Loading...
HomeMy WebLinkAbout20062995.tiff INVENTORY OF ITEMS FOR CONSIDERATION Applicant Petro-Canada Resources, Inc. Case Number USR-1570 Submitted or Prepared Prior to At Hearing Hearing �' 1 Staff Comments X �'� Department of Planning Services Field Check Form X � Planning Commissioner Fitzgerald Field Check Form Letter to Applicant X � Affadavit of sign posting X `' Legal Notifications X � 2 Application X � Maps Deed/Easement Certificate v Surrounding Property/Mineral Owners �' Utilities � Surrounding Property Owners `� 3 Referral List X �l Referrals with comment �' 4 Weld County Code Compliance, referral received 7-10-2006 X �• Weld County Department of Building Inspection, referral received 7-11- X 2006 � Weld County Sheriffs Office, referral received 7-27-2006 X \' Weld County Department of Public Works, Stormwater Division, referral X received 7-28-2006 �' Central Weld County Water District, referral received 8-6-2006 X �� Weld County Department of Public Health and Environment, referral X received 8-10-2006 Weld County Department of Public Works, referral received 8-10-2006 X � State of Colorado, Division of Water Resources, referral received 8-11- X 2006 -P6{�cpibits-. I hereby certify that the 4 items identified herein were submitted to ie Dep a ent of Planning Services at or prior to the sch�e uled Planning Commissioners hearing. � G �> Kim Ogle v Plann r EXHIBIT � �_ 2006-2995 Gc52 �/57� __ ����; W��DC. LAND USE APPLICATION COLORADO SUMMARY SHEET Planner: Kim Ogle Case No.: USR-1570 Hearing Date: September 5, 2006 Applicant: Petro-Canada Resources, Inc. c/o Susan Miller 1099 18'" Street, Suite 400 Denver, CO 80202-1904 Agent: Petro-Canada Resources, Inc. c/o Todd Hodges 1269 Cleveland Avenue Loveland, CO 80537 Request: Site Specific Development Permit and Special Review Permit for a Mineral Resource Development Facility including Oil and Gas Support Services and a pre-manufactured office _. building in the (A)Agricultural Zone District. Legal Description: Lot C of RE- 4205; PaR NW4 & Part N2 of Section 18, T4N, R64W of the 6th P.M., Weld County, Colorado Location: South of and adjacent to CR 46; east of and adjacent to CR 49. Size of Parcel: 105 +/_acres POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services'staff has received responses from the following agencies: � Weld County Code Compliance, referral received 7-10-2006 � Weld County Department of Building Inspection, referral received 7-11-2006 � Weld County Sheriff's Office, referral received 7-27-2006 � Weld County Department of Public Works, Stormwater Division, referral received 7-28-2006 � Central Weld County Water District, referral received 8-6-2006 � Weld County Department of Public Health and Environment, referral received 8-10-2006 � Weld County Department of Public Works, referral received 8-10-2006 � State of Colorado, Division of Water Resources, referral received 8-11-2006 The Department of Planning Services'staff has not received responses from the following agencies: � Platte Valley Fire Protection District � Colorado Division of Wildlife EXHIBIT Petro Canada Resources Inc, USR-1570, page 1 � � � West Greeley Soil Conservation District . State of Colorado Oil & Gas Conservation Commission ^ ���� W�`D�. COLORADO SPECIAL REVIEW PERMIT ADMINISTRATIVE REVIEW Planner. Kim Ogle Case No.: USR-1570 Hearing Date: September 5, 2006 Applicant: Petro-Canada Resources, Inc. c/o Susan Miller 1099 18`" Street, Suite 400 Denver, CO 80202-1904 Agent: Petro-Canada Resources, Inc. c/o Todd Hodges 1269 Cleveland Avenue .-- Loveland, CO 80537 Request: Site Specific Development Permit and Special Review Permit for a Mineral Resource Development Facility including Oil and Gas Support Services and a pre-manufactured office building in the (A)Agricultural Zone District. Legal Description: Lot C of RE- 4205; Part NW4 & Part N2 of Section 18, T4N, R64W of the 6th P.M., Weld County, Colorado Location: South of and adjacent to CR 46; east of and adjacent to CR 49. Size of Parcel: 105 +/-acres Parcel Number: 1053-18-200003 THE DEPARTMENT OF PLANNING SERVICES'STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services'staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: �-- A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other