HomeMy WebLinkAbout20061145.tiff PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAT APPLICATION
FOR PLANNING DEPARTMENT USE DATE RECEIVED: ' (`i O4
RECEIPT#/AMOUNT# Is CASE#ASSIGNED: r� r - 3
APPLICATION RECEIVED BY PLANNER ASSIGNED: 'gr '
Parcel Number
0807 04 001007 c,a"a C,lrrrA rtmD
(12 digit number-found on Tax I.D.information,obtainable at the Weld County Assessors Office,or
(Include all lots being included in the application area,If additional space is required,attach an additional sheet)
Legal Description Lot 7. Shiloh Estates Section 4 , Township 6 North,
Range 87 West
Property Address(If Applicable)
Existing/Proposed Zone Dist: PUD—Estate Total Acreage: 17.41 +/-
Proposed#/Lots 4
Average Lot Size: 4.005 Minimum Lot Size: 3.46 acres Proposed Subdivision Name:_
Shiloh Estates PUD
Proposed Area (Acres) Open Space: NA
a
Are you applying for Conceptual or Specific Guide? Conceptual Specific
X
FEE OWNERS) OF THE PROPERTY (If additional space is required, attach an additional
sheet)
Name: James H. and Cheri Scott
Work Phone# Home Phone# Email
Address
Address: 35236 Comerstone Way
City/State/Zip Code Windsor. Colorado 80550
APPLICANT OR AUTHORIZED AGENT (See Below:Authorization must accompany app/catons signed by
Authorized Agent)
Name: Todd Hodges Desion. LLC
Work Phone#: (970)613-8556 Home Telephone#: N/A Email Address:
Address: 1269 North Cleveland Avenue
City/State/Zip: Loveland. CO 80537
2006-1145
UTILITIES: Water. North Weld County Water District
Sewer: Individual Septic Disposal Systems
Gas: Xcel/Public Service 1. EXHIBIT
Electric: Poudre Valley REA -
Phone: Qwest
DISTRICTS: School:Windsor
Fire: Windsor/Severance
Post: Windsor
I (We)hereby depose and state under penalties of perjury that all statements, proposals, and/or plans
submitted with or contained within the application are true and correct to the best of my(our)knowledge.
Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of
authorization from all fee owners must be included with the application. If a corporation is the fee owner,
notarized evidence must be included indicating the signatory has the legal authority to sign for the
corporation. I (we), the undersigned, hereby request hearings before the Weld County Planning
Commission and the Board of County Commissioners concerning the proposed Change of Zone for the
above described unincorporated area of Weld County, Colorado:
'eaa
Signature: Owner or Authorized Agent Date Signature: Owner or Authorized
Agent Date /Na
Shiloh, Inc. Lot 7 Planned Unit Development
Final Plat Narrative
r
27-7-30.A. A recorded change of zone plat which delineates the proposed uses is attached.
27-7-30.B. A Certificate of Title is included in submitted application materials.
27-7-30.C. A Certificate of Title covering all public dedications is not applicable to this
Application at the direction of the Weld County Department of Public Works.
27-7-30.D. A Deed is included in application materials.
27-7-30.E. A tax statement from the Weld County Treasurer's office in included in
submitted application materials.
27-7-30.F. A Certificate from a qualified engineer in the State responsible for the design of
the utilities is included in application materials.
27-7-30.G. Deed restrictions are not applicable to this application.
27-7-30.H. An improvements agreement according policy regarding is included in
application materials.
27-7-30.I. Review of this proposal by Weld County Public Works has insured the street
system serving this PUD is adequate.
27-7-30.J. A separate off-site road improvements agreement proposal is not applicable to
this application
27-7-30.K. An improvements agreement according policy regarding collateral, including
the construction schedule is included in application materials.
27-7-30.L. A Letter of Credit in the amount of the improvements will be presented to the
Board for acceptance.
27-7-30.M. A certified list of surrounding property owners is included herein.
27-7-30.N. A Mineral Affidavit is included herein.
27-7-30.O The Shiloh, Inc. PUD is in compliance and meets criteria as set forth in
the Change of Zone application materials and Board of County Commissioner's
Change of Zone Resolution. This proposal has been reviewed under the specific
guide.
27-7-30.P. The Final Plan map is included in application materials.
27-7-30.Q. A landscape plan is not applicable to this proposal.
27-7-30.R. A utility map is included in application materials.
Shiloh, Inc. Final Plat, Lot 7
Specific Development Guide
Introduction
This application proposes dividing Lot 7 of Shiloh Estates PUD into four separate lots comparable in
size to the other lots in the subdivision with the exception of Lot 8. Shiloh Estates PUD is located north
of and adjacent to Weld County Road 72 and approximately %1 mile east of Weld County Road 17. The
site is located in an area between Windsor and Severance but not within an Intergovernmental
Agreement Urban Growth Boundary Area. The goal of this proposal is to create three additional
residential lots in Shiloh Estates PUD. The proposed layout and design of the site is illustrated on
submitted materials and is consistent with the greater Shiloh Estates PUD. A cul de sac, Cornerstone
Court, will serve the four lots. Proposed land uses within these four lots will be consistent with the
Estate Zone, the original Development Guide and Covenants. Amended covenants have been submitted
that include this proposal. These submitted Covenants are in draft format and are submitted to the
Homeowners Association concurrently. The uses allowed will remain consistent with surrounding land
uses and properties.
This Development Guide is submitted with this Final Plat application through the Specific Development
Guide option and is consistent with the Development Guide for the greater Shiloh Estates PUD. A
easement for utility, drainage, irrigation, maintenance, riding, hiking, jogging and walking has been
placed consistent with the greater subdivision. An additional easement for utilities has been placed
consistent with the greater subdivision. Outlot A (0.23 acres) shall be used by the Homeowners
Association for the existing subdivision drainage area.
The numbering of the lots as proposed in this application may be confusing as there will be two Lots 1 —
4. This may cause problems with emergency providers. Therefore, the applicant respectfully requests
referral agency review and planning services guidance for final Lot numbering. The applicant proposes
the following Lot numbering solution to minimize confusion:
Lot of Shiloh Estates Lot in ReSubdivision Lot in ReSubdivision
PUD as submitted as Proposed
7 1 7
2 15
3 16
4 17
The following Development Guide has been prepared in accordance with Section 27-4-20 and Article VI
of Chapter 27, Weld County Code.
1
Section 27-4-20.E.14. Initial impact plan addressing all impacts this use will have on the proposed
site and surrounding land uses. A listing of potential impacts is cited in Section 27-6-30 of this
Chapter. (SPECIFIC DEVELOPMENT GUIDE)
Section 27-6-40. Component One-environmental impacts
1. Noise and vibration
2. Smoke, dust and odors
3. Heat, light and glare
4. Visual/aesthetic impacts
S. Electrical interference
6. Water pollution
Development of this proposal should not result in any negative environmental impacts, including the
above listed environmental concerns. The use of the site will be residential and Estate uses. All
applicable state and/or local permits shall be obtained, if necessary.
7. Wastewater disposal
All wastewater disposal on the four proposed lots will be through the use of Individual Septic Disposal
Systems approved by Weld County Department of Environmental Health. A Test Pit Observation by
Northern Colorado GeoTech has been included with application materials.
8. Wetland removal
To the applicant's knowledge, this proposal does not remove wetlands.
9. Erosion and sedimentation
10. Excavating,filling and grading
11. Drilling, ditching and dredging
Any on-site grading, drilling, ditching or dredging will be done sympathetically. Erosion will be kept to
a minimum. A drainage report prepared by Wohnrade Civil Engineers, Inc. is included in application
materials.
12. Air pollution
13. Solid waste
14. Wildlife removal
15. Natural vegetation removal
This proposal will not result in negative impacts to the above listed concerns. The existing residential
and Estate uses within the existing subdivision should not create negative impacts to air pollution or
contribute to solid waste concerns.
16. Radiation/radioacive material
To the applicant's knowledge, there are no radioactive materials located on this site.
17. Drinking water source
The drinking water source is through North Weld County Water District. An agreement has been
approved by the Assistant County Attorney's Office and included herein.
18. Traffic impacts
Impact to traffic on existing county roads and the internal road will create a minimal increase as three
additional lots are proposed. Future building permits shall conform to the county-wide traffic impact
fee.
2
Section 27-6-50 Component Two—service provision impacts
1. Schools
2. Law enforcement
3. Fire protection
4. Ambulance
Service providers for this Planned Unit Development include the Windsor School District, Weld County
law enforcement, and the Windsor/Severance Fire Protection District.
5. Transportation (including circulation and roadways)
6. Traffic impact analysis by registered professional engineer
Cornerstone Court will access from the existing internal road, Cornerstone Way. Cornerstone Way
connects to Weld County Road 72. Loading zones and parking areas are not applicable to this particular
application. Off-street parking is not applicable as each lot is large enough for typical parking
situations. A Private Improvements Agreement is enclosed.
7. Storm drainage
Storm drainage will be handled on-site. A drainage report prepared by Wohnrade Civil Engineers, Inc.
is included in application materials.
8. Utility provisions
9. Water provisions
10. Sewage disposal provisions
The drinking water source is through North Weld County Water District. Approval by Lee Morrison,
Assistant County Attorney and the actual Agreement is included herein. Wastewater disposal is
proposed through Individual Sewage Disposal Systems. Utility providers will have the standard
property perimeter easements as illustrated on the Final Plat. Evidence from the appropriate Utility
Companies of ability to serve the future development in the form of"Will Serve" letters are included
herein. The applicant met with the Town of Windsor(10/11/05) regarding plans to extend sewer service
to this region and to discuss the merits of this proposal. The Town Planner indicated the Town, through
the East Side Sewer Plan, has no plans to extend service to this property. The applicant met with Weld
County Environmental Health regarding density per Septic System. Ms. Smith indicated this proposal,
and the overall density of the entire Shiloh Estates PUD still meets regulations of County Code. This
proposal would result in one septic per 4.4 acres for the entire Shiloh Estates PUD.
Finish of these four lots include a Building Envelope. The Building Envelopes, while large, will
encompass all future buildings on each lot and may include the septic fields within the building
envelope. Final site lay-out with building placement and septic placement will be determined at time of
building permit.
