Loading...
HomeMy WebLinkAbout20060789.tiff RESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF WELD COUNTY ROAD 13 BETWEEN WELD COUNTY ROADS 2 AND FOR APPROXIMATELY SEVEN WEEKS, FOR ROAD CONSTRUCTION WHEREAS,the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS,pursuant to Section 42-4-410(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance,temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS,the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate,warn and guide vehicular traffic on said County roads by posting signs thereon. NOW,THEREFORE,BE IT RESOLVEDthatthe Board of County Commissioners of Weld County,Colorado,deems it necessary to regulate,warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that Weld County Road 13 between Weld County Roads 2 and 8 be temporarily closed, with said closure being effective March 14, 2006, for approximately seven weeks for road construction, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. 2006-0789 (!e' Pa) on', c�� cst° EG0024 03--3/-06 ROAD CLOSURE - WCR 13 PAGE 2 The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 13th day of March, A.D., 2006. BOARD OF CSUNTY COMMISSIONERS IEL " ELD COU , COLORADO ATTEST: Weld County Clerk to the B�� mewdA OA pDavid E. Long, Pro-cE;:my Tem De uty Clerk to the Board ' �� Will' . Jerke 747/ED RM: ' k ,Q- Robert D. asd Co Attorney pAA .� 1 Glenn Vaad Date of signature: -11.&_' 2006-0789 EG0024 et y 6 MEMORANDUM "ilk TO: Clerk to the Board DATE: March 9, 2006 COLORADO FROM: Perry Eisenach, Engineering Division Manager SUBJECT: Agenda Items WCR 13 between WCR 2 and WCR 8 will be closed from 3/14/2006 to 4/30/2006 for road construction by Asphalt Specialties, subcontractor to Weld County's WCR 13 project. pc: Wayne Howard,Project Manager Frank B. Hempen, Jr., Director of Public Works/County Engineer M:\Francie\Agenda Road Closures.doc MAR. 7. 2006 3:13PM NCTC NO. 075 P. 2/2 I {{ C/cskre \)k}e. ; 3/f4/o‘ rr wAt Ys WCR11 WCR 1s WCR 15 WCR 12 oversaw {On= ag WCR 10 am= annao WCR 10 WCR 8 RIND ROAD OIRTROM 1 r WCR 8 min ISM Vie WCR6 "weo"a) WNW" WCR6 taininic so TOW Watt sa"r"an WCR 4 IN=10 Li= I. .) WCR2 eaWww gi 44 r (ffik Mr. 1 v.mwo wT s CLOSED IWI _ , .. . SH7 MOM) � 14 Ill W 4, P ,w1G,aa w Wald poly w®eWsb Department — ...as WCR UMW,a CM 20$.00.04 ea wows. Sara 703)2891666 We olm/oe we — as ea as,TC8 Hello