Petro Canada Resources Inc, USR-1570, page 2 applicable code provisions or ordinance in effect. Section 22-5-100.A.5 (OG.Policy 1.5. ) states"Oil and gas support facilities decisions which do not rely on geology for locations shall '— be subjected to review...." This proposal is for an office for field personnel,storage of new and used miscellaneous equipment such as pipe, tanks, separators and additional parking of vehicles associated with the office. The proposed facility has been reviewed bythe appropriate referral agencies and it has been determined that the attached Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of the health safety and welfare of the inhabitants of the neighborhood and county. B. Section 23-2-220.A.2 --The proposed use is consistent with the intent of the A (Agricultural) Zone District. Section 233-40.A.2 of the Weld County Code provides for Oil and Gas Support and Service as a Use by Special Review in the A (Agricultural)Zone District. C. Section 23-2-220.A.3 --The uses which will be permitted will be compatible with the existing surrounding land uses. The property is surrounded by agricultural fields in crop production and oil and gas production facilities. USR-1517 for Petro-Canada Resources, Inc., is immediately north of and adjacent to this site, with AmUSR-734 for Action Oil northwest of the site with rural residential properties in the general vicinity. There are ten property owners within 500 hundred feet of this proposed office and outdoor storage facility. Staff has not received any letters or telephone calls from surrounding property owners. D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect,or the adopted Master Plans of affected municipalities. The existing site does not lie within the three mile referral area of any municipality. E. Section 23-2-220.A.5--The application complies with Section 23-5 of the Weld County Code. ^ The existing site is not within a recognized overlay district, including the Geologic Hazard, Flood Hazard. The site is located within the Greeley-Weld Airport Authority overlay district. Per the application materials, Michael Reisman, Airport Manager, indicated that the location does not warrant an Avigation Easement or any other agreements. Effective January 1, 2003, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County Road Impact Program. (Ordinance 2002-11). Effective August 1, 2005, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) F. Section 23-2-220.A.6 -- The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. This proposed facility is located on lands described as fallow agricultural and pasture land, and will not remove prime agricultural lands from production. G. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. ,., The Department of Planning Services'staff recommendation for approval is conditional upon the following: Petro Canada Resources Inc, USR-1570, page 3 1. Prior to Scheduling the Board of County Commissioners Hearing: ''" A. The applicant shall submit a Screening Plan for review and approval by the Department of Planning Services,specifically addressing the visual impacts ofa outdoor storage of new and used miscellaneous equipment such as pipe, tanks, separators and associated equipment and materials. (Department of Planning Services) 2. Prior to recording the plat: A. The plat shall be prepared per Section 23-2-260.D of the Weld County Code. (Department of Planning Services) B. All sheets of the plat shall be labeled USR-1570 (Department of Planning Services) C. The plat shall be amended to delineate the following: 1) The attached Development Standards. (Department of Planning Services) 2) County Road 46 is classified by the County as a local gravel road,which requires 60 feet of right-of-way at full build out.The applicant shall verify the existing right-of-way and the documents creating the right-of-way. If the right-of-way can not be verified, it shall be dedicated. The plat shall delineate the existing right-of-way and the documents which created it. (Department of Planning Services) 3) County Road 49 is classified by the County as a arterial road,which requires 140 feet of right-of-way at full build out. The applicant shall verify the existing right-of-way and the documents