Section 27-6-60 Component Three—landscaping elements
1. Landscape plan
2. Treatment, buffering or screening and perimeter treatment
3. Maintenance schedule for landscaping elements
4. On-site improvements agreement
5. Evidence of adequate water
The original Landscaping plan has not been modified by this application. This proposal does not require
additional landscape improvements.
These lots will be tied to the greater Shiloh Estates PUD irrigation system. The system consists of a
3
series of open ditches and underground pipe. Each lot within the PUD will receive a share of the
irrigation water which the Homeowners Association owns. Currently, the Homeowners Association
owns one (1) share each of Larimer and Weld Irrigation and Larimer and Weld Reservoir as well as
ditch rights. The applicant will, as a condition of approval, transfer to the Shiloh Estates Homeowners
Association two (2) additional shares of Larimer and Weld Reservoir and two (2) additional shares of
Larimer and Weld Irrigation.
Section 27-6-70 Component Four—site design
1. Unique site features
There are no site features unique to this particular property.
2. PUD rezoning consistent with Chapter 22 of Weld County Code
Section 22-2-190.D.2.a PUD.Policy 4.1 states, "The design of a planned unit development should ensure
compatibility and harmony with existing and planned uses on adjacent properties and within the planned
unit development." The applicant has carefully considered the existing uses on-site and adjacent
properties. The existing Shiloh Estates PUD Homeowners Association has approved this proposal.
Evidence of support is included herein.
Goal 3 "Discourage urban-scale residential, commercial and industrial development, which is not
located adjacent to existing incorporated municipalities." Chapter 23 of the Weld County Code defined
urban scale development as developments exceeding nine (9) lots and/or located in close proximity to
existing PUDs, subdivisions, municipal boundaries or urban growth corridors and boundaries. This
application proposes three additional PUD estate lots. The property is located within the standard 3-
mile referral area for Windsor and Severance. This proposal is located adjacent to Moriah Estates PUD,
Gander Valley PUD and is in close proximity to the Town of Windsor City limits. This proposal meets
Goal 3.
3. Compatibility within PUD zone district
4. Compatibility with surrounding land uses
The use of the existing Lot 7 will change from one lot to four PUD Estate Lots. The design of the
subdivision takes into consideration the existing uses of the surrounding properties, access to the
additional lots, and surrounding municipalities. This proposal is consistent with the existing PUD Estate
Zone District.
S. Overlay districts
This proposal is not located within the flood hazard, geological hazard, I-25 Mixed Use Development
Area, Intergovernmental Agreement Urban Growth Boundary Area or the airport influence overlay
districts as verified by review of maps on file with Weld County Planning Services. The annexation of
these four lots to a surrounding municipality is not practical at this time as the result will be four lots
within an existing County Subdivision.
A future drill site has been reserved on Lot 2.
4
Section 27-6-80 Component Five—common open space usage
The common open space areas within this subdivision are designed and proposed to be consistent with
the requirements of Section 27-6-80 of the Weld County Code.
1. Permanent common open space restrictions
2. Establishment of homeowners organization
3. Mandatory membership in homeowners organization
4. Homeowners organization responsibilities
5. Homeowners organization powers
6. Ownership and maintenance of common open space
7. 15% common open space allocation
Common Open Space was platted with the Shiloh Estates PUD. The lots within this re-plat of Lot 7
will share the existing common open space as part of the Shiloh Estates HOA. Additional open space
has been designated adjacent to the existing open space. A recreational easement has been delineated
within this proposal and is consistent with existing easements in Shiloh PUD. An existing Homeowners
Association is in place to govern the development. Amended covenants have been included in the
submittal for review and shall be reviewed concurrently by the Homeowners Association. Outlot A
(0.23 acres) shall be used by the Homeowners Association for the existing subdivision drainage area.
These lots will be tied to the greater Shiloh Estates PUD irrigation system. The system consists of a
series of open ditches and underground pipe. Each lot within the PUD will receive a share of the
irrigation water which the Homeowners Association owns. Currently, the Homeowners Association
owns one (1) share each of Larimer and Weld Irrigation and Larimer and Weld Reservoir as well as
ditch rights. The applicant will, as a condition of approval, transfer to the Shiloh Estates Homeowners
Association two (2) additional shares of Larimer and Weld Reservoir and two (2) additional shares of
Larimer and Weld Irrigation.
Section 27-6-90 Component Six—signage
Subdivision signage is existing. Additional signage required through this particular application includes
street signs as reflected in the attached Improvements Agreement.
Section 27-6-100 Component Seven—MUD impact
This proposal is not located within the I-25 Mixed Use Development Area.
Section 27-6-110 Component Eight—intergovernmental agreement impacts
This proposal is not located within an Intergovernmental Agreement Urban Growth Boundary area.
5
Drainage Design Considerations
for
Shiloh Estates P.U.D.
Resubdivision of Lot 7
Final Plat Application
_ Weld County, Colorado
January 2, 2006
Prepared for
Jim Scott/ Shiloh Inc.
35236 Cornerstone Way
Windsor, Colorado 80550
Prepared by:
Wohnrade Civil Engineers, Inc.
337 W.Main Street
Barrington, IL 60010
Phone: (847)-381-2745, Fax: (847)-381-2746
Project Number:0519.00-SHI
EXHIBIT
10
NI Wohnrade Civil Engineers, Inc.
— 337 W.Main Street Barrington,IL 60010 Phone:847-381-2745, Fax:847-381-2746
January 2, 2006
Weld County
Department of Planning Services
1555 N. 17th Avenue
Greeley, Colorado 80631
_ Re: Drainage Design Considerations for
Shiloh Estates P.U.D., Resubdivision of Lot 7
Final Plat Application
— Weld County, Colorado
Dear Staff:
Wohnrade Civil Engineers, Inc. is pleased to submit this drainage study for Shiloh
Estate P.U.D., Resubdivision of Lot 7 for your review. This report complies with the
— _ storm drainage design and technical criteria defined in Sections 24-7-130 and 27-6-50,
paragraph B, Item 7 of the Weld County Code.
— We acknowledge that review of this study by Weld County is for general conformance
with submittal requirements, current design criteria and standard engineering principles
and practices.
If you should have any questions or comments as you review this report, please feel
free to contact me at your convenience.
Sincerely, -Z.O- t'5
— WOHNRADE ,,, . S, INC.
v. •s
u .
Mary B. Wohnra• - h ,
TABLE OF CONTENTS
VICINITY MAP
Page No.
I INTRODUCTION
1.1 Objective 1
1.2 Project History and Previous Studies 1
— 1.3 Mapping and Surveying 1
II SITE LOCATION AND DESCRIPTION
2.1 Site Location 1
2.2 Site Description 1
III HISTORIC CONDITIONS
3.1 Historic Drainage Patterns 2
3.2 Historic Drainage Basins 2
IV DEVELOPED CONDITIONS
4.1 Proposed Site Development 3
4.2 Developed Drainage Basins 3
4.3 Developed Drainage Patterns 3
4.4 Detention Pond 1 3
V DESIGN CRITERIA
5.1 Design References 4
5.2 Hydrologic Criteria 4
VI EROSION CONTROL
6.1 Erosion Control Plan 4
VII CONCLUSIONS
7.1 Compliance with Standards 5
7.2 Variances 5
REFERENCES 6
EXHIBITS
Exhibit 1 FIRM Map
Exhibit 2 Typical Street Section
APPENDICES
Appendix A: Historic Condition Hydrology
Appendix B: Developed Condition Hydrology
Appendix C: Detention Pond 1 Rating and Routing
Appendix D: Culvert Design
DRAWINGS
Sheet 1/2 Historic Condition Plan
Sheet 2/2 Developed Condition Plan
—
JI
_ _ _ ttiJ4
( I
7\iLIB ,
Na tts e.
{ - q
I
`) ^ 3 4
—
Thomya�m --.. _ _ i — i,--
I
Lake ~ .� = —
- • 1 �'25
I . C—
_-7---- —\
�'
t, SITE;
—
r`
N1 / o 0
- 3 /'// 3 r
₹I• / G.; CORNERSTONE •
WAY U n'"\\
—
-4140\ _I -- ) ( I • : . . , ,
- (`2' c n1
I 1 I
D ---..,\ I G
\ a a< a e SNI: 0310.00
SHILOH ESTATES P.U.D.
_ RESUBDIVISION OF LOT 7 WOHNRADE CIVIL ENGINEERS, INC. 1
Sheet
VICINITY MAP..-
337..Barrington. Street
1Scale-20 W M , 80010
1•�Z000' Phone (647)381-2745. Fax: (847)381-2748
Designed By:
MOW
`Sheets/
_ Drainage Design Considerations
for
Shiloh EstateS P.U.D. Re-subdivision of Lot 7
Final Plat Application
Weld County, Colorado
January 2, 2006
1. INTRODUCTION
1.1 Objective
This study documents the results of a comprehensive hydrologic and hydraulic
analysis of both pre and post-development conditions for the proposed Shiloh
Estate P.U.D., Re-subdivision of Lot 7. The Final Plat application proposes to
divide Lot 7 into four (4) lots ranging in size from 4.02 acres to 4.64 acres. The
proposed development is within an Estate Zone District in Weld County and will
be processed through the County as a Planned Unit Development (P.U.D.).
1.2 Project History and Previous Studies
There are no know studies that precede this report.
1.3 Mapping and Surveying
Topographic mapping with a contour interval of 1-foot was obtained by
Wohnrade Civil Engineers, Inc. from Intermill Land Surveying, Inc., Loveland,
Colorado. Additional topography outside of the project boundary was taken from
—
USGS topographic mapping with a ten (10) foot contour interval.
II SITE LOCATION AND DESCRIPTION
2.1 Site Location
The site is located in the southeast quarter of Section 4, Township 6 North,
Range 67 West of the 6th Principal Meridian, Weld County, Colorado. Shiloh
Estates PUD is located north of and adjacent to Weld County Road 72 and
approximately '/ mile east of State Highway 257 (Weld County Road 17.) Lot 7
is located at the north end of Shiloh Estates P.U.D., directly north and adjacent
to Cornerstone Way.(See Vicinity Map.)
