith Bolin, President Grandview Homeowners Board Keith Bolin, President Don Brewer, Vice President Cathy Campbell, Treasurer Virginia Deines, Secretary Robert Olsen, Director CC: Town of Mead(Dean Land) Weld County Commissioners Hello