creating the right-of-way. If the right-of-way can not be verified, it shall be dedicated. The plat shall delineate the existing right-of-way and the documents which created it. (Department of Planning Services) 4) The access shall be placed in such a location to have adequate sight distance in both directions and not below the crest of a hill or where physical obstructions are present. This access road shall be delineated on the USR Plat. (Department of Public Works) 5) The area utilized for outdoor storage of vehicles, equipment or materials shall be screened from public rights-of-way and all adjacent properties with an opaque fence. The fence location, including all man and vehicular gates shall be delineated on the plat. (Department of Planning Services) 6) The plat shall delineate each parking space,and shall be equipped with wheel guards or curb blocks when necessary to prevent vehicles from extending beyond the boundary of the space and from coming into contact with other vehicles,walls,fences or planting. (Department of Public Works) D. Theapplicantshallsubmitadustabatementplanforreviewandapproval,totheEnvironmental Health Services, Weld County Department of Public Health and Environment. Written evidence of compliance shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) E. The applicant shall contact the Department of Public Works, Stormwater Division to verify any drainage requirements associated with the site. Written evidence of approval /compliance shall be submitted to the Department of Planning Services. (Department of Public Works) r-. F. With relocating the office, the number of vehicles that come to this site and leave in company Petro Canada Resources Inc, USR-1570, page 4 trucks in return and leave again in personal vehicles generate approximately 80 additional vehicle trips. With the existing background traffic, this and the existing background traffic ^ pushes the number over the 200 ADT count, which requires dust abatement. The applicant shall be required to provide adequate dust suppressant chemical (calcium chloride or magnesium chloride) for approximately 300 feet at any residence on CR 46 between CR 49 and the entrance no less than twice a year or more often as determined by the Department of Public Works (Motor Grader Supervisor, Department of Public Works) G. The applicant shall submit two(2)paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. (Department of Planning Services) 3. Upon completion of 1. And 2. above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval.The Mylar plat shall be recorded in the office of the WeldCountyClerkandRecorderbyDepartmentofPlanningServices'Staff. Theplatshallbeprepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within thirty (30) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 4. Prior to the Release of Building Permits: A. A plan review is required for each grading permit. Plans are required to bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. (Department of Building I�spection) B. The office will require and engineered foundation based on a site specific geo-technical report — or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. (Department of Building Inspection) C. If applicable,a Storm Water Discharge Permit shall be submitted to the Colorado Department ofPublicHealthandEnvironmentforreviewandapproval. Evidenceofsuchshallbesubmitted in writing to the Weld County Department of Public Health and Environment. (Department of Public Health and Environment) D. The applicant shall obtain written approval from the Kersey Fire Protection District. Evidence of such shall be submitted in writing to the Weld County Department of Building Inspection. (Department of Building Inspection) 5, Prior to the issuance of a Certificate of Occupancy: A. An individual sewage disposal system is required for the proposed pre-manufactured office building(s) and shall be installed according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) B. The septic systems is required to be designed by a Colorado Registered Professional Engineeraccording to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) 6. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and ^ Recorder. (Department of Planning Services) Petro Canada Resources Inc, USR-7570, page 5 7. The Department of Planning Services respectively requests the surveyor provide a digital copy of this Use by Special Review/. Acceptable CAD formats are.dwg, .dxf, and .dgn (Microstation); acceptable ^ GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4). (Group 6 is not acceptable). This digital file may be sent to maps(rDco.weld.co.us. (Department of Planning Services) 8. In accordance with Weld County Code Ordinance 2005-7 approved June 1, 2005, should the plat not be recorded within the required sixty (60) days from the date of the Board of County Commissioner Resolution was signed a $50.00 recording continuance charge shall be added for each additional 3 month period. (Department of Planning Services) SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Petro-Canada Resources, Inc. USR-1570 1. The Site Specifc Development Permit and Special Review Permitfor a Mineral Resource Development Facility including Oil and Gas Support Services and a pre-manufactured office building in the (A) Agricultural Zone District, as indicated in the application materials on file and subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) �-- 3. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 4. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. (Department of Public Health and Environment) 5. Waste materials shall be handled,stored,and disposed in a manner that controls fugitive dust,fugitive particulate emissions, blowing debris, and other potential nuisance conditions. (Department of Public Health and Environment) 6. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved dust abatement plan at all times (Department of Public Health and Environment) 7. This facility shall adhere to the maximum permissible noise levels allowed in the Industrial Zone as delineated in 25-12-103 C.R.S., as amended. (Department of Public Health and Environment) 8. Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. (Department of Public Health and Environment) r Petro Canada Resources Inc, USR-1570, page 6 9. Adequate hand washing and toilet facilities shall be provided for employees and visitors of the facility. (Department of Public Health and Environment) ,-- 10. The facility shall utilize the existing public water supply. (Central Weld County Water District) (Department of Public Health and Environment) 11. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. (Department of Public Health and Environment) 12. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) 13. Should noxious weeds exist on the property or become established as a result of the proposed development the applicanVlandowner shall be responsible for controlling the noxious weeds, pursuant to Chapter 15, Articles I and II of the Weld County Code. (Department of Public Works) 14. The facility shall comply with the Screening Plan at all times. (Department of Planning Services) 15. Off-street parking spaces including the access drive shall be surfaced with gravel, asphalt, concrete or the equivalent and shall be graded to prevent drainage problems. (Department of Public Works) 16. Each parking space shall be equipped with wheel guards or curb blocks when necessary to prevent vehicles from extending beyond the boundary of the space and from coming into contact with other vehicles, walls, fences or planting. (Department of Public Works) 17. Building permits shall be obtained prior to the any new construction. A building permit is required -- for change of use for any existing buildings. (Department of Building Inspection) 18. A plan review is required for each building for which a building permit is required. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. Provide a Code Analysis Data sheet provided by the Department of Building Inspection with each Building permit application. (Department of Building Inspection) 19. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. Current adopted codes include the 2003 International Building Code; 2003 International Mechanical Code; 2003 International Plumbing Code; 2003 International Fuel Gas Code; 2002 National Electrical Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) 20. Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. (Department of Building Inspection) 21. The number of employees shall be limited to twenty(20) persons, including two persons full time in the on-site offce, as stated in the application materials. (Department of Planning Services) _ 22. The hours of operation shall be limited to Monday through Friday 8 A.M to 5 P.M. as stated in the application materials. (Department of Planning Services) Petro Canada Resources Inc, USR-1570, page 7 23. The historical flow patterns and run-off amounts will be maintained on site in such a manner that "' will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. (Department of Planning Services) 24. The applicant shall coordinate with the Weld County Public Works Department on grading prior to placing the magnesium chloride or calcium chloride to County Road 46. Maintenance will consist of regular grading and magnesium chloride application and/or additional road base to keep the surface smooth and to control dust as directed by the Weld County Public Works Department. (Department of Public Works) 25. Each parking space shall be equipped with wheel guards or curb blocks when necessary to prevent vehicles from extending beyond the boundary of the space and from coming into contact with other vehicles, walls, fences or planting. (Department of Public Works) 26. Effective January 1, 2003, Building Permits issued on the lot will be required to adhere to the fee structure of the County wide Road Impact Fee Program. (Department of Planning Services) 27. Effective August 1, 2005, Building permits issued on the subject site will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) (Department of Planning Services) 28. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Planning Services) 29. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. (Department of Planning Services) � 30. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. (Department of Planning Services) 31. Personnel from Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 32. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. (Department of Planning Services) 33. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. (Department of Planning Services) .-� Petro Canada Resources Inc, USR-1570, page 8 � � a DEPARTMENT OF PLANNING SERVICES SOUTHW EST OFFICE ^ �� � 4209 CR 24.5 LONGMONT, CO 80504 PHONE: (720) 652-4210, Ext. 8730 W����i FAX (720)652-4211 COLORADO July 6, 2006 Petro-Canada Resources (USA) Inc c/o Todd Hodges 1269 N Cleveland Av Loveland CO 80537 Subject: USR-1570- Request for a Site Specific Development Plan and Special Review Permit for a Mineral Resource Development Facility, including Oil and Gas Support and Service, including a pre-manufactured office building in the (A)Agricultural Zone District on a parcel of land described as Lot C of RE-4205, being part of the NW4 and part N2 SW4 of Section 18, T4N, R64W of the 6th P.M., Weld County, Colorado. Dear Applicants: Your application and related materials for the request described above are being processed. I have scheduled a meeting with the Weld County Planning Commission for September 5, 2006, at 1:30 p.m. This meeting will take place in the Hearing Room, Weld County Planning Department, 918 10'" Street, Greeley, Colorado. It is recommended that you and/or ,-a representative be in attendance to answer any questions the Planning Commission members may have. it is the applicanYs responsibility to comply with state statutes regarding notice to mineral estate owners. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant shall provide the Weld County Planning Department with written certification indicating the above requirements have been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway(access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the W eld County Planning Commission. This recommendation will be available twenty-four (24) hours before the scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services' office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concerning this matter, please call. Respectfully, r h �Kimgl Plan� �.