2.2 Site Description
The Shiloh Estate P.U.D., Re-subdivision of Lot 7 site is approximately 17.41
acres, and is currently in an Estate Zone District. The site currently contains an
existing residence and outbuildings, located at the east end of Lot 7. An existing
concrete irrigation ditch is located in the northwest corner of the site, and slopes
from northeast to southwest. An access roads is located along the existing
irrigation ditch on the east side. In addition, the Windsor Reservoir Outlet
Channel is located just offsite, and adjacent to the northwest property corner.
There are existing residences located adjacent to the site on the east and south,
which are part of the existing Shiloh Estates P.U.D. The property located north
of the site is agricultural in use, and to the west of the site are both residential
and agricultural uses.
Drainage Design Considerations Wohnrade Civil Engineers, Inc.
Shiloh Estate P.U.D. Resubdivision of Lot 7
Final Plat Application
January 2, 2006
Page 2
Soils information was available from the original soils report for Shiloh Estates
P.U.D. dated 1993 (See Reference 2). Ten exploratory borings were placed
throughout the proposed site. The site generally consists of a thin layer of sandy
clay overlaying a clayey sand which overlies a claystone/siltstone bedrock (See
Reference 2.) Free groundwater was encountered at a depth of six (6) feet near
what in now the existing detention pond.
The Flood Insurance Rate Maps (FIRM's) from the National Flood Insurance
Program have been referenced to determine if the site is located within a
regulatory floodplain. The site is located on Flood Map 080266 465D, and is
outside of any regulatory floodplain (See Exhibit 1.)
III. HISTORIC CONDITIONS
3.1 Historic Drainage Patterns
Roughly one-third of the site (5.9 acres) drains overland from northeast to
southwest at slopes ranging from 1.59% to 14.28% toward the existing pond
located in the southwest portion of Lot 7. Roughly two-thirds of the site (11.4
— acres) drains overland from southeast to northwest at slopes ranging from 0.94%
to 5.56% towards the existing concrete irrigation ditch, and the Windsor
Reservoir Outlet Channel.
Stormwater runoff enters the site from two offsite basins located to the east.
Offsite Basin O1 (5.8 acres) drains overland from east to west to the roadside
ditch located on the north side of Cornerstone Way. Stormwater runoff in the
roadside ditch is conveyed to the existing pond located in the southwest corner
of Lot 7. Offsite Basin O2 (12.4 acres) drains overland from east to west and
enters the site along the east property line.
3.2 Historic Drainage Basins
The site is has been divided into two historic drainage basins as shown on the
Historic Drainage Plan (Drawing 1 of 2.)
Basin H1 (5.9 acres) drains overland from southeast to northwest towards the
existing pond located in the southwest corner of Lot 7. The 5 and 100-year peak
discharges from Basin H1 are 2.0 cfs and 13.1 cfs respectively. Two lots will be
developed within this basin, as well as the proposed Detention Pond 1.
Basin H2 (11.4 acres) drains overland generally from southeast to northwest
towards the Windsor Reservoir Outlet Channel. The 5 and 100-year peak
discharges from Basin H2 are 3.6 cfs and 23.8 cfs respectively. Two lots will be
developed within this basin.
Drainage Design Considerations Wohnrade Civil Engineers, Inc.
Shiloh Estate P.U.D. Resubdivision of Lot 7-Final Plat
Application
January 2, 2006 Page 3
The total 5-year peak discharge from combined basins H1 and H2 is
approximately 5.5 cfs. This will be the allowable discharge from the developed
site during a 100-year storm event.
VI. DEVELOPED CONDITIONS
4.1 Proposed Site Development
The planned unit development proposes four single-family estate lots, and one
outlot. Outlot A (0.23 acres) has been dedicated as a private common open
space.
Site improvements will include a cul-de-sac road, with roadside ditches, a
potable water distribution system, and individual sewage disposal systems.
4.2 Developed Drainage Basins
The developed site has been divided into three (3) on-site drainage basins.
Runoff from roughly 5.9 acres will be routed to an on-site detention pond (Pond
1) located in the southern portion of Lot 4. The flow pattern for the remainder of
the site (11.2 acres) will remain unchanged from historic conditions.
4.3 Developed Drainage Patterns
The overall drainage pattern of the site will remain generally unchanged from pre
to post-development conditions.
Basin 1 (2.3 acres) will drain overland directly into Detention Pond 1.
Basin 2 (3.6 acres) will drain overland, and in a roadside ditch to a culvert
located under Cornerstone Court. Stormwater will be conveyed through the
culvert to Detention Pond 1. The peak 5- and 100-year discharges at Design
Point 2 are 1.8 and 8.6 cfs respectively.
Basin 3 (11.2 acres) will continue to drain overland towards the northwest as it
has done historically. The peak 5- and 100-year discharges at Design Point 3
are 3.9 and 23.9 cfs respectively.
4.4 Detention Pond 1
Detention Pond 1 is located in the southern portion of Lot 4. This pond will
detain developed stormwater runoff from Cornerstone Court, and Lots 1 and 2.
The 100-year peak discharge from offsite Basin O1 (12.3 cfs) will be routed thru
the pond through an 18-inch diameter outlet pipe.
Stormwater runoff from Basin 3 will be undetained due to the negligible increase
in the peak discharge. The peak 100-yr discharge from Basin H2 (11.4 acres) is
23.8 cfs. The peak discharge from Basin 3 (11.2 acres) is 23.9 cfs.
Drainage Design Considerations Wohnrade Civil Engineers, Inc.
Shiloh Estate P.U.D. Resubdivision of Lot 7-Final Plat
Application
January 2, 2006 Page 4
Developed runoff from a 100-year storm event will be released at a 5 year
historic rate. The peak 5 year historic discharge from the existing site is 5.5 cfs.
The pond has been sized using the Modified Puls reservoir routing method. An
11-inch diameter orifice controls the release of on-site developed runoff. The
peak discharge from the pond due to on-site developed runoff is 4.29 cfs with a
maximum associated water surface elevation of 4869.03.
The pond routing was run a second time to include the peak discharge from off-
- site Basin O1, An 18-inch diameter culvert has been sized to convey the peak
runoff from on-site Basins 1 and 2, and off-site Basin O1. The peak discharge
from the pond is 12.09 cfs with a maximum associated water surface elevation of
4869.54.
V. DESIGN CRITERIA
5.1 Design References
Drainage criteria outlined in the Storm Drainage Criteria Manual by the Urban
Drainage and Flood Control District (Reference 1), has been referenced in the
preparation of this study.
5.2 Hydrologic Criteria
Due to the relatively small basin size the Rational Method has been used to
estimate peak stormwater runoff from the project site. Calculations made as part
— of this investigation along with other supporting material, are contained in
Appendix A and B.
An initial 5-year design storm and, major 100-year design storm have been used
to evaluate the proposed drainage system as per Sec. 24-7-130 of the Weld
County Code. Rainfall intensity data for the Rational Method has been taken
from IDF equations generated specifically for the Shiloh Estate P.U.D., Re-
subdivision of Lot 7 site by the computer program "Watershed Modeling" by
Eagle Point software. Input of precipitation amounts for the generation of
intensity equations have been taken from the NOAA Atlas 2, Volume III-
Colorado.
VI. EROSION CONTROL
6.1 Erosion Control Plan
The proposed rainfall erosion control plan during construction will consist of
temporary structural erosion control measures. Silt fencing will be installed along
the south property line of Lot 4. Straw bale inlet protection will be installed at the
upstream end of all culverts, and a sediment siphon will be installed at the
upstream end of the pond outlet structure. In addition, a vehicle tracking pad will
be installed at the entrance to the site.
Drainage Design Considerations Wohnrade Civil Engineers, Inc.
Shiloh Estate P.U.D. Resubdivision of Lot 7-Final Plat
Application
January 2, 2006 Page 5
Permanent vegetative erosion control will be used in conjunction with
landscaping surrounding future residences, and in the ditches of Cornerstone
Court. Permanent revegetation of areas disturbed by construction will be the
responsibility of the contractor
VII. CONCLUSIONS
7.1 Compliance with Standards
All applicable drainage criteria have been complied with in accordance with the
"Weld County Code". The proposed drainage improvements do not adversely
impact surrounding properties.
This study conforms to the guidelines specified in Section 24-7-130 and Section
27-6-50, paragraph B, item 7, of the Weld County Code.
7.2 Variances
No variances are requested as part of this development.
Drainage Design Considerations Wohnrade Civil Engineers, Inc.
Shiloh Estate P.U.D. Resubdivision of Lot 7-Final Plat
Application
January 2, 2006 Page 6
REFERENCES
1) Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control
District, Wright McLaughlin Engineers, Denver, Colorado, March, 1969.
2) Subsurface and Preliminary Percolation Investigation for Shiloh Estates,.
Weld County. Colorado prepared by Foundation & Soils Engineering,
Inc., June 17, 1993.
r
Exhibits
J
KNP
J APPROXIMATE SCALE IN FEET
1O00. .. _._0 .._._ . 1.000
!-4 �� ...---• I.
THOMPSON 1\
LAKE ` _
_ NATIONAL ELMINSURANCE PROGRAM
FIRM
J
\ FLOOD INSURANCE RATE MAP
1 \ WELD COUNTY,
COLORADO
SITE (UNINCORPORATE AREAS)
1
4
I
(T 165E MAP INDEX FOR PANELS NOT PAINTED)
�,fl� /
CC
1 CORNERSTONE WAY COMMUNITY-PANEL NUMBER
\\\< 080266 465 D
1 MAP REVISED: •
e,f SEPTEMBER 22, 1999
1 WCR 72
Federal Emergency Management Agency
ThS la an cadet copy of a portion of the above referenced flood map tt
I was attracted wing F-MITOniJne. iNs map does not reflect changes
or amendments wNch may have been made slbeeuent to the date on the
title block. For the latest proWct Information about National Rood Insurance
Program flood maps check the FEMA Flood Map Store at Nwwv.msc.fema.gov/
^Project: N
SIII: 0519.00
SHILOH ESTATES P.U.D
Da"^ RESUBDIVISION OF LOT 7 WOHNRADE CIVIL ENGINEERS, INC. 1
Sheet
EXHIBIT 1 337 W n. l Street
._fib' 33 W. Main Stre. 80010
NA Phone: (847)381-4745. Fat: (847)381-2746
Designed FIRM MAP 080266 465D 2
\MLC / \Sheets/
_ r
R.O.W. R.O.W.
_ 60'-0"
30'-0"
E.O.P. E.O.P.
24'-O"4' 4'
SHOULDER SHOULDER
'-0" -0'- 12'-0" 12'-0"
2%MIN. 2 MIN.
IN.
BITUMINOUS ASPHALT PAVEMENT
GRAVEL SHOULDER
GRAVEL BASE COARSE OR FULL DEPTH ASPHALT
NOTE: PAVEMENT SECTION TO BE DESIGNED BY SOILS ENGINEER
AND APPROVED BY COUNTY ENGINEER PRIOR TO CONSTRUCTION
TYPICAL SECTION - LOCAL ROADWAY
24' PAVEMENT W/ 4' SHOULDERS
NOT TO SCALE
0 SHILOH ESTATES P.U.D 1
Pro ct;
/05RESUBDIVISION OF LOT 7 WOHNRADE CIVIL ENGINEERS, INC. S2 t
EXHIBIT 2 337 W.
Barrington, Street
Scale: 337W. Mainmina.. 600,0
NA Designed By: TYPICAL STREET SECTION <6.n36' 2'� F� (�7�' z,� 2
\Sheets/
Appendix A
Historic CoaAtition 4 S Year
Composcitn Ri not Coefficient C`akulations
Character of Surface Runoff Project: Shiloh Estates P.U.D.
— Coefficient
Calculations By:M. Chalona
Streets:Paved 0.88
Date:December 22,2005
Streets:Gravel 0.45
—
Drives and Walks 0.87
Roofs 0.85
—
Undeveloped Areas 0.15
Runoff Coefficients are taken from the Urban Drainage and Flood Control District Drainage Criteria Manual,Table 3-1
Basin Basin Area of Area of Area of Area of Roofs Area of Weighted
ID Area Streets: Streets: Concrete Undeveloped Runoff
Paved Gravel Lawns,Clayey Soil Coefficient
(Acres) (Acres) (Acres) (Acres) (Acres) (Acres)
H1 5.9 0.00 0.00 0.00 0.00 5.90 0.15
H2 11.4 0.00 0.00 0.00 0.00 11.40 0.15
-
H1,H2 17.3 0.00 0.00 0.00 0.00 17.30 0.15
- O1 5.8 0.19 0.05 0.02 0.04 5.50 0.18
O2 12.4 0.00 0.00 0.02 0.04 12.34 0.15
-
S:IPROJECTSGSHIIDRNGIFINAL PLATISHI-HistC.wpd Davis,Miller&Wohnrade Civil Engineers,Inc.
_ HlSto Condition - 100 Year
Campo*ill Runoff Citiiincietit Calculations
Character of Surface Runoff Project: Shiloh Estates P.U.D.
— Coefficient
Calculations By:M.Chalona
Streets:Paved 0.93
Date:December 22,2005
Streets:Gravel 0.60
Drives and Walks 0.89
Roofs 0.90
—
Undeveloped Areas 0.50
Runoff Coefficients are taken from the Urban Drainage and Flood Control District Drainage Criteria Manual,Table 3-1
—
Basin Basin Area of Area of Area of Area of Roofs Area of Weighted
ID Area Streets: Streets: Concrete Undeveloped Runoff
Paved Gravel Lawns,C;ayey Soil Coefficient
— (Acres) (Acres) (Acres) (Acres) (Acres) (Acres)
H1 5.9 0.00 0.00 0.00 0.00 5.90 0.50
H2 11.4 0.00 0.00 0.00 0.00 11.40 0.50
H1,H2 17.3 0.00 0.00 0.00 0.00 17.30 0.50
O1 5.8 0.19 0.05 0.02 0.04 5.50 0.52
-
"1 O2 12.4 0.00 0.00 0.02 0.04 12.34 0.50
-
S:IPROJECTS\SHIIDRNGIFINAL PLAT ISHI-HistC.wpd Wohnrade Civil Engineers, Inc.
— 1« c?, C:1, _ : 13.)\
E03 / § CV rm', B 2 a
a « r '
6nte
— co to ®` ; ; ; ; ;
) }ra » mss < » a 3
E > k ! ~ &� ~ '
'2 � ' ° RI
§ a
— a) � ; e ■ a � : 2 | @ ! !
\t # k ®ak !
— -- k� ) k0 EC
/a z :•-r0 7 t I - ! ! ! ! §
c03g .
a ) « cc k ) /
@ I` CO k CO k §
2 . . ,
2 /
a `
E
0 \! 8 a 8 8 |
t } `
J \» : 0 0 ci
» -
a k : , : : ;
3 co
o.
? ? w » <
e \
§
U I! * CO , ,T,,g ! CI
k !
_ t § ! ■ § ■
! ; 10 ; 2 .0 #
C ) !q, ; ci a a a /
.... $ . 2
0 }$ : : 2 - g
o t / \ \ B
— k ■ • � T 2 ? 7
k E\ \ H2 ®
— ^ 6 i—
§ /
\ h
: , ! §
) § _
k \ / / / Cu � 2 } 5
— \ /# a ; ; @ ;
aa o \% # k @ w g c
— ®o2 . ®! § ; ; ; ; 2
) \2¢ Ems § §
� . :
§ 2b \ co
.
— 2 a 2 a , a JO f# ! ! @ ! ®
f7 # k /fl • ~
3{ // k 2 . IF a 9 ■ , q
2nO �
_ _ I ) « 2 Cl /
§ ® ■ r ; ; ■
— . -
E
o v {! | ! 2 § 8
% ! ®
04
J 2- ; : ; : :
0N
— 0 i FT. : 00 ao aco
a.
r
'\
c . . : . .
o 1 II _ , .
— 0 ,
■ ■ ■ ■ ■
- I
® ; ; 00 i 0 V)
e— k | " ! ! | | @ /
_ $ 8 |
) k 7$ : k
E , Z o o
\ i\ \ 2 ` 3 ,a do Fs \
> 4 \ U . . |
: , !
\ ( ! _ , 2 a 8
-
) }-7 ,t
J J & k & J !. ` 2 | 6
User Name: Administrator Date: 12-21-05
Project: SHI - Shiloh Estates P.U.D. Time: 07:59:25
— Network: 00 - Page: 1
Rainfall Report
Rainfall Type Western
Rainfall Library Shiloh Estates P.U.D.
—
Western Precipitation
2yr/6hr 1.40 in
2yr/24hr 2.00 in
100yr/6hr 3.40 in
100yr/24hr 4.60 in
Elevation 4870.00
Rainfall Intensity (in/hr)
- 5 min 15 min 30 min 60 min 6 hr 24 hr
2 yr 3.18 2.08 1.44 0.91 0.23 0.08
5 yr 4.62 3.03 2.10 1.33 0.31 0.11
10 yr 5.58 3.65 2.53 1.60 0.37 0.13
- 25 yr 6.83 4.47 3.10 1.96 0.44 0.15
50 yr 7.98 5.23 3.62 2.29 0.50 0.17
100 yr 9.08 5.95 4.12 2.61 0.57 0.19
-
!^ BDE Values Intensity = B/ (Tc + D) ^E
B D E X Y
2 yr 24.82 9.12 0.78 0.00 0.00
5 yr 36.09 9.12 0.78 0.00 0.00
10 yr 43.59 9.12 0.78 0.00 0.00
25 yr 53.35 9.12 0.78 0.00 0.00
50 yr 62.36 9.12 0.78 0.00 0.00
100 yr 71.00 9.12 0.78 0.00 0.00
_ 1 Table 3-1
RECOMMENDED RUNOFF COEFFICIENTS AND PERCENT IMPERVIOUS
Runoff Coefficients
Storm Frequency
Land Use or Percent
— Surface Characteristics Impervious 2 5 10 100
Business:
Commercial Areas 95 .87 .87 .88 .89
Neighborhood Areas 70 .60 .65 .70 .80
Residential:
-- Single-Family * .40 A5 .50 .60
Multi-Unit(detached) 50 .45 .50 .60 .70
Multi-Unit(attached) 70 .60 .65 .70 .80
% Acre Lots or Larger .30 .35 .40 .60
— Apartments 70 .65 .70 .70 .80
Industrial-
- Light Areas 80 .71 72 .76 82
Heavy Areas 90 .80 .80 .85 .90
Parks. Cemeteries: 7 .10 .18 .25 .45
Playgrounds: 13 .15 .20 .30 .50
Schools- 50 .45 .50 .60 .70
Railroad Yard Areas: 20 .20 .25 .35 .45
Undeveloped Areas:
Historic Flow Analysis, 2 (See Lawns)
Greenbelts, Agriculture,
Offsite Flow Analysis 45 .43 .47 .55 .65
— (When land use not defined)
Streets:
Paved 100 .87 .88 .90 .93
— Gravel (Packed) 40 .40 A5 .50 .60
Drives and Walks 96 .87 .87 .88 .89
Roofs• 90 .80 .85 .90 .90
Lawns, Sandy Soil 0 .00 .01 .05 .20
Lawns, Clayey Soil 0 .05 .15 .25 .50
J * See Figure 2-1 for percent impervious.
_l 11-1-90
\\ 1IRRAN f1RAlAIC(]F akinFI nnn !`f1N Tpf�1 r11.CTg1(`T
��"" t
Slit 0519.00 TABLE 3-1
r WOHNRADE CIVIL ENGINEERS, INC. 1
_l 05 Sheet
RATIONAL METHOD ��"�10
MA RUNOFF COEFFICIENTS "'°'" `�""°'-2J4S `a' `0'"'°1-Z'.5
hw4ned l
\tiheeMj
.50
.20
.10
m
a
O
w .06
a
O
U a
0
'm .04
aQ
—
.02
.01
.005
1 2 4 6 10 20
Average velocity(ftsec)
EQUATION FOR FIGURE 3-1:
J 1 PAVED: V=20.3282(s)0.5
'210.V6 TR5E,Second Ed.,Jmre 196C,) UNPAVED: V=16.1345(5)O5
s= slope in ft/ft
/Project:
P °" TABLE 3-1 r `
Sit 0519.00
r AVERAGE VELOCITIES WONNRAD! CIVIL ENGINEERS, INC. 1
°5 Sheet
Sale: FOR SHALLOW 'n.. 847 Street
NA 337 W. M Dinars: 90010
Phone: (ea)x1-z7u. Fax: (8{l)p51-z7u J
"Designed By: CONCENTRATED FLOWNA
\sheets./
Appendix B
Develo tnditIon - 5 Year
CompositeComPtkiate*SOftCount Calculation
Character of Surface Runoff Project: Shiloh Estates,P.U.D.