� �-- PLANNING COMMISSIONERS' SIGN POSTING CERTIFICATE THE LAST DAY TO POST THE SIGN IS AUGUST 25, 2006 THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT W HICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, KIM OGLE, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE PLANNING COMMISSIONERS HEARING FOR A SITE SPECIFIC DEVELOPMENT PERMIT AND SPECIAL REVIEW PERMIT FOR A MINERAL RESOURCE DEVELOPMENT FACILITY INCLUDING OIL AND GAS SUPPORT SERVICES AND A PRE-MANUFACTURED OFFICE BUILDING IN THE (A) AGRICULTURAL ZONE DISTRICT KIM OGLE Name of Person Posting Sign Signat Person Posting Sign STATE OFCOLORADO ) )ss. COUNTY OF WELD ) The foregoing instrument was subscribed and sworn to me this / day of�������' 2006. WITNESS my hand and offcial seal. WENDI WLOES � � � NOTARY PUBLIC Notary Public ��� .�.-�--1' My Commission Expires: _1'�f��"__ �. � �� � A .PIIBLIC HEARINC CONCERNING �J°`"� � �� TNIS PAQ�PE_RTY WILL BE HELD IIT ��.,°�. ��- � �' - � (i .-�,�:" F.� ..��.K6 � � - q l0 'cE , S^,ke.'-"� . . . p¢GC BT � � . . ... ; . 0N GE� `7 , 2P��a1TJ`��' . . - a��1e�e� �S& � _ . . - 6A.�,ve� a�x-�a'r . eNcaw�'�1FL� . . . . �.�� AEU�f5i �- � CGSf N0. �S� � �io 105+� ACg[S �� ;.�� - F AE INFORMIITION CALL _ _„ : �„;.,. � � . WELD COUNTY OEPIIRTMENT OF � � PLFNNING SERYICES IIT �� �- � -� (970 )353 -6100 ezL 3540 �` t ��-_-r� , �' ' � - � y . . f.M ' - _ � .. . __ .:. ,. rt "�J, WE�� NOTICE W�ro� �� ;; "' , A PUBLIC NEARING CONCERNING , � `� THIS PROPERTY WILL gE NELD qi �� ' � �> , � ' ' ��YtE�s"r '�er � "" J '"� "� � � , UReGI.aY ' � ���, �`�� � � a ox �EPr c, , soo�ar-13o? �1 ;< � � � � ' NGME PE1�OC�1�Woa R65oufr.e5 ..} 1U� � l� Y � USR FfA IN�.7lv�t REEC.+iC &' J�Ir 1 � � I(EQUfSTrb�p,�p�����vK-E p� �'� � � ` � i . ,�' �� N { 7 �... ..FSENO. V9� 1570 ���. ACREt �' ,�� LG�'� ��� ���v. � p� � FOR MOItE IIVr'ORMAiION CFILL �iy�k� �� � � � �R�� � !lIIELID CGUNiY pEPlltiM'Ni OF �" ° b 'll z �f� �.: �q FLA��NINI; 3ERVICES �71' ������ � ��� E� � � ��y� ����11 ,��J���� ( 9701353 � ii100 ei, f. 3540 Ptaf(�� � � ��'��Es7 ����� j � f �f" i � yr �asi,� �i i � 1� �.�� �'� ���I� �f�@ �j ��.�C �B p il � nii �, `+1 e��" ��ae@�la��y;��i� �!��f�����lII����I�������� a� �� +l u� ',";,���� d���81!Y � � � 'r - � _ � � .�� � '�. .� t . A� R✓/� i�_ . . �e�6�� � � � � . � i�,r:�t .�"'�'�� _ ��� ��� � ►. - - e. _�,:�. .,� 4. �, . n_ .� - � � � i . ���-- ��-w �� `���� � --: °�'a-°" � -��-: .- . V' - - - _ � �. ; i� . . � a . 7�._l�A� y:. » w-�;�.� ��--, . `--- - � _ - _ - _ : _ _ _ _ , . . . .. � _ � .j ,�V `� �:�'. ' _ _ _ _ _` `r. � - i Y �. � m 08 / 25 / 2006 ��� ''"'�i�.�. ., �� , - ' ' �, 08/25/200� `R."�' 1 � � �. , I , .t�::�,. � � �� � ;� �� ,�� �;'�,�; ", ' ■ _ *�� - I � � � � �, �,� ���` ' �: �4 ^-- :�. _.� �.. ~- - - � - �. .. ' .f �\ - _. r _ ' � ��� � � � . , r . I`'' . . � �-� . � - ������L�����1�t�1�r �. � . , . T������ � . . :. � ` . � - tii ' � ` .� �! � r . .� �. �.�r� .r� _ - _z�� . � �. - _ - - - - 1 _ � ' ,.., ... 08/25/2006 : . t _ ��6;`� � �s � . ��� .. �w-:.y ' �'p �.���� : �� � � �: � ��.. FIELD CHECK inspection date: August 25, 2006 CASE NUMBER: USR-1570 APPLICANT: Petro-Canada Resources, Inc. c/o Susan Miller 1099 18'" Street, Suite 400 Denver, CO 80202-1904 LEGAL DESCRIPTION: Lot C of RE-4205; Part NW4 & Part N2 of Section 18, T4N, R64W of the 6th P.M., Weld County, Colorado LOCATION: South of and adjacent to CR 46; east of and adjacent to CR 49. N A(Agricultural) N Agricultural/Residential E A(Agricultural) E Agricultural/Residential S A(Agricultural) S Agricultural/Residential W A(AgricWtural) W Agricultural/Residential COMMENTS: Property is off of CR 46 a two land gravel road. The access is near the crest of the hill adjacen to a tank battery. '"` The access into the site is compacted soil and is also an existing oil and gas access road to their facilities. The site slopes north to south and has a slight west to east roll. Presently the site is transitioning to the current permitted uses. The Land Farm .ocated immediately to the North is fenced,gated and is currently under construction. There are numerous oil and gas encumbrances on iste, however,these encumbrances do not appear to affect present or future operations. A tank battery is adjacent to CR 49 at the one-quaRer mile marker to CR 46. CR 49 is a two land arterial road with posted speeds of 65 MH. There are residences in the area,on an east west axis to this facility. The site is vacant for a majority of the property. � �Ki , lanner .-- Hello