— Coefficient
Calculations By:M.Chalona
Streets:Paved 0.88
Streets:Gravel Date:December 22,2005
- 0.45
Drives and Walks 0.87
Roofs 0.85
—
Undeveloped Areas 0.15
Runoff Coefficients are taken from the Urban Drainage and Flood Control District Drainage Criteria Manual,Table 3-1
Basin Basin Area of Area of Area of Area of Roofs Area of Weighted
ID Area Streets: Streets: Walks,Drives Undeveloped Runoff
Paved Gravel Lawns,Clayey Soil Coefficient
— (Acres) (Acres) (Acres) (Acres) (Acres) (Acres)
1 2.3 ' 0.24 0.06 0.02 0.04 1.94 0.25
2 3.6 0.24 0.06 0.02 0.04 3.24 0.22
-
3 11.2 0.00 0.00 0.04 0.08 11.08 0.16
1,2 5.9 0.48 0.12 0.04 0.08 5.18 0.23
—
Deyelopetteoadition- 100 Year
Composite Runes Coefficient Calculations
Character of Surface Runoff Project: Shiloh Estates,P.U.D.
Coefficient
Calculations By:M.Chalona
— Streets:Paved 0.93
Streets:Gravel 0.60 Date:December 22,2005
Drives and Walks 0.89
Roofs 0.90
Undeveloped Areas 0.50
—
Runoff Coefficients are taken from the Urban Drainage and Flood Control District Drainage Criteria Manual,Table 3-1
Basin Basin Area of Area of Area of Area of Roofs Area of Weighted
— ID Area Streets: Streets: Concrete Undeveloped Runoff
Paved Gravel Lawns,Clayey Soil Coefficient
(Acres) (Acres) (Acres) (Acres) (Acres) (Acres)
1 2.3 0.24 0.06 0.02 0.04 1.94 0.56
2 3.6 0.24 0.06 0.02 0.04 3.24 0.54
3 11.2 0.00 0.00 0.04 0.08 11.08 0.50
-
1,2 5.9 0.48 0.12 0.04 0.08 5.18 0.55
- S:\PROJECTS\SHIWRNGWINAL PLATISHI-DevC.wpd
\- E "
:
- :
+ -# § ! F.--
f § != i
13)
C o fl 12! 13 ; C
§ ■ . . � . \
Ikr« aks tNI d \
E » E2 - 1 . ;
f �f f «
i \ '<'-', \ /
2UU coo ! .
_ 2uif� § « §
/a »� \ " 0 k »» B ! ■
§ A02 •
_ Ia « re olio
/ ® 2 §rn; §
k- -
E
3 /! | | ■
t >
`
0
C
c : ; ; ,
In fril : ; G C
•
F.
_ g
o
C..)
T3 I! tiias ; , ri
-
a
) ^ fg ■ ■ ■
CD
! ! ! #
k 2
H ° m e ®
k 8 )
E
k !$ it,
0 `
/ {§ E ,| k
® \ §
j \/ $
-
\ f § \ | � ® k
_ § S \
J \ / k & & h - "
co U. § :
k a ci $k ! ! !
2
/) d �! ; 2 ,
- 21k • to � \ !
E E c is � �4-- ti
6 _ q < .. < C
—
222 f! \ \ \ «
R § ka z7E I. . CO
sw /� § « §
») a 2 « " . \« 5 ! !
§ W02 2
175 CO -15 1- co 4
# 4- _• @ §
a r .
E
o J
- / ! i# \ \ \
cc I
7» : g
cm
CD .
_ 2 « : 0
al
_ t \
E ~ ^
! F Cl (42 in in
=
O 6 t. ■ « ■
_ �
! 13 a
C— 9
C m ho ! ! !
k |
2 a }f = ;
J -
- e /} P q � ® / \
/ I- 2 laj
b
0 9 W- a re c lc_ \ � j ' | " . co,- ° _I \
f o & 0R R 9 - CO
Appendix C
User Name: Administrator Date: 12-24-05
Project: SHI - Shiloh Estates P.U.D. Time: 05:46:31
Scenario: 100yr Developed Page: 1
FLOOD HYDROGRAPH REPORT
Hydrograph Number: 4
Name: Pond 1 Routing without Basin O1
Type: Reservoir: Modified Puls
[HYDROGRAPH INFORMATION]
Peak Flow (Qp) = 4.29 (cfs)
Time to Peak (Tp) = 57.00 (min)
Time of Base (Tb) = 301.00 (min)
Volume = 0.70 (ac-ft)
Time Step = 1.00 (min)
Peak Elevation = 4869.03 (ft)
Detention Time = NA
[RESERVOIR STRUCTURE INFORMATION]
Number = 1
Name = Detention Pond
Storage Type = User-Defined Volume
Maximum Storage = 58833.85 (cu ft)
Maximum Discharge = 6.16 (cfs)
[INFLOW HYDROGRAPH INFORMATION]
Number = 1
Name = Basin 1 and 2
Peak Flow (Qp) = 14.43 (cfs)
Time to Peak (Tp) = 25.80 (min)
Time of Base (Tb) = 69.43 (min)
Volume = 0.70 (ac-ft)
Flow Multiplier = 1.00
[EQUATION]
(I1+I2) + (2 (S1) /dt)-O1 = (2 (S2) /dt)+O2
Where:
I1 = Previous inflow
I2 = Current inflow
S1 = Previous storage
S2 = Current storage
dt = Time increment
O1 = Previous outflow
O2 = Current outflow
A = (I1 + I2)
B = (2 (S1) / dt) - O1
C = (2 (S2) / dt) + O2
i-. User Name: Mary Date: 12-26-05
Project: SHI - Shiloh Estates P.U.D. Time: 10:50:39
— Scenario: 100yr Developed Page: 1
FLOOD HYDROGRAPH REPORT
Hydrograph Number: 6
Name: Pond 1 Routing with Basin O1
Type: Reservoir: Modified Puls
[HYDROGRAPH INFORMATION]
Peak Flow (Qp) = 12.09 (cfs)
Time to Peak (Tp) = 53.00 (min)
Time of Base (Tb) = 223.00 (min)
Volume = 1.38 (ac-ft)
Time Step = 1.00 (min)
Peak Elevation = 4869.54 (ft)
Detention Time = NA
[RESERVOIR STRUCTURE INFORMATION]
Number = 2
Name = Detention Pond 1 with 18"
Dia. Culvert
Storage Type = User-Defined Volume
Maximum Storage = 36021.56 (cu ft)
Maximum Discharge = 13.50 (cfs)
[INFLOW HYDROGRAPH INFORMATION]
Number = 3
Name = Pond 1 Inflow w/ O1
Peak Flow (Qp) = 25.62 (cfs)
Time to Peak (Tp) = 30.00 (min)
Time of Base (Tb) = 79.00 (min)
Volume = 1.38 (ac-ft)
Flow Multiplier = 1.00
[EQUATION]
(11+I2) + (2 (S1) /dt)-O1 = (2 (S2) /dt)+O2
Where:
Il = Previous inflow
I2 = Current inflow
S1 = Previous storage
S2 = Current storage
dt = Time increment
O1 = Previous outflow
O2 = Current outflow
A = (I1 + I2)
B = (2 (S1) / dt) - O1
C = (2 (S2) / dt) + O2
User Name: Administrator Date: 12-24-05
Project: SHI - Shiloh Estates P.U.D. Time: 06:23:26
Scenario: 100yr Developed Page: 1
FLOOD HYDROGRAPH REPORT
Hydrograph Number: 3
Name: Pond 1 Inflow with Basin O1
Type: Combined
[HYDROGRAPH INFORMATION]
Peak Flow (Qp) = 25.62 (cfs)
Time to Peak (Tp) = 30.00 (min)
Time of Base (Tb) = 79.00 (min)
Volume = 1.38 (ac-ft)
Time Step = 1.00 (min)
[COMBINED HYDROGRAPH RECORDS]
Hydrograph Number:1
Name: Pond 1 Inflow w/o O1
Type: Modified Rational
Peak Flow (Qp) = 14.43 (cfs)
Time to Peak (Tp) = 25.80 (min)
Time Step = 1.00 (min)
Hydrograph Number:2
Name: O1
Type: Modified Rational
Peak Flow (Qp) = 12.43 (cfs)
Time to Peak (Tp) = 29. 90 (min)
Time Step = 1.00 (min)
User Name: Administrator Date: 12-24-05
Project: SHI - Shiloh Estates P.U.D. Time: 05:48:22
Scenario: 5-Year Historic Page: 1
FLOOD HYDROGRAPH REPORT
Hydrograph Number: 3
Name: Combine H1 & H2
Type: Combined 5-Year Historic Runoff
[HYDROGRAPH INFORMATION]
Peak Flow (Qp) = 5.53 (cfs) - �^^'�' - �' -�✓
Time to Peak (Tp) = 29.00 (min) boo.i-.
Time of Base (Tb) = 76.00 (min)
Volume = 0.29 (ac-ft)
Time Step = 1.00 (min)
[COMBINED HYDROGRAPH RECORDS]
Hydrograph Number:1
Name: Basin H1
Type: Modified Rational
Peak Flow (Qp) = 2.01 (cfs)
Time to Peak (Tp) = 26.00 (min)
Time Step = 1.00 (min)
Hydrograph Number:2
Name: Basin H2
Type: Modified Rational
Peak Flow (Qp) = 3.67 (cfs)
Time to Peak (Tp) = 28.70 (min)
Time Step = 1.00 (min)
r
r. User Name: Mary Date: 12-26-05
Project: SHI - Shiloh Estates P.U.D. Time: 10:27:14
- Scenario: 100yr Developed Page: 1
RESERVOIR REPORT
Reservoir Number: 1
Name: Detention Pond 1 Stage-Discharge Rating with 11" Dia. Orifice
[RATING CURVE LIMIT]
Minimum Elevation = 4866.70 (ft)
Maximum Elevation = 4871.00 (ft)
—
Elevation Increment = 0.50 (ft)
[STAGE STORAGE INFORMATION]
Storage Method: User-Defined Storage
Input Method: Volume
Number Elevation Area Ave Area Volume Cumulative Volume
(ft) (sq ft) (sq ft) (cu ft) (cu ft)
1 4866.70 0.00 0.00 0.00 0.00
2 4867.00 2744.24 1372.12 47.67 47.67
- 3 4867.50 3619.40 3181.82 886.01 933.68
4 4868.00 13137.93 8378.67 3298.63 4232.30
5 4868.50 12957.44 13047.69 5932.93 10165.23
6 4869.00 18969.09 15963.27 7238.95 17404.19
-
7 4869.50 18496.54 18732.82 8750.03 26154.21
8 4870.00 23584.88 21040.71 9867.34 36021.56
9 4870.50 22809.32 23197.10 10975.00 46996.56
-
10 4871.00 24542.82 23676.07 11837.29 58833.85
[DISCHARGE INFORMATION]
Structure Number: 1
— Type: Circular Orifice
Name: Pond 1 - 11" Dia. Orifice
[RESERVOIR STAGE STORAGE/DISCHARGE]
Elevation Stage Area Storage Discharge
(ft) (ft) (sq ft) (cu ft) (cfs)
— 4866.70 0.00 0.00 0.00 0.00
4867.20 0.50 2412.42 402.07 0.88
4867.70 1.00 6759.38 2253.13 2.31
4868.20 1.50 13210.95 6605.47 3.21
-
4868.70 2.00 19591.22 13060.81 3.90
4869.20 2.50 25085.04 20904.20 4.49
4869.70 3.00 30101.15 30101.15 5.01
4870.20 3.50 34638.48 40411.56 5.48
4870.70 4.00 38798.61 51731.47 5.91
Maximum Storage = 58833.85 (cu ft)
Maximum Discharge = 6.16 (cfs)
User Name: Administrator Date: 12-24-05
Project: SHI - Shiloh Estates P.U.D. Time: 06:13:16
Scenario: 100yr Developed Page: 1
OUTLET STRUCTURE REPORT
Structure Number : 1
Type : Circular Orifice
Name : Pond 1 - 11" Dia. Orifice Stage-Discharge Rating
[RATING CURVE LIMIT]
Minimum Elevation = 4866.70 (ft)
Maximum Elevation = 4871.00 (ft)
Elevation Increment = 0.50 (ft)
[OUTLET STRUCTURE INFORMATION]
Diameter = 0.92 (ft)
Orifice Coefficient = 0.59
Invert Elevation = 4866.70 (ft)
Number of Openings = 1
[CIRCULAR ORIFICE EQUATION]
Q = Co*A( (2gh) /k) ^0.5
[DEFINITIONS]
Co = Orifice Coefficient
A = Wetted Area, (cfs)
k = 1
[MAXIMUM DISCHARGE]
Q = 6.16 (cfs)
[ORIFICE STAGE VS. DISCHARGE]
Elevation (ft) Stage (ft) Discharge (cfs)
4866.70 0.00 0.00
4867.20 0.50 0.88
4867.70 1.00 2.31
4868.20 1.50 3.21
4868.70 2.00 3.90
4869.20 2.50 4.49
4869.70 3.00 5.01
4870.00 3.30 5.30
4871.00 4.30 6.16
User Name: Mary Date: 12-26-05
Project: SHI - Shiloh Estates P.U.D. Time: 10:45:37
— Scenario: 100yr Developed Page: 1
RESERVOIR REPORT
Reservoir Number: 2
Name: Detention Pond 1 Stage-Discharge Rating with 18" Dia. Culvert
—
[RATING CURVE LIMIT]
Minimum Elevation = 4866.68 (ft)
Maximum Elevation = 4870.00 (ft)
Elevation Increment = 0.50 (ft)
[STAGE STORAGE INFORMATION]
Storage Method: User-Defined Storage
Input Method: Volume
Number Elevation Area Ave Area Volume Cumulative Volume
- (ft) (sq ft) (sq ft) (cu ft) (Cu ft)
1 4866.70 0.00 0.00 0.00 0.00
2 4867.00 2744.24 1372.12 47.67 47.67
-
3 4867.50 3619.40 3181.82 886.01 933.68
4 4868.00 13137.93 8378.67 3298.63 4232.30
5 4868.50 12957.44 13047.69 5932.93 10165.23
6 4869.00 18969.09 15963.27 7238.95 17404 .19
7 4869.50 18496.54 18732.82 8750.03 26154 .21
8 4870.00 23584.88 21040.71 9867.34 36021.56
9 4870.50 22809.32 23197.10 10975.00 46996.56
10 4871.00 24542.82 23676.07 11837.29 58833.85
[DISCHARGE INFORMATION]
Structure Number: 1
— Type: User-Defined Rating Curve
Name: Pond 1 - 18" Outlet Pipe
[RESERVOIR STAGE STORAGE/DISCHARGE]
Elevation Stage Area Storage Discharge
(ft) (ft) (sq ft) (cu ft) (cfs)
- 4866.68 0.00 0.00 0.00 0.00
4867.18 0.50 2199.77 366.63 1.23
4867.68 1.00 6363.54 2121.18 3.28
4868.18 1.50 12736.31 6368.16 6.23
4868. 68 2.00 19156.88 12771.26 8.85
4869.18 2.50 24665.04 20554.20 10.88
4869.68 3.00 29706.46 29706.46 12.54
-
Maximum Storage = 36021.56 (cu ft)
Maximum Discharge = 13.50 (cfs)
led " 1-�
- CURRENT DATE: 12-26-2005 FILE DATE: 12-26-2005
CURRENT TIME: 10:37:42 FILE NAME: SHI-POND
FHWA CULVERT ANALYSIS MiWkAAAAAAAAAAAAAAAAAMAA
HY-8, VERSION 6.1 AAAAAAAAAAAMAAAAAAAAAAAAA
U _. . .
..... ... . . . ... ... ... . . ......... . . . . . . . ........ .......... . . . . . ...........c
....
3 C 3 SITE DATA 3 CULVERT SHAPE, MATERIAL, INLET 3
3 r' �....... .............. ....... ....... .................. .. .. ........... ................ ... .............
3 L 3 INLET OUTLET CULVERT 3 BARRELS
3 V 3 ELEV. ELEV. LENGTH 3 SHAPE SPAN RISE MANNING INLET 3
3NO. 3 (ft) (ft) (ft) 3 MATERIAL (ft) (ft) n TYPE 3
3 1 34866.68 4866.25 62.67 3 1 HDPE 1.50 1.50 .011 CONVENTIONAL'
3 2 3 3 3
3 3 3 3 3
3 44 3 3 3
3 5 3 3 3
3 6 3 3 3
AKAAAAMAAAAAMAAAAMAAAAAAAAMAAMMAAAAAMMAP
SUMMARY OF CULVERT FLOWS (cfs) FILE: SHI-POND DATE: 12-26-2005
- ELEV (ft) TOTAL 1 2 3 4 5 6 ROADWAY ITR
4867.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1
4867.29 1.5 1.5 0.0 0.0 0.0 0.0 0.0 0.00 1
4867.63 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.00 1
4867.86 4.3 4.3 0.0 0.0 0.0 0.0 0.0 0.00 1
4868.14 6.0 6.0 0.0 0.0 0.0 0.0 0.0 0.00 1
4668.40 7.5 7.5 0.0 0.0 0.0 0.0 0.0 0.00 1
4868.71 9.0 9.0 0.0 0.0 0.0 0.0 0.0 0.00 1
4869.07 10.5 10.5 0.0 0.0 0.0 0.0 0.0 0.00 1
4869.50 12.0 12.0 0.0 0.0 0.0 0.0 0.0 0.00 1
4869.99 13.5 13.5 0.0 0.0 0.0 0.0 0.0 0.00 1
4870.12 15.0 13.9 0.0 0.0 0.0 0.0 0.0 1.03 6
4870.00 13.5 13.5 0.0 0.0 0.0 0.0 0.0 OVERTOPPING
SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: SHI-POND DATE: 12-26-2005
HEAD HEAD TOTAL FLOW % FLOW
— ELEV (ft) ERROR (ft) FLOW (cfs) ERROR (cfs) ERROR
4867.00 0.000 0.00 0.00 0.00
4867.29 0.000 1.50 0.00 0.00
4867.63 0.000 3.00 0.00 0.00
4867.86 0.000 4.29 0.00 0.00
4868.14 0.000 6.00 0.00 0.00
4868.40 0.000 7.50 0.00 0.00
4868.71 0.000 9.00 0.00 0.00
-
4869.07 0.000 10.50 0.00 0.00
4869.50 0.000 12.00 0.00 0.00
4869.99 0.000 13.50 0.00 0.00
4870.12 -0.007 15.00 0.12 0.80
<1> TOLERANCE (ft) = 0.010 <2> TOLERANCE (%) = 1.000
2
CURRENT DATE: 12-26-2005 FILE DATE: 12-26-2005
CURRENT TIME: 10:37:42 FILE NAME: SHI-POND
PERFORMANCE CURVE FOR CULVERT 1 - 1 ( 1.50 (ft) BY 1.50 (ft) ) RCP
DIS- HEAD- INLET OUTLET
CHARGE WATER CONTROL CONTROL FLOW NORMAL CRIT. OUTLET TW OUTLET TW
FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH DEPTH DEPTH VEL. VEL.
(cfs) (ft) (ft) (ft) <F4> (ft) (ft) (ft) (ft) (fps) (fps)
0.00 4867.00 0.00 0.32 0-NF 0.00 0.00 0.00 0.75 0.00 0.00
1.50 4867.29 0.61 0.61 1-S2n 0.38 0.46 0.26 0.75 7.24 0.00
3.00 4867.63 0.95 0.95 1-S2n 0.55 0.65 0.45 0.75 6.63 0.00
4.29 4867.86 1.18 1.18 1-S2n 0.67 0.79 0.59 0.75 6.62 0.00
6.00 4868.14 1.46 1.46 1-S2n 0.82 0.94 0.74 0.75 6.87 0.00
7.50 4868.41 1.72 1.72 5-S2n 0.95 1.06 0.86 0.75 7.16 0.00
9.00 4868.71 2.03 2.03 5-S2n 1.09 1.16 1.06 0.75 6.76 0.00
10.50 4869.07 2.39 2.29 2-M2c 1.27 1.24 1.24 0.75 6.71 0.00
12.00 4869.50 2.82 2.61 2-M2c 1.50 1.31 1.31 0.75 7.37 0.00
13.50 4869.99 3.31 3.03 2-M2c 1.50 1.37 1.37 0.75 7. 94 0.00
13.65 4870.11 3.43 3.13 2-M2c 1.50 1.39 1.39 0.75 8.06 0.00
El. inlet face invert 4866.68 ft El. outlet invert 4866.25 ft
El. inlet throat invert 0.00 ft El. inlet crest 0.00 ft
***** SITE DATA ***** CULVERT INVERT **************
INLET STATION 100.00 ft
INLET ELEVATION 4866.68 ft
OUTLET STATION 162.67 ft
OUTLET ELEVATION 4866.25 ft
NUMBER OF BARRELS 1
SLOPE (V/H) 0.0069
CULVERT LENGTH ALONG SLOPE 62.67 ft
***** CULVERT DATA SUMMARY ************************
BARREL SHAPE CIRCULAR
BARREL DIAMETER 1.50 ft
BARREL MATERIAL CONCRETE
BARREL MANNING'S n 0.011
INLET TYPE CONVENTIONAL
'- INLET EDGE AND WALL SQUARE EDGE WITH HEADWALL
INLET DEPRESSION NONE
r.
3
CURRENT DATE: 12-26-2005 FILE DATE: 12-26-2005
CURRENT TIME: 10:37:42 FILE NAME: SHI-POND
TAILWATER WAMAAAAAAMAAAAAWAAAA
CONSTANT WATER SURFACE ELEVATION
4867.00
AAAAAAAAKAMAAAAAAAAAAAAAA ROADWAY OVERTOPPING DATA AMAAAAAAAAAAAAAAAAAAAAAAA
ROADWAY SURFACE GRAVEL
EMBANKMENT TOP WIDTH 10.00 ft
CREST LENGTH 10.00 ft
OVERTOPPING CREST ELEVATION 4870.00 ft
User Name: Mary Date: 12-26-05
Project: SHI - Shiloh Estates P.U.D. Time: 10:58:12
Scenario: 100yr Developed Page: 1
OUTLET STRUCTURE REPORT
Structure Number : 2
Type : Trapezoidal Weir
Name : Pond 1 - 6' Weir Stage-Discharge Rating
[RATING CURVE LIMIT]
Minimum Elevation = 4870.00 (ft)
Maximum Elevation = 4871.00 (ft)
Elevation Increment = 0.10 (ft)
[OUTLET STRUCTURE INFORMATION]
Crest Length = 6.00 (ft)
Angle of Walls = 151.93
Crest Elevation = 4870.00 (ft)
Weir Coefficient = 3.13
Exponential = 1.50
[TRAPEZOIDAL EQUATION]
Q = Cw * ( L + 0.8H * tan ( ang/2.0 ) ) * H^exp
[DEFINITIONS]
Cw = Weir Coefficient
H = Headwater depth above inlet control section invert
L = Crest lenght
ang = Angle of the walls
[MAXIMUM DISCHARGE]
Q = 28.80 (cfs)
[WEIR STAGE VS. DISCHARGE]
Elevation (ft) Stage (ft) Discharge (cfs)
4870.00 0.00 0.00
4870.10 0.10 0.63
4870.20 0.20 1.86
4870.30 0.30 3.58
4870.40 0.40 5.76
4870.50 0.50 8.41
4870.60 0.60 11.52
4870.70 0.70 15.10
4870.80 0.80 19.17
4870.90 0.90 23.73
4871.00 1.00 28.80 > I /oc7JL
'J1 __0..J
/3-' r,,'../ 0/ = 2..2.LZc ,s.
—
! )
Ill—
/
3 §
% : 0)
C .
?.-
2
Its -c oleo 2o � @ \ 8
` ` ` kt� w
k ) C. oc0
\ } - ao ■
f } e e \ \ 2 $ w
ra *IC I + . 0 _ 1 »
\ 6- z . C J « \ ' k \0j \
\ \ \ % " k � /
$ - %1
$ . 4 a
it
It } �
/
', ` E
r _,
- - - } -)
m;
(
| /
2 I
_-
\ lid /40
•
\ .!II . 04
15
\ .. . » a 31•h.
/
. \ ( ' A
_ HJII
;Z.
)
te
i_
— ( !
\
_ }
_ w v\`
.B B m g O O r4 y o 8 m LLp
YYYY 'B al . m W .-.CI V ij
Y M 1 G w re...
oyOm 4 S• n 90
va :i01 -. .11 m 00 $ p
m f
mepii rlsartk LT; 04
3a Hi'JII e. � 6h�...%E 'Li 4 qs o, 2 �a1
I o 4 p,- gi, it roweled � ,
O. m $ m Ia :9
gia it
O p dw; nn 71f H
�r rev.. o I o
a b b - a
8 Q1'fi$iB !.�
.0a
aa, .5 rd I- ' e r
_ o...E m G en w
i
FI
go
u1
lb
pqe C n 8cqI $8 a° ggmwwww m
O
g a 887 MIelb'8ati$q � 'S o q$ qui
En neon ti•E
- .oq. I ,, c Sfi«^.,9tie8A9wm y a sa a w
U m I.
X76.SlSB33'^.q&.S �' a S n - Sg
—
wriw i W 9 ._+ _
S y
9 m 988Sgag8$`a,S8 34 Sm '? C,,9 '.S
3 m ^ .Q
@ m _g s:saaa$ggti @ _ g14
O .;
P. qg 0 $84-4-q$R'd.'SS.n.S 4, 0 pp m $$
b ��Ah. C qmq .
V q .i. _ :a.. au n Bin
a ««w •9 .: a
g I qr agag� : : :gaSq
� 6.9t ggq88A$Ei$$6$ a E83 00
Ili $.gj "WA oeo~ 1 ;S o VA.... y
g4 t 5 3$$333333333 F c a ®4°e.$ •OHae
f� ! lit
. L Q
$ g '�Awwwwwww aw..n � mw 018 'Yod^-� '7
.o i' 3333$33$$'$3 .� ,o 1i 3$ I
g
Appendix D
1
- CURRENT DATE: 12-26-2005 FILE DATE: 12-26-2005
CURRENT TIME: 10:11:27 FILE NAME: SHI-2
FHWA CULVERT ANALYSIS AAAAAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAMAAAAAAAAAAA HY-8, VERSION 6.1 AAAAAAAAAAAAAAAAAAAAAAAAAA
C 3 SITE DATA 3 CULVERT SHAPE, MATERIAL, INLET 3
3 L ' INLET OUTLET CULVERT 3 BARRELS
3 V 3 ELEV. ELEV. LENGTH 3 SHAPE SPAN RISE MANNING INLET 3
3NO. 3 (ft) (ft) (ft) 3 MATERIAL (ft) (ft) n TYPE 3
3 1 3 70.44 70.03 30.00 3 1 RCP 1.50 1.50 .011 IMPR SDT CIR3
3 2 3 3 3
3 3 3 3 3
3 4 3 3 3
3 5 3 3 3
3 6 3 3 3
AAAAAMAAAAAAAAAAAAAMAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAO
SUMMARY OF CULVERT FLOWS (cfs) FILE: SHI-2 DATE: 12-26-2005
- ELEV (ft) TOTAL 1 2 3 4 5 6 ROADWAY ITR
70.44 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1
70.86 0.9 0.9 0.0 0.0 0.0 0.0 0.0 0.00 1
71.06 1.7 1.7 0.0 0.0 0.0 0.0 0.0 0.00 1
71.08 1.8 (5-YR) 0.0 0.0 0.0 0.0 0.0 0.00 1
71.31 3.4 3.4 0.0 0.0 0.0 0.0 0.0 0.00 1
71.43 4.3 4.3 0.0 0.0 0.0 0.0 0.0 0.00 1
-
71.57 5.2 5.2 0.0 0.0 0.0 0.0 0.0 0.00 1
71.70 6.0 6.0 0.0 0.0 0.0 0.0 0.0 0.00 1
71.83 6.9 6. 9 0.0 0.0 0.0 0.0 0.0 0.00 1
71.96 7.7 7.7 0.0 0.0 0.0 0.0 0.0 0.00 1
72.08 6.6 (100-YR) 0.0 0.0 0.0 0.0 0.0 0.00 1
73.34 15.1 15.1 0.0 0.0 0.0 0.0 0.0 OVERTOPPING
P.7131313S 31ii.t1X 1\71 21 31 31 31 71 31 31 31 31 71 31 21 31AA Af1Y1A7171b$riririX5brili5"h"""XXX""xX""xxxxx---
-
HfiHFi`iH
317SXXXX3171X31X 31riXriX2ilSX X3iXXX31₹i31]SXXXX3171X X2111 3131X lift tiff i52iXaXxxxxxxnxxxxxxxxxx xxx xs,
SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: SHI-2 DATE: 12-26-2005
HEAD HEAD TOTAL FLOW % FLOW
— ELEV (ft) ERROR (ft) FLOW (cfs) ERROR (cfs) ERROR
70.44 0.000 0.00 0.00 0.00
70.86 0.000 0.86 0.00 0.00
71.06 0.000 1.72 0.00 0.00
- 71.08 0.000 1.80 0.00 0.00
71.31 0.000 3.44 0.00 0.00
71.43 0.000 4.30 0.00 0.00
71.57 0.000 5.16 0.00 0.00
71.70 0.000 6.02 0.00 0.00
71.83 0.000 6.88 0.00 0.00
71.96 0.000 7.74 0.00 0.00
72.08 0.000 8.60 0.00 0.00
XXXAAAAAAXXXXXAXXXXXXXXAAAM 71P.JI)1Yi7l Fl MF17171fSp.113171Ti71AAAFSI\7S7S7171}1I1I1X.31AAAAAAAaAM AA
<1> TOLERANCE (ft) = 0.010 <2> TOLERANCE (%) = 1.000
^ XXXXXXXXXtiXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX2131XXXXXXXXX3iXXXhXnfi Xharinhhxh h hhh
2
CURRENT DATE: 12-26-2005 FILE DATE: 12-26-2005
CURRENT TIME: 10:11:27 FILE NAME: SHI-2
PERFORMANCE CURVE FOR CULVERT 1 - 1 ( 1.50 (ft) BY 1.50 (ft) ) RCP
. ....... ... . . ... ...
DIS- HEAD- INLET OUTLET
_ CHARGE WATER CONTROL CONTROL FLOW NORMAL CRIT. OUTLET TW OUTLET TW
FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH DEPTH DEPTH VEL. VEL.
(cfs) (ft) (ft) (ft) <F4> (ft) (ft) (ft) (ft) (fps) (fps)
MAAAMAAAMAAMPIAMIAAAMAAA
. ... ... ............. .............
0.00 70.44 0.00 0.00 0-NF 0.00 0.00 0.00 -0.03 0.00 0.00
0.86 70.86 0.42 0.42 1-S2n 0.25 0.34 0.14 0.36 9.40 1.38
1.72 71.06 0.62 0.62 1-S2n 0.36 0.49 0.29 0.48 7.16 1.64
1.80 71.08 0.64 0.64 1-S2n 0.36 0.50 0.30 0.49 7.14 1.66
3.44 71.31 0.87 0.87 1-S2n 0.51 0.70 0.54 0.63 5.94 1.95
4.30 71.43 0.99 0.99 1-S2n 0.58 0.79 0. 62 0.69 6.27 2.07
5.16 71.57 1.13 1.13 1-S2n 0.64 0.87 0.69 0.74 6.54 2.16
6.02 71.70 1.26 1.26 1-S2n 0.70 0.94 0.74 0.79 6.87 2.25
6.88 71.83 1.39 1.39 1-S2n 0.76 1.01 0.81 0.83 7.07 2.32
7.74 71. 96 1.52 1.52 5-S2n 0.82 1.08 0.87 0.87 7.27 2.39
8.60 72.08 1.64 1.64 5-S2n 0.87 1.13 0.93 0.91 7.49 2.45
AAAAXAAAXXAAAAAA.A AAAXXXXAXXXXAA7iXXAXXtiXXXXXXXXXfl8li MAAA AAAAXAA ... r . . AA
El. inlet face invert 70.44 ft El. outlet invert 70.03 ft
El. inlet throat invert 70.38 ft El. inlet crest 0.00 ft
XXXA3\XA.A.AAXXXA.XXAAA.XAXXXA71XXAXXAXXXXXXX7iXXXXXXXX7.1XX711131X X11711\X7i AAAA7iT+,AA3L7i7iAAAAA
***** SITE DATA ***** CULVERT INVERT **************
INLET STATION 100.00 ft
INLET ELEVATION 70.44 ft
OUTLET STATION 135.33 ft
OUTLET ELEVATION 70.03 ft
NUMBER OF BARRELS 1
SLOPE (V/H) 0.0116
CULVERT LENGTH ALONG SLOPE 30.00 ft
***** CULVERT DATA SUMMARY ************************
BARREL SHAPE CIRCULAR
BARREL DIAMETER 1.50 ft
BARREL MATERIAL CONCRETE
BARREL MANNING'S n 0.011
INLET TYPE IMPR SDT CIRC
INLET EDGE AND WALL BEVELED EDGES (45-90 DEG WINGWALL)
INLET DEPRESSION NONE
***** SIDE-TAPERED CIRCULAR IMPROVED INLET *******
FACE WIDTH 4.17 ft
SIDE TAPER (4:1 TO 6:1) (X:1) 4.00
FACE HEIGHT 1.50 ft
XXAAXXAA3iXXAXXX7i7iXXAXXXAXXXXAXXXAAX.XTiAAXXAA3iAAA3iAAAAAXAAAXA7iXXAA .1,yA3L3L3�3�3LAA3�7�ti3�t1
_ 3
CURRENT DATE: 12-26-2005 FILE DATE: 12-26-2005
CURRENT TIME: 10:11:27 FILE NAME: SHI-2
. . TAILWATER . ... . . ... ... . . . ... ..... . . . ...
******* REGULAR CHANNEL CROSS SECTION ****************
SIDE SLOPE H/V (X:1) 4.0
CHANNEL SLOPE V/H (ft/ft) 0.010
MANNING'S n ( .01-0. 1) 0.035
CHANNEL INVERT ELEVATION 70.00 ft
CULVERT NO.1 OUTLET INVERT ELEVATION 70.03 ft
******* UNIFORM FLOW RATING CURVE FOR DOWNSTREAM CHANNEL
FLOW W.S.E. FROUDE DEPTH VEL. SHEAR
(cfs) (ft) NUMBER (ft) (f/s) (psf)
0.00 70.00 0.000 0.00 0.00 0.00
0.86 70.39 0.387 0.39 1.38 0.24
1.72 70.51 0.405 0.51 1.64 0.31
1.80 70.52 0.406 0.52 1.66 0.31
3.44 70.66 0.422 0.66 1.95 0.40
4.30 70.72 0.428 0.72 2.07 0.43
5.16 70.77 0.433 0.77 2.16 0.46
6.02 70.82 0.438 0.82 2.25 0.49
"- 6.88 70.86 0.441 0.86 2.32 0.51
7.74 70.90 0.444 0.90 2.39 0.54
8.60 70.94 0.447 0.94 2.45 0.56
A7.131$AAAfI}1i1317.1 AA.J1AXJl Jl7SYiA Il3SXTl3lanAIS 31I\�1{.�;j 7if.$..... j.A
ROADWAY OVERTOPPING DATA " " " ' """ ""' '"" """' ""'
71bAAA71AAAAiiuAAAAAA7lA.AA713171A A71AAA717lAAAAA7lA7171AAA1iAiiAAAAAAA3171F1f17l3lAflflA�T�A J�,y�.S p 7�jLj�7�
ROADWAY SURFACE PAVED
EMBANKMENT TOP WIDTH 24.00 ft
CREST LENGTH 100.00 ft
OVERTOPPING CREST ELEVATION 73.34 ft
AAAAAAiitiAAAAA7lAJl71AA.3lAAAA.AAF\AAA7.\AAAiiAAiiA3\AAAAiiAAAA717131AAA71AAA11A713\}S�I�A,j�J�S17�AA_kL�7�}�}�
Drawings
, N,la0 Al :sualmisli 1[ \ \ N
NVId 30VNIVHa OIHOISIH „ ,,„, a �
a,,,, ,,,, _, tal+ im m leaf A
L J Ol d0 NOISINO>Y1S3Fl O 'i��I�� s a } \
Gfl'd S31V183 HO YF18 'MB Nilli9N1ON7lW7 ofOrtlNNOMI Mi�, I: 1- j- I! '
I --
t
m
z o_
o_
3
z
V U 0
z U
o O 0 0-
0
z cc
W W z 0
W W
N In Sig O
(/1 N OK
a
o w� a
3 I c 0
O O z
rc rc F w a
ri o O ₹ F -
1/1 �/1 U O W C Z K
m
p a
U LL'CI O 6 D
z Z � Nisj z o i.ti z ‘Al z i y
E o o 11 3 1 w I a o o O W o
w a w a a a
0- L- II
146
AN Z _C
1 v C
ul
C1 1
1 j I I o-
1 •.
1 . _
I .• -
1 •
0
.`` a-
II / i Q4*.
1 1 1
1 1 1
i / i i 1 1
1 1 \ i
I oCk
S �
1 / i \ 1
0 ,. / 1
, 1
, I[4--- /ill1
f / \\ j ji,,
1 ►- iSI
a
1 E
1
il
' •� �. �` ,�1y 5
/ ,
/ mss--- jr
l ., ' Ni /
%• \
I
n 1 i _ / l V' , i I g:a
C..._RHA
r', �
jjllno ony3s3b"--, uezoaEo �' —
a
1 . V
1
2
r3900 :40 - ""4'"'N '^'
Mild 39VNIVN0 a3dOl3A3U L 101 AO Notsuuaensati
. . . „ O teal
i+ N 1[ fill][5
/ Qf1'd 43311/183 HO1118 'OM Yu99N10Ni MAW 3GVMNNOM, '9n + 1 i t �� I, .
•
m
u_
-. 0
p
i ? U U z Z
O
g g
o rar
F go
ac
3 m p gF FoF Z Z 9 in 1- K
AS �/1 1/1 Z8 _, K Z K
N N N Z
m _ C. N
g g a "' - z (2 g ^o
in in o o
••
3 E a a w a& a o g a o 0_ o w N
•
N— 11
ii r o I _ _
I ♦ , v^
W 0r � a
i ♦♦♦ w I i
1 ♦♦•MI I o-
1 ♦ -
1 IS,
_
1 `♦
I 1 I♦♦al. o O-
1 / ♦
1 / /
/ /
/ / /
I f �/
I 1
/
/ / /
/ / /
/ / /
/ / /
/ E / ,
I / / 1
CID
/
,\
I , / / t
III ______
O ,
/
I
..„....
,.
.„. ,/ i ,
J '
I i'�-- -,�` \ / �' 1 iY
I �V I I ii.1 ��
tr--__'1 In 1 S, 1 �' I Ij il
ZS
: I ‘1v / \.� / II i I N co aR 1I'
n\\ �y0 I I I ri \a R-T.E -110)- -
�`',� �i' \ I I I 7( "�ry ijid6 I I
F � GR ,.i II
k i- I i J )/ N 1 6
r
p I -,- J \ I t'I 11 1 V
li N I j 1
i � � - \p \�
L_-- _-_--1 ��Ii� iii �...\.\\ �,
I k 1- -- f�' a6 1 I 7/81;ggY w'li‘‘.:_ } o' '_ � I 1�3
c
I �� � l g _ 0 0 il g b
• / I
41
Monaas 3a ` .-----li '<••-',--
1
Hello